Gabriele Vajente ILIAS WG1 meeting - Perugia 20.09.05 Couplings of angular noises into dark fringe...

31
Gabriele Vajente ILIAS WG1 meeting - Perugia 20.09.05 Couplings of angular Couplings of angular noises into dark noises into dark fringe fringe Diffused light Diffused light studies studies

Transcript of Gabriele Vajente ILIAS WG1 meeting - Perugia 20.09.05 Couplings of angular noises into dark fringe...

Gabriele Vajente

ILIAS WG1 meeting - Perugia 20.09.05

Couplings of angular Couplings of angular noises into dark fringenoises into dark fringeDiffused light studiesDiffused light studies

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 2

SummarySummary

• Non-stationary noise couplings due to input beam jitter

• Preliminary study of daily trends

• Preliminary projections of angular control noise

• Acoustic noise by diffused light

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 3

Non stationary noisesNon stationary noises

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 4

Input beam jitterInput beam jitter

• Temperature fluctuations in Laser Lab causing input beam jitter

• Powers oscillates with 20 min period• Does this input beam jitter couple into high frequency noise?• Search for modulated noises analyzing long locks (up to 40 h)

IMC transmission and PRC pick-off powers IMC end quadrants diodes

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 5

Input beam jitterInput beam jitter

• Temperature fluctuations in Laser Lab causing input beam jitter

• Powers oscillates with 20 min period• Does this input beam jitter couple into high frequency noise?• Search for modulated noises analyzing long locks (up to 40 h)

IMC transmission and PRC pick-off powers IMC end quadrants diodes

0.7 mHz

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 6

Analyzed configurationsAnalyzed configurations

• During C6 run:– “bump” between

100 – 300 Hz (diffused light)

– removed before the end of the run

• During M9 minirun:– New power

stabilization scheme

Input laser power is stabilized using a pick-off before the IMC

Input laser power is stabilized using the power transmitted through the IMC

Dark fringe spectrum with and without the “bump”

The “bump” was acoustic noise re-injected by diffused light at north end bench

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 7

Analysis methodologyAnalysis methodology

• Computed DF spectrum at intervals(every 5s or 20s, 60s window length, 216 points for each FFT)

• Computed band-limited RMS: [0, 2], [2, 10], [10, 30], [30, 50], [50, 200], [200, 600], [600, 1000], [1000, 10000] Hz

• Time evolution and frequency analysis of these RMS

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 8

C6 lock C6 lock (without bump)(without bump)

Spectrum of dark fringe band-limited RMS time evolution

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 9

C6 lock C6 lock (without bump)(without bump)

Spectrum of dark fringe band-limited RMS time evolution

2 – 30 HzAngular noise? Coherence with BS, NE, WE and ISYS angular corrections

0.6 – 1 kHzAcoustic noise from the ISYS?

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 10

C6 lock C6 lock (with bump)(with bump)

Spectrum of dark fringe band-limited RMS time evolution

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 11

C6 lock C6 lock (with bump)(with bump)

The “bump” is modulated at 0.38 mHz.

Correlated with NE building temperature

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 12

New power stabilization schemeNew power stabilization scheme

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 13

New power stabilization schemeNew power stabilization scheme

No more modulated noise!

Conclusion:

All these noises were acoustic/angular noises of ISYS coupled through the power fluctuations in the IMC.

IMC tx IMC ty

IMC trans. RFC trans.

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 14

Daily trendsDaily trends

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 15

Daily trendsDaily trends

• During one weekend ITF locked continuously for more than 28 h with all 10 LA loops closed

• Clear daily trend in dark fringe power• Seems to be stable between different locks

Dark fringe after OMC

Dark fringe before OMC

PRC pick-off power

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 16

Effect on dark fringeEffect on dark fringe

Dark fringe demodulated signal

Dark fringe DC signal

Red: DF DC maximum

Green: DF DC minimum

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 17

CoherencesCoherences

B7 DC B7 ACp B7 ACq

B8 DC B8 ACp B8 ACq

Control noise?

Diffused lightRed: B1 DC maximum, Green: B1 DC minimumB7 = NE transmitted beam B8 = WE transmitted beam

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 18

Projections of angular Projections of angular noisesnoises

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 19

Projections of angular noisesProjections of angular noises

• Strong coherence of all angular corrections with dark fringe

• Can compute approximate transfer functions to DF without noise injections

• All angular error signal are coherent with each other

• Can “project” angular noise into DF

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 20

Projections of angular noisesProjections of angular noises

• Strong coherence of all angular corrections with dark fringe

• Can compute approximate transfer functions to DF without noise injections

• All angular error signal are coherent with each other

• Can “project” angular noise into DF

THIS MAKES SENSE ONLY FOR THE DOMINANT SIGNAL!

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 21

Projections of angular noisesProjections of angular noises

Dominant noise source is WI (under local control!)

It’s possible to strongly reduce its gain (by a factor of 20)

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 22

Projections of angular noisesProjections of angular noises

These projections are automatically computed via an octave program

Needed independent measurements of transfer functions!

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 23

Diffused light Diffused light investigationsinvestigations

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 24

Diffused light investigationsDiffused light investigations

• First step: 100 – 300 Hz bump coherent with north end signals

• Found several stray beams in north end bench

• The strongest one comes from the flip mount used to attenuate the beam in front of the quadrants

NE beam

QuadrantsDark fringe spectrum

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 25

Diffused light investigationsDiffused light investigations

• The beam hit the bench box and was diffused• When the box was open, the bump disappeared• Installed a cylindrical-conical aluminum beam dump

• Gain in sensitivity and NS-NS horizon stability

• The same beam in WE bench was dumped with black foam

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 26

Diffused light investigationsDiffused light investigations

• Second step: 100 – 300 Hz coherence with WE signals

h_rec [1sqrt(Hz)]h_rec [1/sqrt(Hz)]

Straylight bump

• Black foam was not sufficient for this beam dumping

• Beam hit the box not orthogonally

• Used black AR-coated glass

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 27

ConclusionsConclusions

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 28

ConclusionsConclusions

• Input beam jitter couples with angular/acoustic noise– disappeared using new laser power stabilization scheme

• Daily trends (still input beam jitter)– will be solved with ISYS drift control

• Stray light has a major effect!– Need to careful dump every stray beam…

• Angular control noise – Dominant with Local Controls– AA not yet optimized. Noise re-injected up to some tens of Hz

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 29

Spare slidesSpare slides

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 30

VIRGO simplified optical schemeVIRGO simplified optical scheme

ILIAS WG1 meeting 20.09.05 – Gabriele Vajente 31

Power stabilizationPower stabilization

Low pass filter at 8 Hz

Unity gain at 60 kHz

Reduction of power fluctuations starting 10 mHz

Does not correct the slow oscillation