FUTURE AND ADVANCE WEAPONS IN INDIAN DEFENSE By Vishwajit Mawale (2341) Kiran Marwade (2340) Paras...
-
Upload
ethan-summers -
Category
Documents
-
view
228 -
download
0
Transcript of FUTURE AND ADVANCE WEAPONS IN INDIAN DEFENSE By Vishwajit Mawale (2341) Kiran Marwade (2340) Paras...
FUTURE AND ADVANCE WEAPONS IN INDIAN
DEFENSE
By
Vishwajit Mawale (2341)
Kiran Marwade (2340)
Paras Adhiya (2362)
INTRODUCTION
ARJUN MK. II MBT
Arjun Mk.2 will have Battle Field
Management System (BFMS) which will
enable the tank to get feed from UAV‘s and
Helicopters, which then enable the Arjun
Mk.2 tank crew much aware of their
surroundings and better understanding of
the battle zone
Self-diagnostic system (SDS) will also be
added to Arjun Mk.2 which is like a health
monitoring system.
Arjun Mk.2 will get a new efficient
1500bhp engine which has been in
development by DRDO in India itself
Weight: 60 tons
Primary weapon: 120 mm rifled tank gun
Secondary weapon: HCB 12.7 mm AA MG,
Mag 7.62 mm Tk715 coaxial MG
Operational range: 435 kilometers
Speed: 75 km/h Road, 42 km/h Cross
country
TEJAS MARK 2
The project is currently moving from planning
to the design phase. It is expected that a
working aircraft will be flying in 2013 before
returning for further testing. A second round of
test flights should hopefully take place in 2014.
The Mark 2 is expected to enter service with the
Indian Air Force and Navy in 3Q 2015.
Performance:
Maximum speed: Mach 1.8
Range: 3,000 km (without refueling)
Armament:
Guns: 1x mounted 23 mm twin-barrel GSh-23
cannon with 220 rounds of ammunition.
Hard points: 8 total: 1× beneath the port-side
intake trunk, 6× under-wing, and 1× under-
fuselage with a capacity of >4000 kg external
fuel and ordnance
ADVANCED MEDIUM COMBAT AIRCRAFT
It have "serpentine-shaped" air intakes, internal
weapons bays, and advanced radomes to increase
its stealth features. Radar-absorbing composites
and paints will supplement the design. The design
phase will last until 2016 when a prototype will be
produced. Testing phases will occur between 2016
and 2021.Limited production will begin in 2022
and more to Full scale production in 2023.
Specifications:
Empty weight: est. 12,000 kg
Loaded weight: est. 17,000 kg
Useful load: est. 5,000 kg (combat load)
Max takeoff weight: est. 26,000 kg
Powerplant: 2x GTX-40V Kaveri
-Maximum thrust: 95 kN
Performance Range: 2,000 km (without
refueling)
Cost:
Est. $95 million