Future Consideration for WITSML from Total

9
1 Future Consideration for WITSML from Total Products should migrate to the same version of WITSML Need provisions for backup in case of system failure Office support should extend to 24/7 operations Global data identification needed Increased requirements for security Newly enabled in-house software developments possible Focus on the content rather than the container Focus on understanding the data and actions being processed

description

Future Consideration for WITSML from Total. Products should migrate to the same version of WITSML Need provisions for backup in case of system failure Office support should extend to 24/7 operations Global data identification needed Increased requirements for security - PowerPoint PPT Presentation

Transcript of Future Consideration for WITSML from Total

Page 1: Future Consideration for WITSML from Total

1

Future Consideration for WITSML from Total

• Products should migrate to the same version of WITSML

• Need provisions for backup in case of system failure• Office support should extend to 24/7 operations• Global data identification needed• Increased requirements for security• Newly enabled in-house software developments

possibleFocus on the content rather than the containerFocus on understanding the data and actions being

processed

Page 2: Future Consideration for WITSML from Total

2

What are WITSML Benefits for StatoilHydro?

• WITSML and WITSML-based processes and products can make it cost effective to implement complex and challenging business cases– Complexity of the physical environment– Diversity of service companies involved

• WITSML can be a catalyst to the identification of new business opportunities

Largest well in the Troll field superimposed over Bergen (to scale)

Page 3: Future Consideration for WITSML from Total

3

Future Considerations for WITSML from StatoilHydro

• Real-time communications systems can be a challenge in some parts of the world

• More software application products must be real-time enabled

• Determine what is “right data” and what is its “right time”• Improving consistency in WITSML usage among processes

and products– WITSML SIG is beginning to define use case “profiles”

• Determine how much human supervision and quality control should remain after automation

• Determine how to handle increased volume from new technologies: wired pipe, well seismic, etc.

Page 4: Future Consideration for WITSML from Total

4

What are WITSML Benefits for Shell?

• Moves Data– Effortlessly – Efficiently– Securely– Preserving Vendor Neutrality

• Enables real-time data flows• Supports well planning and design

– Relevant data from any system, internal or external

– Compare proposal with historical results– Easy data exchange among well engineering applications– Collaboration among geologists, geophysicists,

petrophysicists, reservoir engineers, well engineers, and real time application engineers

Page 5: Future Consideration for WITSML from Total

5

What are WITSML Benefits for Shell?• Combining expertise leads to optimal well delivery

– Staff on the rig - Wellsite engineer, Wellsite geologist, Drilling supervisor, Mudlogger, Directional driller etc. – can easily share data and have more time to focus on the job

– Technical specialists from theoffice can be intimately involvedin the execution of the well,they are fed information from all parties on the rig, and provide advice or intervene when needed

– Reduction of personnel on the rigcan be achieved thus decreasing safety exposure and costs

Page 6: Future Consideration for WITSML from Total

6

What are WITSML Benefits for Shell?

• Improved partner reporting– Timely, high quality

exchange of data without restriction on how that data is used or interpreted

– Partner can interpret the data independently

– Can include daily operations reports, mudlog reports, casing reports etc.

Page 7: Future Consideration for WITSML from Total

7

Summary and Recommendations•WITSML is ready to deliver

value for you today. •Embed WITSML as part of your

real-time data architecture•Use WITSML to get the right

data to the right person• Real-time validation and

optimization to improve drilling performance

• Improve reporting quality with less effort

•Demonstrate value from WITSML usage and expand scope of use

Drag Analysis

2800

3000

3200

3400

3600

3800

4000

4200

4400

4600

4800

5000

5200

5400

5600

5800

6000

6200

6400

6600

6800

7000

7200

7400

7600

7800

8000

8200

8400

8600

8800

9000

200 220 240 260 280 300 320 340 360 380 400Hookload (Klb)

Dep

th (f

t)

Pred R off B Pred R On B Pred PU Pred SO HKLD (avg)

Inc Drillers PU Drillers SO Drillers R off B

Merganser 22/30a-M116" Section

18 5/8" Csg2992 ft

POOH @ 3451ft Change Bit Jets

0 100Inc

MW 735FF 0.15/0.17

Start to increase WOB due to slowROPs through evaporites

WOB decreased after drilling back into claystones

POOH @ 8431ft Change Bit

Page 8: Future Consideration for WITSML from Total

Discussion

8