Gauteng Freeway Improvement Project and
Open Road Tolling
Alex van Niekerk
![Page 2: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/2.jpg)
SANRAL Network
![Page 3: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/3.jpg)
Network Type
Description Non-Toll State Toll PPP(BOT) Total
Dual
Carriageway
610 520 443 1,573
4-Lane
Undivided
11 299 240 550
2-Lane
Single
12,429 1,013 605 14,047
Total 13,050 1,832 1,288 16,170
% of SANRAL Network 81% 11% 8%
![Page 4: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/4.jpg)
Background Gauteng – Economic hub of SA – 38% of GDP
Congestion as a result of traffic growth linked to economic growth
When evaluating feasibility, current situation, as well as future situation considered – “what if not?” 1978
![Page 5: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/5.jpg)
Effect of Congestion on Economic Prosperity of
the Province – Gauteng Province Report (2004)
Potential loss in value added in Gauteng alone could amount to R155 billion over the period 2004 to 2025
Certain development nodes may not reach their full potential as a result of inadequate road access
Every Billion spend – R300m backflow Source: Gautrans Report (Roelof Botha)
![Page 6: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/6.jpg)
Economic Benefit
The Business School of the UCT performed an macro economic impact study for the GFIP
GFIP:
• B/C over 8:1
• IRR: Over 50%
![Page 7: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/7.jpg)
Approval Processes
Approached Minister of Transport 2005 –project proposal
Inter governmental (all spheres) workgroup agreed project principles
EIA approval was obtained
Cabinet approval – mid 2007
Intent to toll process – October 2007
Declared as a toll road – January 2008
Procurement of contracts commenced thereafter
![Page 8: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/8.jpg)
Project Extent:PLANNED LANE ADDITIONS:185 km (2010)
FUTURE UPGRADES:(223 KM)
PLANNED NEW ROUTES:158 km
FINAL SCHEME:561 KM
![Page 9: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/9.jpg)
Road Improvements• In general, freeways are upgraded to 4 lanes per direction
• Some sections, up to 6 lanes per direction
• Interchanges are improved:
7 Systems Interchanges (additional lanes, directional ramps)
27 Access Interchanges (Additional bridges, single points, ramp
Additions, lane additions)
• Auxiliary lanes at on- and off-ramps
• Cross road improvements
• Median lighting is provided
![Page 10: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/10.jpg)
N1: Maraisburg Interchange
![Page 11: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/11.jpg)
N1: MALIBONGWE INTERCHANGE
![Page 12: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/12.jpg)
N1: WILLIAM NICOL INTERCHANGE
![Page 13: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/13.jpg)
N1: RIVONIA ROAD INTERCHANGE :
![Page 14: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/14.jpg)
N1: Allandale Interchange
![Page 15: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/15.jpg)
N1: Rooihuiskraal Interchange
![Page 16: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/16.jpg)
N1/R21 Interchange
![Page 17: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/17.jpg)
Rigel Interchange
![Page 18: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/18.jpg)
N1: Garstfontein Interchange
![Page 19: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/19.jpg)
N1: Atterbury Interchange
![Page 20: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/20.jpg)
N1: Lynnwood Interchange
![Page 21: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/21.jpg)
N3: Gilloolys Interchange
![Page 22: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/22.jpg)
N3: Linksfield Interchange
![Page 23: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/23.jpg)
N3/N12 Elands InterchangeN3: Elands Interchange
![Page 24: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/24.jpg)
N3: Grey Ave. InterchangeN3: Grey Ave. Interchange
![Page 25: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/25.jpg)
N12: Reading Interchange
![Page 26: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/26.jpg)
R21: Benoni Interchange
![Page 27: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/27.jpg)
Structures – Package D1Incremental launch bridge
![Page 28: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/28.jpg)
Allandale Interchange
![Page 29: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/29.jpg)
Beam Placement Garstfontein
Demolish Atterbury Bridge
![Page 30: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/30.jpg)
Median Works
110 t beam –William Nicol Interchange
![Page 31: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/31.jpg)
William Nicol Now
![Page 32: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/32.jpg)
Project Progress
Construction commenced: June 08
SANRAL awarded road construction tenders to the amount of R15 b (excl)
ITS for network completed185 km of network under construction – concludes Phase 1 of GFIP
Managed to reach almost all milestones for the 2010 World Cup – in some instances, milestones were exceeded
![Page 33: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/33.jpg)
Project Progress
For World Cup – approximately 80% of road works complete
Road construction commenced –various completion dates from end 2010 to mid 2011
Toll infrastructure under construction – completion end 2010
Toll system under development – toll commencement April/May 2011
![Page 34: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/34.jpg)
Open Road Tolling
![Page 35: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/35.jpg)
Open Road Tolling (ORT)
In urban environment (space constraint), high traffic volumes (100 000 to 200 000 AADT), conventional tolling not an option
ORT:• All transactions recorded electronically
Number plates or tag
• Vehicle linked to an account
• No physical toll plazas – free flow tolling
![Page 36: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/36.jpg)
SANRAL principles for ORT
One tag standard
One account – may include various vehicles
Central clearing
Full interoperability
![Page 37: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/37.jpg)
ORT - GeneralSANRAL model:TCH & VPC – National SANRAL initiative:Central clearing with all current and future concessions Clearing with CTROMIntegration of Natis and AARTOUtilising special enforcement unit to do violation processing & enforcement
![Page 38: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/38.jpg)
ORT Building Blocks Consist of following:Toll tag
Kiosks/Mobile Kiosks
Satelite Centres
Technical Shelters and Gantries (Toll Point)
Communications Backbone
Central Operations Centre (ORT Back Office, TCH, VPC, ITS
Disaster Recovery Centre
Toll Signage
User Services
![Page 39: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/39.jpg)
Electronic tag
•Tag:
• Standard: 5.8 GHz
• Also known as transponder
or On Board Unit (OBU)
• SANRAL pre-qualified 3
suppliers
![Page 40: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/40.jpg)
Kiosks
At shopping centres:
• Account registration
• Tag problems
• Account queries
![Page 41: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/41.jpg)
ORT – Customer Service
Centres
![Page 42: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/42.jpg)
Assumptions
12 mins at ave of
80km/h = 16km
Turnaround only
possible at next
interchange
Satellite
Centre
Coverage @
12 min
reach
![Page 43: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/43.jpg)
Technical Shelters & Gantries
![Page 44: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/44.jpg)
TOLLING POINT GANTRIES
![Page 45: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/45.jpg)
Communications Backbone
SANRAL Provides: Fibre Optic Backbone
Combination of existing ITS fibre and fibre to be installed
in median
Coms DBO tender: Two tender options:
Provide infrastructure and services – normal payment
DBO contractor allowed to use it commercially –
SANRAL should share in benefit
Contractor: Backup/emergency coms
![Page 46: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/46.jpg)
ORT – Central Operations Centre
ORT Back Office
Transaction Clearing House (TCH)
Violations Processing Centre (VPC)
New ITS ops centre
![Page 47: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/47.jpg)
ORT – Back Office
Receives Transactions from RSS
Apply discounts
Do manual NPR if ANPR failed for non e-Tag transactions
Optimise completeness and compliancy of transaction, before forwarding to the TCH
![Page 48: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/48.jpg)
ORT - TCH Receive transactions from the ORT
operator
TCH links transaction to an account
Does financial clearing
If not successful – forward to VPC
Do account management – call centre
Manage tag logistics – issues the tag to all ETC projects/Retail outlets
![Page 49: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/49.jpg)
Setting Up an Account
Users required to register or set up account:
• Do it at point of presence (kiosk/customer centre)
• Through the internet
• Contacting a call centre
• Tag in a bag
![Page 50: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/50.jpg)
Account Types
Register a:
• Pre paid account (similar to cell prepaid)
Low balance warning
Automatic top up
• Guaranteed post paid
Linked to credit card
Transactions rolled up on daily basis – single transaction on credit card
![Page 51: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/51.jpg)
Account Types (cont.)
Top up of pre-paid account:
• EFT (internet)
• At POP
• At ATM
• By means of debit order
• Etcetera
![Page 52: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/52.jpg)
ORT – Violation Processing
Potential violator identified if:No tag or account
Insufficient funds in account
Vehicle not identifiable
Transaction forwarded to VPC:Send invoice
Not successful – Infringement notice – note, must be peace officers and should be appointed by SANRAL
Not paid – Courtesy letter (RTMC)
Not paid – Enforcement order
![Page 53: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/53.jpg)
Violation Enforcement
Enforcement Unit (traffic officers together with ORT contractor) to be set up to do violation enforcement
Not only toll enforcement but also traffic violations & incident response
![Page 54: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/54.jpg)
Enforcement Unit
A dedicated Enforcement Unit of ±260 Traffic
Officers undergoing training (appointed in conjunction with the RTMC)
Two specialised units are envisaged:
Patrolling Unit (toll enforcement / incident response)
“Road Block” Unit
Patrol vehicles (MPV) and Mobile Payment Stations (MPS) are in prototype phase
MPS Midi’s – 3 workstations, MPS Maxi’s – 4 workstations)
![Page 55: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/55.jpg)
Enforcement Unit
Create a safe environment for Road Users
Secure the infrastructure
Assist with incidents on the freeway
Create an awareness and deterrent effect for non-payment of tolls
Enforcing all Traffic Infringements and Offences
Tracking Vehicles of Special Interest (VOSI)
![Page 56: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/56.jpg)
Patrolling Unit Strategy
The Enforcement Unit will patrol the route 24 hours per day
24 MPV are being procured
MPV’s will patrol +/- 20 km stretches of road with 2 vehicles per shift
![Page 57: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/57.jpg)
Patrol Vehicles
![Page 58: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/58.jpg)
Road Block Unit Strategy
The Enforcement Unit will perform road blocks for 2 shifts per day
Road Blocks at on-ramps, X-roads & technical shelters
20 MPS to be procured
![Page 59: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/59.jpg)
Mobile Pay Stations (Midis)
![Page 60: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/60.jpg)
Mobile Pay Stations (Maxis)
![Page 61: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William](https://reader031.fdocuments.in/reader031/viewer/2022022016/5b5dd2147f8b9a415d8b48fd/html5/thumbnails/61.jpg)
Thank You