Gas to Power in PLN- Gas Indonesia Summit 2018 -
August 2018
Presented by
Ms. Chairani Rachmatullah
Head of Oil & Gas Division
www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.
2
Energy Mix Projection in 2018 to 2027
2018 2027
Coal 62.0% 58.6%
Gas (incl.LNG) 20.8% 20.6%
Hydro 6.9% 9.3%
Geothermal 5.4% 9.8%
HSD + MFO 4.2% 0.4%
Other RE 0.2% 1.3%
Import 0.5% 0%
Renewable Energy (Total of Hydro + Geothermal + Other RE) :
12.5% in 2018To
20.4% in 2027
Source : RUPTL 2018-2027
TWH 2018 2027
GAS (incl. LNG) 57.05 103.48
Electricity Growth 6.86%
Additonal Power Plant 56,024 MW
www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.
3
❖ Government’s commitment related to climate change.
❖ Lower allocation for electricity subsidy.
❖ Less flexibility of Gas/LNG commercial term.
❖ Abundance of domestic coal resource.
❖ Optimizing local source of energy.
❖ Lower Renewable Energy price.
❖ Small and distributed electricity demand versus RE’s economic of scale.
PLN’s Fuel Mix Strategy
www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.
4
Primary Energy Demand Projection 2018-2027
HydroFuel Oil
Gas (include LNG) Coal
www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.
5
Installed Capacity & CF (Coal Fired, Gas Fired, and Hydro PP)
Installed Capacity
Capacity Factor
Realization
Planning
www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.
6
16601808
20602214 2260 2345 2389
2630
30473271
0
500
1000
1500
2000
2500
3000
3500
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
BB
TUD
GAS (INCL. LNG)
14251655 1704
1537 1625 1647 16791882 1879
1992
0
500
1000
1500
2000
2500
3000
3500
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
BB
TUD
GAS (INCL. LNG) RUPTL 2018-2027
Change RUPTL 2017-2026 RUPTL 2018-2027
Electricity Growth 8.27% 6.86%
Power Plant 77,873 MW 56,024 MW
RUPTL 2017-2026
RUPTL 2017-2026 vs RUPTL 2018-2026 (Gas Demand Projection)
www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.
7
Gas Demand Projection 2018-2027
Gas (TBTU) Gas (BBTUD)
Source : RUPTL 2018-2027
www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.
8
❖ Since 2012, LNG plays a vital role for domestic LNG utilization in Indonesia with first LNGsupplying Power plants in Java island via FSRU West Java operated by PT Nusantara Regas.
❖ Other 3 LNG Receiving Facility : LNG Terminal in Arun, Aceh ; FSRU in Lampung ; LNG Terminalin Benoa, Bali.
❖ Arun LNG Terminal (operated by PT Perta Arun Gas) is supplying gas Power Plants and FertilizerPlant in Sumatera Island.
❖ Benoa LNG Terminal (operated by PT Pelindo Energy Logistic) is supplying gas for Pesanggaranpower plant in Bali.
❖ FSRU Lampung (operated by PT PGN LNG) is serving PT PGN to supply gas to its industrialcustumers including PLN in Lampung and West Java area.
❖ Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serveload follower and peaking demand.
❖ PLN is now still the biggest off taker of LNG domestic with more than 90% of LNG domesticconsumption.
❖ In 2017, PLN absorbed 47 cargos of LNG, about 30% of ± 1300 BBTUD total gas demand.
Highlights of LNG Utilization in PLN
www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.
9
New Gas Supply Secured by PLN
❖ Jambaran Tiung Biru field : DCQ = 100 BBTUD, first gas in = 2021, gas supply for = Central-East Java gas fired power plants (Tambak Lorok, Gresik, Grati),PSC contractor = PEPCI.
❖ Sembakung field (Simenggaris) : DCQ = 8 BBTUD, first gas in = 2021, gas supply for = Simenggaris gas fired power plant, located at well head,PSC contractor = JOB P-MEPS.
❖ Senoro field : DCQ = 5 BBTUD, first gas in = 2019, gas supply for = Luwuk gas fired power plant (40 MW), Sulawesi Tenggara,PSC contractor = JOB PMTS.
www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.
10
LNG Trucking Sambera Now in Operation
• first gas in = 30 July 2018.• gas supply for = Sambera gas fired power plants (2 x 20 MW),
Kutai, East Kalimantan.• scheme = BOT for 5 years.