Gate terminal - LNG...15,000 m³ LNG/hr •Vessel capacity up to Q-max: 265,000 m³ LNG •3 LNG...

9
Gate terminal Welcome Copyright © 2013 Gate terminal

Transcript of Gate terminal - LNG...15,000 m³ LNG/hr •Vessel capacity up to Q-max: 265,000 m³ LNG •3 LNG...

  • Gate terminalWelcome

    Copyright © 2013 Gate terminal

  • Overview of Gate terminal

    Layout

    36”12”24”

    Recondensor

    HP pumps

    Open rack vaporizers

  • LNG Full containment tank

    Cross section LNG storage tank

    Copyright © 2013 Gate terminal

    LNG

    Roof nozzles only

    Pump columns

    Foam-glassbottom insulation

    Reinforced concrete base slab

    Suspended ceiling withthermal insulation

    Free-standing9% inner tank

    Annular space withperlite Thermal

    insulation

    Reinforced concrete roof

    Pre-stressedconcrete wall

  • Truck loading

    Copyright © 2013 Gate terminal

    Trucks at loading dock LNG Truck

  • Gate terminal

    Legenda

    ▪ Warm water Link E-ON

    ▪ Terminal Process Area

    ▪ LNG Tanks

    ▪ LNG Channel & Jetty construction.

    Copyright © 2013 Gate terminal

    Main elements of Gate terminal

  • Key components Gate terminal

    Copyright © 2013 Gate terminal

    LNG Jetty Unloading lines and vapour return ‘Full-containment’, LNG Storage tank Seawater ‘open-rack vaporisers’

    LNG

    A

    B

    D

    A B D

    C

    C

  • Process Overview

    Process

    • Re-gassification capacity: 12 BCM of gas per year

    • 2 jetties, max unloading rate: 15,000 m³ LNG/hr

    • Vessel capacity up to Q-max: 265,000 m³ LNG

    • 3 LNG tanks of each:180,000 m³ LNG net

    • Send-out capacity:1.7 mln. m³(n)/hr of gas

    • Warm water link with EON forre-gassification:60,000 m³ warm water/hr.

    Copyright © 2013 Gate terminal

    Technical process view of Gate terminal

    BOG

    Storage

    Pump 50-250 mbarg

    Kickback

    K.O.

    Flare/vent

    K.O.

    LP LNG

    BOG CompressionVacuum breaker gas

    Jetties

    Metering

    Grid

    Seawater

    ORV’s

    HP LNG

    HP Pumps

    Pump kickback

    Padding gas

    Vent

    80 barg NG

    Maintenance

    by-pass

    0 send out

    by-pass

    K.O.

    Recondensor

  • People at the heart of Gate terminal

    Continueous cooling

    2

  • Warm water

    Uniper

    Vent

    Re-

    condensor

    Condensere

    n Boil-off

    gas

    Cold water

    drainage

    Receipt and unloading LNG carriers LNG storrage Export under pressure and regasified

    150 mBarg 4 – 6 Barg 200 mBarg 6 – 9 Barg 77 Barg < 77 Barg

    - 160 °C - 160 °C - 160 °C - 158 °C - 150 °C > 0 °C

    LNG Natural gas

    Process wrapup