FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
-
Upload
philomena-warren -
Category
Documents
-
view
212 -
download
0
Transcript of FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
![Page 1: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/1.jpg)
![Page 2: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/2.jpg)
FUTURE OFFSHOREUpdate on the Consultation
Nigel PeaceLicensing & Consents Unit27 March 2003
![Page 3: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/3.jpg)
ENERGY GROUP
Purpose of talk
• Highlight main issues arising from the consultation
• Indicate how they will be taken forward• In particular, report progress on SEA
![Page 4: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/4.jpg)
ENERGY GROUP
107 responses received
• Developers, including trade associations – 23• Marine users – 12• Environmental, heritage & countryside
organisations – 26• Local authorities, regional organisations – 16• Electricity companies, regulatory bodies – 10• Others, including academics & legal firms - 20
![Page 5: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/5.jpg)
ENERGY GROUP
New legislation – consultation views • Strong support for early legislation to enable
developments to take place outside territorial waters
• Environmental groups would prefer legislation to be part of a comprehensive and integrated framework for the marine environment
• White Paper confirms that legislation will be brought forward as soon as possible
![Page 6: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/6.jpg)
ENERGY GROUP
Items expected to be covered in new legislation • Setting up a “Renewable Energy Zone”
beyond territorial waters for renewable energy projects;
• Giving responsibility to the Crown Estate for the issue of sea bed licences in the Zone;
• Extending the legal framework in territorial waters to the Zone eg section 36 Electricity Act consents;
• Providing a statutory regime for safety zones; possibly extinguishing rights to navigation in the Electricity Act.
![Page 7: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/7.jpg)
ENERGY GROUP
The allocation of rights in Round 2 & future rounds – consultation views • General support for the tender assessment
process outlined in Future Offshore. • Developers concerned about the proposal to offer
leases in fixed, geographically defined regions, following SEA.
• Others – eg environmental groups, NGC – support this proposal.
• Miscellaneous points made on the proposed boundaries of the 3 strategic regions.
![Page 8: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/8.jpg)
ENERGY GROUP
The allocation of rights – consultation views (continued)
• No clear view on the frequency of rounds: environmental groups tend towards a three year cycle whilst developers favour greater frequency
• General agreement that leases should specify timetables for implementation of projects
• No consensus on whether other renewable technologies should be covered within the same planning framework.
![Page 9: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/9.jpg)
ENERGY GROUP
How will next rounds proceed? • Round Two will be based on the three strategic
areas (subject to small extension of Greater Wash boundaries)
• Design of the Round will be agreed between Crown Estate and DTI, taking into account– Responses to consultation – Registrations of interest– SEA Environmental Report
![Page 10: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/10.jpg)
ENERGY GROUP
How will next rounds proceed? (continued)
• Once Round Two under way, DTI & Crown Estate will discuss with BWEA, SEA Steering Group, etc – Taking forward SEA process– Timing and geographical areas of subsequent
rounds
![Page 11: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/11.jpg)
ENERGY GROUP
SEA – views of environmental groups • Concerns that the process is being
implemented too quickly• Widely held view that a national scale SEA is
needed to inform decisions on the best strategic areas for development
• Only a few calls for a moratorium on further development, but wide support for a precautionary approach to sites where data is unavailable and impact uncertain
• Analysis of cumulative impact seen as crucial
![Page 12: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/12.jpg)
ENERGY GROUP
SEA – views of wind industry
• Value of SEA process recognised• Do not want the timetable to slip• Believe rigid application of precautionary principle
would be counterproductive• Concern that positive environmental benefits of
wind energy may not be adequately recognised
![Page 13: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/13.jpg)
ENERGY GROUP
SEA – Timetable
• Environmental Report will be published in draft at the end of April. Four week public consultation during May.
• Report will be finalised at end of May in order to inform Round 2 which will follow in June.
• Progress can be monitored on http://www.og.dti.gov.uk/offshore-wind-sea/
![Page 14: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/14.jpg)
ENERGY GROUP
Responsibility for offshore cables
1. Offshore developers remain responsible for offshore connections to onshore, as now.
2. Extend responsibilities of onshore network operators to offshore, but maintain existing charging arrangements. Offshore developers would then have choice of providing connections themselves or receiving regulated cost-reflective connections.
3. As 2, but adjust the regulatory charging regime so that network operators could recover costs from other customers.
Consultation clarified that there are three options:
![Page 15: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/15.jpg)
ENERGY GROUP
Responsibility for offshore cables (continued)
• No consensus of views on the best way forward• Similarly no consensus on whether a new
regulatory regime is needed for third party access. • A few respondents call for a co-ordinating strategy
for offshore network infrastructure • Clear that this is a key issue for the future
![Page 16: FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.](https://reader036.fdocuments.in/reader036/viewer/2022072014/56649e765503460f94b77547/html5/thumbnails/16.jpg)
ENERGY GROUP
Conclusions • Consultation response generally supports the
proposed way ahead although much comment on detail
• Summary of responses, and Department’s conclusions, will be published in the summer
• SEA process is well under way • Round Two is in active preparation• Legislation will be introduced as soon as
Parliamentary time allows• Key issues for longer term include taking forward
the SEA process; the design of future rounds; and responsibility for offshore cables.