Introducing the next generation of Geothermal Power Plants

Yield increased significantly while aiming for Zero Emission

20+ Mio € investment project in Prelog / Draskovec

A.A.T. Geothermae d.o.o.

REXPO 2013, Zagreb:

„Nominated - most innovative

investment project“

Page 2: G Panel Peter Veseljak AAT Geothermae

• Market opportunity• Technological approach• Key Characteristics of the first project (Croatia)• Organization: Company structure, financing, revenues

Agenda

Page 3: G Panel Peter Veseljak AAT Geothermae

Adressing a new, highly attractive market

Traditional large scale power production

New, decentralized cleanEnergy production

• inflexible design• accidents (nuclear)• CO2 pollution (coal, gas)• use of scare ressources

• shorter lead times• limited capital expenditures• flexible design (market changes)• efficient value chain:• free input factors• less infrastructure (close to market)• no disposal issues

• lowering the risk of blackouts

Society and politicians increasingly sensitive

Page 4: G Panel Peter Veseljak AAT Geothermae

… with a superior solution / clear USP

Photovoltaics, solar, wind• Power generation unpredictable• Grid limitations• No large scale storage technology

available• Supply does not match demand • Back-up power necessary• Ugly appearance, noise emissions

Classic Geothermal• Base load character• Unobstrusive• Combined heat & power („CHP“)

Lots of frictions and inefficiencies

Geothermal plusIntelligent use of aquifer gases:• even cleaner energy (emission free)• much higher output/yield• improved economics• reservoir of highly attractive sites (Pannonian basin)

Page 5: G Panel Peter Veseljak AAT Geothermae

Significant aquifer gas reservoir

(in Billion m3) Reserves Resources TOTALConventional Gas 188 239 427Unconventional Gas 5 2720 2725- shale gas- other tight gas- Coalbed methane- aquifer gas- gashydrat

32

456210254800

1000

456213256800

1000

Worldwide gas reserves and (assumed) resources by type, at the end of 2008:

Source: DIW Berlin 2010

Page 6: G Panel Peter Veseljak AAT Geothermae

The technical concept: simple and compelling

• Standard processes … • … newly and ingeniously combined• … in a standardized /containerized design• ... delivering „clean“ technology + high output/yield

• Prefabrication / Off-the-shelf components (available, reliable, inexpensive)

• Best-in-class cost structure• Highest quality, safety, yield /performance and reliability• Quick & easy adaptable to specific site/market conditions

Ready for rollout in Croatia, the Balcan area , Central & Western Europe

approach

Key elements

Page 7: G Panel Peter Veseljak AAT Geothermae

CHP generation forming a closed loop

• upstream: no harmful (methane) gases released to the environment,

• highly efficient energy con- version process,

• Cheap heat supplied to the citizens, local companies and agricultural production

• C02 kept in the internal system,

• … and safely stored in the aquifer (downstream),

• stimulating new methane production in aquifer.

Benefits

Page 8: G Panel Peter Veseljak AAT Geothermae

Croatia selected for the first project

The ideal site could be spotted:

• 100° C thermal water @ 1.850 m depth

… plus significant volume of acquifer gases of extraordinary purity dissolved in water

• Extensive geological research /test drills done• Nearly all concessions / permits obtained• Attractive feed-in tariff to be granted for 14+ years• CHP consumers nearby• Good local networking

Page 9: G Panel Peter Veseljak AAT Geothermae

Investment costs …

9,000

5,400

4,500

860

1701,570

Capital Cost Distribution

Power Plant

Drilling

Land/physical in-frastructure

technical infra-structure

permitting

Reservein T €

21.5 m€ for 6 MWe/21+ MWth :3‘583 €/kWe installed

Page 10: G Panel Peter Veseljak AAT Geothermae

Funding

• Significant Private Equity investment provided by Founders and Early Stage Investors

• Additional Bank loans

• Application for significant EU funds („NER300 award“ 2013-2014)• first and only project in Croatia • due diligence by EIB in progress• decision of EU Commission expected latest until mid of 2014

Financing almost closed, additional (strategic) investors welcome for 2-5 Mio €

Page 11: G Panel Peter Veseljak AAT Geothermae

Structure supports consequent value creation

• company under Croatian law

• safe, clean and efficient operations and maintenance

• high local content , power plant operated by local utility co.

• local anchoring (option to participate on AATG‘s performance)

• Involvement of strong local partner under discussion

Tasks / responsibilities• project development: development and implementation of the

technical concept, delivery of turnkey projects

• Business development: acquiring follow-up geothermal sites and projects (EU), partnering /joint ventures for quick rollout

• portfolio management: holding plus value added services

Page 12: G Panel Peter Veseljak AAT Geothermae

AATG: Strong, stable revenues

(Mio €) 2015 2016 2017 2018 2019 2020 2021

Revenues - Electricity - Heat

9.28.21.0

11.08.42.6

11.48.62.8

11.98.83.1

12.29.03.2

12.59.23.3

12.89.53.3

AAT geothermae d.o.o. Conservative Case

Still room for improvement: Revenues from heat can be significantly increased!

Page 13: G Panel Peter Veseljak AAT Geothermae

Already spotting follow-up projects in Croatia

• Focus on the implementation of the first plant in Draskovec• Proof of concept• Stable production of electricity and heat • Transferring local management to the regional utility company• Increasing heat and A/C supply for Prelog

• Already identifying follow-up projects with similar characteristics• Targeting for quick Roll-out of the CloZEd Loop technology • Network of highly efficient, decentralized geothermal driven “CloZEd Loop “

plants• Improving conditions governing locations and lowering national

dependency on oil and gas (imports), promoting local economies and agriculture

Page 14: G Panel Peter Veseljak AAT Geothermae

Contact

• Bodo von Düring von Düring Management AGLidostrasse 6CH-6006 Luzern Switzerland

[email protected]+41 (0)41 417 40 70

• Peter VesenjakHosting d.o.o. (ltd.)Representative of AAT Geothermae d.o.o. in the regionTel. 00386 (0)2 7877 455 (reception), Fax. 00386 (0)2 7876 120Mobile: 00386 (0)41 514 [email protected]