Quick Tips for SAS Institute A00-260 Exam - Get Actual A00-260 Dumps
G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...
Transcript of G00-1 COVER SHEET ARCHITECTURAL DRAWINGS A00-1 ...
G00-1 COVER SHEET
ARCHITECTURAL DRAWINGS
A00-1 ABBREVIATIONS AND LEGENDS
A10-1 DEMOLITION, LIFE SAFETY AND FIRST FLOOR PART PLANS
A40-1 PARTITION LEGEND AND DETAILS
A70-1 MATERIALS, CEILING AND FURNITURE PLANS AND SCHEDULES
PLUMBING DRAWINGS
P00-1 LEGEND, SCHEDULES & GENERAL NOTES
P05-1 FIRST FLOOR BELOW SLAB DRAINAGE DEMOLITION
P05-2 FIRST FLOOR PLUMBING DEMOLITION
P10-1 BELOW SLAB DRAINAGE
P10-2 ABOVE SLAB DRAINAGE
P20-1 FIRST FLOOR SUPPLY
P30-1 DETAILS
P60-1 SCHEDULES
FIRE PROTECTION DRAWINGS
F05-1 FIRST FLOOR DEMOLITION FIRE PROTECTION
F10-1 FIRST FLOOR FIRE PROTECTION
MECHANICAL DRAWINGS
M00-1 LEGEND & GENERAL NOTES
M05-1 FIRST FLOOR DEMOLITION DUCTWORK
M06-1 FIRST FLOOR DEMOLITION PIPING
M10-1 FIRST FLOOR DUCTWORK
M20-1 FIRST FLOOR PIPING
M50-1 DETAILS
M60-1 SCHEDULES
ELECTRICAL DRAWINGS
E00-1 LEGENDS, NOTES AND SCHEDULES
E05-1 PART PLAN EXISTING CONDITIONS
E10-1 PART PLAN LIGHTING
E20-1 PART PLAN POWER
E60-1 ELECTRICAL SCHEDULES
RL ROOF LEADER
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RR RETURN REGISTER
S SANITARY
S SOIL
S SOUTH
S STEAM
SA SUPPLY AIR
SD SMOKE DAMPER
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SEC SECTION
SF SUPPLY FAN
SG SUPPLY GRILLE
SHT SHEET
SIM SIMILAR
SK SINK
SMU SOLID MASONRY UNIT
SPEC SPECIFICATION (S)
SPF SPRUCE PINE FIR
SQ SQUARE
SR SUPPLY REGISTER
SS STAINLESS STEEL
SSK SERVICE SINK
STD STANDARD
STL STEEL
STOR STORAGE
SYM SYMMETRY (ICAL)
SYS SYSTEM
T TREAD
T&G TONGUE & GROOVE
T'STAT THERMOSTAT
TB TEST BORING
TD TRANSFER DUCT
TD TRENCH DRAIN
TEL TELEPHONE
TG TRANSFER GRILLE
THK THICK (NESS)
TKBD TACKBOARD
TL TOTAL LOAD
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOS TOP OF STEEL
TP TEST PIT
TPTN TOILET PARTITION
TV TELEVISION
TYP TYPICAL
UD UNDERDRAIN
UGDUNDERGROUNDDUCTWORK
UH UNIT HEATER
UNOUNLESS NOTEDOTHERWISE
UR URINAL
UV UNIT VENTILATOR
V VENT
VAV VARIABLE AIR VOLUME
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
VF VINYL FABRIC
VTR VENT THRU ROOF
W WEST, WIDTH, WIDE
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WCH WATER CLOSET HANDICAP
WCO WALL CLEANOUT
WD WOOD
WG WALL GRILLE
WH WALL HUNG
WIN WINDOW
WP WORKING POINT
WR WALL REGISTER
WWF WELDED WIRE FABRIC
LB (S) POUNDS
LD LINEAR DIFFUSER
LD LINED DUCT
LF LAWN FAUCET
LF LINEAL FEET
LG LONG
LL LIVE LOAD
LPS LOW PRESSURE STEAM
LTG LIGHTING
LTL LINTEL
LTW LOW TEMPERATURE STEAM
LW LIMIT OF WORK
M METER (S)
MAS MASONRY
MAX MAXIMUM
MBH1000 BRITISH THERMALUNIT
MD MANUAL DAMPER
MD MOTORIZED DAMPER
MECH MECHANICAL
MED MEDIUM
MET METAL
MFR MANUFACTURE (R)
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MM MILLIMETER (S)
MO MASONRY OPENING
MR MOP RECEPTOR
MT METAL THRESHOLD
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
No NUMBER
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER (S)
OD OUTSIDE DIAMETER
OED OPEN END DUCT
OFF OFFICE
OH OVERHEAD
OPG OPENING
OPH OPPOSITE HAND
OPP OPPOSITE
P PLATE
P PLUMBING
P PUMP
PAR PARALLEL
PFN PREFINISHED
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PNL PANEL
PNT PAINT (ED)
PP POINT TO POINT
PSFPOUNDS PER SQUAREFOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTN PARTITION
PVC POLYVINYL CHLORIDE
PWD PLYWOOD
PWG POLISHED WIRE GLASS
QT QUARRY TILE
R RISER
RA RETURN AIR
RAD RADIATION
RAD RADIUS
RB RUBBER BASE
RD ROOF DRAIN
REF REFERENCE
REFR REFRIGERATOR
REV REVISION (S)
RG RETURN GRILLE
DWG DRAWING
E EAST
EB EXPANSION BOLT
EF EXHAUST FAN
EIFSEXTERIOR INSULATEDFINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION (S)
ELEC ELECTRIC (AL)
EM ELECTRIC MANHOLE
EP ELECTRIC PANEL
EQ EQUAL
ER EXHAUST REGISTER
ES EACH SIDE
EST ESTIMATE
EWC ELECTRIC WATER COOLER
EXG EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAI FRESH AIR INTAKE
FC FLEXIBLE CONNECTION
FCO FLOOR CLEANOUT
FD FIRE DAMPER
FD FLOOR DRAIN
FD FOUNDATION DRAIN
FE FIRE EXTINGUISHER
FHS FIRE HOSE STATION
FIN FINISH (ED)
FL FINISH LENGTH
FLG FLASHING
FLR FLOOR (ING)
FOC FACE OF CONCRETE
FOS FACE OF STUD
FRR FLOOR RETURN REGISTER
FS FAR SIDE
FTG FOOTING
FYMINIMUM YIELD STRESS(KSI)
GA GAGE, GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACT (OR)
GL GLASS
GPDW GYPSUM DRY WALL
GPM GALLONS PER MINUTE
GV GATE VALVE
H HARDENER
HB HOSE BIB
HD HUB DRAIN
HM HOLLOW METAL
HORIZ HORIZONTAL
HPS HIGH PRESSURE STEAM
HT HEIGHT
HTG HEATING
HTW HOT TEMPERATURE WATER
HVACHEATING - VENTILATING -AIR CONDITIONING
HW HOT WATER
HYD HYDRANT
ID INSIDE DIAMETER
INS INSULATE (D) (ION)
INT INTERIOR
INV INVERT
IPS IRON PIPE SIZE
JC JANITOR'S CLOSET
JT JOINT
K KIPS
KIT KITCHEN
KSI KIPS PER SQUARE INCH
LAB LABORATORY
LAM LAMINATE (D)
LAV (L) LAVATORY
A/C AIR CONDITIONING
AB ANCHOR BOLT
ABT ABOUT
AC ACOUSTICAL
ACB ABOVE CEILING BELOW
ACT ACOUSTICAL TILE
AD ACCESS DOOR
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AL ACOUSTICAL LINING
AL ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APX APPROXIMATE
ARCH ARCHITECT (URAL)
B/W BOTTOM OF WALL
BD BOARD
BDD BACKDRAFT DAMPER
BIT BITUMINOUS
BJ BAR JOIST
BLDG BUILDING
BLKG BLOCKING
BM BENCH MARK
BOF BOTTOM OF FOOTING
BOT BOTTOM
BP BEARING PLATE
BSMT BASEMENT
BSP BASE PLATE
BTU BRITISH THERMAL UNIT
CAB CABINET
CB CATCHBASIN
CD CEILING DIFFUSER
CEM CEMENT (ITIOUS)
CER CERAMIC
CF CUBIC FEET
CFM CUBIC FEET PER MINUTE
CG CEILING GRILLE
CHBD CHALKBOARD
CHT CEILING HEIGHT
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CJT CONTROL JOINT
CL CLOSET
CLG CEILING
CM CENTIMETER (S)
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONN CONNECT
CONST CONSTRUCTION
CONT CONTINUE (OUS)
CONTR CONTRACT (OR)
CORR CORRUGATED
CPT CARPET (ED)
CR CONDENSATE RETURN
CT CERAMIC TILE
CUH CABINET UNIT HEATER
CULV CULVERT
CV CONVECTOR
CW COLD WATER
CY CUBIC YARD
DF DOUGLAS FIR
DF DRINKING FOUNTAIN
DG DOOR GRILLE
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIV DIVISION
DL DEAD LOAD
DMT DEMOUNTABLE
DN DOWN
DTL DETAIL
DW DUCT WRAP
DN
DEMOLITION KEY NOTES
D01 REMOVE EXISTING CMU WALL COMPLETE.
D02 REMOVE EXISTING GPDW WALL COMPLETE. PREP FLOOR
BELOW TO CECIEVE NEW FLOORING.
D03 REMOVE EXISTING DOOR, HM FRAME AND HARDWARE
COMPLETE.
D04 REMOVE EXISTING HM BORROWED LIGHT COMPLETE.
D05 EXISTING STOREFRONT PANEL OF DOORS, HINGES, SLABS AND
HARDWARE TO BE REMOVED AND RELOCATED FOR
RE-INSTALLATION. ALUMINUM STOREFRONT FRAME AT
REMOVED DOOR PANEL TO RECIEVE GLAZING INFILL.
D06 REMOVE EXISTING GLAZING AND PORTION OF EXISTING
STOREFRONT SILL AS REQUIRED TO RECIEVE NEW
STOREFRONT DOOR AT THIS LOCATION.
D07 REMOVE EXISTING PORTION OF SITE CAST CONCRETE WALL TO
ACCOMODATE NEW DOOR OPENING. COORDINATE WITH
STRUCTURAL DRAWINGS.
D07A REMOVE EXISTING PORTION OF CMU WALL TO ACCOMODATE
NEW DOOR OPENING. COORDINATE WITH STRUCTURAL
DRAWINGS.
D08 REMOVE EXISTING MOSAIC FLOOR TILE COMPLETE. CLEAN AND
PREP FLOOR TO RECIEVE NEW FLOORING MATERIALS.
D09 REMOVE EXISTING CARPET FLOORING COMPLETE. F.V. VERIFY
MOSAIC TILE IS NOT PRESENT. REMOVE MOSAIC TILE IF FOUND
UNDER CARPET. CLEAN AND PREP FLOOR TO RECIEVE NEW
FLOORING.
D10 REMOVE EXISTING ACOUSTICAL CEILING TILE AND ASSOCIATED
GRID. REMOVE ALLCEILING DEVICES IN GRID AND COORDINATE
REMOVAL OR RELOCATION WITH ELECTRICAL DRAWINGS.
D11 REMOVE EXISTING GPDW CEILING OR SOFFIT AND FRAMING
COMPLETE. REMOVE ALL CEILING DEVICES IN GRID AND
COORDINATE REMOVAL OR RELOCATION WITH ELECTRICAL
DRAWINGS.
D12 REMOVE EXISTING HANDRAIL AND ASSOCITATED STL
BALUSTERS AND BASE, COMPLETE.
D13 REMOVE EXISTING PLUMBING FIXTURE. SEE PLUMBING
REMOVALS FOR ADDITIONAL INFORMATION.
D14 REMOVE EXISTING BANK OF LOCKERS. FIELD VERIFY EXISTING
FLOOR CONDITION BELOW LOCKERS AND INSTALL NEW MOSAIC
TILE IF/AS REQUIRED TO MATCH ADJACENT. SALVAGE LOCKERS
FOR OWNER.
D15 REMOVE EXISTING CONCRETE FLOOR SLAB AS REQUIRED TO
COMPLETE UNDERSLAB PLUMBING SCOPE. COORDINATE WITH
PLUMBING DRAWINGS.
SEE SCHEDULE FOR OVERAL WIDTH
STUD PARTITION TYPE SCHEDULE
TAG TYPE STUD SIZEGPDW HEIGHT FIRE-RATING SOUND RATING OVERALL
WIDTHREMARKS
SIDE 1 SIDE 2 RATING UL # INSUL STC
B20 B 2 1/2" STL TO DECK - 0 - 3 1/8"
D30 D 3 5/8" STL TO DECK TO DECK 0 - 4 7/8"
D60 D 6" STL TO DECK TO DECK 0 - 7 1/4"
MASONRY PARTITION TYPE SCHEDULE
TAG TYPE NOMINAL SIZEFIRE OVERALL
WIDTHREMARKS
HRS UL #
2" TYP
SEE SCHED
2" TYP
SEE SCHED SEE SCHED
SEE SCHED SEE SCHED SEE SCHED
8" 8"
DOOR AND FRAME SCHEDULE
DOOR
MARK
DOOR FRAME
REMARKSOPENING SIZELEAVES THK TYPE MAT GLASS TYPE MAT
DETAILS
WID HT HEAD JAMB SILL
111 3' - 0" 7' - 0" (1) 1 3/4" SF2 AL TEMP INS 3 AL RELOCATED EXG DOOR AND FRAME
112 3' - 8" 7' - 0" (1) 1 3/4" EXG EXG EXG 2 EXG
112S 3' - 0" 7' - 0" (1) 1 3/4" F 2 HM
112T 3' - 0" 7' - 0" (1) 1 3/4" F WD 2 HM
113 3' - 0" 7' - 0" (1) 1 3/4" FG WD TEMP 2 HM
114 3' - 0" 7' - 0" (1) 1 3/4" FG WD TEMP 2 HM
115 3' - 0" 7' - 0" (1) 1 3/4" FG WD TEMP 2 HM
116 3' - 0" 7' - 0" (1) 1 3/4" FG WD TEMP 2 HM
117 3' - 0" 7' - 0" (1) 1 3/4" FG WD TEMP 2 HM
120 3' - 0" 7' - 0" (1) 1 3/4" EXG EXG EXG 2 EXG
ROOM FINISH SCHEDULE
ROOM WAINSCOT WALLS
REMARKSNo. NAME CODE HT N E S W
111 CORRIDOR EXG EXG EXG
112 ATHLETIC TRAINING RF1 RWB1 VARIES PT1 PT1 VARIES
112S SUPPLY ROOM SC RWB1 PT1 PT1 PT1 PT1
112T TOILET MT1 MT2 CT1 CT1 CT1 CT1
112W WET ROOM MT1 MT2 CT1 CT1 CT1 CT1
113 OFFICE CPT1 RWB1 PT1 PT1 PT1 PT1
114 OFFICE CPT1 RWB1 PT1 PT1 PT1 PT1
115 OFFICE CPT1 RWB1 PT1 PT1 PT1 PT1
116 OFFICE CPT1 RWB1 PT1 PT1 PT1 PT1
117 OFFICE CPT1 RWB1 PT1 PT1 PT1 PT1
MATERIALS LEGEND
MATERIAL MANUFACTURER / SERIES COLOR / FINISH
CARPET TILE 24" X 24" CPT1 MOWHAWK GROUP - TBD TBD
CPT2 MOWHAWK GROUP - TBD TBD
RUBBER FLOOR TILE RF1 ECORE COMMERCIAL - ECOSURFACES NRG TBD
RUBBER WALL BASE 6" RWB1 JOHNSONITE TBD
TRANSITION STRIP TS JOHNSONITE TBD
CERAMIC WALL TILE CT1 TBD TBD
MARBLE THRESHOLD MT TBD TBD
MOSAIC FLOOR TILE 2" X 2" MT1 DALTILE / KEYSTONES TBD
MOSAIC TILE WALL BASE MT2 DALTILE / KEYSTONES TBD
PAINT - FIELD PT1 SHERWIN WILLIAMS TBD
PAINT - ACCENT PT2 SHERWIN WILLIAMS TBD
PAINT - ACCENT PT3 SHERWIN WILLIAMS TBD
PAINT - DOOR TRIM PT4 SHERWIN WILLIAMS TBD
WOOD STAIN WS1 MARSHFIELD DOOR SYSTEMS / PLAIN SLICED MAPLE CLEAR STAIN
ACOUSTICAL CEILING TILE 2' X 2' ACT1 ARMSTRONG TBD
ACOUSTICAL CEILING TILE 2' X 4' ACT2 ARMSTRONG TBD
SEALED CONCRETE SC TBD TBD
PROPOSED VENT PIPING ABOVE FINISHED FLOORV
EXISTING SANITARY PIPING ABOVE FINISHED FLOOR TO REMAIN
EXISTING PIPING BELOW FINISHED FLOOR TO BE COMPLETELY REMOVED
PROPOSED SANITARY PIPING BELOW FINISHED FLOOR
SD
LEGEND
CHECK VALVE
PRESSURE RELIEF VALVE
EWC-X ELECTRIC WATER COOLER
SA "X"
VTR
SHOCK ARRESTOR (P.D.I RATING)
VENT THROUGH ROOF
SHUT-OFF VALVE
CAP
DN DOWN
AFF ABOVE FINISHED FLOOR
BFF BELOW FINISHED FLOOR
TYP. TYPICAL
SGTR SOIL GAS THROUGH ROOF
CIRCULATING PUMP
THERMOMETER
AD ACCESS DOOR
BP-X BOOSTER PUMP
DCP-X DOMESTIC CIRCULATING PUMP
EEW-X EMERGENCY EYEWASH
ET-X EXPANSION TANK
FD-X FLOOR DRAIN
FS-X FLOOR SINK
HB-X HOSE BIBB
CW CLOTHES WASHER
DW DISH WASHER
L-X LAVATORY
MB-X MOP BASIN
SI-X SOLIDS INTERCEPTOR
SK-X SINK
SP-X SUMP PUMP
SH-X SHOWER
UR-X URINAL
WC-X WATER CLOSET
WF-X WASH FOUNTAIN
WH-X WALL HYDRANT
TP-X TRAP PRIMER
FCO-X FLOOR CLEANOUT
EXISTING PIPING ABOVE FINISHED FLOOR TO BE COMPLETELY REMOVED
PROPOSED SANITARY PIPING ABOVE FINISHED FLOORS
XS
EXISTING VENT PIPING ABOVE FINISHED FLOOR TO REMAINXV
PROPOSED GREASE WASTE PIPING ABOVE FINISHED FLOORGW
EXISTING STORM DRAIN PIPING ABOVE FINISHED FLOOR TO REMAINXSD
PROPOSED STORM DRAIN PIPING ABOVE FINISHED FLOORSD
EXISTING SOIL GAS PIPING ABOVE FINISHED FLOOR TO REMAINXSG
PROPOSED SOIL GAS PIPING ABOVE FINISHED FLOORSG
PROPOSED COLD WATER PIPING ABOVE FINISHED FLOORCW
EXISTING COLD WATER PIPING ABOVE FINISHED FLOOR TO REMAINXCW
EXISTING HOT WATER PIPING ABOVE FINISHED FLOOR TO REMAINXHW
PROPOSED HOT WATER PIPING ABOVE FINISHED FLOORHW
EXISTING GAS PIPING ABOVE FINISHED FLOOR TO REMAINXG
PROPOSED GAS PIPING ABOVE FINISHED FLOORG
EXISTING GREASE WASTE PIPING ABOVE FINISHED FLOOR TO REMAINXGW
EXISTING HOT WATER RETURN PIPING ABOVE FINISHED FLOOR TO REMAINXHWR
PROPOSED HOT WATER RETURN PIPING ABOVE FINISHED FLOORHWR
PROPOSED VENT PIPING BELOW FINISHED FLOOR
EXISTING SANITARY PIPING BELOW FINISHED FLOOR TO REMAIN
EXISTING VENT PIPING BELOW FINISHED FLOOR TO REMAIN
PROPOSED GREASE WASTE PIPING BELOW FINISHED FLOOR
EXISTING STORM DRAIN PIPING BELOW FINISHED FLOOR TO REMAIN
PROPOSED STORM DRAIN PIPING BELOW FINISHED FLOOR
EXISTING SOIL GAS PIPING BELOW FINISHED FLOOR TO REMAIN
PROPOSED SOIL GAS PIPING BELOW FINISHED FLOOR
EXISTING GREASE WASTE PIPING BELOW FINISHED FLOOR TO REMAIN
S
V
XS
XV
GW
XSD
SD
XSG
SG
XGW
HOT WATER HOSE BIBB
FREEZE PROOF WALL HYDRANT
FLOOR CLEANOUT
FLOOR DRAIN
PIPE DROP
PIPE RISE
FLOOR SINK
ROOF DRAIN
WALL CLEANOUT
WCO WALL CLEANOUT
CO CLEANOUT
CLEAOUT
UNION
BACKFLOW PREVENTER
WATER METER
SINGLE HORIZONTAL ADJUSTABLE CARRIER
BACK TO BACK HORIZONTAL ADJUSTABLE CARRIER
SINGLE VERTICAL ADJUSTABLE CARRIER
BACK TO BACK VERTICAL ADJUSTABLE CARRIER
W WASTE
CW COLD WATER
HW HOT WATER
HWR HOT WATER RETURN
S SANITARY
V VENT
CONNECT NEW
TO EXISTING
PIPE TEE
SHUT-OFF VALVE WITH THREADED HOSE END
INV. EL INVERT ELEVATION
N.C NORMALLY CLOSED
N.O NORMALLY OPEN
RD-X ROOF DRAIN
GI-X GREASE INTERCEPTOR
PRESSURE GAUGE
FLOOR DRAIN WITH FUNNEL
PROPOSED CONDENSATE PIPING ABOVE FINISHED FLOOR WITH HEAT TRACECD
STAINLESS STEEL ACCESS DOOR
EEWS-X EMERGENCY EYEWASH & SHOWER
EEW-X EMERGENCY EYEWASH
GWVTR GREASE WASTE VENT THROUGH ROOF
PROPOSED GREASE WASTE VENT PIPING BELOW FINISHED FLOOR
EXISTING GREASE WASTE VENT PIPING BELOW FINISHED FLOOR TO REMAIN
GWV
XGWV
PROPOSED GREASE WASTE VENT PIPING ABOVE FINISHED FLOORGWV
EXISTING GREASE WASTE VENT PIPING ABOVE FINISHED FLOOR TO REMAINXGWV
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Key Plan
Harriman Project No.
PA / PE:
Drawn By:Harriman Associates
c
Proj North
Revision DescriptionRev Date
MAY 17, 2021
GORHAM, MAINE
20478
P00-1
DWS
MAM
LEGEND, SCHEDULES &GENERAL NOTES
2021
UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM
ATHLETIC TRAININGRENOVATIONS
PLUMBING PIPING MATERIALS SCHEDULE
SYSTEM MATERIAL
SANITARY WASTE & VENT (UNDERGROUND) SCHEDULE 40 POLYVINYL CHLORIDE (PVC)
SANITARY WASTE & VENT ( ABOVE GROUND) SCHEDULE 40 POLYVINYL CHLORIDE (PVC)
DOMESTIC WATER SUPPLY (ABOVE GROUND) TYPE "L" COPPER WITH PRESS FITTINGS
GENERAL NOTES
1 REFER TO INSTALLATION SCHEDULES FOR THE SIZE OF PIPING CONNECTIONS AND MOUNTING HEIGHTS OF EACHFIXTURE.
2 SANITARY WASTE PIPING SHALL BE INSTALLED WITH A PITCH OF 1/4" PER 1' -0".
3 INDIRECT WASTE PIPING SHALL BE INSTALLED WITH A PITCH OF 1/8" PER 1'- 0" EXCEPT WHERE NOTED.
4 PLUMBING CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF UTILITIES AT ALL POINTS OF CONNECTIONINDICATED ON DRAWINGS BEFORE START OF PROJECT.
5 PROVIDE ISOLATION VALVES ON BRANCH PIPING TO FIXTURE GROUPS & REMOTE FIXTURES AND WHERE INDICATEDON PLANS, VALVES SHALL BE LINE SIZE UNLESS OTHERWISE NOTED.
6 PIPING IN FINISHED AREAS SHALL BE ROUTED CONCEALED; EXPOSED PIPING, WHERE NECESSARY, SHALL BEROUTED AS HIGH AS POSSIBLE AND TIGHT TO WALLS.
7 COORDINATE ALL WORK WITH OTHER TRADES AND CONTRACTORS. COORDINATE PIPING INSTALLATION WITHSTRUCTURAL GRADE BEAMS, FOOTINGS, COLUMN PIERS, ETC. SLEEVE PIPING THROUGH GRADE BEAMS, FOOTING,ETC. WHERE REQUIRED AND AS NOTED ON PLANS. COORDINATE SLEEVE INSTALLATIONS WITH THE ARCHITECT,STRUCTURAL ENGINEER, STRUCTURAL CONTRACTOR AND GENERAL CONTRACTOR BEFORE CONCRETE ISINSTALLED. PIPING INVERTS AND SLOPE SHALL BE CLOSELY COORDINATED TO AVOID CONFLICTS WITH ALL OTHERTRADES BELOW SLAB WORK.
8 CLEAN FAUCET AERATORS AND PIPE STRAINERS PRIOR TO TURNING BUILDING OVER TO THE OWNER.
9 COORDINATE PIPE ROUTING AWAY FROM ELECTRICAL PANELS. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS.
10 ALL PLUMBING FIXTURE SHUT- OFF AND/OR BALANCING VALVES INSTALLED IN PIPE CHASES SHALL BE ACCESSIBLEFROM JUST ABOVE THE CEILING LINE OR ACCESS DOORS PROVIDED LOW IN CHASE WALL.ALL PLUMBING FIXTURESHUT-OFF AND/OR BALANCING VALVES INSTALLED IN PIPE CHASES SHALL BE ACCESSIBLE FROM JUST ABOVE THECEILING LINE OR ACCESS DOORS PROVIDED LOW IN CHASE WALL.
11 ALL UNDERSLAB PIPING SHALL BE INSTALLED TO PROVIDE NO LESS THAN 2" OF COVER BETWEEN THE PIPING ANDTHE FLOOR SLAB.
12 OSHA RULES, REGULATIONS AND REQUIREMENTS, AND ANY STATE AND LOCAL REQUIREMENTS FOR SAFETY SHALLBE FOLLOWED BY THE CONTRACTOR
13 PROVIDE FIXTURE STOPS ON ANY WATER SUPPLY IMMEDIATELY ADJACENT TO PLUMBING FIXTURES.
14 THE TERM "PROVIDE" SHALL MEAN "TO FURNISH, INSTALL AND CONNECT COMPLETELY".
15 ENTIRE PLUMBING INSTALLATION SHALL BE IN COMPLIANCE WITH ALL CURRENT LOCAL, STATE AND FEDERALCODES AND STANDARDS.
16 INDIRECT WASTES SHALL HAVE AN A IR GAP OF AT LEAST TWICE THE DIAMETER OF THE PIPE BUT NOT LESS THAN 1"
17 THE CONTRACTOR SHALL OBTAIN REQUIRED PERMITS AND ARRANGE FOR INSPECTIONS IN ACCORDANCE WITHSTATE & LOCAL ATHORITIES HAVING JURISDICTION
18 VOIDS BETWEEN PIPE SLEEVES AND PIPES SHALL BE FILLED WITH FIRE STOPPING WITH AN HOURLY RATING EQUALTO THAT OF THE WALL
19 PLUMBING CONTRACTOR SHALL CONFIRM EXISTING CONDITIONS PRIOR TO THE INSTALLATION OF SYSTEMS WHICHARE INTENDED TO TIE INTO OR REUSE ANY PART OF THE EXISTING PIPING OR EQUIPMENT
20 PROVIDE VACUUM BREAKERS ON HOSE CONNECTIONS AND WHERE INDICATED ON PLANS AND DETAILS
21 DOMESTIC WATER PIPING ROUTED UNDER SLAB SHALL BE IN A CONTINUOUS NON METALLIC CONDUIT, SEALED ATTHE TOP WITH NON SHRINK GROUT
22 ALL PROPOSED SUPPLY PIPING SHALL BE INSULATED, REFER TO SPECIFICATIONS FOR INSULATION THICKNESS &ACCEPTED PRODUCTS
23 DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE WORK. REVIEW THE GENERALNOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUTIN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY THE ARCHITECT OF ANY CONFLICTS ORDISCREPANCIES PRIOR TO SUBMISSION OF BID.
24 PROVIDE ALL REQUIRED PENETRATIONS IN RATED ASSEMBLIES, INCLUDING BUT LIMITED TO WALLS AND FLOORSWITH A UL APPROVED FIRESTOPPING ASSEMBLY INCLUDING LISTING LABEL OF PENETRATION AFTER PASSINGTHROUGH UTILITIES.
CONSTRUCTION DOCUMENTS
PLUMBING DEMOLITION NOTES
1 DURING DEMOLITION PROPERLY CAP AND PROTECT ALL PIPING THAT WILL REMAIN IN OPERATION
2 WHERE EXISTING INSULATION TO REMAIN IS DAMAGED BY THE REQUIREMENTS OF WORK, REPLACE ANY DAMAGEDINSULATION
3 PLUMBING CONTRACTOR SHALL REFER TO THE SPECIFICATIONS FOR DISTRIBUTION OF RESPONSIBILITY AMONGSTCONTRACTORS FOR SPECIFIC PORTIONS OF CUTTING AND PATCHING WORK. PLUMBING CONTRACTOR SHALLCOORDINATE ALL CUTTING AND PATCHING WORK WITH ALL OTHER CONTRACTORS INVOLVED AS DEFINED IN THESPECIFICATIONS
4 LOCATION OF EXISTING PIPING AS SHOWN ON DRAWINGS IS APPROXIMATE
5 COMPLETELY REMOVE ALL EQUIPMENT AS INDICATED, FIXTURES & OR MISCELLANEOUS ARTICLES IN THEIRENTIRETY INCLUDING AUXILLARY EQUIPMENT, PIPING, WIRING & CONDUIT
6 INCLUDE ALL DEMOLITION OF SYSTEMS AND COMPONENTS WHERE SYSTEMS SHALL BE REPLACED BY NEW WORK.REFER TO THE DRAWINGS & SPECIFICATIONS FOR SCOPE OF NEW & RECONNECTED WORK. THE INTENT OF THISREQUIREMENT IS TO HAVE THE CONTRACTOR DISCONNECT, DEMOLISH & REMOVE ALL EXPOSED & CONCEALEDWORK WHERE BEING REPLACED OR CONNECTED TO THE PROPOSED LAYOUTS
7 COORDINATE ELECTRICAL POWER DISCONNECTION PRIOR TO DEMOLITION WITH ELECTRICAL CONTRACTOR
8 PROTECT ALL FIXTURES, PLUMBING AND WORK OF OTHER TRADES WHICH IS TO REMAIN, FROM DAMAGE DURINGDEMOLITION
9 ALL PIPING TO REMAIN SHALL HAVE ENDS TERMINATED IN A NEAT MANNER READY FOR CONNECTION OF NEWWORK. ALL EXPOSED ENDS OF PIPING SHALL BE CAPPED
10 NO DEAD LEGS LONGER THAN 12" SHALL BE LEFT ON ANY PIPING UPON COMPLETION OF JOB
11 EXISTING PIPING NOT TO BE REUSED, NOT SUPPLYING ANY FIXTURE AND NOT SPECIFICALLY NOTED OR SHOWN ONDRAWINGS TO BE ABANDONED, SHALL BE COMPLETELY REMOVED
12 CONTRACTOR SHALL CLEAN UP, REMOVE AND DISPOSE OF ALL DEBRIS AND DISCARDED ITEMS UPON COMPLETIONOF CONSTRUCTION TO BE READY FOR A NEW OCCUPANCY CONDITION
13 DEMOLISH & COMPLETLY REMOVE EXISTING CONDITIONS DESIGNATED BY A HEAVY DASHED LINE UNLESS NOTEDOTHERWISE. REFER TO LEGEND AND DEMOLITION PLANS FOR SCOPE OF WORK
HB HDH3
H1
XS-2"
XS-2"
DEMOLISH FLOOR
DRAIN & CAP DRAINAGE BELOW
FLOOR
XSD-6"
XS-4"
XS-4"
XS-4"
XSD-6"
DEMOLISH FLOOR DRAIN & CAP DRAINAGE BELOW
FLOOR
DEMOLISH FLOOR DRAIN & CAP DRAINAGE BELOW
FLOOR
XS-2"
DEMOLISH EXISTING DRAINAGE
PIPING & ASSOCIATED ACCESSORIES BACK TO THIS POINT
& PREPARE FOR RECONNECTION
DEMOLISH EXISTING FLOOR DRAIN & ASSOCIATED
ACCESSORIES
DEMOLISH EXISTING
FLOOR DRAIN & ASSOCIATED
ACCESSORIES
DEMOLISH EXISTING FLOOR DRAIN & ASSOCIATED
ACCESSORIES
DEMOLISH EXISTING DRAINAGE PIPING &
ASSOCIATED ACCESSORIES
XS-4"
XS-4"
XS-2"
XS-4"
XV-2"
XS-2"
XS-4"
HCH2
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca le
0 2' 4' 6'
1/4" = 1'-0"
Harriman Project No.
PA / PE:
Drawn By:Harriman Associates
c
Proj North
Revision DescriptionRev Date
MAY 17, 2021
GORHAM, MAINE
20478
P05-1
DWS
MAM
FIRST FLOOR BELOWSLAB DRAINAGE
DEMOLITION
2021
UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM
ATHLETIC TRAININGRENOVATIONS
CONSTRUCTION DOCUMENTS
SCALE: 1/4" = 1'-0"1
ENLARGED BELOW SLAB DRAINAGE DEMOLITION
HBHD
H3
H1
XC
W-3
/4"
XHW-3
/4"
XCW-1
1/2
"
XHW-1
"XCW
-2 1
/2"
XC
W-1
/2"
XHW-1
/2"XCW
-1/2
"
XV-2 1
/2"
XV-2"
XCW-1
/2"
XHW-1
/2"
XC
W-2
"
XH
W-1
1/2
"
DEMOLISH EXISTING SUPPLY
PIPING & ACCESSORIES BACK TO THIS POINT & PREPARE FOR
RECONNECTION
DEMOLISH EXISTING DRINKING FOUNTAIN, ASSOCIATED SUPPLY
& DRAINAGE PIPING
DEMOLISH EXISTING WATER CLOSET, ASSOCIATED SUPPLY &
DRAINAGE PIPING
DEMOLISH EXISTING DRINKING FOUNTAIN, ASSOCIATED SUPPLY
& DRAINAGE PIPING
DEMOLISH EXISTING URINAL, ASSOCIATED SUPPLY & DRAINAGE
PIPING
DEMOLISH EXISTING URINAL, ASSOCIATED SUPPLY & DRAINAGE
PIPING
DEMOLISH EXISTING CARRIER, ASSOCIATED DRAINAGE PIPING &
ACCESSORIES
DEMOLISH EXISTING VENT PIPING
& ASSOCIATED ACCESSORIES
DEMOLISH EXISTING SUPPLY
PIPING & ASSOCIATED ACCESSORIES BACK TO RISERS &
PREPARE FOR RECONNECTION
DEMOLISH EXISTING WASH FOUNTAIN, ASSOCIATED SUPPLY
& DRAINAGE PIPING
DEMOLISH EXISTING SINK, ASSOCIATED SUPPLY & DRAINAGE
PIPING. SINK SHALL BE CLEANED & SAVED FOR RELOCATION IN NEW
CONSTRUCTION
DEMOLISH EXISTING SUPPLY
PIPING & ASSOCIATED ACCESSORIES BACK TO RISERS &
PREPARE FOR RECONNECTION
DEMOLISH EXISTING WASTE PUMP, DRAINAGE PIPING & ASSOCIATED
ACCESSORIES
DEMOLISH EXISTING PUMPED
WASTE BACK TO MAIN & CAP. CONTRACTOR TO FIELD VERIFY
EXACT LOCATION
DEMOLISH EXISTING
FLOOR DRAIN
DEMOLISH EXISTING
FLOOR DRAIN
DEMOLISH EXISTING
FLOOR DRAIN
DEMOLISH EXISTING
FLOOR DRAIN DEMOLISH EXISTING
FLOOR DRAIN
HC H2
XH
W-1
"
XC
W-1
"
XH
W-1
1/4
"
XC
W-1
1/2
"
XH
W-1
"
XV-2"
XV-2"
XV
-2"
XS-2"
XCW-1
"
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca le
0 2' 4' 6'
1/4" = 1'-0"
Harriman Project No.
PA / PE:
Drawn By:Harriman Associates
c
Proj North
Revision DescriptionRev Date
MAY 17, 2021
GORHAM, MAINE
20478
P05-2
DWS
MAM
FIRST FLOOR PLUMBINGDEMOLITION
2021
UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM
ATHLETIC TRAININGRENOVATIONS
CONSTRUCTION DOCUMENTS
SCALE: 1/4" = 1'-0"1
ENLARGED ABOVE SLAB DRAINAGE DEMOLITION
HBHDH3
H1
HCH2
FS-1
SK-1
SK-2
FS-1
FS-1
FCO-1L-1
FD-1 WC-1
S-4"
S-3"
S-4"
FCO-1S-4"
S-2"
CONNECT 4" S
TO EXISTING
4" W UP
4" W UP
2" V UP
(2) 2" V UP
3" S UP
2" W UP
4" W UP
2" V UP
2" W UP
2" W UP
2" W UP
S-4"
S-4"S-4"
XS-2"
XS-2"
XS-2"
XS-4"
XS-4"
XS-4"
XS-4"
CAP
BELOW SLAB
CAP
BELOW SLAB
CAP
BELOW SLAB
CAP
BELOW SLAB
XSD-6"
XSD-6"
XS-2"
XS-2"
OFFICE
113
ATHLETIC TRAINING
112
OFFICE
116
OFFICE
117
WET ROOM
112W
SUPPLY ROOM
112S
MECHANICAL
129
OFFICE
115
OFFICE
114
TUB DRAIN
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca le
0 2' 4' 6'
1/4" = 1'-0"
Harriman Project No.
PA / PE:
Drawn By:Harriman Associates
c
Proj North
Revision DescriptionRev Date
MAY 17, 2021
GORHAM, MAINE
20478
P10-1
DWS
MAM
BELOW SLAB DRAINAGE
2021
UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM
ATHLETIC TRAININGRENOVATIONS
CONSTRUCTION DOCUMENTS
SCALE: 1/4" = 1'-0"1
ENLARGED BELOW SLAB DRAINAGE
FD-1
FS-1
OFFICE
116
OFFICE
113
OFFICE
114
OFFICE
115
112S
SUPPLY
ROOM
TOILET
112T
OFFICE
117
WET ROOM
112W
ATHLETIC TRAINING
112
MENS GA LOCKER
ROOM
120
CORRIDOR
111
MECHANICAL
129
SF-1
HB HDH3
H1
HC H2
FCO-1L-1
WC-1
FS-1
FCO-1
FS-1
SK-2
SK-1
2" V DN
4" W DN
2" W &
1-1/2" V DN
2" W &
1-1/2" V DN
2" W &
1-1/2" V DN
CAP VENT
PIPE
4" W DN
(2) 2" V DN
4" W DN
2" V DN
3" S DN
2" W DN
V-2"
CONNECT 2" V
TO EXISTING
CAP VENT
PIPEXV-2
1/2
"
XV-2"
1-1/2" CD DN
TO FS-1 DN
CD-1
1/2"
CO
CO
CD-1
1/2
"
CD-1
1/2
"
1/4" TUBING
1/4" TUBING
1/4" TUBING
1/4" TUBING
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca le
0 2' 4' 6'
1/4" = 1'-0"
Harriman Project No.
PA / PE:
Drawn By:Harriman Associates
c
Proj North
Revision DescriptionRev Date
MAY 17, 2021
GORHAM, MAINE
20478
P10-2
DWS
MAM
ABOVE SLAB DRAINAGE
2021
UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM
ATHLETIC TRAININGRENOVATIONS
CONSTRUCTION DOCUMENTS
SCALE: 1/4" = 1'-0"1
ENLARGED FIRST FLOOR DRAINAGE
SK-1
L-1
HBHD
H3
H1
HC H2
XCW-1
/2"
XCW-1
/2"
XHW-1
/2"
XH
W-1
/2"
XC
W-3
/4"
XHW-3
/4"
XCW-1
1/2
"
XHW-1
"XCW
-2 1
/2"
XHW-3
/4"
XCW-2
1/2
"
TP-1
SA-"A"WC-1
CONNECT 1" HW &
CW TO EXISTING
CONNECT 1-1/2" HW &
2" CW TO EXISTING
CONNECT 1/2" HW &CW TO EXISTING
SUPPLY UP
CONNECT 1/2" HW &CW TO EXISTING
SUPPLY UP
1/2" CW DN
SK-2
SF-1
1/2" HW &
CW DN
1/2" HW &
CW DN
1-1/2" CW DN PIPE IN WALL
TO WATER CLOSET
1/2" HW &
CW DN1/2" HW &
CW DN
CW
-3/4"
HW
-3/4"
CW-3
/4"
HW-3
/4"
CW-3
/4"
HW-3
/4"
CW-1
"HW
-3/4
"
1/2"
1/2"
1/2"1/
2"1/2"
1/2"
CW
-2"
HW
-1 1/2
"
CW
-2"
HW
-1 1/2
"
XC
W-3
/4"
OFFICE
113
OFFICE
114
ATHLETIC TRAINING
112
OFFICE
116
OFFICE
117
WET ROOM
112W
TOILET
112T
MECHANICAL
129
SUPPLY ROOM
112S
OFFICE
115
HB-1
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca le
0 2' 4' 6'
1/4" = 1'-0"
Harriman Project No.
PA / PE:
Drawn By:Harriman Associates
c
Proj North
Revision DescriptionRev Date
MAY 17, 2021
GORHAM, MAINE
20478
P20-1
DWS
MAM
FIRST FLOOR SUPPLY
2021
UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM
ATHLETIC TRAININGRENOVATIONS
CONSTRUCTION DOCUMENTS
SCALE: 1/4" = 1'-0"1
FIRST FLOOR SUPPLY
CEILING
CEILING MOUNTED
A/C UNIT
CONNECT TO
CONDENSATE PUMP PROVIDED WITH
CASSETTE
RISE PIPE AS HIGH AS POSSIBLE WITHOUT EXCEEDING THE
NOTED MAXIMUM HEIGHT
1/4" PUMP DISCHARGE
FLEXIBLE TUBING
CONNECT TO MAIN DRAIN
AIR INTAKE VENT
PITCH TO DRAIN
.
.
24"
MA
X.
.
.
21"
MA
X.
1-1/2" CONDENSATE
DN TO FLOOR SINK
WALL
FINISHED FLOOR
WALL
EXTEND 1" BELOW THE
GRATE WITH AIR BREAK
12" X 12" FLOOR SINK
WITH 1/2 GRATE
STANDARD FLOOR SINK
DETAIL
4" TRAP UNLESS OTHER
WISE NOTED ON PLANS
4" W TO SANITARY MAIN
REFER TO PLANS
FINISHED FLOOR
CONNECT TO 1-1/2"
MAIN DRAIN
FLEXIBLE TUBING
1/4" CLEAR TUBING
CONNECT TO
CONDENSATE PUMP PROVIDED WITH
CASSETTE
18"
MIN
.
EXTERIOR SURFACE
OF 4" I.D PVC PIPE
HUBLESS JOINT
STAINLESS STEEL
RETAINING CLAMP (TYP)
CLEANOUT CAPSHALL BE FLUSH WITH TOP
OF SLAB
EXPOSED SLAB
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Harriman Project No.
PA / PE:
Drawn By:Harriman Associates
c
Proj North
Revision DescriptionRev Date
MAY 17, 2021
GORHAM, MAINE
20478
P30-1
DWS
MAM
DETAILS
2021
UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM
ATHLETIC TRAININGRENOVATIONS
CONSTRUCTION DOCUMENTSNO SCALE3
CEILING MOUNTED A/C UNIT W/ INTERNAL PUMP
NO SCALE2
AHU-1 CONDENSATE DRAIN WITH PUMPNO SCALE
1FLOOR CLEANOUT AT END OF BRANCH
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Harriman Project No.
PA / PE:
Drawn By:Harriman Associates
c
Proj North
Revision DescriptionRev Date
MAY 17, 2021
GORHAM, MAINE
20478
P60-1
DWS
MAM
SCHEDULES
2021
UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM
ATHLETIC TRAININGRENOVATIONS
CONSTRUCTION DOCUMENTS
TRAP PRIMER SCHEDULEBASIS OF DESIGN TRAP PRIMER SPECIFICATIONS REFER TO THE SPECIFICATIONS FOR
APPROVED EQUALS AND DETAILED DESCRIPTIONS
TAG MANUFACTURER MODEL
BRANCH SIZE AVAILABLE TRAP
CONNECTIONSCW TP
TP-1 MIFAB PRESSURE ACTIVATED TRAPSEAL PRIMER WITH ADJUSTMENT
SCREW MODEL M3-500-NPB
1/2" 1/2" 4
DRAIN SCHEDULEBASIS OF DESIGN DRAIN SPECIFICATIONS REFER TO THE SPECIFICATIONS FOR APPROVED EQUALS AND DETAILED DESCRIPTIONS
TAG DESCRIPTION
BRANCH SIZE SPECIFICATIONS
BASIS OF DESIGN NOTESW V
FCO-1 FLOOR CLEANOUT 4" - WATTS ROUND STAINLESS STEEL STRAINER MODEL CO-1204-R
FCO-2 FLOOR CLEANOUT 3" -. WATTS ROUND STAINLESS STEEL STRAINER MODEL CO-1203-R
FD-1 FLOOR DRAIN 2" 2" WATTS ROUND HEAVY DUTY STAINLESS STEEL STRAINER MODEL FD-1100-2-B6- 6-7
FS-1 FLOOR SINK 4" 2" WATTS STAINLESS STEEL FLOOR SINK MODEL FS-780-4-6-175-HD
PLUMBING FIXTURE INSTALLATION SCHEDULEFURNISHED AND INSTALLED BY PLUMBING CONTRACTOR
TAG DESCRIPTION
BRANCH CONNECTION BASIS OF DESIGN FIXTURE SPECIFICATIONS
REFER TO THE SPECIFICATIONS FOR APPROVED
EQUALS AND DETAILED DESCRIPTIONS
BASIS OF DESIGN FIXTURE SPECIFICATIONS
REFER TO THE SPECIFICATIONS FOR APPROVED
EQUALS AND DETAILED DESCRIPTIONS
MOUNTING HEIGHT
TO RIM UNLESS
NOTED OTHERWISEW V CW HW
WC-1 ADA COMPLIANTWATER CLOSET
FLOOR MOUNTED
3" 2" 1" - AMERICAN STANDARD MADERA EVERCLEAN MODEL 3461.001,PROVIDE CHURCH MODEL 9500CT TOILET SEAT
SLOAN CROWN MODEL 111-1.28 16 1/2"
L-1 ADA COMPLIANTWALL HUNGLAVATORY
2" 1 1/2" 1/2" 1/2" AMERICAN STANDARD MURRO WITH ACRYLIC SHROUD MODEL0954.004EC-0062.00EC, PROVIDE WATTS CONCEALED ARM LAVATORY
CARRIER
AMERICAN STANDARD NEXTGEN SELECTRONIC MODEL 7755.315 34"
SK-1 DROP IN SINK 2" 1 1/2" 1/2" 1/2" DROP IN JUST MFG SINK SL-ADA-2019-16-GR,PROVIDE CENTER REARDRAIN
CHICAGO FAUCET MANUAL FAUCET MODEL 201- G8AE35- 317XKAB 34"
SK-2 EXISTINGRELOCATED SINK
2" 1 1/2" 1/2" 1/2" EXISTING CHICAGO FAUCET MANUAL FAUCET MODEL 305- VBRXKCP 34"
SF-1 SERVICE FAUCET - - 1/2" 1/2" "-" CHICAGO FAUCET MODEL 305-VBRXKCP WITH 20' HOSE AND WESTWARDSTAINLESS STEEL HOSE HANGER MODEL 48PG06
42"
HB-1 HOT WATER HOSEBIBB
3/4" - CHICAGO FAUCETS MODEL 442- LKCABCP 60"
SHOCK ARRESTOR SCHEDULE
TAG MANUFACTURER MODEL
BRANCH
CONNECTION
SUPPORTED
FIXTURE
UNITS
SA-"A" OATEY QUIET PIPE MODEL 34486 1/2" 1-11
ALL SPRINKLERS WITHIN THIS ZONE WILL BE REMOVED; BRANCH PIPING SHALL REMAIN FOR
EXTENSION OF PROPOSED SPRINKLERS
HBHD
H3
H1
HC H2
SPRINKLER PIPING ABOVE FINISHED FLOORF
CAP
DN DOWN
AFF ABOVE FINISHED FLOOR
BFF BELOW FINISHED FLOOR
TYP. TYPICAL
FIRE PROTECTION LEGEND
CONCEALED PENDANT WET SPRINKLER
SEMI RECESSED WET SPRINKLER
SEMI RECESSED DRY SPRINKLER
UPRIGHT SPRINKLER
SIDEWALL WET SPRINKLER
SIDEWALL DRY SPRINKLER
EXISTING SPRINKLER PIPING ABOVE FINISHED FLOORXF
DEMOLISHED SPRINKLER PIPING ABOVE FINISHED FLOOR
DEMO AND REWORK EXISTING SPRINKLER LAYOUT TO PROVIDE FIRE PROTECTION
FOR UPDATED PLAN LAYOUT WITHIN HATCHED AREA INDICATED ON PLANS.COORDINATE SPRINKLER HEAD TYPES REQUIRED WITH NEW CEILING
CONSTRUCTION.COORDINATE LOCATON OF SPRINKLER HEADS WITH ALL OTHER TRADES. PROVIDE SPRINKLER HEADS WITHIN ALL COMBUSTABLE CEILING CAVITIES.
SPRINKLER SYSTEM SHALL COMPLY WITH NFPA-13
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca le
0 2' 4' 6'
1/4" = 1'-0"
Harriman Project No.
PA / PE:
Drawn By:Harriman Associates
c
Proj North
Revision DescriptionRev Date
MAY 17, 2021
GORHAM, MAINE
20478
F05-1
DWS
MAM
FIRST FLOORDEMOLITION FIRE
PROTECTION
2021
UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM
ATHLETIC TRAININGRENOVATIONS
CONSTRUCTION DOCUMENTS
SCALE: 1/4" = 1'-0"1
ENLARGED FIRST FLOOR DEMOLITION FIRE PROTECTION
SPRINKLER PIPING ABOVE FINISHED FLOORF
CAP
DN DOWN
AFF ABOVE FINISHED FLOOR
BFF BELOW FINISHED FLOOR
TYP. TYPICAL
FIRE PROTECTION LEGEND
CONCEALED PENDANT WET SPRINKLER
SEMI RECESSED WET SPRINKLER
SEMI RECESSED DRY SPRINKLER
UPRIGHT SPRINKLER
SIDEWALL WET SPRINKLER
SIDEWALL DRY SPRINKLER
EXISTING SPRINKLER PIPING ABOVE FINISHED FLOORXF
DEMOLISHED SPRINKLER PIPING ABOVE FINISHED FLOOR
DEMO AND REWORK EXISTING SPRINKLER LAYOUT TO PROVIDE FIRE PROTECTION
FOR UPDATED PLAN LAYOUT WITHIN HATCHED AREA INDICATED ON PLANS.COORDINATE SPRINKLER HEAD TYPES REQUIRED WITH NEW CEILING
CONSTRUCTION.COORDINATE LOCATON OF SPRINKLER HEADS WITH ALL OTHER TRADES. PROVIDE SPRINKLER HEADS WITHIN ALL COMBUSTABLE CEILING CAVITIES.
SPRINKLER SYSTEM SHALL COMPLY WITH NFPA-13
HB
HD
H3
H1
HC H2
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca leGra ph ic Sca le
Gra ph ic Sca le
0 2' 4' 6'
1/4" = 1'-0"
Harriman Project No.
PA / PE:
Drawn By:Harriman Associates
c
Proj North
Revision DescriptionRev Date
MAY 17, 2021
GORHAM, MAINE
20478
F10-1
DWS
MAM
FIRST FLOOR FIREPROTECTION
2021
UNIVERSITY OFSOUTHERN MAINEHILL GYMNASIUM
ATHLETIC TRAININGRENOVATIONS
CONSTRUCTION DOCUMENTS
SCALE: 1/4" = 1'-0"2
ENLARGED FIRST FLOOR FIRE PROTECTION