Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power...

12
Gas to Power in PLN - Gas Indonesia Summit 2018 - August 2018 Presented by Ms. Chairani Rachmatullah Head of Oil & Gas Division

Transcript of Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power...

Page 1: Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serve load follower and peaking demand. PLN is now still the biggest off

Gas to Power in PLN- Gas Indonesia Summit 2018 -

August 2018

Presented by

Ms. Chairani Rachmatullah

Head of Oil & Gas Division

Page 2: Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serve load follower and peaking demand. PLN is now still the biggest off

www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.

2

Energy Mix Projection in 2018 to 2027

2018 2027

Coal 62.0% 58.6%

Gas (incl.LNG) 20.8% 20.6%

Hydro 6.9% 9.3%

Geothermal 5.4% 9.8%

HSD + MFO 4.2% 0.4%

Other RE 0.2% 1.3%

Import 0.5% 0%

Renewable Energy (Total of Hydro + Geothermal + Other RE) :

12.5% in 2018To

20.4% in 2027

Source : RUPTL 2018-2027

TWH 2018 2027

GAS (incl. LNG) 57.05 103.48

Electricity Growth 6.86%

Additonal Power Plant 56,024 MW

Page 3: Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serve load follower and peaking demand. PLN is now still the biggest off

www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.

3

❖ Government’s commitment related to climate change.

❖ Lower allocation for electricity subsidy.

❖ Less flexibility of Gas/LNG commercial term.

❖ Abundance of domestic coal resource.

❖ Optimizing local source of energy.

❖ Lower Renewable Energy price.

❖ Small and distributed electricity demand versus RE’s economic of scale.

PLN’s Fuel Mix Strategy

Page 4: Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serve load follower and peaking demand. PLN is now still the biggest off

www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.

4

Primary Energy Demand Projection 2018-2027

HydroFuel Oil

Gas (include LNG) Coal

Page 5: Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serve load follower and peaking demand. PLN is now still the biggest off

www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.

5

Installed Capacity & CF (Coal Fired, Gas Fired, and Hydro PP)

Installed Capacity

Capacity Factor

Realization

Planning

Page 6: Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serve load follower and peaking demand. PLN is now still the biggest off

www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.

6

16601808

20602214 2260 2345 2389

2630

30473271

0

500

1000

1500

2000

2500

3000

3500

2017 2018 2019 2020 2021 2022 2023 2024 2025 2026

BB

TUD

GAS (INCL. LNG)

14251655 1704

1537 1625 1647 16791882 1879

1992

0

500

1000

1500

2000

2500

3000

3500

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

BB

TUD

GAS (INCL. LNG) RUPTL 2018-2027

Change RUPTL 2017-2026 RUPTL 2018-2027

Electricity Growth 8.27% 6.86%

Power Plant 77,873 MW 56,024 MW

RUPTL 2017-2026

RUPTL 2017-2026 vs RUPTL 2018-2026 (Gas Demand Projection)

Page 7: Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serve load follower and peaking demand. PLN is now still the biggest off

www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.

7

Gas Demand Projection 2018-2027

Gas (TBTU) Gas (BBTUD)

Source : RUPTL 2018-2027

Page 8: Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serve load follower and peaking demand. PLN is now still the biggest off

www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.

8

❖ Since 2012, LNG plays a vital role for domestic LNG utilization in Indonesia with first LNGsupplying Power plants in Java island via FSRU West Java operated by PT Nusantara Regas.

❖ Other 3 LNG Receiving Facility : LNG Terminal in Arun, Aceh ; FSRU in Lampung ; LNG Terminalin Benoa, Bali.

❖ Arun LNG Terminal (operated by PT Perta Arun Gas) is supplying gas Power Plants and FertilizerPlant in Sumatera Island.

❖ Benoa LNG Terminal (operated by PT Pelindo Energy Logistic) is supplying gas for Pesanggaranpower plant in Bali.

❖ FSRU Lampung (operated by PT PGN LNG) is serving PT PGN to supply gas to its industrialcustumers including PLN in Lampung and West Java area.

❖ Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serveload follower and peaking demand.

❖ PLN is now still the biggest off taker of LNG domestic with more than 90% of LNG domesticconsumption.

❖ In 2017, PLN absorbed 47 cargos of LNG, about 30% of ± 1300 BBTUD total gas demand.

Highlights of LNG Utilization in PLN

Page 9: Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serve load follower and peaking demand. PLN is now still the biggest off

www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.

9

New Gas Supply Secured by PLN

❖ Jambaran Tiung Biru field : DCQ = 100 BBTUD, first gas in = 2021, gas supply for = Central-East Java gas fired power plants (Tambak Lorok, Gresik, Grati),PSC contractor = PEPCI.

❖ Sembakung field (Simenggaris) : DCQ = 8 BBTUD, first gas in = 2021, gas supply for = Simenggaris gas fired power plant, located at well head,PSC contractor = JOB P-MEPS.

❖ Senoro field : DCQ = 5 BBTUD, first gas in = 2019, gas supply for = Luwuk gas fired power plant (40 MW), Sulawesi Tenggara,PSC contractor = JOB PMTS.

Page 10: Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serve load follower and peaking demand. PLN is now still the biggest off

www.pln.co.id |CONFIDENTIAL !! Any use of this material without specific permission of PLN is strictly prohibited.

10

LNG Trucking Sambera Now in Operation

• first gas in = 30 July 2018.• gas supply for = Sambera gas fired power plants (2 x 20 MW),

Kutai, East Kalimantan.• scheme = BOT for 5 years.

Page 11: Gas to Power in PLN · Compare to pipelined natural gas, PLN prefers LNG to operate its Gas Power Plants to serve load follower and peaking demand. PLN is now still the biggest off