GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited...

23
Rochdale Holdings Pty Ltd A.B.N. 85 009 049 067 trading as: HERRING STORER ACOUSTICS P.O. Box 219, Como, W.A. 6952 (08) 9367 6200 [email protected] GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE ASSESSMENT MT CATTLIN OPERATIONS NIGHT OPERATIONS SEPTEMBER 2019 OUR REFERENCE: 24632319046

Transcript of GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited...

Page 1: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

 

Rochdale Holdings Pty Ltd A.B.N. 85 009 049 067 trading as: 

HERRING STORER ACOUSTICS P.O. Box 219, Como, W.A. 6952   (08) 9367 6200  [email protected] 

 

      

   

 GALAXY LITHIUM AUSTRALIA LTD 

  

ENVIRONMENTAL NOISE ASSESSMENT  

MT CATTLIN OPERATIONS  

NIGHT OPERATIONS      

SEPTEMBER 2019          

OUR REFERENCE: 24632‐3‐19046

Page 2: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

Herring Storer Acoustics  

 

   

DOCUMENT CONTROL PAGE  

ENVIRONMENTAL NOISE ASSESSMENT MT CATTLIN OPERATIONS 

 

 NIGHT OPERATIONS 

 

Job No: 19046  

Document Reference : 24632‐3‐19046  

FOR  

GALAXY LITHIUM AUSTRALIA LTD  

 

DOCUMENT INFORMATION 

Author:  P. Drew  Checked By:  Tim Reynolds 

Date of Issue :  10th September 2019   

REVISION HISTORY 

Revision  Description  Date  Author  Checked 

1  Draft  2/8/2019  PD  TR 

2  Report with corrections  26/8/2019  PD  ‐ 

3  Revised fleet  10/9/2019  PD  TR 

         

         

DOCUMENT DISTRIBUTION 

Copy No.  Revision No.  Destination  Hard Copy Electronic Copy 

1  3 Galaxy Lithium Australia Ltd James Hesford:   [email protected] Keith Muller: [email protected]  

     

     

     

 

Page 3: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

Herring Storer Acoustics   Our Ref: 24632‐3‐19046             

 

 

 

       

CONTENTS  

1.0  INTRODUCTION  1 

2.0  ACOUSTIC CRITERIA  2 

3.0  METHODOLOGY  3 

4.0  PREDICTIONS AND ASSESSMENT  4 

5.0  CONCLUSION  7 

      

APPENDICES       A  Sound Power Levels      B  Noise Contour Plots      C  Mining Scenarios          

Page 4: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

Herring Storer Acoustics Our ref:  24632‐3‐19046        

 

1

1.0 INTRODUCTION  Galaxy  Lithium  Australia  Limited  commissioned  Herring  Storer  Acoustics  to  carry  out acoustic modelling of noise emissions  for proposed extension of mining operations  to  the night period.  The proposal is to operate a reduced fleet of diggers and haul trucks, with the mitigation of noise  emissions  towards  the  Ravensthorpe  town  site  and  other  southern  receptors  by acoustic bunds  and waste  tipping on  the northern  side of waste dumps during  the night period. Mining of the NW Pit has been modelled to include the use of a smaller number of larger capacity CAT 785 Haul Trucks,  instead of CAT 777 Haul Trucks operating  in the other mining areas. Noise  characteristic  is  to be minimized by use of wheeled dozers  in  lieu of track machines. Processing and crushing have been included. The operations are intended to comply with  the  ‘assigned  levels’ under  the Environmental Protection  (Noise) Regulations 1997, with adaptive operational planning to maintain compliance.  Commencement date is subject to approvals and change of Licence condition. The proposal is to commence night mining in January 2020.  Drilling has not been included in the proposal, due to the potential for existing top‐hammer units  to emit noise with  tonal characteristic, which may be unacceptable during  the night period when background noise levels at receptors can be low. Downhole hammer drills have the potential to resolve this issue, investigations into downhole drilling unit noise emissions are being undertaken. However, no drilling will occur during the night period unless  it has been determined through measurement, that the drill noise emissions will be compliant at receptor locations.                            

Figure 1 – Mt Cattlin minesite and surrounds showing receptor locations 

R1 

R4 

R5 

Page 5: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

Herring Storer Acoustics Our ref:  24632‐3‐19046        

 

2

Highly Noise Sensitive receptors R1, R4 & R5 have been acquired by Galaxy Lithium Australia and  the  assessment  of  noise  emissions  is  therefore  not  required  to  these  locations.  The most significant receptors are R6 and R8, located at the northern edge of the Ravensthorpe town‐site. Noise emissions from the proposed TSF Waste Dump has the potential to affect receptors to the south, being receptors R2 & R9.  The Mt Cattlin site has a number of  ‘highly noise sensitive’  receptors  to  the SW, S and SE (Ravensthorpe townsite). An aerial view of the site and surrounds shows these.   

2.0 ACOUSTIC CRITERIA  The  criteria  used  is  in  accordance with  the  Environmental  Protection  (Noise)  Regulations 1997  (as amended).  These  regulations  stipulate maximum  allowable  external noise  levels that can be received at a premises. For noise sensitive premises, the assigned or allowable noise levels are determined by the calculation of an influencing factor. The influencing factor is  calculated  for  the usage of  land within  the  two  circles, having  radii of 100m and 450m from  the  premises  of  concern.  The  base  ‘assigned  levels’  are  listed  in  Table  2.1.  For commercial and  industrial premises  the  ‘assigned noise’  levels are  fixed, as also  shown  in Table 2.1.  

TABLE 2.1 –ASSIGNED OUTDOOR NOISE LEVELS 

Type of premises receiving noise Time of day 

Assigned level (dB)

LA 10  LA 1  LA max

Noise sensitive premises: highly sensitive area (i.e within 15m of a dwelling) 

0700 to 1900 hours Monday to Saturday  45 + IF  55 + IF  65 + IF 

0900 to 1900 hours Sunday and public holidays 

40 + IF  50 + IF  65 + IF 

1900 to 2200 hours all days  40 + IF  50 + IF  55 + IF 

2200 hours on any day to 0700 hours Monday to Saturday and 0900 hours Sunday and public holidays 

35 + IF  45 + IF  55 + IF 

Noise sensitive premises: any area other than highly sensitive area  All hours  60  75  80 

Commercial premises  All hours  60  75  80 

Industrial and utility premises other than those in the Kwinana Industrial Area 

All hours  65  80  90 

Note:   The LA10 noise level is the noise that is exceeded for 10% of the time. The LA1 noise level is the noise that is exceeded for 1% of the time. The LAmax noise level is the maximum noise level recorded. IF = Influencing Factor  

 It  is  a  requirement  that  noise  from  the  site  be  free  of  annoying  characteristics  (tonality, modulation and impulsiveness) at other premises, defined below as per Regulation 9.  Where  the  above  characteristics  are  present  and  cannot  be  practicably  removed,  the adjustments  as  listed  in  Table  2.2  are made  to  the measured  or  predicted  level  at  other premises. 

 TABLE 2.2 – ADJUSTMENTS FOR ANNOYING CHARACTERISTICS WHEN MUSIC IS NOT PRESENT 

Where tonality is present  Where modulation is present  Where impulsiveness is present 

+ 5 dB  + 5 dB  + 10 dB 

Note: Where music  is present the adjustment  is +10 dB, and  is +15dB  if  impulsiveness  is present. The adjustments are cumulative to a maximum of 15 dB. 

   

Page 6: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

Herring Storer Acoustics Our ref:  24632‐3‐19046        

 

3

A summary of the determined ‘influencing factors’ and ‘assigned’ LA10 noise levels are shown in Table 2.3.  

TABLE 2.3 – DETERMINED NIGHT‐TIME LA10 ASSIGNED LEVELS                     

  

3.0 METHODOLOGY  Noise  levels  were  predicted  using  the  acoustic  software  SoundPlan  for  worst  case  wind conditions  in  accordance  with  the  DWER  Draft  Guideline  on  Environmental  Noise  for Prescribed Premises (May 2016).   It is noted that ‘worst case’ wind conditions refer to conditions where there is a temperature inversion  in  conjunction  with  light  winds  in  the  direction  from  noise  source  to  receiver, resulting in effective sound propagation receiver locations.  The sound power levels used in the acoustic modelling are tabulated in the Appendix A. Sound power levels are based on site measurements at Mt Cattlin.  Predicted noise emissions at night have been made  for  January,  June and December 2020. Following the development of the eastern waste dump by December 2020, this waste dump is expected to act as a significant acoustic barrier to noise emissions towards the Ravensthorpe town‐site.  Noise  emissions  to  the  town‐site  will  gradually  reduce  from  December  2020, therefore  there  is no need  to predict noise emissions beyond  this  time period as  the worst case situations will have already occurred.   

   

Receptor Influencing Factor 

 

Night‐timeAssigned LevelLA10 dB(A) 

Sun/Holiday Assigned Level LA10 dB(A) 

WeekdayAssigned LevelLA10 dB(A) 

R1 – rural residence to the NNW of the plant near the Newdegate Ravensthorpe Road. Residence acquired by Galaxy. 

NA  NA  NA  NA 

R2 – demountable accommodation SW of the plant near the South Coast Highway 

0  35   40   45  

R5 – rural residence north of R1. . Residence acquired by Galaxy. 

0  35   40   45  

R6 – residence at  north‐east of Ravensthorpe townsite 

0  35   40   45  

R8 – accommodation camp / residences north edge of Ravensthorpe townsite 

0  35   40   45  

R9 – house (constructed since 2012) SW of plant, west of R2. Influencing factor of 2 due to nearby grain storage facility. 

2  37   42   47  

R10 – rural residence SW of plant  0  35   40   45  

Page 7: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

Herring Storer Acoustics Our ref:  24632‐3‐19046        

 

4

4.0 PREDICTIONS AND ASSESSMENT  

The Galaxy Lithium Mt Cattlin site operates under an Operational Noise Management Plan.  

The most  significant  individual  noise  generating  operation  is  expected  to  be  tipping  and pushing of waste on  the southern edge of  the waste dump. To minimize  the potential  for annoyance and noise emission from this operation, it is proposed to utilize a wheel dozer in lieu  of  a  track  dozer  for  pushing  at  night.  In  some  circumstances  a  track  dozer may  be required,  for example when pushing on a slope where use of a wheel dozer may not be a safe option.  In  these  situations  the use of a  track dozer  should be deferred until  the day period.  

The  waste  dump  development  east  of  the  existing  waste  dump  is  to  be  developed commencing on the southern side of each bench, so that sections of elevated waste dump provide an acoustic barrier to tipping to the north.   

The proposed noise mitigation measures are:  

● Use of wheeled dozer on Waste Dumps at night.  

● Provision of nominated acoustic barrier bunds to main haul roads with line of sight to the southern receptors. 

● No operation of  track dozers or  top‐hammer drills  in  the night period,  to 

avoid  generating  ‘tonal’  noise  emissions  due  to  the  relatively  low background noise encountered during parts of the night‐time period. 

● Waste tipping and spreading to be carried out on the north side of acoustic 

barriers,  shielding noise emissions  to  the Ravensthorpe  town  site and  the southern receptors. 

● Maintain  acoustic  bund  immediately  south  of modular  crushing  circuit  at 

RL181  to  top  of  bund  eastern  2/3  and  RL178  to  top  of  bund  remaining western  1/3.  Stockpile  to  SW  (evident  as  two  stockpiles  in  Appendix  C images) will be joined with to at RL282 as a minimum.  

Noise emissions have been predicted  for a scenario at  January 2020, one scenario  in  June 2020  and  one  scenario  in December  2020,  for  ‘allwinds’‐ worst  case  inversion  condition winds from noise source to receiver. Predictions for the summer scenarios have also been made for the summer prevailing south‐easterly wind condition. The prevailing winter wind condition is from the north (NW), therefore the ‘allwinds’ prediction reasonably represents the prevailing winter condition.  

TABLE 4.1 – PREDICTED NOISE EMISSIONS DURING NIGHT OPERATION SCENARIOS 

Receptor  R2  R6  R8  R9  R10  Comment 

Night‐time Assigned Level LA10 dB(A)  35  35  35  37  35   

Scenario 1: Jan 2020 – Worst Case Winds  33  35  33  34  35  Complies 

Scenario 1: Jan 2020 – SE Winds  26  27  25  27  35  Complies 

Scenario 2: June 2020 – Worst Case Winds  33  35  33  35  32  Complies 

Scenario 3: June 2020 – Worst Case Winds  33  34  32  34  33  Complies 

Scenario 3: June 2020 – SE Winds  28  28  27  29  31  Complies 

   

Page 8: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

Herring Storer Acoustics Our ref:  24632‐3‐19046        

 

5

Appendix B  contains  the predicted noise contour plots. The  relevant  spot predicted noise emissions  for  the  key  receptors  are  shown  in  Table 4.1.  The predictions  show  that noise emissions are capable of complying with the regulation night‐time ‘assigned levels’.  Figure 2 (north to the top) shows the nominal topography of the proposed waste dump and partially developed pits as expected at  January 2020. Acoustic bunds on  southern  side of haul roads are not shown in these figures.                 

Figure 2 – Forecast Nominal Waste Dump and Pit Topography January 2020   Figure  3  shows  the  nominal  topography  of  the  proposed  waste  dump  and  partially developed pits as expected at June 2020.                   

 Figure 3 – Forecast Nominal Waste Dump and Pit Topography June 2020 

   

Page 9: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

Herring Storer Acoustics Our ref:  24632‐3‐19046        

 

6

                  

Figure 4 – Forecast Nominal Waste Dump and Pit Topography December 2020   Once  completed,  the  proposed  eastern waste  dump will  provide  an  acoustic  and  visual barrier to mining operations on the northern side. Figure 5 shows the nominal topography of the final stage of the eastern waste dump.                 

Figure 5 – Forecast Completed Eastern Waste Dump (NW Pit not shown)  The mining scenarios and associated acoustic barriers are shown in Appendix C.  The acoustic modelling shows that noise emissions from the proposed Night Operations  in combination with processing operations  is capable of complying with  the  requirements of the Environmental Protection (Noise) Regulations 1997.   Under  ‘worst  case’  wind  conditions  towards  the  Ravensthorpe  town‐site,  there  will  be mining phases where noise mitigation is required to achieve compliance. Required measures include use of acoustic barriers to mining and haul routes.   

Page 10: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

Herring Storer Acoustics Our ref:  24632‐3‐19046        

 

7

5.0 CONCLUSION  Galaxy  Lithium  Australia  Limited  commissioned  Herring  Storer  Acoustics  to  carry  out acoustic modelling of noise emissions  for proposed extension of mining operations  to  the night period.  The proposal is to operate a reduced fleet of diggers and haul trucks, with the mitigation of noise  emissions  towards  the  Ravensthorpe  town  site  and  other  southern  receptors  by acoustic  bunds  and waste  tipping  on  the  norther  side  of waste  dumps  during  the  night period. Noise  characteristic  is  to be minimized  by use of wheeled dozers  in  lieu of  track machines. Mining of the NW Pit has been modelled to include the use of a smaller number of  larger  capacity  CAT  785 Haul  Trucks,  instead  of  CAT  777 Haul  Trucks  operating  in  the other  mining  areas.  Processing  and  crushing  have  been  included.  The  operations  are intended  to  comply with  the  ‘assigned  levels’ under  the Environmental Protection  (Noise) Regulations 1997, with adaptive operational planning to maintain compliance.  Commencement date is subject to approvals and change of Licence condition. The proposal is to commence night mining in January 2020.  The proposed noise mitigation measures are:  

● Use of wheeled dozer on Waste Dumps at night.  

● Provision of nominated acoustic barrier bunds to main haul roads with line of sight to the southern receptors. 

● No operation of  track dozers or  top‐hammer drills  in  the night period,  to 

avoid  generating  ‘tonal’  noise  emissions  due  to  the  relatively  low background noise encountered during parts of the night‐time period. 

● Waste tipping and spreading to be carried out on the north side of acoustic 

barriers,  shielding noise emissions  to  the Ravensthorpe  town  site and  the southern receptors. 

● Maintain  acoustic  bund  immediately  south  of modular  crushing  circuit  at 

RL181  to  top  of  bund  eastern  2/3  and  RL178  to  top  of  bund  remaining western  1/3.  Stockpile  to  SW  (evident  as  two  stockpiles  in  Appendix  C images) will be joined with to at RL282 as a minimum.  

Noise emissions at night have been predicted for January, June and December 2020. Following the development of the eastern waste dump by December 2020, this waste dump is expected to act as a significant acoustic barrier to noise emissions towards the Ravensthorpe town‐site. Noise emissions to the town‐site will gradually reduce from December 2020, therefore there is no need to predict noise emissions beyond this time period as the worst case situations will have already occurred. 

 Predictions for the summer scenarios have also been made for the summer prevailing south‐easterly  wind  condition.  The  prevailing  winter  wind  condition  is  from  the  north  (NW), therefore the ‘allwinds’ prediction reasonably represents the prevailing winter condition.  The acoustic modelling shows that noise emissions from the proposed Night Operations  in combination  with  processing  and  crushing  operations  is  capable  of  complying  with  the requirements of the Environmental Protection (Noise) Regulations 1997.  

Page 11: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

 

 

                  

APPENDIX A    

Page 12: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

 

 

Acoustic Model Sound Power Levels  

Description  LWA  31.5  40  50  63  80  100  125  160  200  250  315  400  500  630  800  1k  1.25k  1.6k  2k  2.5k  3.15k  4k  5k  6.3k  8k  10k 

17Jan Screen B  105  97  111  96  115  104  107  99  94  93  93  95  95  93  93  94  93  93  94  94  94  94  93  92  92  89  87 

17Jan Screen C  105  109  119  96  105  98  97  97  95  96  98  95  96  94  94  94  93  94  94  95  94  93  92  92  93  89  87 

17Jan Screen D  105  109  119  96  105  98  97  97  95  96  98  95  96  94  94  94  93  94  94  95  94  93  92  92  93  89  87 

17Jan Screen E  96  99  106  92  103  98  93  89  88  90  90  90  85  85  87  93  85  85  84  83  83  82  82  81  82  79  76 

17Jan Screen F  106  108  112  105  107  102  101  105  100  106  108  103  97  94  96  96  95  98  95  93  93  92  91  89  87  86  84 

17Jan Screen H  96  108  92  101  103  98  94  90  88  86  89  86  87  85  86  86  85  86  87  87  85  84  84  80  79  77  74 

Existing Generators  96  105  96  98  99  105  109  102  98  101  96  91  84  87  88  89  85  85  83  83  80  79  78  74  72  68  66 

Plant Screen G  106  108  112  105  107  102  101  105  100  106  108  103  97  94  96  96  95  98  95  93  93  92  91  89  87  86  84 

Stockpile Bin  96  93  99  89  99  87  85  85  85  89  87  82  80  80  78  78  79  76  76  76  76  78  80  83  86  89  91 

17Jan Screen A  96  109  105  85  97  90  97  93  86  87  85  86  86  84  86  86  85  85  83  84  84  83  83  83  85  82  80 

Proces Optical Sorter Rolls Crusher 

88  76  76  82  82  82  91  86  82  86  85  85  85  82  81  79  80  79  76  70  71  70  70  68  68  68  67 

Proces Optical Sorter VSI Crusher 

96  84  84  90  90  90  99  94  90  94  93  93  93  90  89  87  88  87  84  78  79  78  78  76  76  76  75 

Proces Optical Sorter Fines Screen 

105  97  111  96  115  104  107  99  94  93  93  95  95  93  93  94  93  93  94  94  94  94  93  92  92  89  87 

18Mar Optio Screen  105  109  119  96  105  98  97  97  95  96  98  95  96  94  94  94  93  94  94  95  94  93  92  92  93  89  87 

18Mar Optio Screen  105  109  119  96  105  98  97  97  95  96  98  95  96  94  94  94  93  94  94  95  94  93  92  92  93  89  87 

CAT 777D WD4  115  104  107  116  124  110  108  110  105  106  105  106  102  108  111  109  107  105  106  104  101  100  98  94  93  90  88 

CAT 785D T1  118    113  108  108  111  108  110  110  105  110  110  107  114  112  106  109  107  106  107  105  105  101  100  97  94  91 

CAT Wheel Dozer1  114  91  107  99  108  103  103  105  108  106  103  102  107  103  105  106  106  103  105  103  101  99  97  98  95  93  93 

CAT 16H Grader  105    95      97      110      103      98      98      100      94      88 

CAT 773 Water Cart 1 

116  90  102  101  106  103  98  105  112  118  104  102  105  109  108  106  108  105  106  108  106  102  100  98  96  94  94 

Articulated Truck No. 1 

106  100  105  102  116  103  111  106  113  110  101  93  92  96  93  100  97  94  95  92  92  88  88  86  83  80  79 

CAT 785D T2  115    110  105  105  108  105  107  107  102  107  107  104  111  109  103  106  104  103  104  102  102  98  97  94  91  88 

Komatsu PC1250 Excavator 1 

115  92  100  97  104  102  105  125  112  112  115  107  101  105  110  108  105  105  102  103  101  98  96  94  91  89  86 

CAT 785D 6  115    110  105  105  108  105  107  107  102  107  107  104  111  109  103  106  104  103  104  102  102  98  97  94  91  88 

CAT Wheel Dozer 2  114  91  107  99  108  103  103  105  108  106  103  102  107  103  105  106  106  103  105  103  101  99  97  98  95  93  93 

Komatsu PC1900 Excavator 1 

117    114      117      126      120      114      111      105      100      96 

CAT 785D WD5  118    113  108  108  111  108  110  110  105  110  110  107  114  112  106  109  107  106  107  105  105  101  100  97  94  91 

CAT 777D 8  115  104  107  116  124  110  108  110  105  106  105  106  102  108  111  109  107  105  106  104  101  100  98  94  93  90  88 

CAT 777D 7  115  104  107  116  124  110  108  110  105  106  105  106  102  108  111  109  107  105  106  104  101  100  98  94  93  90  88 

CAT 777D 9  115  104  107  116  124  110  108  110  105  106  105  106  102  108  111  109  107  105  106  104  101  100  98  94  93  90  88 

CAT 777D T10  115  104  107  116  124  110  108  110  105  106  105  106  102  108  111  109  107  105  106  104  101  100  98  94  93  90  88 

E482 Rapid Primary Screen 

108  91  93  93  97  97  100  99  97  99  101  98  96  98  101  100  99  100  97  97  95  95  92  88  86  84  81 

18Feb Rapid Screen E394 

98  52  53  59  62  69  73  77  78  76  88  89  89  86  89  88  88  89  88  88  86  86  85  84  82  81  78 

18Feb Rapid Screen E328 

98  51  53  59  64  68  75  77  79  83  84  89  92  88  88  90  87  88  88  86  86  85  84  81  79  79  75 

Page 13: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

 

 

Description  LWA  31.5  40  50  63  80  100  125  160  200  250  315  400  500  630  800  1k  1.25k  1.6k  2k  2.5k  3.15k  4k  5k  6.3k  8k  10k 

Rapid Jaw Crusher  115  61  75  80  93  98  98  96  99  101  99  99  100  104  108  108  104  106  104  105  103  104  104  103  95  93  88 

18Feb Rapid Cone E250 

105  54  57  66  70  75  86  85  85  91  93  95  97  95  96  96  97  97  95  93  92  91  90  88  87  86  84 

18Feb Rapid Cone E481 

105  55  58  68  68  72  81  88  86  88  90  93  94  94  96  98  97  98  95  94  93  93  89  87  85  83  80 

18Feb Rapid Office Generator 

88  41  47  49  64  54  58  63  71  74  75  76  79  77  81  84  75  75  75  77  77  74  73  68  67  65  62 

18Feb Rapid Gen 517 

102  57  57  70  75  72  82  91  89  96  96  89  89  93  93  95  94  94  91  91  90  88  87  83  78  75  71 

18Feb Rapid Gen E305 

95  50  54  59  61  71  78  78  81  86  83  84  87  88  87  87  86  86  85  84  82  82  79  77  74  71  68 

18Feb Rapid Gen E298 

103  52  58  73  62  69  73  75  82  92  85  85  91  90  91  92  94  94  93  94  92  92  89  86  81  78  74 

Rapid Crusher Loader 

106  95  103  93  102  95  102  95  100  100  104  102  101  93  94  95  97  97  96  97  93  92  92  87  86  82  78 

Optio Sorter (South of ROM) Unit 1 

112  91  98  92  93  94  95  98  95  99  100  101  96  95  95  95  94  92  92  93  94  98  102  102  102  103  104 

Optio Sorter (South of ROM) Unit 2 

112  91  98  92  93  94  95  98  95  99  100  101  96  95  95  95  94  92  92  93  94  98  102  102  102  103  104 

18Mar Optio Screen Rapid 1 

106  108  112  105  107  102  101  105  100  106  108  103  97  94  96  96  95  98  95  93  93  92  91  89  87  86  84 

18Mar Optio Screen Rapid 2 

106  108  112  105  107  102  101  105  100  106  108  103  97  94  96  96  95  98  95  93  93  92  91  89  87  86  84 

 

Page 14: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

 

 

                 

APPENDIX B  

 11  Processing and Mining –  January 2020 – Scenario 1 ‐ Worst Case Winds 13  Processing and Mining –  January 2020 – Scenario 1 – SE Summer Prevailing Winds 15  Processing and Mining –  June 2020 – Scenario 2 – Worst Case Winds 17  Processing and Mining –  Dec 2020 – Scenario 3  – Worst Case Winds 19  Processing and Mining –  Dec 2020 – Scenario 3  – SE Summer Prevailing Winds   

     

Page 15: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

 

 

     

Page 16: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

 

 

   

Summer Prevailing Wind 

Page 17: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

 

 

   

Page 18: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

 

 

   

Page 19: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

 

 

   

Summer Prevailing Wind

Page 20: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

 

 

           

APPENDIX C  

MINING SCENARIOS   Scenario 1  January 2020 Scenario 2  June 2020 Scenario 3  December 2020    

  

Page 21: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

Galaxy Resources Limited

meeting a lithium future

Sequence of Mining & Dumping – January 2020

290mRL

2SW PitIn-pit tails

260mRL

WD2 NW 250mRL

220mRL

SE Pit

NE Pit

NW PitPart 1255mRL

1F backfill205mRL

225mRL

paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Text Box
Loader
paul
Text Box
Digger
paul
Text Box
CAT 777 Truck
paul
Text Box
Wheel Dozer
paul
Text Box
Grader
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Text Box
Rejects Moxy
paul
Text Box
2020 January - Scenario 1 Night Operations:
paul
Text Box
6m bund
paul
Polygonal Line
paul
Polygonal Line
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Text Box
CAT Water Cart
paul
Polygonal Line
paul
Polygonal Line
paul
Text Box
7m bund
paul
Polygonal Line
paul
Polygonal Line
paul
Polygonal Line
paul
Polygonal Line
Page 22: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

Galaxy Resources Limited

meeting a lithium future

Sequence of Mining & Dumping - June 2020

290mRL

2SW PitIn-pit tails

200mRL

205mRL

Stage 1Fcomplete

200mRL

SE Pit

NE Pit

NW PitPart 2 SE_W Pit

250mRL

260mRL

NW PitPart 1

270mRL

260mRL

260mRL

paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Text Box
2020 June - Scenario 2 - Night Mining
paul
Polygonal Line
paul
Polygonal Line
paul
Oval
paul
Oval
paul
Oval
paul
Polygonal Line
paul
Polygonal Line
paul
Polygonal Line
Page 23: GALAXY LITHIUM AUSTRALIA LTD ENVIRONMENTAL NOISE … · Galaxy Lithium Australia Limited commissioned Herring Storer Acoustics to carry out acoustic modelling of noise emissions for

Galaxy Resources Limited

meeting a lithium future

Sequence of Mining & Dumping - December 2020

290mRL

2SW PitIn-pit tails

190mRL

WD2 NW Dump260mRL

Backfill210mRL

SE Pitcomplete

NE PitNW PitPart 2

NW PitPart 1

220mRL

270mRL

250mRL

260mRL

paul
Polygonal Line
paul
Polygonal Line
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Oval
paul
Polygonal Line
paul
Oval
paul
Oval
paul
Text Box
2020 December - Scenario 3 - Night Mining
paul
Polygonal Line
paul
Polygonal Line