FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
AL AAL AK +01D Akutan (Proposed GA) 5 $5,250,000.00 $5,250,000.00 $0.00 $0.00 Construct New Airport [Phase 5]
AL AAL AK AFM Ambler GA 4 $7,059,764.00 $0.00 $7,059,764.00 $0.00
Extend Runway [Phase 1] - 18/36, Rehabilitate Runway
[Rehabilitate Runway 18/36] - 18/36, Rehabilitate Runway
09/27
AL AAL AK +07E Angoon (Proposed GA) 4 $1,200,000.00 $1,200,000.00 $0.00 $0.00 Construct New Airport [Phase IV]
AL AAL AK DLG Dillingham P 14 $2,162,210.00 $2,162,210.00 $0.00 $0.00 Construct Runway Safety Area [Phase 2] - 01/19
AL AAL AK DLG Dillingham P 15 $637,950.00 $637,950.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
AL AAL AK FAI Fairbanks International P 42 $10,097,015.00 $5,597,015.00 $4,500,000.00 $0.00 Construct Sand and Chemical Storage Building, Improve Aircraft
Rescue & Fire Fighting Building
AL AAL AK JNU Juneau International P 58 $1,171,875.00 $1,171,875.00 $0.00 $0.00 Rehabilitate Runway 08/26 [Phase 1, Design]
AL AAL AK JNU Juneau International P 57 $1,903,817.00 $1,903,817.00 $0.00 $0.00 Construct Runway Safety Area [Reimbursable Agreement]
08/26
AL AAL AK JNU Juneau International P 59 $703,125.00 $453,125.00 $250,000.00 $0.00 Sustainable Master Plan, Update Airport Master Plan Study
AL AAL AK +08O Kaktovik (Proposed CS) 4 $13,000,000.00 $13,000,000.00 $0.00 $0.00 Construct New Airport [Phase 3]
AL AAL AK ENA Kenai Municipal P 52 $246,177.00 $246,177.00 $0.00 $0.00 Update Airport Master Plan Study [Conduct Airport Master Plan,
Phase 2 - Conduct aeronautical survey]
AL AAL AK ENA Kenai Municipal P 49 $260,968.00 $260,968.00 $0.00 $0.00 Rehabilitate Runway [Airfield Remarking Project] - 01L/19R
AL AAL AK ENA Kenai Municipal P 50 $461,540.00 $461,540.00 $0.00 $0.00 Remove Obstructions
AL AAL AK KTN Ketchikan International P 22 $7,379,813.00 $7,379,813.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Taxiway
AL AAL AK ADQ Kodiak P 16 $13,000,000.00 $3,000,000.00 $10,000,000.00 $0.00 Extend Runway Safety Area [Construction Phase 1] - 07/25,
Extend Runway Safety Area [Construction, phase 1] - 18/36
AL AAL AK JZZ Koliganek GA 2 $5,000,000.00 $5,000,000.00 $0.00 $0.00 Rehabilitate Runway 09/27
AL AAL AK MRI Merrill Field P 59 $937,500.00 $937,500.00 $0.00 $0.00 Acquire Snow Removal Equipment
AL AAL AK MRI Merrill Field P 60 $1,012,500.00 $1,012,500.00 $0.00 $0.00 Rehabilitate Runway Lighting - 16/34
AL AAL AK +09G New 2 $13,622,475.00 $13,622,475.00 $0.00 $0.00 Construct New Airport [Phase 2]
AL AAL AK OME Nome P 22 $40,781,395.00 $3,781,395.00 $37,000,000.00 $0.00 Construct Runway Safety Area - 03/21, Construct Runway Safety
Area - 10/28
AL AAL AK OME Nome P 23 $3,237,337.00 $3,237,337.00 $0.00 $0.00 Rehabilitate Apron
AL AAL AK OTZ Ralph Wien Memorial P 20 $9,309,406.00 $0.00 $9,309,406.00 $0.00 Construct Runway Safety Area [Phase 3] - 09/27
AL AAL AK SIT Sitka Rocky Gutierrez P 29 $4,059,965.00 $0.00 $4,059,965.00 $0.00 Rehabilitate Runway 11/29 [Phase 2]
AL AAL AK *AKS State of Alaska 19 $2,000,000.00 $2,000,000.00 $0.00 $0.00 Update State System Plan Study
AL AAL AK ANC Ted Stevens Anchorage International P 160 $8,250,837.00 $4,250,837.00 $4,000,000.00 $0.00 Widen Runway 07R/25L
AL AAL AK ANC Ted Stevens Anchorage International P 161 $1,668,916.00 $1,668,916.00 $0.00 $0.00 Construct Service Road
AL AAL AK ANC Ted Stevens Anchorage International P 164 $1,640,625.00 $1,640,625.00 $0.00 $0.00 Rehabilitate Terminal Building
AL AAL AK ANC Ted Stevens Anchorage International P 163 $7,028,849.00 $0.00 $7,028,849.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL]
AL AAL AK ANC Ted Stevens Anchorage International P 162 $6,311,950.00 $6,311,950.00 $0.00 $0.00 Rehabilitate Taxiway
AL AAL AK ANC Ted Stevens Anchorage International P 165 $7,373,374.00 $2,592,399.00 $4,780,975.00 $0.00 Rehabilitate Taxiway
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 1 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
AL AAL AK *AKV Various Locations in Alaska 89 $551,962.00 $551,962.00 $0.00 $0.00
Remove Obstructions (Big Lake; Chitina; Iliamna; Karluk;
Ketchikan International; Napaskiak; Noatak; Nome; Nondalton;
Old Harbor; Port Lions; Seward; Shungnak; Skwentna; Twin Hills)
AL AAL AK *AKV Various Locations in Alaska 93 $3,829,246.00 $3,829,246.00 $0.00 $0.00
Rehabilitate Runway (Bethel - 01L/19R; Bettles - 01/19;
Dillingham - 01/19; Holy Cross - 01/19; Homer - 04/22; Ketchikan
International - 11/29; King Salmon - 12/30; Kodiak - 07/25;
Larsen Bay - 04/22; Old Harbor - 03/21; Ouzinkie - 08/26; Ruby
03/21
AL AAL AK *AKV Various Locations in Alaska 91 $170,686.00 $170,686.00 $0.00 $0.00 Rehabilitate Runway (Petersburg James A Johnson - 05/23;
Yakutat - 11/29)
AL AAL AK *AKV Various Locations in Alaska 90 $1,992,750.00 $1,992,750.00 $0.00 $0.00 Conduct aeronautical survey for WAAS approach (Atka;
Mekoryuk; Sand Point; Seward; Togiak)
AL AAL AK *AKV Various Locations in Alaska 94 $6,200,260.00 $6,200,260.00 $0.00 $0.00
Acquire Snow Removal Equipment (Adak; Ambler; Beaver;
Bettles; Deadhorse; Deering; Dillingham; Edward G. Pitka Sr;
Gambell; Homer; Hooper Bay; Ketchikan International; Kivalina;
Kodiak; Koliganek; Nome; Sitka Rocky Gutierrez; Teller; Valdez
Pioneer Field)
AL AAL AK *AKV Various Locations in Alaska 92 $281,250.00 $281,250.00 $0.00 $0.00 Wildlife Hazard Assessments (Nome; Ralph Wien Memorial;
Wiley Post-Will Rogers Memorial)
AL AAL AK WRG Wrangell P 13 $637,950.00 $637,950.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
CE ACE IA AXA Algona Municipal GA 9 $562,500.00 $562,500.00 $0.00 $0.00 Rehabilitate Runway 12/30, Rehabilitate Taxiway
CE ACE IA IKV Ankeny Regional R 18 $1,363,457.00 $173,174.00 $1,190,283.00 $0.00 Improve Runway Safety Area [Design/Construction] - 04/22
CE ACE IA AIO Atlantic Municipal GA 11 $1,041,427.00 $234,064.00 $807,363.00 $0.00 Construct Taxiway [paving full length taxiway]
CE ACE IA TZT Belle Plaine Municipal GA 8 $135,000.00 $135,000.00 $0.00 $0.00 Rehabilitate Runway Lighting - 18/36
CE ACE IA TVK Centerville Municipal GA 6 $439,002.00 $439,002.00 $0.00 $0.00 Acquire Miscellaneous Land
CE ACE IA CKP Cherokee County Regional GA 10 $165,551.00 $165,551.00 $0.00 $0.00 Acquire Snow Removal Equipment
CE ACE IA CAV Clarion Municipal GA 11 $479,070.00 $479,070.00 $0.00 $0.00 Construct Building
CE ACE IA CWI Clinton Municipal GA 19 $637,138.00 $637,138.00 $0.00 $0.00 Construct Terminal Building
CE ACE IA CSQ Creston Municipal GA 10 $192,600.00 $192,600.00 $0.00 $0.00 Rehabilitate Runway Lighting - 16/34
CE ACE IA DVN Davenport Municipal GA 18 $5,530,162.00 $3,038,416.00 $2,491,746.00 $0.00 Rehabilitate Runway 03/21 [Construction]
CE ACE IA DSM Des Moines International P 58 $11,353,604.00 $4,296,195.00 $7,057,409.00 $0.00 Rehabilitate Taxiway [Phase 3 - Taxiway "D" - Construction]
CE ACE IA DBQ Dubuque Regional P 57 $1,987,313.00 $1,028,554.00 $958,759.00 $0.00 Construct Terminal Building [Utilities]
CE ACE IA EST Estherville Municipal GA 9 $680,141.00 $680,141.00 $0.00 $0.00 Rehabilitate Apron
CE ACE IA FXY Forest City Municipal GA 13 $90,000.00 $90,000.00 $0.00 $0.00 Update Airport Master Plan Study
CE ACE IA FOD Fort Dodge Regional P 27 $1,150,000.00 $1,150,000.00 $0.00 $0.00 Expand Aircraft Rescue & Fire Fighting Building, Rehabilitate
Terminal Building
CE ACE IA GFZ Greenfield Municipal GA 5 $153,000.00 $153,000.00 $0.00 $0.00 Extend Taxiway
CE ACE IA GGI Grinnell Regional GA 12 $171,000.00 $171,000.00 $0.00 $0.00 Acquire Snow Removal Equipment
CE ACE IA IOW Iowa City Municipal GA 22 $5,003,600.00 $150,000.00 $4,853,600.00 $0.00 Acquire Land For Approaches
CE ACE IA IFA Iowa Falls Municipal GA 7 $296,026.00 $296,026.00 $0.00 $0.00 Expand Apron
CE ACE IA EFW Jefferson Municipal GA 9 $175,374.00 $175,374.00 $0.00 $0.00 Extend Runway 14/32 [Land Acquisition]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 2 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
CE ACE IA MCW Mason City Municipal P 40 $229,520.00 $229,520.00 $0.00 $0.00 Rehabilitate Access Road
CE ACE IA MCW Mason City Municipal P 39 $413,054.00 $413,054.00 $0.00 $0.00 Acquire Snow Removal Equipment
CE ACE IA MXO Monticello Regional GA 7 $144,983.00 $144,983.00 $0.00 $0.00 Acquire Snow Removal Equipment
CE ACE IA MPZ Mount Pleasant Municipal GA 12 $316,787.00 $316,787.00 $0.00 $0.00 Acquire Snow Removal Equipment, Construct Snow Removal
Equipment Building
CE ACE IA +09B New 6 $3,641,307.00 $171,261.00 $3,470,046.00 $0.00 Construct New Airport [Land Reimbursement]
CE ACE IA +09K New Regional Airport 1 $460,612.00 $460,612.00 $0.00 $0.00 Conduct Airport Master Plan Study [Multi-Year Grant; Site
Selection & MP/ALP & EA]
CE ACE IA TNU Newton Municipal GA 12 $360,000.00 $360,000.00 $0.00 $0.00 Expand Apron
CE ACE IA CCY Northeast Iowa Regional GA 12 $232,200.00 $232,200.00 $0.00 $0.00 Construct Snow Removal Equipment Building
CE ACE IA I75 Osceola Municipal GA 12 $487,134.00 $487,134.00 $0.00 $0.00 Construct Building
CE ACE IA OOA Oskaloosa Municipal GA 8 $151,926.00 $151,926.00 $0.00 $0.00 Improve Airport Drainage
CE ACE IA OTM Ottumwa Regional GA 18 $445,173.00 $445,173.00 $0.00 $0.00 Install Perimeter Fencing
CE ACE IA SHL Sheldon Municipal GA 12 $469,837.00 $469,837.00 $0.00 $0.00 Rehabilitate Taxiway
CE ACE IA SUX Sioux Gateway/Col. Bud Day Field P 48 $821,529.00 $821,529.00 $0.00 $0.00 Acquire Snow Removal Equipment
CE ACE IA SUX Sioux Gateway/Col. Bud Day Field P 47 $428,652.00 $428,652.00 $0.00 $0.00 Security Enhancements
CE ACE IA BRL Southeast Iowa Regional CS 31 $299,840.00 $299,840.00 $0.00 $0.00 Acquire Land For Approaches
CE ACE IA SPW Spencer Municipal GA 21 $327,433.00 $327,433.00 $0.00 $0.00 Rehabilitate Taxiway Lighting
CE ACE IA SLB Storm Lake Municipal GA 10 $199,311.00 $199,311.00 $0.00 $0.00 Extend Runway [Land acquisition] - 17/35
CE ACE IA CID The Eastern Iowa P 47 $5,171,937.00 $3,200,857.00 $1,971,080.00 $0.00 Construct Taxiway
CE ACE IA *IAV Various Locations in Iowa 7 $982,995.00 $982,995.00 $0.00 $0.00
Install Weather Reporting Equipment (Boone Municipal; Keokuk
Municipal; Le Mars Municipal; Muscatine Municipal; Red Oak
Municipal; Schenck Field; Shenandoah Municipal; Webster City
Municipal)
CE ACE IA AWG Washington Municipal GA 7 $2,184,571.00 $170,946.00 $2,013,625.00 $0.00 Rehabilitate Runway 13/31 [Construction]
CE ACE IA ALO Waterloo Regional P 42 $616,500.00 $616,500.00 $0.00 $0.00 Rehabilitate Taxiway
CE ACE KS K78 Abilene Municipal GA 9 $189,000.00 $189,000.00 $0.00 $0.00 Rehabilitate Runway 17/35 [Design]
CE ACE KS K59 Amelia Earhart GA 10 $89,460.00 $89,460.00 $0.00 $0.00 Conduct Environmental Study [Environmental Assessment]
CE ACE KS PTS Atkinson Municipal GA 14 $453,181.00 $453,181.00 $0.00 $0.00 Rehabilitate Runway Lighting [Design/Construct] - 16/34
CE ACE KS ADT Atwood-Rawlins County City-County GA 10 $64,755.00 $64,755.00 $0.00 $0.00 Conduct Environmental Study [Environmental Assessment]
CE ACE KS EQA Captain Jack Thomas/El Dorado GA 10 $315,000.00 $315,000.00 $0.00 $0.00 Construct Taxiway [Taxiway C from apron to Runway 22
Threshold - Design/Construct]
CE ACE KS CNU Chanute Martin Johnson GA 10 $87,840.00 $87,840.00 $0.00 $0.00 Conduct Environmental Study [Environmental Assessment for
Airport Development Projects]
CE ACE KS 8K8 Cimarron Municipal GA 6 $70,821.00 $70,821.00 $0.00 $0.00 Acquire Land For Approaches [Runways 01-19 and 11-29]
CE ACE KS CYW Clay Center Municipal GA 10 $89,887.00 $89,887.00 $0.00 $0.00 Update Airport Master Plan Study
CE ACE KS CFV Coffeyville Municipal GA 18 $310,224.00 $310,224.00 $0.00 $0.00 Improve Airport Drainage
CE ACE KS AAO Colonel James Jabara R 21 $170,665.00 $170,665.00 $0.00 $0.00 Construct Taxiway
CE ACE KS DDC Dodge City Regional CS 29 $94,525.00 $94,525.00 $0.00 $0.00 Wildlife Hazard Assessments
CE ACE KS DDC Dodge City Regional CS 28 $526,237.00 $526,237.00 $0.00 $0.00 Rehabilitate Parking Lot [Design/construct]
CE ACE KS 9K7 Ellsworth Municipal GA 8 $262,705.00 $262,705.00 $0.00 $0.00 Construct Runway [Land Acquisition]
CE ACE KS EMP Emporia Municipal GA 8 $1,191,452.00 $1,191,452.00 $0.00 $0.00 Rehabilitate Runway 01/19 [Construction]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 3 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
CE ACE KS FOE Forbes Field CS 32 $4,277,063.00 $1,746,495.00 $2,530,568.00 $0.00 Rehabilitate Runway 03/21 [Construction]
CE ACE KS 3JC Freeman Field GA 10 $292,625.00 $292,625.00 $0.00 $0.00
Install Runway Vertical/Visual Guidance System - 18/36, Install
Weather Reporting Equipment, Rehabilitate Runway Lighting
18/36
CE ACE KS GCK Garden City Regional P 34 $682,620.00 $682,620.00 $0.00 $0.00
Acquire Handicap Passenger Lift Device, Construct Snow Removal
Equipment Building, Install Guidance Signs, Install Runway
Lighting - 17/35
CE ACE KS GBD Great Bend Municipal GA 22 $88,987.00 $88,987.00 $0.00 $0.00 Wildlife Hazard Assessments
CE ACE KS HYS Hays Regional P 29 $80,811.00 $80,811.00 $0.00 $0.00 Acquire Snow Removal Equipment
CE ACE KS HYS Hays Regional P 30 $158,076.00 $158,076.00 $0.00 $0.00 Rehabilitate Terminal Building [Design]
CE ACE KS HRU Herington Regional GA 7 $144,247.00 $144,247.00 $0.00 $0.00 Acquire Snow Removal Equipment
CE ACE KS HQG Hugoton Municipal GA 10 $81,639.00 $81,639.00 $0.00 $0.00 Conduct Environmental Study [Environmental Assessment]
CE ACE KS IDP Independence Municipal GA 20 $615,873.00 $615,873.00 $0.00 $0.00 Extend Runway 04/22 [Reconfigure connection to Taxiway C
from 04 turnaround], Rehabilitate Taxiway [Design/Construct]
CE ACE KS OJC Johnson County Executive R 27 $1,515,245.00 $1,515,245.00 $0.00 $0.00 Rehabilitate Taxiway [Construction]
CE ACE KS 9K8 Kingman Airport - Clyde Cessna Field GA 14 $526,397.00 $526,397.00 $0.00 $0.00 Construct Taxiway [Construction]
CE ACE KS 36K Lakin GA 2 $119,250.00 $119,250.00 $0.00 $0.00 Conduct Environmental Study [Environmental Assessment]
CE ACE KS LQR Larned-Pawnee County GA 14 $795,600.00 $795,600.00 $0.00 $0.00 Rehabilitate Apron [Design/Construct], Rehabilitate Taxiway
[Design/construct]
CE ACE KS LWC Lawrence Municipal GA 19 $253,561.00 $253,561.00 $0.00 $0.00 Rehabilitate Runway 15/33 [Crackfill]
CE ACE KS LBL Liberal Mid-America Regional CS 21 $202,112.00 $202,112.00 $0.00 $0.00 Rehabilitate Taxiway [Design]
CE ACE KS 13K Lt. William M. Milliken GA 4 $155,700.00 $155,700.00 $0.00 $0.00 Acquire Snow Removal Equipment, Conduct Environmental Study
[Environmental Assessment]
CE ACE KS LYO Lyons-Rice County Municipal GA 16 $262,188.00 $262,188.00 $0.00 $0.00 Extend Runway 17R/35L
CE ACE KS MHK Manhattan Regional P 45 $876,905.00 $876,905.00 $0.00 $0.00 Install Perimeter Fencing
CE ACE KS MHK Manhattan Regional P 44 $7,809,475.00 $2,029,475.00 $5,780,000.00 $0.00 Expand Terminal Building [Construction]
CE ACE KS 3K7 Mark Hoard Memorial GA 4 $312,300.00 $312,300.00 $0.00 $0.00 Construct Snow Removal Equipment Building, Remove
Obstructions
CE ACE KS MYZ Marysville Municipal GA 8 $354,600.00 $354,600.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System
[Design/Construct] - 16/34
CE ACE KS MEJ Meade Municipal GA 11 $52,949.00 $52,949.00 $0.00 $0.00 Update Airport Master Plan Study
CE ACE KS 48K Ness City Municipal GA 6 $205,489.00 $205,489.00 $0.00 $0.00 Construct Runway [Land Acquisition]
CE ACE KS OEL Oakley Municipal GA 11 $502,993.00 $502,993.00 $0.00 $0.00 Construct Apron [Construction]
CE ACE KS 53K Osage City Municipal GA 8 $104,956.00 $104,956.00 $0.00 $0.00 Construct Runway 17/35 [Land Acquisition]
CE ACE KS PHG Phillipsburg Municipal GA 11 $160,650.00 $160,650.00 $0.00 $0.00 Rehabilitate Runway 13/31 [Design]
CE ACE KS TQK Scott City Municipal GA 14 $273,636.00 $273,636.00 $0.00 $0.00 Rehabilitate Runway Lighting - 17/35
CE ACE KS K82 Smith Center Municipal GA 12 $26,357.00 $26,357.00 $0.00 $0.00 Acquire Miscellaneous Land
CE ACE KS JHN Stanton County Municipal GA 10 $140,895.00 $140,895.00 $0.00 $0.00 Acquire Snow Removal Equipment
CE ACE KS 3K3 Syracuse-Hamilton County Municipal GA 10 $59,931.00 $59,931.00 $0.00 $0.00 Extend Runway 18/36 [Land - Easement]
CE ACE KS 5K2 Tribune Municipal GA 7 $716,453.00 $716,453.00 $0.00 $0.00 Construct Taxiway [Construct]
CE ACE KS EGT Wellington Municipal GA 13 $1,495,386.00 $1,495,386.00 $0.00 $0.00 Improve Runway Safety Area [Design/Construct] - 17/35
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 4 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
CE ACE KS ICT Wichita Mid-Continent P 66 $6,384,315.00 $3,908,639.00 $2,475,676.00 $0.00 Rehabilitate Apron [Phase 3a]
CE ACE MO MKC Charles B. Wheeler Downtown R 26 $4,227,979.00 $0.00 $4,227,979.00 $0.00 Rehabilitate Taxiway [Phase 3]
CE ACE MO MKC Charles B. Wheeler Downtown R 23 $2,651,027.00 $0.00 $2,651,027.00 $0.00 Construct Aircraft Rescue & Fire Fighting Building
CE ACE MO MKC Charles B. Wheeler Downtown R 25 $257,218.00 $150,000.00 $107,218.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
CE ACE MO JLN Joplin Regional P 32 $1,234,141.00 $0.00 $1,234,141.00 $0.00 Construct Service Road
CE ACE MO JLN Joplin Regional P 34 $1,391,195.00 $971,530.00 $419,665.00 $0.00 Construct Taxiway [Phase 1A]
CE ACE MO MCI Kansas City International P 70 $5,054,051.00 $2,362,682.00 $2,691,369.00 $0.00 Rehabilitate Taxiway "A" [Phase 2]
CE ACE MO STL Lambert-St Louis International P 138 $414,053.00 $0.00 $414,053.00 $0.00 Rehabilitate Taxiway [Phase 1 - Design]
CE ACE MO STL Lambert-St Louis International P 135 $179,098.00 $0.00 $179,098.00 $0.00 Install Noise Monitoring System
CE ACE MO STL Lambert-St Louis International P 137 $405,012.00 $0.00 $405,012.00 $0.00 Rehabilitate Apron [Phase 1 - Design]
CE ACE MO STL Lambert-St Louis International P 139 $14,193.00 $0.00 $14,193.00 $0.00 Zero Emissions Vehicle/Infrastructure (Pilot Program FY12-15
ONLY)
CE ACE MO STL Lambert-St Louis International P 136 $7,178,764.00 $2,616,816.00 $4,561,948.00 $0.00 Rehabilitate Taxiway [Phase 2 - Construction], Rehabilitate
Taxiway [Phase 2 - Construction]
CE ACE MO *MOB Missouri State Block Grant Program 59 $7,950,000.00 $7,950,000.00 $0.00 $0.00 Non primary development projects in state block grant program
CE ACE MO *MOB Missouri State Block Grant Program 58 $4,425,658.00 $4,425,658.00 $0.00 $0.00 Non primary development projects in state block grant program
CE ACE MO SGF Springfield-Branson National P 49 $2,753,031.00 $2,753,031.00 $0.00 $0.00 Construct Apron, Construct Terminal Building
CE ACE NE ANW Ainsworth Regional GA 10 $2,057,000.00 $2,057,000.00 $0.00 $0.00 Rehabilitate Runway 13/31
CE ACE NE AIA Alliance Municipal GA 16 $390,000.00 $390,000.00 $0.00 $0.00 Rehabilitate Runway 12/30 [Phase I - Design]
CE ACE NE 4V9 Antelope County GA 5 $222,000.00 $222,000.00 $0.00 $0.00 Rehabilitate Runway 13/31 [Phase I - Design]
CE ACE NE BTA Blair Municipal GA 13 $1,380,000.00 $1,380,000.00 $0.00 $0.00 Acquire Land For Approaches [Phase I]
CE ACE NE BTA Blair Municipal GA 12 $186,795.00 $186,795.00 $0.00 $0.00 Acquire Snow Removal Equipment
CE ACE NE FNB Brenner Field GA 9 $3,218,000.00 $3,218,000.00 $0.00 $0.00 Construct Taxiway, Install Taxiway Lighting, Widen Runway
[Design Construct] - 14/32
CE ACE NE HDE Brewster Field GA 11 $601,200.00 $601,200.00 $0.00 $0.00 Rehabilitate Runway Lighting - 18/36, Rehabilitate Taxiway
Lighting
CE ACE NE BBW Broken Bow Municipal/Keith Glaze Field GA 6 $174,600.00 $174,600.00 $0.00 $0.00 Update Airport Master Plan Study
CE ACE NE BBW Broken Bow Municipal/Keith Glaze Field GA 7 $83,000.00 $83,000.00 $0.00 $0.00 Acquire Land For Approaches
CE ACE NE CSB Cambridge Municipal GA 7 $349,000.00 $349,000.00 $0.00 $0.00 Rehabilitate Runway 14/32 [Phase I -Design]
CE ACE NE GRI Central Nebraska Regional P 37 $1,284,929.00 $1,284,929.00 $0.00 $0.00 Construct Terminal Building [Phase I - Design]
CE ACE NE CDR Chadron Municipal GA 14 $364,800.00 $364,800.00 $0.00 $0.00 Rehabilitate Runway 02/20 [Phase I - Design]
CE ACE NE OLU Columbus Municipal GA 12 $227,000.00 $227,000.00 $0.00 $0.00 Acquire Land For Approaches
CE ACE NE CEK Crete Municipal GA 10 $401,000.00 $401,000.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 17/35, Rehabilitate
Taxiway
CE ACE NE CEK Crete Municipal GA 11 $178,000.00 $178,000.00 $0.00 $0.00 Acquire Snow Removal Equipment
CE ACE NE OMA Eppley Airfield P 64 $10,882,500.00 $5,404,558.00 $5,477,942.00 $0.00 Rehabilitate Runway 18/36 [Phase II - Construction]
CE ACE NE OMA Eppley Airfield P 65 $1,706,250.00 $0.00 $1,706,250.00 $0.00 Improve Airport Drainage [Phase II Construction, East]
CE ACE NE ODX Evelyn Sharp Field GA 8 $832,022.00 $832,022.00 $0.00 $0.00 Construct Building
CE ACE NE GRN Gordon Municipal GA 7 $304,825.00 $304,825.00 $0.00 $0.00 Rehabilitate Runway [Phase I - Design] - 04/22
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 5 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
CE ACE NE IML Imperial Municipal GA 11 $324,000.00 $324,000.00 $0.00 $0.00 Rehabilitate Apron [Phase I - Design], Rehabilitate Taxiway
[Phase I- Design]
CE ACE NE LXN Jim Kelly Field GA 13 $409,500.00 $409,500.00 $0.00 $0.00 Construct Snow Removal Equipment Building
CE ACE NE EAR Kearney Regional P 25 $1,686,896.00 $1,686,896.00 $0.00 $0.00 Construct Aircraft Rescue & Fire Fighting Building
CE ACE NE EAR Kearney Regional P 28 $55,665.00 $55,665.00 $0.00 $0.00 Wildlife Hazard Assessments
CE ACE NE LNK Lincoln P 48 $450,000.00 $450,000.00 $0.00 $0.00 Rehabilitate Runway [Phase I - Design] - 18/36
CE ACE NE LNK Lincoln P 49 $569,800.00 $569,800.00 $0.00 $0.00 Acquire Snow Removal Equipment
CE ACE NE 0F4 Loup City Municipal GA 5 $1,032,969.00 $1,032,969.00 $0.00 $0.00 Extend Runway 16/34
CE ACE NE MLE Millard R 8 $126,000.00 $126,000.00 $0.00 $0.00 Rehabilitate Runway 12/30
CE ACE NE AFK Nebraska City Municipal GA 13 $300,000.00 $300,000.00 $0.00 $0.00 Construct Taxiway [Phase II - Grade]
CE ACE NE LBF North Platte Regional Airport Lee Bird Field P 27 $1,260,763.00 $1,260,763.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 12/30, Rehabilitate
Taxiway
CE ACE NE 50K Pawnee City Municipal GA 2 $142,000.00 $142,000.00 $0.00 $0.00 Acquire Miscellaneous Land
CE ACE NE 7V7 Red Cloud Municipal GA 7 $189,000.00 $189,000.00 $0.00 $0.00 Improve Building
CE ACE NE SWT Seward Municipal GA 11 $664,378.00 $664,378.00 $0.00 $0.00 Construct Building
CE ACE NE ONL The O'Neill Municipal-John L Baker Field GA 9 $158,500.00 $158,500.00 $0.00 $0.00 Acquire Snow Removal Equipment
CE ACE NE BFF Western Nebraska Regional/William B.
Heilig Field CS 36 $96,000.00 $96,000.00 $0.00 $0.00 Acquire Handicap Passenger Lift Device
CE ACE NE BFF Western Nebraska Regional/William B.
Heilig Field CS 35 $1,525,000.00 $1,525,000.00 $0.00 $0.00 Improve Terminal Building
CE ACE NE JYR York Municipal GA 12 $900,000.00 $900,000.00 $0.00 $0.00 Construct Building [Hangar]
EA BEC WV EBD Appalachian Regional GA 5 $567,021.00 $567,021.00 $0.00 $0.00 Construct Building
EA BEC WV 48I Braxton County GA 18 $2,011,112.00 $160,952.00 $1,850,160.00 $0.00 Rehabilitate Runway 01/19 [Construction - Paving]
EA BEC WV MRB Eastern WV Regional/Shepherd Field R 31 $150,000.00 $150,000.00 $0.00 $0.00 Acquire Miscellaneous Land, Rehabilitate Taxiway E3
EA BEC WV EKN Elkins-Randolph County-Jennings Randolph
Field GA 22 $1,067,345.00 $0.00 $1,067,345.00 $0.00 Rehabilitate Taxiway
EA BEC WV EKN Elkins-Randolph County-Jennings Randolph
Field GA 21 $450,000.00 $450,000.00 $0.00 $0.00 Rehabilitate Taxiway
EA BEC WV 4G7 Fairmont Municipal-Frankman Field GA 14 $733,776.00 $733,776.00 $0.00 $0.00 Construct Taxiway [Construction]
EA BEC WV LWB Greenbrier Valley P 32 $197,600.00 $197,600.00 $0.00 $0.00 Construct Taxiway [Design]
EA BEC WV 6L4 Logan County GA 12 $200,967.00 $200,967.00 $0.00 $0.00 Install Weather Reporting Equipment
EA BEC WV MPG Marshall County GA 20 $111,972.00 $111,972.00 $0.00 $0.00 Construct Building
EA BEC WV BLF Mercer County GA 26 $58,223.00 $58,223.00 $0.00 $0.00 Construct Taxiway [Design]
EA BEC WV PKB Mid-Ohio Valley Regional CS 42 $824,191.00 $824,191.00 $0.00 $0.00 Rehabilitate Runway 03/21 [Construction], Rehabilitate Runway
10/28, Rehabilitate Taxiway
EA BEC WV MGW Morgantown Municipal-Walter L. Bill Hart
Field P 35 $1,185,422.00 $1,185,422.00 $0.00 $0.00 Rehabilitate Terminal Building [Roof]
EA BEC WV CKB North Central West Virginia P 37 $52,500.00 $52,500.00 $0.00 $0.00 Install Perimeter Fencing
EA BEC WV CKB North Central West Virginia P 38 $432,680.00 $432,680.00 $0.00 $0.00 Update Airport Master Plan Study
EA BEC WV 79D Philippi/Barbour County Regional GA 14 $87,817.00 $87,817.00 $0.00 $0.00 Construct Fuel Farm
EA BEC WV BKW Raleigh County Memorial CS 32 $372,735.00 $299,970.00 $72,765.00 $0.00 Rehabilitate Terminal Building
EA BEC WV SXL Summersville GA 10 $173,598.00 $173,598.00 $0.00 $0.00 Rehabilitate Runway 04/22
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 6 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
EA BEC WV HTS Tri-State/Milton J. Ferguson Field P 50 $967,862.00 $967,862.00 $0.00 $0.00 Acquire Handicap Passenger Lift Device, Improve Airport
Drainage, Rehabilitate Taxiway [Construct]
EA BEC WV HTS Tri-State/Milton J. Ferguson Field P 51 $250,000.00 $0.00 $250,000.00 $0.00 Sustainable Management Plan
EA BEC WV W22 Upshur County Regional GA 27 $150,000.00 $150,000.00 $0.00 $0.00 Construct Building
EA BEC WV CRW Yeager P 52 $7,322,582.00 $2,206,096.00 $5,116,486.00 $0.00 Remove Obstructions [Construction]
EA BEC WV CRW Yeager P 53 $200,000.00 $0.00 $200,000.00 $0.00 Sustainable Management Plan
EA HAR DE 33N Delaware Airpark GA 16 $2,802,840.00 $400,841.00 $2,401,999.00 $0.00 Construct Runway 09/27 [Site Work/Access Road, Phase X]
EA HAR DE ILG New Castle R 35 $893,910.00 $893,910.00 $0.00 $0.00 Construct Taxiways "B" and "E" (Design), Expand Terminal Apron
(Design), Rehabilitate Taxiway "A" (Design)
EA HAR DE ILG New Castle R 36 $154,388.00 $154,388.00 $0.00 $0.00 Conduct Environmental Study - Remove Obstructions [Off Airport
- Preliminary Design]
EA HAR DE GED Sussex County GA 29 $4,297,047.00 $481,500.54 $3,815,546.46 $0.00 Extend Runway 04/22, Rehabilitate Runway 04/22
EA HAR NJ ACY Atlantic City International P 86 $1,756,732.00 $1,756,732.00 $0.00 $0.00 Construct Deicing Containment Facility [Design]
EA HAR NJ ACY Atlantic City International P 84 $169,470.00 $169,470.00 $0.00 $0.00 Install Perimeter Fencing required by 49 CFR 1542 [Final Design]
EA HAR NJ ACY Atlantic City International P 85 $1,444,869.00 $1,444,869.00 $0.00 $0.00 Rehabilitate Taxiway "D"
EA HAR NJ WWD Cape May County GA 33 $1,154,232.00 $1,154,232.00 $0.00 $0.00 Acquire Land For Approaches
EA HAR NJ CDW Essex County R 35 $67,050.00 $67,050.00 $0.00 $0.00 Rehabilitate Taxiway Lighting [Taxiway N and H (Design)]
EA HAR NJ N81 Hammonton Municipal GA 19 $203,977.00 $203,977.00 $0.00 $0.00
Remove Obstructions [Off Airport], Remove Obstructions [On-
Airport (Design)], Update Miscellaneous Study [Obstruction
Removal Study]
EA HAR NJ N12 Lakewood GA 16 $206,529.00 $206,529.00 $0.00 $0.00 Remove Obstructions [Runway 24 End]
EA HAR NJ N07 Lincoln Park R 11 $126,120.00 $126,120.00 $0.00 $0.00 Rehabilitate Taxiway [Hangar Taxilane - Final Design]
EA HAR NJ LDJ Linden R 16 $133,965.00 $133,965.00 $0.00 $0.00 Rehabilitate Runway 09/27 [Construction]
EA HAR NJ MIV Millville Municipal GA 36 $881,560.00 $450,000.00 $431,560.00 $0.00 Rehabilitate Terminal Apron (Construction)
EA HAR NJ MMU Morristown Municipal CS 48 $958,356.00 $695,000.00 $263,356.00 $0.00 Conduct Environmental Study [Rehabilitate Runway 5/23]
EA HAR NJ MJX Robert J. Miller Air Park GA 24 $1,240,135.00 $1,240,135.00 $0.00 $0.00 Construct Runway [Crosswind Runway 14/32, Construct]
EA HAR NJ SMQ Somerset R 12 $70,745.00 $70,745.00 $0.00 $0.00 Conduct Environmental Study [Obstruction Removal Study-Off
Airport]
EA HAR NJ *NJS State of New Jersey 1 $367,138.00 $367,138.00 $0.00 $0.00 Conduct State System Plan Study
EA HAR NJ TTN Trenton Mercer CS 42 $1,063,521.00 $1,063,521.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
EA HAR NJ TTN Trenton Mercer CS 43 $281,250.00 $115,029.00 $166,221.00 $0.00 Conduct Miscellaneous Study [Obstruction Study]
EA HAR NJ TTN Trenton Mercer GA 40 $65,325.00 $65,325.00 $0.00 $0.00 Wildlife Hazard Assessments
EA HAR PA AGC Allegheny County R 32 $1,717,055.00 $150,000.00 $1,567,055.00 $0.00 Rehabilitate Taxiway "B" (Construction)
EA HAR PA AGC Allegheny County R 31 $249,894.00 $249,894.00 $0.00 $0.00 Acquire Snow Removal Equipment [Snow Plow]
EA HAR PA XLL Allentown Queen City Municipal GA 19 $104,188.00 $104,188.00 $0.00 $0.00 Conduct Miscellaneous Study [Obstruction Study]
EA HAR PA AOO Altoona-Blair County CS 41 $333,492.00 $333,492.00 $0.00 $0.00 Install Airfield Guidance Signs [Airfield sign panels/markings
(Construction)], Install Perimeter Fencing [Construction]
EA HAR PA LBE Arnold Palmer Regional P 44 $430,730.00 $430,730.00 $0.00 $0.00 Update Airport Master Plan Study
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 7 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
EA HAR PA LBE Arnold Palmer Regional P 45 $517,733.00 $517,733.00 $0.00 $0.00 Construct Parking Lot, Rehabilitate Taxiway [Parallel Taxiway
Final Design]
EA HAR PA LBE Arnold Palmer Regional P 46 $236,817.00 $0.00 $236,817.00 $0.00 Sustainable Master Plan
EA HAR PA BFD Bradford Regional CS 41 $268,280.00 $268,280.00 $0.00 $0.00 Rehabilitate Terminal Apron, Remove Obstructions [Phase III]
EA HAR PA CXY Capital City R 27 $230,600.00 $230,600.00 $0.00 $0.00 Update Airport Master Plan Study
EA HAR PA CXY Capital City R 26 $98,379.00 $98,379.00 $0.00 $0.00 Improve Airport Drainage [Hangar Taxiway (Design)], Rehabilitate
Runway Lighting [Design] - 12/30
EA HAR PA @01N Delaware Valley Region 14 $88,104.00 $44,052.00 $44,052.00 $0.00 Conduct Metropolitan System Plan Study
EA HAR PA DUJ Dubois Regional CS 36 $250,174.00 $250,174.00 $0.00 $0.00 Improve Utilities, Security Enhancements
EA HAR PA DUJ Dubois Regional CS 37 $46,056.00 $46,056.00 $0.00 $0.00 Acquire Snow Removal Equipment [Truck and Spreader]
EA HAR PA DUJ Dubois Regional CS 35 $24,745.00 $24,745.00 $0.00 $0.00 Rehabilitate Taxiway [Hangar Taxiway (Design)]
EA HAR PA ERI Erie International/Tom Ridge Field P 58 $5,974,834.00 $1,366,295.00 $4,608,539.00 $0.00 Rehabilitate Runway 06/24
EA HAR PA W05 Gettysburg Regional GA 9 $61,474.00 $61,474.00 $0.00 $0.00 Rehabilitate Runway 06/24 [Preliminary Design]
EA HAR PA W05 Gettysburg Regional GA 8 $488,564.00 $488,564.00 $0.00 $0.00 Acquire Easement For Approaches [Runway 6 End]
EA HAR PA MDT Harrisburg International P 72 $1,148,341.00 $1,148,341.00 $0.00 $0.00 Update Airport Master Plan Study
EA HAR PA MDT Harrisburg International P 75 $1,704,101.00 $1,704,101.00 $0.00 $0.00
Acquire Friction Measuring Equipment, Acquire Snow Removal
Equipment [Two Trucks with Plows and One Broom], Rehabilitate
Runway 13/31 [Final Design]
EA HAR PA MDT Harrisburg International P 74 $452,842.00 $452,842.00 $0.00 $0.00 Rehabilitate Taxiway "A" [Phase III]
EA HAR PA MDT Harrisburg International P 76 $1,597,006.00 $1,597,006.00 $0.00 $0.00 Construct Snow Removal Equipment Building [Demolish Existing
Terminal Building for Site Preparation]
EA HAR PA MDT Harrisburg International P 73 $163,727.00 $163,727.00 $0.00 $0.00 Improve Aircraft Rescue & Fire Fighting Building [Phase II]
EA HAR PA JST John Murtha Johnstown-Cambria County CS 45 $326,250.00 $326,250.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
EA HAR PA ABE Lehigh Valley International P 95 $1,396,309.00 $0.00 $1,396,309.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
EA HAR PA ABE Lehigh Valley International P 96 $240,939.00 $0.00 $240,939.00 $0.00 Conduct Noise Compatibility Plan Study
EA HAR PA ABE Lehigh Valley International P 93 $3,007,326.00 $3,007,326.00 $0.00 $0.00 Acquire Land for Development
EA HAR PA ABE Lehigh Valley International P 94 $2,648,909.00 $0.00 $2,648,909.00 $0.00 Improve Runway Safety Area [Construct, Phase V] - 13/31
EA HAR PA *PAB Pennsylvania State Block Grant Program 67 $5,439,155.00 $5,439,155.00 $0.00 $0.00 Non primary development projects in state block grant program
EA HAR PA *PAB Pennsylvania State Block Grant Program 69 $1,466,064.00 $0.00 $1,466,064.00 $0.00 Non primary development projects in state block grant program
EA HAR PA *PAB Pennsylvania State Block Grant Program 68 $2,683,158.00 $2,683,158.00 $0.00 $0.00 Non primary development projects in state block grant program
EA HAR PA PHL Philadelphia International P 101 $21,099,126.00 $6,099,126.00 $15,000,000.00 $0.00 Acquire Land for Development, Construct Taxiway [Phase II]
EA HAR PA PHL Philadelphia International P 102 $371,250.00 $0.00 $371,250.00 $0.00 Acquire Equipment [Acquire & Install Automatic Dependent
Surveillance Broadcast]
EA HAR PA PIT Pittsburgh International P 115 $6,583,565.00 $2,117,603.00 $4,465,962.00 $0.00 Rehabilitate Runway 14/32 [Phase VII]
EA HAR PA RDG Reading Regional/Carl A Spaatz Field GA 53 $139,266.00 $139,266.00 $0.00 $0.00 Rehabilitate Taxiway [South Taxilane (Design)]
EA HAR PA FWQ Rostraver R 20 $216,731.00 $216,731.00 $0.00 $0.00 Rehabilitate Apron [Main Apron (Design/Construct)]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 8 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
EA HAR PA FWQ Rostraver R 21 $57,592.00 $57,592.00 $0.00 $0.00 Conduct Miscellaneous Study [Obstruction Removal Study]
EA HAR PA UNV University Park P 58 $144,817.00 $144,817.00 $0.00 $0.00 Rehabilitate Apron [General Aviation Apron (Final Design)],
Rehabilitate Taxiway "D" (Design)
EA HAR PA UNV University Park P 57 $995,418.00 $995,418.00 $0.00 $0.00 Rehabilitate Taxiway Lighting [Taxiways A/B/C/E/G/H]
EA HAR PA AVP Wilkes-Barre/Scranton International P 58 $752,111.00 $752,111.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - Runway 10/28,
Rehabilitate Terminal Apron
EA HAR PA AVP Wilkes-Barre/Scranton International P 59 $757,356.00 $757,356.00 $0.00 $0.00 Extend Taxiway [Taxiway B (Runway 22 Approach End-Design)]
EA NYC NJ EWR Newark Liberty International P 132 $3,634,199.00 $3,634,199.00 $0.00 $0.00 Rehabilitate Access Road [Design/Construction]
EA NYC NJ EWR Newark Liberty International P 133 $421,875.00 $0.00 $421,875.00 $0.00 Acquire Equipment [Automatic Dependent Surveillance
Broadcast Squitters]
EA NYC NJ TEB Teterboro R 50 $1,000,000.00 $1,000,000.00 $0.00 $0.00 Improve Runway Safety Area [Phase 1] - 01/19
EA NYC NY SLK Adirondack Regional CS 57 $967,110.00 $967,110.00 $0.00 $0.00 Improve Terminal Building [Construction]
EA NYC NY SLK Adirondack Regional CS 56 $85,405.00 $85,405.00 $0.00 $0.00 Rehabilitate Apron [Terminal Apron/Drainage Improvements
Phase II (Design)]
EA NYC NY 9G3 Akron R 19 $179,147.00 $179,147.00 $0.00 $0.00 Acquire Land for Development, Improve Access Road
EA NYC NY ALB Albany International P 118 $1,993,844.00 $1,993,844.00 $0.00 $0.00 Construct Sand and Chemical Storage Building
EA NYC NY ALB Albany International P 119 $143,100.00 $143,100.00 $0.00 $0.00 Acquire Easement For Approaches
EA NYC NY ALB Albany International P 117 $173,430.00 $173,430.00 $0.00 $0.00 Rehabilitate Runway Lighting [Rehabilitate Airfield Electrical
Lighting Vault - Phase II, Grid & Sitework - Construction] - 01/19
EA NYC NY ALB Albany International P 120 $385,587.00 $385,587.00 $0.00 $0.00 Construct Service Road, Install Perimeter Fencing
EA NYC NY ALB Albany International P 116 $708,056.00 $708,056.00 $0.00 $0.00 Rehabilitate Service Road [Design/Construction]
EA NYC NY ALB Albany International P 121 $611,989.00 $611,989.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
EA NYC NY 23N Bayport Aerodrome GA 13 $116,696.00 $116,696.00 $0.00 $0.00
Install Miscellaneous NAVAIDS [Replace Segmented Circle Airport
Marker System - Design/Construction], Rehabilitate Access Road
[Design]
EA NYC NY HWV Brookhaven R 28 $271,087.00 $271,087.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 06/24,
Rehabilitate Runway 06/24 [Construction]
EA NYC NY HWV Brookhaven R 29 $637,193.00 $0.00 $637,193.00 $0.00 Rehabilitate Taxiway Lighting [Rehabilitate Taxiway Edge Lighting
(Taxiways C/D/E/F/L) including Signage - Construction - Phase I]
EA NYC NY 9G0 Buffalo Airfield R 23 $166,104.00 $166,104.00 $0.00 $0.00 Acquire Land for Development, Improve Access Road
EA NYC NY BUF Buffalo Niagara International P 85 $70,071.00 $70,071.00 $0.00 $0.00 Improve Utilities [Design]
EA NYC NY BUF Buffalo Niagara International P 82 $5,105,945.00 $0.00 $5,105,945.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
[Phase 9 - Design/Construction]
EA NYC NY BUF Buffalo Niagara International P 84 $142,869.00 $142,869.00 $0.00 $0.00 Remove Obstructions
EA NYC NY BUF Buffalo Niagara International P 83 $838,386.00 $838,386.00 $0.00 $0.00 Improve Terminal Building [Construction]
EA NYC NY D38 Canandaigua R 33 $82,350.00 $82,350.00 $0.00 $0.00 Rehabilitate Taxiway [Taxiways A,B,C including Taxiway Lighting,
airport location signs, and runway guard lights]
EA NYC NY D38 Canandaigua R 31 $63,000.00 $63,000.00 $0.00 $0.00
Conduct Environmental Study [Prepare Short Form
Environmental Assessment For East Apron General Aviation
Complex Development]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 9 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
EA NYC NY D38 Canandaigua R 32 $58,950.00 $58,950.00 $0.00 $0.00 Rehabilitate Apron [Rehabilitate a portion of the Main Apron]
EA NYC NY OLE Cattaraugus County-Olean GA 17 $633,600.00 $633,600.00 $0.00 $0.00 Construct Taxiway [Construct T-Hangar Taxilane - Construction]
EA NYC NY OLE Cattaraugus County-Olean GA 18 $72,000.00 $72,000.00 $0.00 $0.00 Install Perimeter Fencing [Design]
EA NYC NY DKK Chautauqua County/Dunkirk GA 47 $296,120.00 $296,120.00 $0.00 $0.00 Remove Obstructions [Obstruction Removal Runway Ends 6, 15,
and 33]
EA NYC NY DKK Chautauqua County/Dunkirk GA 46 $352,031.00 $352,031.00 $0.00 $0.00
Install Airfield Guidance Signs [Replace 24 Airfield Guidance Signs
- Design and Construction], Install Miscellaneous NAVAIDS
[Replace Segmented Circle and Install Two Wind Cones - Design
and Construction], Rehabilitate Taxiway Lighting
EA NYC NY JHW Chautauqua County/Jamestown CS 41 $65,550.00 $65,550.00 $0.00 $0.00 Rehabilitate Parking Lot [Design]
EA NYC NY 7N1 Corning-Painted Post GA 18 $373,044.00 $373,044.00 $0.00 $0.00 Construct Apron
EA NYC NY N03 Cortland County-Chase Field GA 22 $92,345.00 $92,345.00 $0.00 $0.00 Rehabilitate Runway 06/24 [Grooving and pavement markings
(Design and Construction)]
EA NYC NY N03 Cortland County-Chase Field GA 21 $569,235.00 $569,235.00 $0.00 $0.00 Construct Snow Removal Equipment Building
EA NYC NY DSV Dansville Municipal GA 23 $184,590.00 $184,590.00 $0.00 $0.00 Remove Obstructions [Easement Acquisition for Obstruction
Removal - Phase II]
EA NYC NY DSV Dansville Municipal GA 22 $100,800.00 $100,800.00 $0.00 $0.00
Install Miscellaneous NAVAIDS [Replace Beacon - Design],
Rehabilitate Apron [Rehabilitate a portion of the apron - Design],
Rehabilitate Taxiway [Taxiways "A" and "B"]
EA NYC NY POU Dutchess County GA 39 $1,211,400.00 $1,211,400.00 $0.00 $0.00 Construct Taxiway [Partial Parallel Taxiway K to Runway 24
Threshold (Construction)]
EA NYC NY POU Dutchess County GA 40 $81,900.00 $81,900.00 $0.00 $0.00 Rehabilitate Taxiway [Rehabilitate Taxiway "B" and Stub
Taxiways "A" and "C" - Design]
EA NYC NY ELM Elmira/Corning Regional P 60 $336,250.00 $336,250.00 $0.00 $0.00 Mark Obstructions [Rehabilitate Six Off Airport Obstruction
Beacons - Construction]
EA NYC NY 0G7 Finger Lakes Regional GA 24 $704,966.00 $150,000.00 $554,966.00 $0.00 Rehabilitate Taxiway [Taxiway "A" - Construction], Rehabilitate
Taxiway Lighting [Taxiway "A" - Construction]
EA NYC NY GFL Floyd Bennett Memorial GA 51 $1,035,000.00 $150,000.00 $885,000.00 $0.00 Remove Obstructions [On-Airport Obstruction Removal (Trees)
Construction]
EA NYC NY GFL Floyd Bennett Memorial GA 52 $342,630.00 $342,630.00 $0.00 $0.00 Acquire Easement For Approaches
EA NYC NY GFL Floyd Bennett Memorial GA 53 $208,614.00 $208,614.00 $0.00 $0.00 Conduct Environmental Study [Environmental Assessment for
Obstruction Removal]
EA NYC NY FOK Francis S Gabreski GA 16 $477,000.00 $477,000.00 $0.00 $0.00 Acquire Snow Removal Equipment [Replace Snow Blower]
EA NYC NY FOK Francis S Gabreski GA 17 $360,260.00 $360,260.00 $0.00 $0.00 Rehabilitate Runway 15/33 [Including Markings and Drainage
Design]
EA NYC NY NY0 Fulton County GA 18 $191,440.00 $191,440.00 $0.00 $0.00 Install Weather Reporting Equipment
EA NYC NY GVQ Genesee County R 30 $63,000.00 $63,000.00 $0.00 $0.00 Construct Taxiway [Hangar Taxiway Development, Phase III
Design]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 10 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
EA NYC NY GVQ Genesee County R 31 $200,000.00 $0.00 $200,000.00 $0.00 Construct Terminal Building [Design]
EA NYC NY GVQ Genesee County R 29 $973,800.00 $973,800.00 $0.00 $0.00 Construct Apron [Relocate Tie-down Apron - Construction]
EA NYC NY BGM Greater Binghamton/Edwin A Link Field P 64 $2,606,573.00 $1,472,420.00 $1,134,153.00 $0.00 Rehabilitate Apron [Rehabilitate West Apron - (Construction)]
EA NYC NY ROC Greater Rochester International P 83 $828,000.00 $0.00 $828,000.00 $0.00 Rehabilitate Taxiway [Rehabilitate Taxiways A1, A2, A3, E, N & C
to Runway 04/22 - Construction]
EA NYC NY ROC Greater Rochester International P 81 $492,667.00 $492,667.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
EA NYC NY ROC Greater Rochester International P 84 $1,807,508.00 $359,396.00 $1,448,112.00 $0.00 Rehabilitate Apron [Phase 5 - Design and Construction]
EA NYC NY ROC Greater Rochester International P 82 $5,500,000.00 $4,049,539.00 $1,450,461.00 $0.00 Improve Runway Safety Area - 10/28
EA NYC NY RME Griffiss International GA 32 $4,095,000.00 $150,000.00 $3,945,000.00 $0.00 Rehabilitate Taxiway [Phase 3 (Design Only)], Rehabilitate
Taxiway [Taxiways A, J and E9 - Phase II (Construction)]
EA NYC NY RME Griffiss International GA 31 $2,149,940.00 $0.00 $2,149,940.00 $0.00 Rehabilitate Building [Construction - Phase I]
EA NYC NY RME Griffiss International GA 33 $449,100.00 $449,100.00 $0.00 $0.00 Install Taxiway Lighting [Taxiway K Edge Lighting (Design and
Construction)]
EA NYC NY HTF Hornell Municipal GA 20 $85,500.00 $85,500.00 $0.00 $0.00 Remove Obstructions [Obstruction Study for Runway 18
Approach], Remove Obstructions [Site Evaluation Study]
EA NYC NY ITH Ithaca Tompkins Regional P 66 $175,500.00 $175,500.00 $0.00 $0.00 Expand Apron [Design]
EA NYC NY ITH Ithaca Tompkins Regional P 68 $1,032,915.00 $1,032,915.00 $0.00 $0.00 Install Perimeter Fencing required by 49 CFR 1542
EA NYC NY ITH Ithaca Tompkins Regional P 67 $209,700.00 $209,700.00 $0.00 $0.00 Acquire Snow Removal Equipment [Ramp Dozer]
EA NYC NY JFK John F Kennedy International P 178 $6,279,544.00 $6,279,544.00 $0.00 $0.00
Rehabilitate Taxiway [Rehabilitate & Widen Taxiway P From
Taxiway PC to Taxiway B) Including Lighting, Signage & Marking
Construction Phase III]
EA NYC NY JFK John F Kennedy International P 177 $7,352,007.00 $7,352,007.00 $0.00 $0.00
Rehabilitate Taxiway [Rehabilitate Taxiway B between Taxiway N
and Taxiway U including Lighting, Signage & Marking
Design/Construction Phase I]
EA NYC NY N89 Joseph Y Resnick GA 32 $211,486.00 $211,486.00 $0.00 $0.00
Install Miscellaneous NAVAIDS [Rehabilitate Airport Beacon &
Windcone - Design & Construction], Rehabilitate Runway Lighting
[Rehabilitate Runway Threshold Lights - Design & Construction]
04/22, Rehabilitate Taxiway Lighting
EA NYC NY N89 Joseph Y Resnick GA 33 $79,740.00 $79,740.00 $0.00 $0.00 Conduct Environmental Study [Prepare an Environmental
Assessment and Preliminary Engineering]
EA NYC NY LGA La Guardia P 139 $3,754,807.00 $3,754,807.00 $0.00 $0.00 Improve Airport Drainage [Upgrade Pumps in Pump House 4
(Phase 2)]
EA NYC NY LKP Lake Placid GA 37 $766,800.00 $766,800.00 $0.00 $0.00 Expand Apron [Construction], Rehabilitate Taxiway [Taxiways A,
B, & C - Crack Repair (Design Only)]
EA NYC NY 5G0 Le Roy R 24 $137,773.00 $137,773.00 $0.00 $0.00 Acquire Land for Development, Remove Obstructions [Runway
10 Approach]
EA NYC NY ISP Long Island MacArthur P 91 $409,269.00 $409,269.00 $0.00 $0.00 Remove Obstructions [Runway 15L/33R and 15R/33L Obstruction
Removal - Construction]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 11 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
EA NYC NY ISP Long Island MacArthur P 90 $298,106.00 $298,106.00 $0.00 $0.00
Construct Taxiway [Relocate western section of Taxiway "S"
including relocating service road, Taxiway Edge Lighting, Signage,
Markings and Drainage - Design], Extend Taxiway [Extend
Taxiway "W" including Taxiway Edge Lighting]
EA NYC NY ISP Long Island MacArthur P 92 $291,726.00 $291,726.00 $0.00 $0.00 Rehabilitate Runway Lighting [Replace Airfield Electrical Vault
Design] - 06/24
EA NYC NY OIC Lt Warren Eaton GA 32 $191,606.00 $191,606.00 $0.00 $0.00
Install Miscellaneous NAVAIDS [Rehabilitate Beacon
Construction], Install Taxiway Lighting [Install Taxiway Lighting on
South Parallel Taxiway - Construction]
EA NYC NY MAL Malone-Dufort GA 29 $657,005.00 $289,138.00 $367,867.00 $0.00 Rehabilitate Runway 14/32 (Construction)
EA NYC NY MAL Malone-Dufort GA 28 $36,180.00 $36,180.00 $0.00 $0.00 Rehabilitate Runway Lighting [Replace Existing Electric Vault and
Upgrade Lighting Equipment (Design Only)] - 14/32
EA NYC NY MSS Massena International-Richards Field CS 61 $4,249,010.00 $69,250.00 $4,179,760.00 $0.00
Acquire Safety Equipment and/or Fencing [ARFF Equipment
(Turnout Gear)], Rehabilitate Runway 09-27 [Paved shoulders),
Runway Safety Area Improvements (Construction)] - 09/27,
Rehabilitate Runway 05-23
EA NYC NY MSS Massena International-Richards Field CS 60 $80,750.00 $80,750.00 $0.00 $0.00 Remove Obstructions [Phase III (Off-Airport Land/Easement
Acquisition)]
EA NYC NY IAG Niagara Falls International P 42 $2,856,699.00 $2,856,699.00 $0.00 $0.00 Construct Terminal Building [Phase 3]
EA NYC NY OGS Ogdensburg International CS 45 $3,421,900.00 $150,000.00 $3,271,900.00 $0.00 Rehabilitate Runway 09/27 [Construction]
EA NYC NY OGS Ogdensburg International CS 44 $394,250.00 $394,250.00 $0.00 $0.00 Acquire Snow Removal Equipment [Snow Blower and Plow]
EA NYC NY MGJ Orange County GA 34 $2,886,958.00 $450,000.00 $2,436,958.00 $0.00
Construct Runway [Including Parallel Taxiway "A", two exit
Taxiways, Runway and Taxiway Edge Lighting, Signage, Markings,
Drainage, Wetland Mitigation and Reimbursable Agreements
Design]
EA NYC NY FZY Oswego County GA 39 $625,387.00 $625,387.00 $0.00 $0.00
Acquire Aircraft Deicing Equipment [Aircraft Deicing Equipment
Acquisition & Collection Tank (Construction)], Rehabilitate
Taxiway "E" [Design]
EA NYC NY FZY Oswego County GA 40 $1,062,000.00 $36,000.00 $1,026,000.00 $0.00
Rehabilitate Taxiway D [East, from the intersection of Taxiway
"B"/"E" toward the southeast and ending at the Runway 33 End,
and Stub Taxiway "F" between Taxiway "D" and Runway 15-33
(Construction)]
EA NYC NY PEO Penn Yan GA 30 $1,046,328.00 $1,046,328.00 $0.00 $0.00 Rehabilitate Runway 01/19 [Including milling, overlaying,
grooving and new markings - Construction]
EA NYC NY PBG Plattsburgh International P 46 $1,583,032.00 $0.00 $1,583,032.00 $0.00 Improve Utilities [Military Airport Program] [Water/Wastewater
Improvements - Phase II]
EA NYC NY PBG Plattsburgh International P 47 $1,384,625.00 $0.00 $1,384,625.00 $0.00 Improve Fuel Farm [Military Airport Program] (Relocation
Design & Construction)]
EA NYC NY PBG Plattsburgh International P 45 $1,171,162.00 $1,171,162.00 $0.00 $0.00 Rehabilitate Runway 17/35 [Pavement Joint Resealing
(Construction)]
EA NYC NY PBG Plattsburgh International P 48 $2,815,935.00 $335,268.00 $2,480,667.00 $0.00 Expand Terminal Building [Construction - Phase 1]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 12 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
EA NYC NY PTD Potsdam Municipal/Damon Field/ GA 28 $31,770.00 $31,770.00 $0.00 $0.00 Install Perimeter Fencing [Design Only], Rehabilitate Taxiway "A"
[Design Only]
EA NYC NY 06N Randall R 30 $47,005.00 $47,005.00 $0.00 $0.00
Acquire Land for Development, Rehabilitate Taxiway
[Rehabilitate Taxilanes Surrounding Hangar Buildings and Self-
Fueling Area Including Markings and Drainage - Design]
EA NYC NY 06N Randall R 29 $34,848.00 $34,848.00 $0.00 $0.00 Acquire Land for Development, Rehabilitate Apron [Crack Repair
Design]
EA NYC NY FRG Republic CS 46 $86,555.00 $86,555.00 $0.00 $0.00 Install Airport Beacons [Remove, Replace and Relocate Airport
Rotating Beacon - Design]
EA NYC NY 5B2 Saratoga County GA 29 $90,000.00 $90,000.00 $0.00 $0.00 Wildlife Hazard Assessments
EA NYC NY 5B2 Saratoga County GA 28 $1,058,309.00 $150,000.00 $908,309.00 $0.00
Install Runway Vertical/Visual Guidance System [Construction]
05/23 and Runway 32 End, Rehabilitate Taxiway Lighting
[Construction]
EA NYC NY 4B7 Schroon Lake GA 9 $56,880.00 $56,880.00 $0.00 $0.00 Rehabilitate Runway 16-34 [Overlay & Remarking (Design Only)]
EA NYC NY 44N Sky Acres R 25 $46,588.00 $46,588.00 $0.00 $0.00 Construct Snow Removal Equipment Building [Design]
EA NYC NY SWF Stewart International P 70 $1,979,977.00 $1,979,977.00 $0.00 $0.00
Rehabilitate Runway 16/34 [Including associated marking
(Construction - Phase 1)], Rehabilitate Runway 9/27 [Including
associated marking]
EA NYC NY MSV Sullivan County International GA 31 $63,810.00 $63,810.00 $0.00 $0.00 Improve Airport Drainage [Design]
EA NYC NY SYR Syracuse Hancock International P 128 $397,800.00 $397,800.00 $0.00 $0.00
Acquire Safety Equipment and/or Fencing [ARFF Equipment
(Turnout Gear)], Acquire Snow Removal Equipment [Replace
Snow Removal Equipment (Snow Plow)]
EA NYC NY SYR Syracuse Hancock International P 129 $4,060,800.00 $4,060,800.00 $0.00 $0.00 Construct Apron [Construct Remain-Over-Night Apron (Design
and Construction)], Construct Taxiway [Design and Construction]
EA NYC NY SYR Syracuse Hancock International P 130 $2,885,400.00 $0.00 $2,885,400.00 $0.00 VALE Infrastructure [Install Electrification and Preconditioned Air
Units]
EA NYC NY SYR Syracuse Hancock International P 127 $424,386.00 $424,386.00 $0.00 $0.00 Acquire Land For Approaches [Runway 28 End]
EA NYC NY 4B6 Ticonderoga Municipal GA 22 $247,147.00 $247,147.00 $0.00 $0.00 Update Airport Master Plan Study
EA NYC NY CZG Tri-Cities GA 22 $137,277.00 $137,277.00 $0.00 $0.00 Rehabilitate Runway [Including Markings (Design)]
EA NYC NY ART Watertown International CS 43 $1,956,862.00 $150,000.00 $1,806,862.00 $0.00 Rehabilitate Taxiway "B" [Phase II, from Taxiway "A" to Runway 7
(Construction)]
EA NYC NY ELZ Wellsville Municipal Airport,Tarantine Field GA 28 $380,988.00 $380,988.00 $0.00 $0.00
Rehabilitate Taxiway Lighting [Including Signage and Regulators
(Taxiway "A" from Terminal Area to Approach ends of Runway 10
28) - Construction]
EA NYC NY HPN Westchester County P 108 $331,572.00 $331,572.00 $0.00 $0.00 Acquire Aircraft Deicing Equipment [Replace Aircraft Deicer
Vehicle]
EA NYC NY HPN Westchester County P 110 $5,340,509.00 $5,340,509.00 $0.00 $0.00
Rehabilitate Taxiway [Rehabilitate Taxiway "A" between Runway
11-29 and Taxiway "G" between Taxiway "E" and Runway 16
Threshold including associated marking, lighting, signage and
drainage - Construction]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 13 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
EA NYC NY HPN Westchester County P 111 $553,748.00 $553,748.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
EA NYC NY HPN Westchester County P 109 $201,528.00 $201,528.00 $0.00 $0.00 Remove Obstructions [Pole - Construction]
EA NYC NY SDC Williamson-Sodus R 27 $118,283.00 $118,283.00 $0.00 $0.00
Rehabilitate Apron [Terminal Apron including crack repair,
pavement sealing and drainage improvements - Design &
Construction], Rehabilitate Taxiway [Parallel Taxiway]
EA NYC NY SDC Williamson-Sodus R 28 $40,230.00 $40,230.00 $0.00 $0.00 Conduct Environmental Study [Environmental Assessment to
Acquire Land for Runway 10-28]
EA WAS DC DCA Ronald Reagan Washington National P 28 $19,957,210.00 $10,187,469.00 $9,769,741.00 $0.00 Improve Runway Safety Area [Phase 1 (Earthwork and General
Package Construction)] - 15/33
EA WAS DC IAD Washington Dulles International P 47 $13,000,000.00 $0.00 $13,000,000.00 $0.00 Construct Runway
EA WAS DC IAD Washington Dulles International P 48 $6,560,987.00 $6,560,987.00 $0.00 $0.00 Rehabilitate Taxiway [Construction]
EA WAS DC @008 Washington Metropolitan Area 10 $300,000.00 $300,000.00 $0.00 $0.00
Conduct State System Plan Study [Update Ground Access Study
Phase 2 / Air Cargo Element Phase 2 / Process 2013 Air
Passenger Survey Phase 1]
EA WAS MD BWI Baltimore/Washington International
Thurgood Marshall P 89 $5,775,000.00 $0.00 $5,775,000.00 $0.00 Construct Taxiway "D" [Phase 1]
EA WAS MD BWI Baltimore/Washington International
Thurgood Marshall P 88 $15,236,991.00 $3,927,261.00 $11,309,730.00 $0.00 Improve Runway Safety Area [Construction - Phase 1] - 15R/33L
EA WAS MD DMW Carroll County Regional/Jack B Poage Field R 28 $150,000.00 $150,000.00 $0.00 $0.00 Update Airport Master Plan Study
EA WAS MD W41 Crisfield Municipal GA 10 $218,151.00 $218,151.00 $0.00 $0.00 Conduct Environmental Study
EA WAS MD ESN Easton/Newnam Field GA 39 $173,065.00 $173,065.00 $0.00 $0.00 Rehabilitate Apron
EA WAS MD FDK Frederick Municipal R 38 $3,862,304.00 $0.00 $3,862,304.00 $0.00 Extend Runway [Acquire Land] - 05/23, Remove Obstructions
EA WAS MD FDK Frederick Municipal R 37 $1,054,315.00 $1,054,315.00 $0.00 $0.00 Extend Runway [Acquire Land] - 05/23
EA WAS MD 2G4 Garrett County GA 12 $112,387.00 $112,387.00 $0.00 $0.00 Update Airport Master Plan Study
EA WAS MD CBE Greater Cumberland Regional GA 20 $2,342,169.00 $150,000.00 $2,192,169.00 $0.00 Rehabilitate Runway [Acquire Land] - 05/23, Rehabilitate Runway
[Obstruction Removal (Design and Construction)] - 05/23
EA WAS MD HGR Hagerstown Regional-Richard A Henson
Field CS 49 $1,000,000.00 $150,000.00 $850,000.00 $0.00 Extend Runway 09/27 [Construction - Phase 11]
EA WAS MD HGR Hagerstown Regional-Richard A Henson
Field CS 50 $517,313.00 $0.00 $517,313.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
EA WAS MD SBY Salisbury-Ocean City Wicomico Regional P 47 $603,093.00 $603,093.00 $0.00 $0.00 Rehabilitate Runway 05/23 [Design]
EA WAS MD SBY Salisbury-Ocean City Wicomico Regional P 48 $2,500,000.00 $0.00 $2,500,000.00 $0.00 Rehabilitate Runway 05/23 [Construction - Phase 1]
EA WAS MD 2W6 St. Mary's County Regional GA 19 $488,994.00 $488,994.00 $0.00 $0.00 Extend Runway 11/29 [Relocate Airport Drive - Design Only]
EA WAS MD FME Tipton R 17 $153,275.00 $153,275.00 $0.00 $0.00 Update Airport Master Plan Study
EA WAS VA MFV Accomack County GA 15 $252,000.00 $252,000.00 $0.00 $0.00 Remove Obstructions [Design and Construction, Phase 1, On-
Airport)]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 14 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
EA WAS VA MTV Blue Ridge GA 19 $821,132.00 $821,132.00 $0.00 $0.00 Expand Apron [Obstruction Removal - Construction (On Airport)]
EA WAS VA 0V4 Brookneal/Campbell County GA 6 $38,484.00 $38,484.00 $0.00 $0.00 Rehabilitate Runway 06/24 [Crack seal and remarking]
EA WAS VA CHO Charlottesville-Albemarle P 43 $3,671,088.00 $99,741.00 $3,571,347.00 $0.00 Extend Runway 03/21 [Taxiway Paving (Phase 3)]
EA WAS VA CPK Chesapeake Regional GA 19 $135,000.00 $135,000.00 $0.00 $0.00 Conduct Environmental Study
EA WAS VA *VAS Commonwealth of Virginia 8 $950,000.00 $450,000.00 $500,000.00 $0.00 Sustainable Management Plan
EA WAS VA PVG Hampton Roads Executive R 14 $4,770,000.00 $150,000.00 $4,620,000.00 $0.00 Construct Runway 10/28 [Construction - Phase 3 (Paving and
Lighting)]
EA WAS VA OFP Hanover County Municipal GA 25 $414,000.00 $414,000.00 $0.00 $0.00 Remove Obstructions [Runway 34 Approach], Remove
Obstructions [Runway 34 Approach (Construction, tree clearing)]
EA WAS VA OFP Hanover County Municipal GA 26 $27,000.00 $27,000.00 $0.00 $0.00 Acquire Easement For Approaches, Construct Taxiway [Acquire
Land]
EA WAS VA JYO Leesburg Executive R 37 $924,495.00 $924,495.00 $0.00 $0.00 Improve Runway Safety Area [Construction] - 17/35
EA WAS VA LUA Luray Caverns GA 15 $2,184,886.00 $150,000.00 $2,034,886.00 $0.00 Rehabilitate Runway 04/22 [Construction]
EA WAS VA LYH Lynchburg Regional/Preston Glenn Field P 36 $4,171,320.00 $1,867,565.00 $2,303,755.00 $0.00 Rehabilitate Taxiway [Construction]
EA WAS VA HEF Manassas Regional/Harry P. Davis Field R 39 $600,000.00 $0.00 $600,000.00 $0.00 Extend Runway - 16L/34R
EA WAS VA HEF Manassas Regional/Harry P. Davis Field R 37 $1,735,645.00 $500,000.00 $1,235,645.00 $0.00 Rehabilitate Taxiway [(Construction - Phase 4)]
EA WAS VA HEF Manassas Regional/Harry P. Davis Field R 36 $877,390.00 $877,390.00 $0.00 $0.00 Rehabilitate Taxiway [Relocate 16L Localizer - Phase 3]
EA WAS VA HEF Manassas Regional/Harry P. Davis Field R 38 $3,099,245.00 $0.00 $3,099,245.00 $0.00 Extend Runway 16L/34R [Phase 2 (Construction)]
EA WAS VA FYJ Middle Peninsula Regional GA 9 $999,000.00 $302,000.00 $697,000.00 $0.00 Improve Airport Drainage [Construction]
EA WAS VA MKJ Mountain Empire GA 21 $40,500.00 $40,500.00 $0.00 $0.00 Remove Obstructions [Land Acquisition - Phase I]
EA WAS VA PHF Newport News/Williamsburg International P 47 $774,000.00 $774,000.00 $0.00 $0.00 Improve Terminal Building [Design]
EA WAS VA ORF Norfolk International P 63 $2,028,643.00 $2,028,643.00 $0.00 $0.00 Conduct Environmental Study [Runway 5R/23L]
EA WAS VA OMH Orange County GA 15 $66,150.00 $66,150.00 $0.00 $0.00 Remove Obstructions [Acquire Easements]
EA WAS VA RIC Richmond International P 61 $542,086.00 $542,086.00 $0.00 $0.00 Rehabilitate Taxiway [Realignment (Design)]
EA WAS VA RMN Stafford Regional R 25 $450,000.00 $450,000.00 $0.00 $0.00 Conduct Environmental Study [Including Graveyard Study &
Phase III Archeological Study]
EA WAS VA JFZ Tazewell County GA 18 $74,250.00 $74,250.00 $0.00 $0.00 Improve Airport Drainage [Final Design]
EA WAS VA JFZ Tazewell County GA 17 $27,000.00 $27,000.00 $0.00 $0.00 Improve Airport Drainage [Land Acquisition]
EA WAS VA VJI Virginia Highlands GA 30 $630,000.00 $630,000.00 $0.00 $0.00 Remove Obstructions [Easement Acquisition, Runway 24
Approach]
EA WAS VA VJI Virginia Highlands GA 32 $485,113.00 $485,113.00 $0.00 $0.00 Extend Runway 06/24 [Land Acquisition]
EA WAS VA VJI Virginia Highlands GA 31 $1,006,515.00 $700,000.00 $306,515.00 $0.00 Remove Obstructions [Runway 24 Approach (Construction)]
EA WAS VA OKV Winchester Regional GA 29 $540,000.00 $540,000.00 $0.00 $0.00 Acquire Land For Approaches
GL BIS ND BAC Barnes County Municipal GA 14 $66,864.00 $66,864.00 $0.00 $0.00 Construct Taxiway [Design], Rehabilitate Apron [Design]
GL BIS ND 20U Beach GA 9 $59,032.00 $59,032.00 $0.00 $0.00 Construct Fuel Farm [Phase 1 Design], Rehabilitate Runway
12/30
GL BIS ND BIS Bismarck Municipal P 51 $162,000.00 $162,000.00 $0.00 $0.00 Conduct Environmental Study
GL BIS ND BIS Bismarck Municipal P 50 $2,736,000.00 $2,736,000.00 $0.00 $0.00 Expand Access Road, Rehabilitate Taxiway
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 15 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
GL BIS ND D09 Bottineau Municipal GA 11 $98,586.00 $98,586.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan with
Narrative Report]
GL BIS ND 9D7 Cando Municipal GA 10 $387,566.00 $387,566.00 $0.00 $0.00 Construct Building [Phase 1 - Design], Construct Taxiway [Phase 2
- Construction]
GL BIS ND 46D Carrington Municipal GA 9 $495,900.00 $495,900.00 $0.00 $0.00 Construct Building, Install Apron Lighting, Rehabilitate Apron,
Rehabilitate Runway 13/31, Rehabilitate Taxiway
GL BIS ND 5N8 Casselton Robert Miller Regional GA 20 $117,009.00 $117,009.00 $0.00 $0.00
Improve Access Road, Rehabilitate Apron [Phase 1
Construction], Rehabilitate Runway 13/31 [Phase 1
Construction]
GL BIS ND 2C8 Cavalier Municipal GA 12 $119,726.00 $119,726.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 16/34, Rehabilitate
Taxiway
GL BIS ND S32 Cooperstown Municipal GA 10 $83,925.00 $83,925.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 13/31, Rehabilitate
Taxiway
GL BIS ND D50 Crosby Municipal GA 10 $702,947.00 $702,947.00 $0.00 $0.00
Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS,
Install Runway Vertical/Visual Guidance System - 12/30,
Rehabilitate Apron [Rehabilitate Apron East Side], Rehabilitate
Runway 12/30, Rehabilitate Runway Lighting
GL BIS ND DIK Dickinson - Theodore Roosevelt Regional P 30 $1,650,606.00 $1,650,606.00 $0.00 $0.00
Acquire Easement For Approaches, Construct Snow Removal
Equipment Building, Expand Apron [Phase 1 - Design - General
Aviation Apron], Extend Runway Safety Area [Reimbursable
Agreement] - 14/32
GL BIS ND DIK Dickinson - Theodore Roosevelt Regional P 29 $278,149.00 $278,149.00 $0.00 $0.00 Update Airport Master Plan Study [Phase II]
GL BIS ND 51D Edgeley Municipal GA 12 $451,800.00 $451,800.00 $0.00 $0.00 Construct Building [Phase 2 - Hangar]
GL BIS ND 4E7 Ellendale Municipal GA 7 $921,600.00 $921,600.00 $0.00 $0.00 Improve Runway Safety Area - 13/31, Rehabilitate Runway
13/31, Rehabilitate Taxiway
GL BIS ND D05 Garrison Municipal GA 10 $394,200.00 $394,200.00 $0.00 $0.00 Rehabilitate Apron [Overlay], Rehabilitate Runway 13/31 [Crack
Seal], Rehabilitate Taxiway [Overlay]
GL BIS ND D57 Glen Ullin Regional GA 11 $249,750.00 $249,750.00 $0.00 $0.00 Construct Fuel Farm, Rehabilitate Runway 11/29
GL BIS ND GFK Grand Forks International P 45 $3,560,445.00 $3,560,445.00 $0.00 $0.00 Construct Snow Removal Equipment Building, Rehabilitate
Runway Lighting - 17L/35R, Rehabilitate Taxiway Lighting
GL BIS ND GWR Gwinner-Roger Melroe Field GA 14 $203,400.00 $203,400.00 $0.00 $0.00 Construct Fuel Farm
GL BIS ND K74 Hamry Field GA 13 $30,456.00 $30,456.00 $0.00 $0.00 Improve Airport Drainage [Phase 1 - Hydrological Analysis]
GL BIS ND BWP Harry Stern GA 18 $134,992.00 $134,992.00 $0.00 $0.00 Acquire Land For Approaches
GL BIS ND 5H4 Harvey Municipal GA 10 $89,543.00 $89,543.00 $0.00 $0.00 Improve Building [Phase III - Floor], Improve Snow Removal
Equipment Building
GL BIS ND FAR Hector International P 41 $3,102,446.00 $3,102,446.00 $0.00 $0.00 Construct Taxiway, Construct Taxiway, Expand Apron
GL BIS ND 7K5 Kenmare Municipal GA 11 $1,097,794.00 $1,097,794.00 $0.00 $0.00
Rehabilitate Apron, Rehabilitate Runway 8/26 [Phase 2
Construction], Rehabilitate Runway Lighting [Extend Fixtures]
08/26, Rehabilitate Taxiway [Phase 2 - Construction]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 16 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
GL BIS ND 7L2 Linton Municipal GA 12 $29,700.00 $29,700.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 09/27, Rehabilitate
Taxiway
GL BIS ND 6L3 Lisbon Municipal GA 11 $40,050.00 $40,050.00 $0.00 $0.00 Construct Building [Phase 1 - Design], Rehabilitate Runway
14/32, Rehabilitate Taxiway
GL BIS ND HZE Mercer County Regional GA 11 $48,600.00 $48,600.00 $0.00 $0.00 Rehabilitate Runway 14/32
GL BIS ND MOT Minot International P 46 $8,134,810.00 $3,134,810.00 $5,000,000.00 $0.00 Construct Terminal Building [Phase 2/2]
GL BIS ND HBC Mohall Municipal GA 9 $243,332.00 $243,332.00 $0.00 $0.00 Install Airport Beacons, Install Miscellaneous NAVAIDS, Update
Airport Master Plan Study
GL BIS ND 3P3 Mott Municipal GA 12 $33,750.00 $33,750.00 $0.00 $0.00 Rehabilitate Runway [Crack Seal]
GL BIS ND +09J New 2 $5,514,148.00 $1,314,148.00 $4,200,000.00 $0.00 Construct New Airport [Phase 2 - Pave Runway 13/31, runway
lighting, connecting taxiway and apron]
GL BIS ND 2D5 Oakes Municipal GA 9 $1,540,118.00 $1,540,118.00 $0.00 $0.00 Install Miscellaneous Navigational Aids, Rehabilitate Apron,
Rehabilitate Runway 12/30, Rehabilitate Taxiway
GL BIS ND Y74 Parshall-Hankins GA 8 $96,749.00 $96,749.00 $0.00 $0.00 Rehabilitate Runway 12/30 [Phase 1 - Design - Overlay]
GL BIS ND PMB Pembina Municipal GA 8 $112,930.00 $112,930.00 $0.00 $0.00 Update Airport Master Plan Study
GL BIS ND PMB Pembina Municipal GA 7 $156,127.00 $156,127.00 $0.00 $0.00 Install Miscellaneous Navigational Aids, Rehabilitate Access Road,
Rehabilitate Apron
GL BIS ND D55 Robertson Field GA 10 $615,245.00 $615,245.00 $0.00 $0.00 Rehabilitate Apron [Phase 3 - Construction]
GL BIS ND RUG Rugby Municipal GA 12 $787,000.00 $787,000.00 $0.00 $0.00 Rehabilitate Apron [Phase 3 - Construction]
GL BIS ND ISN Sloulin Field International P 36 $204,934.00 $204,934.00 $0.00 $0.00 Improve Runway Safety Area [Phase 1 - Design] - 11/29, Install
Instrument Approach Aid - 11/29, Rehabilitate Taxiway
GL BIS ND 08D Stanley Municipal GA 11 $150,000.00 $150,000.00 $0.00 $0.00 Construct Apron
GL BIS ND *NDS State of North Dakota 11 $332,379.00 $332,379.00 $0.00 $0.00 Update State System Plan Study
GL BIS ND D60 Tioga Municipal GA 5 $47,700.00 $47,700.00 $0.00 $0.00 Rehabilitate Runway 12/30
GL BIS ND D60 Tioga Municipal GA 6 $239,804.00 $239,804.00 $0.00 $0.00 Conduct aeronautical survey for WAAS approach, Update Airport
Master Plan Study
GL BIS ND 96D Walhalla Municipal GA 7 $84,174.00 $84,174.00 $0.00 $0.00 Rehabilitate Apron [Design], Rehabilitate Runway 15/33 [Design],
Rehabilitate Taxiway [Design]
GL BIS ND 5C8 Washburn Municipal GA 13 $53,100.00 $53,100.00 $0.00 $0.00
Construct Apron [Phase 1 - Design and Soil Testing for Apron
Expansion], Widen Taxiway [Phase 1 - Design and Soil Testing for
Taxiway Widening]
GL BIS ND S25 Watford City Municipal GA 15 $81,000.00 $81,000.00 $0.00 $0.00 Rehabilitate Apron [Phase 4 - Design and Drainage Plan]
GL BIS SD ABR Aberdeen Regional P 33 $836,146.00 $836,146.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct
Runway 13/31 [Design], Environmental Mitigation [Design]
GL BIS SD 6V5 Bison Municipal GA 8 $25,200.00 $25,200.00 $0.00 $0.00 Construct Fuel Farm
GL BIS SD SPF Black Hills-Clyde Ice Field GA 21 $245,000.00 $245,000.00 $0.00 $0.00 Construct Taxiway [Construct Parallel Taxiway (Phase 5)
Obstruction Removal, Fuel Farm Relocation]
GL BIS SD BTN Britton Municipal GA 11 $216,000.00 $216,000.00 $0.00 $0.00 Rehabilitate Runway 01/19
GL BIS SD BKX Brookings Regional GA 26 $10,524,541.00 $1,549,541.00 $8,975,000.00 $0.00 Construct Runway 12/30 [Relocate Navigational Aids]
GL BIS SD 6V0 Edgemont Municipal GA 5 $77,000.00 $77,000.00 $0.00 $0.00 Update Airport Master Plan Study
GL BIS SD 3W8 Eureka Municipal GA 5 $69,300.00 $69,300.00 $0.00 $0.00 Rehabilitate Apron [Design], Rehabilitate Runway 12/30 [Design],
Rehabilitate Taxiway
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 17 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
GL BIS SD 3FU Faulkton Municipal GA 7 $91,970.00 $91,970.00 $0.00 $0.00 Construct Snow Removal Equipment Building [Design], Construct
Terminal Building [Design], Update Airport Master Plan Study
GL BIS SD 4P3 Flandreau Municipal GA 7 $81,000.00 $81,000.00 $0.00 $0.00 Conduct Environmental Study [Environmental Assessment for
New Runway]
GL BIS SD 9D0 Highmore Municipal GA 5 $125,385.00 $125,385.00 $0.00 $0.00 Expand Access Road
GL BIS SD HON Huron Regional GA 31 $25,000.00 $25,000.00 $0.00 $0.00 Conduct Miscellaneous Study
GL BIS SD FSD Joe Foss Field P 46 $1,862,854.00 $1,862,854.00 $0.00 $0.00 Improve Runway Safety Area [Construction - Perimeter
Road/Fence/Localizer/Grading] - 03/21
GL BIS SD FSD Joe Foss Field P 47 $4,103,640.00 $0.00 $4,103,640.00 $0.00 Improve Runway Safety Area - 03/21
GL BIS SD FSD Joe Foss Field P 45 $1,877,470.00 $1,877,470.00 $0.00 $0.00
Acquire Equipment [Acquire], Acquire Snow Removal Equipment,
Conduct Miscellaneous Study, Improve Runway Safety Area
[Phase 2 - Environmental Assessment] - 03/21, Install Perimeter
Fencing [Phase 1 - East Side Improvements], Rehabilitate Apron
[Design], Update Airport Master Plan
GL BIS SD LEM Lemmon Municipal GA 12 $292,500.00 $292,500.00 $0.00 $0.00 Construct Terminal Building
GL BIS SD Y14 Marv Skie-Lincoln County GA 12 $131,138.00 $131,138.00 $0.00 $0.00 Rehabilitate Apron [Design], Rehabilitate Taxiway [Design]
GL BIS SD 5P2 Mc Laughlin Municipal GA 7 $279,000.00 $279,000.00 $0.00 $0.00 Install Runway Lighting - 13/31
GL BIS SD MKA Miller Municipal GA 7 $90,000.00 $90,000.00 $0.00 $0.00 Construct Access Road [Design], Construct Taxiway [Design],
Rehabilitate Apron [Design], Rehabilitate Runway 15/33 [Design]
GL BIS SD MBG Mobridge Municipal GA 10 $572,220.00 $572,220.00 $0.00 $0.00 Construct Building
GL BIS SD 8F6 Murdo Municipal GA 9 $64,000.00 $64,000.00 $0.00 $0.00 Extend Runway 14/32 [Design]
GL BIS SD PHP Philip GA 9 $27,000.00 $27,000.00 $0.00 $0.00 Rehabilitate Apron [Phase I Design], Rehabilitate Runway 12/30
[Phase I - Design], Rehabilitate Taxiway [Phase I - Design]
GL BIS SD PIR Pierre Regional P 33 $837,000.00 $837,000.00 $0.00 $0.00
Acquire Snow Removal Equipment, Improve Airport Drainage,
Modify Terminal Building [Demolish old terminal], Wildlife
Hazard Assessments
GL BIS SD RAP Rapid City Regional P 44 $3,460,000.00 $2,122,333.00 $1,337,667.00 $0.00
Rehabilitate Runway 05/23, [Crack seal/Rejuvenator]
Rehabilitate Runway 14/32 [Phase 1], Wildlife Hazard
Assessments
GL BIS SD 8D3 Sisseton Municipal GA 10 $81,900.00 $81,900.00 $0.00 $0.00 Conduct Environmental Study
GL BIS SD Y03 Springfield Municipal GA 6 $134,010.00 $134,010.00 $0.00 $0.00 Construct Terminal Building
GL BIS SD 49B Sturgis Municipal GA 12 $108,031.00 $108,031.00 $0.00 $0.00 Acquire Easement For Approaches, Acquire Land for
Development
GL BIS SD 1D7 The Sigurd Anderson GA 7 $279,000.00 $279,000.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 12/30,
Rehabilitate Runway Lighting - 12/30
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 18 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
GL BIS SD *SDV Various Locations in South Dakota 18 $360,000.00 $360,000.00 $0.00 $0.00
Rehabilitate Runway (Flandreau Municipal - 10/28; Gettysburg
Municipal - 13/31; Gregory Municipal - Flynn Field - 13/31;
Lemmon Municipal - 11/29; Parkston Municipal - 15/33; Platte
Municipal - 14/32; Sisseton Municipal - 16/34; Springfield
Municipal - 15/33), Rehabilitate Taxiway (Marv Skie-Lincoln
County)
GL BIS SD AGZ Wagner Municipal GA 9 $31,500.00 $31,500.00 $0.00 $0.00 Conduct Environmental Study, Install Perimeter Fencing [Design]
GL BIS SD ATY Watertown Regional CS 27 $171,000.00 $171,000.00 $0.00 $0.00 Improve Utilities, Update Airport Master Plan Study
GL BIS SD 4X4 Wessington Springs GA 8 $144,870.00 $144,870.00 $0.00 $0.00 Rehabilitate Runway 12/30
GL BIS SD 6E5 Wilder GA 10 $373,500.00 $373,500.00 $0.00 $0.00 Construct Building, Expand Snow Removal Equipment Building
GL BIS SD ICR Winner Regional GA 12 $2,430,000.00 $2,430,000.00 $0.00 $0.00 Extend Runway 13/31
GL CHI IL SPI Abraham Lincoln Capital P 65 $718,199.00 $0.00 $718,199.00 $0.00 Acquire Snow Removal Equipment
GL CHI IL SPI Abraham Lincoln Capital P 64 $2,199,005.00 $1,007,365.00 $1,191,640.00 $0.00 Construct Taxiway
GL CHI IL BMI Central IL Regional Airport at Bloomington-
Normal P 60 $1,859,192.00 $1,859,192.00 $0.00 $0.00 Expand Apron
GL CHI IL BMI Central IL Regional Airport at Bloomington-
Normal P 62 $603,650.00 $603,650.00 $0.00 $0.00
Acquire Friction Measuring Equipment, Acquire Snow Removal
Equipment
GL CHI IL BMI Central IL Regional Airport at Bloomington-
Normal P 61 $607,096.00 $607,096.00 $0.00 $0.00 Acquire Easement For Approaches [Runway 2 Approach]
GL CHI IL MDW Chicago Midway International P 81 $5,086,497.00 $5,086,497.00 $0.00 $0.00 Rehabilitate Taxiway, Rehabilitate Taxiway
GL CHI IL ORD Chicago O'Hare International P 131 $20,000,000.00 $0.00 $20,000,000.00 $0.00 Construct Runway 10C-28C
GL CHI IL ORD Chicago O'Hare International P 133 $10,131,999.00 $10,131,999.00 $0.00 $0.00 Construct Runway 10C/28C
GL CHI IL ORD Chicago O'Hare International P 137 $3,373,622.00 $0.00 $3,373,622.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
GL CHI IL ORD Chicago O'Hare International P 138 $10,000,000.00 $0.00 $10,000,000.00 $0.00 Construct Taxiway
GL CHI IL ORD Chicago O'Hare International P 134 $375,000.00 $0.00 $375,000.00 $0.00 Noise Mitigation Measures for Public Buildings [Ebinger School
Design]
GL CHI IL ORD Chicago O'Hare International P 132 $65,000,000.00 $0.00 $65,000,000.00 $0.00 Construct Runway 10R/28L
GL CHI IL ORD Chicago O'Hare International P 135 $11,000,000.00 $0.00 $11,000,000.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
GL CHI IL RFD Chicago/Rockford International P 69 $738,902.00 $738,902.00 $0.00 $0.00 Construct Apron
GL CHI IL RFD Chicago/Rockford International P 68 $1,427,739.00 $1,427,739.00 $0.00 $0.00 Acquire Safety Equipment and/or Fencing [Phase 2]
GL CHI IL RFD Chicago/Rockford International P 70 $4,343,043.00 $385,568.00 $3,957,475.00 $0.00 Rehabilitate Runway 01/19 [Phase 4]
GL CHI IL PIA General Downing - Peoria International P 59 $3,497,120.00 $2,203,877.00 $1,293,243.00 $0.00 Rehabilitate Apron
GL CHI IL PIA General Downing - Peoria International P 60 $944,209.00 $0.00 $944,209.00 $0.00 Expand Apron
GL CHI IL *ILB Illinois State Block Grant Program 107 $648,479.00 $0.00 $648,479.00 $0.00 Non primary development projects in state block grant program
GL CHI IL *ILB Illinois State Block Grant Program 110 $6,250,000.00 $0.00 $6,250,000.00 $0.00 Non primary development projects in state block grant program
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 19 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
GL CHI IL *ILB Illinois State Block Grant Program 108 $1,000,000.00 $1,000,000.00 $0.00 $0.00 Non primary development projects in state block grant program
GL CHI IL *ILB Illinois State Block Grant Program 109 $433,794.00 $0.00 $433,794.00 $0.00 Non primary development projects in state block grant program
GL CHI IL *ILB Illinois State Block Grant Program 106 $1,144,659.00 $0.00 $1,144,659.00 $0.00 Non primary development projects in state block grant program
GL CHI IL *ILB Illinois State Block Grant Program 105 $16,843,615.00 $16,843,615.00 $0.00 $0.00 Non primary development projects in state block grant program
GL CHI IL MLI Quad City International P 73 $2,239,260.00 $2,239,260.00 $0.00 $0.00 Install Runway Lighting - 09/27
GL CHI IL MLI Quad City International P 74 $516,044.00 $0.00 $516,044.00 $0.00 Expand Service Road
GL CHI IL MLI Quad City International P 75 $1,126,143.00 $1,126,143.00 $0.00 $0.00 Expand Snow Removal Equipment Building [Phase 2]
GL CHI IL MWA Williamson County Regional P 30 $675,000.00 $675,000.00 $0.00 $0.00 Construct Terminal Building [Design (Phase III)]
GL CHI IN AID Anderson Municipal-Darlington Field GA 27 $244,500.00 $244,500.00 $0.00 $0.00
Rehabilitate Runway 12/30 [Design], Rehabilitate Runway
Lighting [Design] - 12/30, Update Airport Master Plan Study
[Phase 1]
GL CHI IN JVY Clark Regional R 26 $1,170,900.00 $368,302.00 $802,598.00 $0.00
Extend Runway 18/36 [Phase 7 - Consists of road relocation
(Phase 2 - Land Acquisition) and Navigational Aids Design (Phase
1)]
GL CHI IN BAK Columbus Municipal GA 25 $90,450.00 $90,450.00 $0.00 $0.00 Rehabilitate Runway 14/32 [Pavement Analysis]
GL CHI IN CFJ Crawfordsville Municipal GA 12 $150,000.00 $150,000.00 $0.00 $0.00 Extend Runway 4/22 [Phase 3 - Design]
GL CHI IN DCY Daviess County GA 14 $188,100.00 $188,100.00 $0.00 $0.00 Acquire Snow Removal Equipment, Rehabilitate Runway Lighting
[Including Regulator Replacement] - 18/36
GL CHI IN GWB De Kalb County GA 21 $401,334.00 $401,334.00 $0.00 $0.00 Acquire Land For Approaches
GL CHI IN MIE Delaware County Regional GA 27 $275,132.00 $275,132.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
GL CHI IN 1I9 Delphi Municipal GA 12 $459,990.00 $459,990.00 $0.00 $0.00 Extend Runway [Land Acquisition] - 18/36
GL CHI IN EYE Eagle Creek Airpark R 20 $543,924.00 $150,000.00 $393,924.00 $0.00 Rehabilitate Taxiway
GL CHI IN EVV Evansville Regional P 56 $13,729,938.00 $0.00 $13,729,938.00 $0.00 Improve Runway Safety Area - 04/22
GL CHI IN EVV Evansville Regional P 54 $7,669,670.00 $0.00 $7,669,670.00 $0.00 Improve Runway Safety Area - 04/22
GL CHI IN EVV Evansville Regional P 55 $5,261,015.00 $1,661,015.00 $3,600,000.00 $0.00 Improve Runway Safety Area - 04/22
GL CHI IN FWA Fort Wayne International P 63 $2,745,094.00 $2,745,094.00 $0.00 $0.00 Improve Access Road [Design and Construction]
GL CHI IN FKR Frankfort Municipal GA 17 $901,616.00 $300,000.00 $601,616.00 $0.00 Install Runway Vertical/Visual Guidance System - 04/22,
Rehabilitate Runway Lighting - 04/22
GL CHI IN FRH French Lick Municipal GA 13 $162,000.00 $162,000.00 $0.00 $0.00 Expand Apron [Phase 3 -Design/Bid], Extend Taxiway [Relocate
Parallel Taxiway; Phase 1 - Environmental Assessment/Design]
GL CHI IN RCR Fulton County GA 12 $195,300.00 $195,300.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
GL CHI IN GYY Gary/Chicago International GA 29 $6,000,000.00 $1,000,000.00 $5,000,000.00 $0.00 Extend Runway 12/30
GL CHI IN HFY Greenwood Municipal GA 27 $108,000.00 $108,000.00 $0.00 $0.00 Improve Airport Drainage [Design], Rehabilitate Taxiway [Design]
GL CHI IN 05C Griffith-Merrillville R 12 $410,700.00 $410,700.00 $0.00 $0.00 Construct Taxiway [Phase 6 - Design of Parallel Taxiway and
Connectors (Center Portion), and Acquire Land]
GL CHI IN 2R2 Hendricks County-Gordon Graham Field R 14 $186,628.00 $186,628.00 $0.00 $0.00 Install Perimeter Fencing
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 20 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
GL CHI IN TYQ Indianapolis Executive R 24 $417,150.00 $417,150.00 $0.00 $0.00 Acquire Land For Approaches
GL CHI IN IND Indianapolis International P 133 $820,915.00 $0.00 $820,915.00 $0.00 Construct Deicing Containment Facility [Phase 2B - Construction]
GL CHI IN IND Indianapolis International P 129 $3,620,633.00 $3,620,633.00 $0.00 $0.00 Rehabilitate Runway 05R/23L [Construction - Phase 1],
Rehabilitate Taxiway [Taxiway "N" - between N-3 and D]
GL CHI IN IND Indianapolis International P 130 $1,236,000.00 $1,236,000.00 $0.00 $0.00 Rehabilitate Runway 05L/23R [Design], Rehabilitate Taxiway
[Design], Rehabilitate Taxiway [Design]
GL CHI IN IND Indianapolis International P 132 $3,447,760.00 $3,447,760.00 $0.00 $0.00 Construct Deicing Containment Facility [Phase 2 - Construction]
GL CHI IN IND Indianapolis International P 131 $112,500.00 $0.00 $112,500.00 $0.00 Conduct Noise Compatibility Plan Study
GL CHI IN UMP Indianapolis Metropolitan R 20 $248,510.00 $248,510.00 $0.00 $0.00 Rehabilitate Taxiway [Phase 2 - Construction]
GL CHI IN 50I Kentland Municipal GA 9 $2,067,340.00 $447,894.00 $1,619,446.00 $0.00 Rehabilitate Runway 09/27 [Rehabilitate, Widen, and Lengthen
Runway; Correct Runway Safety Area, Extend Runway]
GL CHI IN OKK Kokomo Municipal GA 21 $1,300,000.00 $150,000.00 $1,150,000.00 $0.00 Extend Runway 05/23 [Extend parallel taxiway]
GL CHI IN MZZ Marion Municipal GA 23 $549,948.00 $549,948.00 $0.00 $0.00
Acquire Land For Approaches [Runway 4/22], Construct Taxiway
[Construct Partial Parallel Taxiway Design Phase Only to Runway
15 End], Rehabilitate Taxiway
GL CHI IN MGC Michigan City Municipal-Phillips Field GA 17 $472,819.00 $150,000.00 $322,819.00 $0.00 Install Perimeter Fencing [Portion 1, Phase 2 - Re-bid and
Construct]
GL CHI IN BMG Monroe County GA 29 $9,844,890.00 $300,000.00 $9,544,890.00 $0.00 Improve Runway Safety Area [Repair and Mitigate Sinkhole in
Runway Safety Area - Phase 1 - Construction] - 17/35
GL CHI IN UWL New Castle-Henry Co Municipal GA 13 $500,504.00 $500,504.00 $0.00 $0.00 Construct Runway [Land Acquisition); Grading and Drainage
Design]
GL CHI IN OVO North Vernon GA 16 $175,425.00 $175,425.00 $0.00 $0.00 Acquire Snow Removal Equipment [Environmental, Design &
Purchase]
GL CHI IN I76 Peru Municipal GA 16 $121,608.00 $121,608.00 $0.00 $0.00 Rehabilitate Runway Lighting [Electrical Vault Replacement
Design and Construct] - 01/19
GL CHI IN VPZ Porter County Regional GA 25 $433,741.00 $290,641.00 $143,100.00 $0.00
Rehabilitate Runway 09-27 [Including Taxiway "A" - Phase 1],
Rehabilitate Taxiway [Secondary Taxiways "Partial C, O, and P"
Phase 2 - Construction]
GL CHI IN PLD Portland Municipal GA 10 $154,731.00 $154,731.00 $0.00 $0.00 Construct Fuel Farm
GL CHI IN 4I7 Putnam County GA 15 $3,550,050.00 $150,000.00 $3,400,050.00 $0.00 Rehabilitate Runway 18-36 [Vertical Curve Correction and
Overlay) Design - Phase 3]
GL CHI IN I22 Randolph County GA 15 $1,168,380.00 $1,168,380.00 $0.00 $0.00 Expand Apron, Rehabilitate Apron, Rehabilitate Taxiway
GL CHI IN RID Richmond Municipal GA 16 $400,074.00 $400,074.00 $0.00 $0.00 Install Taxiway Lighting [Construct Taxiway "A" lighting]
GL CHI IN I83 Salem Municipal GA 13 $3,477,927.00 $510,215.00 $2,967,712.00 $0.00 Construct Runway [New Runway Phase 4 Grading & Acquire
Parcels, and Utilities - Phase 2]
GL CHI IN SMD Smith Field GA 14 $115,650.00 $115,650.00 $0.00 $0.00 Acquire Snow Removal Equipment [Tractor & Blower
Attachment]
GL CHI IN *INS State of Indiana 11 $145,800.00 $145,800.00 $0.00 $0.00 Update State System Plan Study
GL CHI IN SIV Sullivan County GA 16 $176,830.00 $176,830.00 $0.00 $0.00 Improve Fuel Farm [Phase 1]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 21 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
GL CHI IN HUF Terre Haute International-Hulman Field GA 41 $27,000.00 $27,000.00 $0.00 $0.00 Modify Access Road [Relocate Road - Planning Study], Remove
Obstructions [Runway 5-23 and 14-32]
GL CHI IN ANQ Tri-State Steuben County GA 14 $55,800.00 $55,800.00 $0.00 $0.00 Update Airport Master Plan Study
GL CHI IN BFR Virgil I Grissom Municipal GA 12 $449,098.00 $449,098.00 $0.00 $0.00 Improve Runway Safety Area [Phase 2 - Construction] - 13/31,
Update Airport Master Plan Study [Phase 1]
GL CHI IN IWH Wabash Municipal GA 14 $1,768,136.00 $218,252.00 $1,549,884.00 $0.00 Rehabilitate Runway 09/27 [Construct]
GL CHI IN ASW Warsaw Municipal GA 12 $144,000.00 $144,000.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
GL CHI IN MCX White County GA 14 $150,000.00 $150,000.00 $0.00 $0.00 Extend Runway 18/36 [Land Acquisition]
GL DET MI APN Alpena County Regional P 19 $133,000.00 $133,000.00 $0.00 $0.00 Improve Terminal Building
GL DET MI FNT Bishop International P 53 $3,022,666.00 $3,022,666.00 $0.00 $0.00 Acquire Snow Removal Equipment, Rehabilitate Taxiway,
Rehabilitate Taxiway Lighting
GL DET MI LAN Capital Region International P 52 $1,597,689.00 $1,597,689.00 $0.00 $0.00
Acquire Easement For Approaches, Conduct Miscellaneous
Study, Expand Aircraft Rescue & Fire Fighting Building,
Rehabilitate Runway Lighting - 10R/28L, Remove Obstructions
GL DET MI CVX Charlevoix Municipal P 17 $774,000.00 $774,000.00 $0.00 $0.00 Rehabilitate Apron
GL DET MI TVC Cherry Capital P 38 $3,744,934.00 $3,744,934.00 $0.00 $0.00 Apply Runway Friction Course - 10/28, Apply Runway Friction
Course - 18/36, Extend Runway 10/28
GL DET MI CIU Chippewa County International P 33 $179,550.00 $179,550.00 $0.00 $0.00 Rehabilitate Runway 16/34, Security Enhancements
GL DET MI ESC Delta County P 36 $902,500.00 $902,500.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 18/36, Rehabilitate
Taxiway
GL DET MI DTW Detroit Metropolitan Wayne County P 107 $8,082,901.00 $5,187,901.00 $2,895,000.00 $0.00 Rehabilitate Runway 04R/22L
GL DET MI IMT Ford P 18 $113,850.00 $113,850.00 $0.00 $0.00
Acquire Aircraft Rescue & Fire Fighting Safety Equipment,
Acquire Snow Removal Equipment, Improve Building, Improve
Terminal Building, Rehabilitate Runway 01/19, Rehabilitate
Taxiway
GL DET MI GRR Gerald R. Ford International P 49 $5,399,319.00 $5,399,319.00 $0.00 $0.00 Expand Terminal Building
GL DET MI CMX Houghton County Memorial P 38 $892,645.00 $892,645.00 $0.00 $0.00 Environmental Mitigation, Rehabilitate Apron
GL DET MI AZO Kalamazoo/Battle Creek International P 40 $507,251.00 $507,251.00 $0.00 $0.00 Rehabilitate Runway 17/35, Runway Incursion Markings
GL DET MI MBL Manistee County-Blacker P 5 $835,610.00 $835,610.00 $0.00 $0.00
Acquire Snow Removal Equipment, Expand Snow Removal
Equipment Building, Rehabilitate Apron, Rehabilitate Runway
09/27, Rehabilitate Taxiway
GL DET MI MBS MBS International P 48 $1,379,635.00 $1,379,635.00 $0.00 $0.00 Construct Terminal Building, Rehabilitate Apron, Rehabilitate
Runway 05/23, Rehabilitate Runway 14/32, Rehabilitate Taxiway
GL DET MI *MIB Michigan State Block Grant Program 89 $150,000.00 $0.00 $150,000.00 $0.00 Non primary development projects in state block grant program
GL DET MI *MIB Michigan State Block Grant Program 88 $18,134,929.00 $18,134,929.00 $0.00 $0.00 Non primary development projects in state block grant program
GL DET MI MKG Muskegon County P 37 $424,768.00 $424,768.00 $0.00 $0.00 Expand Aircraft Rescue & Fire Fighting Building, Improve Airport
Miscellaneous Improvements
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 22 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
GL DET MI PLN Pellston Regional Airport of Emmet County P 33 $1,662,500.00 $1,662,500.00 $0.00 $0.00 Improve Terminal Building, Rehabilitate Apron, Rehabilitate
Runway 05/23, Rehabilitate Runway 14/32, Rehabilitate Taxiway
GL DET MI SAW Sawyer International P 37 $742,500.00 $742,500.00 $0.00 $0.00 Rehabilitate Taxiway
GL DET MI YIP Willow Run CS 39 $9,355,145.00 $355,145.00 $9,000,000.00 $0.00 Rehabilitate Runway 05R/23L
GL DET MI YIP Willow Run CS 40 $11,775,575.00 $0.00 $11,775,575.00 $0.00 Rehabilitate Runway 05R/23L
GL DET OH CAK Akron-Canton Regional P 60 $234,000.00 $0.00 $234,000.00 $0.00 Sustainable Master Plan
GL DET OH CAK Akron-Canton Regional P 59 $4,113,491.00 $4,113,491.00 $0.00 $0.00 Construct Deicing Containment Facility, Rehabilitate Access Road,
Rehabilitate Taxiway
GL DET OH EDJ Bellefontaine Regional GA 9 $539,820.00 $539,820.00 $0.00 $0.00 Construct Building
GL DET OH 5G7 Bluffton GA 13 $531,217.00 $531,217.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 05/23 [Crack Seal, Seal
Coat, Pavement Marking], Rehabilitate Taxiway
GL DET OH BKL Burke Lakefront R 12 $10,819,113.00 $15,244.00 $10,803,869.00 $0.00 Improve Runway Safety Area - 06L/24R
GL DET OH HAO Butler County Regional R 24 $62,505.00 $62,505.00 $0.00 $0.00 Rehabilitate Apron [Crack Repair, Seal Coat and Remark]
GL DET OH CDI Cambridge Municipal GA 13 $267,532.00 $267,532.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 04/22
GL DET OH PCW Carl R Keller Field GA 31 $1,745,100.00 $1,745,100.00 $0.00 $0.00 Rehabilitate Runway 18/36 [Construction], Rehabilitate Taxiway
[Construction North and South of Runway 9/27]
GL DET OH CLE Cleveland-Hopkins International P 101 $2,164,618.00 $2,164,618.00 $0.00 $0.00 Construct Runway 06L/24R
GL DET OH 02G Columbiana County GA 16 $45,646.00 $45,646.00 $0.00 $0.00 Rehabilitate Apron [Design], Rehabilitate Apron, Rehabilitate
Taxiway [Design]
GL DET OH VES Darke County GA 10 $85,889.00 $85,889.00 $0.00 $0.00 Acquire Land for Development [Reimbursement]
GL DET OH MGY Dayton-Wright Brothers R 15 $180,000.00 $0.00 $180,000.00 $0.00 Sustainable Master Plan
GL DET OH DFI Defiance Memorial GA 11 $344,781.00 $344,781.00 $0.00 $0.00 Install Taxiway Lighting, Remove Obstructions
GL DET OH DLZ Delaware Municipal - Jim Moore Field GA 19 $137,843.00 $137,843.00 $0.00 $0.00 Rehabilitate Apron
GL DET OH LHQ Fairfield County GA 23 $548,644.00 $548,644.00 $0.00 $0.00 Acquire Land for Development, Install Perimeter Fencing,
Rehabilitate Apron [Crack Seal], Rehabilitate Taxiway [Crack Seal]
GL DET OH I23 Fayette County GA 9 $301,097.00 $301,097.00 $0.00 $0.00 Construct Access Road, Improve Utilities
GL DET OH FDY Findlay GA 24 $55,953.00 $55,953.00 $0.00 $0.00 Improve Airport Drainage, Install Runway Vertical/Visual
Guidance System - 07/25
GL DET OH FZI Fostoria Metropolitan GA 13 $346,581.00 $346,581.00 $0.00 $0.00 Extend Taxiway
GL DET OH GQQ Galion Municipal GA 9 $116,890.00 $116,890.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 05/23, Remove
Obstructions [Hangar]
GL DET OH 7G8 Geauga County GA 16 $79,740.00 $79,740.00 $0.00 $0.00 Improve Airport Drainage
GL DET OH PMH Greater Portsmouth Regional GA 17 $90,885.00 $90,885.00 $0.00 $0.00 Improve Airport Drainage, Install Perimeter Fencing, Remove
Obstructions
GL DET OH I19 Greene County-Lewis A. Jackson Regional GA 19 $314,395.00 $314,395.00 $0.00 $0.00 Construct Taxiway, Remove Obstructions
GL DET OH I95 Hardin County GA 10 $65,529.00 $65,529.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 04/22 [Crack
Repair/Seal], Rehabilitate Runway 04/22 [Design]
GL DET OH 8G6 Harrison County GA 11 $150,000.00 $150,000.00 $0.00 $0.00 Update Airport Master Plan Study
GL DET OH 10G Holmes County GA 12 $2,022,896.00 $2,022,896.00 $0.00 $0.00 Construct Runway 09/27, Extend Runway 09/27
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 23 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
GL DET OH DAY James M Cox Dayton International P 80 $4,277,333.00 $4,277,333.00 $0.00 $0.00
Acquire Friction Measuring Equipment, Improve Airport
Drainage, Install Perimeter Fencing, Modify Service Road,
Rehabilitate Runway 06L/24R, Rehabilitate Taxiway, Remove
Obstructions, Update Miscellaneous Study
GL DET OH 2G2 Jefferson County Airpark GA 16 $157,219.00 $157,219.00 $0.00 $0.00 Acquire Snow Removal Equipment
GL DET OH 1G3 Kent State University GA 13 $102,600.00 $0.00 $102,600.00 $0.00 Sustainable Master Plan
GL DET OH 4I3 Knox County GA 15 $553,423.00 $553,423.00 $0.00 $0.00 Install Perimeter Fencing
GL DET OH CQA Lakefield GA 15 $81,936.00 $81,936.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 08/26
GL DET OH LPR Lorain County Regional R 22 $176,400.00 $176,400.00 $0.00 $0.00 Rehabilitate Apron [Design], Rehabilitate Taxiway [Design]
GL DET OH UYF Madison County GA 16 $187,758.00 $187,758.00 $0.00 $0.00 Install Weather Reporting Equipment, Rehabilitate Taxiway
GL DET OH MNN Marion Municipal GA 21 $210,600.00 $210,600.00 $0.00 $0.00 Improve Airport Drainage, Rehabilitate Runway 07/25 [Crack
Repair and Seal Coat]
GL DET OH 1G5 Medina Municipal R 12 $149,493.00 $149,493.00 $0.00 $0.00 Improve Airport Drainage, Wildlife Hazard Assessments
GL DET OH MWO Middletown Regional/Hook Field GA 12 $251,456.00 $251,456.00 $0.00 $0.00 Improve Utilities [Phase II], Rehabilitate Runway 05/23 [Crack
Seal & Joint Repair]
GL DET OH 4I9 Morrow County GA 11 $162,900.00 $162,900.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 10/28, Remove
Obstructions
GL DET OH EOP Pike County GA 10 $65,175.00 $65,175.00 $0.00 $0.00 Construct Service Road, Rehabilitate Taxiway
GL DET OH CMH Port Columbus International P 79 $11,541,095.00 $1,541,095.00 $10,000,000.00 $0.00 Construct Runway 10R/28L
GL DET OH 3W2 Put-in-Bay GA 20 $87,300.00 $87,300.00 $0.00 $0.00 Construct Taxiway [Design], Rehabilitate Apron [Design],
Rehabilitate Taxiway [Design]
GL DET OH LCK Rickenbacker International CS 40 $1,143,414.00 $1,143,414.00 $0.00 $0.00 Acquire Snow Removal Equipment [Two (2) Snow Blowers]
GL DET OH RZT Ross County GA 15 $362,615.00 $362,615.00 $0.00 $0.00 Rehabilitate Runway 05/23, Rehabilitate Taxiway
GL DET OH I12 Sidney Municipal GA 17 $2,289,704.00 $2,289,704.00 $0.00 $0.00 Acquire Easement For Approaches
GL DET OH TDZ Toledo Executive R 24 $172,246.00 $172,246.00 $0.00 $0.00 Rehabilitate Runway 04/22, Rehabilitate Runway 14/32,
Rehabilitate Taxiway
GL DET OH MRT Union County GA 20 $335,527.00 $335,527.00 $0.00 $0.00 Rehabilitate Runway 09/27, Rehabilitate Runway Lighting
09/27, Rehabilitate Taxiway
GL DET OH VNW Van Wert County GA 15 $180,246.00 $180,246.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 09/27, Remove
Obstructions
GL DET OH 3G3 Wadsworth Municipal GA 16 $229,410.00 $229,410.00 $0.00 $0.00 Acquire Land for Development
GL DET OH I68 Warren County/John Lane Field GA 15 $132,828.00 $132,828.00 $0.00 $0.00 Acquire Land for Development, Rehabilitate Runway 01/19
GL DET OH BJJ Wayne County GA 20 $90,798.00 $90,798.00 $0.00 $0.00 Update Airport Master Plan Study, Wildlife Hazard Assessments
GL DET OH 1G0 Wood County GA 25 $321,951.00 $321,951.00 $0.00 $0.00 Construct Terminal Building, Rehabilitate Apron, Rehabilitate
Runway Lighting - 10/28
GL DET OH ZZV Zanesville Municipal GA 13 $113,895.00 $113,895.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 04/22,
Rehabilitate Runway 04/22
GL MSP MN AIT Aitkin Municipal-Steve Kurtz Field GA 14 $31,500.00 $31,500.00 $0.00 $0.00 Wildlife Hazard Assessments
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 24 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
GL MSP MN ANE Anoka County-Blaine Airport(Janes Field) R 12 $431,550.00 $0.00 $431,550.00 $0.00 Groove Runway 09/27
GL MSP MN ANE Anoka County-Blaine Airport(Janes Field) R 11 $565,741.00 $565,741.00 $0.00 $0.00 Rehabilitate Taxiway
GL MSP MN AUM Austin Municipal GA 12 $252,323.00 $252,323.00 $0.00 $0.00 Acquire Snow Removal Equipment
GL MSP MN BDE Baudette International GA 12 $77,940.00 $77,940.00 $0.00 $0.00 Conduct Airport Master Plan Study [Prepare master plan]
GL MSP MN BJI Bemidji Regional P 29 $605,093.00 $605,093.00 $0.00 $0.00 Acquire Snow Removal Equipment, Rehabilitate Apron
GL MSP MN BRD Brainerd Lakes Regional P 38 $412,051.00 $412,051.00 $0.00 $0.00 Acquire Snow Removal Equipment
GL MSP MN CFE Buffalo Municipal GA 10 $451,120.00 $313,055.00 $138,065.00 $0.00 Extend Runway 17/35 [Land Acquisition]
GL MSP MN AXN Chandler Field GA 11 $676,161.00 $676,161.00 $0.00 $0.00 Construct Building
GL MSP MN COQ Cloquet Carlton County GA 11 $272,957.00 $272,957.00 $0.00 $0.00 Construct Building [Site Preparation]
GL MSP MN DTL Detroit Lakes-Wething Field GA 9 $30,300.00 $30,300.00 $0.00 $0.00 Rehabilitate Taxiway
GL MSP MN DLH Duluth International P 55 $1,576,071.00 $1,576,071.00 $0.00 $0.00 Construct Apron [Phase 2], Construct Terminal Building, Wildlife
Hazard Assessments
GL MSP MN ELO Ely Municipal GA 13 $233,325.00 $233,325.00 $0.00 $0.00
Rehabilitate Runway [Longitudinal Crack Repair] - 12/30,
Rehabilitate Runway 12/30 [Phase 1 - Design], Rehabilitate
Runway Lighting [Phase 1 - Design] - 12/30
GL MSP MN EVM Eveleth-Virginia Municipal GA 11 $2,073,696.00 $2,073,696.00 $0.00 $0.00 Construct Taxiway [Remove and Relocate Taxiways A, B, and C],
Rehabilitate Runway 14/32, Rehabilitate Runway 09/27
GL MSP MN INL Falls International P 26 $610,666.00 $610,666.00 $0.00 $0.00 Expand Terminal Building, Rehabilitate Apron, Rehabilitate
Runway 13/31, Rehabilitate Taxiway
GL MSP MN FBL Faribault Municipal GA 11 $35,010.00 $35,010.00 $0.00 $0.00 Rehabilitate Taxiway [Design]
GL MSP MN FFM Fergus Falls Municipal-Einar Mickelson Field GA 11 $171,950.00 $171,950.00 $0.00 $0.00 Install Airfield Guidance Signs, Install Runway Vertical/Visual
Guidance System - 13/31, Install Taxiway Lighting
GL MSP MN FCM Flying Cloud R 17 $431,550.00 $0.00 $431,550.00 $0.00 Groove Runway 10R/28L
GL MSP MN FCM Flying Cloud R 16 $1,924,608.00 $336,187.00 $1,588,421.00 $0.00 Construct Service Road, Rehabilitate Runway 18/36
GL MSP MN GPZ Grand Rapids/Itasca County Airport-Gordon
Newstrom Field GA 17 $444,635.00 $444,635.00 $0.00 $0.00
Acquire Land For Approaches, Rehabilitate Apron [Design and
Construction], Remove Obstructions
GL MSP MN 04Y Hawley Municipal GA 8 $156,217.00 $156,217.00 $0.00 $0.00 Conduct Airport Master Plan Study
GL MSP MN CHU Houston County GA 5 $447,988.00 $447,988.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 13/31
GL MSP MN HCD Hutchinson Municipal-Butler Field GA 14 $210,915.00 $210,915.00 $0.00 $0.00 Remove Obstructions, Update Airport Master Plan Study
GL MSP MN MJQ Jackson Municipal GA 12 $76,140.00 $76,140.00 $0.00 $0.00 Update Airport Master Plan Study [Phase 1]
GL MSP MN LXL Little Falls/Morrison County-Lindbergh Field GA 14 $208,776.00 $208,776.00 $0.00 $0.00 Rehabilitate Apron [North General Aviation Apron]
GL MSP MN XVG Longville Municipal GA 9 $115,830.00 $115,830.00 $0.00 $0.00 Conduct Airport Master Plan Study [Phase 1], Rehabilitate Apron
[Phase 1 - Design]
GL MSP MN 3N8 Mahnomen County GA 11 $126,984.00 $126,984.00 $0.00 $0.00 Acquire Snow Removal Equipment [Sweeper attachment],
Expand Apron [Phase 2]
GL MSP MN MKT Mankato Regional GA 20 $146,435.00 $146,435.00 $0.00 $0.00 Install Perimeter Fencing
GL MSP MN MSP Minneapolis-St Paul International/Wold-
Chamberlain P 109 $517,500.00 $0.00 $517,500.00 $0.00 Sustainable Management Plan
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 25 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
GL MSP MN MSP Minneapolis-St Paul International/Wold-
Chamberlain P 107 $1,032,047.00 $1,032,047.00 $0.00 $0.00 Rehabilitate Apron
GL MSP MN MSP Minneapolis-St Paul International/Wold-
Chamberlain P 108 $6,855,664.00 $6,855,664.00 $0.00 $0.00 Construct Deicing Containment Facility, Expand Apron
GL MSP MN MVE Montevideo-Chippewa County GA 13 $40,298.00 $40,298.00 $0.00 $0.00 Improve Fuel Farm
GL MSP MN JKJ Moorhead Municipal GA 8 $51,666.00 $51,666.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 12/30, Rehabilitate
Taxiways
GL MSP MN MOX Morris Municipal - Charlie Schmidt Field GA 6 $854,860.00 $854,860.00 $0.00 $0.00 Acquire Land for Development, Construct Building
GL MSP MN CNB Myers Field GA 10 $20,455.00 $20,455.00 $0.00 $0.00 Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate
Runway 12/30, Rehabilitate Taxiway
GL MSP MN ULM New Ulm Municipal GA 11 $2,933,956.00 $150,000.00 $2,783,956.00 $0.00 Rehabilitate Taxiway
GL MSP MN VVV Ortonville Municipal-Martinson Field GA 9 $25,005.00 $25,005.00 $0.00 $0.00 Conduct Miscellaneous Study [Storm Water Pollution Prevention
Plan], Rehabilitate Parking Lot, Rehabilitate Runway 16/34
GL MSP MN OWA Owatonna Degner Regional GA 16 $170,685.00 $170,685.00 $0.00 $0.00 Update Airport Master Plan Study
GL MSP MN PKD Park Rapids Municipal-Konshok Field GA 13 $2,491,395.00 $2,491,395.00 $0.00 $0.00 Construct Runway 17/35
GL MSP MN LYV Quentin Aanenson Field GA 10 $378,000.00 $378,000.00 $0.00 $0.00 Expand Apron
GL MSP MN HIB Range Regional P 34 $2,138,280.00 $2,138,280.00 $0.00 $0.00 Rehabilitate Taxiway
GL MSP MN RGK Red Wing Regional GA 12 $170,078.00 $170,078.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 09/27
GL MSP MN RST Rochester International P 33 $454,813.00 $454,813.00 $0.00 $0.00 Construct Deicing Containment Facility, Rehabilitate Runway
13/31
GL MSP MN ROX Roseau Municipal/Rudy Billberg Field GA 8 $78,097.00 $78,097.00 $0.00 $0.00 Rehabilitate Runway 16/34, Rehabilitate Taxiway
GL MSP MN MML Southwest Minnesota Regional
Marshall/Ryan Field GA 12 $286,991.00 $286,991.00 $0.00 $0.00 Acquire Land For Approaches
GL MSP MN D42 Springfield Municipal GA 10 $204,647.00 $204,647.00 $0.00 $0.00 Acquire Snow Removal Equipment, Construct Fuel Farm
GL MSP MN STC St. Cloud Regional GA 25 $1,326,599.00 $1,326,599.00 $0.00 $0.00 Extend Runway 13/31, Rehabilitate Runway 05/23
GL MSP MN SAZ Staples Municipal GA 9 $484,107.00 $484,107.00 $0.00 $0.00 Construct Taxiway
GL MSP MN TVF Thief River Falls Regional GA 17 $47,386.00 $47,386.00 $0.00 $0.00 Rehabilitate Runway 03/21, Rehabilitate Taxiway
GL MSP MN 14Y Todd Field GA 8 $1,101,802.00 $1,101,802.00 $0.00 $0.00
Conduct Miscellaneous Study, Rehabilitate Apron, Rehabilitate
Runway 16/34 [Phase 2 - Constuction], Rehabilitate Taxiway
[Crack, rout and seal west hangar taxilane], Rehabilitate Taxiway
[Reconstruct east apron taxilanes and east hangar taxilane]
GL MSP MN ACQ Waseca Municipal GA 10 $567,169.00 $567,169.00 $0.00 $0.00 Rehabilitate Apron
GL MSP MN ONA Winona Municipal-Max Conrad Field GA 8 $3,955,709.00 $696,713.00 $3,258,996.00 $0.00 Improve Runway Safety Area - 12/30, Rehabilitate Taxiway
GL MSP WI GRB Austin Straubel International P 44 $180,000.00 $180,000.00 $0.00 $0.00
Update Airport Master Plan Study [Master Plan Preparation
(Phase 2 - Airport Layout Plan development)], Wildlife Hazard
Assessments [Wildlife Hazard Assessment Update and Wildlife
Hazard Management Plan]
GL MSP WI CWA Central Wisconsin P 42 $5,187,018.00 $1,487,018.00 $3,700,000.00 $0.00 Improve Terminal Building
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 26 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
GL MSP WI EAU Chippewa Valley Regional P 35 $3,067,534.00 $1,000,000.00 $2,067,534.00 $0.00 Construct Taxiway [Reconfigure intersection of Taxiways A, B,
and C; realign Taxiway A to Runway 4 threshold (Phase 3)]
GL MSP WI MKE General Mitchell International P 75 $2,324,425.00 $0.00 $2,324,425.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
GL MSP WI MKE General Mitchell International P 73 $6,930,101.00 $4,258,737.00 $2,671,364.00 $0.00
Acquire Equipment [Squitters], Acquire Safety Equipment and/or
Fencing, Construct Deicing Containment Facility [Design],
Construct Service Road [Part 2], Install Runway Lighting
07R/25L, Rehabilitate Runway 07R/25L
GL MSP WI MKE General Mitchell International P 74 $9,208,677.00 $0.00 $9,208,677.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
GL MSP WI LSE La Crosse Municipal P 36 $2,502,000.00 $2,502,000.00 $0.00 $0.00
Acquire Snow Removal Equipment, Rehabilitate Runway 18/36,
Rehabilitate Terminal Building [Phase 1 - Design], Wildlife Hazard
Assessments
GL MSP WI ATW Outagamie County Regional P 47 $1,933,664.00 $1,933,664.00 $0.00 $0.00
Construct Apron [South General Aviation Apron (Phase 2
Construction)], Rehabilitate Access Road and Service Road
(Design and Construction)]
GL MSP WI RHI Rhinelander-Oneida County P 35 $616,992.00 $616,992.00 $0.00 $0.00
Acquire Aircraft Rescue & Fire Fighting Vehicle, Conduct
Miscellaneous Study [Develop stormwater management as
required by Clean Water Act]
GL MSP WI *WIB Wisconsin State Block Grant Program 61 $15,686,923.00 $15,686,923.00 $0.00 $0.00 Non primary development projects in state block grant program
GL MSP WI *WIB Wisconsin State Block Grant Program 62 $1,518,432.00 $0.00 $1,518,432.00 $0.00 Non primary development projects in state block grant program
GL MSP WI *WIB Wisconsin State Block Grant Program 63 $1,708,997.00 $0.00 $1,708,997.00 $0.00 Non primary development projects in state block grant program
GL MSP WI *WIB Wisconsin State Block Grant Program 64 $4,199,286.00 $0.00 $4,199,286.00 $0.00 Non primary development projects in state block grant program
NE ANE CT BDL Bradley International P 56 $960,000.00 $0.00 $960,000.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
NE ANE CT BDL Bradley International P 55 $194,866.00 $194,866.00 $0.00 $0.00 Rehabilitate Taxiway [Design "S" West, "U" and "J"]
NE ANE CT DXR Danbury Municipal R 38 $431,100.00 $431,100.00 $0.00 $0.00 Update Airport Master Plan Study
NE ANE CT GON Groton-New London GA 28 $405,000.00 $405,000.00 $0.00 $0.00 Acquire Snow Removal Equipment
NE ANE CT HVN Tweed-New Haven P 41 $1,762,190.00 $1,762,190.00 $0.00 $0.00 Install Perimeter Fencing
NE ANE CT OXC Waterbury-Oxford GA 21 $81,000.00 $81,000.00 $0.00 $0.00 Wildlife Hazard Assessments
NE ANE CT IJD Windham GA 11 $307,800.00 $307,800.00 $0.00 $0.00 Update Airport Master Plan Study, Wildlife Hazard Assessments
NE ANE MA HYA Barnstable Municipal-Boardman/Polando
Field P 58 $4,819,057.00 $1,357,353.00 $3,461,704.00 $0.00
Rehabilitate Apron [Phase I - Deicing], Rehabilitate Apron [Phase
II], Rehabilitate Taxiway [Realignment of Taxiway "A"]
NE ANE MA HYA Barnstable Municipal-Boardman/Polando
Field P 57 $814,500.00 $814,500.00 $0.00 $0.00 Improve Runway Safety Area - 06/24
NE ANE MA BVY Beverly Municipal R 33 $2,380,500.00 $151,801.00 $2,228,699.00 $0.00 Rehabilitate Apron [West Apron]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 27 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
NE ANE MA CQX Chatham Municipal GA 21 $651,093.00 $651,093.00 $0.00 $0.00 Construct Snow Removal Equipment Building [Phase II
Construction]
NE ANE MA FIT Fitchburg Municipal GA 22 $438,165.00 $438,165.00 $0.00 $0.00 Acquire Easement For Approaches
NE ANE MA BOS General Edward Lawrence Logan
International P 119 $2,000,000.00 $0.00 $2,000,000.00 $0.00 VALE Infrastructure
NE ANE MA BOS General Edward Lawrence Logan
International P 117 $4,973,512.00 $4,973,512.00 $0.00 $0.00 Rehabilitate Taxiway "B"
NE ANE MA BOS General Edward Lawrence Logan
International P 118 $1,947,992.00 $0.00 $1,947,992.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
NE ANE MA BED Laurence G Hanscom Field P 34 $471,031.00 $471,031.00 $0.00 $0.00 Acquire Snow Removal Equipment [2]
NE ANE MA BED Laurence G Hanscom Field P 33 $821,545.00 $821,545.00 $0.00 $0.00 Improve Runway Safety Area - 11/29, Rehabilitate Taxiway
[Taxilane Old Hangars]
NE ANE MA LWM Lawrence Municipal R 34 $82,826.00 $82,826.00 $0.00 $0.00 Wildlife Hazard Assessments
NE ANE MA 1B9 Mansfield Municipal GA 28 $198,450.00 $0.00 $198,450.00 $0.00 Remove Obstructions [Permitting]
NE ANE MA 1B9 Mansfield Municipal GA 27 $254,970.00 $254,970.00 $0.00 $0.00 Remove Obstructions [Easements]
NE ANE MA GHG Marshfield Municipal - George Harlow Field GA 23 $13,714,200.00 $2,373,115.00 $11,341,085.00 $0.00
Rehabilitate Runway 06/24 [Phase III - Runway Safety Areas,
Rehabilitation], Rehabilitate Runway 06/24 [Phase IV - Mitigation
and Obstruction], Rehabilitate Taxiway [Parallel]
NE ANE MA GHG Marshfield Municipal - George Harlow Field GA 25 $585,000.00 $0.00 $585,000.00 $0.00 Acquire Land For Approaches
NE ANE MA GHG Marshfield Municipal - George Harlow Field GA 24 $172,800.00 $172,800.00 $0.00 $0.00 Rehabilitate Runway 06/24 [Phase V - Reimbursable Agreement]
NE ANE MA ACK Nantucket Memorial P 58 $606,000.00 $606,000.00 $0.00 $0.00 Install Airfield Guidance Signs, Rehabilitate Taxiway "D"
NE ANE MA ACK Nantucket Memorial P 57 $881,536.00 $881,536.00 $0.00 $0.00 Update Airport Master Plan Study
NE ANE MA EWB New Bedford Regional P 49 $73,800.00 $73,800.00 $0.00 $0.00 Rehabilitate Runway 05/23 [2 year mitigation monitoring]
NE ANE MA EWB New Bedford Regional P 48 $11,334,600.00 $927,371.00 $10,407,229.00 $0.00 Rehabilitate Runway 05/23 [Construction]
NE ANE MA OWD Norwood Memorial R 34 $351,000.00 $351,000.00 $0.00 $0.00 Rehabilitate Taxiway "A" [Environmental Assessment]
NE ANE MA OWD Norwood Memorial R 33 $1,075,500.00 $0.00 $1,075,500.00 $0.00 Rehabilitate Taxiway "A" [Environmental Assessment]
NE ANE MA ORE Orange Municipal GA 23 $1,155,600.00 $150,000.00 $1,005,600.00 $0.00 Rehabilitate Apron [Phase III - General Aviation Apron],
Rehabilitate Taxiway [Phase III]
NE ANE MA PYM Plymouth Municipal GA 41 $85,581.00 $85,581.00 $0.00 $0.00 Conduct Environmental Study [Phase III]
NE ANE MA PVC Provincetown Municipal P 35 $251,100.00 $251,100.00 $0.00 $0.00 Install Airfield Guidance Signs [Includes Segmented Circle and
Windcone], Rehabilitate Apron [Crack Repair]
NE ANE MA PVC Provincetown Municipal P 36 $694,852.00 $694,852.00 $0.00 $0.00 Conduct Environmental Study [Design]
NE ANE MA TAN Taunton Municipal - King Field GA 24 $295,200.00 $295,200.00 $0.00 $0.00 Update Airport Master Plan Study
NE ANE MA BAF Westfield-Barnes Regional GA 42 $8,742,195.00 $150,000.00 $8,592,195.00 $0.00 Rehabilitate Runway 02/20
NE ANE MA BAF Westfield-Barnes Regional GA 43 $2,145,869.00 $0.00 $2,145,869.00 $0.00 Noise Mitigation Measures for Residences within 70 - 74 DNL
NE ANE MA BAF Westfield-Barnes Regional GA 44 $350,590.00 $0.00 $350,590.00 $0.00 Acquire Land for Noise Compatibility within 70 - 74 DNL
NE ANE MA CEF Westover ARB/Metropolitan GA 30 $952,200.00 $952,200.00 $0.00 $0.00 Construct Snow Removal Equipment Building
NE ANE MA CEF Westover ARB/Metropolitan GA 29 $153,614.00 $47,855.00 $105,759.00 $0.00 Conduct Noise Compatibility Plan Study
NE ANE MA ORH Worcester Regional GA 46 $486,385.00 $486,385.00 $0.00 $0.00 Remove Obstructions [Phase II]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 28 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
NE ANE MA ORH Worcester Regional GA 47 $407,900.00 $407,900.00 $0.00 $0.00 Acquire Snow Removal Equipment [Sweeper]
NE ANE ME AUG Augusta State CS 28 $68,877.00 $68,877.00 $0.00 $0.00 Remove Obstructions [Avigation Easements]
NE ANE ME AUG Augusta State CS 27 $59,292.00 $59,292.00 $0.00 $0.00 Update Airport Master Plan Study
NE ANE ME BGR Bangor International P 58 $1,871,875.00 $1,871,875.00 $0.00 $0.00 Improve Airport Miscellaneous Improvements
NE ANE ME BGR Bangor International P 60 $157,100.00 $157,100.00 $0.00 $0.00 Rehabilitate Apron [Terminal Apron], Rehabilitate Taxiway "N"
NE ANE ME BGR Bangor International P 59 $747,007.00 $747,007.00 $0.00 $0.00 Rehabilitate Runway 15/33 [Phase I - Drainage Investigation],
Rehabilitate Runway Lighting [Guard Lights] - 15/33
NE ANE ME BST Belfast Municipal GA 11 $34,740.00 $34,740.00 $0.00 $0.00 Update Airport Master Plan Study [Phase I]
NE ANE ME BST Belfast Municipal GA 12 $88,650.00 $88,650.00 $0.00 $0.00 Remove Obstructions [Phase I - Analysis and Environmental
Assessment]
NE ANE ME 0B1 Bethel Regional GA 12 $750,000.00 $750,000.00 $0.00 $0.00 Construct Terminal Building [Terminal Building, Access Road,
Parking and Site Preparation], Construct Utilities [Vault]
NE ANE ME BXM Brunswick Executive GA 10 $73,800.00 $0.00 $73,800.00 $0.00 Improve Airport Drainage [Stormwater - Design and Permitting]
NE ANE ME BXM Brunswick Executive GA 6 $85,680.00 $85,680.00 $0.00 $0.00 Rehabilitate Runway 01R/19L [Crack Sealing and Repair]
NE ANE ME BXM Brunswick Executive GA 7 $194,850.00 $64,320.00 $130,530.00 $0.00 Rehabilitate Building [Hangar Roof]
NE ANE ME BXM Brunswick Executive GA 9 $181,350.00 $0.00 $181,350.00 $0.00 Construct Snow Removal Equipment Building [Design Only]
NE ANE ME BXM Brunswick Executive GA 8 $1,183,320.00 $0.00 $1,183,320.00 $0.00 Rehabilitate Building [General Aviation Terminal Building],
Rehabilitate Building [Hangar]
NE ANE ME CAR Caribou Municipal GA 16 $3,424,500.00 $1,529,805.00 $1,894,695.00 $0.00 Rehabilitate Runway 01/19, Rehabilitate Runway 11/29
NE ANE ME OLD Dewitt Field,Old Town Municipal GA 11 $472,500.00 $472,500.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Taxiway [Taxilane]
NE ANE ME 1B0 Dexter Regional GA 9 $558,000.00 $558,000.00 $0.00 $0.00 Construct Taxiway [Taxilane Construction (includes stormwater
mitigation)]
NE ANE ME IZG Eastern Slopes Regional GA 17 $225,000.00 $225,000.00 $0.00 $0.00 Rehabilitate Taxiway
NE ANE ME 3B1 Greenville Municipal GA 16 $94,500.00 $94,500.00 $0.00 $0.00 Update Airport Master Plan Study
NE ANE ME BHB Hancock County-Bar Harbor P 38 $1,557,090.00 $0.00 $1,557,090.00 $0.00 Construct Taxiway [Construction]
NE ANE ME BHB Hancock County-Bar Harbor P 37 $2,561,278.00 $2,561,278.00 $0.00 $0.00 Expand Terminal Building
NE ANE ME BHB Hancock County-Bar Harbor P 36 $68,553.00 $68,553.00 $0.00 $0.00 Improve Airport Miscellaneous Improvements [Marking]
NE ANE ME RKD Knox County Regional P 43 $802,800.00 $802,800.00 $0.00 $0.00 Install Perimeter Fencing
NE ANE ME RKD Knox County Regional P 44 $43,200.00 $43,200.00 $0.00 $0.00 Acquire Snow Removal Equipment
NE ANE ME RKD Knox County Regional P 45 $153,000.00 $153,000.00 $0.00 $0.00 Construct Service Road
NE ANE ME RKD Knox County Regional P 42 $328,500.00 $328,500.00 $0.00 $0.00 Remove Obstructions [Easements]
NE ANE ME 59B Newton Field GA 13 $1,225,170.00 $1,225,170.00 $0.00 $0.00 Construct Building [Construction], Expand Apron
NE ANE ME FVE Northern Aroostook Regional GA 18 $31,500.00 $31,500.00 $0.00 $0.00 Rehabilitate Runway 14/32 [Pavement Maintenance]
NE ANE ME FVE Northern Aroostook Regional GA 17 $222,897.00 $222,897.00 $0.00 $0.00 Construct Building [Hangar]
NE ANE ME PQI Northern Maine Regional Airport at Presque
Isle P 41 $216,600.00 $216,600.00 $0.00 $0.00 Install Miscellaneous NAVAIDS [Windcone], Remove Obstructions
NE ANE ME PQI Northern Maine Regional Airport at Presque
Isle P 40 $19,190.00 $19,190.00 $0.00 $0.00 Rehabilitate Runway 01/19 [Crack Repair]
NE ANE ME 81B Oxford County Regional GA 10 $193,500.00 $193,500.00 $0.00 $0.00 Install Perimeter Fencing
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 29 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
NE ANE ME 2B7 Pittsfield Municipal GA 14 $526,302.00 $526,302.00 $0.00 $0.00 Expand Apron
NE ANE ME 2B7 Pittsfield Municipal GA 15 $290,196.00 $0.00 $290,196.00 $0.00 Rehabilitate Taxiway
NE ANE ME PWM Portland International Jetport P 74 $1,380,639.00 $1,380,639.00 $0.00 $0.00 Acquire Snow Removal Equipment
NE ANE ME PWM Portland International Jetport P 75 $300,000.00 $0.00 $300,000.00 $0.00 Sustainable Master Plan
NE ANE ME PNN Princeton Municipal GA 5 $509,400.00 $509,400.00 $0.00 $0.00 Construct Taxiway
NE ANE ME SFM Sanford Seacoast Regional R 27 $48,780.00 $48,780.00 $0.00 $0.00 Wildlife Hazard Assessments
NE ANE ME SFM Sanford Seacoast Regional R 28 $46,350.00 $46,350.00 $0.00 $0.00 Rehabilitate Taxiway [Design (Taxilane)]
NE ANE ME WVL Waterville Robert Lafleur GA 20 $234,900.00 $234,900.00 $0.00 $0.00 Rehabilitate Runway 05/23 [Phase I - Design]
NE ANE ME IWI Wiscasset GA 17 $45,000.00 $45,000.00 $0.00 $0.00 Conduct Environmental Study
NE ANE NH LEB Lebanon Municipal CS 49 $517,860.00 $517,860.00 $0.00 $0.00 Remove Obstructions [Environmental Assessment], Remove
Obstructions [Permitting/Mitigation]
NE ANE NH MHT Manchester P 96 $238,160.00 $238,160.00 $0.00 $0.00 Acquire Snow Removal Equipment
NE ANE NH MHT Manchester P 94 $4,040,797.00 $4,040,797.00 $0.00 $0.00 Rehabilitate Apron [Terminal Apron], Rehabilitate Taxiway "N"
NE ANE NH MHT Manchester P 97 $327,307.00 $327,307.00 $0.00 $0.00 Improve Access Road, Modify Terminal Building
NE ANE NH MHT Manchester P 95 $263,250.00 $263,250.00 $0.00 $0.00 Remove Obstructions
NE ANE NH *NHB New Hampshire State Block Grant Program 19 $3,955,960.00 $0.00 $3,955,960.00 $0.00 Non primary development projects in state block grant program
NE ANE NH *NHB New Hampshire State Block Grant Program 18 $4,102,793.00 $4,102,793.00 $0.00 $0.00 Non primary development projects in state block grant program
NE ANE RI SFZ North Central State R 26 $1,543,700.00 $1,543,700.00 $0.00 $0.00 Construct Apron
NE ANE RI OQU Quonset State R 19 $1,268,325.00 $1,268,325.00 $0.00 $0.00 Construct Utilities [Vault]
NE ANE RI OQU Quonset State R 20 $22,770.00 $22,770.00 $0.00 $0.00 Construct Utilities [Reimbursable Agreement for Vault]
NE ANE RI PVD Theodore Francis Green State P 104 $5,000,000.00 $0.00 $5,000,000.00 $0.00 Acquire Land for Noise Compatibility within 70 - 74 DNL
NE ANE RI PVD Theodore Francis Green State P 102 $1,059,731.00 $0.00 $1,059,731.00 $0.00 Remove Obstructions [Demolition of Hangar]
NE ANE RI PVD Theodore Francis Green State P 105 $2,911,431.00 $0.00 $2,911,431.00 $0.00 Extend Runway 05/23 [Land Acquisition]
NE ANE RI PVD Theodore Francis Green State P 100 $132,566.00 $132,566.00 $0.00 $0.00 Improve Runway Safety Area [Phase IV - Reimbursable
Agreement] - 16/34
NE ANE RI PVD Theodore Francis Green State P 103 $800,000.00 $0.00 $800,000.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
NE ANE RI PVD Theodore Francis Green State P 101 $6,181,496.00 $2,350,501.00 $3,830,995.00 $0.00 Improve Runway Safety Area [Phase III] - 16/34
NE ANE RI WST Westerly State CS 20 $269,812.00 $269,812.00 $0.00 $0.00 Remove Obstructions [Easements]
NE ANE RI WST Westerly State CS 21 $231,786.00 $231,786.00 $0.00 $0.00 Light Obstructions
NE ANE VT BTV Burlington International P 95 $2,590,677.00 $2,590,677.00 $0.00 $0.00 Rehabilitate Taxiway
NE ANE VT BTV Burlington International P 97 $182,700.00 $182,700.00 $0.00 $0.00 Security Enhancements [Design]
NE ANE VT BTV Burlington International P 98 $1,179,000.00 $0.00 $1,179,000.00 $0.00 Acquire Land for Noise Compatibility within 65 - 69 DNL
NE ANE VT BTV Burlington International P 96 $1,071,000.00 $1,071,000.00 $0.00 $0.00 Rehabilitate Apron [Phase III]
NE ANE VT MVL Morrisville-Stowe State GA 12 $507,891.00 $507,891.00 $0.00 $0.00 Remove Obstructions
NE ANE VT MVL Morrisville-Stowe State GA 13 $3,621,325.00 $0.00 $3,621,325.00 $0.00 Rehabilitate Runway 01/19
NE ANE VT EFK Newport State GA 11 $155,730.00 $155,730.00 $0.00 $0.00 Update Airport Master Plan Study
NE ANE VT EFK Newport State GA 12 $179,100.00 $179,100.00 $0.00 $0.00 Construct Snow Removal Equipment Building [Design]
NE ANE VT EFK Newport State GA 13 $123,500.00 $123,500.00 $0.00 $0.00 Conduct Environmental Study
NE ANE VT RUT Rutland - Southern Vermont Regional CS 41 $1,071,667.00 $360,810.00 $710,857.00 $0.00 Extend Runway Safety Area [Phase VIA - Relocate Road] - 01/19
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 30 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
NE ANE VT RUT Rutland - Southern Vermont Regional CS 39 $351,000.00 $351,000.00 $0.00 $0.00 Extend Runway Safety Area [Phase V - Final Design for Runway
01 End] - 01/19
NE ANE VT RUT Rutland - Southern Vermont Regional CS 40 $307,350.00 $307,350.00 $0.00 $0.00 Extend Runway Safety Area [Phase VIII (1) Reimbursable
Agreement] - 01/19
NE ANE VT RUT Rutland - Southern Vermont Regional CS 42 $2,970,410.00 $0.00 $2,970,410.00 $0.00 Extend Runway Safety Area [Phase VIB (Runway 19 End)] - 01/19
NE ANE VT RUT Rutland - Southern Vermont Regional CS 38 $219,959.00 $219,959.00 $0.00 $0.00 Install Airfield Guidance Signs [Markings and Signs]
NE ANE VT *VTV Various Locations in Vermont 10 $126,461.00 $126,461.00 $0.00 $0.00 Install Perimeter Fencing (Edward F Knapp State; Newport State)
NE ANE VT DDH William H. Morse State GA 8 $66,690.00 $66,690.00 $0.00 $0.00 Update Airport Master Plan Study
NM DEN CO ASE Aspen-Pitkin County/Sardy Field P 49 $844,691.00 $844,691.00 $0.00 $0.00 Construct Taxiway [Design], Rehabilitate Apron [Design],
Rehabilitate Runway 15/33
NM DEN CO ASE Aspen-Pitkin County/Sardy Field P 48 $1,089,723.00 $1,089,723.00 $0.00 $0.00 Acquire Snow Removal Equipment
NM DEN CO AJZ Blake Field GA 11 $129,818.00 $129,818.00 $0.00 $0.00 Conduct Airport Master Plan Study
NM DEN CO APA Centennial R 46 $5,825,483.00 $850,000.00 $4,975,483.00 $0.00 Rehabilitate Runway 10/28
NM DEN CO COS City of Colorado Springs Municipal P 55 $12,758,552.00 $3,896,146.00 $8,862,406.00 $0.00 Rehabilitate Taxiway
NM DEN CO AKO Colorado Plains Regional GA 15 $230,000.00 $230,000.00 $0.00 $0.00 Install Perimeter Fencing
NM DEN CO CEZ Cortez Municipal CS 31 $1,933,781.00 $1,933,781.00 $0.00 $0.00 Improve Airport Miscellaneous Improvements, Rehabilitate
Apron
NM DEN CO DEN Denver International P 80 $12,779,350.00 $5,725,985.00 $7,053,365.00 $0.00 Rehabilitate Runway 17R/35L, Rehabilitate Taxiway
NM DEN CO DEN Denver International P 81 $1,779,292.00 $1,779,292.00 $0.00 $0.00 Rehabilitate Taxiway
NM DEN CO DEN Denver International P 79 $2,000,000.00 $0.00 $2,000,000.00 $0.00 Expand Apron
NM DEN CO EGE Eagle County Regional P 51 $1,764,235.00 $1,764,235.00 $0.00 $0.00 Construct Snow Removal Equipment Building
NM DEN CO EIK Erie Municipal GA 14 $25,000.00 $25,000.00 $0.00 $0.00 Install Taxiway Lighting
NM DEN CO FNL Fort Collins-Loveland Municipal P 32 $1,536,295.00 $1,536,295.00 $0.00 $0.00 Install Perimeter Fencing, Rehabilitate Apron
NM DEN CO 1V6 Fremont County GA 14 $1,995,000.00 $1,995,000.00 $0.00 $0.00 Construct Taxiway
NM DEN CO FTG Front Range R 39 $3,049,211.00 $1,349,211.00 $1,700,000.00 $0.00 Rehabilitate Taxiway [Phase 1 - Design]
NM DEN CO GJT Grand Junction Regional P 51 $3,688,829.00 $3,688,829.00 $0.00 $0.00 Construct Terminal Building
NM DEN CO GUC Gunnison-Crested Butte Regional P 47 $1,000,000.00 $1,000,000.00 $0.00 $0.00 Acquire Land For Approaches
NM DEN CO AIB Hopkins Field GA 9 $2,125,000.00 $2,125,000.00 $0.00 $0.00 Improve Runway Safety Area - 05/23
NM DEN CO ITR Kit Carson County GA 11 $450,000.00 $450,000.00 $0.00 $0.00 Expand Apron
NM DEN CO LXV Lake County GA 11 $150,000.00 $150,000.00 $0.00 $0.00 Conduct Airport Master Plan Study
NM DEN CO LAA Lamar Municipal GA 18 $700,485.00 $700,485.00 $0.00 $0.00 Rehabilitate Apron
NM DEN CO 20V Mc Elroy Airfield GA 13 $450,186.00 $450,186.00 $0.00 $0.00 Expand Apron, Rehabilitate Runway 09/27
NM DEN CO MTJ Montrose Regional P 42 $350,000.00 $350,000.00 $0.00 $0.00 Expand Apron [Design], Rehabilitate Apron
NM DEN CO TAD Perry Stokes GA 7 $509,944.00 $509,944.00 $0.00 $0.00 Install Perimeter Fencing
NM DEN CO PUB Pueblo Memorial P 33 $5,000,000.00 $1,000,000.00 $4,000,000.00 $0.00 Rehabilitate Taxiway
NM DEN CO PUB Pueblo Memorial P 32 $657,000.00 $0.00 $657,000.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
NM DEN CO 4V0 Rangely GA 10 $329,050.00 $329,050.00 $0.00 $0.00 Improve Airport Drainage, Install Weather Reporting Equipment
NM DEN CO BJC Rocky Mountain Metropolitan R 55 $1,000,000.00 $0.00 $1,000,000.00 $0.00 Construct Taxiway
NM DEN CO BJC Rocky Mountain Metropolitan R 54 $7,394,000.00 $0.00 $7,394,000.00 $0.00 Improve Runway Safety Area [Construct] - 11L/29R
NM DEN CO BJC Rocky Mountain Metropolitan R 56 $190,753.00 $150,000.00 $40,753.00 $0.00 Improve Runway Safety Area [Relocate Localizer] - 11L/29R
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 31 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
NM DEN CO ALS San Luis Valley Regional/Bergman Field CS 19 $888,889.00 $763,889.00 $125,000.00 $0.00 Construct Terminal Building, Wildlife Hazard Assessments
NM DEN CO ALS San Luis Valley Regional/Bergman Field CS 18 $306,000.00 $0.00 $306,000.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
NM DEN CO *COS State of Colorado 14 $142,673.00 $142,673.00 $0.00 $0.00 Update State System Plan Study
NM DEN CO STK Sterling Municipal GA 12 $600,000.00 $600,000.00 $0.00 $0.00 Rehabilitate Taxiway
NM DEN CO PSO Stevens Field GA 21 $212,000.00 $212,000.00 $0.00 $0.00 Acquire Snow Removal Equipment
NM DEN CO TEX Telluride Regional P 29 $843,532.00 $843,532.00 $0.00 $0.00 Improve Runway Safety Area [Construction - Phase 5] - 09/27
NM DEN CO TEX Telluride Regional P 31 $125,000.00 $0.00 $125,000.00 $0.00 Wildlife Hazard Assessments
NM DEN CO TEX Telluride Regional P 30 $245,109.00 $245,109.00 $0.00 $0.00 Improve Runway Safety Area [Construction - Phase 6 - Design de
icing pad] - 09/27
NM DEN CO 2V5 Wray Municipal GA 13 $400,000.00 $400,000.00 $0.00 $0.00 Rehabilitate Taxiway
NM DEN CO HDN Yampa Valley P 40 $940,000.00 $940,000.00 $0.00 $0.00 Construct Service Road, Rehabilitate Apron, Rehabilitate Runway
10/28
NM DEN CO 2V6 Yuma Municipal GA 10 $150,000.00 $150,000.00 $0.00 $0.00 Install Weather Reporting Equipment
NM DEN UT BMC Brigham City GA 25 $185,719.00 $185,719.00 $0.00 $0.00 Acquire Snow Removal Equipment
NM DEN UT BCE Bryce Canyon GA 15 $150,000.00 $150,000.00 $0.00 $0.00 Acquire Snow Removal Equipment
NM DEN UT BCE Bryce Canyon GA 14 $375,000.00 $375,000.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Taxiway
NM DEN UT U96 Cal Black Memorial GA 14 $479,258.00 $479,258.00 $0.00 $0.00 Improve Runway Safety Area - 01/19, Improve Utilities,
Rehabilitate Runway 01/19
NM DEN UT CNY Canyonlands Field CS 26 $125,000.00 $0.00 $125,000.00 $0.00 Wildlife Hazard Assessments
NM DEN UT CNY Canyonlands Field CS 25 $150,000.00 $150,000.00 $0.00 $0.00 Improve Access Road, Rehabilitate Parking Lot
NM DEN UT DTA Delta Municipal GA 13 $70,000.00 $70,000.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 17/35, Rehabilitate
Taxiway
NM DEN UT U34 Green River Municipal GA 10 $300,000.00 $300,000.00 $0.00 $0.00
Install Miscellaneous Navigational Aids, Install Runway
Vertical/Visual Guidance System - 13/31, Rehabilitate Runway
Lighting - 13/31
NM DEN UT 36U Heber City Municipal - Russ McDonald Field GA 25 $256,000.00 $256,000.00 $0.00 $0.00 Rehabilitate Runway 04/22 [Design]
NM DEN UT LGU Logan-Cache GA 25 $515,000.00 $515,000.00 $0.00 $0.00 Construct Taxiway
NM DEN UT 41U Manti-Ephraim GA 7 $59,920.00 $59,920.00 $0.00 $0.00 Conduct Environmental Study
NM DEN UT MLF Milford Municipal/Ben and Judy Briscoe
Field GA 12 $229,467.00 $229,467.00 $0.00 $0.00 Update Airport Master Plan Study
NM DEN UT U64 Monticello GA 7 $85,000.00 $85,000.00 $0.00 $0.00 Construct Snow Removal Equipment Building, Install Perimeter
Fencing
NM DEN UT U14 Nephi Municipal GA 17 $383,669.00 $383,669.00 $0.00 $0.00 Acquire Snow Removal Equipment, Construct Snow Removal
Equipment Building
NM DEN UT OGD Ogden-Hinckley R 40 $156,500.00 $156,500.00 $0.00 $0.00 Acquire Snow Removal Equipment
NM DEN UT OGD Ogden-Hinckley R 39 $43,000.00 $0.00 $43,000.00 $0.00 Wildlife Hazard Assessments
NM DEN UT PVU Provo Municipal P 38 $653,335.00 $653,335.00 $0.00 $0.00 Rehabilitate Runway 13/31
NM DEN UT PVU Provo Municipal P 37 $750,000.00 $0.00 $750,000.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
NM DEN UT PVU Provo Municipal P 36 $196,665.00 $196,665.00 $0.00 $0.00 Construct Terminal Building
NM DEN UT RIF Richfield Municipal GA 16 $8,491,288.00 $1,244,653.00 $7,246,635.00 $0.00 Construct Runway 01/19 [Paving (Schedule II)]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 32 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
NM DEN UT RIF Richfield Municipal GA 15 $129,442.00 $129,442.00 $0.00 $0.00 Construct Runway 01/19
NM DEN UT 74V Roosevelt Municipal GA 11 $658,628.00 $658,628.00 $0.00 $0.00 Expand Apron, Rehabilitate Apron
NM DEN UT SLC Salt Lake City International P 103 $11,894,887.00 $3,894,887.00 $8,000,000.00 $0.00 Construct Apron
NM DEN UT U77 Spanish Fork-Springville-Woodhouse Field GA 21 $2,390,000.00 $2,390,000.00 $0.00 $0.00 Extend Runway [Phase I - Paving; Phase II - Grading and Land
Acquisition] - 12/30
NM DEN UT SGU St George Municipal P 22 $11,000,000.00 $1,000,000.00 $10,000,000.00 $0.00 Construct New Airport [Construction - Phase VI]
NM DEN UT SGU St George Municipal P 23 $125,000.00 $0.00 $125,000.00 $0.00 Wildlife Hazard Assessments
NM DEN UT VEL Vernal Regional CS 27 $60,800.00 $0.00 $60,800.00 $0.00 Wildlife Hazard Assessments
NM DEN UT VEL Vernal Regional CS 29 $6,664,529.00 $150,000.00 $6,514,529.00 $0.00 Construct Runway 16/34
NM DEN UT VEL Vernal Regional CS 28 $630,000.00 $0.00 $630,000.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
NM DEN UT ENV Wendover GA 26 $6,500,000.00 $1,000,000.00 $5,500,000.00 $0.00 Extend Runway 08/26, Wildlife Hazard Assessments
NM DEN WY AFO Afton Municipal GA 21 $122,391.00 $122,391.00 $0.00 $0.00 Construct Taxiway [Design], Rehabilitate Runway Lighting
[Design] - 16/34
NM DEN WY CPR Casper/Natrona County International P 51 $6,568,693.00 $1,068,693.00 $5,500,000.00 $0.00 Install Runway Vertical/Visual Guidance System - 08/26,
Rehabilitate Taxiway
NM DEN WY CYS Cheyenne Regional/Jerry Olson Field P 50 $300,000.00 $0.00 $300,000.00 $0.00 Sustainable Management Plan
NM DEN WY CYS Cheyenne Regional/Jerry Olson Field P 49 $575,000.00 $575,000.00 $0.00 $0.00 Rehabilitate Runway 09/27, Rehabilitate Runway 13/31,
Rehabilitate Runway Lighting - 09/27, Rehabilitate Taxiway
NM DEN WY DGW Converse County GA 20 $140,000.00 $140,000.00 $0.00 $0.00 Rehabilitate Apron
NM DEN WY DUB Dubois Municipal GA 15 $650,000.00 $650,000.00 $0.00 $0.00 Rehabilitate Runway 10/28 [Design]
NM DEN WY EVW Evanston-Uinta County Burns Field GA 25 $76,500.00 $76,500.00 $0.00 $0.00 Rehabilitate Apron
NM DEN WY FBR Fort Bridger GA 11 $321,488.00 $321,488.00 $0.00 $0.00 Update Airport Master Plan Study
NM DEN WY GCC Gillette-Campbell County P 38 $870,000.00 $870,000.00 $0.00 $0.00 Expand Apron
NM DEN WY JAC Jackson Hole P 49 $1,876,206.00 $1,876,206.00 $0.00 $0.00 Improve Terminal Building
NM DEN WY JAC Jackson Hole P 50 $1,000,000.00 $0.00 $1,000,000.00 $0.00 Conduct Noise Compatibility Plan Study
NM DEN WY JAC Jackson Hole P 48 $354,932.00 $354,932.00 $0.00 $0.00 Rehabilitate Apron
NM DEN WY BYG Johnson County GA 16 $523,693.00 $523,693.00 $0.00 $0.00 Construct Taxiway
NM DEN WY LAR Laramie Regional CS 30 $125,000.00 $0.00 $125,000.00 $0.00 Wildlife Hazard Assessments
NM DEN WY +09F New (Replacement Airport) 3 $2,799,002.00 $2,799,002.00 $0.00 $0.00 Construct New Airport
NM DEN WY +09F New (Replacement Airport) 4 $8,165,000.00 $0.00 $8,165,000.00 $0.00 Construct New Airport
NM DEN WY POY Powell Municipal GA 14 $150,000.00 $150,000.00 $0.00 $0.00 Construct Snow Removal Equipment Building [Construction]
NM DEN WY RIW Riverton Regional P 36 $74,000.00 $74,000.00 $0.00 $0.00 Wildlife Hazard Assessments
NM DEN WY RIW Riverton Regional P 34 $1,540,500.00 $1,540,500.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Taxiway
NM DEN WY RIW Riverton Regional P 35 $250,000.00 $250,000.00 $0.00 $0.00 Acquire Snow Removal Equipment
NM DEN WY RKS Rock Springs-Sweetwater County P 31 $1,014,627.00 $1,014,627.00 $0.00 $0.00 Rehabilitate Runway 03/21
NM DEN WY SHR Sheridan County P 45 $373,291.00 $373,291.00 $0.00 $0.00 Update Airport Master Plan Study
NM DEN WY SHR Sheridan County P 46 $655,600.00 $655,600.00 $0.00 $0.00 Acquire Snow Removal Equipment [Rotary Plow and Sweeper]
NM DEN WY *WYS State of Wyoming 8 $250,000.00 $250,000.00 $0.00 $0.00 Conduct State System Plan Study
NM DEN WY TOR Torrington Municipal GA 14 $330,000.00 $330,000.00 $0.00 $0.00 Update Airport Master Plan Study
NM DEN WY WRL Worland Municipal CS 20 $125,000.00 $0.00 $125,000.00 $0.00 Wildlife Hazard Assessments
NM DEN WY COD Yellowstone Regional P 31 $1,002,048.00 $1,002,048.00 $0.00 $0.00 Expand Apron
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 33 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
NM HLN MT BHK Baker Municipal GA 17 $231,800.00 $231,800.00 $0.00 $0.00 Install Miscellaneous Navigational Aids, Rehabilitate Apron,
Rehabilitate Runway 13/31, Rehabilitate Taxiway
NM HLN MT BTM Bert Mooney P 49 $772,427.00 $772,427.00 $0.00 $0.00
Acquire Safety Equipment and/or Fencing, Construct Parking Lot
[Phase I - Design and Utility Relocation], Expand Terminal
Building [Phase II - Utility Relocation], Improve Airport Drainage
NM HLN MT S85 Big Sky Field GA 8 $54,900.00 $54,900.00 $0.00 $0.00 Conduct Environmental Study
NM HLN MT 6S0 Big Timber GA 8 $237,200.00 $237,200.00 $0.00 $0.00 Conduct Airport Master Plan Study
NM HLN MT BIL Billings Logan International P 45 $2,297,073.00 $2,297,073.00 $0.00 $0.00 Expand Apron
NM HLN MT BIL Billings Logan International P 44 $6,054,169.00 $1,937,556.00 $4,116,613.00 $0.00
Install Guidance Signs, Install Runway Distance-To-Go Signs
10L/28R, Rehabilitate Runway 10L/28R [Phase IV], Rehabilitate
Runway Lighting - 10L/28R, Rehabilitate Taxiway Lighting
NM HLN MT 3U3 Bowman Field GA 16 $94,950.00 $94,950.00 $0.00 $0.00 Conduct Environmental Study, Remove Obstructions
NM HLN MT BZN Bozeman Yellowstone International P 41 $2,848,924.00 $2,848,924.00 $0.00 $0.00 Expand Terminal Building [Phase VI]
NM HLN MT CII Choteau GA 7 $115,740.00 $115,740.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 05/23, Rehabilitate
Runway 14/32, Rehabilitate Taxiway
NM HLN MT M46 Colstrip GA 14 $53,100.00 $53,100.00 $0.00 $0.00
Construct Taxiway [Phase I], Expand Apron [Phase I], Rehabilitate
Apron [Phase I], Rehabilitate Runway 06/24 [Phase I],
Rehabilitate Taxiway [Phase I]
NM HLN MT S01 Conrad GA 5 $128,700.00 $128,700.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 06/24, Rehabilitate
Taxiway
NM HLN MT GDV Dawson Community GA 12 $260,774.00 $260,774.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 02/20, Rehabilitate
Runway 12/30, Rehabilitate Taxiway
NM HLN MT GDV Dawson Community GA 13 $52,178.00 $52,178.00 $0.00 $0.00 Wildlife Hazard Assessments
NM HLN MT 38S Deer Lodge-City-County GA 11 $122,327.00 $122,327.00 $0.00 $0.00 Conduct Environmental Study
NM HLN MT S71 Edgar G Obie GA 13 $382,326.00 $382,326.00 $0.00 $0.00 Construct Fuel Farm, Construct Snow Removal Equipment
Building [Phase II - Construction]
NM HLN MT 97M Ekalaka GA 9 $308,670.00 $308,670.00 $0.00 $0.00
Acquire Snow Removal Equipment [Phase I], Construct Taxiway,
Install Guidance Signs [Phase I], Install Taxiway Lighting [Phase I],
Rehabilitate Runway Lighting [Phase I] - 13/31
NM HLN MT EKS Ennis - Big Sky GA 12 $104,400.00 $104,400.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 16/34, Rehabilitate
Taxiway
NM HLN MT MLS Frank Wiley Field GA 14 $296,640.00 $296,640.00 $0.00 $0.00 Update Airport Master Plan Study
NM HLN MT MLS Frank Wiley Field GA 15 $54,000.00 $54,000.00 $0.00 $0.00 Wildlife Hazard Assessments
NM HLN MT GPI Glacier Park International P 47 $1,705,942.00 $1,705,942.00 $0.00 $0.00 Modify Terminal Building
NM HLN MT GTF Great Falls International P 57 $738,000.00 $0.00 $738,000.00 $0.00
Conduct Noise Compatibility Plan Study, Noise Mitigation
Measures for Residences within 65 - 69 DNL [Phase VI (Design
Only)]
NM HLN MT GTF Great Falls International P 56 $2,148,001.00 $2,148,001.00 $0.00 $0.00 Construct Snow Removal Equipment Building
NM HLN MT HVR Havre City-County GA 16 $82,745.00 $82,745.00 $0.00 $0.00 Wildlife Hazard Assessments
NM HLN MT HVR Havre City-County GA 15 $374,361.00 $374,361.00 $0.00 $0.00 Install Perimeter Fencing required by 14 CFR 139, Rehabilitate
Runway 08/26
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 34 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
NM HLN MT HLN Helena Regional P 45 $1,303,614.00 $1,303,614.00 $0.00 $0.00
Conduct Miscellaneous Study, Install Guidance Signs, Install
Runway Distance-To-Go Signs - 09/27, Rehabilitate Runway
Lighting - 09/27, Rehabilitate Taxiway Lighting
NM HLN MT LWT Lewistown Municipal GA 18 $375,995.00 $375,995.00 $0.00 $0.00
Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Safety
Equipment and/or Fencing, Acquire Safety Equipment and/or
Fencing, Rehabilitate Building
NM HLN MT S59 Libby GA 12 $243,180.00 $243,180.00 $0.00 $0.00 Conduct Airport Master Plan Study
NM HLN MT M75 Malta GA 10 $305,896.00 $305,896.00 $0.00 $0.00 Construct Building [Phase I]
NM HLN MT 9S4 Mineral County GA 9 $238,500.00 $238,500.00 $0.00 $0.00 Construct Building, Expand Apron
NM HLN MT MSO Missoula International P 56 $3,830,976.00 $3,830,976.00 $0.00 $0.00 Expand Apron, Rehabilitate Apron [Phase II - Construction],
Rehabilitate Taxiway [Phase II - Construction]
NM HLN MT +00U New 7 $2,456,788.00 $2,456,788.00 $0.00 $0.00 Construct New Airport [Phase IV]
NM HLN MT 8S1 Polson GA 5 $237,143.00 $237,143.00 $0.00 $0.00 Conduct Environmental Study, Update Airport Master Plan Study
NM HLN MT PO1 Poplar Municipal GA 9 $503,611.00 $503,611.00 $0.00 $0.00 Acquire Snow Removal Equipment, Construct Snow Removal
Equipment Building
NM HLN MT 7S0 Ronan GA 10 $130,500.00 $130,500.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 16/34, Rehabilitate
Taxiway
NM HLN MT RPX Roundup GA 11 $708,000.00 $708,000.00 $0.00 $0.00 Construct Taxiway [Phase III], Install Airfield Guidance Signs,
Install Taxiway Lighting
NM HLN MT PWD Sher-Wood GA 8 $118,259.00 $118,259.00 $0.00 $0.00 Conduct Airport Master Plan Study
NM HLN MT *MTS State of Montana 11 $321,510.00 $321,510.00 $0.00 $0.00 Update State System Plan Study
NM HLN MT 32S Stevensville GA 11 $111,600.00 $111,600.00 $0.00 $0.00 Conduct Environmental Study
NM HLN MT 32S Stevensville GA 10 $298,021.00 $298,021.00 $0.00 $0.00 Extend Taxiway, Install Miscellaneous NAVAIDS
NM HLN MT THM Thompson Falls GA 8 $114,300.00 $114,300.00 $0.00 $0.00 Install Airfield Guidance Signs, Rehabilitate Apron, Rehabilitate
Runway 07/25, Rehabilitate Taxiway
NM HLN MT 9U0 Turner GA 6 $216,346.00 $216,346.00 $0.00 $0.00 Construct Fuel Farm
NM HLN MT GGW Wokal Field/Glasgow International GA 18 $125,000.00 $0.00 $125,000.00 $0.00 Wildlife Hazard Assessments
NM HLN MT 6S3 Woltermann Memorial GA 11 $120,831.00 $120,831.00 $0.00 $0.00 Update Airport Master Plan Study
NM HLN MT WYS Yellowstone CS 14 $247,834.00 $247,834.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 01/19, Rehabilitate
Taxiway
NM SEA ID 1U7 Bear Lake County GA 10 $822,291.00 $822,291.00 $0.00 $0.00 Construct Taxiway, Rehabilitate Runway 10/28
NM SEA ID BOI Boise Air Terminal/Gowen Field P 58 $4,694,378.00 $4,694,378.00 $0.00 $0.00 Improve Runway Safety Area - 10L/28R, Improve Service Road,
Rehabilitate Taxiway, Security Enhancements
NM SEA ID 65S Boundary County GA 12 $609,300.00 $609,300.00 $0.00 $0.00 Acquire Land For Approaches
NM SEA ID EUL Caldwell Industrial R 25 $223,158.00 $223,158.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 12/30, Rehabilitate
Taxiway
NM SEA ID EUL Caldwell Industrial R 26 $52,289.00 $52,289.00 $0.00 $0.00 Wildlife Hazard Assessments
NM SEA ID LLJ Challis GA 8 $150,000.00 $150,000.00 $0.00 $0.00 Conduct Environmental Study
NM SEA ID COE Coeur D'Alene - Pappy Boyington Field GA 40 $125,000.00 $0.00 $125,000.00 $0.00 Wildlife Hazard Assessments
NM SEA ID COE Coeur D'Alene - Pappy Boyington Field GA 39 $300,000.00 $0.00 $300,000.00 $0.00 Sustainable Management Plan
NM SEA ID COE Coeur D'Alene - Pappy Boyington Field GA 38 $262,687.00 $262,687.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Taxiway
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 35 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
NM SEA ID U82 Council Municipal GA 5 $188,817.00 $188,817.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 17/35, Rehabilitate
Taxiway
NM SEA ID SUN Friedman Memorial P 39 $2,234,754.00 $2,234,754.00 $0.00 $0.00
Construct Access Road, Construct Apron, Construct Taxiway,
Install Perimeter Fencing, Rehabilitate Apron, Remove
Obstructions
NM SEA ID SUN Friedman Memorial P 38 $691,860.00 $691,860.00 $0.00 $0.00 Construct Runway Safety Area [Phase I - Preliminary Engineering]
- 13/31
NM SEA ID GIC Idaho County GA 14 $711,636.00 $711,636.00 $0.00 $0.00 Rehabilitate Runway 07/25
NM SEA ID IDA Idaho Falls Regional P 38 $2,316,501.00 $2,316,501.00 $0.00 $0.00 Expand Terminal Building
NM SEA ID JER Jerome County GA 14 $130,660.00 $130,660.00 $0.00 $0.00 Rehabilitate Runway 09/27, Rehabilitate Taxiway
NM SEA ID TWF Joslin Field - Magic Valley Regional P 35 $2,578,577.00 $801,826.00 $1,776,751.00 $0.00 Rehabilitate Apron, Rehabilitate Taxiway
NM SEA ID TWF Joslin Field - Magic Valley Regional P 34 $751,423.00 $751,423.00 $0.00 $0.00 Conduct Miscellaneous Study, Rehabilitate Apron, Rehabilitate
Runway 07/25
NM SEA ID SMN Lemhi County GA 16 $2,122,646.00 $1,805,146.00 $317,500.00 $0.00 Extend Runway 17/35, Rehabilitate Taxiway
NM SEA ID LWS Lewiston-Nez Perce County P 34 $468,750.00 $468,750.00 $0.00 $0.00 Update Airport Master Plan Study
NM SEA ID LWS Lewiston-Nez Perce County P 35 $367,172.00 $367,172.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 08/26
NM SEA ID U02 McCarley Field GA 10 $427,109.00 $427,109.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 01/19, Rehabilitate
Taxiway
NM SEA ID PIH Pocatello Regional P 36 $1,005,192.00 $1,005,192.00 $0.00 $0.00
Acquire Snow Removal Equipment, Conduct Miscellaneous
Study, Construct Taxiway, Improve Terminal Building, Security
Enhancements
NM SEA ID 1S6 Priest River Municipal GA 4 $655,560.00 $655,560.00 $0.00 $0.00 Construct Apron, Construct Taxiway, Construct Taxiway, Improve
Access Road, Rehabilitate Apron
NM SEA ID RXE Rexburg-Madison County GA 11 $426,863.00 $426,863.00 $0.00 $0.00 Construct Taxiway, Rehabilitate Apron, Rehabilitate Runway
17/35
NM SEA ID SZT Sandpoint GA 13 $1,007,326.00 $1,007,326.00 $0.00 $0.00 Rehabilitate Apron
NM SEA ID SZT Sandpoint GA 14 $370,000.00 $370,000.00 $0.00 $0.00 Update Airport Master Plan Study
NM SEA ID S83 Shoshone County GA 8 $123,691.00 $123,691.00 $0.00 $0.00 Conduct Airport Master Plan Study
NM SEA ID *IDS State of Idaho 9 $175,000.00 $175,000.00 $0.00 $0.00 Update State System Plan Study
NM SEA ID S87 Weiser Municipal GA 10 $143,390.00 $143,390.00 $0.00 $0.00 Install Miscellaneous Navigational Aids, Rehabilitate Apron,
Rehabilitate Taxiway
NM SEA OR S12 Albany Municipal GA 13 $281,700.00 $281,700.00 $0.00 $0.00 Install Perimeter Fencing
NM SEA OR AST Astoria Regional GA 20 $300,000.00 $300,000.00 $0.00 $0.00 Conduct Environmental Study
NM SEA OR UAO Aurora State GA 17 $139,393.00 $139,393.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Taxiway
NM SEA OR S05 Bandon State GA 7 $165,000.00 $165,000.00 $0.00 $0.00 Update Airport Master Plan Study
NM SEA OR BDN Bend Municipal GA 22 $200,000.00 $200,000.00 $0.00 $0.00 Conduct Environmental Study
NM SEA OR M50 Boardman GA 7 $654,267.00 $654,267.00 $0.00 $0.00 Rehabilitate Apron
NM SEA OR DLS Columbia Gorge Regional/The Dalles
Municipal GA 11 $1,485,000.00 $1,485,000.00 $0.00 $0.00 Construct Taxiway, Rehabilitate Taxiway
NM SEA OR 61S Cottage Grove State GA 7 $360,000.00 $360,000.00 $0.00 $0.00 Install Airport Beacons, Install Guidance Signs, Install Taxiway
Lighting, Rehabilitate Runway 15/33
NM SEA OR PDT Eastern Oregon Regional at Pendleton CS 23 $125,000.00 $0.00 $125,000.00 $0.00 Wildlife Hazard Assessments
NM SEA OR GCD Grant County Regional/Ogilvie Field GA 9 $1,182,261.00 $1,182,261.00 $0.00 $0.00 Rehabilitate Runway 09/27, Rehabilitate Taxiway
NM SEA OR HRI Hermiston Municipal GA 7 $270,000.00 $270,000.00 $0.00 $0.00 Install Perimeter Fencing
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 36 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
NM SEA OR JSY Joseph State GA 9 $155,000.00 $155,000.00 $0.00 $0.00 Install Perimeter Fencing, Remove Obstructions
NM SEA OR LMT Klamath Falls P 34 $627,410.00 $627,410.00 $0.00 $0.00
Environmental Mitigation, Install Runway Distance-To-Go Signs
07/25, Rehabilitate Apron, Rehabilitate Runway 07/25, Wildlife
Hazard Assessments
NM SEA OR LGD La Grande/Union County GA 19 $3,241,063.00 $2,481,740.00 $759,323.00 $0.00 Rehabilitate Runway 12/30
NM SEA OR 9S9 Lexington GA 7 $133,000.00 $133,000.00 $0.00 $0.00 Update Airport Master Plan Study
NM SEA OR EUG Mahlon Sweet Field P 49 $459,375.00 $459,375.00 $0.00 $0.00 Acquire Friction Measuring Equipment, Security Enhancements
[Phase 1 - Design], Wildlife Hazard Assessments
NM SEA OR SLE McNary Field GA 18 $2,938,199.00 $2,938,199.00 $0.00 $0.00 Install Airfield Guidance Signs
NM SEA OR 4S9 Mulino State GA 11 $125,000.00 $125,000.00 $0.00 $0.00 Remove Obstructions
NM SEA OR ONP Newport Municipal GA 22 $1,860,854.00 $35,854.00 $1,825,000.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate
Runway 16/34, Wildlife Hazard Assessments
NM SEA OR ONO Ontario Municipal GA 11 $617,655.00 $617,655.00 $0.00 $0.00 Install Miscellaneous Navigational Aids, Rehabilitate Taxiway
NM SEA OR PDX Portland International P 71 $5,000,000.00 $0.00 $5,000,000.00 $0.00 Rehabilitate Taxiway
NM SEA OR PDX Portland International P 70 $5,403,034.00 $3,403,034.00 $2,000,000.00 $0.00 Rehabilitate Taxiway
NM SEA OR S39 Prineville GA 12 $209,387.00 $209,387.00 $0.00 $0.00 Install Miscellaneous Navigational Aids, Install Weather
Reporting Equipment
NM SEA OR S39 Prineville GA 11 $200,000.00 $200,000.00 $0.00 $0.00 Update Airport Master Plan Study
NM SEA OR RDM Roberts Field P 37 $325,000.00 $0.00 $325,000.00 $0.00 Sustainable Management Plan
NM SEA OR RDM Roberts Field P 36 $1,320,000.00 $1,195,000.00 $125,000.00 $0.00
Acquire Snow Removal Equipment, Rehabilitate Runway 04/22,
Rehabilitate Runway Lighting - 04/22, Wildlife Hazard
Assessments
NM SEA OR MFR Rogue Valley International - Medford P 39 $7,458,024.00 $2,349,058.00 $5,108,966.00 $0.00 Rehabilitate Runway 14/32
NM SEA OR SPB Scappoose Industrial Airpark GA 20 $299,281.00 $299,281.00 $0.00 $0.00 Install Airfield Guidance Signs, Remove Obstructions
NM SEA OR S45 Siletz Bay State GA 7 $488,205.00 $488,205.00 $0.00 $0.00 Install Miscellaneous Navigational Aids, Rehabilitate Apron,
Rehabilitate Taxiway
NM SEA OR OTH Southwest Oregon Regional P 37 $1,000,000.00 $1,000,000.00 $0.00 $0.00 Construct Terminal Building
NM SEA OR *ORS State of Oregon 12 $272,376.00 $272,376.00 $0.00 $0.00 Update State System Plan Study
NM SEA OR TMK Tillamook GA 14 $305,565.00 $305,565.00 $0.00 $0.00 Install Perimeter Fencing
NM SEA OR *ORV Various Locations in Oregon 27 $248,766.00 $248,766.00 $0.00 $0.00
Rehabilitate Apron (Albany Municipal; Independence State;
McMinnville Municipal; McNary Field; Newport Municipal;
Portland-Hillsboro; Portland-Troutdale; Scappoose Industrial
Airpark), Rehabilitate Runway (Aurora State - 17/35; Corvallis
Municipal - 09/27)
NM SEA OR *ORV Various Locations in Oregon 28 $299,060.00 $299,060.00 $0.00 $0.00 Rehabilitate Runway (Corvallis Municipal - 17/35)
NM SEA OR 35S Wasco State GA 5 $50,000.00 $50,000.00 $0.00 $0.00 Install Miscellaneous NAVAIDS
NM SEA WA S97 Anderson Field GA 3 $151,290.00 $151,290.00 $0.00 $0.00 Install Miscellaneous NAVAIDS
NM SEA WA AWO Arlington Municipal GA 24 $1,077,214.00 $1,077,214.00 $0.00 $0.00 Install Airfield Guidance Signs, Install Taxiway Lighting, Wildlife
Hazard Assessments
NM SEA WA S50 Auburn Municipal R 19 $63,000.00 $63,000.00 $0.00 $0.00 Wildlife Hazard Assessments
NM SEA WA S50 Auburn Municipal R 20 $238,307.00 $238,307.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 16/34
NM SEA WA BLI Bellingham International P 50 $495,180.00 $495,180.00 $0.00 $0.00 Construct Deicing Containment Facility
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 37 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
NM SEA WA BLI Bellingham International P 51 $586,650.00 $586,650.00 $0.00 $0.00 Construct Apron, Rehabilitate Apron
NM SEA WA BFI Boeing Field/King County International P 50 $1,756,435.00 $1,756,435.00 $0.00 $0.00 Rehabilitate Taxiway
NM SEA WA BFI Boeing Field/King County International P 49 $3,500,000.00 $0.00 $3,500,000.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
NM SEA WA HQM Bowerman GA 12 $160,651.00 $160,651.00 $0.00 $0.00 Update Airport Master Plan Study
NM SEA WA PWT Bremerton National GA 27 $151,045.00 $151,045.00 $0.00 $0.00 Rehabilitate Runway 01/19
NM SEA WA PWT Bremerton National GA 28 $500,000.00 $500,000.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Taxiway
NM SEA WA CLS Chehalis-Centralia GA 15 $91,200.00 $91,200.00 $0.00 $0.00 Construct Snow Removal Equipment Building, Rehabilitate
Runway 16/34
NM SEA WA TDO Ed Carlson Memorial Field - South Lewis
County GA 7 $146,266.00 $146,266.00 $0.00 $0.00 Update Airport Master Plan Study
NM SEA WA SFF Felts Field R 28 $1,641,111.00 $1,641,111.00 $0.00 $0.00 Acquire Land For Approaches
NM SEA WA SFF Felts Field R 27 $1,564,560.00 $1,564,560.00 $0.00 $0.00 Rehabilitate Apron
NM SEA WA FHR Friday Harbor P 29 $220,500.00 $220,500.00 $0.00 $0.00
Improve Airport Drainage, Install Miscellaneous Navigational
Aids, Install Runway Vertical/Visual Guidance System - 16/34,
Rehabilitate Runway Lighting - 16/34
NM SEA WA 3W7 Grand Coulee Dam GA 5 $267,916.00 $267,916.00 $0.00 $0.00 Acquire Snow Removal Equipment, Construct Snow Removal
Equipment Building
NM SEA WA MWH Grant County International GA 39 $302,860.00 $302,860.00 $0.00 $0.00 Update Airport Master Plan Study
NM SEA WA 0S9 Jefferson County International GA 12 $455,083.00 $455,083.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 09/27, Rehabilitate
Taxiway
NM SEA WA 43D Odessa Municipal GA 6 $153,106.00 $153,106.00 $0.00 $0.00 Extend Runway 02/20, Install Miscellaneous NAVAIDS
NM SEA WA OLM Olympia Regional GA 24 $2,249,939.00 $1,570,880.00 $679,059.00 $0.00 Construct Taxiway, Install Miscellaneous NAVAIDS, Rehabilitate
Taxiway
NM SEA WA ORS Orcas Island CS 12 $147,600.00 $147,600.00 $0.00 $0.00 Conduct Environmental Study
NM SEA WA 55S Packwood GA 4 $45,481.00 $45,481.00 $0.00 $0.00 Improve Runway Safety Area - 01/19, Rehabilitate Runway 01/19
NM SEA WA EAT Pangborn Memorial P 35 $9,865,068.00 $1,924,452.00 $7,940,616.00 $0.00 Extend Runway 12/30, Rehabilitate Taxiway
NM SEA WA VUO Pearson Field GA 9 $355,126.00 $355,126.00 $0.00 $0.00
Install Airfield Guidance Signs, Install Miscellaneous Navigational
Aids, Rehabilitate Apron, Rehabilitate Runway 08/26,
Rehabilitate Taxiway
NM SEA WA PLU Pierce County - Thun Field GA 15 $121,500.00 $121,500.00 $0.00 $0.00 Install Runway Lighting - 16/34
NM SEA WA 33S Pru Field GA 6 $275,018.00 $275,018.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 01/19, Rehabilitate
Taxiway
NM SEA WA PUW Pullman/Moscow Regional P 39 $136,800.00 $136,800.00 $0.00 $0.00 Rehabilitate Terminal Building
NM SEA WA RNT Renton Municipal R 25 $100,000.00 $100,000.00 $0.00 $0.00 Wildlife Hazard Assessments
NM SEA WA RNT Renton Municipal R 24 $7,150,000.00 $150,000.00 $7,000,000.00 $0.00 Improve Service Road, Rehabilitate Taxiway, Remove
Obstructions
NM SEA WA RLD Richland GA 25 $241,489.00 $241,489.00 $0.00 $0.00 Install Perimeter Fencing
NM SEA WA SHN Sanderson Field GA 12 $600,000.00 $600,000.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 05/23
NM SEA WA SEA Seattle-Tacoma International P 132 $3,547,527.00 $0.00 $3,547,527.00 $0.00 VALE Infrastructure
NM SEA WA SEA Seattle-Tacoma International P 130 $5,878,694.00 $5,878,694.00 $0.00 $0.00 Construct Runway 16R/34L [Phase 21]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 38 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
NM SEA WA SEA Seattle-Tacoma International P 131 $3,900,000.00 $0.00 $3,900,000.00 $0.00 Noise Mitigation Measures for Public Buildings
NM SEA WA PAE Snohomish County (Paine Field) R 54 $870,256.00 $0.00 $870,256.00 $0.00 Rehabilitate Runway 16L/34R
NM SEA WA PAE Snohomish County (Paine Field) R 53 $773,915.00 $150,000.00 $623,915.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
NM SEA WA GEG Spokane International P 50 $13,896,565.00 $7,896,565.00 $6,000,000.00 $0.00 Rehabilitate Taxiways
NM SEA WA GEG Spokane International P 51 $7,035,721.00 $0.00 $7,035,721.00 $0.00 Construct Aircraft Rescue & Fire Fighting Building
NM SEA WA 1S5 Sunnyside Municipal GA 6 $257,266.00 $257,266.00 $0.00 $0.00 Install Weather Reporting Equipment
NM SEA WA PSC Tri-Cities P 40 $3,014,139.00 $3,014,139.00 $0.00 $0.00 Rehabilitate Taxiway
NM SEA WA 2S1 Vashon Municipal GA 5 $470,531.00 $470,531.00 $0.00 $0.00 Improve Runway Safety Area - 17/35
NM SEA WA 2S8 Wilbur GA 11 $409,889.00 $409,889.00 $0.00 $0.00 Construct Taxiway, Install Weather Reporting Equipment
NM SEA WA CLM William R Fairchild International CS 32 $931,015.00 $931,015.00 $0.00 $0.00 Construct Apron
NM SEA WA YKM Yakima Air Terminal/McAllister Field P 37 $4,400,000.00 $0.00 $4,400,000.00 $0.00 Rehabilitate Taxiway
NM SEA WA YKM Yakima Air Terminal/McAllister Field P 35 $773,100.00 $773,100.00 $0.00 $0.00 Rehabilitate Apron
NM SEA WA YKM Yakima Air Terminal/McAllister Field P 36 $5,654,597.00 $1,654,597.00 $4,000,000.00 $0.00 Install Miscellaneous Navigational Aids, Rehabilitate Taxiway
SO ATL GA AGS Augusta Regional at Bush Field P 36 $568,401.00 $568,401.00 $0.00 $0.00 Update Airport Master Plan Study [Conduct Master Plan]
SO ATL GA BQK Brunswick Golden Isles P 35 $2,818,006.00 $0.00 $2,818,006.00 $0.00 Rehabilitate Taxiway "A" [Reconstruction]
SO ATL GA BQK Brunswick Golden Isles P 34 $11,724,854.00 $1,242,818.00 $10,482,036.00 $0.00 Rehabilitate Runway 07/25 [Construction]
SO ATL GA CSG Columbus Metropolitan P 38 $384,678.00 $384,678.00 $0.00 $0.00 Rehabilitate Apron [General Aviation Apron], Security
Enhancements [Phase I - Design]
SO ATL GA *GAB Georgia State Block Grant Program 12 $27,313,471.00 $19,703,471.00 $7,610,000.00 $0.00 Non primary development projects in state block grant program
SO ATL GA *GAB Georgia State Block Grant Program 13 $10,260,000.00 $0.00 $10,260,000.00 $0.00 Non primary development projects in state block grant program
SO ATL GA ATL Hartsfield - Jackson Atlanta International P 111 $45,000.00 $0.00 $45,000.00 $0.00 VALE Vehicle [VALE - conversion of 4 vehicles to natural gas use]
SO ATL GA ATL Hartsfield - Jackson Atlanta International P 109 $9,129,810.00 $8,707,935.00 $421,875.00 $0.00
Acquire Equipment [Automatic Dependent Surveillance
Broadcast Squitters], Rehabilitate Runway 08L/26R [Phase I
Reconstruct center keel section]
SO ATL GA SAV Savannah/Hilton Head International P 54 $4,450,826.00 $3,750,826.00 $700,000.00 $0.00
Construct Taxiway [North Airfield Development - Final Phase V-C,
Extend Taxiway "A"], Construct Taxiway [North Airfield
Development - Phase VIIIa Construct Taxiway "H"], Improve
Runway Safety Area - 01/19, Rehabilitate Runway Lighting
10/28
SO ATL GA ABY Southwest Georgia Regional P 41 $1,527,642.00 $1,527,642.00 $0.00 $0.00 Construct Terminal Building [Phase V-C, airport access & demo
old terminal], Expand Apron
SO ATL GA ABY Southwest Georgia Regional P 40 $150,519.00 $150,519.00 $0.00 $0.00 Construct Terminal Building [Phase V-A - Relocate FAA
equipment (site preparation & implementation)]
SO ATL GA ABY Southwest Georgia Regional P 42 $350,676.00 $350,676.00 $0.00 $0.00 Construct Terminal Building [Phase V-B - Relocate FAA
equipment (Building construction)]
SO ATL GA VLD Valdosta Regional P 30 $299,790.00 $299,790.00 $0.00 $0.00
Conduct Miscellaneous Study, Expand Apron [Design - Phase I],
Install Emergency Generator [Design - Phase I], Modify Terminal
Building [Design/Bid]
SO ATL PR SIG Fernando Luis Ribas Dominicci P 8 $62,039.00 $62,039.00 $0.00 $0.00 Wildlife Hazard Assessments [Conduct Wildlife Hazard
Asessment]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 39 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO ATL PR SJU Luis Munoz Marin International P 49 $30,800.00 $30,800.00 $0.00 $0.00 Extend Taxiway "S" [Design]
SO ATL SC AIK Aiken Municipal GA 16 $172,021.00 $172,021.00 $0.00 $0.00 Install Perimeter Fencing [Design and Construction]
SO ATL SC 88J Allendale County GA 13 $142,500.00 $142,500.00 $0.00 $0.00 Install Perimeter Fencing [Design], Remove Obstructions [Design
and Construction]
SO ATL SC AND Anderson Regional GA 19 $520,573.00 $450,000.00 $70,573.00 $0.00 Acquire Easement For Approaches [Phase I], Wildlife Hazard
Assessments
SO ATL SC BNL Barnwell Regional GA 11 $127,555.00 $127,555.00 $0.00 $0.00 Update Airport Master Plan Study
SO ATL SC MKS Berkeley County GA 19 $525,323.00 $525,323.00 $0.00 $0.00
Acquire Easement For Approaches [Runway 23 Approach - Phase
I], Acquire Land For Approaches, Remove Obstructions [Runway
23 Approach - Design]
SO ATL SC JZI Charleston Executive GA 19 $45,004.00 $45,004.00 $0.00 $0.00 Install Perimeter Fencing [Extend Security Fencing - Design]
SO ATL SC CAE Columbia Metropolitan P 42 $3,636,337.00 $3,636,337.00 $0.00 $0.00
Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft
Rescue & Fire Fighting Building [Phase I - Design], Improve
Terminal Building [Phase IV]
SO ATL SC UDG Darlington County Jetport GA 13 $46,424.00 $46,424.00 $0.00 $0.00 Rehabilitate Apron [Phase 2 Design and Bidding]
SO ATL SC FLO Florence Regional P 31 $99,124.00 $99,124.00 $0.00 $0.00
Install Emergency Generator [Phase 1 - Design], Install Taxiway
Lighting [Phase I - Taxiway "B" (North), "D" & "E" (Design Only)],
Modify Terminal Building [Design Services], Remove Obstructions
SO ATL SC GGE Georgetown County GA 15 $1,846,916.00 $192,048.00 $1,654,868.00 $0.00 Rehabilitate Taxiway [Parallel Taxiway - Phase II - Construction]
SO ATL SC CRE Grand Strand GA 18 $999,714.00 $999,714.00 $0.00 $0.00 Construct Apron [Construction - Phase II]
SO ATL SC GMU Greenville Downtown GA 22 $789,767.00 $789,767.00 $0.00 $0.00 Install Airfield Guidance Signs [Construction], Install Taxiway
Lighting [Construction]
SO ATL SC GSP Greenville Spartanburg International P 48 $11,750,913.00 $11,750,913.00 $0.00 $0.00 Rehabilitate Apron [Design], Rehabilitate Terminal Building
SO ATL SC GRD Greenwood County GA 14 $150,752.00 $150,752.00 $0.00 $0.00 Rehabilitate Runway 09/27 [Design]
SO ATL SC HVS Hartsville Regional GA 14 $944,847.00 $150,000.00 $794,847.00 $0.00 Construct Runway Safety Area - 03/21
SO ATL SC CUB Jim Hamilton L.B. Owens R 19 $201,114.00 $201,114.00 $0.00 $0.00 Acquire Land for Development, Construct Taxiway [Taxiway "A"
Extension, Phase III - Environmental Permiting]
SO ATL SC 6J0 Lexington County at Pelion GA 14 $300,000.00 $300,000.00 $0.00 $0.00 Construct Taxiway, Install Perimeter Fencing
SO ATL SC LRO Mt Pleasant Regional-Faison Field GA 17 $122,623.00 $122,623.00 $0.00 $0.00 Improve Runway Safety Area [Construction - Runway 17 End]
17/35
SO ATL SC MYR Myrtle Beach International P 52 $3,751,741.00 $0.00 $3,751,741.00 $0.00 Construct Apron [Apron & Taxiway Design & Construction]
SO ATL SC MYR Myrtle Beach International P 51 $3,832,699.00 $3,832,699.00 $0.00 $0.00 Expand Terminal Building [Phase IV]
SO ATL SC OGB Orangeburg Municipal GA 19 $92,202.00 $92,202.00 $0.00 $0.00 Construct Fuel Farm [Design and Permitting]
SO ATL SC PYG Pageland GA 10 $181,398.00 $181,398.00 $0.00 $0.00 Construct Fuel Farm [Construction], Construct Taxiway
[Construct Taxiway]
SO ATL SC LQK Pickens County GA 20 $243,450.00 $243,450.00 $0.00 $0.00 Acquire Land For Approaches
SO ATL SC PHH Robert F Swinnie GA 7 $186,698.00 $186,698.00 $0.00 $0.00 Construct Taxiway [Taxiway to Hangar Area - Construction]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 40 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO ATL SC UZA Rock Hill/York County/Bryant Field R 24 $150,000.00 $150,000.00 $0.00 $0.00 Rehabilitate Apron [Design], Rehabilitate Taxiway [Design]
SO ATL SC SPA Spartanburg Downtown Memorial GA 18 $90,220.00 $90,220.00 $0.00 $0.00 Acquire Land For Approaches
SO ATL SC *SCS State of South Carolina 13 $481,377.00 $481,377.00 $0.00 $0.00 Update State System Plan Study
SO ATL SC SMS Sumter GA 18 $514,975.00 $514,975.00 $0.00 $0.00
Acquire Land For Approaches [Phase 3 - Runway 23 Approach],
Construct Apron [Phase 1 Design], Construct Taxiway [Taxilane
Phase 1 - Design]
SO ATL SC 35A Union County, Troy Shelton Field GA 8 $387,747.00 $387,747.00 $0.00 $0.00 Remove Obstructions [Construction], Update Airport Master Plan
Study
SO ATL SC *SCV Various Locations in South Carolina 19 $1,391,945.00 $1,301,945.00 $90,000.00 $0.00
Construct Building (Marion County), Install Perimeter Fencing
(Barnwell Regional), Rehabilitate Runway (Lexington County at
Pelion - 18/36), Remove Obstructions (Lexington County at
Pelion), Wildlife Hazard Assessments (Donaldson Center)
SO ATL SC CDN Woodward Field GA 20 $549,000.00 $150,000.00 $399,000.00 $0.00 Improve Runway Safety Area [Land Acquisition and Design for
Standard Runway Safety Area (Phase 3 of 5)] - 06/24
SO ATL VI STT Cyril E King P 32 $5,866,383.00 $5,866,383.00 $0.00 $0.00 Install Perimeter Fencing required by 49 CFR 1542, Rehabilitate
Apron [Rehabilitate General Aviation Apron]
SO ATL VI STX Henry E Rohlsen P 33 $4,819,420.00 $1,738,521.00 $3,080,899.00 $0.00 Rehabilitate Apron [Phase I - Construction], Update
Miscellaneous Study
SO JAN AL 8A0 Albertville Regional-Thomas J Brumlik Field GA 23 $275,718.00 $275,718.00 $0.00 $0.00 Construct Apron
SO JAN AL ANB Anniston Regional GA 29 $465,300.00 $465,300.00 $0.00 $0.00 Install Perimeter Fencing [Phase I]
SO JAN AL 26A Ashland/Lineville GA 9 $243,035.00 $243,035.00 $0.00 $0.00 Acquire Land For Approaches
SO JAN AL 0R1 Atmore Municipal GA 10 $36,756.00 $36,756.00 $0.00 $0.00 Conduct Environmental Study [Environmental Assessment for
Runway 18/36 Safety Area Improvements]
SO JAN AL AUO Auburn University Regional GA 28 $1,028,398.00 $1,028,398.00 $0.00 $0.00 Construct Taxiway [Construct hangar access taxiway]
SO JAN AL EKY Bessemer R 12 $357,214.00 $357,214.00 $0.00 $0.00 Rehabilitate Apron
SO JAN AL 0A8 Bibb County GA 10 $21,399.00 $21,399.00 $0.00 $0.00 Rehabilitate Runway 10/28 [Marking Only]
SO JAN AL BHM Birmingham-Shuttlesworth International P 91 $2,847,790.00 $0.00 $2,847,790.00 $0.00 VALE Infrastructure
SO JAN AL BHM Birmingham-Shuttlesworth International P 88 $1,916,682.00 $0.00 $1,916,682.00 $0.00 Rehabilitate Runway 06/24 [Runway 24 End]
SO JAN AL BHM Birmingham-Shuttlesworth International P 89 $946,182.00 $946,182.00 $0.00 $0.00 Remove Obstructions
SO JAN AL BHM Birmingham-Shuttlesworth International P 90 $6,001,875.00 $3,642,375.00 $2,359,500.00 $0.00 Security Enhancements [Terminal Security]
SO JAN AL 71J Blackwell Field GA 14 $107,315.00 $107,315.00 $0.00 $0.00
Construct Access Road [Phase 1 - Design Only], Construct Apron
[Phase 1 - Design Only], Construct Taxiway [Phase 1 - Design
Only], Construct Terminal Building [Site Design Only]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 41 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO JAN AL 12J Brewton Municipal GA 11 $73,570.00 $73,570.00 $0.00 $0.00 Rehabilitate Airport Beacons, Update Airport Master Plan Study
SO JAN AL 09A Butler-Choctaw County GA 5 $546,510.00 $546,510.00 $0.00 $0.00
Acquire Land For Approaches, Rehabilitate Runway 11/29 [Crack
seal, sealcoat, and marking], Rehabilitate Runway Lighting
11/29
SO JAN AL 61A Camden Municipal GA 8 $31,319.00 $31,319.00 $0.00 $0.00 Install Perimeter Fencing [Design Only], Rehabilitate Runway
18/36 [Displace Runway 18 Threshold - Design Only]
SO JAN AL 14J Carl Folsom GA 9 $458,482.00 $458,482.00 $0.00 $0.00 Construct Taxiway [Connecting Taxiway and Lighting
Construction (Phase 2)]
SO JAN AL 02A Chilton County GA 10 $1,557,562.00 $46,331.00 $1,511,231.00 $0.00
Install Runway Vertical/Visual Guidance System - 08/26,
Rehabilitate Runway 08/26 [Construction], Rehabilitate Runway
Lighting - 08/26
SO JAN AL 11A Clayton Municipal GA 4 $80,283.00 $80,283.00 $0.00 $0.00 Install Miscellaneous Navigational Aids, Install Perimeter Fencing
SO JAN AL 9A4 Courtland GA 11 $57,600.00 $57,600.00 $0.00 $0.00 Rehabilitate Taxiway
SO JAN AL SEM Craig Field GA 13 $199,951.00 $199,951.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 15/33
SO JAN AL CMD Cullman Regional-Folsom Field GA 20 $540,180.00 $540,180.00 $0.00 $0.00 Acquire Land For Approaches, Rehabilitate Apron
SO JAN AL 4R9 Dauphin Island GA 11 $337,152.00 $337,152.00 $0.00 $0.00 Acquire Land For Approaches [Phase 6], Install Perimeter Fencing
SO JAN AL DYA Demopolis Municipal GA 11 $527,400.00 $527,400.00 $0.00 $0.00 Install Perimeter Fencing [Phase 1], Remove Obstructions [Phase
2]
SO JAN AL DHN Dothan Regional P 36 $161,111.00 $161,111.00 $0.00 $0.00 Rehabilitate Apron [General Aviation Apron (Design Only)]
SO JAN AL EDN Enterprise Municipal GA 18 $339,726.00 $339,726.00 $0.00 $0.00 Conduct Environmental Study, Install Weather Reporting
Equipment, Modify Terminal Building
SO JAN AL 5R4 Foley Municipal GA 11 $604,193.00 $604,193.00 $0.00 $0.00
Construct Fuel Farm, Install Runway Vertical/Visual Guidance
System - 18/36, Rehabilitate Runway 18/36 [Relocate Runway 36
threshold]
SO JAN AL 33J Geneva Municipal GA 10 $60,685.00 $60,685.00 $0.00 $0.00 Rehabilitate Runway 11/29
SO JAN AL 7A0 Greensboro Municipal GA 4 $184,749.00 $184,749.00 $0.00 $0.00 Rehabilitate Runway Lighting - 18/36
SO JAN AL 8A1 Guntersville Municipal - Joe Starnes Field GA 17 $6,297,014.00 $1,297,014.00 $5,000,000.00 $0.00 Construct Runway [site preparation, clearing, stream mitigation],
Update Airport Master Plan Study
SO JAN AL 5M0 Hartselle-Morgan County Regional GA 13 $297,000.00 $297,000.00 $0.00 $0.00 Expand Apron
SO JAN AL HSV Huntsville International-Carl T Jones Field P 71 $350,000.00 $0.00 $350,000.00 $0.00 Sustainable Management Plan
SO JAN AL HSV Huntsville International-Carl T Jones Field P 72 $15,750,761.00 $0.00 $15,750,761.00 $0.00 Rehabilitate Runway 18L/36R
SO JAN AL 4A9 Isbell Field GA 19 $70,000.00 $70,000.00 $0.00 $0.00 Rehabilitate Apron
SO JAN AL JKA Jack Edwards GA 27 $151,535.00 $151,535.00 $0.00 $0.00 Rehabilitate Runway 09/27 [Seal cracks and remark]
SO JAN AL 4R3 Jackson Municipal GA 9 $837,388.00 $552,785.00 $284,603.00 $0.00 Improve Runway Safety Area [Runway 19 End] - 01/19
SO JAN AL PRN MacCrenshaw Memorial GA 11 $52,457.00 $52,457.00 $0.00 $0.00 Construct Taxiway [Taxilanes for Hangar Access (Phase 1 - Design
Only)]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 42 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO JAN AL MDQ Madison County Executive/Tom Sharp Jr
Field GA 24 $1,172,264.00 $1,172,264.00 $0.00 $0.00 Construct Apron
SO JAN AL HAB Marion County-Rankin Fite GA 11 $193,500.00 $193,500.00 $0.00 $0.00 Install Taxiway Lighting
SO JAN AL GZH Middleton Field GA 11 $332,154.00 $332,154.00 $0.00 $0.00 Acquire Land For Approaches, Extend Taxiway [Phase 1 - Design
Only]
SO JAN AL BFM Mobile Downtown GA 27 $15,015,736.00 $308,400.00 $14,707,336.00 $0.00 Construct Taxiway [Realign Taxiway "A" (Phase 1)], Construct
Taxiway [Realign Taxiway "A" (Phase 2)]
SO JAN AL MOB Mobile Regional P 51 $3,369,428.00 $2,038,330.00 $1,331,098.00 $0.00 Improve Airport Drainage [Construction], Install Guidance Signs
[Replace airfield signage (Construction)]
SO JAN AL MVC Monroe County GA 10 $258,105.00 $258,105.00 $0.00 $0.00 Acquire Land For Approaches [Runway 21 End]
SO JAN AL MGM Montgomery Regional (Dannelly Field) P 44 $141,750.00 $141,750.00 $0.00 $0.00 Improve Runway Safety Area [Design Only] - 10/28, Wildlife
Hazard Assessments
SO JAN AL 06A Moton Field Municipal GA 16 $96,167.00 $96,167.00 $0.00 $0.00 Install Perimeter Fencing [Fence stream crossings, environmental
for fenceline clearing], Update Airport Master Plan Study
SO JAN AL GAD Northeast Alabama Regional GA 14 $2,117,461.00 $225,861.00 $1,891,600.00 $0.00 Rehabilitate Runway 06/24 [Construction]
SO JAN AL MSL Northwest Alabama Regional CS 32 $95,000.00 $0.00 $95,000.00 $0.00 Wildlife Hazard Assessments
SO JAN AL MSL Northwest Alabama Regional CS 31 $200,000.00 $0.00 $200,000.00 $0.00 Rehabilitate Terminal Building
SO JAN AL 1M4 Posey Field GA 9 $113,651.00 $113,651.00 $0.00 $0.00 Improve Access Road
SO JAN AL 1A9 Prattville - Grouby Field GA 15 $307,600.00 $307,600.00 $0.00 $0.00 Improve Airport Drainage, Install Weather Reporting Equipment
SO JAN AL 7A5 Roanoke Municipal GA 8 $27,900.00 $27,900.00 $0.00 $0.00 Acquire Land For Approaches
SO JAN AL 20A Robbins Field GA 9 $425,342.00 $425,342.00 $0.00 $0.00 Remove Obstructions [Tree removal]
SO JAN AL 4A6 Scottsboro Municipal-Word Field GA 17 $86,155.00 $86,155.00 $0.00 $0.00 Strengthen Runway 04/22 [Overlay (Design Only)]
SO JAN AL 79J South Alabama Regional at Bill Benton Field GA 18 $75,334.00 $75,334.00 $0.00 $0.00 Improve Airport Erosion Control
SO JAN AL PLR St Clair County R 15 $1,018,900.00 $174,900.00 $844,000.00 $0.00 Rehabilitate Taxiway [Parallel Taxiway (Construction)]
SO JAN AL ASN Talladega Municipal GA 24 $150,000.00 $150,000.00 $0.00 $0.00 Construct Access Road, Rehabilitate Runway 04/22, Rehabilitate
Taxiway [Sealcoat & Mark relocated Parallel Taxiway]
SO JAN AL ASN Talladega Municipal GA 25 $1,321,996.00 $0.00 $1,321,996.00 $0.00 Construct Apron [Phase III - Construct cargo apron]
SO JAN AL ALX Thomas C Russell Field GA 15 $133,200.00 $133,200.00 $0.00 $0.00 Extend Taxiway [Parallel Taxiway - Design]
SO JAN AL TOI Troy Municipal GA 14 $175,196.00 $175,196.00 $0.00 $0.00 Remove Obstructions, Update Airport Master Plan Study
SO JAN AL TCL Tuscaloosa Regional GA 29 $99,000.00 $1,233.00 $97,767.00 $0.00 Wildlife Hazard Assessments
SO JAN AL A08 Vaiden Field GA 8 $294,818.00 $294,818.00 $0.00 $0.00 Install Weather Reporting Equipment [Construction]
SO JAN AL JFX Walker County-Bevill Field GA 16 $94,500.00 $94,500.00 $0.00 $0.00 Extend Taxiway
SO JAN AL EUF Weedon Field GA 18 $38,952.00 $38,952.00 $0.00 $0.00 Construct Fuel Farm [Phase 1 - Design]
SO JAN AL 08A Wetumpka Municipal GA 14 $220,338.00 $220,338.00 $0.00 $0.00 Install Perimeter Fencing, Update Airport Master Plan Study
SO JAN MS 9M4 Ackerman Choctaw County GA 8 $146,924.00 $146,924.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 01/19, Rehabilitate
Taxiway
SO JAN MS 1M2 Belzoni Municipal GA 13 $111,150.00 $111,150.00 $0.00 $0.00 Acquire Land for Development
SO JAN MS 8M1 Booneville/Baldwyn GA 14 $26,100.00 $26,100.00 $0.00 $0.00 Remove Obstructions
SO JAN MS MBO Bruce Campbell Field GA 21 $150,000.00 $150,000.00 $0.00 $0.00 Remove Obstructions
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 43 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO JAN MS 19M C. A. Moore GA 14 $221,936.00 $221,936.00 $0.00 $0.00 Improve Airport Drainage, Install Perimeter Fencing
SO JAN MS 04M Calhoun County GA 10 $256,460.00 $256,460.00 $0.00 $0.00 Construct Building, Construct Taxiway
SO JAN MS 23M Clarke County GA 13 $61,965.00 $61,965.00 $0.00 $0.00 Acquire Land for Development, Rehabilitate Runway 16/34
[Relocate threshold (surveying and preliminary engineering only)]
SO JAN MS 0R0 Columbia-Marion County GA 10 $67,897.00 $67,897.00 $0.00 $0.00 Rehabilitate Runway Lighting - 05/23, Remove Obstructions
[Runway 05 Approach]
SO JAN MS UBS Columbus-Lowndes County GA 15 $80,307.00 $80,307.00 $0.00 $0.00 Install Miscellaneous Navigational Aids, Update Airport Master
Plan Study
SO JAN MS M24 Dean Griffin Memorial GA 13 $1,802,986.00 $1,802,986.00 $0.00 $0.00 Improve Runway Safety Area [Shift runway south, widen runway
Phase 1 - Construction)] - 17/35
SO JAN MS CKM Fletcher Field GA 19 $229,882.00 $229,882.00 $0.00 $0.00 Construct Taxiway [Phase 1 - Sitework]
SO JAN MS CKM Fletcher Field GA 20 $193,500.00 $193,500.00 $0.00 $0.00 Construct Taxiway [Phase 2 - Paving]
SO JAN MS 2M4 G. V. Montgomery GA 9 $26,865.00 $26,865.00 $0.00 $0.00
Construct Terminal Building [Design Only], Install Miscellaneous
Navigational Aids [Rotating beacon tower (Design Only)],
Rehabilitate Access Road [Design Only]
SO JAN MS GTR Golden Triangle Regional P 51 $2,743,879.00 $554,551.00 $2,189,328.00 $0.00 Rehabilitate Taxiway
SO JAN MS GTR Golden Triangle Regional P 50 $342,934.00 $342,934.00 $0.00 $0.00 Rehabilitate Runway 18/36, Rehabilitate Taxiway
SO JAN MS GWO Greenwood-Leflore GA 15 $323,771.00 $323,771.00 $0.00 $0.00 Widen Taxiway [Phase 1 - Design of "A" and "B" and Construction
of "B"]
SO JAN MS GNF Grenada Municipal GA 10 $327,897.00 $327,897.00 $0.00 $0.00 Improve Airport Drainage, Rehabilitate Apron
SO JAN MS GPT Gulfport-Biloxi International P 81 $4,724,703.00 $4,724,703.00 $0.00 $0.00
Expand Terminal Building, Improve Airport Drainage [Improve
airfield drainage (Phase 1)], Install Perimeter Fencing [Phase 1],
Rehabilitate Runway [Rehabilitate runway touch down zones]
SO JAN MS HBG Hattiesburg Bobby L Chain Municipal GA 20 $1,070,125.00 $280,490.00 $789,635.00 $0.00
Improve Runway Safety Area [Culvert ditch and grade safety
area] - 13/31, Update Airport Master Plan Study [Airport Layout
Plan and Narrative Report]
SO JAN MS PIB Hattiesburg-Laurel Regional P 34 $709,048.00 $709,048.00 $0.00 $0.00 Rehabilitate Runway 18/36 [Design Only], Rehabilitate Taxiway
[Design Only], Rehabilitate Terminal Building
SO JAN MS HKS Hawkins Field GA 14 $326,561.00 $326,561.00 $0.00 $0.00 Rehabilitate Runway 16/34 [Design Only]
SO JAN MS LUL Hesler-Noble Field GA 8 $597,706.00 $597,706.00 $0.00 $0.00 Construct Access Road, Construct Taxiway [Construct hangar
access taxiway]
SO JAN MS M44 Houston Municipal GA 13 $231,000.00 $231,000.00 $0.00 $0.00 Expand Apron
SO JAN MS 4R1 I H Bass Jr Memorial GA 11 $56,102.00 $56,102.00 $0.00 $0.00 Acquire Land For Approaches
SO JAN MS IDL Indianola Municipal GA 16 $147,347.00 $147,347.00 $0.00 $0.00 Construct Building, Rehabilitate Runway 18/36
SO JAN MS 15M Iuka GA 9 $182,025.00 $182,025.00 $0.00 $0.00
Expand Apron, Install Runway Vertical/Visual Guidance System
18/36, Rehabilitate Apron, Rehabilitate Runway 18/36,
Rehabilitate Taxiway
SO JAN MS JAN Jackson-Evers International P 48 $4,114,350.00 $4,114,350.00 $0.00 $0.00 Security Enhancements [Security Enhancements required by Part
1542 - Phase 2]
SO JAN MS M23 James H Easom Field GA 12 $326,700.00 $326,700.00 $0.00 $0.00 Construct Terminal Building
SO JAN MS JVW John Bell Williams GA 18 $176,109.00 $176,109.00 $0.00 $0.00 Rehabilitate Runway 12/30 [Seal Coat], Rehabilitate Taxiway
[Taxiway "A" (West), "E", & "F" - Seal Coat]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 44 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO JAN MS MEI Key Field P 33 $1,025,000.00 $1,025,000.00 $0.00 $0.00 Improve Airport Drainage, Improve Airport Miscellaneous
Improvements, Install Perimeter Fencing
SO JAN MS MEI Key Field P 32 $964,261.00 $964,261.00 $0.00 $0.00 Improve Airport Miscellaneous Improvements, Rehabilitate
Apron
SO JAN MS OSX Kosciusko-Attala County GA 12 $200,729.00 $200,729.00 $0.00 $0.00 Improve Airport Drainage
SO JAN MS LMS Louisville Winston County GA 13 $660,542.00 $660,542.00 $0.00 $0.00 Construct Terminal Building, Improve Access Road, Install
Perimeter Fencing
SO JAN MS 17M Magee Municipal GA 8 $109,720.00 $109,720.00 $0.00 $0.00 Acquire Land For Approaches, Rehabilitate Runway 18/36,
Remove Obstructions [Runways 18 and 36]
SO JAN MS MCB McComb/Pike County/John E Lewis Field GA 22 $236,268.00 $236,268.00 $0.00 $0.00 Install Perimeter Fencing [Phase 1 - Design], Rehabilitate Runway
Lighting - 15/33
SO JAN MS GLH Mid Delta Regional CS 31 $491,037.00 $388,294.00 $102,743.00 $0.00
Acquire Aircraft Rescue & Fire Fighting Vehicle [Phase 1
Engineering Only], Install Runway Vertical/Visual Guidance
System - 18L/36R, Rehabilitate Runway 18L/36R [Markings],
Rehabilitate Taxiway [Taxiway "E" - Phase 1 (Design Only)
SO JAN MS M72 New Albany-Union County GA 15 $64,634.00 $64,634.00 $0.00 $0.00 Remove Obstructions
SO JAN MS T36 Paul Pittman Memorial GA 15 $177,871.00 $177,871.00 $0.00 $0.00 Rehabilitate Runway Lighting - 18/36, Rehabilitate Terminal
Building
SO JAN MS MPE Philadelphia Municipal GA 14 $64,287.00 $64,287.00 $0.00 $0.00 Construct Terminal Building
SO JAN MS 22M Pontotoc County GA 10 $266,702.00 $266,702.00 $0.00 $0.00 Construct Fuel Farm, Construct Runway Safety Area - 11/29,
Install Perimeter Fencing
SO JAN MS M13 Poplarville-Pearl River County GA 9 $111,704.00 $111,704.00 $0.00 $0.00
Rehabilitate Apron [Crack seal and seal coat], Rehabilitate
Runway 16/34 [Crack seal, seal coat and remark], Rehabilitate
Taxiway [Crack seal, seal coat and remark]
SO JAN MS M43 Prentiss-Jefferson Davis County GA 9 $353,485.00 $353,485.00 $0.00 $0.00 Construct Building [Construct hangars], Construct Taxiway
[Construct hangar access taxiway]
SO JAN MS CRX Roscoe Turner GA 22 $36,981.00 $36,981.00 $0.00 $0.00 Rehabilitate Taxiway
SO JAN MS M37 Ruleville-Drew GA 12 $374,573.00 $374,573.00 $0.00 $0.00 Rehabilitate Airport Beacons, Rehabilitate Runway 18/36
SO JAN MS HSA Stennis International GA 27 $507,804.00 $507,804.00 $0.00 $0.00 Construct Apron
SO JAN MS 00M Thigpen Field GA 8 $450,927.00 $450,927.00 $0.00 $0.00
Extend Runway 16/34 [Acquire land and mitigate wetlands],
Install Perimeter Fencing, Rehabilitate Apron [Crack seal and seal
coat apron], Rehabilitate Runway 16/34 [Crack seal, patch and
seal coat runway]
SO JAN MS 01M Tishomingo County GA 15 $472,555.00 $472,555.00 $0.00 $0.00 Acquire Land For Approaches, Improve Runway Safety Area
17/35, Update Airport Master Plan Study
SO JAN MS PQL Trent Lott International GA 29 $184,717.00 $184,717.00 $0.00 $0.00 Rehabilitate Apron [Rehabilitate main apron (Construction)]
SO JAN MS UTA Tunica Municipal P 20 $109,895.00 $109,895.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Taxiway, Update Airport Master
Plan Study
SO JAN MS TUP Tupelo Regional P 38 $144,773.00 $144,773.00 $0.00 $0.00 Improve Building, Install Perimeter Fencing, Wildlife Hazard
Assessments
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 45 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO JAN MS UOX University-Oxford GA 27 $237,150.00 $237,150.00 $0.00 $0.00 Construct Apron, Rehabilitate Runway 09/27, Remove
Obstructions
SO JAN MS *MSV Various Locations in Mississippi 4 $31,500.00 $31,500.00 $0.00 $0.00
Construct Access Road (Hesler-Noble Field), Construct Apron
(Stennis International), Construct Building (Calhoun County;
Prentiss-Jefferson Davis County; Winona-Montgomery County),
Construct Fuel Farm (Macon Municipal; Pontotoc County)
SO JAN MS VKS Vicksburg Municipal GA 6 $142,421.00 $142,421.00 $0.00 $0.00 Rehabilitate Runway 01/19
SO JAN MS 5A6 Winona-Montgomery County GA 12 $346,303.00 $346,303.00 $0.00 $0.00 Construct Building, Install Weather Reporting Equipment
SO JAN MS 87I Yazoo County GA 13 $27,131.00 $27,131.00 $0.00 $0.00 Rehabilitate Runway 17/35 [Phase 1 - Design Only]
SO MEM KY DWU Ashland Regional GA 17 $81,000.00 $81,000.00 $0.00 $0.00 Conduct Environmental Study, Install Perimeter Fencing
SO MEM KY PAH Barkley Regional P 43 $104,661.00 $104,661.00 $0.00 $0.00 Rehabilitate Runway 14/32
SO MEM KY SJS Big Sandy Regional GA 15 $86,395.00 $86,395.00 $0.00 $0.00 Rehabilitate Taxiway [Phase 1 - Design]
SO MEM KY LEX Blue Grass P 64 $1,500,600.00 $1,500,600.00 $0.00 $0.00 Acquire Snow Removal Equipment, Construct Runway 09/27,
Environmental Mitigation, Rehabilitate Terminal Building
SO MEM KY LEX Blue Grass P 63 $1,000,000.00 $1,000,000.00 $0.00 $0.00 Conduct Environmental Study
SO MEM KY BWG Bowling Green-Warren County Regional GA 26 $183,553.00 $63,553.00 $120,000.00 $0.00 Acquire Snow Removal Equipment, Wildlife Hazard Assessments
SO MEM KY LOU Bowman Field R 22 $970,687.00 $970,687.00 $0.00 $0.00 Rehabilitate Taxiway
SO MEM KY I93 Breckinridge County GA 8 $3,208,428.00 $1,542,970.00 $1,665,458.00 $0.00 Rehabilitate Runway 09/27 [Design Phase 2 and Construction]
SO MEM KY FFT Capital City GA 15 $1,245,096.00 $294,860.00 $950,236.00 $0.00 Conduct Miscellaneous Study [Phase I (Obstruction Study)],
Rehabilitate Apron
SO MEM KY FFT Capital City GA 14 $95,000.00 $95,000.00 $0.00 $0.00 Wildlife Hazard Assessments
SO MEM KY CVG Cincinnati/Northern Kentucky International P 82 $9,060,984.00 $4,173,500.00 $4,887,484.00 $0.00 Rehabilitate Taxiway
SO MEM KY 0I8 Cynthiana-Harrison County GA 11 $175,000.00 $175,000.00 $0.00 $0.00 Rehabilitate Runway 11/29
SO MEM KY FGX Fleming-Mason GA 16 $518,576.00 $518,576.00 $0.00 $0.00 Acquire Land For Approaches
SO MEM KY K62 Gene Snyder GA 13 $72,000.00 $72,000.00 $0.00 $0.00 Conduct Environmental Study
SO MEM KY GLW Glasgow Municipal GA 24 $203,150.00 $203,150.00 $0.00 $0.00 Acquire Land For Approaches
SO MEM KY M20 Grayson County GA 9 $88,880.00 $88,880.00 $0.00 $0.00 Update Airport Master Plan Study
SO MEM KY EHR Henderson City-County GA 25 $111,244.00 $111,244.00 $0.00 $0.00 Conduct Airport Master Plan Study
SO MEM KY CEY Kyle-Oakley Field GA 24 $124,644.00 $124,644.00 $0.00 $0.00 Update Airport Master Plan Study
SO MEM KY 6I2 Lebanon-Springfield GA 13 $45,000.00 $45,000.00 $0.00 $0.00 Conduct Miscellaneous Study [Obstruction Survey]
SO MEM KY LOZ London-Corbin Airport-Magee Field GA 21 $74,393.00 $74,393.00 $0.00 $0.00 Remove Obstructions
SO MEM KY LOZ London-Corbin Airport-Magee Field GA 20 $72,000.00 $72,000.00 $0.00 $0.00 Install Perimeter Fencing
SO MEM KY SDF Louisville International-Standiford Field P 95 $18,118,943.00 $12,418,943.00 $5,700,000.00 $0.00
Acquire Land for Noise Compatibility within 65 - 69 DNL, Noise
Mitigation Measures for Residences within 65 - 69 DNL, Noise
Mitigation Measures for Residences within 65 - 69 DNL
SO MEM KY SDF Louisville International-Standiford Field P 97 $1,940,914.00 $1,940,914.00 $0.00 $0.00 Acquire Safety Equipment and/or Fencing, Conduct
Environmental Study, Rehabilitate Taxiway Lighting
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 46 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO MEM KY SDF Louisville International-Standiford Field P 96 $1,266,914.00 $1,266,914.00 $0.00 $0.00 Rehabilitate Runway 11/29, Rehabilitate Runway 17R/35L,
Rehabilitate Taxiway
SO MEM KY 2I0 Madisonville Municipal GA 24 $149,850.00 $149,850.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 05/23
SO MEM KY 5M9 Marion-Crittenden County GA 11 $499,959.00 $499,959.00 $0.00 $0.00 Construct Building
SO MEM KY M25 Mayfield Graves County GA 14 $590,916.00 $590,916.00 $0.00 $0.00 Rehabilitate Runway 01/19 [This will be a crack repair and seal
coat], Rehabilitate Taxiway [Phase 2 - Construction]
SO MEM KY 18I McCreary County GA 10 $93,079.00 $93,079.00 $0.00 $0.00 Install Miscellaneous Navigational Aids
SO MEM KY M97 Morehead-Rowan County Clyde A. Thomas
Regional GA 7 $746,505.00 $746,505.00 $0.00 $0.00 Construct Building [Phase 1 - Construction]
SO MEM KY IOB Mount Sterling-Montgomery County GA 16 $558,715.00 $558,715.00 $0.00 $0.00 Rehabilitate Apron [Design and Construction], Rehabilitate
Taxiway, Update Miscellaneous Study
SO MEM KY M21 Muhlenberg County GA 14 $172,930.00 $172,930.00 $0.00 $0.00 Construct Taxiway [Phase 1 - Design Only], Environmental
Mitigation, Expand Apron [Phase 1 - Design Only]
SO MEM KY OWB Owensboro-Daviess County P 48 $992,225.00 $992,225.00 $0.00 $0.00 Improve Terminal Building [Phase 2], Install Guidance Signs
SO MEM KY PBX Pike County-Hatcher Field GA 15 $85,580.00 $85,580.00 $0.00 $0.00 Install Perimeter Fencing
SO MEM KY 2M0 Princeton-Caldwell County GA 11 $46,210.00 $46,210.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 05/23
SO MEM KY 2I3 Rough River State Park GA 1 $223,200.00 $223,200.00 $0.00 $0.00
Conduct Environmental Study [Environmental Assesment for
Road Relocation], Remove Obstructions [Phase 1 - Obstruction
Survey]
SO MEM KY 4M7 Russellville-Logan County GA 15 $60,840.00 $60,840.00 $0.00 $0.00 Acquire Easement For Approaches
SO MEM KY BRY Samuels Field GA 16 $25,000.00 $25,000.00 $0.00 $0.00 Conduct Environmental Study
SO MEM KY I50 Stanton GA 6 $163,568.00 $163,568.00 $0.00 $0.00 Conduct Environmental Study
SO MEM KY DVK Stuart Powell Field GA 19 $405,196.00 $405,196.00 $0.00 $0.00
Acquire Land for Development, Construct Fuel Farm [Phase I
(Design Only)], Improve Runway Safety Area - 12/30, Remove
Obstructions
SO MEM KY TWT Sturgis Municipal GA 13 $2,011,125.00 $2,011,125.00 $0.00 $0.00 Rehabilitate Runway 18/36 [Construction - Phase 2 - Overlay]
SO MEM KY AAS Taylor County GA 16 $51,048.00 $51,048.00 $0.00 $0.00 Remove Obstructions, Update Miscellaneous Study
SO MEM KY CPF Wendell H Ford GA 17 $44,341.00 $44,341.00 $0.00 $0.00 Rehabilitate Taxiway [Phase 1 - Design]
SO MEM KY BYL Williamsburg-Whitley County GA 15 $152,067.00 $152,067.00 $0.00 $0.00 Construct Building
SO MEM KY BYL Williamsburg-Whitley County GA 16 $150,000.00 $150,000.00 $0.00 $0.00 Rehabilitate Runway 02/20, Rehabilitate Runway Lighting - 02/20
SO MEM NC OAJ Albert J Ellis P 35 $1,664,614.00 $1,664,614.00 $0.00 $0.00 Construct Terminal Building [Phase 5]
SO MEM NC AVL Asheville Regional P 42 $2,562,954.00 $2,562,954.00 $0.00 $0.00 Construct Aircraft Rescue & Fire Fighting Building [Construction]
SO MEM NC AVL Asheville Regional P 43 $2,855,596.00 $1,595,596.00 $1,260,000.00 $0.00 Rehabilitate Runway 16/34 [Design - Phase 1]
SO MEM NC CLT Charlotte/Douglas International P 69 $12,000,000.00 $0.00 $12,000,000.00 $0.00 Construct Runway 18R/36L
SO MEM NC CLT Charlotte/Douglas International P 70 $11,357,060.00 $11,357,060.00 $0.00 $0.00 Rehabilitate Runway 18C/36C
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 47 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO MEM NC EWN Coastal Carolina Regional P 36 $1,275,750.00 $1,275,750.00 $0.00 $0.00
Acquire Aircraft Rescue & Fire Fighting Safety Equipment,
Rehabilitate Runway 04/22 [Design], Rehabilitate Taxiway,
Rehabilitate Taxiway Lighting, Security Enhancements
SO MEM NC FAY Fayetteville Regional/Grannis Field P 41 $3,791,677.00 $2,129,114.00 $1,662,563.00 $0.00 Rehabilitate Runway 04/22 [Pave Runway Shoulders]
SO MEM NC *NCB North Carolina State Block Grant Program 46 $20,921,989.00 $16,421,989.00 $4,500,000.00 $0.00 Non primary development projects in state block grant program
SO MEM NC GSO Piedmont Triad International P 68 $4,398,087.00 $4,398,087.00 $0.00 $0.00
Construct Runway [Construct Runway 5L-23R and associated
taxiways; Construct connector Taxiway "F"; Extend Taxiway "K";
Acquire Land, Phase XII]
SO MEM NC GSO Piedmont Triad International P 69 $3,285,000.00 $0.00 $3,285,000.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
SO MEM NC PGV Pitt-Greenville P 39 $804,878.00 $0.00 $804,878.00 $0.00 Improve Runway Safety Area [Noise Land Acquisition (65 DNL)]
02/20
SO MEM NC PGV Pitt-Greenville P 38 $2,831,164.00 $870,246.00 $1,960,918.00 $0.00 Improve Runway Safety Area [Extend Runway 2 (Runway Shift)
Phase 1 - Utility Relocation] - 02/20
SO MEM NC RDU Raleigh-Durham International P 43 $3,297,834.00 $3,297,834.00 $0.00 $0.00 Rehabilitate Apron
SO MEM NC RDU Raleigh-Durham International P 44 $3,365,000.00 $0.00 $3,365,000.00 $0.00 Rehabilitate Apron [Phase 2]
SO MEM NC ILM Wilmington International P 47 $5,473,582.00 $2,732,216.00 $2,741,366.00 $0.00 Rehabilitate Runway 17/35
SO MEM NC ILM Wilmington International P 49 $1,000,000.00 $0.00 $1,000,000.00 $0.00 Acquire Easement For Approaches
SO MEM NC ILM Wilmington International P 48 $102,595.00 $102,595.00 $0.00 $0.00 Rehabilitate Runway 17/35 [Phase 2 - Reimbursable Agreement]
SO MEM TN JWN John C Tune R 17 $6,250,284.00 $300,000.00 $5,950,284.00 $0.00 Construct Runway Safety Area [Relocate road, grade and
construct standard Runway Safety Area] - 02/20
SO MEM TN CHA Lovell Field P 59 $180,608.00 $180,608.00 $0.00 $0.00 Rehabilitate Apron [Terminal Apron - Phase 1 - Design]
SO MEM TN MEM Memphis International P 86 $34,254,688.00 $24,254,688.00 $10,000,000.00 $0.00 Rehabilitate Apron [Terminal Apron - Phase 3]
SO MEM TN BNA Nashville International P 95 $6,403,896.00 $6,403,896.00 $0.00 $0.00 Environmental Mitigation
SO MEM TN BNA Nashville International P 96 $5,363,073.00 $0.00 $5,363,073.00 $0.00 Rehabilitate Taxiway "B"
SO MEM TN *TNB Tennessee State Block Grant Program 45 $13,155,009.00 $13,155,009.00 $0.00 $0.00 Non primary development projects in state block grant program
SO MEM TN *TNB Tennessee State Block Grant Program 46 $6,103,500.00 $0.00 $6,103,500.00 $0.00 Non primary development projects in state block grant program
SO MEM TN TRI Tri-Cities Regional TN/VA P 65 $1,885,677.00 $1,885,677.00 $0.00 $0.00 Install Perimeter Fencing required by 49 CFR 1542, Modify
Terminal Building, Rehabilitate Access Road
SO ORL FL SPG Albert Whitted R 21 $108,250.00 $53,720.00 $54,530.00 $0.00 Wildlife Hazard Assessments
SO ORL FL X06 Arcadia Municipal GA 4 $237,024.00 $237,024.00 $0.00 $0.00 Conduct Airport Master Plan Study [Conduct Airport Master Plan
Study and Airport Layout Plan]
SO ORL FL BOW Bartow Municipal GA 31 $819,666.00 $65,097.00 $754,569.00 $0.00 Rehabilitate Apron
SO ORL FL F95 Calhoun County GA 5 $342,463.00 $342,463.00 $0.00 $0.00 Expand Apron [Terminal Apron]
SO ORL FL VQQ Cecil GA 17 $1,016,918.00 $1,016,918.00 $0.00 $0.00 Improve Airport Drainage
SO ORL FL VQQ Cecil GA 18 $1,083,020.00 $0.00 $1,083,020.00 $0.00 Install Perimeter Fencing not Required by 14 CFR 139/49 CFR
1542 [Install Perimeter/Wildlife/Safety Fence]
SO ORL FL CTY Cross City GA 9 $150,000.00 $150,000.00 $0.00 $0.00 Rehabilitate Runway 13/31 [Design]
SO ORL FL CGC Crystal River GA 6 $224,953.00 $224,953.00 $0.00 $0.00 Conduct Environmental Study
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 48 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO ORL FL DAB Daytona Beach International P 65 $2,205,663.00 $2,205,663.00 $0.00 $0.00 Improve Terminal Building
SO ORL FL DAB Daytona Beach International P 66 $180,000.00 $0.00 $180,000.00 $0.00 Environmental Mitigation [Implement Wildlife Hazard
Management Program - (Phase I - Design - Tree Clearing)]
SO ORL FL DAB Daytona Beach International P 67 $450,000.00 $0.00 $450,000.00 $0.00 Construct Aircraft Rescue & Fire Fighting Building [Relocate ARFF
Building (Phase I - Design)]
SO ORL FL 54J Defuniak Springs GA 7 $87,570.00 $87,570.00 $0.00 $0.00 Acquire Equipment, Construct Access Road [Phase I - Design
Only]
SO ORL FL VPS Eglin AFB P 25 $2,743,526.00 $2,743,526.00 $0.00 $0.00 Construct Aircraft Rescue & Fire Fighting Building
SO ORL FL X01 Everglades Airpark GA 3 $257,333.00 $257,333.00 $0.00 $0.00 Construct Taxiway [South Taxiway (Design and Construction)]
SO ORL FL ORL Executive R 28 $81,900.00 $81,900.00 $0.00 $0.00 Rehabilitate Taxiway [Taxiways "B", "E", and "E6" - Design]
SO ORL FL FHB Fernandina Beach Municipal GA 23 $441,025.00 $150,000.00 $291,025.00 $0.00 Rehabilitate Taxiway Lighting [Taxiway "B"]
SO ORL FL XFL Flagler County GA 15 $108,900.00 $108,900.00 $0.00 $0.00 Construct Taxiway [Partial Parallel Taxiway "H" (Design - Phase I)]
SO ORL FL FXE Fort Lauderdale Executive R 28 $315,000.00 $0.00 $315,000.00 $0.00 Sustainable Master Plan
SO ORL FL FXE Fort Lauderdale Executive R 27 $1,493,540.00 $434,661.00 $1,058,879.00 $0.00 Construct Taxiway [Construct/Relocate Taxiway "G"]
SO ORL FL FLL Fort Lauderdale/Hollywood International P 71 $23,944,694.00 $3,944,694.00 $20,000,000.00 $0.00 Extend Runway 09R/27L
SO ORL FL GNV Gainesville Regional P 36 $4,277,876.00 $1,790,719.00 $2,487,157.00 $0.00 Construct Taxiway [Relocate Taxiway "E-4"], Rehabilitate Taxiway
[Taxiway "E" (Construction)]
SO ORL FL HEG Herlong Recreational R 16 $191,795.00 $150,000.00 $41,795.00 $0.00 Rehabilitate Runway Lighting [Rehabilitate Airfield Lighting &
Vault Improvement (Phase 1 - Design)] - 07/25
SO ORL FL BKV Hernando County GA 16 $340,224.00 $340,224.00 $0.00 $0.00 Update Airport Master Plan Study [Update Master Plan and
Airport Layout Plan]
SO ORL FL BKV Hernando County GA 17 $89,282.00 $89,282.00 $0.00 $0.00 Wildlife Hazard Assessments
SO ORL FL IMM Immokalee Regional GA 8 $6,754,362.00 $150,000.00 $6,604,362.00 $0.00 Rehabilitate Runway 09/27 [Construction]
SO ORL FL INF Inverness GA 5 $112,500.00 $112,500.00 $0.00 $0.00 Update Airport Master Plan Study [Update Airport Master
Plan/Airport Layout Plan]
SO ORL FL JAX Jacksonville International P 53 $371,891.00 $0.00 $371,891.00 $0.00 Construct Aircraft Rescue & Fire Fighting Training Facility [Phase
2]
SO ORL FL JAX Jacksonville International P 52 $1,570,641.00 $1,570,641.00 $0.00 $0.00
Rehabilitate Access Road [Improve Access Road], Rehabilitate
Runway Lighting [Runway Lighting Rehabilitation (Phase 6 of 6)]
08/26
SO ORL FL TMB Kendall-Tamiami Executive R 10 $60,503.00 $60,503.00 $0.00 $0.00 Wildlife Hazard Assessments [Conduct Wildlife Hazard
Assessment]
SO ORL FL EYW Key West International P 47 $2,525,136.00 $2,525,136.00 $0.00 $0.00
Acquire Land For Approaches [Runway End 27], Improve Access
Road [Construction], Improve Airport Drainage [Phase I - Design],
Improve Runway Safety Area [Runway 27 End]
SO ORL FL 42J Keystone Airpark GA 22 $106,095.00 $106,095.00 $0.00 $0.00 Install Miscellaneous NAVAIDS [Install Rotating Beacon]
SO ORL FL ISM Kissimmee Gateway R 33 $2,033,100.00 $2,033,100.00 $0.00 $0.00 Rehabilitate Runway 06/24 [Including Runway Lighting]
SO ORL FL X14 La Belle Municipal GA 6 $84,603.00 $84,603.00 $0.00 $0.00 Construct Apron [Terminal Apron (Design)]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 49 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO ORL FL X07 Lake Wales Municipal GA 15 $145,800.00 $145,800.00 $0.00 $0.00
Construct Taxiway [Realign Taxiway "A" (Phase I - Design)],
Improve Access Road [Phase 1 - Design], Improve Runway Safety
Area [Runway 24 End - Design] - 06/24
SO ORL FL LAL Lakeland Linder Regional R 35 $6,822,873.00 $1,000,000.00 $5,822,873.00 $0.00
Construct Taxiway "E1", Rehabilitate Apron [Rehabilitate
southside aprons (airside center)], Rehabilitate Runway 09/27
[Partial Rehabilitation of Runway (Design & Construction)]
SO ORL FL LEE Leesburg International GA 22 $1,457,174.00 $1,457,174.00 $0.00 $0.00 Construct Taxiway [Relocate/Construct Taxiway "A"]
SO ORL FL MKY Marco Island GA 10 $5,649,916.00 $4,158,718.00 $1,491,198.00 $0.00 Rehabilitate Apron [Main Apron - Construction], Rehabilitate
Runway 17/35 [Construction]
SO ORL FL MAI Marianna Municipal GA 16 $83,809.00 $83,809.00 $0.00 $0.00 Rehabilitate Runway 18/36 [Design Only]
SO ORL FL MLB Melbourne International P 39 $2,466,000.00 $2,466,000.00 $0.00 $0.00
Construct Apron [Cargo Apron (Phase I)], Construct Taxiway
[Construct Taxiway Connector between Taxiway "K" and "S"],
Widen Taxiway "K", Wildlife Hazard Assessments [Wildlife Hazard
Management Plan]
SO ORL FL COI Merritt Island GA 18 $786,048.00 $384,835.00 $401,213.00 $0.00 Improve Runway Safety Area [Design Only] - 11/29
SO ORL FL MIA Miami International P 68 $29,187,416.00 $29,187,416.00 $0.00 $0.00
Construct Apron [West Side Cargo Apron (Phase 2,
Construction)], Rehabilitate Runway 12/30 [Construction],
Rehabilitate Taxiway [Taxiways "P", "Q" & "R" (Construction)]
SO ORL FL APF Naples Municipal GA 34 $4,514,754.00 $1,077,148.00 $3,437,606.00 $0.00 Extend Taxiway [Extend Taxiway "A" & Associated Drainage
(Construction Phase)]
SO ORL FL EVB New Smyrna Beach Municipal R 16 $1,659,600.00 $343,305.00 $1,316,295.00 $0.00 Rehabilitate Runway 11/29 [Construction], Rehabilitate Taxiway
[Rehabilitate Portion of Taxiway "D" and "E" (Construction)]
SO ORL FL F45 North Palm Beach County General Aviation R 16 $900,000.00 $900,000.00 $0.00 $0.00 Environmental Mitigation [Wetland Wildlife Mitigation (Phase 1)]
SO ORL FL SGJ Northeast Florida Regional GA 33 $1,205,222.00 $1,205,222.00 $0.00 $0.00
Improve Airport Drainage [Improve Drainage along Taxiway "D"],
Widen Taxiway [Reconstruct & Widen Connector Taxiway "D-3"
(Construction)]
SO ORL FL OPF Opa-Locka Executive R 17 $60,503.00 $60,503.00 $0.00 $0.00 Wildlife Hazard Assessments [Conduct Wildlife Hazard
Assessment]
SO ORL FL MCO Orlando International P 114 $12,034,899.00 $5,739,969.00 $6,294,930.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate
Runway 18R/36L [Construction]
SO ORL FL SFB Orlando Sanford International P 71 $11,170,065.00 $3,729,619.00 $7,440,446.00 $0.00 Improve Runway Safety Area - 09L/27R, Rehabilitate Apron
[Southwest Ramp Apron (Phase 1 - Construction)]
SO ORL FL OMN Ormond Beach Municipal R 16 $226,224.00 $226,224.00 $0.00 $0.00
Construct Taxiway [Taxiway "G" (Design)], Install Runway
Vertical/Visual Guidance System [Design] - 17/35, Rehabilitate
Taxiway Lighting [Taxiway "C" (Design)]
SO ORL FL FMY Page Field R 18 $139,812.00 $139,812.00 $0.00 $0.00 Rehabilitate Runway 05/23 [Phase 1 - Design]
SO ORL FL 28J Palatka Municipal - Lt. Kay Larkin Field GA 23 $64,800.00 $64,800.00 $0.00 $0.00 Construct Taxiway [Construct Taxiway "D"], Expand Apron [North
Apron]
SO ORL FL PHK Palm Beach County Glades GA 4 $72,322.00 $72,322.00 $0.00 $0.00 Install Weather Reporting Equipment [Design]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 50 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO ORL FL PBI Palm Beach International P 57 $708,316.00 $708,316.00 $0.00 $0.00
Conduct Miscellaneous Study [Obstruction Survey], Construct
Taxiway [Construct Taxilane - North and South (Design)], Improve
Terminal Building [Design]
SO ORL FL PNS Pensacola Gulf Coast Regional P 39 $8,037,588.00 $8,037,588.00 $0.00 $0.00
Acquire Land for Development, Install Perimeter Fencing
required by 49 CFR 1542 [Phase 1 Design], Rehabilitate Apron
[Cargo Apron (Design)], Rehabilitate Apron [General Aviation
Apron - Design]
SO ORL FL PCM Plant City GA 9 $150,000.00 $150,000.00 $0.00 $0.00 Rehabilitate Taxiway "A"
SO ORL FL SRQ Sarasota/Bradenton International P 50 $3,168,642.00 $3,168,642.00 $0.00 $0.00
Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Guidance
Signs, Rehabilitate Terminal Building, Security Enhancements
[Security Survillance System]
SO ORL FL X26 Sebastian Municipal GA 10 $600,000.00 $600,000.00 $0.00 $0.00 Improve Access Road
SO ORL FL RSW Southwest Florida International P 51 $3,891,689.00 $3,891,689.00 $0.00 $0.00
Expand Access Road [Design], Improve Terminal Building [Phase
2], Install Guidance Signs [Replace Airfield Signage], Install
Runway Vertical/Visual Guidance System - 06/24, Noise
Mitigation Measures [Noise Mitigation Measures (Phase 2)]
SO ORL FL TIX Space Coast Regional GA 25 $3,725,428.00 $3,725,428.00 $0.00 $0.00 Rehabilitate Apron [West Apron]
SO ORL FL FPR St Lucie County International GA 34 $552,931.00 $552,931.00 $0.00 $0.00 Construct Taxiway [Taxiway "D-1" Realignment]
SO ORL FL PIE St Petersburg-Clearwater International P 39 $1,907,417.00 $1,907,417.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate
Taxiway [Taxiways "A" and "M" (Phase 1, Design)]
SO ORL FL 24J Suwannee County GA 10 $561,293.00 $561,293.00 $0.00 $0.00 Rehabilitate Apron [Terminal Apron]
SO ORL FL TLH Tallahassee Regional P 37 $21,169,024.00 $7,209,638.00 $13,959,386.00 $0.00 Rehabilitate Runway 09/27 [Construction - Phase 2]
SO ORL FL VDF Tampa Executive R 33 $88,547.00 $88,547.00 $0.00 $0.00 Wildlife Hazard Assessments [Conduct Wildlife Hazard
Assessment]
SO ORL FL TPA Tampa International P 59 $1,465,023.00 $1,465,023.00 $0.00 $0.00 Conduct Airport Master Plan Study [Phase 2]
SO ORL FL TPA Tampa International P 60 $1,597,680.00 $1,597,680.00 $0.00 $0.00
Rehabilitate Runway 1L/19R [Slab & joint replacement)],
Rehabilitate Taxiway [Taxiways "D", "S" and Associated
Connectors]
SO ORL FL MTH The Florida Keys Marathon GA 31 $152,163.00 $152,163.00 $0.00 $0.00 Improve Terminal Building [Utilities], Wildlife Hazard
Assessments [Develop Wildlife Hazard Management Plan]
SO ORL FL 1J0 Tri-County GA 9 $198,621.00 $198,621.00 $0.00 $0.00 Construct Taxiway [Parallel Taxiway for Runway 01/19 (Design)],
Construct Taxiway [Hangar Taxilane]
SO ORL FL X23 Umatilla Municipal GA 8 $53,811.00 $53,811.00 $0.00 $0.00 Construct Parking Lot [Phase 1 - Design], Rehabilitate Runway
01/19 [Phase 1 - Design]
SO ORL FL X59 Valkaria GA 6 $1,766,758.00 $150,000.00 $1,616,758.00 $0.00
Rehabilitate Runway 10/28 [Construction], Wildlife Hazard
Assessments [Wildlife Hazard Assessment and Management Plan
(Site Visit Report)]
SO ORL FL VRB Vero Beach Municipal GA 38 $1,691,120.00 $116,928.00 $1,574,192.00 $0.00 Rehabilitate Runway 04/22 [Construction], Rehabilitate Taxiway
"A"
SO ORL FL VRB Vero Beach Municipal GA 37 $544,103.00 $296,605.00 $247,498.00 $0.00 Sustainable Master Plan, Update Airport Master Plan Study
[Airport Master Plan and Airport Layout Plan]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 51 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SO ORL FL CHN Wauchula Municipal GA 12 $292,500.00 $292,500.00 $0.00 $0.00 Construct Taxiway [Construct Taxilanes]
SO ORL FL X60 Williston Municipal GA 14 $150,000.00 $150,000.00 $0.00 $0.00 Rehabilitate Runway 14/32 [Design]
SO ORL FL SUA Witham Field GA 17 $215,550.00 $215,550.00 $0.00 $0.00 Rehabilitate Runway Lighting [Design] - 12/30, Wildlife Hazard
Assessments
SO ORL FL ZPH Zephyrhills Municipal GA 12 $4,066,542.00 $529,680.00 $3,536,862.00 $0.00 Rehabilitate Runway 04/22 [Construction]
SW AROK AR BPK Baxter County GA 14 $274,524.00 $274,524.00 $0.00 $0.00 Rehabilitate Runway 05/23
SW AROK AR 7M3 Bearce GA 11 $192,033.00 $192,033.00 $0.00 $0.00 Install Perimeter Fencing [Phase 2 - Construction], Install Runway
Vertical/Visual Guidance System - 08/26
SW AROK AR VBT Bentonville Municipal/Louise M Thaden
Field GA 9 $551,698.00 $551,698.00 $0.00 $0.00 Improve Runway Safety Area - 18/36
SW AROK AR LIT Bill and Hillary Clinton National/Adams Field P 80 $5,124,468.00 $5,124,468.00 $0.00 $0.00
Acquire Miscellaneous Land [Phase 2], Rehabilitate Runway
Lighting [Edge, Touchdown Zone, & Centerline Lighting]
04L/22R, Rehabilitate Taxiway Lighting [Taxiway Centerline]
SW AROK AR HKA Blytheville Municipal GA 13 $236,138.00 $236,138.00 $0.00 $0.00 Install Perimeter Fencing
SW AROK AR HRO Boone County CS 22 $89,870.00 $89,870.00 $0.00 $0.00 Rehabilitate Runway 18/36 [Phase 1 - Conduct Pavement
Evaluation]
SW AROK AR HRO Boone County CS 21 $111,617.00 $111,617.00 $0.00 $0.00 Install Perimeter Fencing [Phase 2], Rehabilitate Parking Lot
SW AROK AR 4M3 Carlisle Municipal GA 12 $190,964.00 $190,964.00 $0.00 $0.00 Rehabilitate Runway 18/36
SW AROK AR 4M1 Carroll County GA 13 $52,468.00 $52,468.00 $0.00 $0.00 Install Perimeter Fencing
SW AROK AR 4M8 Clarendon Municipal GA 7 $213,712.00 $213,712.00 $0.00 $0.00 Construct Runway [Phase 6 - Taxiway Paving, Marking & Lighting]
SW AROK AR CCA Clinton Municipal GA 11 $196,293.00 $196,293.00 $0.00 $0.00 Construct Taxiway [Construct Hangar Access Taxiway]
SW AROK AR 86 Conway Replacement Airport 6 $6,568,000.00 $1,350,000.00 $5,218,000.00 $0.00
Construct New Airport [Phase 6 (Stage 2B Paving
Taxiway/Apron, Entrance Road Construction, Utility
Construction)]
SW AROK AR 4M9 Corning Municipal GA 17 $153,923.00 $153,923.00 $0.00 $0.00 Rehabilitate Taxiway [Phase 5 - Construction]
SW AROK AR 32A Danville Municipal GA 4 $331,143.00 $331,143.00 $0.00 $0.00 Acquire Land for Development, Install Perimeter Fencing,
Remove Obstructions
SW AROK AR 5M1 De Witt Municipal GA 7 $115,985.00 $115,985.00 $0.00 $0.00 Construct Taxiway [Phase 3 - Taxiway Lighting]
SW AROK AR +08B Delta Regional Airport 9 $1,500,000.00 $1,500,000.00 $0.00 $0.00 Construct New Airport [Phase 9 (Construct Stage 4 - Parallel
Taxiway & Drainage Improvements)]
SW AROK AR FSM Fort Smith Regional P 41 $2,868,007.00 $2,528,020.00 $339,987.00 $0.00 Rehabilitate Taxiway [Taxiway "A" West Rehabilitation, Phase 2
of 3]
SW AROK AR M36 Frank Federer Memorial GA 7 $410,049.00 $410,049.00 $0.00 $0.00 Rehabilitate Apron [East Aprons]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 52 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SW AROK AR PBF Grider Field GA 12 $293,963.00 $293,963.00 $0.00 $0.00 Rehabilitate Apron
SW AROK AR CDH Harrell Field GA 14 $296,761.00 $296,761.00 $0.00 $0.00 Rehabilitate Runway Lighting [Construction] - 01/19, Rehabilitate
Taxiway Lighting [Rehabilitate a portion of the taxiway lighting]
SW AROK AR HBZ Heber Springs Municipal GA 11 $265,937.00 $265,937.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 05/23,
Rehabilitate Runway Lighting - 05/23
SW AROK AR M18 Hope Municipal GA 9 $367,948.00 $367,948.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 16/34, Install
Taxiway Lighting [South Parallel Taxiway Lighting]
SW AROK AR 6M2 Horseshoe Bend GA 6 $148,748.00 $148,748.00 $0.00 $0.00 Acquire Land for Development
SW AROK AR M77 Howard County GA 7 $51,660.00 $51,660.00 $0.00 $0.00 Improve Runway Safety Area [Design Only] - 01/19, Rehabilitate
Runway [Design Only] - 01/19
SW AROK AR DEQ J Lynn Helms Sevier County GA 10 $84,165.00 $84,165.00 $0.00 $0.00 Acquire Land for Development, Install Perimeter Fencing
SW AROK AR JBR Jonesboro Municipal GA 19 $801,716.00 $801,716.00 $0.00 $0.00 Rehabilitate Runway 13/31 [Overlay]
SW AROK AR M32 Lake Village Municipal GA 9 $204,889.00 $204,889.00 $0.00 $0.00 Extend Runway 01/19 [Construction Phase I - Grading and
Drainage]
SW AROK AR M78 Malvern Municipal GA 5 $45,000.00 $45,000.00 $0.00 $0.00 Update Airport Master Plan Study
SW AROK AR MXA Manila Municipal GA 10 $392,213.00 $392,213.00 $0.00 $0.00 Rehabilitate Runway 18/36
SW AROK AR 6M8 Marked Tree Municipal GA 9 $120,534.00 $120,534.00 $0.00 $0.00 Install Miscellaneous Navigational Aids, Install Runway
Vertical/Visual Guidance System - 18/36
SW AROK AR 42A Melbourne Municipal - John E Miller Field GA 14 $215,496.00 $215,496.00 $0.00 $0.00 Rehabilitate Runway Lighting - 03/21
SW AROK AR HOT Memorial Field GA 21 $123,597.00 $123,597.00 $0.00 $0.00 Install Airfield Guidance Signs, Wildlife Hazard Assessments
SW AROK AR MEZ Mena Intermountain Municipal GA 17 $237,056.00 $237,056.00 $0.00 $0.00 Rehabilitate Taxiway
SW AROK AR XNA Northwest Arkansas Regional P 47 $3,430,505.00 $3,430,505.00 $0.00 $0.00 Acquire Equipment, Expand Terminal Building [Phase 7], Update
Airport Master Plan Study, Widen Taxiway
SW AROK AR 7M4 Osceola Municipal GA 7 $188,426.00 $188,426.00 $0.00 $0.00 Rehabilitate Taxiway
SW AROK AR 7M6 Paris Municipal GA 3 $135,416.00 $135,416.00 $0.00 $0.00 Install Miscellaneous NAVAIDS [Beacon Pole Installation],
Rehabilitate Runway 03/21
SW AROK AR 7M7 Piggott Municipal GA 9 $74,774.00 $74,774.00 $0.00 $0.00 Install Miscellaneous Navigational Aids, Install Taxiway Lighting
SW AROK AR M70 Pocahontas Municipal GA 6 $175,050.00 $175,050.00 $0.00 $0.00 Install Taxiway Lighting
SW AROK AR ROG Rogers Municipal-Carter Field GA 32 $67,500.00 $67,500.00 $0.00 $0.00 Wildlife Hazard Assessments
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 53 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SW AROK AR ROG Rogers Municipal-Carter Field GA 31 $159,143.00 $159,143.00 $0.00 $0.00 Rehabilitate Apron [Phase 3 (Design-Only for Southeast Apron)],
Rehabilitate Taxiway
SW AROK AR RUE Russellville Regional GA 12 $116,157.00 $116,157.00 $0.00 $0.00 Rehabilitate Runway 07/25 [Seal Coat and Remark]
SW AROK AR SUZ Saline County Regional GA 7 $119,040.00 $119,040.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 02/20 [Rejuvenate]
SW AROK AR 9M8 Sheridan Municipal GA 7 $460,697.00 $460,697.00 $0.00 $0.00 Extend Runway 01/19 [Phase 2 - Construction], Rehabilitate
Runway 01/19 [Overlay - Construction]
SW AROK AR SLG Smith Field GA 12 $70,200.00 $70,200.00 $0.00 $0.00 Rehabilitate Taxiway [Design-Only]
SW AROK AR *ARS State of Arkansas 11 $200,000.00 $200,000.00 $0.00 $0.00 Conduct State System Plan Study
SW AROK AR SGT Stuttgart Municipal GA 20 $230,796.00 $230,796.00 $0.00 $0.00 Rehabilitate Apron [Phase II - East Apron (Ramp)]
SW AROK AR HEE Thompson-Robbins GA 10 $216,616.00 $216,616.00 $0.00 $0.00 Rehabilitate Taxiway Lighting
SW AROK AR M27 Waldron Municipal GA 7 $89,059.00 $89,059.00 $0.00 $0.00 Construct Taxiway [Phase II - Parallel Taxiway Lighting]
SW AROK AR M60 Woodruff County GA 5 $50,850.00 $50,850.00 $0.00 $0.00 Conduct Airport Master Plan Study
SW AROK OK AXS Altus/Quartz Mountain Regional GA 13 $529,693.00 $529,693.00 $0.00 $0.00 Construct Access Road, Construct Apron
SW AROK OK 80F Antlers Municipal GA 5 $497,312.00 $497,312.00 $0.00 $0.00 Construct Taxiway, Rehabilitate Apron
SW AROK OK 1F0 Ardmore Downtown Executive GA 13 $94,680.00 $94,680.00 $0.00 $0.00 Rehabilitate Apron [Design]
SW AROK OK BVO Bartlesville Municipal GA 10 $854,086.00 $854,086.00 $0.00 $0.00 Rehabilitate Taxiway
SW AROK OK CQB Chandler Regional GA 10 $395,001.00 $395,001.00 $0.00 $0.00 Rehabilitate Apron
SW AROK OK 4O5 Cherokee Municipal GA 6 $150,000.00 $150,000.00 $0.00 $0.00
Install Miscellaneous NAVAIDS [Replace rotating beacon and
Replace winsock], Widen Runway 17/35 [Design for widening
runway and relocate lighting]
SW AROK OK CHK Chickasha Municipal GA 12 $202,261.00 $202,261.00 $0.00 $0.00 Rehabilitate Runway 17/35 [Construction], Rehabilitate Taxiway
[Construction]
SW AROK OK O65 Christman Airfield GA 8 $271,800.00 $271,800.00 $0.00 $0.00 Construct Taxiway [Construct Partial Parallel Taxiway]
SW AROK OK GCM Claremore Regional GA 16 $197,455.00 $197,455.00 $0.00 $0.00 Extend Taxiway [Phase II (Construction)]
SW AROK OK 95F Cleveland Municipal GA 8 $115,339.00 $115,339.00 $0.00 $0.00 Rehabilitate Runway Lighting - 18/36
SW AROK OK CUH Cushing Municipal GA 13 $159,300.00 $159,300.00 $0.00 $0.00 Rehabilitate Apron
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 54 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SW AROK OK 1K4 David Jay Perry GA 8 $1,188,203.00 $1,188,203.00 $0.00 $0.00 Construct Taxiway [Construct Parallel Taxiway]
SW AROK OK F08 Eufaula Municipal GA 7 $78,128.00 $78,128.00 $0.00 $0.00 Rehabilitate Runway 17/35
SW AROK OK 6K4 Fairview Municipal GA 7 $1,238,172.00 $1,238,172.00 $0.00 $0.00 Extend Runway 17/35 [Extend & Widen Runway]
SW AROK OK GAG Gage GA 4 $636,301.00 $636,301.00 $0.00 $0.00 Rehabilitate Runway 17/35
SW AROK OK GMJ Grove Municipal GA 16 $158,130.00 $158,130.00 $0.00 $0.00 Construct Apron [Design - West Apron], Construct Taxiway
[Design - Parallel Taxiway "B"]
SW AROK OK GOK Guthrie-Edmond Regional GA 14 $83,191.00 $83,191.00 $0.00 $0.00 Acquire Snow Removal Equipment
SW AROK OK H68 Hefner-Easley GA 3 $46,440.00 $46,440.00 $0.00 $0.00 Rehabilitate Runway Lighting [Phase I - Design Only] - 18/36
SW AROK OK 1K2 Lindsay Municipal GA 7 $99,618.00 $99,618.00 $0.00 $0.00 Install Perimeter Fencing
SW AROK OK 1F4 Madill Municipal GA 4 $367,067.00 $367,067.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Runway 18/36, Rehabilitate
Taxiway
SW AROK OK 4O4 McCurtain County Regional GA 10 $2,873,342.00 $2,078,365.00 $794,977.00 $0.00 Construct Taxiway [Construct Parallel Taxiway]
SW AROK OK MIO Miami Municipal GA 17 $2,433,345.00 $1,584,927.00 $848,418.00 $0.00 Extend Taxiway [Construction], Rehabilitate Runway 17/35
[Overlay - Construction]
SW AROK OK 93F Mignon Laird Municipal GA 6 $86,719.00 $86,719.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 18/36
SW AROK OK F81 Okemah Flying Field GA 5 $1,384,547.00 $1,384,547.00 $0.00 $0.00 Construct New Airport [Phase 6 - Pave Runway]
SW AROK OK OKM Okmulgee Regional GA 19 $120,013.00 $120,013.00 $0.00 $0.00 Install Perimeter Fencing [Phase 2]
SW AROK OK PVJ Pauls Valley Municipal GA 12 $1,669,253.00 $1,010,978.00 $658,275.00 $0.00 Construct Taxiway [Parallel Taxiway (Construction)]
SW AROK OK PNC Ponca City Regional GA 15 $117,031.00 $117,031.00 $0.00 $0.00 Rehabilitate Runway 17/35 [Remark]
SW AROK OK 3O3 Purcell Municipal - Steven E. Shephard Field GA 6 $100,359.00 $100,359.00 $0.00 $0.00 Rehabilitate Runway 17/35 [Rehabilitate/Marking], Rehabilitate
Taxiway [Rehabilitate/Marking]
SW AROK OK RVS Richard Lloyd Jones Jr R 27 $1,487,408.00 $150,000.00 $1,337,408.00 $0.00 Rehabilitate Runway Lighting - 01L/19R, Wildlife Hazard
Assessments [Conduct Wildlife Hazard Assessment]
SW AROK OK RKR Robert S Kerr GA 10 $575,893.00 $575,893.00 $0.00 $0.00 Install Weather Reporting Equipment, Rehabilitate Apron
SW AROK OK JSV Sallisaw Municipal GA 11 $53,802.00 $53,802.00 $0.00 $0.00 Construct Taxiway [Hangar Taxiway (Design Only)]
SW AROK OK 2K4 Scott Field GA 6 $464,438.00 $464,438.00 $0.00 $0.00 Construct Taxiway [Partial Parallel Taxiway - Phase II], Install
Miscellaneous Navigational Aids, Rehabilitate Apron
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 55 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SW AROK OK SRE Seminole Municipal GA 14 $105,120.00 $105,120.00 $0.00 $0.00 Rehabilitate Runway 16/34 [Design Phase]
SW AROK OK *OKS State of Oklahoma 13 $200,000.00 $200,000.00 $0.00 $0.00 Update State System Plan Study
SW AROK OK F30 Sulphur Municipal GA 7 $36,686.00 $36,686.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Taxiway [Overlay]
SW AROK OK TQH Tahlequah Municipal GA 10 $483,137.00 $483,137.00 $0.00 $0.00 Construct Apron, Install Miscellaneous Navigational Aids, Install
Runway Vertical/Visual Guidance System - 17/35
SW AROK OK 1O4 Thomas Municipal GA 10 $594,647.00 $594,647.00 $0.00 $0.00 Construct Taxiway [Partial Parallel Taxiway]
SW AROK OK TUL Tulsa International P 85 $6,500,000.00 $0.00 $6,500,000.00 $0.00 Rehabilitate Runway 18L/36R
SW AROK OK OUN University of Oklahoma Westheimer R 24 $271,836.00 $271,836.00 $0.00 $0.00 Improve Runway Safety Area [Design] - 03/21, Rehabilitate
Runway 03/21 [Phase I - Design]
SW AROK OK H04 Vinita Municipal GA 8 $80,845.00 $80,845.00 $0.00 $0.00 Extend Runway 17/35 [Phase III - Design Only]
SW AROK OK JWG Watonga Regional GA 7 $223,974.00 $223,974.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System, Install Taxiway
Lighting
SW AROK OK WWR West Woodward GA 11 $175,252.00 $175,252.00 $0.00 $0.00 Rehabilitate Apron [Design], Rehabilitate Runway Lighting
[Design] - 17/35
SW AROK OK OKC Will Rogers World P 64 $490,000.00 $490,000.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
SW LAN
M LA IYA Abbeville Chris Crusta Memorial GA 16 $122,400.00 $122,400.00 $0.00 $0.00
Construct Taxiway [Taxiway Re-alignment (Feasibility Study)],
Update Airport Master Plan Study
SW LAN
M LA AEX Alexandria International P 58 $830,565.00 $830,565.00 $0.00 $0.00
Improve Runway Safety Area [Runway 14 Approach Obstacle
Removal] - 14/32, Rehabilitate Apron [Phase III - Southwest
Apron]
SW LAN
M LA AEX Alexandria International P 59 $214,083.00 $214,083.00 $0.00 $0.00 Rehabilitate Apron [North Apron Phase I (Design)]
SW LAN
M LA BTR Baton Rouge Metropolitan, Ryan Field P 98 $697,593.00 $697,593.00 $0.00 $0.00
Improve Runway Safety Area [Threshold Recovery (Phase I-
Design)] - 04L/22R
SW LAN
M LA BTR Baton Rouge Metropolitan, Ryan Field P 97 $581,380.00 $581,380.00 $0.00 $0.00
Modify Aircraft Rescue & Fire Fighting Building, Wildlife Hazard
Assessments
SW LAN
M LA DRI Beauregard Regional GA 15 $1,378,096.00 $1,378,096.00 $0.00 $0.00 Rehabilitate Runway 18/36 [Phase II - Construction]
SW LAN
M LA CWF Chennault International GA 12 $3,637,683.00 $1,637,683.00 $2,000,000.00 $0.00
Rehabilitate Runway 15/33 [Construction - Phase 1], Wildlife
Hazard Assessments [Wildlife Hazard Implementation Plan]
SW LAN
M LA 0R5 David G Joyce GA 9 $114,311.00 $114,311.00 $0.00 $0.00 Update Airport Master Plan Study
SW LAN
M LA HZR False River Regional GA 16 $210,073.00 $210,073.00 $0.00 $0.00
Rehabilitate Runway 18/36 [Removal & Reconstruction of failing
runway pavement]
SW LAN
M LA PTN Harry P Williams Memorial GA 15 $273,724.00 $273,724.00 $0.00 $0.00 Rehabilitate Seaplane Base
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 56 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SW LAN
M LA 3R4 Hart GA 9 $104,782.00 $104,782.00 $0.00 $0.00 Acquire Land For Approaches
SW LAN
M LA 5F4 Homer Municipal GA 6 $88,200.00 $88,200.00 $0.00 $0.00 Rehabilitate Runway 12/30 [Phase 1 - Design]
SW LAN
M LA 3R7 Jennings GA 15 $78,300.00 $78,300.00 $0.00 $0.00 Update Airport Master Plan Study
SW LAN
M LA L32 Jonesville GA 6 $39,861.00 $39,861.00 $0.00 $0.00 Remove Obstructions [Design]
SW LAN
M LA 9M6 Kelly-Dumas GA 14 $368,206.00 $368,206.00 $0.00 $0.00 Construct Apron [Phase 2 - Construction]
SW LAN
M LA LCH Lake Charles Regional P 43 $1,801,913.00 $1,801,913.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Taxiway
SW LAN
M LA NEW Lakefront R 26 $82,440.00 $0.00 $82,440.00 $0.00 Wildlife Hazard Assessments
SW LAN
M LA NEW Lakefront R 25 $99,312.00 $99,312.00 $0.00 $0.00
Rehabilitate Apron [Phase I - Design], Rehabilitate Taxiway
[Phase I - Design]
SW LAN
M LA NEW Lakefront R 24 $80,525.00 $80,525.00 $0.00 $0.00 Rehabilitate Runway 18R/36L
SW LAN
M LA 3R2 Le Gros Memorial GA 9 $252,470.00 $252,470.00 $0.00 $0.00
Rehabilitate Runway 04/22 [Clean and Reseal Pavement Joints],
Rehabilitate Taxiway [Taxiways "A", "A-1" and "B"]
SW LAN
M LA MSY Louis Armstrong New Orleans International P 96 $9,941,056.00 $6,267,291.00 $3,673,765.00 $0.00
Rehabilitate Runway Lighting [1 of 3 Multi-Year] - 10/28,
Rehabilitate Runway Lighting [2 of 3 Multi-Year] - 10/28,
Rehabilitate Runway Lighting [3 of 3 Multi-Year] - 10/28
SW LAN
M LA L38 Louisiana Regional GA 12 $3,423,643.00 $2,516,818.00 $906,825.00 $0.00 Extend Runway 17/35 [Phase 2]
SW LAN
M LA MNE Minden GA 10 $294,333.00 $294,333.00 $0.00 $0.00 Construct Apron
SW LAN
M LA MLU Monroe Regional P 31 $1,660,615.00 $1,660,615.00 $0.00 $0.00 Install Perimeter Fencing, Rehabilitate Taxiway
SW LAN
M LA IER Natchitoches Regional GA 18 $984,128.00 $984,128.00 $0.00 $0.00 Rehabilitate Apron [Phase 2 - Construction of Ramp]
SW LAN
M LA RSN Ruston Regional GA 17 $356,862.00 $356,862.00 $0.00 $0.00 Construct Apron [Construction]
SW LAN
M LA DTN Shreveport Downtown R 21 $759,241.00 $759,241.00 $0.00 $0.00 Rehabilitate Taxiway [Construction]
SW LAN
M LA SHV Shreveport Regional P 58 $3,921,690.00 $2,402,513.00 $1,519,177.00 $0.00 Rehabilitate Taxiway
SW LAN
M LA F87 Union Parish GA 12 $968,811.00 $968,811.00 $0.00 $0.00 Rehabilitate Runway 16/34 [Phase 2 - Construction]
SW LAN
M LA TVR Vicksburg Tallulah Regional GA 13 $735,330.00 $735,330.00 $0.00 $0.00 Rehabilitate Apron
SW LAN
M LA 3F4 Vivian GA 7 $77,662.00 $77,662.00 $0.00 $0.00 Update Airport Master Plan Study
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 57 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SW LAN
M LA F89 Winnsboro Municipal GA 7 $174,357.00 $174,357.00 $0.00 $0.00 Rehabilitate Apron [Phase 2 - Construction]
SW LAN
M NM ALM Alamogordo-White Sands Regional GA 21 $508,500.00 $508,500.00 $0.00 $0.00 Extend Runway 03/21 [Phase 1 - Design]
SW LAN
M NM ABQ Albuquerque International Sunport P 42 $9,077,735.00 $3,562,886.00 $5,514,849.00 $0.00 Rehabilitate Taxiway "A" [Phase 2]
SW LAN
M NM ABQ Albuquerque International Sunport P 43 $483,584.00 $0.00 $483,584.00 $0.00 VALE Infrastructure [eGSE charging stations]
SW LAN
M NM E80 Alexander Municipal GA 12 $113,080.00 $113,080.00 $0.00 $0.00 Improve Access Road
SW LAN
M NM F37 Carrizozo Municipal GA 5 $519,086.00 $519,086.00 $0.00 $0.00 Rehabilitate Taxiway
SW LAN
M NM CNM Cavern City Air Terminal CS 22 $310,024.00 $310,024.00 $0.00 $0.00 Update Airport Master Plan Study
SW LAN
M NM DMN Deming Municipal GA 16 $211,638.00 $211,638.00 $0.00 $0.00 Rehabilitate Taxiway
SW LAN
M NM 5T6 Dona Ana County at Santa Teresa GA 21 $914,699.00 $914,699.00 $0.00 $0.00 Improve Runway Safety Area - 10/28, Rehabilitate Runway 10/28
SW LAN
M NM AEG Double Eagle II R 19 $120,880.00 $120,880.00 $0.00 $0.00 Rehabilitate Apron
SW LAN
M NM FMN Four Corners Regional P 36 $1,916,265.00 $1,916,265.00 $0.00 $0.00
Install Perimeter Fencing, Rehabilitate Taxiway "B" [Design &
Construct]
SW LAN
M NM SVC Grant County GA 15 $439,038.00 $439,038.00 $0.00 $0.00 Rehabilitate Apron
SW LAN
M NM GNT Grants-Milan Municipal GA 13 $519,961.00 $519,961.00 $0.00 $0.00 Improve Runway Safety Area - 13/31
SW LAN
M NM E05 Hatch Municipal GA 9 $46,395.00 $46,395.00 $0.00 $0.00 Rehabilitate Runway 11/29
SW LAN
M NM LVS Las Vegas Municipal GA 14 $1,375,586.00 $1,375,586.00 $0.00 $0.00
Rehabilitate Runway 02/20 [Apply Porous Friction Course],
Rehabilitate Runway 14/32 [Apply Porous Friction Course]
SW LAN
M NM HOB Lea County Regional CS 20 $215,419.00 $215,419.00 $0.00 $0.00 Conduct Miscellaneous Study [Phase 1 - Drainage Study]
SW LAN
M NM LAM Los Alamos GA 11 $51,135.00 $51,135.00 $0.00 $0.00 Rehabilitate Taxiway
SW LAN
M NM 0.00E+00 Moriarty GA 13 $201,831.00 $201,831.00 $0.00 $0.00 Rehabilitate Taxiway [Hangar Taxiways]
SW LAN
M NM E14 Ohkay Owingeh GA 9 $82,914.00 $82,914.00 $0.00 $0.00
Rehabilitate Runway 16/34 [Relocate Threshold and Markings
Design Only], Rehabilitate Runway Lighting [Design Only] - 16/34
SW LAN
M NM PRZ Portales Municipal GA 17 $140,684.00 $140,684.00 $0.00 $0.00 Rehabilitate Runway 01/19
SW LAN
M NM ROW Roswell International Air Center P 27 $1,330,520.00 $1,330,520.00 $0.00 $0.00 Rehabilitate Runway 03/21 [Phase 1]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 58 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SW LAN
M NM SAF Santa Fe Municipal P 39 $762,910.00 $762,910.00 $0.00 $0.00 Install Runway Lighting - 02/20
SW LAN
M NM SAF Santa Fe Municipal P 40 $1,557,510.00 $237,090.00 $1,320,420.00 $0.00 Construct Taxiway "F" [Phase II]
SW LAN
M NM SXU Santa Rosa Route 66 GA 12 $2,447,352.00 $2,447,352.00 $0.00 $0.00 Rehabilitate Runway 08/26 [Phase II - Construction]
SW LAN
M NM ONM Socorro Municipal GA 13 $354,813.00 $354,813.00 $0.00 $0.00 Rehabilitate Runway 15/33 [Sealcoat]
SW LAN
M NM SKX Taos Regional GA 31 $752,452.00 $752,452.00 $0.00 $0.00 Construct Runway 12/30 [Design-Only - Phase II]
SW LAN
M NM SKX Taos Regional GA 29 $778,600.00 $151,020.00 $627,580.00 $0.00 Environmental Mitigation [Phase 2]
SW LAN
M NM SKX Taos Regional GA 30 $320,713.00 $320,713.00 $0.00 $0.00
Construct Snow Removal Equipment Building [Phase II
Construction]
SW LAN
M NM TCS Truth Or Consequences Municipal GA 14 $168,764.00 $168,764.00 $0.00 $0.00 Rehabilitate Taxiway "A" [Sealcoat/Crackseal]
SW LAN
M NM TCC Tucumcari Municipal GA 15 $295,952.00 $295,952.00 $0.00 $0.00
Construct Service Road [Construct Service/Perimeter Road],
Rehabilitate Runway 03/21 [Pavement Maintenance]
SW LAN
M NM N17 Vaughn Municipal GA 8 $149,237.00 $149,237.00 $0.00 $0.00 Rehabilitate Runway 09/27
SW TEX TX ABI Abilene Regional P 43 $8,597,558.00 $1,097,558.00 $7,500,000.00 $0.00 Rehabilitate Runway 17L/35R [Phase I - Design], Rehabilitate
Taxiway [Taxiways "M", "N" and "P", Phase II (Construction)]
SW TEX TX AUS Austin-Bergstrom International P 58 $7,212,562.00 $2,212,562.00 $5,000,000.00 $0.00 Extend Taxiway "A" [Phase I]
SW TEX TX BRO Brownsville/South Padre Island
International P 41 $7,973,523.00 $1,823,340.00 $6,150,183.00 $0.00
Install Airfield Guidance Signs [Construction], Rehabilitate Apron
[Construction - Phase II], Rehabilitate Runway 13R/31L,
Rehabilitate Taxiway "B" [Mill and Overlay]
SW TEX TX CRP Corpus Christi International P 50 $25,764,892.00 $7,364,892.00 $18,400,000.00 $0.00
Extend Runway 13/31 [Phase II - Construction], Extend Taxiway
"F" [Phase I - Design], Rehabilitate Apron [East General Aviation
Apron, Phase I (Design)]
SW TEX TX DAL Dallas Love Field P 44 $820,722.00 $820,722.00 $0.00 $0.00 Conduct Miscellaneous Study, Rehabilitate Taxiway
SW TEX TX DAL Dallas Love Field P 43 $7,900,000.00 $900,000.00 $7,000,000.00 $0.00 Rehabilitate Apron
SW TEX TX DFW Dallas/Fort Worth International P 107 $7,148,999.00 $0.00 $7,148,999.00 $0.00 Rehabilitate Taxiway
SW TEX TX DFW Dallas/Fort Worth International P 105 $9,047,696.00 $9,047,696.00 $0.00 $0.00 Rehabilitate Runway 18L/36R, Rehabilitate Taxiway, Rehabilitate
Taxiway Lighting
SW TEX TX DFW Dallas/Fort Worth International P 106 $421,875.00 $0.00 $421,875.00 $0.00 Acquire Equipment
SW TEX TX DRT Del Rio International CS 15 $150,000.00 $150,000.00 $0.00 $0.00 Install Apron Lighting, Rehabilitate Apron [North Apron, Phase I
(Design)]
SW TEX TX GGG East Texas Regional P 39 $2,925,207.00 $0.00 $2,925,207.00 $0.00 Construct Service Road [Phase I]
SW TEX TX ELP El Paso International P 33 $6,035,548.00 $6,035,548.00 $0.00 $0.00 Acquire Equipment, Rehabilitate Apron [Joint Seal Replacement],
Rehabilitate Taxiway "A"
SW TEX TX AFW Fort Worth Alliance R 52 $897,102.00 $897,102.00 $0.00 $0.00 Rehabilitate Taxiway, Rehabilitate Taxiway Lighting
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 59 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SW TEX TX AFW Fort Worth Alliance R 51 $10,000,000.00 $0.00 $10,000,000.00 $0.00 Extend Runway 16L/34R [Phase 10]
SW TEX TX IAH George Bush Intercontinental/Houston P 97 $600,000.00 $0.00 $600,000.00 $0.00 Sustainable Master Plan
SW TEX TX IAH George Bush Intercontinental/Houston P 99 $18,000,000.00 $10,000,000.00 $8,000,000.00 $0.00 Rehabilitate Taxiway
SW TEX TX IAH George Bush Intercontinental/Houston P 98 $9,880,000.00 $9,880,000.00 $0.00 $0.00 Rehabilitate Apron
SW TEX TX IAH George Bush Intercontinental/Houston P 100 $3,482,140.00 $0.00 $3,482,140.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
SW TEX TX IAH George Bush Intercontinental/Houston P 96 $13,062,533.00 $13,062,533.00 $0.00 $0.00 Extend Runway 15R/33L
SW TEX TX LRD Laredo International P 75 $2,703,707.00 $2,703,707.00 $0.00 $0.00
Acquire Safety Equipment and/or Fencing [Construct Perimeter
Security Fence], Improve Terminal Building, Rehabilitate Apron
[General Aviation Apron, Phase 8]
SW TEX TX LBB Lubbock Preston Smith International P 38 $1,750,954.00 $1,750,954.00 $0.00 $0.00 Improve Runway Safety Area [Relocate Service Road] - 17R/35L
SW TEX TX MFE McAllen Miller International P 44 $762,352.00 $762,352.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle, Improve Runway
Safety Area [Design-Only] - 13/31, Install Perimeter Fencing
SW TEX TX MAF Midland International P 54 $3,404,500.00 $3,404,500.00 $0.00 $0.00
Construct Apron [Construct Runway 16R's Run-Up Apron], Extend
Taxiway [Northwest Taxilane Extension], Improve Airport
Miscellaneous Improvements, Install Runway Lighting [Runway
and Taxiway Lighting Cable Replacement] - 16R/34L, Rehabilitate
Access Road, Rehabilitate Service Road, Wildlife Hazard
Assessments [Wildlife Hazard Management Plan]
SW TEX TX AMA Rick Husband Amarillo International P 38 $3,756,217.00 $3,756,217.00 $0.00 $0.00
Improve Airport Drainage, Improve Terminal Building, Install
Miscellaneous NAVAIDS [Replace primary wind cone Runway
04/22, Relocate supplemental wind cone Runway 04/22, and
Upgrade airfield lighting control system for Runway 04/22 and
13/31], Install Runway Distance-To-Go Signs [Replace Runway
04/22 Distance Remaining Signs], Wildlife Hazard Assessments
SW TEX TX SAT San Antonio International P 75 $6,400,000.00 $0.00 $6,400,000.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
SW TEX TX SAT San Antonio International P 76 $11,377,923.00 $2,377,923.00 $9,000,000.00 $0.00 Construct Taxiway "W" [Construction], Rehabilitate Runway
12R/30L, Rehabilitate Taxiway "G" [Phase 1]
SW TEX TX SPS Sheppard AFB/Wichita Falls Municipal P 11 $4,600,388.00 $1,000,000.00 $3,600,388.00 $0.00 Acquire Snow Removal Equipment, Construct Terminal Building
[Phase 1 - Design/Construct], Rehabilitate Taxiway "C"
SW TEX TX *TXB Texas State Block Grant Program 85 $23,883,385.00 $23,883,385.00 $0.00 $0.00 Non primary development projects in state block grant program
SW TEX TX *TXB Texas State Block Grant Program 84 $17,834,436.00 $17,834,436.00 $0.00 $0.00 Non primary development projects in state block grant program
SW TEX TX TYR Tyler Pounds Regional P 34 $1,015,061.00 $1,015,061.00 $0.00 $0.00
Extend Runway 4/22 [Phase 1 - Acquire Land], Rehabilitate
Runway 04/22 [Preliminary Engineering Report and Design
Phase 1]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 60 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
SW TEX TX HRL Valley International P 55 $3,643,269.00 $3,643,269.00 $0.00 $0.00
Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate
Runway 17R/35L [Mill and Overlay], Rehabilitate Taxiway
[Taxiways "J" and "K"]
SW TEX TX ACT Waco Regional P 34 $236,916.00 $236,916.00 $0.00 $0.00 Construct Service Road [Design-Only]
SW TEX TX HOU William P Hobby P 38 $475,000.00 $0.00 $475,000.00 $0.00 Sustainable Master Plan
WP HNL AS FAQ Fitiuta GA 27 $2,000,000.00 $2,000,000.00 $0.00 $0.00 Install Perimeter Fencing
WP HNL AS Z08 Ofu GA 11 $150,000.00 $0.00 $150,000.00 $0.00 Wildlife Hazard Assessments
WP HNL AS Z08 Ofu GA 10 $3,063,282.00 $3,063,282.00 $0.00 $0.00 Construct Aircraft Rescue & Fire Fighting Building [Phase I]
WP HNL AS PPG Pago Pago International P 51 $1,200,000.00 $1,200,000.00 $0.00 $0.00 Install Perimeter Fencing
WP HNL FM TKK Chuuk International GA 16 $200,000.00 $0.00 $200,000.00 $0.00 Conduct Miscellaneous Study [Runway Safety Area Study]
WP HNL FM TKK Chuuk International GA 15 $1,400,000.00 $0.00 $1,400,000.00 $0.00
Rehabilitate Runway 04/22 [Phase I - Design], Rehabilitate
Runway Lighting [Relocate airfield electrical vault - Phase 1
(Design)] - 04/22
WP HNL FM TKK Chuuk International GA 17 $1,500,000.00 $0.00 $1,500,000.00 $0.00 Construct Aircraft Rescue & Fire Fighting Building [Phase III]
WP HNL GU GUM Guam International P 88 $500,000.00 $500,000.00 $0.00 $0.00 Update Airport Master Plan Study
WP HNL GU GUM Guam International P 85 $2,005,605.00 $2,005,605.00 $0.00 $0.00 Extend Runway 06L/24R [Phase XI]
WP HNL GU GUM Guam International P 86 $1,876,981.00 $876,981.00 $1,000,000.00 $0.00 Rehabilitate Runway 06L/24R [Phase III]
WP HNL GU GUM Guam International P 87 $1,017,000.00 $1,017,000.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
WP HNL HI HNL Honolulu International P 113 $10,522,090.00 $10,522,090.00 $0.00 $0.00 Rehabilitate Runway 04R/22L [Phase II - Construction]
WP HNL HI HNL Honolulu International P 116 $450,000.00 $0.00 $450,000.00 $0.00 Sustainable Management Plan
WP HNL HI HNL Honolulu International P 114 $6,748,889.00 $6,748,889.00 $0.00 $0.00 Improve Terminal Building
WP HNL HI HNL Honolulu International P 115 $575,492.00 $575,492.00 $0.00 $0.00 Rehabilitate Runway Lighting [Phase III] - 04L/22R
WP HNL HI JRF Kalaeloa (John Rodgers Field) R 14 $2,969,560.00 $894,691.00 $2,074,869.00 $0.00 Rehabilitate Building [Hangar - Phase II]
WP HNL HI LNY Lanai P 17 $15,300,000.00 $0.00 $15,300,000.00 $0.00 Improve Runway Safety Area - 03/21
WP HNL HI LNY Lanai P 16 $1,041,930.00 $1,041,930.00 $0.00 $0.00 Rehabilitate Runway Lighting - 03/21
WP HNL HI MKK Molokai P 19 $3,022,148.00 $3,022,148.00 $0.00 $0.00 Improve Airport Drainage [Box Culvert - Phase II]
WP HNL HI *HIS State of Hawaii 5 $2,500,000.00 $2,500,000.00 $0.00 $0.00 Update State System Plan Study
WP HNL HI *HIS State of Hawaii 6 $904,500.00 $904,500.00 $0.00 $0.00 Conduct State System Plan Study
WP HNL MH MAJ Marshall Islands International GA 14 $2,000,000.00 $0.00 $2,000,000.00 $0.00 Install Perimeter Fencing [Phase II]
WP HNL MP GRO Benjamin Taisacan Mangiona International P 22 $833,315.00 $833,315.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
WP HNL MP GSN Francisco C. Ada/Saipan International P 77 $2,311,042.00 $2,311,042.00 $0.00 $0.00 Construct Aircraft Rescue & Fire Fighting Training Facility [Phase
V]
WP HNL MP GSN Francisco C. Ada/Saipan International P 76 $794,025.00 $794,025.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
WP HNL MP TNI Tinian International P 22 $830,025.00 $830,025.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
WP HNL PW ROR Babelthuap/Koror GA 17 $4,500,000.00 $0.00 $4,500,000.00 $0.00 Construct Apron [Phase V]
WP HNL PW ROR Babelthuap/Koror GA 18 $500,000.00 $0.00 $500,000.00 $0.00 Rehabilitate Apron [Phase I - Design Only]
WP LAX AZ DUG Bisbee Douglas International GA 8 $196,407.00 $196,407.00 $0.00 $0.00 Update Airport Master Plan Study
WP LAX AZ CHD Chandler Municipal R 23 $393,380.00 $393,380.00 $0.00 $0.00 Rehabilitate Apron, Rehabilitate Taxiway Lighting [Taxiway "A"]
WP LAX AZ P33 Cochise County GA 4 $177,721.00 $177,721.00 $0.00 $0.00 Update Airport Master Plan Study
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 61 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
WP LAX AZ P52 Cottonwood GA 15 $175,836.00 $175,836.00 $0.00 $0.00 Install Weather Reporting Equipment
WP LAX AZ E60 Eloy Municipal GA 12 $261,462.00 $261,462.00 $0.00 $0.00 Rehabilitate Taxiway
WP LAX AZ E60 Eloy Municipal GA 11 $135,891.00 $135,891.00 $0.00 $0.00 Conduct Miscellaneous Study [Conduct Airport Drainage Master
Plan Study]
WP LAX AZ FFZ Falcon Field R 23 $575,542.00 $219,776.00 $355,766.00 $0.00 Install Taxiway Lighting
WP LAX AZ FLG Flagstaff Pulliam P 37 $270,000.00 $0.00 $270,000.00 $0.00 Sustainable Master Plan
WP LAX AZ FLG Flagstaff Pulliam P 36 $4,905,017.00 $2,000,000.00 $2,905,017.00 $0.00 Rehabilitate Taxiway [Taxilanes]
WP LAX AZ GCN Grand Canyon National Park P 25 $90,000.00 $90,000.00 $0.00 $0.00 Wildlife Hazard Assessments
WP LAX AZ 1G4 Grand Canyon West P 16 $404,488.00 $404,488.00 $0.00 $0.00
Rehabilitate Apron [Crack seal, Fog seal, and remarking of the
aircraft parking apron], Rehabilitate Runway 17/35 [Crack seal
and fog seal], Rehabilitate Taxiway [Crack seal, Fog seal, and
remarking of Taxiway "A" and "C"]
WP LAX AZ 1G4 Grand Canyon West P 15 $71,250.00 $71,250.00 $0.00 $0.00 Wildlife Hazard Assessments
WP LAX AZ P14 Holbrook Municipal GA 15 $136,590.00 $136,590.00 $0.00 $0.00 Rehabilitate Runway Lighting [Design/Construct] - 03/21
WP LAX AZ IGM Kingman GA 26 $101,443.00 $101,443.00 $0.00 $0.00 Wildlife Hazard Assessments
WP LAX AZ IFP Laughlin/Bullhead International P 43 $1,317,024.00 $1,317,024.00 $0.00 $0.00 Install Taxiway Lighting [Taxiway "A"], Rehabilitate Taxiway "A"
WP LAX AZ IFP Laughlin/Bullhead International P 42 $101,443.00 $101,443.00 $0.00 $0.00 Wildlife Hazard Assessments
WP LAX AZ IFP Laughlin/Bullhead International P 44 $963,629.00 $963,629.00 $0.00 $0.00 Extend Runway 16/34 [Including parallel taxiway, Phase 1
Design]
WP LAX AZ PGA Page Municipal P 27 $90,027.00 $90,027.00 $0.00 $0.00 Wildlife Hazard Assessments
WP LAX AZ PAN Payson GA 19 $54,636.00 $54,636.00 $0.00 $0.00 Expand Apron [Phase 1 - Design Only]
WP LAX AZ DVT Phoenix Deer Valley R 32 $1,931,051.00 $1,931,051.00 $0.00 $0.00 Rehabilitate Taxiway "A" [Phase II]
WP LAX AZ DVT Phoenix Deer Valley R 33 $398,350.00 $398,350.00 $0.00 $0.00 Update Airport Master Plan Study
WP LAX AZ PHX Phoenix Sky Harbor International P 77 $11,804,550.00 $7,064,940.00 $4,739,610.00 $0.00 Rehabilitate Apron [East cargo apron], Rehabilitate Apron [West
hold bay]
WP LAX AZ IWA Phoenix-Mesa Gateway P 35 $6,391,545.00 $3,407,868.00 $2,983,677.00 $0.00 Rehabilitate Runway 12R/30L
WP LAX AZ RYN Ryan Field R 26 $180,326.00 $180,326.00 $0.00 $0.00 Construct Service Road [Phase I - Design], Install Perimeter
Fencing [Phase I - Design]
WP LAX AZ RYN Ryan Field R 25 $179,388.00 $179,388.00 $0.00 $0.00 Acquire Equipment [Acquire Sweeper]
WP LAX AZ SAD Safford Regional GA 23 $2,022,804.00 $2,022,804.00 $0.00 $0.00 Rehabilitate Apron [Phase II]
WP LAX AZ E77 San Manuel GA 6 $180,618.00 $180,618.00 $0.00 $0.00 Update Airport Master Plan Study
WP LAX AZ SDL Scottsdale R 30 $318,710.00 $318,710.00 $0.00 $0.00 Rehabilitate Runway Lighting [and signage] - 03/21
WP LAX AZ SOW Show Low Regional CS 23 $3,800,000.00 $219,250.00 $3,580,750.00 $0.00 Remove Obstructions [Runway 6 Approach - Phase II]
WP LAX AZ FHU Sierra Vista Municipal-Libby AAF GA 27 $191,779.00 $191,779.00 $0.00 $0.00 Acquire Equipment
WP LAX AZ FHU Sierra Vista Municipal-Libby AAF GA 28 $85,141.00 $85,141.00 $0.00 $0.00 Wildlife Hazard Assessments
WP LAX AZ TYL Taylor GA 20 $450,000.00 $450,000.00 $0.00 $0.00 Install Perimeter Fencing [Design/Construct]
WP LAX AZ TUS Tucson International P 67 $865,070.00 $865,070.00 $0.00 $0.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
WP LAX AZ TUS Tucson International P 68 $2,548,830.00 $2,548,830.00 $0.00 $0.00 Security Enhancements [Emergency Operations Center]
WP LAX AZ TUS Tucson International P 69 $364,240.00 $364,240.00 $0.00 $0.00 Update Airport Master Plan Study
WP LAX AZ TUS Tucson International P 70 $9,963,848.00 $1,037,804.00 $8,926,044.00 $0.00 Rehabilitate Apron [Terminal Apron, Phase II]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 62 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
WP LAX AZ *AZV Various Locations in Arizona 1 $956,130.00 $956,130.00 $0.00 $0.00
Wildlife Hazard Assessments (Casa Grande Municipal; Chandler
Municipal; Falcon Field; Glendale Municipal; Marana Regional;
Phoenix Deer Valley; Phoenix Goodyear; Scottsdale)
WP LAX AZ E25 Wickenburg Municipal GA 22 $2,213,548.00 $2,213,548.00 $0.00 $0.00 Construct Access Road, Construct Apron
WP LAX AZ NYL Yuma MCAS/Yuma International P 36 $3,646,530.00 $2,833,382.00 $813,148.00 $0.00 Expand Apron
WP LAX AZ NYL Yuma MCAS/Yuma International P 35 $54,636.00 $54,636.00 $0.00 $0.00 Wildlife Hazard Assessments
WP LAX CA L45 Bakersfield Municipal GA 17 $361,679.00 $361,679.00 $0.00 $0.00 Install Airport Beacons, Rehabilitate Runway 16/34, Rehabilitate
Taxiway "A"
WP LAX CA BNG Banning Municipal GA 13 $558,225.00 $558,225.00 $0.00 $0.00 Construct Taxiway [Phase II]
WP LAX CA BUR Bob Hope P 57 $1,289,440.00 $1,289,440.00 $0.00 $0.00
Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate
Runway 08/26 [Shoulders], Rehabilitate Runway 15/33
[Shoulders]
WP LAX CA POC Brackett Field R 16 $652,500.00 $652,500.00 $0.00 $0.00 Construct Heliport/Helipad
WP LAX CA CXL Calexico International GA 15 $172,206.00 $172,206.00 $0.00 $0.00 Rehabilitate Runway 08/26 [Phase 1 - Design]
WP LAX CA CMA Camarillo R 33 $2,655,301.00 $2,655,301.00 $0.00 $0.00 Rehabilitate Runway 08/26, Rehabilitate Runway Lighting
08/26, Rehabilitate Taxiway [Exit taxiways at runway ends]
WP LAX CA 49X Chemehuevi Valley GA 10 $900,000.00 $900,000.00 $0.00 $0.00 Expand Apron [Phase 2]
WP LAX CA BIH Eastern Sierra Regional GA 15 $265,252.00 $265,252.00 $0.00 $0.00 Conduct Airport Master Plan Study
WP LAX CA BIH Eastern Sierra Regional GA 14 $479,141.00 $479,141.00 $0.00 $0.00
Improve Runway Safety Area [Phase I - Design] - 16/34,
Rehabilitate Runway 16/34 [Phase I (Design)], Rehabilitate
Runway Lighting [Phase I - Design] - 16/34
WP LAX CA EMT El Monte R 14 $450,000.00 $450,000.00 $0.00 $0.00 Rehabilitate Apron [Phase 1 - Design]
WP LAX CA L18 Fallbrook Community Airpark GA 5 $163,800.00 $163,800.00 $0.00 $0.00 Install Weather Reporting Equipment
WP LAX CA WJF General Wm J Fox Airfield GA 15 $1,948,593.00 $1,948,593.00 $0.00 $0.00 Install Perimeter Fencing not Required by 14 CFR 139/49 CFR
1542 [Phase I]
WP LAX CA SEE Gillespie Field R 22 $824,925.00 $824,925.00 $0.00 $0.00 Construct Service Road [Phase II]
WP LAX CA IPL Imperial County CS 29 $982,132.00 $982,132.00 $0.00 $0.00
Conduct Miscellaneous Study [Airport Pavement Maintenance
Plan], Construct Taxiway [Reconfigure entrance taxiways at
Runway 14/32 ends (Phase 1 - Design)], Install Perimeter Fencing
required by 14 CFR 139
WP LAX CA IPL Imperial County CS 30 $117,420.00 $117,420.00 $0.00 $0.00 Wildlife Hazard Assessments
WP LAX CA IYK Inyokern CS 28 $84,024.00 $84,024.00 $0.00 $0.00 Wildlife Hazard Assessments
WP LAX CA SNA John Wayne Airport-Orange County P 43 $1,365,285.00 $1,365,285.00 $0.00 $0.00 Install Airfield Guidance Signs, Rehabilitate Service Road
WP LAX CA LPC Lompoc GA 15 $180,000.00 $180,000.00 $0.00 $0.00 Rehabilitate Apron [Design]
WP LAX CA LGB Long Beach /Daugherty Field/ P 40 $15,150,000.00 $4,688,697.00 $10,461,303.00 $0.00 Rehabilitate Runway 07L/25R, Rehabilitate Taxiway [Taxiways "E"
and "F"]
WP LAX CA LAX Los Angeles International P 74 $5,500,000.00 $0.00 $5,500,000.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL [El
Segundo]
WP LAX CA LAX Los Angeles International P 73 $10,000,000.00 $0.00 $10,000,000.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
[Inglewood]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 63 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
WP LAX CA LAX Los Angeles International P 75 $5,000,000.00 $0.00 $5,000,000.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
[L.A. County]
WP LAX CA LAX Los Angeles International P 76 $34,125,000.00 $9,861,539.00 $24,263,461.00 $0.00 Improve Runway Safety Area - 07L/25R
WP LAX CA LAX Los Angeles International P 77 $421,875.00 $0.00 $421,875.00 $0.00 Acquire Equipment [Acquire Automatic Dependent Surveillance
Broadcast Squitter units]
WP LAX CA RIV March ARB R 10 $6,460,183.00 $4,348,638.00 $2,111,545.00 $0.00
Construct Apron [General Aviation Apron], Construct Fuel Farm
[Military Airport Program] [Install above ground fuel storage tank
for General Aviation], Construct Terminal Building [General
Aviation]
WP LAX CA CRQ McClellan-Palomar P 31 $78,515.00 $78,515.00 $0.00 $0.00 Wildlife Hazard Assessments
WP LAX CA MHV Mojave GA 28 $189,720.00 $189,720.00 $0.00 $0.00 Acquire Equipment [Vacuum Sweeper]
WP LAX CA OKB Oceanside Municipal GA 11 $339,619.00 $339,619.00 $0.00 $0.00 Install Perimeter Fencing not Required by 14 CFR 139/49 CFR
1542, Rehabilitate Apron
WP LAX CA ONT Ontario International P 39 $400,000.00 $400,000.00 $0.00 $0.00 Conduct Noise Compatibility Plan Study
WP LAX CA ONT Ontario International P 38 $3,844,143.00 $3,844,143.00 $0.00 $0.00 Improve Runway Safety Area - 08L/26R
WP LAX CA PSP Palm Springs International P 50 $10,312,904.00 $10,312,904.00 $0.00 $0.00 Rehabilitate Apron [Phase II - Construction], Rehabilitate Taxiway
[Phase II - Construction]
WP LAX CA RAL Riverside Municipal R 27 $2,596,762.00 $2,596,762.00 $0.00 $0.00 Acquire Land For Approaches
WP LAX CA SBD San Bernardino International R 25 $79,885.00 $79,885.00 $0.00 $0.00 Wildlife Hazard Assessments
WP LAX CA SAN San Diego International P 71 $11,372,400.00 $0.00 $11,372,400.00 $0.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
WP LAX CA SAN San Diego International P 69 $3,109,162.00 $0.00 $3,109,162.00 $0.00 VALE Infrastructure
WP LAX CA SAN San Diego International P 70 $7,825,881.00 $6,825,881.00 $1,000,000.00 $0.00 Improve Airport Drainage
WP LAX CA SBA Santa Barbara Municipal P 46 $2,690,106.00 $2,690,106.00 $0.00 $0.00 Rehabilitate Runway 15R/33L, Rehabilitate Taxiway [Taxiways
"C", "H" & "J", Phase II]
WP LAX CA IZA Santa Ynez GA 13 $148,226.00 $148,226.00 $0.00 $0.00 Security Enhancements [East apron access control improvements
- Phase 1 (Design)]
WP LAX CA MIT Shafter-Minter Field GA 20 $432,896.00 $432,896.00 $0.00 $0.00 Rehabilitate Runway 12/30, Rehabilitate Runway Lighting [Phase
1 - Design] - 12/30
WP LAX CA VCV Southern California Logistics R 22 $153,000.00 $153,000.00 $0.00 $0.00 Wildlife Hazard Assessments
WP LAX CA VCV Southern California Logistics R 21 $5,679,169.00 $5,679,169.00 $0.00 $0.00 Rehabilitate Runway 03/21 [Phase 2]
WP LAX CA TSP Tehachapi Municipal GA 12 $164,122.00 $164,122.00 $0.00 $0.00 Install Runway Lighting - 11/29
WP LAX CA L19 Wasco-Kern County GA 8 $77,849.00 $77,849.00 $0.00 $0.00 Rehabilitate Runway 12/30
WP LAX CA WHP Whiteman R 15 $1,295,000.00 $1,295,000.00 $0.00 $0.00 Install Perimeter Fencing [Phase 1 - Design/Construct]
WP SFO CA AAT Alturas Municipal GA 9 $67,500.00 $67,500.00 $0.00 $0.00 Update Airport Master Plan Study
WP SFO CA ACV Arcata P 40 $2,148,784.00 $2,148,784.00 $0.00 $0.00 Construct Aircraft Rescue & Fire Fighting Building [Construction
Phase II]
WP SFO CA O85 Benton Field GA 15 $45,000.00 $45,000.00 $0.00 $0.00 Construct Wash Rack [Phase 1 - Design]
WP SFO CA D83 Boonville GA 4 $70,200.00 $70,200.00 $0.00 $0.00 Widen Runway 13/31 [Design]
WP SFO CA O57 Bryant Field GA 9 $54,900.00 $54,900.00 $0.00 $0.00 Update Airport Master Plan Study
WP SFO CA CCR Buchanan Field R 19 $45,000.00 $45,000.00 $0.00 $0.00 Wildlife Hazard Assessments
WP SFO CA MER Castle GA 15 $657,783.00 $657,783.00 $0.00 $0.00 Construct Taxiway "B-1"
WP SFO CA MER Castle GA 16 $795,330.00 $0.00 $795,330.00 $0.00 Install Apron Lighting [Phase II - Construct], Rehabilitate Building
[Hangars, Phase 1 - Design]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 64 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
WP SFO CA O59 Cedarville GA 8 $67,500.00 $67,500.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
WP SFO CA STS Charles M. Schulz - Sonoma County P 44 $28,101,270.00 $3,086,618.00 $25,014,652.00 $0.00 Improve Runway Safety Area - 14/32, Improve Runway Safety
Area - 01/19
WP SFO CA STS Charles M. Schulz - Sonoma County P 46 $4,202,078.00 $0.00 $4,202,078.00 $0.00 Environmental Mitigation [Habitat enhancement to mitigate
impacts for Runways 14/32 and 1/19 Safety Area Improvements]
WP SFO CA STS Charles M. Schulz - Sonoma County P 45 $10,483,270.00 $0.00 $10,483,270.00 $0.00 Environmental Mitigation [Mitigation credit acquisition for
Runway 14/32 and 1/19 Safety Area Improvements]
WP SFO CA CIC Chico Municipal P 33 $263,258.00 $263,258.00 $0.00 $0.00
Improve Airport Drainage [Taxiways "D" and "F" Intersection
Design and Construction], Rehabilitate Runway 13R/31L [Remark
Design and Construction]
WP SFO CA O60 Cloverdale Municipal GA 7 $80,000.00 $80,000.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
WP SFO CA O89 Fall River Mills GA 14 $45,000.00 $45,000.00 $0.00 $0.00
Rehabilitate Apron [Design (reseal, rejuvenate, and remark)],
Rehabilitate Runway 02/20 [Design (reseal, rejuvenate, and
remark)], Rehabilitate Taxiway [Design]
WP SFO CA O89 Fall River Mills GA 13 $164,775.00 $164,775.00 $0.00 $0.00 Install Apron Lighting [Construct - Install Apron Lighting], Install
Miscellaneous NAVAIDS [Install Rotating Beacon]
WP SFO CA FAT Fresno Yosemite International P 71 $6,600,000.00 $1,176,651.00 $5,423,349.00 $0.00 Improve Runway Safety Area [Phase 1 - Construction] - 11L/29R
WP SFO CA FAT Fresno Yosemite International P 72 $2,440,762.00 $2,440,762.00 $0.00 $0.00 Improve Runway Safety Area [Phase 2 - Construction] - 11L/29R
WP SFO CA 2O1 Gansner Field GA 11 $35,213.00 $35,213.00 $0.00 $0.00 Acquire Snow Removal Equipment [Snow Plow Sweeper
Attachment]
WP SFO CA 2O1 Gansner Field GA 12 $72,000.00 $72,000.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
WP SFO CA E36 Georgetown GA 9 $67,500.00 $67,500.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
WP SFO CA HJO Hanford Municipal GA 22 $119,531.00 $119,531.00 $0.00 $0.00 Rehabilitate Taxiway [Rehabilitate hangar taxilanes, Phase 1
(Design)]
WP SFO CA HJO Hanford Municipal GA 21 $75,000.00 $75,000.00 $0.00 $0.00 Update Airport Master Plan Study
WP SFO CA HES Healdsburg Municipal GA 9 $398,548.00 $398,548.00 $0.00 $0.00 Rehabilitate Runway 13/31 [Phase II - Construction (Crack seal
joints and seal coat)]
WP SFO CA CVH Hollister Municipal GA 16 $383,368.00 $383,368.00 $0.00 $0.00 Rehabilitate Runway 13/31 [Design]
WP SFO CA TVL Lake Tahoe GA 35 $1,080,711.00 $1,080,711.00 $0.00 $0.00 Rehabilitate Apron [Construction - Phase 1 and Phase 2]
WP SFO CA TVL Lake Tahoe GA 34 $108,000.00 $108,000.00 $0.00 $0.00 Wildlife Hazard Assessments
WP SFO CA 1O2 Lampson Field GA 16 $47,744.00 $47,744.00 $0.00 $0.00 Install Weather Reporting Equipment
WP SFO CA 1O2 Lampson Field GA 15 $75,000.00 $75,000.00 $0.00 $0.00 Update Airport Master Plan Study
WP SFO CA O24 Lee Vining GA 7 $54,900.00 $54,900.00 $0.00 $0.00 Update Airport Master Plan Study
WP SFO CA LHM Lincoln Regional/Karl Harder Field R 17 $600,000.00 $600,000.00 $0.00 $0.00 Improve Access Road [Construction - Phase 1]
WP SFO CA LVK Livermore Municipal R 24 $151,500.00 $151,500.00 $0.00 $0.00 Rehabilitate Runway 07R/25L [Design (Overlay, Remarking, and
Lighting)]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 65 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
WP SFO CA MAE Madera Municipal GA 25 $63,000.00 $63,000.00 $0.00 $0.00 Conduct Miscellaneous Study [Pavement Management
Maintenance Program]
WP SFO CA MAE Madera Municipal GA 26 $76,500.00 $76,500.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
WP SFO CA MMH Mammoth Yosemite P 26 $96,551.00 $96,551.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
WP SFO CA MMH Mammoth Yosemite P 28 $634,142.00 $634,142.00 $0.00 $0.00
Conduct Miscellaneous Study [Pavement Maintenance
Management Program (Including pavement condition survey)],
Rehabilitate Apron [Phase I - Joint seal and markings (Design)],
Rehabilitate Taxiway [Phase I - Joint seal and markings (Design)],
Rehabilitate Terminal Building
WP SFO CA MMH Mammoth Yosemite P 27 $56,880.00 $56,880.00 $0.00 $0.00 Wildlife Hazard Assessments
WP SFO CA OAR Marina Municipal GA 11 $300,000.00 $300,000.00 $0.00 $0.00 Update Airport Master Plan Study [Master Plan Update including
Airport Layout Plan]
WP SFO CA TLR Mefford Field GA 14 $234,890.00 $234,890.00 $0.00 $0.00 Rehabilitate Runway 13/31
WP SFO CA MCE Merced Regional//Macready Field CS 21 $109,078.00 $109,078.00 $0.00 $0.00 Wildlife Hazard Assessments
WP SFO CA MCE Merced Regional//Macready Field CS 22 $68,513.00 $68,513.00 $0.00 $0.00 Rehabilitate Apron [Design]
WP SFO CA OAK Metropolitan Oakland International P 67 $2,179,006.00 $0.00 $2,179,006.00 $0.00 VALE Infrastructure [Installation of eight precondition air units]
WP SFO CA OAK Metropolitan Oakland International P 66 $4,123,068.00 $4,123,068.00 $0.00 $0.00 Improve Runway Safety Area [Phase 4] - 11/29
WP SFO CA OAK Metropolitan Oakland International P 65 $13,000,000.00 $0.00 $13,000,000.00 $0.00 Improve Runway Safety Area [Phase 3] - 11/29
WP SFO CA MOD Modesto City County-Harry Sham Field P 37 $120,000.00 $120,000.00 $0.00 $0.00 Wildlife Hazard Assessments
WP SFO CA APC Napa County R 30 $100,606.00 $100,606.00 $0.00 $0.00 Improve Airport Miscellaneous Improvements [Rehabilitate
airfield lighting vault]
WP SFO CA APC Napa County R 29 $57,690.00 $57,690.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan Update
with Narrative Report]
WP SFO CA O02 Nervino GA 10 $63,000.00 $63,000.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
WP SFO CA SJC Norman Y. Mineta San Jose International P 82 $5,154,470.00 $2,035,976.00 $3,118,494.00 $0.00 Construct Taxiway [Phase VI]
WP SFO CA L52 Oceano County GA 7 $132,437.00 $132,437.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
WP SFO CA OVE Oroville Municipal GA 18 $99,900.00 $99,900.00 $0.00 $0.00 Rehabilitate Apron [North Side Apron - Design]
WP SFO CA OVE Oroville Municipal GA 19 $958,274.00 $958,274.00 $0.00 $0.00 Rehabilitate Apron [North Side Apron - Construction]
WP SFO CA PRB Paso Robles Municipal GA 22 $145,965.00 $145,965.00 $0.00 $0.00 Rehabilitate Taxiway [Design - Taxiways "A" and "F"]
WP SFO CA RBL Red Bluff Municipal GA 12 $62,735.00 $62,735.00 $0.00 $0.00 Rehabilitate Runway 15/33 [Phase 1 - Design]
WP SFO CA RDD Redding Municipal P 44 $749,176.00 $749,176.00 $0.00 $0.00 Expand Terminal Building [Construction]
WP SFO CA O32 Reedley Municipal GA 15 $56,700.00 $56,700.00 $0.00 $0.00 Install Perimeter Fencing [Design]
WP SFO CA O05 Rogers Field GA 16 $63,000.00 $63,000.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 66 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
WP SFO CA SMF Sacramento International P 52 $8,081,772.00 $2,081,772.00 $6,000,000.00 $0.00
Construct Apron [Terminal Modernization Program - Construct
terminal apron and associated taxiways, Remain-Over-Night
apron, and partial crossfield taxiway (Taxiway "W")]
WP SFO CA SNS Salinas Municipal GA 22 $3,375,417.00 $3,375,417.00 $0.00 $0.00 Rehabilitate Taxiway [Construction - Phase 1]
WP SFO CA SQL San Carlos R 16 $2,283,119.00 $2,283,119.00 $0.00 $0.00 Construct Fuel Farm, Improve Airport Drainage [Replace pump
station and generator]
WP SFO CA SFO San Francisco International P 63 $5,614,134.00 $5,614,134.00 $0.00 $0.00 Improve Runway Safety Area - 01R/19L
WP SFO CA SFO San Francisco International P 62 $1,191,657.00 $1,191,657.00 $0.00 $0.00
Environmental Mitigation [Environmental mitigation, Phase II, for
Runway 10L/28R and 10R/28L Runway Safety Area
improvements]
WP SFO CA SBP San Luis County Regional P 40 $144,421.00 $144,421.00 $0.00 $0.00 Conduct Miscellaneous Study [Pavement Maintenance
Management Program]
WP SFO CA SBP San Luis County Regional P 41 $333,325.00 $333,325.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report and Aeronautical Survey]
WP SFO CA D86 Sequoia Field GA 6 $1,090,083.00 $1,090,083.00 $0.00 $0.00 Install Miscellaneous NAVAIDS [Replace Rotating Beacon],
Rehabilitate Apron
WP SFO CA SCK Stockton Metropolitan P 32 $120,000.00 $120,000.00 $0.00 $0.00 Wildlife Hazard Assessments
WP SFO CA TCY Tracy Municipal GA 14 $523,500.00 $523,500.00 $0.00 $0.00
Conduct Miscellaneous Study [Pavement Maintenance
Management Program], Rehabilitate Runway 12/30 [Design],
Rehabilitate Runway 08/26 [Design], Rehabilitate Taxiway
[Taxiways "A", "B", "C", "D", "E", "F", Taxilanes, & New Cross
Taxiway to Relocated Runway 8/26 Thresholds]
WP SFO CA TCY Tracy Municipal GA 15 $76,500.00 $76,500.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
WP SFO CA TRK Truckee-Tahoe GA 29 $1,053,000.00 $1,053,000.00 $0.00 $0.00 Rehabilitate Apron [Aprons A1, A2, & A3]
WP SFO CA UKI Ukiah Municipal GA 12 $75,000.00 $75,000.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]
WP SFO CA VIS Visalia Municipal CS 29 $60,040.00 $60,040.00 $0.00 $0.00 Wildlife Hazard Assessments
WP SFO CA WVI Watsonville Municipal GA 13 $775,953.00 $775,953.00 $0.00 $0.00 Rehabilitate Apron [General Aviation Apron, Phase 1],
Rehabilitate Taxiway "C"
WP SFO CA DWA Yolo County GA 14 $82,800.00 $82,800.00 $0.00 $0.00
Construct Taxiway [Design - Taxiway Run-Up Apron Areas at both
Runway 16/34 Ends], Update Miscellaneous Study [Update
Airport Drainage Study]
WP SFO NV TMT Austin GA 14 $92,469.00 $92,469.00 $0.00 $0.00 Expand Apron [Design]
WP SFO NV BAM Battle Mountain GA 22 $360,864.00 $360,864.00 $0.00 $0.00 Update Airport Master Plan Study [Update Airport Master Plan
with Airport Layout Plan]
WP SFO NV BTY Beatty GA 13 $103,125.00 $103,125.00 $0.00 $0.00 Remove Obstructions [Phase 1 - Design]
WP SFO NV BVU Boulder City Municipal P 20 $908,990.00 $908,990.00 $0.00 $0.00 Construct Access Road [Design], Improve Airport Drainage
[Design and Construction - Phase I]
WP SFO NV CXP Carson R 26 $1,005,872.00 $1,005,872.00 $0.00 $0.00 Rehabilitate Apron [Main Apron, Phase 2 - Construction (West
End)]
Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation Page 67 of 68
FAA - Office of Airports FY 2013 Grants Awarded Report Date: 10/16/2013
Region ADO State LOCID Airport Service
Level
Grant Seq
Number
AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work
WP SFO NV CXP Carson R 25 $1,387,500.00 $1,387,500.00 $0.00 $0.00 Rehabilitate Apron [Main Apron, Phase 1 - Construction (East
End)]
WP SFO NV LOL Derby Field GA 13 $75,000.00 $75,000.00 $0.00 $0.00 Update Airport Master Plan Study
WP SFO NV EKO Elko Regional P 42 $1,189,802.00 $1,077,824.00 $111,978.00 $0.00 Rehabilitate Apron [Rehabilitate De-Icing Pad]
WP SFO NV EKO Elko Regional P 43 $1,705,867.00 $0.00 $1,705,867.00 $0.00 Rehabilitate Runway 05/23 [Phase II - Construction]
WP SFO NV ELY Ely /Yelland Field/ GA 16 $75,000.00 $75,000.00 $0.00 $0.00 Wildlife Hazard Assessments
WP SFO NV ELY Ely /Yelland Field/ GA 17 $92,509.00 $92,509.00 $0.00 $0.00 Update Airport Master Plan Study
WP SFO NV FLX Fallon Municipal GA 13 $234,375.00 $234,375.00 $0.00 $0.00 Install Weather Reporting Equipment
WP SFO NV HTH Hawthorne Industrial GA 11 $2,715,049.00 $2,715,049.00 $0.00 $0.00 Rehabilitate Apron [Overlay - Construct]
WP SFO NV 06U Jackpot/Hayden Field GA 9 $75,000.00 $75,000.00 $0.00 $0.00 Update Airport Master Plan Study
WP SFO NV 06U Jackpot/Hayden Field GA 10 $95,625.00 $95,625.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System - 15/33
WP SFO NV 1L1 Lincoln County GA 8 $74,444.00 $74,444.00 $0.00 $0.00 Update Airport Master Plan Study
WP SFO NV MEV Minden-Tahoe GA 25 $84,375.00 $84,375.00 $0.00 $0.00 Rehabilitate Taxiway [Phase I - Design Only - Taxiways "E", "F",
"G"]
WP SFO NV MEV Minden-Tahoe GA 24 $528,944.00 $528,944.00 $0.00 $0.00 Rehabilitate Apron [Tie Down]
WP SFO NV VGT North Las Vegas R 32 $2,160,918.00 $2,160,918.00 $0.00 $0.00
Construct Taxiway [Construct 6 run up pads (Runway Ends 30L,
30R and 25; Taxiways "A", "K", and "M")], Improve Airport
Drainage [Install 2 Drainage Culverts], Improve Airport Erosion
Control, Install Guidance Signs [Taxiways "D" and "M"; Runways
12L-30R, 7-25, & 12R-30L]
WP SFO NV VGT North Las Vegas R 31 $425,945.00 $425,945.00 $0.00 $0.00 Install Guidance Signs [Taxiways "A", "F" and "G"]
WP SFO NV VGT North Las Vegas R 33 $89,063.00 $89,063.00 $0.00 $0.00 Wildlife Hazard Assessments
WP SFO NV 10U Owyhee GA 7 $75,000.00 $75,000.00 $0.00 $0.00 Update Airport Master Plan Study
WP SFO NV 0 Pahrump (New) 6 $739,994.00 $0.00 $739,994.00 $0.00 Conduct Environmental Study [Phase II of Environmental Impact
Statement]
WP SFO NV RTS Reno/Stead R 31 $169,935.00 $169,935.00 $0.00 $0.00 Acquire Snow Removal Equipment [Snow Blower]
WP SFO NV RTS Reno/Stead R 32 $337,500.00 $337,500.00 $0.00 $0.00 Rehabilitate Taxiway "C" [Phase I - Design]
WP SFO NV RNO Reno/Tahoe International P 98 $5,756,250.00 $1,521,983.00 $4,234,267.00 $0.00 Rehabilitate Runway 16L/34R [Touchdown Areas - Design and
Construction]
WP SFO NV RNO Reno/Tahoe International P 97 $3,368,299.00 $0.00 $3,368,299.00 $0.00 Rehabilitate Apron [Phase 17 - Construction, Phase 18 - Design]
WP SFO NV TPH Tonopah GA 12 $450,000.00 $450,000.00 $0.00 $0.00
Construct Heliport/Helipad, Install Miscellaneous NAVAIDS
[Segmented Circle and Wind Cone], Install Perimeter Fencing
[include 2 automatic gates, Install Runway Vertical/Visual
Guidance System - 15/33
WP SFO NV LWL Wells Municipal/Harriet Field GA 10 $118,035.00 $118,035.00 $0.00 $0.00 Install Runway Vertical/Visual Guidance System [Phase II] - 08/26
WP SFO NV WMC Winnemucca Municipal GA 20 $92,386.00 $92,386.00 $0.00 $0.00 Install Perimeter Fencing
WP SFO NV WMC Winnemucca Municipal GA 18 $167,513.00 $167,513.00 $0.00 $0.00 Acquire Land For Approaches
WP SFO NV WMC Winnemucca Municipal GA 19 $75,000.00 $75,000.00 $0.00 $0.00 Update Airport Master Plan Study [Airport Layout Plan and
Narrative Report]