G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

15
G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ABBREVIATIONS AND LEGENDS A10-1 DEMOLITION, LIFE SAFETY AND FIRST FLOOR PART PLANS A40-1 PARTITION LEGEND AND DETAILS A70-1 MATERIALS, CEILING AND FURNITURE PLANS AND SCHEDULES PLUMBING DRAWINGS P00-1 LEGEND, SCHEDULES & GENERAL NOTES P05-1 FIRST FLOOR BELOW SLAB DRAINAGE DEMOLITION P05-2 FIRST FLOOR PLUMBING DEMOLITION P10-1 BELOW SLAB DRAINAGE P10-2 ABOVE SLAB DRAINAGE P20-1 FIRST FLOOR SUPPLY P30-1 DETAILS P60-1 SCHEDULES FIRE PROTECTION DRAWINGS F05-1 FIRST FLOOR DEMOLITION FIRE PROTECTION F10-1 FIRST FLOOR FIRE PROTECTION MECHANICAL DRAWINGS M00-1 LEGEND & GENERAL NOTES M05-1 FIRST FLOOR DEMOLITION DUCTWORK M06-1 FIRST FLOOR DEMOLITION PIPING M10-1 FIRST FLOOR DUCTWORK M20-1 FIRST FLOOR PIPING M50-1 DETAILS M60-1 SCHEDULES ELECTRICAL DRAWINGS E00-1 LEGENDS, NOTES AND SCHEDULES E05-1 PART PLAN EXISTING CONDITIONS E10-1 PART PLAN LIGHTING E20-1 PART PLAN POWER E60-1 ELECTRICAL SCHEDULES

Transcript of G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

Page 1: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

G00-1 COVER SHEET

ARCHITECTURAL DRAWINGS

A00-1 ABBREVIATIONS AND LEGENDS

A10-1 DEMOLITION, LIFE SAFETY AND FIRST FLOOR PART PLANS

A40-1 PARTITION LEGEND AND DETAILS

A70-1 MATERIALS, CEILING AND FURNITURE PLANS AND SCHEDULES

PLUMBING DRAWINGS

P00-1 LEGEND, SCHEDULES & GENERAL NOTES

P05-1 FIRST FLOOR BELOW SLAB DRAINAGE DEMOLITION

P05-2 FIRST FLOOR PLUMBING DEMOLITION

P10-1 BELOW SLAB DRAINAGE

P10-2 ABOVE SLAB DRAINAGE

P20-1 FIRST FLOOR SUPPLY

P30-1 DETAILS

P60-1 SCHEDULES

FIRE PROTECTION DRAWINGS

F05-1 FIRST FLOOR DEMOLITION FIRE PROTECTION

F10-1 FIRST FLOOR FIRE PROTECTION

MECHANICAL DRAWINGS

M00-1 LEGEND & GENERAL NOTES

M05-1 FIRST FLOOR DEMOLITION DUCTWORK

M06-1 FIRST FLOOR DEMOLITION PIPING

M10-1 FIRST FLOOR DUCTWORK

M20-1 FIRST FLOOR PIPING

M50-1 DETAILS

M60-1 SCHEDULES

ELECTRICAL DRAWINGS

E00-1 LEGENDS, NOTES AND SCHEDULES

E05-1 PART PLAN EXISTING CONDITIONS

E10-1 PART PLAN LIGHTING

E20-1 PART PLAN POWER

E60-1 ELECTRICAL SCHEDULES

Page 2: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

RL ROOF LEADER

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RR RETURN REGISTER

S SANITARY

S SOIL

S SOUTH

S STEAM

SA SUPPLY AIR

SD SMOKE DAMPER

SD STORM DRAIN

SDMH STORM DRAIN MANHOLE

SEC SECTION

SF SUPPLY FAN

SG SUPPLY GRILLE

SHT SHEET

SIM SIMILAR

SK SINK

SMU SOLID MASONRY UNIT

SPEC SPECIFICATION (S)

SPF SPRUCE PINE FIR

SQ SQUARE

SR SUPPLY REGISTER

SS STAINLESS STEEL

SSK SERVICE SINK

STD STANDARD

STL STEEL

STOR STORAGE

SYM SYMMETRY (ICAL)

SYS SYSTEM

T TREAD

T&G TONGUE & GROOVE

T'STAT THERMOSTAT

TB TEST BORING

TD TRANSFER DUCT

TD TRENCH DRAIN

TEL TELEPHONE

TG TRANSFER GRILLE

THK THICK (NESS)

TKBD TACKBOARD

TL TOTAL LOAD

TOC TOP OF CONCRETE

TOF TOP OF FOOTING

TOS TOP OF STEEL

TP TEST PIT

TPTN TOILET PARTITION

TV TELEVISION

TYP TYPICAL

UD UNDERDRAIN

UGDUNDERGROUNDDUCTWORK

UH UNIT HEATER

UNOUNLESS NOTEDOTHERWISE

UR URINAL

UV UNIT VENTILATOR

V VENT

VAV VARIABLE AIR VOLUME

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VD VOLUME DAMPER

VERT VERTICAL

VF VINYL FABRIC

VTR VENT THRU ROOF

W WEST, WIDTH, WIDE

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WCH WATER CLOSET HANDICAP

WCO WALL CLEANOUT

WD WOOD

WG WALL GRILLE

WH WALL HUNG

WIN WINDOW

WP WORKING POINT

WR WALL REGISTER

WWF WELDED WIRE FABRIC

LB (S) POUNDS

LD LINEAR DIFFUSER

LD LINED DUCT

LF LAWN FAUCET

LF LINEAL FEET

LG LONG

LL LIVE LOAD

LPS LOW PRESSURE STEAM

LTG LIGHTING

LTL LINTEL

LTW LOW TEMPERATURE STEAM

LW LIMIT OF WORK

M METER (S)

MAS MASONRY

MAX MAXIMUM

MBH1000 BRITISH THERMALUNIT

MD MANUAL DAMPER

MD MOTORIZED DAMPER

MECH MECHANICAL

MED MEDIUM

MET METAL

MFR MANUFACTURE (R)

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MM MILLIMETER (S)

MO MASONRY OPENING

MR MOP RECEPTOR

MT METAL THRESHOLD

MTD MOUNTED

N NORTH

NA NOT APPLICABLE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

No NUMBER

NS NEAR SIDE

NTS NOT TO SCALE

OC ON CENTER (S)

OD OUTSIDE DIAMETER

OED OPEN END DUCT

OFF OFFICE

OH OVERHEAD

OPG OPENING

OPH OPPOSITE HAND

OPP OPPOSITE

P PLATE

P PLUMBING

P PUMP

PAR PARALLEL

PFN PREFINISHED

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PNL PANEL

PNT PAINT (ED)

PP POINT TO POINT

PSFPOUNDS PER SQUAREFOOT

PSI POUNDS PER SQUARE INCH

PT POINT

PTN PARTITION

PVC POLYVINYL CHLORIDE

PWD PLYWOOD

PWG POLISHED WIRE GLASS

QT QUARRY TILE

R RISER

RA RETURN AIR

RAD RADIATION

RAD RADIUS

RB RUBBER BASE

RD ROOF DRAIN

REF REFERENCE

REFR REFRIGERATOR

REV REVISION (S)

RG RETURN GRILLE

DWG DRAWING

E EAST

EB EXPANSION BOLT

EF EXHAUST FAN

EIFSEXTERIOR INSULATEDFINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION (S)

ELEC ELECTRIC (AL)

EM ELECTRIC MANHOLE

EP ELECTRIC PANEL

EQ EQUAL

ER EXHAUST REGISTER

ES EACH SIDE

EST ESTIMATE

EWC ELECTRIC WATER COOLER

EXG EXISTING

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAI FRESH AIR INTAKE

FC FLEXIBLE CONNECTION

FCO FLOOR CLEANOUT

FD FIRE DAMPER

FD FLOOR DRAIN

FD FOUNDATION DRAIN

FE FIRE EXTINGUISHER

FHS FIRE HOSE STATION

FIN FINISH (ED)

FL FINISH LENGTH

FLG FLASHING

FLR FLOOR (ING)

FOC FACE OF CONCRETE

FOS FACE OF STUD

FRR FLOOR RETURN REGISTER

FS FAR SIDE

FTG FOOTING

FYMINIMUM YIELD STRESS(KSI)

GA GAGE, GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACT (OR)

GL GLASS

GPDW GYPSUM DRY WALL

GPM GALLONS PER MINUTE

GV GATE VALVE

H HARDENER

HB HOSE BIB

HD HUB DRAIN

HM HOLLOW METAL

HORIZ HORIZONTAL

HPS HIGH PRESSURE STEAM

HT HEIGHT

HTG HEATING

HTW HOT TEMPERATURE WATER

HVACHEATING - VENTILATING -AIR CONDITIONING

HW HOT WATER

HYD HYDRANT

ID INSIDE DIAMETER

INS INSULATE (D) (ION)

INT INTERIOR

INV INVERT

IPS IRON PIPE SIZE

JC JANITOR'S CLOSET

JT JOINT

K KIPS

KIT KITCHEN

KSI KIPS PER SQUARE INCH

LAB LABORATORY

LAM LAMINATE (D)

LAV (L) LAVATORY

A/C AIR CONDITIONING

AB ANCHOR BOLT

ABT ABOUT

AC ACOUSTICAL

ACB ABOVE CEILING BELOW

ACT ACOUSTICAL TILE

AD ACCESS DOOR

ADJ ADJUSTABLE

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AL ACOUSTICAL LINING

AL ALUMINUM

ALT ALTERNATE

AP ACCESS PANEL

APX APPROXIMATE

ARCH ARCHITECT (URAL)

B/W BOTTOM OF WALL

BD BOARD

BDD BACKDRAFT DAMPER

BIT BITUMINOUS

BJ BAR JOIST

BLDG BUILDING

BLKG BLOCKING

BM BENCH MARK

BOF BOTTOM OF FOOTING

BOT BOTTOM

BP BEARING PLATE

BSMT BASEMENT

BSP BASE PLATE

BTU BRITISH THERMAL UNIT

CAB CABINET

CB CATCHBASIN

CD CEILING DIFFUSER

CEM CEMENT (ITIOUS)

CER CERAMIC

CF CUBIC FEET

CFM CUBIC FEET PER MINUTE

CG CEILING GRILLE

CHBD CHALKBOARD

CHT CEILING HEIGHT

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CJT CONTROL JOINT

CL CLOSET

CLG CEILING

CM CENTIMETER (S)

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONN CONNECT

CONST CONSTRUCTION

CONT CONTINUE (OUS)

CONTR CONTRACT (OR)

CORR CORRUGATED

CPT CARPET (ED)

CR CONDENSATE RETURN

CT CERAMIC TILE

CUH CABINET UNIT HEATER

CULV CULVERT

CV CONVECTOR

CW COLD WATER

CY CUBIC YARD

DF DOUGLAS FIR

DF DRINKING FOUNTAIN

DG DOOR GRILLE

DH DOUBLE HUNG

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIV DIVISION

DL DEAD LOAD

DMT DEMOUNTABLE

DN DOWN

DTL DETAIL

DW DUCT WRAP

Page 3: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

DN

DEMOLITION KEY NOTES

D01 REMOVE EXISTING CMU WALL COMPLETE.

D02 REMOVE EXISTING GPDW WALL COMPLETE. PREP FLOOR

BELOW TO CECIEVE NEW FLOORING.

D03 REMOVE EXISTING DOOR, HM FRAME AND HARDWARE

COMPLETE.

D04 REMOVE EXISTING HM BORROWED LIGHT COMPLETE.

D05 EXISTING STOREFRONT PANEL OF DOORS, HINGES, SLABS AND

HARDWARE TO BE REMOVED AND RELOCATED FOR

RE-INSTALLATION. ALUMINUM STOREFRONT FRAME AT

REMOVED DOOR PANEL TO RECIEVE GLAZING INFILL.

D06 REMOVE EXISTING GLAZING AND PORTION OF EXISTING

STOREFRONT SILL AS REQUIRED TO RECIEVE NEW

STOREFRONT DOOR AT THIS LOCATION.

D07 REMOVE EXISTING PORTION OF SITE CAST CONCRETE WALL TO

ACCOMODATE NEW DOOR OPENING. COORDINATE WITH

STRUCTURAL DRAWINGS.

D07A REMOVE EXISTING PORTION OF CMU WALL TO ACCOMODATE

NEW DOOR OPENING. COORDINATE WITH STRUCTURAL

DRAWINGS.

D08 REMOVE EXISTING MOSAIC FLOOR TILE COMPLETE. CLEAN AND

PREP FLOOR TO RECIEVE NEW FLOORING MATERIALS.

D09 REMOVE EXISTING CARPET FLOORING COMPLETE. F.V. VERIFY

MOSAIC TILE IS NOT PRESENT. REMOVE MOSAIC TILE IF FOUND

UNDER CARPET. CLEAN AND PREP FLOOR TO RECIEVE NEW

FLOORING.

D10 REMOVE EXISTING ACOUSTICAL CEILING TILE AND ASSOCIATED

GRID. REMOVE ALLCEILING DEVICES IN GRID AND COORDINATE

REMOVAL OR RELOCATION WITH ELECTRICAL DRAWINGS.

D11 REMOVE EXISTING GPDW CEILING OR SOFFIT AND FRAMING

COMPLETE. REMOVE ALL CEILING DEVICES IN GRID AND

COORDINATE REMOVAL OR RELOCATION WITH ELECTRICAL

DRAWINGS.

D12 REMOVE EXISTING HANDRAIL AND ASSOCITATED STL

BALUSTERS AND BASE, COMPLETE.

D13 REMOVE EXISTING PLUMBING FIXTURE. SEE PLUMBING

REMOVALS FOR ADDITIONAL INFORMATION.

D14 REMOVE EXISTING BANK OF LOCKERS. FIELD VERIFY EXISTING

FLOOR CONDITION BELOW LOCKERS AND INSTALL NEW MOSAIC

TILE IF/AS REQUIRED TO MATCH ADJACENT. SALVAGE LOCKERS

FOR OWNER.

D15 REMOVE EXISTING CONCRETE FLOOR SLAB AS REQUIRED TO

COMPLETE UNDERSLAB PLUMBING SCOPE. COORDINATE WITH

PLUMBING DRAWINGS.

Page 4: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

SEE SCHEDULE FOR OVERAL WIDTH

STUD PARTITION TYPE SCHEDULE

TAG TYPE STUD SIZEGPDW HEIGHT FIRE-RATING SOUND RATING OVERALL

WIDTHREMARKS

SIDE 1 SIDE 2 RATING UL # INSUL STC

B20 B 2 1/2" STL TO DECK - 0 - 3 1/8"

D30 D 3 5/8" STL TO DECK TO DECK 0 - 4 7/8"

D60 D 6" STL TO DECK TO DECK 0 - 7 1/4"

MASONRY PARTITION TYPE SCHEDULE

TAG TYPE NOMINAL SIZEFIRE OVERALL

WIDTHREMARKS

HRS UL #

Page 5: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

2" TYP

SEE SCHED

2" TYP

SEE SCHED SEE SCHED

SEE SCHED SEE SCHED SEE SCHED

8" 8"

DOOR AND FRAME SCHEDULE

DOOR

MARK

DOOR FRAME

REMARKSOPENING SIZELEAVES THK TYPE MAT GLASS TYPE MAT

DETAILS

WID HT HEAD JAMB SILL

111 3' - 0" 7' - 0" (1) 1 3/4" SF2 AL TEMP INS 3 AL RELOCATED EXG DOOR AND FRAME

112 3' - 8" 7' - 0" (1) 1 3/4" EXG EXG EXG 2 EXG

112S 3' - 0" 7' - 0" (1) 1 3/4" F 2 HM

112T 3' - 0" 7' - 0" (1) 1 3/4" F WD 2 HM

113 3' - 0" 7' - 0" (1) 1 3/4" FG WD TEMP 2 HM

114 3' - 0" 7' - 0" (1) 1 3/4" FG WD TEMP 2 HM

115 3' - 0" 7' - 0" (1) 1 3/4" FG WD TEMP 2 HM

116 3' - 0" 7' - 0" (1) 1 3/4" FG WD TEMP 2 HM

117 3' - 0" 7' - 0" (1) 1 3/4" FG WD TEMP 2 HM

120 3' - 0" 7' - 0" (1) 1 3/4" EXG EXG EXG 2 EXG

ROOM FINISH SCHEDULE

ROOM WAINSCOT WALLS

REMARKSNo. NAME CODE HT N E S W

111 CORRIDOR EXG EXG EXG

112 ATHLETIC TRAINING RF1 RWB1 VARIES PT1 PT1 VARIES

112S SUPPLY ROOM SC RWB1 PT1 PT1 PT1 PT1

112T TOILET MT1 MT2 CT1 CT1 CT1 CT1

112W WET ROOM MT1 MT2 CT1 CT1 CT1 CT1

113 OFFICE CPT1 RWB1 PT1 PT1 PT1 PT1

114 OFFICE CPT1 RWB1 PT1 PT1 PT1 PT1

115 OFFICE CPT1 RWB1 PT1 PT1 PT1 PT1

116 OFFICE CPT1 RWB1 PT1 PT1 PT1 PT1

117 OFFICE CPT1 RWB1 PT1 PT1 PT1 PT1

MATERIALS LEGEND

MATERIAL MANUFACTURER / SERIES COLOR / FINISH

CARPET TILE 24" X 24" CPT1 MOWHAWK GROUP - TBD TBD

CPT2 MOWHAWK GROUP - TBD TBD

RUBBER FLOOR TILE RF1 ECORE COMMERCIAL - ECOSURFACES NRG TBD

RUBBER WALL BASE 6" RWB1 JOHNSONITE TBD

TRANSITION STRIP TS JOHNSONITE TBD

CERAMIC WALL TILE CT1 TBD TBD

MARBLE THRESHOLD MT TBD TBD

MOSAIC FLOOR TILE 2" X 2" MT1 DALTILE / KEYSTONES TBD

MOSAIC TILE WALL BASE MT2 DALTILE / KEYSTONES TBD

PAINT - FIELD PT1 SHERWIN WILLIAMS TBD

PAINT - ACCENT PT2 SHERWIN WILLIAMS TBD

PAINT - ACCENT PT3 SHERWIN WILLIAMS TBD

PAINT - DOOR TRIM PT4 SHERWIN WILLIAMS TBD

WOOD STAIN WS1 MARSHFIELD DOOR SYSTEMS / PLAIN SLICED MAPLE CLEAR STAIN

ACOUSTICAL CEILING TILE 2' X 2' ACT1 ARMSTRONG TBD

ACOUSTICAL CEILING TILE 2' X 4' ACT2 ARMSTRONG TBD

SEALED CONCRETE SC TBD TBD

Page 6: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

PROPOSED VENT PIPING ABOVE FINISHED FLOORV

EXISTING SANITARY PIPING ABOVE FINISHED FLOOR TO REMAIN

EXISTING PIPING BELOW FINISHED FLOOR TO BE COMPLETELY REMOVED

PROPOSED SANITARY PIPING BELOW FINISHED FLOOR

SD

LEGEND

CHECK VALVE

PRESSURE RELIEF VALVE

EWC-X ELECTRIC WATER COOLER

SA "X"

VTR

SHOCK ARRESTOR (P.D.I RATING)

VENT THROUGH ROOF

SHUT-OFF VALVE

CAP

DN DOWN

AFF ABOVE FINISHED FLOOR

BFF BELOW FINISHED FLOOR

TYP. TYPICAL

SGTR SOIL GAS THROUGH ROOF

CIRCULATING PUMP

THERMOMETER

AD ACCESS DOOR

BP-X BOOSTER PUMP

DCP-X DOMESTIC CIRCULATING PUMP

EEW-X EMERGENCY EYEWASH

ET-X EXPANSION TANK

FD-X FLOOR DRAIN

FS-X FLOOR SINK

HB-X HOSE BIBB

CW CLOTHES WASHER

DW DISH WASHER

L-X LAVATORY

MB-X MOP BASIN

SI-X SOLIDS INTERCEPTOR

SK-X SINK

SP-X SUMP PUMP

SH-X SHOWER

UR-X URINAL

WC-X WATER CLOSET

WF-X WASH FOUNTAIN

WH-X WALL HYDRANT

TP-X TRAP PRIMER

FCO-X FLOOR CLEANOUT

EXISTING PIPING ABOVE FINISHED FLOOR TO BE COMPLETELY REMOVED

PROPOSED SANITARY PIPING ABOVE FINISHED FLOORS

XS

EXISTING VENT PIPING ABOVE FINISHED FLOOR TO REMAINXV

PROPOSED GREASE WASTE PIPING ABOVE FINISHED FLOORGW

EXISTING STORM DRAIN PIPING ABOVE FINISHED FLOOR TO REMAINXSD

PROPOSED STORM DRAIN PIPING ABOVE FINISHED FLOORSD

EXISTING SOIL GAS PIPING ABOVE FINISHED FLOOR TO REMAINXSG

PROPOSED SOIL GAS PIPING ABOVE FINISHED FLOORSG

PROPOSED COLD WATER PIPING ABOVE FINISHED FLOORCW

EXISTING COLD WATER PIPING ABOVE FINISHED FLOOR TO REMAINXCW

EXISTING HOT WATER PIPING ABOVE FINISHED FLOOR TO REMAINXHW

PROPOSED HOT WATER PIPING ABOVE FINISHED FLOORHW

EXISTING GAS PIPING ABOVE FINISHED FLOOR TO REMAINXG

PROPOSED GAS PIPING ABOVE FINISHED FLOORG

EXISTING GREASE WASTE PIPING ABOVE FINISHED FLOOR TO REMAINXGW

EXISTING HOT WATER RETURN PIPING ABOVE FINISHED FLOOR TO REMAINXHWR

PROPOSED HOT WATER RETURN PIPING ABOVE FINISHED FLOORHWR

PROPOSED VENT PIPING BELOW FINISHED FLOOR

EXISTING SANITARY PIPING BELOW FINISHED FLOOR TO REMAIN

EXISTING VENT PIPING BELOW FINISHED FLOOR TO REMAIN

PROPOSED GREASE WASTE PIPING BELOW FINISHED FLOOR

EXISTING STORM DRAIN PIPING BELOW FINISHED FLOOR TO REMAIN

PROPOSED STORM DRAIN PIPING BELOW FINISHED FLOOR

EXISTING SOIL GAS PIPING BELOW FINISHED FLOOR TO REMAIN

PROPOSED SOIL GAS PIPING BELOW FINISHED FLOOR

EXISTING GREASE WASTE PIPING BELOW FINISHED FLOOR TO REMAIN

S

V

XS

XV

GW

XSD

SD

XSG

SG

XGW

HOT WATER HOSE BIBB

FREEZE PROOF WALL HYDRANT

FLOOR CLEANOUT

FLOOR DRAIN

PIPE DROP

PIPE RISE

FLOOR SINK

ROOF DRAIN

WALL CLEANOUT

WCO WALL CLEANOUT

CO CLEANOUT

CLEAOUT

UNION

BACKFLOW PREVENTER

WATER METER

SINGLE HORIZONTAL ADJUSTABLE CARRIER

BACK TO BACK HORIZONTAL ADJUSTABLE CARRIER

SINGLE VERTICAL ADJUSTABLE CARRIER

BACK TO BACK VERTICAL ADJUSTABLE CARRIER

W WASTE

CW COLD WATER

HW HOT WATER

HWR HOT WATER RETURN

S SANITARY

V VENT

CONNECT NEW

TO EXISTING

PIPE TEE

SHUT-OFF VALVE WITH THREADED HOSE END

INV. EL INVERT ELEVATION

N.C NORMALLY CLOSED

N.O NORMALLY OPEN

RD-X ROOF DRAIN

GI-X GREASE INTERCEPTOR

PRESSURE GAUGE

FLOOR DRAIN WITH FUNNEL

PROPOSED CONDENSATE PIPING ABOVE FINISHED FLOOR WITH HEAT TRACECD

STAINLESS STEEL ACCESS DOOR

EEWS-X EMERGENCY EYEWASH & SHOWER

EEW-X EMERGENCY EYEWASH

GWVTR GREASE WASTE VENT THROUGH ROOF

PROPOSED GREASE WASTE VENT PIPING BELOW FINISHED FLOOR

EXISTING GREASE WASTE VENT PIPING BELOW FINISHED FLOOR TO REMAIN

GWV

XGWV

PROPOSED GREASE WASTE VENT PIPING ABOVE FINISHED FLOORGWV

EXISTING GREASE WASTE VENT PIPING ABOVE FINISHED FLOOR TO REMAINXGWV

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Key Plan

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Revision DescriptionRev Date

MAY 17, 2021

GORHAM, MAINE

20478

P00-1

DWS

MAM

LEGEND, SCHEDULES &GENERAL NOTES

2021

UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM

ATHLETIC TRAININGRENOVATIONS

PLUMBING PIPING MATERIALS SCHEDULE

SYSTEM MATERIAL

SANITARY WASTE & VENT (UNDERGROUND) SCHEDULE 40 POLYVINYL CHLORIDE (PVC)

SANITARY WASTE & VENT ( ABOVE GROUND) SCHEDULE 40 POLYVINYL CHLORIDE (PVC)

DOMESTIC WATER SUPPLY (ABOVE GROUND) TYPE "L" COPPER WITH PRESS FITTINGS

GENERAL NOTES

1 REFER TO INSTALLATION SCHEDULES FOR THE SIZE OF PIPING CONNECTIONS AND MOUNTING HEIGHTS OF EACHFIXTURE.

2 SANITARY WASTE PIPING SHALL BE INSTALLED WITH A PITCH OF 1/4" PER 1' -0".

3 INDIRECT WASTE PIPING SHALL BE INSTALLED WITH A PITCH OF 1/8" PER 1'- 0" EXCEPT WHERE NOTED.

4 PLUMBING CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF UTILITIES AT ALL POINTS OF CONNECTIONINDICATED ON DRAWINGS BEFORE START OF PROJECT.

5 PROVIDE ISOLATION VALVES ON BRANCH PIPING TO FIXTURE GROUPS & REMOTE FIXTURES AND WHERE INDICATEDON PLANS, VALVES SHALL BE LINE SIZE UNLESS OTHERWISE NOTED.

6 PIPING IN FINISHED AREAS SHALL BE ROUTED CONCEALED; EXPOSED PIPING, WHERE NECESSARY, SHALL BEROUTED AS HIGH AS POSSIBLE AND TIGHT TO WALLS.

7 COORDINATE ALL WORK WITH OTHER TRADES AND CONTRACTORS. COORDINATE PIPING INSTALLATION WITHSTRUCTURAL GRADE BEAMS, FOOTINGS, COLUMN PIERS, ETC. SLEEVE PIPING THROUGH GRADE BEAMS, FOOTING,ETC. WHERE REQUIRED AND AS NOTED ON PLANS. COORDINATE SLEEVE INSTALLATIONS WITH THE ARCHITECT,STRUCTURAL ENGINEER, STRUCTURAL CONTRACTOR AND GENERAL CONTRACTOR BEFORE CONCRETE ISINSTALLED. PIPING INVERTS AND SLOPE SHALL BE CLOSELY COORDINATED TO AVOID CONFLICTS WITH ALL OTHERTRADES BELOW SLAB WORK.

8 CLEAN FAUCET AERATORS AND PIPE STRAINERS PRIOR TO TURNING BUILDING OVER TO THE OWNER.

9 COORDINATE PIPE ROUTING AWAY FROM ELECTRICAL PANELS. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS.

10 ALL PLUMBING FIXTURE SHUT- OFF AND/OR BALANCING VALVES INSTALLED IN PIPE CHASES SHALL BE ACCESSIBLEFROM JUST ABOVE THE CEILING LINE OR ACCESS DOORS PROVIDED LOW IN CHASE WALL.ALL PLUMBING FIXTURESHUT-OFF AND/OR BALANCING VALVES INSTALLED IN PIPE CHASES SHALL BE ACCESSIBLE FROM JUST ABOVE THECEILING LINE OR ACCESS DOORS PROVIDED LOW IN CHASE WALL.

11 ALL UNDERSLAB PIPING SHALL BE INSTALLED TO PROVIDE NO LESS THAN 2" OF COVER BETWEEN THE PIPING ANDTHE FLOOR SLAB.

12 OSHA RULES, REGULATIONS AND REQUIREMENTS, AND ANY STATE AND LOCAL REQUIREMENTS FOR SAFETY SHALLBE FOLLOWED BY THE CONTRACTOR

13 PROVIDE FIXTURE STOPS ON ANY WATER SUPPLY IMMEDIATELY ADJACENT TO PLUMBING FIXTURES.

14 THE TERM "PROVIDE" SHALL MEAN "TO FURNISH, INSTALL AND CONNECT COMPLETELY".

15 ENTIRE PLUMBING INSTALLATION SHALL BE IN COMPLIANCE WITH ALL CURRENT LOCAL, STATE AND FEDERALCODES AND STANDARDS.

16 INDIRECT WASTES SHALL HAVE AN A IR GAP OF AT LEAST TWICE THE DIAMETER OF THE PIPE BUT NOT LESS THAN 1"

17 THE CONTRACTOR SHALL OBTAIN REQUIRED PERMITS AND ARRANGE FOR INSPECTIONS IN ACCORDANCE WITHSTATE & LOCAL ATHORITIES HAVING JURISDICTION

18 VOIDS BETWEEN PIPE SLEEVES AND PIPES SHALL BE FILLED WITH FIRE STOPPING WITH AN HOURLY RATING EQUALTO THAT OF THE WALL

19 PLUMBING CONTRACTOR SHALL CONFIRM EXISTING CONDITIONS PRIOR TO THE INSTALLATION OF SYSTEMS WHICHARE INTENDED TO TIE INTO OR REUSE ANY PART OF THE EXISTING PIPING OR EQUIPMENT

20 PROVIDE VACUUM BREAKERS ON HOSE CONNECTIONS AND WHERE INDICATED ON PLANS AND DETAILS

21 DOMESTIC WATER PIPING ROUTED UNDER SLAB SHALL BE IN A CONTINUOUS NON METALLIC CONDUIT, SEALED ATTHE TOP WITH NON SHRINK GROUT

22 ALL PROPOSED SUPPLY PIPING SHALL BE INSULATED, REFER TO SPECIFICATIONS FOR INSULATION THICKNESS &ACCEPTED PRODUCTS

23 DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE WORK. REVIEW THE GENERALNOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUTIN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY THE ARCHITECT OF ANY CONFLICTS ORDISCREPANCIES PRIOR TO SUBMISSION OF BID.

24 PROVIDE ALL REQUIRED PENETRATIONS IN RATED ASSEMBLIES, INCLUDING BUT LIMITED TO WALLS AND FLOORSWITH A UL APPROVED FIRESTOPPING ASSEMBLY INCLUDING LISTING LABEL OF PENETRATION AFTER PASSINGTHROUGH UTILITIES.

CONSTRUCTION DOCUMENTS

PLUMBING DEMOLITION NOTES

1 DURING DEMOLITION PROPERLY CAP AND PROTECT ALL PIPING THAT WILL REMAIN IN OPERATION

2 WHERE EXISTING INSULATION TO REMAIN IS DAMAGED BY THE REQUIREMENTS OF WORK, REPLACE ANY DAMAGEDINSULATION

3 PLUMBING CONTRACTOR SHALL REFER TO THE SPECIFICATIONS FOR DISTRIBUTION OF RESPONSIBILITY AMONGSTCONTRACTORS FOR SPECIFIC PORTIONS OF CUTTING AND PATCHING WORK. PLUMBING CONTRACTOR SHALLCOORDINATE ALL CUTTING AND PATCHING WORK WITH ALL OTHER CONTRACTORS INVOLVED AS DEFINED IN THESPECIFICATIONS

4 LOCATION OF EXISTING PIPING AS SHOWN ON DRAWINGS IS APPROXIMATE

5 COMPLETELY REMOVE ALL EQUIPMENT AS INDICATED, FIXTURES & OR MISCELLANEOUS ARTICLES IN THEIRENTIRETY INCLUDING AUXILLARY EQUIPMENT, PIPING, WIRING & CONDUIT

6 INCLUDE ALL DEMOLITION OF SYSTEMS AND COMPONENTS WHERE SYSTEMS SHALL BE REPLACED BY NEW WORK.REFER TO THE DRAWINGS & SPECIFICATIONS FOR SCOPE OF NEW & RECONNECTED WORK. THE INTENT OF THISREQUIREMENT IS TO HAVE THE CONTRACTOR DISCONNECT, DEMOLISH & REMOVE ALL EXPOSED & CONCEALEDWORK WHERE BEING REPLACED OR CONNECTED TO THE PROPOSED LAYOUTS

7 COORDINATE ELECTRICAL POWER DISCONNECTION PRIOR TO DEMOLITION WITH ELECTRICAL CONTRACTOR

8 PROTECT ALL FIXTURES, PLUMBING AND WORK OF OTHER TRADES WHICH IS TO REMAIN, FROM DAMAGE DURINGDEMOLITION

9 ALL PIPING TO REMAIN SHALL HAVE ENDS TERMINATED IN A NEAT MANNER READY FOR CONNECTION OF NEWWORK. ALL EXPOSED ENDS OF PIPING SHALL BE CAPPED

10 NO DEAD LEGS LONGER THAN 12" SHALL BE LEFT ON ANY PIPING UPON COMPLETION OF JOB

11 EXISTING PIPING NOT TO BE REUSED, NOT SUPPLYING ANY FIXTURE AND NOT SPECIFICALLY NOTED OR SHOWN ONDRAWINGS TO BE ABANDONED, SHALL BE COMPLETELY REMOVED

12 CONTRACTOR SHALL CLEAN UP, REMOVE AND DISPOSE OF ALL DEBRIS AND DISCARDED ITEMS UPON COMPLETIONOF CONSTRUCTION TO BE READY FOR A NEW OCCUPANCY CONDITION

13 DEMOLISH & COMPLETLY REMOVE EXISTING CONDITIONS DESIGNATED BY A HEAVY DASHED LINE UNLESS NOTEDOTHERWISE. REFER TO LEGEND AND DEMOLITION PLANS FOR SCOPE OF WORK

Page 7: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

HB HDH3

H1

XS-2"

XS-2"

DEMOLISH FLOOR

DRAIN & CAP DRAINAGE BELOW

FLOOR

XSD-6"

XS-4"

XS-4"

XS-4"

XSD-6"

DEMOLISH FLOOR DRAIN & CAP DRAINAGE BELOW

FLOOR

DEMOLISH FLOOR DRAIN & CAP DRAINAGE BELOW

FLOOR

XS-2"

DEMOLISH EXISTING DRAINAGE

PIPING & ASSOCIATED ACCESSORIES BACK TO THIS POINT

& PREPARE FOR RECONNECTION

DEMOLISH EXISTING FLOOR DRAIN & ASSOCIATED

ACCESSORIES

DEMOLISH EXISTING

FLOOR DRAIN & ASSOCIATED

ACCESSORIES

DEMOLISH EXISTING FLOOR DRAIN & ASSOCIATED

ACCESSORIES

DEMOLISH EXISTING DRAINAGE PIPING &

ASSOCIATED ACCESSORIES

XS-4"

XS-4"

XS-2"

XS-4"

XV-2"

XS-2"

XS-4"

HCH2

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca le

0 2' 4' 6'

1/4" = 1'-0"

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Revision DescriptionRev Date

MAY 17, 2021

GORHAM, MAINE

20478

P05-1

DWS

MAM

FIRST FLOOR BELOWSLAB DRAINAGE

DEMOLITION

2021

UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM

ATHLETIC TRAININGRENOVATIONS

CONSTRUCTION DOCUMENTS

SCALE: 1/4" = 1'-0"1

ENLARGED BELOW SLAB DRAINAGE DEMOLITION

Page 8: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

HBHD

H3

H1

XC

W-3

/4"

XHW-3

/4"

XCW-1

1/2

"

XHW-1

"XCW

-2 1

/2"

XC

W-1

/2"

XHW-1

/2"XCW

-1/2

"

XV-2 1

/2"

XV-2"

XCW-1

/2"

XHW-1

/2"

XC

W-2

"

XH

W-1

1/2

"

DEMOLISH EXISTING SUPPLY

PIPING & ACCESSORIES BACK TO THIS POINT & PREPARE FOR

RECONNECTION

DEMOLISH EXISTING DRINKING FOUNTAIN, ASSOCIATED SUPPLY

& DRAINAGE PIPING

DEMOLISH EXISTING WATER CLOSET, ASSOCIATED SUPPLY &

DRAINAGE PIPING

DEMOLISH EXISTING DRINKING FOUNTAIN, ASSOCIATED SUPPLY

& DRAINAGE PIPING

DEMOLISH EXISTING URINAL, ASSOCIATED SUPPLY & DRAINAGE

PIPING

DEMOLISH EXISTING URINAL, ASSOCIATED SUPPLY & DRAINAGE

PIPING

DEMOLISH EXISTING CARRIER, ASSOCIATED DRAINAGE PIPING &

ACCESSORIES

DEMOLISH EXISTING VENT PIPING

& ASSOCIATED ACCESSORIES

DEMOLISH EXISTING SUPPLY

PIPING & ASSOCIATED ACCESSORIES BACK TO RISERS &

PREPARE FOR RECONNECTION

DEMOLISH EXISTING WASH FOUNTAIN, ASSOCIATED SUPPLY

& DRAINAGE PIPING

DEMOLISH EXISTING SINK, ASSOCIATED SUPPLY & DRAINAGE

PIPING. SINK SHALL BE CLEANED & SAVED FOR RELOCATION IN NEW

CONSTRUCTION

DEMOLISH EXISTING SUPPLY

PIPING & ASSOCIATED ACCESSORIES BACK TO RISERS &

PREPARE FOR RECONNECTION

DEMOLISH EXISTING WASTE PUMP, DRAINAGE PIPING & ASSOCIATED

ACCESSORIES

DEMOLISH EXISTING PUMPED

WASTE BACK TO MAIN & CAP. CONTRACTOR TO FIELD VERIFY

EXACT LOCATION

DEMOLISH EXISTING

FLOOR DRAIN

DEMOLISH EXISTING

FLOOR DRAIN

DEMOLISH EXISTING

FLOOR DRAIN

DEMOLISH EXISTING

FLOOR DRAIN DEMOLISH EXISTING

FLOOR DRAIN

HC H2

XH

W-1

"

XC

W-1

"

XH

W-1

1/4

"

XC

W-1

1/2

"

XH

W-1

"

XV-2"

XV-2"

XV

-2"

XS-2"

XCW-1

"

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca le

0 2' 4' 6'

1/4" = 1'-0"

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Revision DescriptionRev Date

MAY 17, 2021

GORHAM, MAINE

20478

P05-2

DWS

MAM

FIRST FLOOR PLUMBINGDEMOLITION

2021

UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM

ATHLETIC TRAININGRENOVATIONS

CONSTRUCTION DOCUMENTS

SCALE: 1/4" = 1'-0"1

ENLARGED ABOVE SLAB DRAINAGE DEMOLITION

Page 9: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

HBHDH3

H1

HCH2

FS-1

SK-1

SK-2

FS-1

FS-1

FCO-1L-1

FD-1 WC-1

S-4"

S-3"

S-4"

FCO-1S-4"

S-2"

CONNECT 4" S

TO EXISTING

4" W UP

4" W UP

2" V UP

(2) 2" V UP

3" S UP

2" W UP

4" W UP

2" V UP

2" W UP

2" W UP

2" W UP

S-4"

S-4"S-4"

XS-2"

XS-2"

XS-2"

XS-4"

XS-4"

XS-4"

XS-4"

CAP

BELOW SLAB

CAP

BELOW SLAB

CAP

BELOW SLAB

CAP

BELOW SLAB

XSD-6"

XSD-6"

XS-2"

XS-2"

OFFICE

113

ATHLETIC TRAINING

112

OFFICE

116

OFFICE

117

WET ROOM

112W

SUPPLY ROOM

112S

MECHANICAL

129

OFFICE

115

OFFICE

114

TUB DRAIN

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca le

0 2' 4' 6'

1/4" = 1'-0"

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Revision DescriptionRev Date

MAY 17, 2021

GORHAM, MAINE

20478

P10-1

DWS

MAM

BELOW SLAB DRAINAGE

2021

UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM

ATHLETIC TRAININGRENOVATIONS

CONSTRUCTION DOCUMENTS

SCALE: 1/4" = 1'-0"1

ENLARGED BELOW SLAB DRAINAGE

Page 10: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

FD-1

FS-1

OFFICE

116

OFFICE

113

OFFICE

114

OFFICE

115

112S

SUPPLY

ROOM

TOILET

112T

OFFICE

117

WET ROOM

112W

ATHLETIC TRAINING

112

MENS GA LOCKER

ROOM

120

CORRIDOR

111

MECHANICAL

129

SF-1

HB HDH3

H1

HC H2

FCO-1L-1

WC-1

FS-1

FCO-1

FS-1

SK-2

SK-1

2" V DN

4" W DN

2" W &

1-1/2" V DN

2" W &

1-1/2" V DN

2" W &

1-1/2" V DN

CAP VENT

PIPE

4" W DN

(2) 2" V DN

4" W DN

2" V DN

3" S DN

2" W DN

V-2"

CONNECT 2" V

TO EXISTING

CAP VENT

PIPEXV-2

1/2

"

XV-2"

1-1/2" CD DN

TO FS-1 DN

CD-1

1/2"

CO

CO

CD-1

1/2

"

CD-1

1/2

"

1/4" TUBING

1/4" TUBING

1/4" TUBING

1/4" TUBING

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca le

0 2' 4' 6'

1/4" = 1'-0"

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Revision DescriptionRev Date

MAY 17, 2021

GORHAM, MAINE

20478

P10-2

DWS

MAM

ABOVE SLAB DRAINAGE

2021

UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM

ATHLETIC TRAININGRENOVATIONS

CONSTRUCTION DOCUMENTS

SCALE: 1/4" = 1'-0"1

ENLARGED FIRST FLOOR DRAINAGE

Page 11: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

SK-1

L-1

HBHD

H3

H1

HC H2

XCW-1

/2"

XCW-1

/2"

XHW-1

/2"

XH

W-1

/2"

XC

W-3

/4"

XHW-3

/4"

XCW-1

1/2

"

XHW-1

"XCW

-2 1

/2"

XHW-3

/4"

XCW-2

1/2

"

TP-1

SA-"A"WC-1

CONNECT 1" HW &

CW TO EXISTING

CONNECT 1-1/2" HW &

2" CW TO EXISTING

CONNECT 1/2" HW &CW TO EXISTING

SUPPLY UP

CONNECT 1/2" HW &CW TO EXISTING

SUPPLY UP

1/2" CW DN

SK-2

SF-1

1/2" HW &

CW DN

1/2" HW &

CW DN

1-1/2" CW DN PIPE IN WALL

TO WATER CLOSET

1/2" HW &

CW DN1/2" HW &

CW DN

CW

-3/4"

HW

-3/4"

CW-3

/4"

HW-3

/4"

CW-3

/4"

HW-3

/4"

CW-1

"HW

-3/4

"

1/2"

1/2"

1/2"1/

2"1/2"

1/2"

CW

-2"

HW

-1 1/2

"

CW

-2"

HW

-1 1/2

"

XC

W-3

/4"

OFFICE

113

OFFICE

114

ATHLETIC TRAINING

112

OFFICE

116

OFFICE

117

WET ROOM

112W

TOILET

112T

MECHANICAL

129

SUPPLY ROOM

112S

OFFICE

115

HB-1

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca le

0 2' 4' 6'

1/4" = 1'-0"

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Revision DescriptionRev Date

MAY 17, 2021

GORHAM, MAINE

20478

P20-1

DWS

MAM

FIRST FLOOR SUPPLY

2021

UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM

ATHLETIC TRAININGRENOVATIONS

CONSTRUCTION DOCUMENTS

SCALE: 1/4" = 1'-0"1

FIRST FLOOR SUPPLY

Page 12: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

CEILING

CEILING MOUNTED

A/C UNIT

CONNECT TO

CONDENSATE PUMP PROVIDED WITH

CASSETTE

RISE PIPE AS HIGH AS POSSIBLE WITHOUT EXCEEDING THE

NOTED MAXIMUM HEIGHT

1/4" PUMP DISCHARGE

FLEXIBLE TUBING

CONNECT TO MAIN DRAIN

AIR INTAKE VENT

PITCH TO DRAIN

.

.

24"

MA

X.

.

.

21"

MA

X.

1-1/2" CONDENSATE

DN TO FLOOR SINK

WALL

FINISHED FLOOR

WALL

EXTEND 1" BELOW THE

GRATE WITH AIR BREAK

12" X 12" FLOOR SINK

WITH 1/2 GRATE

STANDARD FLOOR SINK

DETAIL

4" TRAP UNLESS OTHER

WISE NOTED ON PLANS

4" W TO SANITARY MAIN

REFER TO PLANS

FINISHED FLOOR

CONNECT TO 1-1/2"

MAIN DRAIN

FLEXIBLE TUBING

1/4" CLEAR TUBING

CONNECT TO

CONDENSATE PUMP PROVIDED WITH

CASSETTE

18"

MIN

.

EXTERIOR SURFACE

OF 4" I.D PVC PIPE

HUBLESS JOINT

STAINLESS STEEL

RETAINING CLAMP (TYP)

CLEANOUT CAPSHALL BE FLUSH WITH TOP

OF SLAB

EXPOSED SLAB

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Revision DescriptionRev Date

MAY 17, 2021

GORHAM, MAINE

20478

P30-1

DWS

MAM

DETAILS

2021

UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM

ATHLETIC TRAININGRENOVATIONS

CONSTRUCTION DOCUMENTSNO SCALE3

CEILING MOUNTED A/C UNIT W/ INTERNAL PUMP

NO SCALE2

AHU-1 CONDENSATE DRAIN WITH PUMPNO SCALE

1FLOOR CLEANOUT AT END OF BRANCH

Page 13: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Revision DescriptionRev Date

MAY 17, 2021

GORHAM, MAINE

20478

P60-1

DWS

MAM

SCHEDULES

2021

UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM

ATHLETIC TRAININGRENOVATIONS

CONSTRUCTION DOCUMENTS

TRAP PRIMER SCHEDULEBASIS OF DESIGN TRAP PRIMER SPECIFICATIONS REFER TO THE SPECIFICATIONS FOR

APPROVED EQUALS AND DETAILED DESCRIPTIONS

TAG MANUFACTURER MODEL

BRANCH SIZE AVAILABLE TRAP

CONNECTIONSCW TP

TP-1 MIFAB PRESSURE ACTIVATED TRAPSEAL PRIMER WITH ADJUSTMENT

SCREW MODEL M3-500-NPB

1/2" 1/2" 4

DRAIN SCHEDULEBASIS OF DESIGN DRAIN SPECIFICATIONS REFER TO THE SPECIFICATIONS FOR APPROVED EQUALS AND DETAILED DESCRIPTIONS

TAG DESCRIPTION

BRANCH SIZE SPECIFICATIONS

BASIS OF DESIGN NOTESW V

FCO-1 FLOOR CLEANOUT 4" - WATTS ROUND STAINLESS STEEL STRAINER MODEL CO-1204-R

FCO-2 FLOOR CLEANOUT 3" -. WATTS ROUND STAINLESS STEEL STRAINER MODEL CO-1203-R

FD-1 FLOOR DRAIN 2" 2" WATTS ROUND HEAVY DUTY STAINLESS STEEL STRAINER MODEL FD-1100-2-B6- 6-7

FS-1 FLOOR SINK 4" 2" WATTS STAINLESS STEEL FLOOR SINK MODEL FS-780-4-6-175-HD

PLUMBING FIXTURE INSTALLATION SCHEDULEFURNISHED AND INSTALLED BY PLUMBING CONTRACTOR

TAG DESCRIPTION

BRANCH CONNECTION BASIS OF DESIGN FIXTURE SPECIFICATIONS

REFER TO THE SPECIFICATIONS FOR APPROVED

EQUALS AND DETAILED DESCRIPTIONS

BASIS OF DESIGN FIXTURE SPECIFICATIONS

REFER TO THE SPECIFICATIONS FOR APPROVED

EQUALS AND DETAILED DESCRIPTIONS

MOUNTING HEIGHT

TO RIM UNLESS

NOTED OTHERWISEW V CW HW

WC-1 ADA COMPLIANTWATER CLOSET

FLOOR MOUNTED

3" 2" 1" - AMERICAN STANDARD MADERA EVERCLEAN MODEL 3461.001,PROVIDE CHURCH MODEL 9500CT TOILET SEAT

SLOAN CROWN MODEL 111-1.28 16 1/2"

L-1 ADA COMPLIANTWALL HUNGLAVATORY

2" 1 1/2" 1/2" 1/2" AMERICAN STANDARD MURRO WITH ACRYLIC SHROUD MODEL0954.004EC-0062.00EC, PROVIDE WATTS CONCEALED ARM LAVATORY

CARRIER

AMERICAN STANDARD NEXTGEN SELECTRONIC MODEL 7755.315 34"

SK-1 DROP IN SINK 2" 1 1/2" 1/2" 1/2" DROP IN JUST MFG SINK SL-ADA-2019-16-GR,PROVIDE CENTER REARDRAIN

CHICAGO FAUCET MANUAL FAUCET MODEL 201- G8AE35- 317XKAB 34"

SK-2 EXISTINGRELOCATED SINK

2" 1 1/2" 1/2" 1/2" EXISTING CHICAGO FAUCET MANUAL FAUCET MODEL 305- VBRXKCP 34"

SF-1 SERVICE FAUCET - - 1/2" 1/2" "-" CHICAGO FAUCET MODEL 305-VBRXKCP WITH 20' HOSE AND WESTWARDSTAINLESS STEEL HOSE HANGER MODEL 48PG06

42"

HB-1 HOT WATER HOSEBIBB

3/4" - CHICAGO FAUCETS MODEL 442- LKCABCP 60"

SHOCK ARRESTOR SCHEDULE

TAG MANUFACTURER MODEL

BRANCH

CONNECTION

SUPPORTED

FIXTURE

UNITS

SA-"A" OATEY QUIET PIPE MODEL 34486 1/2" 1-11

Page 14: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

ALL SPRINKLERS WITHIN THIS ZONE WILL BE REMOVED; BRANCH PIPING SHALL REMAIN FOR

EXTENSION OF PROPOSED SPRINKLERS

HBHD

H3

H1

HC H2

SPRINKLER PIPING ABOVE FINISHED FLOORF

CAP

DN DOWN

AFF ABOVE FINISHED FLOOR

BFF BELOW FINISHED FLOOR

TYP. TYPICAL

FIRE PROTECTION LEGEND

CONCEALED PENDANT WET SPRINKLER

SEMI RECESSED WET SPRINKLER

SEMI RECESSED DRY SPRINKLER

UPRIGHT SPRINKLER

SIDEWALL WET SPRINKLER

SIDEWALL DRY SPRINKLER

EXISTING SPRINKLER PIPING ABOVE FINISHED FLOORXF

DEMOLISHED SPRINKLER PIPING ABOVE FINISHED FLOOR

DEMO AND REWORK EXISTING SPRINKLER LAYOUT TO PROVIDE FIRE PROTECTION

FOR UPDATED PLAN LAYOUT WITHIN HATCHED AREA INDICATED ON PLANS.COORDINATE SPRINKLER HEAD TYPES REQUIRED WITH NEW CEILING

CONSTRUCTION.COORDINATE LOCATON OF SPRINKLER HEADS WITH ALL OTHER TRADES. PROVIDE SPRINKLER HEADS WITHIN ALL COMBUSTABLE CEILING CAVITIES.

SPRINKLER SYSTEM SHALL COMPLY WITH NFPA-13

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca le

0 2' 4' 6'

1/4" = 1'-0"

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Revision DescriptionRev Date

MAY 17, 2021

GORHAM, MAINE

20478

F05-1

DWS

MAM

FIRST FLOORDEMOLITION FIRE

PROTECTION

2021

UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM

ATHLETIC TRAININGRENOVATIONS

CONSTRUCTION DOCUMENTS

SCALE: 1/4" = 1'-0"1

ENLARGED FIRST FLOOR DEMOLITION FIRE PROTECTION

Page 15: G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...

SPRINKLER PIPING ABOVE FINISHED FLOORF

CAP

DN DOWN

AFF ABOVE FINISHED FLOOR

BFF BELOW FINISHED FLOOR

TYP. TYPICAL

FIRE PROTECTION LEGEND

CONCEALED PENDANT WET SPRINKLER

SEMI RECESSED WET SPRINKLER

SEMI RECESSED DRY SPRINKLER

UPRIGHT SPRINKLER

SIDEWALL WET SPRINKLER

SIDEWALL DRY SPRINKLER

EXISTING SPRINKLER PIPING ABOVE FINISHED FLOORXF

DEMOLISHED SPRINKLER PIPING ABOVE FINISHED FLOOR

DEMO AND REWORK EXISTING SPRINKLER LAYOUT TO PROVIDE FIRE PROTECTION

FOR UPDATED PLAN LAYOUT WITHIN HATCHED AREA INDICATED ON PLANS.COORDINATE SPRINKLER HEAD TYPES REQUIRED WITH NEW CEILING

CONSTRUCTION.COORDINATE LOCATON OF SPRINKLER HEADS WITH ALL OTHER TRADES. PROVIDE SPRINKLER HEADS WITHIN ALL COMBUSTABLE CEILING CAVITIES.

SPRINKLER SYSTEM SHALL COMPLY WITH NFPA-13

HB

HD

H3

H1

HC H2

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca leGra ph ic Sca le

Gra ph ic Sca le

0 2' 4' 6'

1/4" = 1'-0"

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Revision DescriptionRev Date

MAY 17, 2021

GORHAM, MAINE

20478

F10-1

DWS

MAM

FIRST FLOOR FIREPROTECTION

2021

UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM

ATHLETIC TRAININGRENOVATIONS

CONSTRUCTION DOCUMENTS

SCALE: 1/4" = 1'-0"2

ENLARGED FIRST FLOOR FIRE PROTECTION