GB 291 English

download GB 291 English

of 16

Transcript of GB 291 English

  • 8/8/2019 GB 291 English

    1/16

    S e i n c l u

    y e n

    l a si n s

    t r u c c i o n

    e s

    e ne s p

    a o l

    Pittsburgh Corning Corporation 3UHVTXH ,VOH 'ULYH

    Pittsburgh, PA 152391-800-624-2120www.pittsburghcorning.com

    All trademarks and registered trademarks in this brochure are owned and

    protected by Pittsburgh Corning Corporation, Pittsburgh, PA 15239

    2006 Pittsburgh Corning Corporation

    3ULQWHG LQ 8 6 $ *% 0 5HY

    ProVantage Glass Block Installation System

    Page 1 of 16

  • 8/8/2019 GB 291 English

    2/16

    Pittsburgh CorningProVantage Glass Block Installation SystemAssembly Instructions

    Introduction:The ProVantage Glass Block Installation System isthe easiest way to install Pittsburgh Corning PremiereSeries (4" thick) Glass Block, and get professionalresults. There are two methods of installation -ProVantage I and ProVantage II. Here is additionalinformation about each method.

    ProVantage I: (page 3) This method is used to install straight walls in

    4-sided openings. In this method, glass block panels are installed in

    perimeter channel. The maximum opening size for exterior panels is

    50 square feet. The maximum opening size for interior panels is

    85 square feet. 7KH MRLQWV RI WKHVH SDQHOV FDQ EH QLVKHG ZLWKProVantage Glass Block Surface Grout orPittsburgh Corning Glass Block Sealant. SealantQLVKLQJ LV QRW UHFRPPHQGHG IRU ZHW HQYLURQPHQWV

    ProVantage II: (page 12) 7KLV PHWKRG LV XVHG WR LQVWDOO VWUDLJKW FXUYHG RUangled walls in 2, 3 or 4 sided openings.

    In this method, glass block panels are secured tothe wall using special wall anchors.

    The maximum opening size for 4 sided exteriorpanels is 50 sq. ft.

    The maximum opening size for interior panelsframed on at least 3 sides is 85 sq. ft.

    Interior panels framed on 2 sides can be amaximum of 60 sq. ft.

    7KH MRLQWV RI WKHVH SDQHOV FDQ EH QLVKHG ZLWKProVantage Glass Block Surface Grout or Pittsburgh&RUQLQJ *ODVV %ORFN 6HDODQW 6HDODQW QLVK FDQ RQO\be used on straight walls in 4-sided openings, and isQRW UHFRPPHQGHG IRU ZHW HQYLURQPHQWV

    1

    Before you begin installing your glass blocks, decide ZKLFK LQVWDOODWLRQ PHWKRG DQG MRLQW QLVK RSWLright for your project.

    The materials required for ProVantage glass block installation are:

    1. Pittsburgh Corning Premiere Series (4" thick)Glass Block

    2. Perimeter Channel (ProVantage I installation only)

    3. ProVantage Glass Block Installation System: Horizontal Spacers Vertical Spacers Anchors (packaged with fasteners and shims

    ProVantage II installation system only) Shaped Spacers (ARQUE , HEDRON ,

    TRIDRON as needed) Pittsburgh Corning Glass Block Sealant ProVantage Glass Block Surface Grout

    JURXW QLVK RQO\

    *URXW 6HDOHU JURXW QLVK RQO\

    [ )ODW +HDG *DOYDQL]HG 6FUHZV(ProVantage I installation only)

    6. White Touch-up Paint(ProVantage I installation only)

    The tools required for the ProVantage glass block installation system are a miter saw or miter box, metalVQLSV KDQG VDZ XWLOLW\ NQLIH VFUHZ JXQ VFUHZGU

    OHYHO VPDOO OHYHO WDSH PHDVXUH FDXON JXQ UPDOOHW UXEEHU JORYHV VSRRQ VKDSHG QLVKLQJ WRR

    )RU *URXW )LQLVKLQJ \RX ZLOO DOVR QHHG D UXEEHU RDbucket, tile/grout sponge, cheesecloth, small paintbrush.

    2

    ProVantage Glass Block Installation System

    Page 2 of 16

  • 8/8/2019 GB 291 English

    3/16

    ProVantage

    I1. Prepare The Opening Or Curb

    A. Make sure the openingis the correct size. UseWKH WDEOH EHORZ WR QG WKH

    correct dimensions for astraight wall with two jambsusing channels.

    ProVantage IPerimeter Channel Construction

    Using 8" High Glass Block

    Rough Opening Width and Height (Inches)

    4"Number of Blocks

    8"

    4-1/48-1/8

    1215-7/819-3/423-5/827-1/231-3/835-1/439-1/8

    4346-7/8

    123456789

    101112

    8-1/416-1/8

    2431-7/839-3/447-5/855-1/263-3/871-1/479-1/8

    8794-7/8

    6"

    6-1/412-1/8

    1823-7/829-3/435-5/841-1/247-3/853-1/459-1/8

    6570-7/8

    Note: Blocks are available in 4" x 8", 6" x 8", and 8" x 8" sizesFor larger panelsadd 3-7/8" for each additional 4" wide block...add 5-7/8" for each additional 6" wide block...add 7-7/8" for each additonal 8" block.

    3

    % 8VH D OHYHO WR PDNH VXUH WKH RSHQLQJ LV OHYHOplumb.

    C. Measure the opening diagonally from cornerto corner in both directions, and compare thedimensions to check for squareness. Thesedimensions should be equal within 1/8".

    Note: If there are any problems with the opening or curb,adjust it before proceeding.

    2. Install Perimeter Channel $ &XW WKH FKDQQHO WR W WKH SHULPHWHU RI WKH R

    The channel ends may be cut straight or mitered.a. If cutting the ends straight:

    Cut the side channels to the height of theopening.

    Cut the top and bottom channels the widthRI WKH RSHQLQJ PLQXV VR WKH\ ZLOO Wbetween the side channels.

    b. If mitering the ends, make all cuts at a 45 angle.

    4

    ProVantage Glass Block Installation System

    Page 3 of 16

  • 8/8/2019 GB 291 English

    4/16

  • 8/8/2019 GB 291 English

    5/16

    C. In the bottom channelapply two beads of sealant the full lengthof the channel a 1/4"in from each side.

    D. Place a glass block in the side channeland slide it into thebottom channel.

    E. Apply four 1/2"diameter dabs of sealant to the side of a block behind theraised edge, 1/2" infrom each corner.

    ) 3UHVV D YHUWLFDOspacer into placenext to the block.

    G. Apply four 1/2"diameter dabsof sealant to theYHUWLFDO VSDFHU in from each corner.

    H. Insert the next block tight against theYHUWLFDO VSDFHU

    I. Continue inserting spacers and blocks in thismanner to complete the row, but do not applysealant to the side of the last installed spacer.Insert the last block in the side channel and slideit into the bottom channel.

    7

    - &KHFN WKH UVW URZ IRU DOLJQPHQW RI VSDFHUVand blocks. Make sure all the blocks are sittingcompletely in the channel and the

    joints are tight.

    K. Apply two 1/4" beads of sealant to the top of therow of blocks just behind the raised edges.

    / 3ODFH D KRUL]RQWDO VSDFHU RQ WRS RI WKH UVW URof blocks. If more than one section of horizontalspacer is required, be sure to lay them end toHQG ZLWK WKH MRLQW GLUHFWO\ DERYH D YHUWLFDOStagger these joints on each following row.

    0 5HPRYH DQ\ H[FHVV VHDODQW ,I QHFHVVDU\ DGMXVWWKH VL]H RI WKH VHDODQW EHDGV WR SUHYHQW VTXHout on the following rows. The joint areas must bekept clean of sealant.

    5 Install TheSecond ThroughNext To Last Row

    A. Line up your second row of glass blocks next to your opening. Apply two1/4" beads of sealant to the top of the blocks, justbehind the raised edges. Always apply sealant tothe block, not the horizontal spacer. These blocks

    ZLOO EH WXUQHG RYHU ZKHQ LQVWDOOHG VR WKH VHD will contact the horizontal spacer.8

    ProVantage Glass Block Installation System

    Page 5 of 16

  • 8/8/2019 GB 291 English

    6/16

    B. Install the second row: Start the row from the opposite end. For

    H[DPSOH LI \RX LQVWDOOHG WKH UVW URZ IURP OHIW WRright, install the second from right to left.

    Install the blocks sealant side down. ,QVWDOO YHUWLFDO VSDFHUV ZLWK VHDODQW DV LOOXVWUDWHGLQ WKH UVW URZ H[FHSW IRU WKH ODVW LQVWDOOHGYHUWLFDO VSDFHU

    C. Install the remaining rows in this manner until youreach the last row. Check each row for alignmentYHUWLFDOO\ DQG KRUL]RQWDOO\

    9

    6. Install The Last Row A. Line up your last row of glass blocks next to your

    opening. Apply two 1/4" beads of sealant to the topof the blocks, just behind the raised edges.

    B. Apply a 1/4" bead of sealant horizontally along thetop inside leg of the half channel at the top of theopening, where the faces of the blocks will contactthe channel.

    C. Slide one block with sealant applied into the right jamb and one block into the left jamb.

    D. Install the remaining blocks in the same manneras before, except do not apply sealant in the lastYHUWLFDO MRLQW ,QVHUW WKH ODVW VSDFHU DIWHUthe last block.

    10

    ProVantage Glass Block Installation System

    Page 6 of 16

  • 8/8/2019 GB 291 English

    7/16

    E. Apply a 1/4" bead of sealant horizontally acrossthe top of the opening 1/2" from the face of theglass blocks. This sealant line will be used tosecure the second half of the top channel.

    F. Apply a 1/4" bead of sealant along the top insideleg of the second half channel.

    G. Slide the half channel into place between theblocks and the top of the opening. If necessary,temporarily apply a piece of tape to the channel tohold it in place until the sealant sets.

    + :DLW KRXUV EHIRUH QLVKLQJ WKH MRLQWV WR DOORZ the sealant to cure.

    11

    ProVantage

    II1. Prepare The Opening Or Curb

    A. Make sure the opening is the correctVL]H 8VH WKH WDEOH EHORZ WR QG WKH

    correct dimensions for a straight wall with two jambs.

    ProVantage IIWall Anchor ConstructionUsing 8" High Glass Block

    Rough Opening Width and Height (Inches)

    4"Number of Blocks

    8"

    4-9/168-1/2

    12-3/816-1/420-1/8

    2427-7/831-3/435-5/839-1/243-3/847-1/4

    123456789

    101112

    8-9/1616-1/224-3/832-1/440-1/8

    4855-7/863-3/471-5/879-1/287-3/895-1/4

    6"

    6-9/1613-1/218-3/824-1/430-1/8

    3641-7/847-3/453-5/859-1/265-3/871-1/4

    Note: Blocks are available in 4" x 8", 6" x 8", and 8" x 8" sizesFor larger panelsadd 3-7/8" for each additional 4" wide block...add 5-7/8" for each additional 6" wide block...add 7-7/8" for each additonal 8" block.

    12

    ProVantage Glass Block Installation System

    Page 7 of 16

  • 8/8/2019 GB 291 English

    8/16

    % )RU ZDOOV ZLWK FXUYHV DQG RU DQJOHV LW LVrecommended that you layout your wall beforeconstructing a curb.

    & 0DNH VXUH WKH FXUYHG DQG RU DQJOHG VHFWLRQV RI \RXU RSHQLQJ RU FXUE DUH FRQJXUHG FRUUHFWO\

    D. The curb must be as wide as, or wider than, theglass block thickness (4" or wider).

    ( $SSO\ QLVK PDWHULDO WR WKH FXUE 7KHFXUE ZLOO EH YLVLEOH WKURXJK WKH JODVVblocks. If installing the glass blocksLQ D ZHW HQYLURQPHQW WDNHstepsto ensure that the curb is

    waterproof.

    ) 8VH D OHYHO WR PDNHsure the opening isOHYHO DQG SOXPE

    G. If your project has 3 or4 sides, measure diagonally from corner to corner

    in both directions and compare the dimensions tocheck for squareness. These dimensions shouldbe equal within 1/8".

    H. If there are any problems with the opening or curb,adjust it before proceeding.

    2. Test Fit The First Row A. Cut horizontal spacers for straight sections of the

    wall.a. For straight walls between two jambs or one

    jamb and a shaped block, cut the horizontalspacer 1/4" shorter than the nominal dimension.

    13

    ANGLE CURVE

    Note: If it is necessary to have a joint in the horizontal VSDFHU WR H[WHQG LW WR W WKH ZLGWK RI WKH VHFWthe joint will align with a vertical spacer. Stagger these jointson each following row.

    b. For straight sections between one jamb and anEndBlock , cut the horizontal spacer 1" shorterthan the nominal dimension.

    c. For straight sections between a shaped block and an EndBlock , cut the horizontal spacer3/4" shorter than the nominal dimension.

    d. For EndBlock , t rimthe end of the spacerWR W WKH VKDSHby cutting the twocorners at a 45 angle3/4" from each corner.

    14

    ProVantage Glass Block Installation System

    Page 8 of 16

  • 8/8/2019 GB 291 English

    9/16

    B. Insert an anchor intothe ends of the horizontalspacers wherethey meet a

    jamb.

    C. Place thespacer in the bottomof the opening, centered in thesection. DO NOT install with screws.

    ' &XUYHG ZDOO VHFWLRQV 5HPRYH WKH EDUEHG WDEV IURP D KDOI $548(

    horizontal spacer. Place the spacer in the bottom of the opening,

    centered under the ARQUE block location.There should be a 1/2" tapered to 1/4" gapbetween straight sections of spacer and theshaped spacer.

    E. 90 angled wall sections: 5HPRYH WKH EDUEHG WDEV IURP D KDOI +('521

    horizontal spacer. Place the spacer in the bottom of the opening,

    centered under the HEDRON block location.There should be a 1/2" gap between straightsections of spacer and the shaped spacer.

    15

    F. 45 angled wall sections: 5HPRYH WKH EDUEHG WDEV IURP D KDOI 75,'521

    horizontal spacer. Place the spacer in the bottom of the opening,

    centered under the TRIDRON block location.There should be a 1/2" gap between straightsections of spacer and the shaped spacer.

    G. Install theUVW URZ RI blocks andYHUWLFDOspacers,starting withD YHUWLFDOspacer in the

    jamb.

    H. There areVSHFLDO YHUWLFDOspacers forshaped blocks.Be sure to insertthese spacersbefore, betweenand aftershaped blocks.

    , 7KH YHUWLFDO VSDFHUV IRU +('521 and TRIDRON

    EORFNV DUH DW WKH VSDFHUV IRU $548( blocksare tapered. The smaller end is placed at the back of the ARQUE EORFN 7KH DSSURSULDWH YHUWLFDOspacers are packaged with the shaped horizontal

    spacers.16

    ProVantage Glass Block Installation System

    Page 9 of 16

  • 8/8/2019 GB 291 English

    10/16

    - ,I \RXU SURMHFW GRHV QRW KDYH D MDPE RQ ERWK HQGVyou may need to temporarily prop a 2 x 4 stud atthe open end of the wall. Make sure the stud isSOXPE 7KLV VWXG ZLOO VHUYH DV D SOXPE SRLQW IRUyou to follow as you set the blocks.

    . &KHFN WKH UVW URZ IRU OHYHO OHQJWKZLVH DQGcrosswise. Make sure the blocks are straight andplumb.

    L. If necessary, insert shims under the horizontalVSDFHUV WR OHYHO WKH URZ 8VH D DW EODGH VFUHZGULYHUto lift the horizontal spacer as you insert shims.

    17

    M.Place a horizontalspacer withanchor insertedinto the ends, onWRS RI WKH UVWrow.

    N. Mark the locationof the anchorV notch on the

    jamb. If your wallhas two jambs, mark the anchor locations on both

    jambs. These marks will be used to draw a plumbline on the jambs.

    2 5HPRYH WKH WRS KRUL]RQWDO VSDFHU EORFNV DQGYHUWLFDO VSDFHUV EHLQJ FDUHIXO QRW WR GLVWXUbottom horizontal spacer or shims.

    P. Trace the outline of the horizontal spacers andmark the shim locations.

    4 8VLQJ D OHYHOdraw a plumbline on the jambsthe height of thepanel, startingin the V notch of the anchor. This

    will be the centerline for all theanchors.

    3. Install The First RowStraight sections:

    A. Apply two 1/4" beads of sealant to the curb, 1/4"inside the traced outline of the horizontal spacers.

    B. Replace shims in the marked locations.

    18

    ProVantage Glass Block Installation System

    Page 10 of 16

  • 8/8/2019 GB 291 English

    11/16

    C. Reinstall thebottom horizontalspacer, withanchor inserted,pressing it downinto the sealant.Do not attachthe anchor withscrews.

    D. Line up the blocksthat will be installed on top of the horizontal spacer.

    Apply two 1/4" beads of sealant across the top of the blocks, just behind the raised edges. TheseEORFNV ZLOO EH WXUQHG RYHU ZKHQ LQVWDOOHG VR WKHsealant beads

    will contactthe bottomhorizontalspacer.

    Alwaysapply thesealant tothe block, notthe horizontal spacer.

    ( ,QVWDOO WKH UVW JODVV EORFN DQG YHUWLFDO VSDFHU $SSO\ IRXU GDEV RI VHDODQW WR D YHUWLFDOspacer, 1/2" from each corner. 3UHVV WKH YHUWLFDO VSDFHU VHDODQW WRZDUGV WKHDQFKRU LQWR SODFH RYHU WKH DQFKRU $SSO\ IRXU GDEV RI VHDODQW WR WKH YHUWLFDOspacer, 1/2" in from each corner. ,QVWDOO WKH UVWblock with thesealant beadsdown on thehorizontal spacer.Push the block UPO\ DJDLQVW WKH

    jamb and base.

    19

    F. Apply four 1/2" dabs of sealant to the side of theSUHYLRXVO\ LQVWDOOHG EORFN LQ IURP HDFK FR3UHVV D YHUWLFDO VSDFHU LQWRplace on the sealant dabs.

    G. Apply four 1/2" dabs of VHDODQW WR WKH YHUWLFDOspacer, 1/2" in from eachcorner. Install the nextblock with the sealantbeads down.

    H. Continue installing blocksDQG YHUWLFDO VSDFHUV LQ WKLV PDQQHU XQWLO \RXthe last slot in the straight section. DO NOT applysealant to the side of the last block that meets a

    jamb or shaped block.

    I. If your project is a straight wall with two jambs,FRPSOHWH WKH UVW URZ E\ LQVHUWLQJ D YHUWLFDOspacer, with no sealant applied, between the lastblock and the jamb.

    - &KHFN WKH UVW URZ IRU OHYHO OHQJWKZLVH DQGcrosswise, and adjust shims as needed.

    K. If your project has shaped blocks, continue with6WHS / WR FRPSOHWH WKH UVW URZ

    20

    ProVantage Glass Block Installation System

    Page 11 of 16

  • 8/8/2019 GB 291 English

    12/16

    HEDRON , TRIDRON and ARQUE blocks:L. Apply four 1/2" dabs of sealant to the side of the

    SUHYLRXVO\ LQVWDOOHG EORFN WKDW IDFHV WKH VKDSHGblock, 1/2" in from each corner.

    0 3UHVV DQ DSSURSULDWH YHUWLFDO VSDFHU LQWR SODFH RQthe side of the block. Remember, there are specialYHUWLFDO VSDFHUV IRU XVH ZLWK VKDSHG EORFNV 7KHYHUWLFDO VSDFHUV DUH SDFNDJHG ZLWK WKH VKDSHGhorizontal spacers for each block.

    N. Apply a 1/4" bead of sealant around the raisedimpression of the shaped, half horizontal spacer,and attach it to the bottom of the shaped block.

    O. Apply a 1/4" bead of sealant around the insideperimeter of the traced outline of the half spacer.

    3 $SSO\ IRXU GDEV RI VHDODQW WR WKH YHUWLFDO VSDFHUfacing the shaped block, 1/2" from each corner.

    21 22

    Q. Install the shapedblock with the half horizontal spacerdown.

    R. Apply four 1/2"dabs of sealantto the side of theshaped block,1/2" from each corner,DQG SUHVV D VSHFLDO YHUWLFDOspacer into place.

    S. Install the remaining horizontal spacers, blocksDQG YHUWLFDO VSDFHUV WR FRPSOHWH WKH UVW UR

    7 0DNH VXUH WKH UVW URZ LV VWUDLJKW SOXPE DQlengthwise and crosswise. Insert or adjust shimsas needed.

    8 ,I \RX KDYH SURSSHG D WHPSRUDU\ [ DW WKH HQGof your project, make sure it is plumb, and theblocks are aligned correctly.

    V. If your project has shaped blocks, assemble theKRUL]RQWDO VSDFHUV WKDW W RQ WRS RI WKH UVWinserting the barbed tabs of the shaped spacersinto the slots in the straight spacers or adjoiningshaped spacers.

    W.Insert ananchorinto theend of thehorizontalspacer

    where itmeets the

    jamb andWHVW W WKHassembledVSDFHUV RQ WRS RI WKH UVW URZ RI EORFNV $GMXVWKRUL]RQWDO VSDFHUV WR W UPO\ RQ WRS RI HDFK EO

    ProVantage Glass Block Installation System

    Page 12 of 16

  • 8/8/2019 GB 291 English

    13/16

    4. Install The Remaining Rows A. Apply two1/4" beads of sealant on topof the straightsections of WKH SUHYLRXVrow of blocks,

    just behindthe raised edges. If your project has shapedblocks, apply a 1/4" bead of sealant around the topSHULPHWHU RI WKH VKDSHG EORFNV LQ WKH SUHYLRXV URZ

    B. Install the horizontal spacers, with anchorsinserted in each end that contacts a jamb, on topRI WKH EORFNV 0DNH VXUH WKH VSDFHUV W UPO\ RQthe glass blocks. Press the spacer down onto thesealant.

    C. Align the Vnotch in theanchor withthe plumbline drawn onthe jamb, andDWWDFK WKH DQFKRU XVLQJ WKH VFUHZV SURYLGHG LQthe anchor pack. If your project has two jambs,be sure to attach theanchors at each end.

    ' 5HPRYH DQ\ H[FHVVsealant from theKRUL]RQWDO DQG YHUWLFDO

    joints. Adjust the size of VHDODQW EHDGV WR SUHYHQWsqueeze out (keep jointarea clean of sealant). Donot change the location of the beads of sealant.

    23

    Straight sections:E. Line up the blocks that will be installed on top of

    the horizontal spacer and apply two 1/4" beads of sealant across the top of the blocks, just behindthe raised edges.

    ) ,QVWDOO WKH JODVV EORFNV DQG YHUWLFDO VSDFHUproject has two jambs, start at the opposite jambDV WKH SUHYLRXV URZ

    $SSO\ IRXU GDEV RI VHDODQW WR D YHUWLFDOspacer, 1/2" from each corner, and press i t intoSODFH RYHU WKH DQFKRU $SSO\ IRXU GDEV RI VHDODQW WR WKH YHUWLFspacer, 1/2" in from each corner.

    Install a block with the sealant beads down on theKRUL]RQWDO VSDFHU SUHVVLQJ LW UPO\ DJDLQVW WKH

    Apply four 1/2" dabs of sealant to the side of theEORFN IURP HDFK FRUQHU DQG SUHVV D YHUWLspacer into place.

    * &RQWLQXH LQVWDOOLQJ EORFNV DQG YHUWLFDO VSDin this manner until you reach the last slot in thestraight section. Do not apply sealant to the sideof the last block. This is the side of the block thatmeets the jamb or shaped block. If your projecthas shaped blocks, skip to Step M.

    Straight walls with 2 jambs:+ &RPSOHWH WKH URZ E\ LQVHUWLQJ D YHUWLFDO VSDF

    with no sealant applied, between the last block andthe jamb.

    , &KHFN WKH URZ IRU OHYHO OHQJWKZLVH DQG FURVVZand adjust, as needed. Repeat Steps 4A - 4H to

    install the remaining rows.24

    ProVantage Glass Block Installation System

    Page 13 of 16

  • 8/8/2019 GB 291 English

    14/16

    - 2QFH \RX KDYH LQVWDOOHG WKH WRS URZ LQVHUWa horizontal spacerbetween thetop of theblocks andthe framedopening,if spacepermits.

    K. Check the wall for straight and plumb one moretime. If necessary, use a rubber mallet to gentlytap the wall into alignment.

    / /HW WKH VHDODQW GU\ RYHUQLJKW EHIRUH QLVKLQJ WKH joints.

    HEDRON , TRIDRON and ARQUE blocks:M.Apply four

    1/2" dabsof sealantto theside of theSUHYLRXVO\installedblock, 1/2"from eachcorner.

    1 3UHVV D VSHFLDO YHUWLFDO VSDFHU LQWR SODFH RQ WKHside of the block. Remember, there are specialYHUWLFDO VSDFHUV IRU XVH ZLWK VKDSHG EORFNV

    O. Apply four 1/2" dabs of sealant to the specialYHUWLFDO VSDFHU

    25

    P. Apply a 1/4" beadof sealant aroundthe top perimeterof the shapedblock and installit sealant sidedown on top of thespacer.

    Q. If another shaped block is next, install it in thesame manner.

    R. Install theremainingblocks andYHUWLFDOspacers inthe row. Makesure youinsert specialYHUWLFDO VSDFHUVbefore, between and aftershaped blocks.

    6 0DNH VXUH WKH URZ LV VWUDLJKW SOXPE DQG OHYlengthwise and crosswise. Adjust shims as needed.

    7 ,I \RX KDYH SURSSHG D WHPSRUDU\ [ DW WKH HQGof your wall, make sure it is plumb, and the blocksare aligned correctly.

    U. Install the remaining rows in the same manner.

    V. Once all components are installed, check the wallIRU VWUDLJKW SOXPE DQG OHYHO RQH PRUH WLPH ,I necessary, use a rubber mallet to gently tap the

    wall into alignment.

    : /HW WKH VHDODQW GU\ RYHUQLJKW EHIRUH QLVKLQJ W joints.

    X. After the sealant is dry, use long nose pliers toUHPRYH VKLPV DQG OO WKH VSDFHV ZLWK VHDODQW

    26

    ProVantage Glass Block Installation System

    Page 14 of 16

  • 8/8/2019 GB 291 English

    15/16

    Grout FinishingIMPORTANT: The ProVantage Surface Grout was designed andtested for this application - DO NOTSUBSTITUTE!

    CAUTION: Avoid contact with skin.Safety glasses and impervious gloves arerecommended to minimize skin and eye contact.

    'R QRW QLVK WKH MRLQWV XQWLO VHDODQW KDV FXUHG IRU hours. If you installed a temporary 2 x 4 stud at theRSHQ HQG RI \RXU SURMHFW UHPRYH LW EHIRUH QLVKLQJthe joints.

    $ 5HPRYH DQ\ VHDODQW VTXHH]HG RXW IURP WKH MRLQWV with a utility knife.

    B. Mix a half bag of grout according to the directions onthe bucket. This will grout approximately 40 blocks.

    C. Let the mixture set for 5-10 minutes after mixing.

    ' 6SUHDG WKH JURXW XVLQJ D UXEEHU RDW SUHVVLQJ WKHgrout into the joints. Be sure to push grout in frommultiple directions to ensure the joints are fullySDFNHG %H FDUHIXO QRW WR PRYH WKH JODVV EORFNV ZKLOH DSSO\LQJ JURXW 7KH ZDOO ZLOO EH D ELW H[LEOHuntil the grout has cured.

    E. Use a damp tile sponge and clean water to wipeoff excess grout. Wipe in multiple directions,GLDJRQDOO\ DFURVV WKH EORFNV WR SUHYHQW UHPRYLQJgrout from the joints. Rinse the sponge frequently.

    27

    F. Let the grout set for 15 minutes, then wipe it againusing clean water.

    G. Let the grout cure for 4 hours, then useFKHHVHFORWK WR SROLVK DQ\ OP RII WKH EORFNV

    H. Apply sealer to the grout lines with a paint brush. Immediately wipe sealer off glass surfaces toSUHYHQW LW IURP DGKHULQJ WR WKHglass.

    , $SSO\ D VHFRQG FRDW RI VHDOHU RQFH WKH UVW FRDdry.

    J. After the grout has cured for 72 hours, caulk allperimeter joints with a bead of sealant.

    Sealant FinishingIMPORTANT: Not recommended for showerapplications.

    CAUTION: Avoid contact with skin. Safety glassesand impervious gloves are recommended toPLQLPL]H VNLQ DQG H\H FRQWDFW 3URYLGH VXIFLHQWmechanical ventilation.

    'R QRW QLVK WKH MRLQWV XQWLO VHDODQW KDV FXUHG24 hours. If you installed a temporary 2 x 4 stud at theRSHQ HQG RI \RXU SURMHFW UHPRYH LW EHIRUH QLVKLQthe joints.

    Note: If you are installing blocks in a moist environment or LI \RXU ZDOO LV QRW IUDPHG RQ DOO IRXU VLGHV JURXWrecommended.

    $ 5HPRYH DQ\ VHDODQW VTXHH]HG RXW IURP WKH MRLQ with a utility knife.

    B. Open the sealant as instructed on the tube.&RYHUDJH UDWH LV RQH WXEH SHU EORFNV 'R QRWseal more joints than you can tool in 15 minutes.

    28

    ProVantage Glass Block Installation System

    Page 15 of 16

  • 8/8/2019 GB 291 English

    16/16

    & 6HDO WKH KRUL]RQWDO MRLQWV UVW E\ SODFLQJ WKH QR]]OHof the tube in the joint at the perimeter on a 45angle. Pull the tube along the joint while laying aEHDG RI VHDODQW 6OLJKWO\ RYHUOO WKH MRLQWV

    ' 3XVK WKH VSRRQ VKDSHG QLVKLQJ WRRO RYHU WKH joints at a 45 angle to collect the excess sealantand seal the joint. Periodically wipe the sealantIURP WKH QLVKLQJ WRRO

    ( 6HDO WKH YHUWLFDO MRLQWV LQ WKH VDPH PDQQHUCarefully work the joint intersections to create aVPRRWK QLVK

    F. Let the sealant cure for 48 hours before puttingany stress on the panel.

    G. Seal the perimeter joints with sealant.

    Maintenance

    An important part of the functional beauty of Pittsburgh Corning Glass Block products is that theyDUH YLUWXDOO\ PDLQWHQDQFH IUHH 7KHUHV QRWKLQJ WR URWrust, peel or paint. All that is needed is an occasional

    wiping with a damp, soft cloth on interior panels ora hosing on exterior panels, With minimal attention,your Pittsburgh Corning Glass Block will remainVSDUNOLQJ DQG EHDXWLIXO IRU \HDUV

    If you need assistanceWe hope these instructions are clear and answeryour questions about the installation of PittsburghCorning Premiere Series Glass Blocks and FinishingUnits with the ProVantage Glass Block Installation

    29

    System. For additional information on Pittsburgh&RUQLQJ *ODVV %ORFN YLVLW RXU ZHEVLWH DWwww.pittsburghcorning.com or call 1-800-624-2120.

    The information contained herein is accurateand reliable to the best of our knowledge. But,EHFDXVH 3LWWVEXUJK &RUQLQJ KDV QR FRQWURO RYHUinstallation, workmanship, accessory materials, orconditions of application NO REPRESENTATIONOR WARRANTY, EXPRESSED OR IMPLIED,EITHER AS TO MERCHANTABILITY OR FITNESSFOR A PARTICULAR PURPOSE, IS MADE asto the performance or results of an installationcontaining the products which extends beyond thedescription on the face hereof and ANY AND ALLLIABILITY FOR NEGLIGENCE , STRICT LIABILITYOR ANY OTHER THEORY OF TORT LIABILITY ISEXPRESSLY DISCL AIMED.

    If the products otherwise fail to conform to therepresentations made herein, through no fault of WKH EX\HU EX\HUV H[FOXVLYH UHPHG\ DW 3LWWVEXUJKCornings option, is the repair or replacement, of thenonconforming products or return of the purchaseprice paid by purchaser. If replacement is elected,Pittsburgh Corning will not be responsible forLQVWDOODWLRQ RU ODERU FRVWV ,Q QR HYHQW VKDOO Corning be responsible or liable for any incidental,VSHFLDO FRQVHTXHQWLDO RU SXQLWLYH GDPDJHV ZKLFKmight result from product failure, regardless of thetheory of liability upon which any such damages areclaimed.

    3LWWVEXUJK &RUQLQJ &RUSRUDWLRQ SURYLGHV ZULWWH warranties for many of its products, and such ZDUUDQWLHV WDNH SUHFHGHQFH RYHU WKH VWDWHPHQcontained herein. You may obtain a copy of the

    warranty for this product by contacting PittsburghCorning.