Future Transportation Projects within the Loxahatchee River Basin
description
Transcript of Future Transportation Projects within the Loxahatchee River Basin
![Page 1: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.fdocuments.in/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/1.jpg)
Future Transportation Projects within the Loxahatchee River
Basin
Florida Department of TransportationDistrict IV
3400 W. Commercial Blvd.Ft. Lauderdale, FL 33309
Photo by Jeff Ripple
![Page 2: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.fdocuments.in/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/2.jpg)
FDOT District 4 Work Program Loxahatchee River Basin
1. I-95 – widening, add HOV lanes
a) from Don Ross Rd to SR 706 - Oct. 2007
b) From SR 706 to St. Lucie Co. – Year 2011
c) I-95 resurfacing – SR 76 to St. Lucie Co. – Oct. 2007
2. SR 706 from the Turnpike to Chasewood Plaza – Aug. 2007
3. I-95 ITS installation - June 2007
![Page 3: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.fdocuments.in/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/3.jpg)
Current Activities
ETDM Screening
Wildlife Crossing Survey
Collect Traffic Data
![Page 4: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.fdocuments.in/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/4.jpg)
WHAT IS ETDM? A GIS based software program that allows
agencies the opportunity to post comments regarding the proposed transportation improvement project.
![Page 5: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.fdocuments.in/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/5.jpg)
Current Activities-ETDM
• SFWMD – coordinate with LRCC, coordinate with
CERP, coordinate with Park
• FDEP – coordinate with LRCC, coordinate with
CERP, coordinate with Park
No comments from Department of Interior regarding W&S
![Page 6: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.fdocuments.in/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/6.jpg)
Culvert/Bridge Crossing Usage Survey
![Page 7: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.fdocuments.in/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/7.jpg)
Culvert/Bridge Crossing Usage Survey
nongame species Vehicle/pedestrian
activities
![Page 8: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.fdocuments.in/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/8.jpg)
Preliminary Traffic Study
Initial Analysis indicates need for additional capacity – one additional lane in each direction
(This was determined by developing a long term Average Annual Daily Traffic forecast based on
current and planned future developments)
![Page 9: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.fdocuments.in/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/9.jpg)
Purpose Start data collection early to identify issues up front to allow
input from stakeholders that will be useful during the PD&E study
• Does the bridge profile need to be studied?
![Page 10: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.fdocuments.in/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/10.jpg)
Agency CoordinationAgency coordination required for transportation
projects within the Loxahatchee River Basin:
Loxahatchee River• Wild and Scenic River• Section 4(f) property
Jonathan Dickinson State Park• Section 4(f) property
![Page 11: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.fdocuments.in/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/11.jpg)
FDOT Coordination for Wild and Scenic Rivers
Coordination with National Park Service (NPS):
• Coordination letter describing the proposed activities is submitted to NPS for review and comment
• NPS must respond within 30 days
• NPScomments should be incorporated into the appropriate PD&E Document
![Page 12: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.fdocuments.in/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/12.jpg)
Compensation for Unavoidable Impacts
• Mitigation for impacts to wetlands and/or park land would be required for unavoidable impacts from FDOT projects
• Agencies (South Florida Water Management District, U.S. Army Corps of Engineers) prefer mitigation to be:
In kind Within the same drainage basin as the impact
• FDOT will need potential mitigation areas/projects within the basin