Gas/Condensate Well Drilling, Completion & Production Equipment
November 5, 2013 WDEQ-AQD/WRAP Presentation
Pinedale Anticline
Brian R Bohlmann, P.E.
Emissions Inventory Supervisor
WY Department of Environmental Quality
Air Quality Division
Photos Taken September 17, 2008
![Page 2: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/2.jpg)
Oil and Gas Development
![Page 3: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/3.jpg)
Oil and Gas Development July, 2012
• Jonah Field and Pinedale Anticline Development (JPAD)
![Page 4: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/4.jpg)
September, 2013 Permitting Guidance Update
![Page 5: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/5.jpg)
Jonah-Pinedale Anticline Development (JPAD) & Normally Pressured Lance (NPL) Area
![Page 6: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/6.jpg)
Jonah-Pinedale Anticline Development (JPAD) Area 2008 Well/Monitor Locations
![Page 7: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/7.jpg)
Pinedale Anticline Development
• Pinedale Anticline Project Area (PAPA) Record of Decision (ROD) issued July 27, 2000 – 700 wells mainly Federal minerals
• PAPA Supplemental Environmental Impact Statement (SEIS) ROD issued September 12, 2008 – 4,400 wells on 600 pads and a liquids gathering
system – average 7.3 wells per pad – 40 acre down-hole well spacing
![Page 8: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/8.jpg)
![Page 9: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/9.jpg)
![Page 10: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/10.jpg)
At the basic level:
• A deviated (or directional) well is a well that has been intentionally deviated from vertical. The deviation (or inclination) is measured from the vertical.
• A horizontal well is a deviated well with an inclination at or near 90o
Vertical Well
• Some unintentional deviation
• Typical inclination < 3o
Deviated (directional) Well
• Planned deviation from vertical
• Planned direction (azimuth)
• Inclination up to 85o
Horizontal Well
• Planned deviation of 85o –
95o
• Planned azimuth
a
a
Directional Drilling
![Page 11: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/11.jpg)
Development Options
40ac Parent
PAD
20ac Satellite
PAD
10ac Satellite
PAD
10ac Satellite
PAD
~800 ft –
Access Roads &
Pipelines
~800 ft –
Access Roads &
Pipelines
~800 ft –
Access Roads &
Pipelines
Production
Facilities
20ac
10ac
40ac
10ac
40ac Parent
PAD
Production
Facilities
Production
Facilities
10ac
20ac
10ac
40ac
20ac 10ac
Individual
Well
Production
Facilities
Individual
Well
Production
Facilities
Individual
Well
Production
Facilities
Individual
Well
Production
Facilities
Pods
Pads
Single Wells
40ac 10ac Pads; Pods; or Single Wells…
![Page 12: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/12.jpg)
Construction of a new well pad
Existing Multi-well Production Site
![Page 13: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/13.jpg)
Construction of a new well pad
Drill Rig
![Page 14: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/14.jpg)
Proposed Well Locations
(Down-hole 40 acre well spacing in the Pinedale Anticline)
Wells
Proposed Wells
![Page 15: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/15.jpg)
Shell’s Nabors 784 Drill Rig
Wells
Drill Rigs
Production Equipment
![Page 16: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/16.jpg)
Shell’s Nabors 784 Drill Rig
Control Room
![Page 17: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/17.jpg)
Cat 3512 (~1500 HP each) Diesel Generator Stacks w/SCR Note: Typically all 3 generators operate only during the drilling of the first
2,500 feet of each well with 2 generators operating for the rest of the drilling.
![Page 18: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/18.jpg)
Insulated Urea storage tank used w/SCR to control NOx emissions from the diesel generators.
Urea Tank
![Page 19: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/19.jpg)
Shed housing the Drill Mud Pumps
![Page 20: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/20.jpg)
Drill Mud Tanks
![Page 21: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/21.jpg)
Chemical Tanks
![Page 22: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/22.jpg)
Drill Mud Return Pipe
![Page 23: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/23.jpg)
Drill Cuttings Solids/Liquids Separation
![Page 24: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/24.jpg)
Drill Cuttings Shaker
![Page 25: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/25.jpg)
Drill Cuttings
![Page 26: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/26.jpg)
Drill Cuttings
![Page 27: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/27.jpg)
Drill Cuttings from different wells
Drill Cuttings
![Page 28: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/28.jpg)
Temporary Water Storage Ponds
![Page 29: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/29.jpg)
Well Blow-Out Preventer
![Page 30: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/30.jpg)
Drilling Flare Box w/Spark Ignition
![Page 31: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/31.jpg)
Well Casing (45 foot lengths)
![Page 32: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/32.jpg)
Drill Rigs
![Page 33: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/33.jpg)
Drill Rigs
![Page 34: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/34.jpg)
Drill Rigs
Warbonnet Area
![Page 35: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/35.jpg)
Portable 4-Phase Green Completion Equipment
(JPAD operators began using green completions in 2005) {Green Completions required on all wells in the CDA as of 8/1/10}
![Page 36: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/36.jpg)
Well Fracing Equipment
Sand Tanks
![Page 37: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/37.jpg)
Well Fracing Equipment
Fracing Fluid Tanks
![Page 38: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/38.jpg)
Mesa 7-27 Well (Single Well Site)
![Page 39: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/39.jpg)
Well Separator
![Page 40: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/40.jpg)
Separator Heater
Separator Heater
Dehydrator Contact Tower
Glycol Pump
![Page 41: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/41.jpg)
Dehydrator Kimray Glycol Pump
![Page 42: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/42.jpg)
Dehydrator Reboiler Heater
![Page 43: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/43.jpg)
Line Heater for Heat Tracing
Pneumatic Pumps
![Page 44: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/44.jpg)
Controlled Pneumatic Glycol Heat Trace Pump
![Page 45: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/45.jpg)
Dehydrator & Pneumatic Pump Control Device
![Page 46: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/46.jpg)
Uncontrolled Condensate & Produced Water Storage Tanks
200 bbl storage tanks
![Page 47: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/47.jpg)
Condensate Tank Thief Hatch
![Page 48: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/48.jpg)
Truck Loadout Hook-ups for Storage Tanks
![Page 49: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/49.jpg)
Facility Data Logger & Control Station
![Page 50: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/50.jpg)
Gas Sales Custody Transfer Point
![Page 51: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/51.jpg)
Multiple Well Facility
![Page 52: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/52.jpg)
Dehydration Unit Contact Towers and Control Devices
Dehy Contact Towers
Dehy Control Devices Heaters
![Page 53: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/53.jpg)
Dehydrator & Pneumatic Pump Control Device Note: Storage tanks have a separate control device for VOCs
Temporary Unit
![Page 54: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/54.jpg)
Multiple Well Facility
(As of July 28, 2004, for all multiple well or Pad facilities, all emissions from existing and new tanks and dehydration units must be controlled upon the
first date of production.)
Dehy Flare
Tank Flare
Dehy Contact Tower
Heater Stacks
![Page 55: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/55.jpg)
Line Heater w/3 Pneumatic Pumps
Pneumatic Pumps
![Page 56: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/56.jpg)
Controlled Pneumatic Glycol Heat Trace Pump
![Page 57: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/57.jpg)
Solar Powered Control Station
![Page 58: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/58.jpg)
Controlled Condensate & Produced Water Storage Tanks
300 bbl storage tanks
![Page 59: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/59.jpg)
Methanol Tank
![Page 60: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/60.jpg)
Reclaimed Well Pad
Sage Brush
![Page 61: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/61.jpg)
Reclaimed Well Pad
![Page 62: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/62.jpg)
Camouflaged Storage Tanks near the Lander Cut-Off Trail
![Page 63: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/63.jpg)
Questar Gas Management’s (now QEPE)
Liquids Gathering Facility (processes nearly 160 million mcf of gas and 1.4 million bbls of condensate in 2012)
![Page 64: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/64.jpg)
Enterprise Jonah Gas Gathering’s Paradise Compressor Station
{consists of 8 Cat G3612LE (3,668 Hp), 2 Cat G3516LE (1,800 Hp), and 1 Cat G3408CLE (425 Hp) compressor engines: Total of 33,369 Hp at one compressor station}
![Page 65: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/65.jpg)
Anticline Water Disposal Photo taken from the Boulder Monitoring Station Location
(Processed 5.9 million barrels of water and 41,236 bbls of condensate in 2012)
![Page 66: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/66.jpg)
Shell’s Warbonnet Water Handling Facility (Phase I) Temporary Storage Tanks
![Page 67: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/67.jpg)
Shell’s Warbonnet Water Handling Facility (Phase I) Truck Unloading Produced Water
![Page 68: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/68.jpg)
Shell’s Warbonnet Water Handling Facility (Phase I) Storage Tanks
500 bbl storage tanks
![Page 69: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/69.jpg)
Shell’s Warbonnet Water Handling Facility (Phase I) Temporary Generators for Electrical Needs
![Page 70: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/70.jpg)
Construction of Shell’s Liquid Gathering System
![Page 71: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/71.jpg)
Construction of Shell’s Liquid Gathering System
![Page 73: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/73.jpg)
Boulder Monitoring Station (measured 8-hour ozone level of 122 ppb in February, 2008)
![Page 74: Gas Well Drilling and Production Equipment](https://reader034.fdocuments.in/reader034/viewer/2022051007/586b5b8b1a28ab43268b516b/html5/thumbnails/74.jpg)
Websites/Links • Inventory Web Page: http://deq.state.wy.us/aqd/ei.asp
• UGRB Ozone Non-Attainment Area Inventory Forms Web page: http://deq.state.wy.us/aqd/Annual%20and%20Winter%20Upper%20Green%20River%20Basin%20Emission%20Inventories.asp
• Actual Emissions Web Page: http://deq.state.wy.us/aqd/Actual%20Emissions.asp
• Oil & Gas forms & Guidance Documents Web page: http://deq.state.wy.us/aqd/oilgas.asp
• Oil & Gas Production Facilities Guidance Document: http://deq.state.wy.us/aqd/Oil%20and%20Gas/September%202013%20FINAL_Oil%20and%20Gas%20Revision_UGRB.pdf