Future Exploration of Venus: Future Exploration of Venus: Some NASA PerspectivesSome NASA Perspectives
Adriana Ocampo & Steve SaundersNational Aeronautics and Space [email protected]
James Cutts & Tibor Balint Jet Propulsion Laboratory / [email protected] & [email protected]
Presented at the
Chapman ConferenceExploring Venus as a Terrestrial Planet
Key Largo, Florida, USA13-16 February 2006
2
OverviewOverview
• Brief Summary of Past/Present Venus In-situ Missions• Recent Solar System Exploration Strategic Plans• Next steps
3
Past Past Missions:Missions:Russian Russian Venus Lander Missions (1965Venus Lander Missions (1965--1981)1981)
Year Type / Method Comment Method EDLVenusVenera 3 FAILED
1965 Venus Lander Impacted Venus, Contact Lost Parachute
Venera 4FAILED
1967 Venus Probe Failed at altitude 24.96 km Parachute
Venera 5FAILED
1969 Venus Probe During parachute descent data was transmitted from the atmosphere for 53minutes before failure
Parachute
Venera 6FAILED
1969 Venus Probe During parachute descent data was transmitted from the atmosphere for 51minutes before failure
Parachute
Venera 7PARTIAL FAILURE
1970 Venus Lander 35 minutes of data during descent, 23 min.weak signal from the surface (1st man made object to return data after landing on another planet)
Aerobraking then parachute
Venera 8 1972 Venus Lander Data during descent, plus 50 minutes after landing
Aerobraking/ D2.5m parachute at 60km
Venera 9 1975 Venus Orbiter and Lander
Operated for 53 minutes after landing Protective hemispherical shell/ three parachutes/ disk shaped drag brake/ metal, compressible doughnut-shaped landing cushion
Venera 10 1975 Venus Orbiter and Lander
Operated for 65 minutes after landing See Venera 9
Venera 11 1978 Venus Lander Transmitted data after touchdown for 95 minutes, until it moved out of range with Earth.
Aerodynamic ~/ parachute ~/ atmospheric braking/ soft landing
Venera 12 1978 Venus Lander Worked until out of range , transmitted fromthe surface for 110 minutes.
See Venera 11
Venera 13 1981 Venus Lander The lander survived for 117 minutes. Parachute/ at 47km parachute released/ aerobrakingVenera 14 1981 Venus Lander The lander survived for 57 minutes See Venera 13
The longest surface mission survived for almost 2 hours
4
Past Past Missions: Missions: CloseClose--up Surface Features on Venus (USSR)up Surface Features on Venus (USSR)
5
Past Missions: Past Missions: Venus Exploration, VEGA MissionVenus Exploration, VEGA Mission
VEGA balloon during Earth atmosphere testing
• International project: VEGA 1 & 2• Was managed by Space Research Institute (IKI)• Combined study of Venus and Halley's comet• Developed by Babakin Space Center • Fabricated by Lavochkin Association
(in Khimki, Moscow region)
• Flew by Venus on June 11th and 15th, 1985; • Studied the surface & atmosphere of Venus with
• 2 balloons with 4 scientific experiments & • 2 landers with 9 experiments
• VERY FRUITFUL INTERNATIONAL COOPERATION
VEGA Mission Profile
6
Past Past Missions: Missions: US Venus MissionsUS Venus Missions
• 1962 - Mariner 2 (U.S.) flew by Venus(12/14/62); Verified high temperatures.
• 1974 - Mariner 10 (U.S.) bound for Mercury, flew by Venus (2/5/74); Tracked global atmospheric circulation with visible and violet imagery.
• 1978 - Pioneer Venus Orbiter (U.S.) radar mapped Venus (12/78); Pioneer Venus Multiprobe (U.S.) dropped four probes through Venusian clouds.
• 1989 - Magellan (U.S.) was launched toward Venus (5/4/89). It arrived at Venus in 1990 and mapped98% of the planet. Mission ended in 1994.
7
Past Past Missions: Missions: PioneerPioneer--Venus ProbesVenus Probes
Large ProbeSeparation Sequence Small Probe Pressure Vessel Internal ArrangementLarge Probe Pressure Vessel Internal Arrangement
Large Probe Small Probe
Large Probe Design Summary Mass Deceleration Module Pressure Vessel
302 kg 109 kg 193 kg
Diameter Aeroshell Pressure Vessel
142 cm 78 cm
Battery 19 cell AgZn 40 A-h
Data Rate 128/256 bps Science Accommodations 7 pressure vessel penetrations
9 windows (8 sapphire, 1 diamond) Science Instruments 35 kg total, 106 W
- (LAS) Atmospheric Structures - (LN) Nephelometer - (LCPS) Cloud Particle Size Spectrometer - (LIR) Infrared Radiometer - (LNMS) Neutral Mass Spectrometer - (LGS) Gas Chromatograph - (LSFR) Solar Flux Radiometer
Small Probe Design Summary Mass Deceleration Module Pressure Vessel
94 kg 33 kg 61 kg
Diameter Aeroshell Pressure Vessel
76 cm 47 cm
Battery 20 cell AgZn 11 A-h
Data Rate 16/64 bps Science Accommodations 3 doors
2 windows (sapphire) Science Instruments 4.5 kg total, 10 W
- (SAS) Atmospheric Structures - (SN) Nephelometer - (SNFR) Net Flux Radiometer
©2005 • The Boeing Company • All rights reserved
Ref: Bernie Bienstock, Boeing Satellite Systems
8
• established by NASA in July 2005
• to identify scientific priorities and strategy for exploration of Venus. VEXAG is currently composed of two co-chairs and two focus groups.
•The focus groups will actively solicit input from the scientificcommunity. VEXAG will report its findings and provide input to NASA, but will not make recommendations.
• Chaired by Sushil Atreya and Janet Luhmann
• Next meeting May 1-2, 2006 Pasadena California
Venus Exploration Analysis Group (VEXAG)
http://www.lpi.usra.edu/vexag/vexag.html
9
OnOn--going going Mission:Mission: Venus Express (ESA)Venus Express (ESA)
• Follow-on to Mars Express• Will study the atmosphere, the plasma
environment, and the surface of Venus• Nominal mission: 500 days in Venus orbit• Launch Mass: 1270 kg • Operational orbit: 24-hour elliptical, quasi-
polar orbit• Instruments:
– ASPERA-4: Analyzer of Space Plasmas and Energetic Atoms
– MAG: Magnetometer – PFS: Planetary Fourier Spectrometer – SPICAV: Spectroscopy for
Investigation of Characteristics of the Atmosphere of Venus
– VeRa: Venus Radio Science – VIRTIS: Visible and Infrared Thermal
Imaging Spectrometer – VMC: Venus Monitoring Camera Ref: ESA
10
OnOn--going going Mission:Mission: Venus Express (ESA)Venus Express (ESA)NASA Participation on Venus Express:• 10 Venus Express Participating Scientist (PS) selected
(NASA NRA Jan. ‘05; selection July ‘05, 10 selected out of 30 proposals submitted)
Charles Acton - JPL NAIFSushil Atreya - Univ. Michigan,Coupled dynamics and
chemistryKevin Baines - JPL, To the depths of Venus with Venus
Express. US Science lead PS.Pontus Brandt - JHU/APL, Aspera-4 investigationDavid Crisp - JPL, To the depths of Venus with Venus
ExpressSanjay Limaye - Univ. Wisconsin, Exploration of dynamics
and chemistryJanet Luhmann - UC Berkeley, Building on PVOChris Russell - UCLA, Magnetometer investigationAlan Stern - SwRI, Occultation experiments (SPICAV)Len Tyler - Stanford, Radio science
• DSN support (bistatic radar, Venus movie, etc) Tommy Thompson Lead for DSN and Program Support
• Educational Outreach Program lead by Rosalyn Pertzborg and Sanjay Limaye
ESA Announcement of Opportunity for Interdisciplinary Scientist is out
NASA is considering supporting 1-3 USA VEX IDS
Ref: ESA
11
Future International Mission: Future International Mission: Venus Climate Orbiter Venus Climate Orbiter –– aka Planetaka Planet--C (JAXA)C (JAXA)
• The science plan of VCO is complementary with that of the ESA’s Venus Express mission
• VCO focuses on global imaging from equatorial orbit
• Science Goals: – Atmospheric dynamics
Mechanism of super-rotationMeridionalcirculationMeso-scale processesLightningCloud physics
– Detection of active volcanism– Inhomogeneity of surface material– Zodiacal light
• Science Instruments:– 1-mm Camera (IR1) – 2-mm Camera (IR2) – Ultraviolet Imager (UVI)– Longwave Infrared Camera (LIR) – Lightning and Airglow Camera (LAC) – Sensor Digital Electronics Unit (DE) – Radio Science (RS)
Ref: Takeshi Imamura, JAXA’s Venus Climate Orbiter (Planet-C) Overview
• Launch / Arrival: June 2010 / Dec 2010• Planned mission lifetime: 2 years • S/C mass: 480 kg (including fuel)• Science payload: 34 kg• Attitude control:
Pointing accuracy 0.1° / Stability 0.01°• Orbit: Periapsis 300 km / Apoapsis 13 Rv
/ Period 30 hours
12
Recent NASA Solar System Exploration Strategic PlansRecent NASA Solar System Exploration Strategic Plans
1. NRC Decadal Survey – 2002“New Frontiers in the Solar System, an Integrated Exploration Strategy”. Technical Report, Space Studies Board, National Research Council, Washington, D.C. http://www.nap.edu
2. Solar System Exploration Roadmap – 2003The 2003 Solar System Exploration Roadmap is available on line at http://solarsystem.nasa.gov/multimedia/download-detail.cfm?DL_ID=3
3. Strategic Road Map for Solar System Exploration – 2005Available from the Outer Planets Assessment Group (OPAG) website:http://www.lpi.usra.edu/opag/announcements.html
1. 1. 2. 3. 2. 3.
13
Solar System Exploration Decadal Survey Solar System Exploration Decadal Survey –– 20022002
Integrated Exploration Strategy• Presents key scientific questions• Ranked list of conceptual missions• Recommendations for the decade 2003-2013• A set of “deferred high priority flight missions
for decades beyond that”• Recommended significant investments in
advanced technology to enable high priority flight missions
Implementation Approach• Discovery Program (<$350M) PI-led and
competitively selected (6 to 7 per decade)• New Frontiers Program (<$650M) PI-led and
competitively selected, but to a specified set of targets (4 per decade) – Jupiter Orbiter w/ Probe, Lunar Sample Return, Comet Sample Return and Venus In Situ Explorer
• Flagship missions (>$650M) – directed missions – like Cassini Huygens, 1 per decadehttp://www.nap.edu
14
SSE Decadal Survey:SSE Decadal Survey:Inner Solar System: Keys to Habitable WorldsInner Solar System: Keys to Habitable Worlds
Exploration Strategy• Sample Return Missions from targets of
increasing difficulty– Moon first – Mars next– Mercury-Venus
• In-Situ Exploration of Venus– Investigate surface and
atmospheric chemistry– Demonstrate key technologies for
sample return
• Network Science at Venus and Mercury– Seismology and magnetic fields– Heat flow– Atmospheric circulation for Venus– Technologies for extreme
environmentsCourtesy NASA/JPL-Caltech
15
SSE Decadal Survey : SSE Decadal Survey : Chronological Sequence of Missions & Criteria for Setting PrioriChronological Sequence of Missions & Criteria for Setting Priorities ties
• Scientific Merit– Significance of progress on high priority science objectives– Creates new or changes existing paradigms– Affects direction of future research– Improves predictive models
• Opportunity– Orbital Mechanics– Relationship to other missions– International cooperation– Scientific discovery making this the right time for the mission– Public Interest
• Technological Readiness– Often drives choices between missions with equal scientific merit and no clear
opportunity based discriminators – Major element of cost risk equation– Requires intensive mission trades and projection of future technological progress
16
Solar System Exploration Strategic Road Map Solar System Exploration Strategic Road Map –– May 2005May 2005
Acronyms and Legend
SPAB – South Pole Aitken BasinSR – Sample Return
FB – FlybyDP – Deep Probes
Habitability ThreadArchitecture Thread
Europa Astrobiology or Neptune System or …Venus Surface Sample Return
Education & Public Outreach
2005 - 2015 2015 - 2025 2025 - 2035
Strategic First-Decade Technology Developments:- Power- Hypervelocity/Aero entry- High Temperature and High
Pressure Operations- Low Temperature Operations
Europa Geophysical Observer
ScienceDecision
Flagship Missions
Research and Analysis
Ground-based Observations
Technology Development
Titan Explorer
Venus Surface Explorer
New Horizons (Pluto)
Lunar SPAB
Jupiter Polar Orb
3/decade
Discovery 5/decade
OR
Comet Surface SR
Jupiter FB/DP
Venus In situ Explorer
New Frontiers
Other future options
TechnologyDecision
TechnologyDecision
New Start Decision
All mission categories in the SSE Roadmap (2005) includes missions for Venus ExplorationThese categories are: Flagship, New Frontiers and Discovery
17
Potential Future Missions: Discovery / New Frontiers ClassesPotential Future Missions: Discovery / New Frontiers ClassesNext StepNext Step: : Some Options for Venus ProgramSome Options for Venus Program
Discovery Program– Venus concepts have been proposed at each opportunity;– Include orbiter, probe, lander and balloon concepts;– No Venus concept has been selected to date;– Discovery 12 AO has been issued. Because the competition is on-going no
information on current concepts are available.
New Frontiers Program– Announcement of Opportunity expected in 2008
International collaboration and coordination- Mission of Opportunity via Discovery and New Frontiers- ESA’s Cosmic Vision
VEXAG- voice for the scientific community. Encourage coordination and could
influence the collaborative process among agencies- Please participate