GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks,...
Transcript of GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks,...
![Page 1: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including](https://reader033.fdocuments.in/reader033/viewer/2022060313/5f0b59ed7e708231d4301671/html5/thumbnails/1.jpg)
GDOT’s complete Street Policy
![Page 2: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including](https://reader033.fdocuments.in/reader033/viewer/2022060313/5f0b59ed7e708231d4301671/html5/thumbnails/2.jpg)
![Page 3: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including](https://reader033.fdocuments.in/reader033/viewer/2022060313/5f0b59ed7e708231d4301671/html5/thumbnails/3.jpg)
GA 400 & I-285 Interchange: A Design Build Finance Project
12’ paved surface with 2’ unobstructed shoulders (grass) on either side with a chain link fence
Connects Local and Regional multiuse path and provide connectivity thru the interchange
Includes Shared-Use Path: Funded by 400PATH , GDOT & City of Sandy Spring
![Page 4: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including](https://reader033.fdocuments.in/reader033/viewer/2022060313/5f0b59ed7e708231d4301671/html5/thumbnails/4.jpg)
Safe Routes to Schools at Various Locations
Design-Build Project: low cost solution & expedited delivery
![Page 5: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including](https://reader033.fdocuments.in/reader033/viewer/2022060313/5f0b59ed7e708231d4301671/html5/thumbnails/5.jpg)
General Scope Items
• Connect intermittent sidewalks along roadways near schools
• Upgrade wheelchair ramps and pedestrian signals
• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc.
• Widen existing bridge to accommodate a sidewalk
• Including other innovative pavement markings and devices
Solar Powered Signs
Radar Speed Signs
Rectangular Rapid Flashing Beacons
![Page 6: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including](https://reader033.fdocuments.in/reader033/viewer/2022060313/5f0b59ed7e708231d4301671/html5/thumbnails/6.jpg)
Raised Crosswalks / Speed Tables
![Page 7: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including](https://reader033.fdocuments.in/reader033/viewer/2022060313/5f0b59ed7e708231d4301671/html5/thumbnails/7.jpg)
Before Projects:
![Page 8: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including](https://reader033.fdocuments.in/reader033/viewer/2022060313/5f0b59ed7e708231d4301671/html5/thumbnails/8.jpg)
GDOT’s Proposed Solution: Semi Protected 2-Way Cycle Path
![Page 9: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including](https://reader033.fdocuments.in/reader033/viewer/2022060313/5f0b59ed7e708231d4301671/html5/thumbnails/9.jpg)
After public involvement….
![Page 10: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including](https://reader033.fdocuments.in/reader033/viewer/2022060313/5f0b59ed7e708231d4301671/html5/thumbnails/10.jpg)
Atlanta BeltLine Project
![Page 11: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including](https://reader033.fdocuments.in/reader033/viewer/2022060313/5f0b59ed7e708231d4301671/html5/thumbnails/11.jpg)
Atlanta BeltLine Project
The Atlanta BeltLine is:
A planned loop of 22 miles of modern streetcar
33 miles of multi-use trails
2,000 acres of parks
connect 45 intown neighborhoods
Public art
Historic preservation
![Page 12: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including](https://reader033.fdocuments.in/reader033/viewer/2022060313/5f0b59ed7e708231d4301671/html5/thumbnails/12.jpg)
Partnerships that Provide Possibilities