f.sq-wi.013.2 Work Instruction for Performing Test at Switch Gear

5
TITLE WORK INSTRUCTION FOR PERFORMING TEST AT SWITCH GEAR DOCUMENT NUMBER REV DATE SHEET F.SQ-WI.013.2 0 21 May 2012 1 of 5 PROCEDURE AUTHORIZATION This work instruction have been generated and implemented to identify the control that shall be applied by members of staff in the department when carrying out their duties Department Authorization Signed: Date: This confirms that this work instruction has been approved for official issue and that members of staff shall complete the tasks assigned in accordance with the mechanisms defined herein Corporate Authorization (Company Director) Signed: Date: The work instruction forms part of a formal system within the company which ensures that this document is handled in a controlled manner in accordance with documented procedures. This work instruction will be subject to audit as part of the company policy towards quality Quality Authorization (Quality Management Rep' s) Signed: Date: PROCEDURE REVISION Rev. Date Section Outline of Changed Authorization 0 21 May 2012 First Issue 1 2 3 4

description

wi.013.2 Work Instruction for Performing Test at Switch Gear

Transcript of f.sq-wi.013.2 Work Instruction for Performing Test at Switch Gear

Page 1: f.sq-wi.013.2 Work Instruction for Performing Test at Switch Gear

TITLE

WORK INSTRUCTION FOR PERFORMING TEST AT SWITCH GEAR

DOCUMENT NUMBER REV DATE SHEET

F.SQ-WI.013.2 0 21 May 2012 1 of 3

PROCEDURE AUTHORIZATION

This work instruction have been generated and implemented to identify the control that shall be applied by members of staff in the department when carrying out their duties

Department Authorization

Signed:

Date:

This confirms that this work instruction has been approved for official issue and that members of staff shall complete the tasks assigned in accordance with the mechanisms defined herein

Corporate Authorization (Company Director)

Signed:

Date:

The work instruction forms part of a formal system within the company which ensures that this document is handled in a controlled manner in accordance with documented procedures.This work instruction will be subject to audit as part of the company policy towards quality

Quality Authorization(Quality Management Rep' s)

Signed:

Date:

PROCEDURE REVISION

Rev. Date Section Outline of Changed Authorization0 21 May 2012 First Issue

1

2

3

4

STATEMENT OF CONFIDENTIALITY

This working instruction is for controlled circulation unless stamped "Uncontrolled Copy”. The documents or extracts from documents must nor be passed or copied to other companies, agents or persons without the permission of the relevant Company Directors.

Page 2: f.sq-wi.013.2 Work Instruction for Performing Test at Switch Gear

TITLE

WORK INSTRUCTION FOR PERFORMING TEST AT SWITCH GEAR

DOCUMENT NUMBER REV DATE SHEET

F.SQ-WI.013.2 0 21 May 2012 2 of 3

TABLE OF CONTENT

Page

1.0 SCOPE 3

2.0 WORKING INSTRUCTION 3

Page 3: f.sq-wi.013.2 Work Instruction for Performing Test at Switch Gear

TITLE

WORK INSTRUCTION FOR PERFORMING TEST AT SWITCH GEAR

DOCUMENT NUMBER REV DATE SHEET

F.SQ-WI.013.2 0 21 May 2012 3 of 3

1.0 SCOPE

These work instruction describe the detail procedure for performing testing of Switch Gear certification.

2.0 WORKING INSTRUCTION

No. DESCRIPTION Action to be taken1.0 PERFORMING TEST

1.1 Preparation 1. Prepare the item specification1.2 Measuring 1. Work carefully when measuring

2. Wear apropriate PPE, glove with electrical insulation, shoes with safety insulation.

3. Always calibrate or check calibration expiry of each testing tools.

1.3 Record 1. Make sure that all identification has been recorded.

2. Record all measurement result3. Kinds of test :

a. Earth continuity

b. High voltage isolation

c. Insulation resistance

d. Tripping/closing supply circuits from external sources have continuity & integrity

e. Push button operation - Location and color.

f. Pick up & drop off voltage of contactors and relays.

g. Accessibility of emergency opr. device.

h. Current and voltage transformer ratio.

i. Short circuit test.

j. Panel wiring termination and identification.

k. Warning labels.

l. Control operation test.