G. H. Schettler HouseCase Study

© Robert. A. Young

All rights reserved

Page 2: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Historic Preservation– Building Conservation– Neighborhood Revitalization – Rehabilitation Tax Credits

Environmental Controls– Passive Solar– Daylighting– Thermal Mass

Sustainability– Energy Conservation– Resource Conservation– Urban Revitalization – Reduce/Reuse/Recycle– Enhance Livability

Page 3: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

First Floor–BeforeMay, 2000

Page 4: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Second Floor–BeforeMay, 2000

Page 5: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Timeline

1904 Constructed

1936 Converted to five apartment units

1961 Resumed use as single family home

1994 Purchased by current owner

2000 Rehabilitated back to single family home

2001 Historic Landmarks Commission Award

Utah Heritage Foundation Award

Page 6: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Goals

Model a Process

Reduce Natural Resource Consumption/Increase Comfort

Reduce Waste/Increase Recycled Content

Reduce Hazardous Contamination

Be Financially Competitive

Page 7: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Process Model

Physical Assessment

Performance Programming

Schematic Design

Design Review

Construction Documents

Construction

Occupation/Commissioning

Page 8: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case

Study

BuildingEnvelope

Physical Assessment

Page 9: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

InfrastructurePhysical Assessment

Page 10: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Character Defining Features

Physical Assessment

Page 11: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Character Defining Features

Physical Assessment

Page 12: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Building Chronology

1936 SLC Tax Photo1936 SLC Tax Photo

Physical Assessment

Page 13: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Recreated Original 1904 Floor PlansPhysical Assessment

Page 14: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Construction Documents

Page 15: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Construction

Page 16: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Construction

Page 17: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Construction

Page 18: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Construction

Page 19: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Reduce Natural Resource Consumption/Increase Comfort

Architectural

Mechanical Thermal Control

Plumbing

Electrical/Lighting

Page 20: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Reduce Natural Resource Consumption/Increase Comfort

Before Rehabilitation

Heating Load: 135,075 Btuh

Cooling Load: 48,077 Btuh

After Rehabilitation

Heating Load: 85,564 Btuh (36.7% lower)

Cooling Load: 37,275 Btuh (22.5% lower)

Page 21: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Architectural

Brick construction

Large/Tall windows

Page 22: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Architectural

Ceiling height

Transoms

Double-hung windows

Page 23: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Architectural

Operable skylight in stairwell

Page 24: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Architectural

Window upgrades

Page 25: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Architectural

Insulation upgrades

Page 26: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Architectural

Light colored roofing

Page 27: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Architectural

Light wall color

Page 28: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Mechanical Thermal Control

Central forced air furnace

Split system air-conditioning

Combustion air inlet

Page 29: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Mechanical Thermal Control

Two thermal zones

Programmable thermostats

Page 30: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Mechanical Thermal Control

Gas-fired fireplace inserts

Page 31: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Mechanical Thermal Control

Paddle fan in kitchen

Page 32: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Mechanical Thermal Control

Attic ventilation fan

Ridge vents

Page 33: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Electrical/Lighting

Daylighting

Page 34: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Electrical/Lighting

Tasklighting

Upgraded appliances

Page 35: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Electrical/Lighting

Programmable timersAutomated controls

Page 36: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Plumbing

Low flow water fixtures

Low water use appliances

DHW tank insulated

Page 37: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Reduce Waste/Increase Recycled Content

Reduce demand for new materials

Reuse existing materials

Reduce landfill pressure

Page 38: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

Stewardship of the Built Environment

Reduce Waste/Increase Recycled Content

Case 1: Rehabilitate Original House

New Materials Needed: 24.5 tonsConstruction Waste: 22.8 tonsTotal Material Stream: 47.3 tons

85.9% recycled content from original construction.

Case 2: Build New House in the Suburbs

New Materials Needed: 173.5 tonsConstruction Waste: 8.9 tonsTotal Material Stream: 182.4 tons ~4X Case1

0% recycled content (no original construction to reuse).

Case 3: Demolish House and Rebuild Comparable New House (but not a “Monster House”)

New Materials Needed: 173.5 tonsConstruction Waste: 178.3 tonsTotal Material Stream: 351.8 tons ~7.4X Case 1

0% or only nominal recycled content from original construction.

Page 39: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Reduce Waste/Increase Recycled Content

Percentage ofDemolition Waste Material Total WeightPlaster/Lath 62.2Asphalt Roofing 9.8Wood (flooring, framing, etc.) 6.6 Concrete 6.5Cedar Shingles 3.8Gypsum Board 3.4Ceiling Tile 2.6Aluminum 2.0Insulation 1.3 Carpet 1.2Carpet Pad 0.6

100.0

Page 40: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Reduce Hazardous Contamination

Asbestos

Lead

Indoor air quality

Page 41: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Be Financially Competitive (2001)

Project Cost: $215,000 $84.42/sf

Tax Credits: $ 41,800

Net Cost: $173,200 $67.97/sf

Overall Cost: $ 302,700 $119.13/sf

Note: Average cost for new construction locally was >$150/sf.

Page 42: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

North Parlor

Before

After

Page 43: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Dining Room

Before After

Page 44: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Kitchen

Before After

Page 45: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Porch

Before

After

Page 46: G. H. Schettler House Case Study © Robert. A. Young All rights reserved.

G. H. Schettler House Case Study

Exterior

Before