GAS WELL DELIQUIFICATION - Artificial lift · GAS WELL DELIQUIFICATION ... Ejector CHEVRON, USA :...

28
1 File Name GAS WELL DELIQUIFICATION USING JET PUMP TECHNOLOGY By; Sacha Sarshar, Caltec BACK GROUND PRINCIPLE OF JET PUMP OPERATION SOME SOLUTIONS FIELD EXPERIENC SO FAR CONCLUDING REMARKS

Transcript of GAS WELL DELIQUIFICATION - Artificial lift · GAS WELL DELIQUIFICATION ... Ejector CHEVRON, USA :...

1 File Name

GAS WELL DELIQUIFICATIONUSING

JET PUMP TECHNOLOGYBy; Sacha Sarshar, Caltec

• BACK GROUND• PRINCIPLE OF JET PUMP OPERATION• SOME SOLUTIONS• FIELD EXPERIENC SO FAR• CONCLUDING REMARKS

2 File Name

CAUSES OF LIQUID LOADING

• WELL FLOWING BELOW ANNULAR MIST REGIME• GAS VELOCITY BELOW A MINIMUM

(5m/s at wellhead)• POOR WELL DRAW DOWN

SIGNS OF LIQUID LOADING• FLUCTUATING THP• WELLHEAD FLOW VELOCITY BELOW MINIMUM• DECREASING LIQUID/GAS RATIO

3 File Name

REMEDIAL ACTIONS

• MAINTAIN RESERVOIR PRESSURE/FLOW• IMPROVE WELL FLOW AT PERFORATION

ZONE• CHANGE TUBING ( increase velocity)• ARTIFICIAL LIFT (VARIOUS METHODS)• WATER SHUT OFF• REDUCE THP, USING A PRESSURE

BOOSTING SYSTEM( jet pump application)

4 File Name

IMPORTANT FACTORS TO CONSIDER

• THE SEVERITY OF THE PROBLEM CAUSED BY DELAYS IN TAKING REMEDIAL ACTION

• EARLY REMEDIAL ACTION AVOIDS OR DEFERS COSTLY SOLUTIONS

• NOT ALL CASES NEED GAS-LIQUID SEPARATION

• DEFERRING COSTLY SOLUTIONS IS STILL COST EFFECTIVE ,AS LOWER COST SOLUTIONS HAVE A SHORT PAY BACK PERIOD

5 File Name

JET PUMP-PRINCIPLE OF OPERATION

NOZZLEMIXINGTUBE DIFFUSER

HP FLOW

LP FLOW

DISCHARGEFLOW

NOZZLEMIXINGTUBE DIFFUSER

HP FLOW

LP FLOW

DISCHARGEFLOW

6 File Name

APPLICATIONS OF JET PUMPS IN OIL&GAS PRODUCTION

• WELL KICK-OFF/DELIQUIFICATION• BOOST PRODUCTION OF INDIVIDUAL WELLS

(oil or gas)• BOOST PRODUCTION OF MANIFOLDED

WELLS (oil or gas)• BOOST PRESSURE OF LP GAS• PREVENT FLARING LLP GAS • DE-BOTTLENECK COMPRESSORS• DOWN HOLE, GAS MOTIVE FLOW

7 File Name

JET PUMP WITH REPLACABLE INTERNALS

8 File Name

KEY FACTORS AFFECTING PERFORMANCE

• HP/LP PRESSURE RATIO• LP/HP FLOW RATIO• DISCHARGE/LP PRESSURE RATIO

OTHER FACTORS;

• TEMPERATURE,Z FACTOR, Cp/Cv ratio etc.

9 File Name

GUIDE TO JET PUMP PERFORMANCE

10 File Name

SOURCES OF MOTIVE (HP) GAS

• HP WELLS/ HP GAS LINE• LIFT GAS• COMPRESSOR OUTLET GAS• HP LIQUID (LIMITED)

11 File Name

EFFECT OF LIQUID IN LP GAS

12 File Name

Spilamberto Field, AGIP, Italy

13 File Name

BP AMETHYST, UKProblem

WEAK WELLS WERE LOADED AND HAD RESTRICTED PRODUCTION UNDER PREVAILING THP

To

Dow

nstr

eam

Proc

ess/

Pipe

lines

High Pressure Wells

Low Pressure Wells(initially backedout)

Gas Eductor on Platform

14 File Name

G EM IN IS ub sea M anifo ld

ExportSales

40M M S C FDCom pressor

7.4 M M S CFD850 psig

R ecycle

400 ps ig

200 ps ig

1250 psigP rocess

E jector

G EM IN IS ub sea M anifo ld

ExportSales

40M M S C FDCom pressor

7.4 M M S CFD850 psig

R ecycle

400 ps ig

200 ps ig

1250 psigP rocess

E jector

CHEVRON, USA : GEMINI PROJECT (GOM

15 File Name

HEWITT FIELD JET PUMPHP wells increased production by 25% & 41%

16 File Name

USE OF TEST SEPARATOR IN WELL REVIVAL

Test Separator

Production Header

Test Header

Booster Pump

Jet Pum

p

HP gas

Well

Test Separator

Production Header

Test Header

Booster Pump

Jet Pum

p

HP gas

Well

17 File Name

ANGSI FIELD WELL REVIVAL OPTION

HI-SEP

TEST HEADER MAIN PRODUCTION HEADER

TO METERING SYSTEM

HP HEADER

P

P

T P

P

JET PUMP

P

TO EXPORT LINE

COMMINGLER

ALTERNATIVE PATH FOR LIQUIDS

BOOSTER PUMP

P

WELLCOM BOOST

SDV

M

EXISTING WELL TESTING METERS

A-1030

MA-1031 HI-SEP

LIFT GAS LINE

P P

WELL REVIVAL WELLCOM BOOST

18 File Name

Table X3: MALAYSIA: Platform C: Gas Jet Pump Application for Well- Kickoff with Backpressure Reduction

4654.4 MMscfd & 100 bbl/d

240(initial 465)

One or two LP wells

8.3 MMscfd and 230 bbl/d

(1/3rd flow)

3100C73.3

4652 MMscfd & 200 bbl/d

165(initial 465)

C38.3 MMscfd and 230 bbl/d

(1/3rd flow)

3100C73.2

4652 MMscfd & 200 bbl/d

Well kick off

100(initial 465)

C325 MMscfd and 688 bbl/d

3100C73.1

Predicted(psia)

Fluid FlowrateMMscfd & bbl/d

Pressure(psia)

Well Name

Fluid Flowrate

MMscfd & bbl/d

Pressure(psia )

WELL

Discharge Pressure

Estimated Low PressureHigh PressureCase

17/5/07

19 File Name

JET PUMP SOLUTION USING NEW HP WELL

20 File Name

INDE PLATFORM JET PUMP

21 File Name

INDE PLATFORM S.NORTH SEA, UK

Low Pressure Gas Wells

Jet PumpCompressor

Export

Kilo

Juliet

Subsea Line

Davy Line

Bessemer Line

Dp

Separator

22 File Name

WELLCOM BOOST SYSTEM

COMMINGLER

LOW PRESSURE OIL WELLS

JET PUMP

TO PIPELINE

GAS

LIQUID

I-SEP

BOOSTER PUMPCOMMINGLER

LIQUID

HIGH PRESSURE GAS GAS

LIQUID

23 File Name

A (PD) TWIN SCREW PUMP

24 File Name

I-SEP COMPACTSEPARATOR

25 File Name

I-SEP IN DE-GASSING APPLICATION

I-SEP

26 File Name

I-SEP WITH REPLACEABLE INTERNALS

27 File Name

WELLCOM BOOST SYSTEM OFFSHORE MALAYSIA

Jet pump

I-SEP

HI-SEP

Booster pump

28 File Name

CONCLUDING REMARKS

• THERE ARE NUMEROUS SOLUTIONS FOR DELIQUIFICATION OF GAS WELLS

• THE APPROPRIATE SOLUTION DEPENDS MAINLY ON WELL FEATURES,RESERVOIR CONDITIONS,AND THE EXTENT OF LOADING

• JET PUMPS ARE HIGHLY COST EFFECTIVE TO OFFLOAD WELLS PROVIDED A MOTIVE HP SOURCE IS AVAILABLE AND THE WELL STATUS IS NOT BEYOND THE ABILITY OF THIS SOLUTION

• JET PUMPS CAN BE USED AS ADDITIONAL HELP TO OTHER SOLUTIONS TO INCREASE PRODUCTION