GB-0980019-web

2
LS* O* Ø* H* W* LS* O* H* D* LS* O* 50 mm 50 mm 50 mm Inlet option A Inlet option B Inlet option C 6 Take the KE-Interior duct out of the mounting bracket and lift the bracket up against the celing (left sitting above KE-Interi- or duct). 8 Unzip socket/zip below air inlet. Mount air inlet socket onto supply spigot with clamp and tighten clamp. Zip up socket/zip.... 9 ...and the KE-Interior duct system is ready. 7 Feed the material bulb ends into the chan- nel opening and then push the last part of the textile duct towards the end section. Ensure that the duct is taut from end to end and tighten tautness screws as in step 5 . When taking down the duct for cleaning etc. the steps 4 to 8 should be followed in reverse order. LS = Length of socket O = Offset W = Width Ø = Inlet diameter H = Height D = Interior duct diameter *See further sizing details on enclosed project drawings, if any, and also see deli- very note (packing list) and read off position description. D-Lite Alu General rules Please find Information on delivery and installa- tion in the box labelled INFO. Room reference Suspension type Delivery Note KE-------- #Office 1 ---------- ---------- D-Lite Alu Alu-rails labelled with a saw symbol do not require further trimming. 0980019-GB

description

When taking down the duct for cleaning etc. the steps 4 to 8 should be followed in reverse order. *See further sizing details on enclosed project drawings, if any, and also see deli- very note (packing list) and read off position description. Please find Information on delivery and installa- tion in the box labelled INFO. Delivery Note Room reference Suspension type inlet socket onto supply spigot with clamp and tighten clamp. Zip up socket/zip.... Inlet option C Inlet option B Inlet option A

Transcript of GB-0980019-web

Page 1: GB-0980019-web

LS*

O*

Ø*

H*W*

LS*

O*H*

D*

LS*

O*

50mm

50mm

50mm

Inlet option A

Inlet option B

Inlet option C

6 Take the KE-Interior duct out of the mounting bracket and lift the bracket up against the celing (left sitting above KE-Interi-or duct).

8 Unzip socket/zip below air inlet. Mount air inlet socket onto supply spigot with clamp and tighten clamp. Zip up socket/zip....

9 ...and the KE-Interior duct system is ready.

7 Feed the material bulb ends into the chan-nel opening and then push the last part of the textile duct towards the end section. Ensure that the duct is taut from end to end and tighten tautness screws as in step 5 .

When taking down the duct for cleaning etc. the steps 4 to 8 should be followed in reverse order.

LS = Length of socketO = OffsetW = WidthØ = Inlet diameterH = HeightD = Interior duct diameter

*See further sizing details on enclosed project drawings, if any, and also see deli-very note (packing list) and read off position description.

D-Lite AluGeneral rules

Please find Information on delivery and installa-tion in the box labelled INFO.

Room reference

Suspension type

Delivery NoteKE--------#Office 1--------------------D-Lite Alu

Alu-rails labelled with a saw symbol do not require further trimming.

0980019-GB

Page 2: GB-0980019-web

A

01/2017

max. 500 mm 500-1200 mmmax. 50 mm

D + 11 mm

500 m

m

250 mm

50 m

m

Begin by comparing the contents of the box against the delivery

note (packing list).

Not included: Screws for ceil-ing suspension (every 500-1200 mm).

You will need: Cordless drill/driver, measuring tape, 3 mm

Allen key, and rubber hammer.

The D-Lite Starter Kit contains all the parts needed for both duct ends; which includes 1 Off mounting bracket.

2 End section 1 with mounting bracket is screwed onto the ceiling, positioned in accordance to the location of air inlet socket (measurement A). Screw 1 should be placed max. 40 mm from the end.

4 From the box feed the KE-Interior duct over the mounting bracket and then feed both textile bulbs into the channel openings of the start rails. Take care that the textile bulbs are fed equally at the same time into the D-Lite Alu rails.

5 Pull/push the KE-Interior duct along the rails until reaching the end section 2. Make sure that the textile bulb is taut up to the end section and tighten the 2 tautness screws (using 3 mm Allen key).

3 Further rails are mounted by means of the joining pins (apply rubber hammer). Place screw 2 max. 500 mm from screw 1 and then every 500-1200 mm depending on ceiling type. Complete by mounting end section 2.

Channel opening for mounting of textile bulb ------------------------

Channel for joining pinsand end screws ----------------------

Channel for bulb of duct---------------

This side against ceiling-----------------------------(for clarity the rail is shown here upside down)

1 End sections and mounting bracket should be assembled prior to mounting on ceiling.

Further rails (standard 2500 mm)

Starter Kit contains:Joining pins (12)Start rails (4)Tautness screws (4)Mounting bracket (1)

Screws for mountingbracket (2)

End sections (2)End screws (8)

--------------------------------Groove formounting bracket

-----------------Channel for joining pins and end screws------------Groove for guidance of mounting

screws (self-tappers)

min. 20 mm to wall

End section 1500 mm

End section 2500 mm