Presented by Xavier Urrutia, Director Wednesday, August 14, 2013 FY 2014 Proposed Budget Worksession Parks & Recreation

Transcript of FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014...

Page 1: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

Presented by Xavier Urrutia, Director

Wednesday, August 14, 2013

FY 2014 Proposed Budget Worksession

Parks & Recreation

Page 2: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

2 2

• Department Overview

• FY 2013 Accomplishments

• FY 2013 Performance Measures

• FY 2014 Program Initiatives

• FY 2014 Proposed Budget

Agenda

Page 3: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

3

Department Overview

Page 4: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

4 4

• The mission of the San Antonio Parks

and Recreation Department is to

provide exceptional parks, facilities,

programs and services to improve the

quality of life for all. • FY 2014 Proposed Budget supports initiatives that align with

SA 2020’s Goals for Health & Fitness and Sustainability:

• Fitness Opportunities

• Parks Linear Greenway Trails Program

• Parks Recycling Program

• Tree Planting Program

Department Overview

Page 5: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

5 5

Administration

Recreation Services Park Operations &

Maintenance Park Planning

Department Overview

Page 6: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

6 6

• Parks = 243

• Acres = 14,518

• Community Centers = 26

• Adult/Senior Centers = 3

• Outdoor Pools = 24

• Dog Parks = 6

• Skate Plazas = 14

• Pavilions/Gazebos = 157

• Playgrounds = 167

• Miles of Trails = 141

• Summer Youth

Program

• Swimming Lessons

• Youth Sports

• Holiday Camps

• Recreation Open Play

• Natural Area Activities

• Fitness Activities

• Music and Dance

Classes

• Volunteer

Opportunities

Department Overview

Page 7: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

FY 2013 Accomplishments

Page 8: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

8 8

2013 Recognitions

• National Recreation and Park Association (NRPA) selected SAPR to receive Excellence in Innovative Programming Award in October at the NRPA National Congress in Houston – Recognizes Fitness in the Park, Ride 2 Own

Bicycle & Take Note Youth Music Programs

• Top Honors from Texas Recreation & Park Society

– Statewide Arts & Humanities Award

– Park Design Excellence Award

Page 9: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

9 9

2013 Fitness Program Improvements

• Continued programs to promote fitness and a healthy lifestyle

• Fitness in the Park Program • Year-round

• Additional classes with more variety

• Extended Pool Season and Swim hours • Added swim opportunities in Fall and Spring

• Morning Lap Swim Program

• Initiated SA Fit Pass Program • Get Out & Play SA

Page 10: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

10 10

• FY 2013 Program utilized

$100,000 from Solid Waste

Fund

–Cumulative total of 195 sites

–Completed 100% of parks with

public access

– Implemented pilot program

for solar-powered trash

compactors

10

2013 Recycling in Parks

Page 11: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

11

City of San Antonio, Texas

Performance

Measures

Page 12: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

12 12

0

25

50

75

100

125

150

175

200

FY 2012 Actual

FY 2013 Target

FY 2013 Estimate

FY 2014 Target

163 168 174 181

Playground Inspections Completed

Page 13: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

13 13

0

1,000

2,000

FY 2012 Actual

FY 2013 Target

FY 2013 Estimate

FY 2014 Target

1,153 1,244 1,2871,412

Recycling Receptacles

Recycling Receptacles 1:1 to Regular Trash Receptacles

Page 14: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

FY2014 Proposed Programs and Initiatives

Page 15: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

15 15

• Improve department efficiency and

effectiveness through reorganization

• Renovate and maintain existing facilities

through sustainable methods

• Expand resources through community

partnerships and programs

• Educate the community on the

opportunities and services provided by Parks

and Recreation

2014 Goals and Objectives

Page 16: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

16 16

• Continue fitness initiatives – Fitness in the Park Program

– SA Fit Pass Program

– Mobile Fit Program

• Continue recycling expansion

– Move toward goal of 1:1 ratio of recycling to

regular trash receptacles

– Adapt trash compactor program

• Expand the Trail Steward Program

• Implement deferred maintenance program

to be presented by BES

2014 Program Initiatives

Page 17: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

17 17

67%

21%

2%10%

% of Parks and Recreation

Operations Budget$46.3* Million

Maintenance

Recreation

Park Planning

Contracts/Admin

Parks Major Program Categories

• Parks will continue

to focus on

maintenance as

highest priority

• Parks will provide

opportunities for

participation in a

variety of

recreation

activities *Does not include Park Police

Page 18: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

FY 2014 Proposed Budget

Page 19: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

19 19

Department Budget History ($ in Millions)

19

$0

$20

$40

$60

$80

$100

2006 2007 2008 2009 2010 2011 2012 2013 Proposed 2014

$58.8 $56.7 $59.2 $59.3 $59.0 $58.9

$55.6 $52.8

$56.1

Page 20: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

20 20

20

Department Position History

0

100

200

300

400

500

600

700

800

900

1000

2006 2007 2008 2009 2010 2011 2012 2013 Proposed 2014

136 136 142 149 150 150 150 153 152

704 615 569 593 551 530 512 493 464

107

104 89

121 100

82 51 39

23

Part Time

Full Time

Park Police

762 713

685 639

801

863

800 855

947

Page 21: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

21 21

Parks & Recreation

General Fund

FY 2013 Adopted Budget

$59.0 M*

FY 2014 Proposed Budget

$58.9 M

Variance ($) (-$0.1 M)

Variance (%) (-0.2%)

21

FY 2014 Proposed Budget

Personal Services $38.1

65%

Contractual Services

$6.7 11%

Commodities $3.3 6%

Self Insurance- Other $10.6 18%

Capital Outlay $.09 0.2%

Transfers $.09 .02%

Proposed Budget by Expenditure Type ($ in Millions)

*Includes Park Police

Page 22: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

22 22

In addition to the General Fund, Parks manages:

• 2005 Sales Tax Venue (Prop 2) – $2,036,200 No positions

• 2010 Sales Tax Venue (Prop 2)

– $31,988,396 No positions

• Tree Mitigation/Canopy Funds

– $598,946 2 positions

• City Cemeteries

– $128,502 No positions

2014 Proposed Budget

Page 23: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

23

City of San Antonio, Texas

FY2014 Proposed Efficiencies/Service Modifications

Page 24: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

24 24

Redirect Tree Watering Expenditures

Redirect one Equipment Operator to Tree Mitigation/Canopy Fund

Watering/maintenance of 1,400 new trees

Will not change frequency trees are watered or tree planting survival rate

Focus on maintaining 14,918 trees

Savings: $53,293

Page 25: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

25 25

• Create team of programmers housed at

Parks & Recreation Dept. Headquarters

• Develop programming for all Regular

Community Centers

• More consistent and balanced programs

- Wellness - Science

- Arts - Nature

• 8 full-time vacant positions

eliminated

• Savings: $245,885

Centralize Community Centers Programming

Page 26: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

26 26

• As approved by City Council, management

of the Botanical Garden will transition to the

S. A. Botanical Society by 2018

• 2014 Proposal is to transfer the education

component

• No service impact with efficiency

• City to manage maintenance

• Reduces one position

• Savings: $62,357

Redirection of Botanical Garden Education

Page 27: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

27 27

• Staff reviewed current park usage and

amenities

• Will realign sanitation to meet actual service

requirements

• Reducing service schedule is more efficient

for staff time and resources

• Mowing and repair requests will not be

impacted

• Efficiency will eliminate 17 vacancies

• Savings: $759,357

Realign Sanitation/Landscape Maintenance Sectors

Page 28: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

28 28

• Outdoor pool schedule to add Monday

service: from 6 to 7 days

• During peak period of Friday, Saturday &

Sunday: all 24 pools open

• Monday – Thursday: alternating 6 pool

locations open; geographically staggered

• No changes to free extended pool season

or lap swimming

• Savings: $309,395

Outdoor Swimming Pool Reduction

Page 29: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

29 29

• Close 10 underutilized open play centers

– No structured programming

– Low attendance (averages half of regular centers)

– Full-service centers in close proximity

• Reduction will allow department to focus on

youth activities at full-service sites and will

encourage increased use of those centers

• Facilities will be made available for rentals as

well as Parks Summer Youth Program

• Reduces 2 full-time and 16 part-time positions

• Savings: $547,498

Consolidate all 10 Open Play Community Centers with the 15 full-service Centers

Page 30: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

30 30

• Proposal would reduce operating funds

targeted for park renovations

• Renovations to continue through capital

funding for specific projects as available

• Parks included in proposed $5M deferred

maintenance funding to be presented in

Building & Equipment Services work session

• Playground Replacement funding of $500,000

in CIP

• Reduction will eliminate 1 vacant position

• Savings: $308,692

Reduce Park Renovation Funds

Page 31: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

31

City of San Antonio, Texas

FY 2014 Proposed Enhancements

Page 32: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

32 32

• Trail Stewards provide non-law enforcement

assistance along linear greenway trails

– Staff presence

– Maintenance issues identified

– Trail maps and information

– Year-round program

– Expansion into Medina River Natural Area

• Allows Park Police to focus on law

enforcement

• Redirects funding from vacant Park Police

Commander position for this improvement

Trail Steward Program Expansion

Page 33: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

33 33

• Establishes Woodard Community Center as a

full-service center

• Located in both Promise and Choice

Neighborhood footprints

• Anticipated increase in recreational needs

from families in nearby housing developments

• Will provide variety of structured programs

and activities

• $150,000

Woodard Community Center Enhancement

Page 34: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

34 34

• Park Acquisition & Development Maintenance- $295,005 • 147 park components and amenities added

• Adds 2 positions, equipment, and supplies

• Linear Greenway Trail Development Maintenance- $41,436 • 1.5 additional miles in FY 2014

• Adds supplies and materials funding

2014 Operating Costs for New Development

Page 35: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

35 35

• A total of $858,395 in revenue

enhancements are proposed

– Facilities Rental Fees

– Program Participation Fees

• New fees = $485,195

• Increases to existing fees = $373,200

• Some fee structures will be streamlined

2014 Revenue Enhancements

Page 36: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

36 36

2014 Revenue Enhancements

New Fees

• Community Center Membership Fee

– Youth: $5 per year, Adults: $10 per year

• Outdoor Pools Season Pass

– Youth pass: $25 per year

– Senior pass: $30 per year

– Adult pass: $40 per year

• Boxing Participation Fee

– Adults: $40 per year; Youth: $30 per year

• Estimated increased revenue $485,195

Page 37: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

37 37

2014 Revenue Enhancements

Increases to Existing Fees

• Program Participation Fees

– Summer Youth, Music and Dance, Girls Fast

Pitch Softball, Senior Centers, Sports and Swim

Team, Natatorium Admission

• Facilities Rentals

– Club Houses, Gyms, Community Centers, Ball

Fields, McFarlin Tennis Courts, Pavilions

• Botanical Garden Admission Fees

• Estimated increased revenue $373,200

Page 38: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

38 38

• SYP - 8 week program

• recreational activities

• enrichment programming

• includes free lunch and snack

Summer Youth Program

Current

200% FPL and below:

1st child - $20.00

201% FPL and over:

1st child - $250.00

Proposed

175% FPL and below:

1st child - $40.00

176% FPL and over:

1st child - $260.00

• Discounted rates apply for additional children

Page 39: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

39 39

• Establishment of a $1 dollar monthly Park

Maintenance Fee added to the

Environmental Fee

– $6.6 million annually

• In FY 2015, could dedicate all or a portion of

the Parks Venue Tax

– Up to $29 million annually

• Full cost recovery for all recreational

activities

– $8.4 million annually in additional fees

Parks Dedicated Funding Options

Page 40: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

40 40

• FY 2014 Parks and Recreation

Department Proposed Budget:

• Aligns with City Council &

Community priorities

• No elimination of services

• Sustains maintenance in parks

• Continues to provide various

opportunities for fitness, health and

recreation

• Establishes new and revised fees to

supplement cost recovery

2014 Conclusion

Page 41: FY 2013 Proposed Budget Worksession Parks & Recreation...FY 2013 Adopted Budget $59.0 M* FY 2014 Proposed Budget $58.9 M Variance ($) (-$0.1 M) Variance (%) (-0.2%) 21 FY 2014 Proposed

Presented by Xavier Urrutia, Director

Wednesday, August 14, 2013

FY 2014 Proposed Budget Worksession

Parks & Recreation