Financial StatementsFor the Period
September 1, 2012 ‐ July 31, 2013
For the Meeting of the Board of Trustees ‐ August 8, 2013
for
Houston Community College System&
Houston Community College Public Facility Corporation
Memorandum Management Discussion & Analysis
Summary HCCS Unrestricted Revenue & Expenditures 1
Exemptions & Waivers Detail 4
Fund Balances Balance Sheet By Fund 5
Adjusted Budgets by Division 6
Actual YTD by College 6
Cash Flow Analysis 7
Contact Hours Reimbursement 12
Enrollment Data 13
Charts Revenue & Expenditure YTD thru July 31, 2013 14
Revenue and Expenditures with Trendlines 15
Revenue Source Comparison By Year 16
Expenditure Source Comparison By Year 17
Designated Funds Budget Summary / Cash Position 18
Capital Projects & Unexpended Plant Fund Projects 19
Unexpended 2004 CIP Projects 20
2013 CIP Projects 26
CIP Footnotes 31
CIP Residual Funds 32
Plant Fund Maintenance Tax Notes 2006 (Central Utility Plant Project) 33
Maintenance Tax Notes/Sr. Lien Bonds 2008 34
Maintenance Tax Notes 2010 36
Maintenance Tax Notes 2011 37
Bonds/Notes Schedule of Bonds & Maintenance Tax Notes 39
Auxiliary Sources and Uses of Auxiliary Funds 41
Restricted Funds Grants, Contracts and Student Aid 43
Position Control 2013 Positions 50
Pos. Control Charts FTE (Full‐Time Equivalent) Monthly Comparison 57
Duplicated Headcount Monthly Comparison 66
Unduplicated Headcount Monthly Comparison 67
Table of ContentsFor the Period September 1, 2012 ‐ July 31, 2013
For the Meeting of the Board of Trustees
Houston Community College System
Statement of Net Assets PFC 1
Statement of Cash Flows (Cash Basis‐ Interim Period) PFC 2
Public Safety Institute PFC 3
Westgate PFC 4
Hayes Road ‐ Alief Project PFC 5
Northline Mall Project PFC 6
Houston Community College ‐ Public Facility Corporation
Table of Contents For the Period September 1, 2012 ‐ July 31, 2013
For the Meeting of the Board of Trustees
MEMORANDUM
To: Houston Community College System Board of Trustees
From: Renee Byas, Acting Chancellor
Date: August 7, 2013
Re: Financial Report for Month Ended July 31, 2013
Enclosed please find the preliminary financial reports for the month ending July 31, 2013 for your review. The financial report is an internal management report submitted to the Board of Trustees to compare actual financial activities to the approved budgets, strategic priorities, and financial policies for the reported fiscal year.
Operating Fund net revenue through July 31, 2013 is $281,855,493 which is 1.1% below last year. Expenditures year‐to‐date total $243,561,714 which is 0.2% less than the same time last year, for a net of $38,293,779.
The reserves for the month of July 2013 are $60,228,918 or 20.7% of revenues (see page III). Thus, we continue to project a healthy fiscal strength for the college.
Managements Discussion and Analysis
Thru July 31, 2013
Revenues
Expenditures
Total revenues and expenditures by expense type for the Operating Fund for 2012‐2013 are reported on page one,
behind the tab Detailed Financial Statements. Highlights of financial activities year‐to‐date are as follows:
State Appropriations received year to date totaled $63,495,699, 0.4% below last year. Total appropriations
received are expected to be $70,014,007. This amount was reduced by $218,031 due to a formula reallocation
to align with the Legislative Budget Board data and methodology.
Ad Valorem Tax collections totaled $104,405,862 year‐to‐date. The year‐to‐date total is 0.1% above last year.
The proportion of tax revenue applied to operations decreased this year due to the increase in tax revenue
applied to debt service. However, this decrease in tax revenue to operations is offset by the increase in tax
revenue due to increases in property valuations. We project total tax revenue for the fiscal year will be
$105,811,761.
Tuition and Fees net revenue year to date totaled $105,229,822 which is 3.3% lower than the same time last
year. Enrollment numbers for Fall 2012 declined 6.5% compared to last year, namely due to a 10% decline in
international students compared to last year, Spring enrollment remained flat at 0.3% above the previous year
and Summer enrollment shows a 6.6% decrease compared to the previous year. We are projecting tuition and
fees revenue to be $105,370,959.
Insurance/Risk Management payments totaled $6,519,897 year‐to‐date, 7.1% above last year. The increase is
due to an increase in insurance premiums. Total expenses for the year are expected to be within budget at
$6,871,709.
Tuition & Fee‐Extended Learning receipts totaled $6,241,171 year to date, 0.74% above last year. Total tuition
and fees‐Extended Learning at fiscal year end are expected to be $6,287,729.
Rental and Leases expenses totaled $2,159,748 year‐to‐date, which is 48.8% below the previous year. The
decrease is due to the completion of IT projects. Total expenses at year end are projected to be $2,831,514.
Total revenue collections, net of exemptions and waivers, totaled $281,855,493 year‐to‐date. This is a 1.1% decrease below last year.
Total Salaries are $148,766,993 year‐to‐date, 2.6% above the previous year, namely due to the 2% salary
increases. Total salaries at year end are expected to be $163,283,858.
Benefits costs totaled $14,751,325 year‐to‐date, 20% above last year. This increase is due namely to the
reduction in the state's contribution to TRS and ORP and an increase in health insurance premiums. Total
benefits at fiscal year end are expected to be $18,152,880.
Contract Services expense totaled $18,327,458 year‐to‐date, 10% above last year. The increase is mainly due to
IT hiring temporary personnel for projects, additional security staff at the District and using contract interpreters
to fill the personnel shortages. Fiscal year end expenses are projected to be $24,368,462.
Utilities costs totaled $7,063,294 year‐to‐date. We will continue to monitor these costs. Total utilities cost at
fiscal year end is projected to $8,490,022.
i
Managements Discussion and Analysis
Thru July 31, 2013
Budget Priorities funding allocated for the year are detailed below through July 31, 2013.
Contingency/Budget Priority Funding
Expense:
Position Management
Capital Outlay & Equipment
Other
Total Contingency/Budget Priorities
Grants
Unexpended Plant Fund
1,147,346$
10,225,030
11,372,376$
6,095,773
305,625
3,823,632
The 2013 CIP budgets are $425,137,284 and are 2.6% committed to‐date. Please see page 26 for the summary
and pages 27 through 30 for details.
Budget expenditures for grant‐funded projects so far this year total $14,721,637.
ii
Capital Outlay expenses totaled $3,080,913 year‐to‐date. Expenditures are projected to $6,479,509.
Transfers/Debt activities totaled $28,330,519 year‐to‐date, a 28.2% decrease compared to last year. The
decrease is due to a transfer in FY2012 to purchase the Westheimer/Eldridge land. Items in this expense
category include all student revenue bond payments, transfers for scholarship matching funds, and transfers to
the Unexpended Plant Fund. Total expenses are expected to be $35,304,211.
Total operating fund expenditures year‐to‐date total $243,561,714, a 0.2% decrease below last year.
Instructional and Other Materials expenses totaled $5,448,881 year‐to‐date, which is 29% above last year.
COMPASS Internet Units, TCCTA Adobe Master Collection and additional support for Moodlerooms, Inc
contributed to the increase. Expenses in this area are projected to be $9,485,879.
The college has received $1,243,264 in new grant awards since the beginning of the current fiscal year.
Total grant awards (federal, state & private) year‐to‐date total, $46,486,081.
Cash Position ‐ The use of the Unexpended Plant Fund Excluding 2004 CIP for deferred maintenance projects was
discontinued in FY 2009. All deferred maintenance expense is captured in the operating account. See page 18
for prior year encumbrances.
Unexpended Plant Fund Projects include current construction, deferred maintenance, and property acquisition
projects for a budget of $47,180,067. Funds for these projects are 100% committed. See page 19 for more
details.
The 2004 CIP budgets are $263,779,995 and are 100% committed. The spending categories in the schedule have
now been revised for more ease of reference to the Board approved budget. Please see page 20 for the
summary and pages 21 through 25 for details.
The Maintenance Tax Note 2006 tracks the financial progress of the Central Utility Plant. Commitments year‐to‐
date total $12.5 million, 99.87% of budget. See page 33 for the details.
Managements Discussion and Analysis
Thru July 31, 2013
Public Facility Corporation
Balance Sheet – Operating Fund
Cash and Investments
Cash
Investments
Total
Fund Balance
Audited Fund Balance, August 31, 2012
Projected Revenue @ 08/31/2013
Total Projected Revenue
Projected Expenses @ 08/31/2013
FY 2012 Purchase Order Roll
Total Projected Expenses @ 08/31/2013
Ending Fund Balance (Beg. Fund Balance + Revenue ‐ Expenses)
Required Reserve for FY 2013 (11% Projected Revenues)
Added Reserves
Additional Expenditures Funded From Reserves:
Reimbursement to State for Insurance
Lump Sum Bonus
Total Expenses Paid From Reserves
Added Reserves
Required Reserve for FY 2013 (11% Projected Revenues)
Current Reserves
% of Total Operating Revenue
The Public Facility Corporation tracks the progress of the PFC ‐ Public Safety Institute, Katy Campus (Westgate),
Alief and Northline Mall deferred maintenance, new construction and renovation projects. Expenditures year‐to‐
date total $100.8 million, 98.7% of budget. See pages PFC 1‐6 for details.
July 2013 July 2012
95,843,934$ 78,064,707$
357,182,263$
286,369,094$
2,395,994
18,781,770 7,984,305
114,625,704$ 86,049,012$
66,664,585$
The projected reserves at July 31, 2013 of $60,228,918 is an estimate at this time and represents 20.7% of expected
general fund revenue for this fiscal year, which is within our financial stability policy requiring us to maintain a fund
balance of 9% ‐11% of general fund revenues as of August 31.
iii
31,956,945$
60,228,918$
20.7%
288,765,088$
68,417,175$
31,956,945$
36,460,230$
290,517,678
(9,900,000)$ 1,711,743$ (8,188,257)
28,271,973$
Expense to Date Balance Budget
(8,100,000) ‐ (8,100,000)
(1,800,000) 1,711,743 (88,257)
YTD Adjusted Budget
YTD Actuals Thru
July 31, 2013
YTD Actuals Thru
July 31, 2012
2012‐2013 Inc/(Dec)
vs. 2011‐2012
Actuals %
Inc/(Dec)YTD vs.
PriorYTD
Projected Actuals
2012‐2013
Projected 2012‐2013
Inc/(Dec) vs. Adj
Budget
Projected 2012‐
2013 Inc/(Dec) vs.
Adj Budget %
REVENUES
State Appropriations 70,232,038$ 63,495,699$ 63,779,106$ (283,407)$ ‐0.44% 70,014,007$ (218,031)$ ‐0.31%Ad Valorem Taxes 102,195,871 104,405,862 104,341,537 64,325 0.06% 105,811,761 3,615,890 3.54%Tuition, Net 43,067,676 40,158,942 41,978,987 (1,820,045) ‐4.34% 40,216,106 (2,851,570) ‐6.62%Fees 71,520,739 65,070,880 66,790,991 (1,720,111) ‐2.58% 65,154,853 (6,365,886) ‐8.90%Other Local Income* 2,517,960 2,020,706 1,399,374 621,332 44.40% 2,517,960 ‐ 0.00%Tuition & Fee, Net
‐‐ Extended Learning6,188,581 6,241,171 6,195,087 46,084 0.74% 6,287,729 99,148 1.60%
Grant Revenue 434,410 462,232 462,356 (124) ‐0.03% 515,262 80,852 18.61%
Total Revenues 296,157,275 281,855,493 284,947,439 (3,091,946) ‐1.09% 290,517,678$ (5,639,597)$ ‐1.90%
EXPENSES
Faculty‐FT 53,987,382 50,991,693 49,784,819 1,206,874 2.42% 53,987,382 ‐ 0.00%
Faculty‐PT 31,277,914 27,138,113 26,787,552 350,561 1.31% 31,212,804 (65,110) ‐0.21%
Librarian/Counselor‐FT 4,830,690 4,393,852 5,417,691 (1,023,839) ‐18.90% 4,731,891 (98,799) ‐2.05%
Librarian/Counselor‐PT 858,739 555,892 508,023 47,870 9.42% 852,907 (5,832) ‐0.68%
Staff‐FT 66,155,644 59,195,927 56,076,984 3,118,943 5.56% 64,928,910 (1,226,734) ‐1.85%Staff‐PT 10,180,997 6,491,516 6,432,874 58,642 0.91% 7,569,964 (2,611,033) ‐25.65%
Sub‐total Salaries 167,291,366 148,766,993 145,007,943 3,759,051 2.59% 163,283,858 (4,007,508) ‐2.40%
Employee Benefits 18,152,880 14,751,325 12,295,929 2,455,396 19.97% 18,152,880 ‐ 0.00%
Supplies Gen Exp 6,123,125 4,660,200 4,398,092 262,109 5.96% 5,416,838 (706,287) ‐11.53%
Travel 1,064,640 777,330 696,397 80,932 11.62% 1,030,126 (34,514) ‐3.24%
Marketing Costs 1,766,634 1,299,364 936,196 363,168 38.79% 1,466,130 (300,504) ‐17.01%
Rental & Leases 2,831,514 2,159,748 4,214,401 (2,054,653) ‐48.75% 2,831,514 ‐ 0.00%
Insurance/Risk Mgmt 6,872,206 6,519,897 6,088,158 431,739 7.09% 6,871,709 (497) ‐0.01%
Contract Services 24,368,462 18,327,458 16,631,834 1,695,623 10.20% 24,368,462 ‐ 0.00%
Utilities 12,899,947 7,063,294 6,556,434 506,860 7.73% 8,490,022 (4,409,925) ‐34.19%
Other Departmental Expenses 2,082,970 1,697,014 1,243,446 453,568 36.48% 1,863,291 (219,679) ‐10.55%
Instructional & Other Materials 9,485,879 5,448,881 4,225,807 1,223,075 28.94% 9,485,879 ‐ 0.00%
Maintenance & Repair 1,537,173 678,779 671,517 7,262 1.08% 1,324,665 (212,508) ‐13.82%
Transfers/Debt 35,304,211 28,330,519 39,467,200 (11,136,682) ‐28.22% 35,304,211 ‐ 0.00%
Contingency (4,802,111) ‐ ‐ ‐ 0.00% ‐ 4,802,111 ‐100.00%Capital Outlay 11,178,379 3,080,913 1,567,921 1,512,992 96.50% 6,479,509 (4,698,870) ‐42.04%
Total Expenses 296,157,275 243,561,714 244,001,274 (439,560) ‐0.18% 286,369,094 (9,788,181) ‐3.31%
REVENUES H/(L) Vs EXPENSES 0 38,293,779 40,946,165 (2,652,386) 4,148,584 4,148,584
* Includes interest & dividends income, fines & penalties and parking fines
1
HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues & Expenditures HCCS CURRENT UNRESTRICTED
State
Appropriations Ad Valorem Taxes Tuition, Net Fees
Other Local
Income
Extended
Learning Grant Revenue
Total Projected
Revenue
70,014,007 105,811,761 40,216,106 65,154,853 2,517,960 6,287,729 515,262 290,517,678
24.1% 36.4% 13.8% 22.4% 0.9% 2.2% 0.2%
Salaries Employee Benefits
General & Admin.
Expenses Transfers/Debt
Total Projected
Expenses
163,283,858 18,152,880 69,628,145 35,304,211 286,369,094
57% 6% 24% 12%
HOUSTON COMMUNITY COLLEGEProjected Revenues & Expenditures as of July 31, 2013
2
24%
36%
14%
23%
1% 2% 0%
Revenue State Appropriations
Ad Valorem Taxes
Tuition, Net
Fees
Other Local Income
Tuition & Fee, Net ‐‐ Extended LearningGrant Revenue
57%
7%
24%
12%
Expenses
Salaries
Employee Benefits
General & Admin.Expenses
Transfers/Debt
Approved Budget Adjusted Budget
YTD Actuals Thru
July 31, 2013
Encumbrances Thru
July 31, 2013
Total Actuals &
Encumbrances Thru
July 31, 2013
Balance as of July
31, 2013
YTD Actuals Thru
July 31, 2012
Encumbrances Thru
July 31, 2012
Total Actuals &
Encumbrances Thru
July 31, 2012
2012‐2013 Inc/(Dec)
vs. 2011‐2012
Actuals &
Encumbrances %
Inc/(Dec)YTD vs.
PriorYTD
EXPENSES
Faculty‐FT 53,987,382 53,987,382 50,991,693 1,193,923 52,185,616 1,801,766 49,784,819 2,114,695 51,899,514 286,102 0.55%
Faculty‐PT 31,277,914 31,212,804 27,138,113 1,062,574 28,200,687 3,012,117 26,787,552 1,282,612 28,070,164 130,523 0.46%
Librarian/Counselor‐FT 4,830,690 4,731,891 4,393,852 218,649 4,612,500 119,391 5,417,691 317,483 5,735,174 (1,122,673) ‐19.58%
Librarian/Counselor‐PT 858,739 852,907 555,892 108,285 664,178 188,729 508,023 111,516 619,539 44,639 7.21%
Staff‐FT 66,155,644 64,928,910 59,195,927 3,885,411 63,081,338 1,847,572 56,076,984 4,917,579 60,994,563 2,086,775 3.42%
Staff‐PT 10,180,997 7,569,964 6,491,516 1,527,556 8,019,072 (449,108) 6,432,874 1,243,784 7,676,658 342,414 4.46%
Sub‐total Salaries 167,291,366 163,283,858 148,766,993 7,996,398 156,763,392 6,520,466 145,007,943 9,987,670 154,995,612 1,767,779 1.14%
Employee Benefits 18,152,880 18,152,880 14,751,325 1,872 14,753,197 3,399,683 12,295,929 6,173 12,302,101 2,451,096 19.92%
Supplies Gen Exp 6,123,125 5,416,838 4,660,200 756,638 5,416,838 (0) 4,398,092 571,212 4,969,304 447,534 9.01%
Travel 1,064,640 1,030,126 777,330 400 777,730 252,396 696,397 2,342 698,740 78,990 11.30%
Marketing Costs 1,766,634 1,466,130 1,299,364 143,365 1,442,729 23,401 936,196 169,801 1,105,997 336,732 30.45%
Rental & Leases 2,831,514 2,831,514 2,159,748 107,565 2,267,313 564,201 4,214,401 210,309 4,424,710 (2,157,397) ‐48.76%
Insurance/Risk Mgmt 6,872,206 6,871,709 6,519,897 ‐ 6,519,897 351,812 6,088,158 ‐ 6,088,158 431,739 7.09%
Contract Services 24,368,462 24,368,462 18,327,458 4,035,250 22,362,707 2,005,755 16,631,834 2,422,584 19,054,418 3,308,289 17.36%
Utilities 12,899,947 8,490,022 7,063,294 41,847 7,105,141 1,384,881 6,556,434 48,000 6,604,434 500,708 7.58%
Other Departmental Expenses 2,082,970 1,863,291 1,697,014 166,277 1,863,291 0 1,243,446 61,756 1,305,202 558,089 42.76%
Instructional & Other Materials 9,485,879 9,485,879 5,448,881 2,508,788 7,957,670 1,528,209 4,225,807 389,067 4,614,874 3,342,796 72.44%
Maintenance & Repair 1,537,173 1,324,665 678,779 645,887 1,324,665 (0) 671,517 623,457 1,294,974 29,691 2.29%
Transfers/Debt 35,304,211 35,304,211 28,330,519 ‐ 28,330,519 6,973,692 39,467,200 ‐ 39,467,200 (11,136,682) ‐28.22%
Contingency (4,802,111) ‐ ‐ ‐ ‐ ‐ ‐ ‐ 0.00%
Capital Outlay 11,178,379 6,479,509 3,080,913 3,398,596 6,479,509 0 1,567,921 1,300,098 2,868,019 3,611,489 125.92%
Total Expenses 296,157,275 286,369,094 243,561,714 19,802,884 263,364,598 23,004,496 244,001,274 15,792,470 259,793,744 3,570,854 1.37%
3
HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues and Expenditures & Encumbrances HCCS CURRENT UNRESTRICTED
FY 2011‐12 FY 2012‐13
Tuition
Budget:Adjusted Budget FY 2012‐13 43,067,676$
Exemptions & Waivers (6,798,328)
Adjusted Budget FY 2012‐13, Net 36,269,348$
Revenues Received:Tuition 48,824,432 48,860,870 46,957,270
Waivers & Exemptions:Dual Credit (5,170,736) (5,193,934) (4,819,811)
Other (1,693,502) (1,687,950) (1,978,517)
Total Waivers & Exemptions (6,864,238) (6,881,884) (6,798,328)
Total Tuition Revenue, Net 41,960,194$ 41,978,986$ 40,158,942$
Tuition ‐ Extended Learning
Budget:Budget FY 2012‐13 6,188,581$
Exemptions & Waivers (2,150,277)
Budget FY 2012‐13, Net 4,038,304$
Revenues Received:
Tuition 8,853,381 8,520,067 8,391,448
Waivers & Exemptions:
Corrections (2,612,080) (2,324,980) (2,150,277)
Total EL Tuition Revenue, Net 6,241,301$ 6,195,087$ 6,241,171$
Exemptions & Waivers
Dept of Corrections 2,612,080$ 2,324,980$ 2,150,277$
Dual Credit Waiver 5,170,736 5,193,934 4,819,811
Other:
Employee Fee Exemptions 84,810 84,690 69,971
Firemen 42,521 42,521 25,475
Hazelwood 906,036 904,271 1,262,519
Deaf & Blind 309,603 309,615 257,751
High Ranking Hi SCH Grad 868 868 2,418
Child of Disabled Vet ETC 431 431 1,686
Nonres Military Per & Dep 2,390 2,390 ‐
Emp of State Coll & Univ ‐ ‐ 319
Nonres Teach/Research Asst 13,905 13,905 10,443
Nonres Competitive Scholar ‐ ‐ 2,301
Senior Citizens 18,730 18,447 15,702
Scholarship Distribution 1,450 1,450 ‐
Apprenticeship Waivers (28) (28) (38)
Special Fees Waiver HFD 117 117 ‐
A VISA Waiver (Non‐Alien Waiver) 1,110 1,110 ‐
Refugee Waiver (1,554) (1,110) (162)
Foster Children‐Resident 294,543 290,703 305,407
Fire Academy Waiver 157 157 ‐
Undocumented Students 2,171 2,171 ‐
TX Tomorrow Waiver 2,874 2,874 ‐
Peace Officer Exemption 13,368 13,368 14,275
Stipends ‐ ‐ 10,450
Total Other Exemptions 1,693,502 1,687,950 1,978,517
Grand Total Exemptions & Waivers 9,476,318$ 9,206,864$ 8,948,605$
Note: As of December 31, 2008, the financial statements reflect all expenses incurred for Exemptions and Waivers as net of tuition and fee revenue. Prior to this date Exemptions & Waivers were shown as an expenditure and revenue was shown as gross revenue.
4
Exemptions & Waivers
Thur July 31, 2013
Account
End of Year
Activity
Year‐to‐Date
Activity thru
7/31/2012
Year‐to‐Date
Activity thru
7/31/2013
Unrestricted Auxiliary Restricted Total
Unexpended
Plant Renewal
Retirement of
Debt
Investment in
Plant Total
Consolidation &
Elimination Total All Funds
ASSETSCurrent Assets:
Cash & cash equivalents 95,843,934$ 8,873,274$ ‐$ 104,717,208$ 3,727,350$ 16,001,802 ‐$ 19,729,152$ ‐$ 124,446,360$
Restricted cash & cash equivalents ‐ ‐ 12,830,909 12,830,909 470,230,704 27,240,704 ‐ 497,471,408 ‐ 510,302,317
Short term Investments ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Accounts/Other receivable (net) 23,194,293 1,190,438 2,478,998 26,863,729 ‐ 585,577 ‐ 585,577 ‐ 27,449,306
Deferred charges 1,180,131 393,022 10,896 1,584,049 ‐ ‐ ‐ ‐ ‐ 1,584,049
Prepaids 24,765 5,058 ‐ 29,823 881,382 ‐ ‐ 881,382 ‐ 911,205
Total Current Assets 120,243,123 10,461,792 15,320,803 146,025,718 474,839,436 43,828,083 ‐ 518,667,519 ‐ 664,693,237
Non‐current Assets:
Deferred charges, net ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Restricted long‐term investments ‐ ‐ ‐ ‐ 32,004,457 2,456,907 ‐ 34,461,364 ‐ 34,461,364
Long‐term investments 18,781,770 ‐ ‐ 18,781,770 ‐ ‐ ‐ ‐ ‐ 18,781,770
Capital Assets, net ‐ ‐ ‐ ‐ 102,951,981 ‐ 666,951,500 769,903,481 ‐ 769,903,481
Total Non‐current Assets 18,781,770 ‐ ‐ 18,781,770 134,956,438 2,456,907 666,951,500 804,364,845 ‐ 823,146,615
Total Assets 139,024,893$ 10,461,792$ 15,320,803$ 164,807,488$ 609,795,874$ 46,284,990$ 666,951,500$ 1,323,032,364$ ‐$ 1,487,839,852$
LIABILITIESCurrent Liabilities:
Accounts payable 7,865,774 233,291 1,099,291 9,198,356 336,442 ‐ ‐ 336,442 ‐ 9,534,798
Accrued liabilities 174,310 ‐ 24,809 199,119 2,719 ‐ ‐ 2,719 ‐ 201,838
Compensated absences 2,351,464 ‐ ‐ 2,351,464 ‐ ‐ ‐ ‐ ‐ 2,351,464
Funds held for others ‐ 107,889 520,271 628,160 189,209 ‐ ‐ 189,209 ‐ 817,369
Deferred revenue 20,571,984 609,907 745,439 21,927,330 1,599,275 ‐ (1,600,060) (785) ‐ 21,926,545
Notes payable‐current portion ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bonds payable‐current portion ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital lease obligations‐current ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Current Liabilities 30,963,532 951,087$ 2,389,810 34,304,429 2,127,645 ‐ (1,600,060) 527,585 ‐ 34,832,014
Non‐current Liabilities:
Deposits ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Notes payable ‐ ‐ ‐ ‐ 139,850,892 ‐ 37,761,145 177,612,037 ‐ 177,612,037
Bonds payable ‐ ‐ ‐ ‐ 465,221,463 27,838,473 294,379,496 787,439,431 ‐ 787,439,431
Capital lease obligations ‐ ‐ ‐ ‐ ‐ ‐ 104,429,832 104,429,832 ‐ 104,429,832
Total Non‐current Liabilities ‐ ‐ ‐ ‐ 605,072,355 27,838,473 436,570,472 1,069,481,300 ‐ 1,069,481,300
Total Liabilities 30,963,532$ 951,087$ 2,389,810$ 34,304,429$ 607,200,000$ 27,838,473$ 434,970,412$ 1,070,008,885$ ‐$ 1,104,313,311$
Fund Balance‐
August 31, 2012 Audited 66,664,585 11,747,296 9,080,325 87,492,206 3,738,684 10,061,216 235,429,798 249,229,698 ‐ 336,721,904
Revenues Over Expenditures
Unrestricted 41,396,777 (2,236,591) 39,160,186 39,160,186
Restricted 3,850,668 3,850,668 3,850,668
Net Investment in Plant (1,142,808) 8,385,302 (3,448,710) 3,793,784 3,793,784
Total Fund Balances 108,061,362$ 9,510,705$ 12,930,993$ 130,503,060$ 2,595,876$ 18,446,518$ 231,981,088$ 253,023,482$ ‐$ 383,526,542$
Total Liabilities & Fund Balances 139,024,894$ 10,461,792$ 15,320,803$ 164,807,489$ 609,795,874$ 46,284,991$ 666,951,500$ 1,323,032,367$ ‐$ 1,487,839,852$
5
PLANT & BOND FUNDS
Houston Community CollegeBalance Sheet By Fund
For Month Ended July 31, 2013
CURRENT & LOAN FUNDS
CENTRAL
NORTH
WEST
NORTH
EAST
SOUTH
WEST SOUTH EAST COLEMAN
EXTENDED
LEARNING
CHAN‐
CELLOR
DEPUTY CHAN‐
CELLOR
INSTITU‐
TIONAL
EFFECTIVE‐
NESS*
INSTRUC‐
TION
INFO
TECH
STUDENT
SUCCESS SYSTEM HCCS
% of
Adjusted
Budget
EXPENSES
Faculty‐FT 10,363,292 10,323,252 7,506,187 12,224,453 4,948,893 5,961,943 2,358,182 ‐ 3,000 ‐ 298,180 ‐ ‐ ‐ 53,987,382 18.23%
Faculty‐PT 4,799,369 6,308,299 4,115,361 5,771,364 3,851,946 2,033,783 3,662,833 ‐ 450 ‐ 734,509 ‐ ‐ ‐ 31,277,914 10.56%
Librarian/Counselor‐FT 936,418 1,133,600 942,795 768,653 529,552 85,066 2,887 ‐ ‐ ‐ 344,733 ‐ 86,986 ‐ 4,830,690 1.63%
Librarian/Counselor‐PT 95,927 194,185 119,380 214,206 83,152 34,980 ‐ ‐ ‐ ‐ 24,373 ‐ 92,536 ‐ 858,739 0.29%
Staff‐FT 5,724,016 4,684,151 4,879,110 5,759,968 3,908,827 2,426,599 3,799,680 4,587,175 14,811,129 ‐ 4,459,620 6,751,801 4,363,568 ‐ 66,155,644 22.34%
Staff‐PT 1,942,575 1,669,471 788,382 1,595,118 1,197,805 389,771 795,822 282,854 547,935 ‐ 346,124 207,010 418,130 ‐ 10,180,997 3.44%
Sub‐total Salaries 23,861,597 24,312,958 18,351,215 26,333,762 14,520,175 10,932,142 10,619,404 4,870,029 15,362,514 ‐ 6,207,539 6,958,811 4,961,220 ‐ 167,291,366 56.49%
Employee Benefits ‐ ‐ ‐ 4 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 18,152,876 18,152,880 6.13%
Supplies Gen Exp 361,979 407,181 226,699 328,232 288,341 347,473 253,016 380,601 1,196,911 ‐ 233,604 347,149 (28,606) 1,780,545 6,123,125 2.07%
Travel 92,592 116,844 30,428 51,327 29,915 123,558 93,526 159,329 142,493 ‐ 115,467 71,905 37,256 ‐ 1,064,640 0.36%
Marketing Costs 43,979 47,528 56,696 39,443 79,482 32,472 405,734 171,085 888,215 ‐ ‐ 2,000 ‐ ‐ 1,766,634 0.60%
Rental & Leases 31,920 127,089 1,310,622 540,876 41,484 483,719 28,952 59,022 177,846 ‐ 3,738 23,760 2,486 ‐ 2,831,514 0.96%
Insurance/Risk Mgmt 794 245 ‐ 98 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 676 ‐ 6,870,393 6,872,206 2.32%
Contract Services 269,304 282,236 40,260 26,707 177,893 343,590 363,063 535,819 13,004,067 ‐ 153,483 2,931,844 56,383 6,183,813 24,368,462 8.23%
Utilities 3,331 ‐ 4,600 ‐ ‐ ‐ ‐ ‐ 1,587,809 ‐ ‐ 1,400,000 ‐ 9,904,207 12,899,947 4.36%
Other Departmental Expenses 40,065 46,820 42,491 28,721 41,488 130,696 52,742 388,668 187,247 ‐ 206,286 230,771 275,759 411,216 2,082,970 0.70%
Instructional & Other Materials 492,070 343,476 168,636 285,643 95,494 357,808 997,675 113,714 23,649 ‐ 1,050,421 5,297,020 260,273 ‐ 9,485,879 3.20%
Maintenance & Repair 143,433 48,060 56,993 24,563 21,372 83,949 159,700 1,265 973,011 ‐ 6,460 13,234 2,614 2,519 1,537,173 0.52%
Transfers/Debt ‐ 845,619 5,636,142 1,155,001 ‐ ‐ ‐ ‐ 3,264 ‐ ‐ ‐ 494,389 27,169,796 35,304,211 11.92%
Contingency 50 3,854 12,500 ‐ 11,632 5,860 ‐ 35,000 20,446 ‐ ‐ ‐ 6,202 (4,897,655) (4,802,111) ‐1.62%
Capital Outlay 579,366 325,007 297,973 118,059 275,868 592,573 44,634 62,350 3,236,614 ‐ 12,945 1,462,738 56,016 4,114,236 11,178,379 3.77%
Total Budget 25,920,480 26,906,917 26,235,255 28,932,436 15,583,144 13,433,840 13,018,446 6,776,882 36,804,086 ‐ 7,989,943 18,739,908 6,123,992 69,691,946 296,157,275 100.00%
6
CENTRAL
NORTH
WEST
NORTH
EAST
SOUTH
WEST SOUTH EAST COLEMAN
EXTENDED
LEARNING
CHAN‐
CELLOR
DEPUTY CHAN‐
CELLOR
INSTITU‐
TIONAL
EFFECTIVE‐
NESS*
INSTRUC‐
TION
INFO
TECH
STUDENT
SUCCESS SYSTEM HCCS
% of
Actuals
EXPENSES
Faculty‐FT 9,884,791 9,805,240 6,962,205 11,635,232 4,712,386 5,573,648 2,266,522 ‐ 2,925 ‐ 148,745 ‐ ‐ ‐ 50,991,693 20.94%
Faculty‐PT 4,240,049 5,598,686 3,536,382 5,141,864 3,598,783 1,645,692 3,005,478 ‐ 450 ‐ 370,730 ‐ ‐ ‐ 27,138,113 11.14%
Librarian/Counselor‐FT 867,672 978,073 854,409 707,054 499,402 76,168 2,886 ‐ ‐ ‐ 333,874 ‐ 74,312 ‐ 4,393,852 1.80%
Librarian/Counselor‐PT 57,569 141,587 113,094 153,545 36,363 20,101 ‐ ‐ ‐ ‐ 3,279 ‐ 30,354 ‐ 555,892 0.23%
Staff‐FT 5,150,398 4,159,543 4,257,319 5,190,498 3,527,340 2,202,609 3,449,942 3,970,750 13,357,550 ‐ 4,030,539 5,954,840 3,944,599 ‐ 59,195,927 24.30%
Staff‐PT 1,117,465 1,152,832 628,299 1,062,641 818,808 241,605 586,057 124,686 284,822 ‐ 173,918 115,978 184,404 ‐ 6,491,516 2.67%
Sub‐total Salaries 21,317,944 21,835,961 16,351,709 23,890,835 13,193,082 9,759,822 9,310,884 4,095,436 13,645,747 ‐ 5,061,085 6,070,819 4,233,669 ‐ 148,766,993 61.08%
Employee Benefits ‐ ‐ ‐ 3 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 14,751,322 14,751,325 6.06%
Supplies Gen Exp 230,917 300,435 196,355 244,506 197,496 210,877 198,730 279,535 840,641 ‐ 200,548 159,877 122,594 1,477,690 4,660,200 1.91%
Travel 53,782 100,915 23,239 41,300 22,898 87,277 61,768 141,668 82,205 ‐ 92,759 42,173 27,344 ‐ 777,330 0.32%
Marketing Costs 26,753 41,966 49,689 35,483 43,339 28,485 169,345 135,006 769,298 ‐ ‐ ‐ ‐ ‐ 1,299,364 0.53%
Rental & Leases 31,898 64,052 904,100 503,073 32,380 386,624 12,995 38,145 164,484 ‐ 2,234 17,347 2,415 ‐ 2,159,748 0.89%
Insurance/Risk Mgmt 509 245 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6,519,144 6,519,897 2.68%
Contract Services 177,084 154,412 37,433 25,565 106,452 294,402 93,797 176,439 10,475,646 ‐ 110,659 1,619,200 49,548 5,006,820 18,327,458 7.52%
Utilities 3,330 ‐ 3,200 ‐ ‐ ‐ ‐ ‐ 592,412 ‐ ‐ 1,125,248 ‐ 5,339,103 7,063,294 2.90%
Other Departmental Expenses 33,207 37,807 34,130 21,090 28,652 104,265 40,914 343,316 156,621 ‐ 169,684 144,099 181,745 401,481 1,697,014 0.70%
Instructional & Other Materials 393,581 291,556 125,458 266,966 64,351 202,839 569,729 ‐ 11,827 ‐ 628,129 2,658,052 236,395 ‐ 5,448,881 2.24%
Maintenance & Repair 49,193 18,437 33,508 17,563 7,408 37,079 109,937 724 387,879 ‐ 6,459 8,394 2,198 ‐ 678,779 0.28%
Transfers/Debt ‐ 845,382 5,634,237 1,155,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 494,389 20,201,510 28,330,519 11.63%
Contingency ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 0.00%
Capital Outlay 532,830 186,371 156,252 100,496 100,867 84,895 31,348 30,053 1,284,412 ‐ 6,160 566,844 386 ‐ 3,080,913 1.26%
Total Expense 22,851,029 23,877,540 23,549,312 26,301,882 13,796,924 11,196,564 10,599,447 5,240,322 28,411,172 ‐ 6,277,718 12,412,053 5,350,683 53,697,069 243,561,714 100.00%% of Adjusted
Budget by Division 88.16% 88.74% 89.76% 90.91% 88.54% 83.35% 81.42% 77.33% 77.20% 0.00% 78.57% 66.23% 87.37% 77.05% 82.24% 100.00%
Remaining Balance 3,069,451 3,029,377 2,685,943 2,630,554 1,786,220 2,237,276 2,418,999 1,536,560 8,392,914 ‐ 1,712,225 6,327,855 773,309 15,994,877 52,595,561
*As of June 2013 Institutional Effectiveness is combine with Instruction
HOUSTON COMMUNITY COLLEGE2012‐2013 Expenditures
YTD Adjusted Budget by Division
YTD Actuals by Division
Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug.
Central FY2013 8.77% 17.29% 26.04% 33.04% 39.26% 47.17% 57.14% 65.82% 73.39% 80.26% 88.16%
FY2012 8.89% 17.89% 27.03% 35.01% 41.49% 49.28% 58.01% 66.97% 74.34% 81.43% 88.98% 94.59%
Northwest FY2013 8.26% 17.69% 26.42% 33.44% 38.94% 47.07% 55.52% 66.24% 73.83% 80.69% 88.74%
FY2012 8.55% 18.72% 27.39% 33.69% 38.31% 46.70% 55.31% 66.77% 74.43% 81.57% 89.43% 95.09%
Northeast FY2013 6.80% 19.95% 27.15% 32.73% 37.67% 43.91% 50.45% 72.27% 78.06% 83.73% 89.76%
FY2012 6.70% 20.76% 27.75% 33.82% 40.16% 46.70% 53.35% 76.04% 82.19% 88.46% 94.27% 98.45%
Southwest FY2013 8.59% 19.46% 28.35% 35.52% 42.81% 50.66% 58.75% 69.07% 76.64% 83.33% 90.91%
FY2012 8.58% 19.19% 28.11% 36.68% 43.63% 50.96% 58.38% 71.97% 79.03% 85.23% 92.21% 96.87%
Southeast FY2013 7.94% 16.74% 25.87% 33.20% 39.17% 47.32% 56.36% 65.24% 73.23% 80.28% 88.54%
FY2012 8.68% 17.97% 27.56% 35.39% 41.33% 49.39% 57.90% 67.21% 74.92% 81.69% 89.81% 95.46%
Coleman FY2013 8.06% 17.28% 24.93% 31.55% 37.77% 46.07% 53.62% 60.80% 67.75% 75.25% 83.35%
FY2012 8.26% 17.29% 25.18% 32.46% 39.63% 47.52% 55.02% 63.80% 71.21% 79.83% 87.22% 93.29%
Extended Learning FY2013 7.79% 15.60% 23.76% 31.35% 35.83% 43.18% 50.20% 58.35% 65.86% 73.65% 81.42%
7 FY2012 7.97% 15.68% 23.55% 30.39% 37.09% 45.43% 53.07% 60.96% 69.35% 76.72% 84.68% 91.63%
Chancellor FY2013 7.14% 13.81% 24.51% 30.61% 37.97% 44.47% 51.04% 57.47% 63.05% 70.54% 77.33%
FY2012 8.66% 16.11% 23.27% 30.27% 39.34% 45.84% 53.37% 61.08% 68.18% 74.82% 81.30% 89.24%
Deputy Chancellor FY2013 4.52% 10.80% 17.79% 31.74% 38.89% 45.25% 43.00% 54.57% 62.02% 67.90% 77.20%
FY2012 4.52% 10.28% 16.85% 22.58% 31.70% 38.52% 45.34% 51.71% 59.06% 69.23% 76.82% 80.46%
Institute Effectiveness* FY2013 8.33% 16.67% 25.00% 33.33% 41.67% 50.00% 58.33% 66.67% 75.00% 0.00% 0.00%
FY2012 5.76% 15.21% 22.37% 29.85% 38.13% 45.15% 52.82% 59.23% 67.73% 76.94% 85.77% 94.82%
Instruction FY2013 6.55% 15.59% 22.53% 28.70% 33.58% 42.38% 49.16% 55.69% 63.65% 71.13% 78.57%
FY2012 6.73% 16.23% 22.67% 28.96% 35.81% 42.78% 52.10% 59.22% 65.59% 72.63% 82.25% 89.27%
Info Tech FY2013 5.56% 12.11% 16.63% 20.99% 29.10% 35.17% 39.77% 47.07% 54.83% 60.15% 66.23%
FY2012 20.14% 33.96% 40.28% 45.47% 52.99% 59.23% 64.92% 71.03% 76.35% 82.70% 88.44% 99.49%
Student Success FY2013 7.33% 14.68% 23.02% 30.31% 40.96% 44.53% 49.81% 58.28% 65.57% 72.81% 87.37%
FY2012 8.33% 15.89% 23.44% 30.58% 40.76% 48.76% 56.63% 65.19% 72.58% 80.37% 90.28% 98.41%
System FY2013 12.41% 18.87% 22.34% 27.24% 33.14% 37.21% 42.87% 66.35% 70.66% 72.23% 77.05%
FY2012 22.23% 25.94% 29.46% 32.09% 36.45% 39.69% 43.39% 63.98% 68.16% 71.84% 79.45% 88.27%
Total HCCS FY2013 8.55% 16.77% 23.49% 30.55% 36.88% 43.38% 49.23% 63.07% 69.69% 75.04% 82.24%
FY2012 12.05% 20.09% 26.81% 32.55% 38.82% 45.08% 51.63% 65.11% 71.48% 77.90% 85.35% 91.73%
*As of June 2013 Institutional Effectiveness is combine with Instruction
Houston Community College
Cash Flow Analysis ‐ Monthly Percentage of Budget UsedFY2013 vs. FY2012
Adjusted Budget
FY2012
YTD Actuals Thru
7/31/2012 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
7/31/2013 % of Budget Used
EXPENSES
Faculty‐FT 10,353,763 9,866,559 95.29% 10,363,292 9,884,791 95.38%
Faculty‐PT 4,897,846 4,321,147 88.23% 4,799,369 4,240,049 88.35%
Librarian/Counselor‐FT 1,079,656 979,062 90.68% 936,418 867,672 92.66%
Librarian/Counselor‐PT 88,599 44,814 50.58% 95,927 57,569 60.01%
Staff‐FT 5,334,062 4,834,291 90.63% 5,724,016 5,150,398 89.98%
Staff‐PT 1,848,246 1,215,526 65.77% 1,942,575 1,117,465 57.52%
Sub‐total Salaries 23,602,172 21,261,400 90.08% 23,861,597 21,317,944 89.34%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 282,165 198,112 70.21% 361,979 230,917 63.79%
Travel 103,094 68,928 66.86% 92,592 53,782 58.09%
Marketing Costs 59,243 36,246 61.18% 43,979 26,753 60.83%
Rental & Leases 80,498 71,500 88.82% 31,920 31,898 99.93%
Insurance/Risk Mgmt 794 444 55.97% 794 509 64.05%
Contract Services 268,280 214,381 79.91% 269,304 177,084 65.76%
Utilities ‐ ‐ ‐ 3,331 3,330 0.00%
Other Departmental Expenses 59,311 21,825 36.80% 40,065 33,207 82.88%
Instructional & Other Materials 474,133 394,907 83.29% 492,070 393,581 79.98%
Maintenance & Repair 155,115 65,651 42.32% 143,433 49,193 34.30%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency ‐ ‐ 0.00% 50 ‐ ‐
Capital Outlay 114,409 89,641 78.35% 579,366 532,830 91.97%
Total Expenses 25,199,214 22,423,035 88.98% 25,920,480 22,851,029 88.16%
Adjusted Budget
FY2012
YTD Actuals Thru
7/31/2012 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
7/31/2013 % of Budget Used
EXPENSES
Faculty‐FT 9,652,013 9,133,477 94.63% 10,323,252 9,805,240 94.98%
Faculty‐PT 5,867,925 5,161,350 87.96% 6,308,299 5,598,686 88.75%
Librarian/Counselor‐FT 1,039,104 958,024 92.20% 1,133,600 978,073 86.28%
Librarian/Counselor‐PT 145,675 121,693 83.54% 194,185 141,587 72.91%
Staff‐FT 3,961,874 3,581,502 90.40% 4,684,151 4,159,543 88.80%
Staff‐PT 1,439,139 1,050,390 72.99% 1,669,471 1,152,832 69.05%
Sub‐total Salaries 22,105,730 20,006,437 90.50% 24,312,958 21,835,961 89.81%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 277,848 166,606 59.96% 407,181 300,435 73.78%
Travel 91,102 71,971 79.00% 116,844 100,915 86.37%
Marketing Costs 43,145 30,393 70.44% 47,528 41,966 88.30%
Rental & Leases 118,687 44,078 37.14% 127,089 64,052 50.40%
Insurance/Risk Mgmt 15 ‐ 0.00% 245 245 0.00%
Contract Services 284,020 186,657 65.72% 282,236 154,412 54.71%
Utilities ‐ ‐ ‐ ‐ ‐ 0.00%
Other Departmental Expenses 47,541 29,265 61.56% 46,820 37,807 80.75%
Instructional & Other Materials 226,057 169,903 75.16% 343,476 291,556 84.88%
Maintenance & Repair 25,520 18,906 74.08% 48,060 18,437 38.36%
Transfers/Debt 883,899 878,970 99.44% 845,619 845,382 ‐
Contingency 5,407 ‐ 0.00% 3,854 ‐ ‐
Capital Outlay 145,126 88,386 60.90% 325,007 186,371 57.34%
Total Expenses 24,254,097 21,691,573 89.43% 26,906,917 23,877,540 88.74%
Central College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Northwest College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
8
Adjusted Budget
FY2012
YTD Actuals Thru
7/31/2012 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
7/31/2013 % of Budget Used
EXPENSES
Faculty‐FT 6,933,487 6,576,622 94.85% 7,506,187 6,962,205 92.75%
Faculty‐PT 3,960,168 3,697,973 93.38% 4,115,361 3,536,382 85.93%
Librarian/Counselor‐FT 1,067,762 992,165 92.92% 942,795 854,409 90.63%
Librarian/Counselor‐PT 118,806 100,290 84.41% 119,380 113,094 94.73%
Staff‐FT 4,574,777 4,148,483 90.68% 4,879,110 4,257,319 87.26%
Staff‐PT 713,488 578,450 81.07% 788,382 628,299 79.69%
Sub‐total Salaries 17,368,488 16,093,983 92.66% 18,351,215 16,351,709 89.10%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 289,705 274,688 94.82% 226,699 196,355 86.61%
Travel 32,839 23,785 72.43% 30,428 23,239 76.37%
Marketing Costs 54,559 49,150 90.09% 56,696 49,689 87.64%
Rental & Leases 1,296,974 1,242,595 95.81% 1,310,622 904,100 68.98%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐
Contract Services 29,798 26,376 88.52% 40,260 37,433 92.98%
Utilities 3,800 2,850 75.00% 4,600 3,200 0.00%
Other Departmental Expenses 39,617 30,909 78.02% 42,491 34,130 80.32%
Instructional & Other Materials 139,321 106,467 76.42% 168,636 125,458 74.40%
Maintenance & Repair 54,912 44,563 81.15% 56,993 33,508 58.79%
Transfers/Debt 5,640,942 5,639,337 99.97% 5,636,142 5,634,237 ‐
Contingency 11,607 ‐ 0.00% 12,500 ‐ ‐
Capital Outlay 46,000 40,317 87.65% 297,973 156,252 52.44%
Total Expenses 25,008,562 23,575,018 94.27% 26,235,255 23,549,312 89.76%
Adjusted Budget
FY2012
YTD Actuals Thru
7/31/2012 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
7/31/2013 % of Budget Used
EXPENSES
Faculty‐FT 12,219,531 11,561,888 94.62% 12,224,453 11,635,232 95.18%
Faculty‐PT 6,227,997 5,688,057 91.33% 5,771,364 5,141,864 89.09%
Librarian/Counselor‐FT 1,262,189 1,183,728 93.78% 768,653 707,054 91.99%
Librarian/Counselor‐PT 192,494 149,677 77.76% 214,206 153,545 71.68%
Staff‐FT 5,176,829 4,725,099 91.27% 5,759,968 5,190,498 90.11%
Staff‐PT 1,555,994 1,228,556 78.96% 1,595,118 1,062,641 66.62%
Sub‐total Salaries 26,635,033 24,537,005 92.12% 26,333,762 23,890,835 90.72%
Employee Benefits ‐ ‐ ‐ 4 3 ‐
Supplies Gen Exp 290,852 203,391 69.93% 328,232 244,506 74.49%
Travel 52,626 34,144 64.88% 51,327 41,300 80.47%
Marketing Costs 45,952 34,796 75.72% 39,443 35,483 89.96%
Rental & Leases 754,003 671,412 89.05% 540,876 503,073 93.01%
Insurance/Risk Mgmt 56 56 ‐ 98 ‐ 0.00%
Contract Services 46,109 35,437 76.85% 26,707 25,565 95.72%
Utilities ‐ ‐ ‐ ‐ ‐ ‐
Other Departmental Expenses 29,122 21,315 73.19% 28,721 21,090 73.43%
Instructional & Other Materials 214,430 173,255 80.80% 285,643 266,966 93.46%
Maintenance & Repair 27,935 19,420 69.52% 24,563 17,563 71.50%
Transfers/Debt 2,484,173 2,484,044 99.99% 1,155,001 1,155,000 100.00%
Contingency 7,024 ‐ 0.00% ‐ ‐ #DIV/0!
Capital Outlay 96,837 80,554 83.18% 118,059 100,496 85.12%
Total Expenses 30,684,152 28,294,828 92.21% 28,932,436 26,301,882 90.91%
9
Northeast College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Southwest College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Adjusted Budget
FY2012
YTD Actuals Thru
7/31/2012 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
7/31/2013 % of Budget Used
EXPENSES
Faculty‐FT 4,859,539 4,601,859 94.70% 4,948,893 4,712,386 95.22%
Faculty‐PT 3,551,588 3,335,814 93.92% 3,851,946 3,598,783 93.43%
Librarian/Counselor‐FT 714,338 658,603 92.20% 529,552 499,402 94.31%
Librarian/Counselor‐PT 79,814 46,451 58.20% 83,152 36,363 43.73%
Staff‐FT 3,375,775 3,003,471 88.97% 3,908,827 3,527,340 90.24%
Staff‐PT 1,057,975 763,092 72.13% 1,197,805 818,808 68.36%
Sub‐total Salaries 13,639,030 12,409,289 90.98% 14,520,175 13,193,082 90.86%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 269,351 174,427 64.76% 288,341 197,496 68.49%
Travel 42,912 22,057 51.40% 29,915 22,898 76.54%
Marketing Costs 67,782 59,906 88.38% 79,482 43,339 54.53%
Rental & Leases 172,373 162,474 94.26% 41,484 32,380 78.05%
Insurance/Risk Mgmt 105 105 ‐ ‐ ‐ ‐
Contract Services 154,744 124,609 80.53% 177,893 106,452 59.84%
Utilities ‐ ‐ ‐ ‐ ‐ ‐
Other Departmental Expenses 72,613 27,477 37.84% 41,488 28,652 69.06%
Instructional & Other Materials 60,754 48,076 79.13% 95,494 64,351 67.39%
Maintenance & Repair 14,162 7,058 49.84% 21,372 7,408 34.66%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency 5,436 ‐ 0.00% 11,632 ‐ 0.00%
Capital Outlay 86,453 64,179 74.24% 275,868 100,867 36.56%
Total Expenses 14,585,715 13,099,659 89.81% 15,583,144 13,796,924 88.54%
Adjusted Budget
FY2012
YTD Actuals Thru
7/31/2012 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
7/31/2013 % of Budget Used
EXPENSES
Faculty‐FT 6,106,406 5,737,660 93.96% 5,961,943 5,573,648 93.49%
Faculty‐PT 1,849,491 1,504,388 81.34% 2,033,783 1,645,692 80.92%
Librarian/Counselor‐FT 165,915 149,267 89.97% 85,066 76,168 89.54%
Librarian/Counselor‐PT 30,635 24,382 79.59% 34,980 20,101 57.46%
Staff‐FT 2,323,566 2,112,882 90.93% 2,426,599 2,202,609 90.77%
Staff‐PT 343,656 237,889 69.22% 389,771 241,605 61.99%
Sub‐total Salaries 10,819,669 9,766,468 90.27% 10,932,142 9,759,822 89.28%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 348,700 213,029 61.09% 347,473 210,877 60.69%
Travel 83,560 53,636 64.19% 123,558 87,277 70.64%
Marketing Costs 6,523 2,020 30.97% 32,472 28,485 87.72%
Rental & Leases 488,309 385,496 78.95% 483,719 386,624 79.93%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐
Contract Services 329,121 229,099 69.61% 343,590 294,402 85.68%
Utilities ‐ ‐ ‐ ‐ ‐ 0.00%
Other Departmental Expenses 74,931 57,250 76.40% 130,696 104,265 79.78%
Instructional & Other Materials 353,980 253,384 71.58% 357,808 202,839 56.69%
Maintenance & Repair 54,423 28,554 52.47% 83,949 37,079 44.17%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency 36,819 ‐ 0.00% 5,860 ‐ 0.00%
Capital Outlay 30,205 23,352 0.00% 592,573 84,895 0.00%
Total Expenses 12,626,240 11,012,289 87.22% 13,433,840 11,196,564 83.35%
Southeast College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Coleman College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
10
Adjusted Budget
FY2012
YTD Actuals Thru
7/31/2012 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
7/31/2013 % of Budget Used
EXPENSES
Faculty‐FT 2,320,138 2,199,360 94.79% 2,358,182 2,266,522 96.11%
Faculty‐PT 3,553,094 2,830,360 79.66% 3,662,833 3,005,478 82.05%
Librarian/Counselor‐FT 67,910 62,251 91.67% 2,887 2,886 99.97%
Librarian/Counselor‐PT ‐ ‐ 0.00% ‐ ‐ 0.00%
Staff‐FT 3,584,988 3,287,988 91.72% 3,799,680 3,449,942 90.80%
Staff‐PT 639,763 447,456 69.94% 795,822 586,057 73.64%
Sub‐total Salaries 10,165,893 8,827,415 86.83% 10,619,404 9,310,884 87.68%
Employee Benefits ‐ ‐ ‐ ‐ ‐ 0.00%
Supplies Gen Exp 190,378 145,134 76.23% 253,016 198,730 78.54%
Travel 71,942 43,239 60.10% 93,526 61,768 66.04%
Marketing Costs 186,702 159,775 85.58% 405,734 169,345 41.74%
Rental & Leases 39,509 21,519 54.47% 28,952 12,995 44.88%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ 0.00%
Contract Services 50,260 33,851 67.35% 363,063 93,797 25.83%
Utilities ‐ ‐ ‐ ‐ ‐ ‐
Other Departmental Expenses 46,467 34,902 75.11% 52,742 40,914 77.57%
Instructional & Other Materials 948,718 639,920 67.45% 997,675 569,729 57.11%
Maintenance & Repair 118,803 100,763 84.81% 159,700 109,937 68.84%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency ‐ ‐ ‐ ‐ ‐ ‐
Capital Outlay 14,381 13,160 0.00% 44,634 31,348 70.23%
Total Expenses 11,833,053 10,019,677 84.68% 13,018,446 10,599,447 81.42%
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
11
Division of Extended Learning
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12Academic 12,077,904 12,739,232 14,345,992 16,652,752 17,802,080 17,354,256
Technical 4,378,250 4,422,336 4,883,890 5,680,164 5,924,078 5,822,072
Continuing Education 2,091,365 1,847,195 1,810,761 1,880,857 1,914,445 1,798,940
Total Fundable Contact Hrs 18,547,519 19,008,763 21,040,643 24,213,773 25,640,603 24,975,268
Source: Certified CBM004 & CBM00C.
12
HOUSTON COMMUNITY COLLEGEAnnual Fundable Contact Hours
FY 2006-07 thru FY 2011-12
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
2006‐07 2007‐08 2008‐09 2009‐10 2010‐11 2011‐12
Continuing Education Technical Academic
+5.9%+15.1%
+10.7%+2.5%
‐2.6%
HOUSTON COMMUNITY COLLEGEUnduplicated Headcount Comparison Semester‐To‐Semester (FY 2010‐11 thru FY 2013‐14)
Fall Semester (Unduplicated Enrollment ‐ All Students)*
Spring Semester (Unduplicated Enrollment ‐ All Students)
Summer Semester (Unduplicated Enrollment ‐ All Students)*
* As of August 2, 2013.
13
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
-69
-59
-49
-39
-29
-19 -9 1 11 21 31 41 51 61 71 81 91 101
111
121
131
Spr 13
Spr 12
Spr 11
Census Day
First Class Day
Spr 13 Enrollment:+0.1% (Spr13 to 12)‐5.8% (Spr13 to 11)
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
-62
-52
-42
-32
-22
-12 -2 8 18 28 38 48
Sum 13
Sum 12
Sum 11
Census Day
First Class Day
Sum 13 Enrollment:‐6.5% (Sum13 to 12)‐6.6% (Sum13 to 11)
0
10000
20000
30000
40000
50000
60000
70000
80000
-110
-100 -90
-80
-70
-60
-50
-40
-30
-20
-10 0 10 20 30
Fall 13
Fall 12
Fall 11 Fall 13 Enrollment:‐6.9% (Fall13 to 12)‐3.9% (Fall13 to 11)
First Class Day
Census Day
HOUSTON COMMUNITY COLLEGERevenues & Expenditures Comparison Year to Date Thru July 31, 2013
2009 Positions
Revenues Expenditures Rev H/(L) Exp
YTD Actuals Thru July 31, 2013 281,855,493 243,561,714 38,293,779
YTD Actuals Thru July 31, 2012 284,947,439 244,001,274 40,946,165
(3,091,946) (439,560)
14
220,000,000
230,000,000
240,000,000
250,000,000
260,000,000
270,000,000
280,000,000
290,000,000
Revenues Expenditures
` HOUSTON COMMUNITY COLLEGEMonthly Revenues & Expenditures Comparison Year to Date By Month
Revenues SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 58,227,650 9,431,856 25,352,097 36,128,428 60,245,426 41,908,473 9,764,951 17,027,931 14,879,839 9,286,385 8,551,062
2011‐2012 61,685,752 9,480,515 24,214,599 37,832,575 66,013,487 35,495,964 10,116,378 16,794,724 15,263,177 9,332,949 7,924,181 9,726,145
2009 Positions
Expenditures SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 28,324,834 24,699,442 20,905,041 21,510,456 20,451,195 19,565,831 17,598,083 41,691,992 20,176,089 16,109,839 21,477,516
2011‐2012 37,698,782 23,302,047 20,581,833 17,164,427 19,407,583 18,185,253 18,965,252 39,130,360 18,696,899 18,586,628 21,489,075 18,505,226
15
‐ 5,000,000
10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐ 5,000,000
10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
HOUSTON COMMUNITY COLLEGERevenues Comparison Year to Date Thru July 31, 2013 by Source
2009 Positions
State
Appropriations Ad Valorem Taxes Tuition, Net Fees
Other Local
Income* Extended Learning Grant Revenue Total Revenues
YTD Actuals Thru July 31, 2013 63,495,699 104,405,862 40,158,942 65,070,880 2,020,706 6,241,171 462,232 281,855,493
YTD Actuals Thru July 31, 2012 63,779,106 104,341,537 41,978,987 66,790,991 1,399,374 6,195,087 462,356 284,947,439
(283,407) 64,325 (1,820,045) (1,720,111) 621,332 46,084 (124) (3,091,946)
16
‐
20,000,000
40,000,000
60,000,000
80,000,000
100,000,000
120,000,000
StateAppropriations
Ad Valorem Taxes Tuition, Net Fees Other LocalIncome*
Extended Learning Grant Revenue
HOUSTON COMMUNITY COLLEGEExpense Comparison Year to Date Thru July 31, 2013 by Source
2009 Positions
YTD Actuals Thru Faculty‐FT Faculty‐PT
Librarian/
Counselor‐FT
Librarian/
Counselor‐PT Staff‐FT Staff‐PT
Employee
Benefits
Supplies Gen
Exp Travel
Marketing
Costs
Rental &
Leases
Insurance/
Risk Mgmt
Contract
Services Utilities
Other
Departmental
Expenses
Instructional &
Other
Materials
Maintenance &
Repair
Transfers/
Debt Capital Outlay Total Expenses
July 31, 2013 50,991,693 27,138,113 4,393,852 555,892 59,195,927 6,491,516 14,751,325 4,660,200 777,330 1,299,364 2,159,748 6,519,897 18,327,458 7,063,294 1,697,014 5,448,881 678,779 28,330,519 3,080,913 243,561,714
July 31, 2012 49,784,819 26,787,552 5,417,691 508,023 56,076,984 6,432,874 12,295,929 4,398,092 696,397 936,196 4,214,401 6,088,158 16,631,834 6,556,434 1,243,446 4,225,807 671,517 39,467,200 1,567,921 244,001,274
1,206,874 350,561 (1,023,839) 47,870 3,118,943 58,642 2,455,396 262,109 80,932 363,168 (2,054,653) 431,739 1,695,623 506,860 453,568 1,223,075 7,262 (11,136,682) 1,512,992 (439,560)
17
‐
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
9,000,000
10,000,000
11,000,000
12,000,000
13,000,000
14,000,000
15,000,000
16,000,000
17,000,000
18,000,000
19,000,000
20,000,000
21,000,000
22,000,000
23,000,000
24,000,000
25,000,000
26,000,000
27,000,000
28,000,000
29,000,000
30,000,000
TOTAL
Unexpended Plant Funds
Total Unexpended Plant Fund Balances per Books (1,121,850)$
Spending/Encumbrances/Reserve for Future Use
‐ Encumbrances/PO Issued General Unexpended FY13 1,121,850
Total Plant Fund PO 1,121,850$
Anticipated Unexpended Plant Shortfall ‐$
HOUSTON COMMUNITY COLLEGEUnexpended Plant Fund Excluding 2004 CIP
Cash Position to July 31, 2013
18
Description of Use
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances To
Date Unexpended
DEFERRED MAINTENANCE FY05
System Administration 604,863$ 604,863$ ‐$ ‐$
Subtotal 604,863$ 604,863$ ‐$ ‐$
DEFERRED MAINTENANCE FY06
System Administration 649,625$ 649,624$ ‐$ ‐$
Northwest College 412,743 412,743 ‐ ‐
Coleman College 190,738 190,736 ‐ ‐
Subtotal 1,253,106$ 1,253,103$ ‐$ ‐$
DEFERRED MAINTENANCE FY07
System Administration 775,610$ 775,610$ ‐$ ‐$
Central College 373,917 373,917 ‐ ‐
Northwest College 599,383 599,383 ‐ ‐
Northeast College 1,059,733 1,059,733 ‐ ‐
Southwest College 74,607 74,607 ‐ ‐
Southeast College 38,742 38,742 ‐ ‐
Coleman College 9,900 9,900 ‐ ‐
Subtotal 2,931,893$ 2,931,892$ ‐$ ‐$
DEFERRED MAINTENANCE FY08
System Administration 10,195$ 10,195$ ‐$ ‐$
Central College 478,637 478,637 ‐ ‐
Northwest College 1,217,755 1,217,755 ‐ ‐
Northeast College 494,886 494,886 ‐ ‐
Southwest College 42,063 42,063 ‐ ‐
Coleman College 73,813 73,813 ‐ ‐
Subtotal 2,317,348$ 2,317,349$ ‐$ ‐$
OTHER GENERAL PROJECTS
Minor Construction 657,807$ 657,807$ ‐$ ‐$
System 11,481,737 11,134,281 347,456 ‐
Central College 3,218,637 3,129,754 88,883 ‐
Northwest College 4,060,039 4,051,428 8,611 ‐
Northeast College 1,106,793 700,228 406,565 ‐
Southwest College 1,587,304 1,325,995 261,309 ‐
Southeast College 1,995,204 1,989,030 6,174 ‐
Coleman College 1,341,161 1,341,159 2 ‐
Subtotal 25,448,682$ 24,329,682$ 1,119,000$ ‐$
SURPLUS PROPERTY
Palmetto Property ‐ Purchase 495,154$ 495,154$ ‐$ ‐$
Dixie Property‐ Refund 20,000 20,000 ‐
288 Property‐ Purchase 1,142,402 1,139,552 2,850 ‐
Warehouse Property 12,966,619 12,966,619 ‐ ‐
Subtotal 14,624,175$ 14,621,325$ 2,850$ ‐$
Total Anticipated Uses 47,180,067$ 46,058,214$ 1,121,850$ ‐$
UNEXPENDED PLANT FUND PROJECTSas of July 31, 2013
19
HOUSTON COMMUNITY COLLEGE
Total Budget
to Date
Total
Expenditures
To Date
Encumbrances
To Date
% of
Expen‐
ditures Unexpended
% of
Total
BudgetSources:
Central College 2001A Bond 25,318,535$
2003 Limited Tax Bond and Premium 150,748,497
Actural Interest Earned 2003 Limited Tax Bonds 20,868,074
2005 Limited Tax and Building Bond 1,875,000
2003/2005 LTD Bond Issuance Cost (2,068,522)
2006 Jr Lien Bond Std Revenue Bond 30,000,000
Bond Issuance Cost (913,149)
Actual Interest Earned 2006 Jr Lien Bonds 2,608,533
Transferred to Fund 7305/Hayes Road (3,169,049)
2008 Maintenance Tax Notes 56,912,320
2008 MTN Bond Issuance Cost (1,056,912)
Actual Interest Earned 2008 MTN 1,654,029
2008 Sr. Lien Bond 1,714,953
Transferred to Residual CIP Funds (20,712,314)
Total Available with Reclassification 263,779,995$
Uses:
Construction 119,635,550$ 119,628,602$ 6,948$ 100% ‐$ 0%
CPMS PGAL 11,121,809 11,121,809 ‐ 100% ‐ 0%
Facility Planning 1,677,989 1,677,989 ‐ 100% ‐ 0%
Architect Fees and Engineering 7,507,764 7,505,762 2,002 100% ‐ 0%
Other Costs including Bldg/Land Purchase 2,262,477 2,258,218 4,259 100% ‐ 0%
Inspectors 890,000 890,000 ‐ 100% ‐ 0%
Design Standard 103,370 103,370 ‐ 100% ‐ 0%
Site Improvement and Infrastructure Development 52,582,367 52,073,872 508,496 100% (0) 0%
IT Infrastructure Master Plan 29,507,115 29,173,797 333,318 100% 0 0%
Furniture and Fixtures 13,979,273 13,908,378 70,895 100% 0 0%
Small Business 567,383 567,383 ‐ 100% ‐ 0%
Administrative Services 3,413,568 3,381,849 22,500 100% 9,219 0%
Material Testing 542,445 537,606 4,839 100% (0) 0%
Contingency for Construction 717,302 0% 717,302 100%
Surveying 465,888 460,552 5,335 100% 0 0%
Design and Geotech 110,111 110,111 100% ‐ 0%
Signage 70,000 70,000 100% ‐ 0%
Blue Light Security 126,000 120,600 5,400 100% ‐ 0%
PGAL Website Development 181,208 181,208 ‐ 100% ‐ 0%
System Architect Furniture Consultant 11,367 11,367 100% ‐ 0%
Northline Demolition‐Pizza Hut 226,246 226,246 100% ‐ 0%
Police Cars 342,223 341,613 610 100% ‐ 0%
Bering St. Property 50,687 50,687 100% ‐ 0%
General Repairs & Maintenance 2,079,239 2,079,239 100% ‐ 0%
Land Purchase 1,919,729 1,919,729 100% ‐ 0%
Amateur Sports Complex ‐ Willie Gay Hall 2,240,764 2,233,764 7,000 100% ‐ 0%
Total Construction Cost 252,331,871$ 250,633,753$ 971,602$ 100% 726,521$ 0%
Note: Expenditures Not In Construction Schedule
Deferred Maintenance 5,000,000$ 5,000,000$ ‐$ 100% ‐$ 0%
IT Development 6,448,123 6,448,122 ‐ 100% ‐ 0%
263,779,995$ 262,081,875$ 971,603$ 100% 726,521$ 0%
Anticipated Budget Shortfall/Surplus (0)
*Footnote on next page
HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of July 31, 2013
20
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
Central ‐ San Jacinto:*
Construction Cost 1,241,868$ 1,241,868$ ‐$
CPMS PGAL 111,440 111,440 ‐ ‐
Facilities Space Programming 393,715 393,715 ‐ ‐
Material Testing ‐ ‐ ‐ ‐
IT Infrastructure Capital Projects 5,687 5,687 ‐ ‐
Design Standards 3,904 3,904 ‐
Total Central ‐ San Jacinto 1,780,694$ 1,780,694$ ‐$ ‐$
Central ‐ Learning Hub/Science Bldg:*
Construction Cost 21,504,724$ 21,499,805$ 4,919$ -$ CPMS PGAL 1,967,801 1,967,801 ‐
Facilities Space Programming 148,096 148,096 ‐
Architect and Engineering 1,242,506 1,242,506 ‐
Furniture, Fixtures & Equipment 2,019,706 2,019,706 ‐
Inspectors 187,000 187,000 ‐
Project Software 7,614 7,614 ‐
Design Standards 15,086 15,086 ‐
Site Infrastructure Improvements 5,688,425 5,428,687 259,738 ‐
IT Infrastructure Master Plan 2,726,528 2,726,528 ‐
Design Geotech 10,150 10,150 ‐
Material Testing 32,994 32,356 638 ‐
Surveying 69,453 64,118 5,335 ‐
Blue Light Security 18,000 17,100 900 ‐
Total Central ‐ Learning Hub/Science
Bldg:*
35,638,083$ 35,366,553$ 271,530$ ‐$
NEC ‐ Learning Hub:*
Construction Cost 14,001,119$ 14,001,119$ ‐
CPMS PGAL 1,187,440 1,187,440 ‐
Facilities Space Programming 145,889 145,889 ‐
Architect and Engineering 723,556 723,556 ‐
Furniture, Fixtures & Equipment 1,651,908 1,651,908 ‐
Other Costs including Bldg/Land Purchase ‐ ‐
Inspectors 205,000 205,000 ‐
Project Software ‐ ‐
Design Standards 9,015 9,015 ‐
Site Infrastructure Improvements 92,682 92,682 ‐
IT Infrastructure Master Plan 1,249,836 1,249,836 ‐
Design Geotech ‐ ‐
Material Testing 123,607 123,607 ‐
Surveying 71,081 71,081 ‐
Total NEC ‐ Learning Hub 19,461,133$ 19,461,133$ ‐$ ‐$
HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of July 31, 2013
21
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of July 31, 2013
NEC ‐ Science Engineering & Technology:*
Construction Cost 11,626,428$ 11,626,428$ ‐$
CPMS PGAL 857,203 857,203 ‐
Facilities Space Programming 52,058 52,058 ‐
Architect and Engineering 635,906 635,906 ‐
Furniture, Fixtures & Equipment 643,154 607,016 36,138 ‐
Other Costs including Bldg/Land Purchase 73,800 73,800 ‐
Inspectors ‐ ‐
Project Software ‐ ‐
Design Standards 6,818 6,818 ‐
Site Infrastructure Improvements 15,423,461 15,357,930 65,531 ‐
IT Infrastructure Master Plan 1,160,897 1,160,824 73 ‐
Design Geotech 28,500 28,500 ‐
Material Testing 95,465 95,465 ‐
Surveying 10,035 10,035 ‐
Blue Light Security 18,000 17,100 900 ‐
Total NEC ‐ Science Eng & Technology 30,631,725$ 30,529,083$ 102,642$ ‐$
NEC ‐ Pinemont:
CPMS PGAL 6,269$ 6,269$ ‐$ ‐$
Facilities Space Programming 71,292 71,292 ‐ ‐
Other Costs including Bldg/Land Purchase 102,156 102,156 ‐ ‐
Surveying 22,483 22,483 ‐ ‐
Total NEC ‐ Pinemont 202,200$ 202,200$ ‐$ ‐$
SEC ‐ Felix Fraga (Drennan):*
Construction Cost 12,419,858$ 12,417,829$ 2,029$ ‐$
CPMS PGAL 1,216,969 1,216,969 ‐
Facilities Space Programming 227,023 227,023 ‐
Architect and Engineering 835,511 835,511 ‐
Furniture, Fixtures & Equipment 1,007,619 977,469 30,150 ‐
Other Costs including Bldg/Land Purchase 62,466 62,466 ‐
Inspectors - ‐
Project Software - ‐
Design Standards 6,873 6,873 ‐
Site Infrastructure Improvements 5,993,954 5,960,197 33,757 ‐
IT Infrastructure Master Plan 1,268,478 1,268,405 73 ‐
Design Geotech 18,200 18,200 ‐
Material Testing 137,662 137,662 ‐
Surveying 27,674 27,674 ‐
HUB/Small Business Program ‐ ‐ ‐ ‐
HUB/Small Business Program ‐ ‐
Bering St Property 50,687 50,687 ‐
Signage ‐ ‐
Blue Light Security 18,000 17,100 900 ‐ Total SEC ‐ Felix Fraga (Drennan):* 23,290,974$ 23,224,065$ 66,909$ ‐$
22
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of July 31, 2013
SEC ‐ Felix Morales:*
Construction Cost 3,653,330$ 3,653,330$ ‐$
CPMS PGAL 667,905 667,905 ‐
Facilities Space Programming 62,181 62,181 ‐
Architect and Engineering 353,970 351,968 2,002 ‐
Furniture, Fixtures & Equipment 902,023 898,276 3,747 ‐
Inspectors ‐ ‐
Project Software ‐ ‐
Design Standards 3,117 3,117 ‐
Site Infrastructure Improvements 98,015 96,070 1,945 ‐
IT Infrastructure Master Plan 1,135,522 1,008,321 127,201 0
Design Geotech ‐ ‐
Material Testing 10,009 5,808 4,201 ‐
Surveying 1,225 1,225 ‐
Total SEC ‐ Felix Morales 6,887,296$ 6,748,200$ 139,096$ 0$
SEC ‐ Learning Hub:*
Construction Cost 16,550,039$ 16,550,039$ ‐$
CPMS PGAL 1,744,048 1,744,048 ‐
Facilities Space Programming 126,588 126,588 ‐
Architect and Engineering 875,415 875,415 ‐
Furniture, Fixtures & Equipment 1,839,167 1,838,307 860 ‐
Other Costs including Bldg/Land Purchase 32,480 28,221 4,259 ‐
Inspectors 258,000 258,000 ‐ ‐
Project Software ‐ ‐
Design Standards 9,367 9,367 ‐
Site Infrastructure Improvements 12,149,303 12,038,386 110,917 ‐
IT Infrastructure Master Plan 2,157,010 2,157,010 ‐
Administrative Services ‐ ‐
Design Geotech 9,525 9,525 ‐ ‐
Material Testing 115,883 115,883 ‐
Surveying 144,094 144,094 ‐
Blue Light Security 18,000 18,000 - ‐
Total SEC ‐ Learning Hub 36,028,917$ 35,912,883$ 116,036$ ‐$
23
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of July 31, 2013
SW ‐ Missouri City:*
Construction Cost 8,891,630$ 8,891,630$ ‐$
CPMS PGAL 601,635 601,635 ‐ ‐
Facilities Space Programming 194,111 194,111 ‐
Architect and Engineering 958,905 958,905 ‐ ‐
Furniture, Fixtures & Equipment 1,011,146 1,011,146 ‐ ‐
Library & Bookstore 1,991,575 1,991,575 ‐
Inspectors ‐ ‐
Project Software ‐ ‐
Design Standards 4,999 4,999 ‐
Site Infrastructure Improvements 5,061,234 5,061,234 ‐ ‐
IT Infrastructure Capital Projects 2,246,083 2,246,083 ‐ ‐
Design Geotech ‐ ‐
Material Testing ‐ ‐
Surveying 48,311 48,311 ‐
Blue Light Security 18,000 17,100 900 ‐
Total SW ‐ Missouri City 21,027,628$ 21,026,728$ 900$ ‐$
SW ‐ West Loop Phase I:*
Construction Cost 9,031,922$ 9,031,922$ ‐$ ‐$
CPMS PGAL 1,033,865 1,033,865 ‐
Facilities Space Programming 76,260 76,260 ‐
Architect and Engineering 718,694 718,694 ‐
Furniture, Fixtures & Equipment 2,154,214 2,154,214 ‐ ‐
Design Standards 8,170 8,170 ‐
IT Infrastructure Capital Projects 2,864,190 2,864,190 ‐ ‐
Design Geotech 22,116 22,116 ‐
Material Testing 21,141 21,140 ‐ ‐
Surveying 14,995 14,995 ‐ ‐
Exterior Signage 70,000 70,000 ‐ ‐
Blue Light Security 18,000 17,100 900 ‐
Total SW ‐ West Loop Phase I 16,033,566$ 16,032,665$ 900$ ‐$
24
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of July 31, 2013
SW ‐ Learning Hub ‐ Stafford:*
Construction Cost 20,714,629$ 20,714,629$ ‐$ ‐$
CPMS PGAL 1,727,234 1,727,234 ‐
Facilities Space Programming 180,778 180,778 ‐
Architect and Engineering 1,155,688 1,155,688 ‐ ‐
Furniture, Fixtures & Equipment 2,750,339 2,750,339 ‐ ‐
Inspectors 240,000 240,000 ‐
Project Software ‐ ‐
Design Standards 15,845 15,845 ‐
Site Infrastructure Improvements 8,075,292 8,038,685 36,607 ‐
IT Infrastructure Capital Projects 2,535,820 2,535,820 ‐ ‐
Design Geotech 21,620 21,620 ‐
Material Testing ‐ ‐
Surveying 56,536 56,536 ‐
Blue Light Security 18,000 17,100 900 ‐
Total SW ‐ Learning Hub ‐ Stafford 37,491,782$ 37,454,275$ 37,507$ ‐$
System ‐ Network:
IT Infrastructure Capital Projects 12,158,847$ 11,952,876$ 205,971$ ‐
Administrative Services 3,413,568 3,381,849 22,500 9,219
PGAL Website Development 181,209 181,208 1 ‐
HUB/Small Business Program 567,383 567,383 ‐ ‐
System Architect Furniture Consultant 11,367 11,367 ‐ Ft. Bend Library Inflation Cost Increase ‐ ‐ Northline Demolition‐Pizza Hut 226,246 226,246 ‐
Police Cars 342,223 341,613 610 ‐
General Repairs & Maintenance 2,079,239 2,079,239 ‐
Land Purchase 1,919,729 1,919,729 ‐
Amateur Sports Complex ‐ Willie Gay Hall 2,240,764 2,233,764 7,000 ‐
Total ‐ System ‐ Network 23,140,575$ 22,895,274$ 236,080$ 9,219$
Construction Contingency 717,302$ ‐$ ‐$ 717,302
Subtotal Above 252,331,875$ 250,633,752$ 971,600$ 726,521$
100.00% 99.33% 0.39% 0.29%
EXPENDITURES NOT IN CONSTRUCTION SCHEDULE
Deferred Maintenance 5,000,000$ 5,000,000$ ‐$ ‐$
IT Development 6,448,123 6,448,122 ‐ ‐
GRAND TOTAL 263,779,998$ 262,081,874$ 971,600$ 726,521$
100.00% 99.36% 0.37% 0.28%
25
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures To
Date
Encumbrances
July 31, 2013 Unexpended
Sources:
Bond Proceeds 454,167,571$
Capitalized Interest (26,559,053)
Issuance Cost & Underwriters' Discount (2,608,518)
Interest Earned 137,284
Total Available with Reclassification 425,137,284$
Uses:
Land 8,171,973$ 8,171,973$ ‐$ ‐$
Construction Cost 1,754,655 364,006 1,390,649 ‐
Architect and Engineering 133,880 82,065 51,815 ‐
Site Infrastructure Improvements 89,660 864 88,796 ‐
Inspection 135,960 ‐ 135,960 ‐
Material Testing 248,327 111,522 136,805 ‐
IT Infrastructure Capital Projects 47,282 ‐ 47,282 ‐
Furniture, Fixtures & Equipment 565,883 ‐ 565,883 ‐
Contingency for Construction(Int. Earned) 3,500,000 ‐ ‐ 3,500,000
Small Business 2,000,000 ‐ 5,985 1,994,015
Administrative Services 660,000 ‐ ‐ 660,000
Construction Auditor 137,284 ‐ ‐ 137,284
Total Construction Cost 17,444,902$ 8,730,430$ 2,423,174$ 6,291,299$
Anticipated Budget Shortfall/Surplus 407,692,382
26
HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of July 31, 2013
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
July 31, 2013 Unexpended
Central Campus: 23,071,888 23,071,888
Land ‐ ‐ ‐
Construction Cost ‐ ‐ ‐
Architect and Engineering ‐ ‐ ‐
Site Infrastructure Improvements 87,500 ‐ 87,500 ‐
Inspection ‐ ‐ ‐
Material Testing ‐ ‐ ‐
IT Infrastructure Capital Projects ‐ ‐ ‐
Furniture, Fixtures & Equipment ‐ ‐ ‐
Contingency ‐ ‐ ‐ Total Central Campus 23,159,388$ ‐$ 87,500$ 23,071,888$
South Campus Workforce Building 24,142,734$ 24,142,734$
Land ‐ ‐ ‐
Construction Cost ‐ ‐ ‐
Architect and Engineering ‐ ‐ ‐
Site Infrastructure Improvements 2,160 864 1,296 ‐
Inspection ‐ ‐ ‐
Material Testing ‐
IT Infrastructure Capital Projects ‐ ‐ ‐
Furniture, Fixtures & Equipment ‐ ‐ ‐
Contingency ‐ ‐ ‐ Total South Campus 24,144,894$ 864$ 1,296$ 24,142,734$
Northline 19,710,118$ 19,710,118$
Land ‐ ‐ ‐
Construction Cost ‐ ‐ ‐
Architect and Engineering ‐ ‐ ‐
Site Infrastructure Improvements ‐ ‐ ‐
Inspection ‐ ‐ ‐
Material Testing ‐
IT Infrastructure Capital Projects ‐ ‐ ‐
Furniture, Fixtures & Equipment ‐ ‐ ‐
Contingency ‐ ‐ ‐ Total Northline 19,710,118$ ‐$ ‐$ 19,710,117$
Northforest Workforce & Early College 29,169,687$ 29,169,687$
Land 8,102,273 8,102,273 ‐ ‐
Construction Cost 1,633,824 364,006 1,269,818 ‐
Architect and Engineering ‐ ‐ ‐
Site Infrastructure Improvements ‐ ‐ ‐
Inspection ‐ ‐ ‐
Material Testing 199,996 107,998 91,998 ‐
IT Infrastructure Capital Projects 47,282 ‐ 47,282 ‐
Furniture, Fixtures & Equipment 267,174 ‐ 267,174 ‐
Contingency ‐ ‐ ‐ Total Northforest & Early College 39,420,235$ 8,574,277$ 1,676,272$ 29,169,687$
HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of July 31, 2013
27
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
July 31, 2013 Unexpended
HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of July 31, 2013
Acres Homes 12,797,976$ ‐$ 12,797,976$
Land 13600 13600 ‐ ‐
Construction Cost ‐ ‐ ‐
Architect and Engineering ‐ ‐ ‐
Site Infrastructure Improvements ‐ ‐ ‐
Inspection ‐ ‐ ‐
Material Testing ‐
IT Infrastructure Capital Projects ‐ ‐ ‐
Furniture, Fixtures & Equipment ‐ ‐ ‐
Contingency ‐ ‐ ‐ Total ‐ Pinemont 12,811,576$ 13,600$ ‐$ 12,797,976$
Alief Campus 9,851,535$ 9,851,535$
Land ‐ ‐ ‐
Construction Cost ‐ ‐ ‐
Architect and Engineering ‐ ‐ ‐
Site Infrastructure Improvements ‐ ‐ ‐
Inspection ‐ ‐ ‐
Material Testing 3,524 3,524 ‐ ‐
IT Infrastructure Capital Projects ‐ ‐ ‐
Furniture, Fixtures & Equipment ‐ ‐ ‐
Contingency ‐ ‐ ‐ Total ‐ Alief 9,855,059$ 3,524$ ‐$ 9,851,535$
Westside Campus 52,226,812$ 52,226,812$
Land 0 0 ‐
Construction Cost ‐ ‐ ‐
Architect and Engineering 5,000 ‐ 5,000 ‐
Site Infrastructure Improvements ‐ ‐ ‐
Inspection ‐ ‐ ‐
Material Testing ‐
IT Infrastructure Capital Projects ‐ ‐ ‐
Furniture, Fixtures & Equipment ‐ ‐ ‐
Contingency ‐ ‐ ‐ Total ‐ Westside 52,231,812$ ‐$ 5,000$ 52,226,812$
Southeast Campus 26,071,099$ 26,071,099$
Land 0 0 ‐
Construction Cost ‐ ‐ ‐
Architect and Engineering ‐ ‐ ‐
Site Infrastructure Improvements ‐ ‐ ‐
Inspection ‐ ‐ ‐
Material Testing 44,807 ‐ 44,807 ‐
IT Infrastructure Capital Projects ‐ ‐ ‐
Furniture, Fixtures & Equipment ‐ ‐ ‐
Contingency ‐ ‐ ‐ Total ‐ Southeast 26,115,906$ ‐$ 44,807$ 26,071,099$
28
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
July 31, 2013 Unexpended
HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of July 31, 2013
Felix Fraga Campus 15,083,715$ 15,083,715$
Land ‐ ‐ ‐
Construction Cost 120,831 ‐ 120,831 ‐
Architect and Engineering 128,880 82,065 46,815 ‐
Site Infrastructure Improvements ‐ ‐ ‐
Inspection 135,960 ‐ 135,960 ‐
Material Testing ‐ ‐ ‐
IT Infrastructure Capital Projects ‐ ‐ ‐
Furniture, Fixtures & Equipment 298,709 ‐ 298,709 ‐
Contingency ‐ ‐ ‐ Total ‐ Felix Fraga 15,768,094$ 82,065$ 602,314$ 15,083,715$
Westloop Campus 17,739,106$ ‐$ 17,739,106$
Land ‐
Construction Cost ‐
Architect and Engineering ‐
Site Infrastructure Improvements ‐
Inspection ‐
Material Testing ‐
IT Infrastructure Capital Projects ‐
Furniture, Fixtures & Equipment ‐
Contingency ‐ Total ‐ Westloop 17,739,106$ ‐$ ‐$ 17,739,106$
Braes Oak Campus 11,826,071$ 11,826,071$
Land ‐
Construction Cost ‐
Architect and Engineering ‐
Site Infrastructure Improvements ‐
Inspection ‐
Material Testing ‐
IT Infrastructure Capital Projects ‐
Furniture, Fixtures & Equipment ‐
Contingency ‐ Total ‐ Braes Oak 11,826,071$ ‐$ ‐$ 11,826,071$
Stafford Campus 26,608,659$ 26,608,659$
Land ‐ ‐ ‐
Construction Cost ‐ ‐ ‐
Architect and Engineering ‐
Site Infrastructure Improvements ‐
Inspection ‐ ‐ ‐
Material Testing ‐ ‐ ‐
IT Infrastructure Capital Projects ‐ ‐ ‐
Furniture, Fixtures & Equipment ‐ ‐ ‐
Contingency ‐ ‐ ‐ Total ‐ Stafford Campus 26,608,659$ ‐$ ‐$ 26,608,659$
29
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
July 31, 2013 Unexpended
HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of July 31, 2013
Missouri City 21,188,376$ ‐$ ‐$ 21,188,376$
Land ‐ ‐ ‐
Construction Cost ‐ ‐ ‐
Architect and Engineering ‐
Site Infrastructure Improvements ‐
Inspection ‐ ‐ ‐
Material Testing ‐ ‐ ‐
IT Infrastructure Capital Projects ‐ ‐ ‐
Furniture, Fixtures & Equipment ‐ ‐ ‐
Contingency ‐ 21,188,376$ ‐$ ‐$ 21,188,377$
Total ‐ Missouri City
Coleman 118,204,606$ 118,204,606$
Land 56100 56100 ‐ ‐
Construction Cost ‐ ‐ ‐
Architect and Engineering ‐ ‐ ‐
Site Infrastructure Improvements ‐ ‐ ‐
Inspection ‐ ‐ ‐
Material Testing ‐ ‐ ‐
IT Infrastructure Capital Projects ‐ ‐ ‐
Furniture, Fixtures & Equipment ‐ ‐ ‐
Contingency ‐ ‐ Total ‐ Coleman 118,260,706$ 56,100$ ‐$ 118,204,606$
Small Business 3,500,000 ‐ ‐ 3,500,000 Administrative Services 2,000,000 ‐ 5,985 1,994,015
Construction Auditor 660,000 ‐ ‐ 660,000
Construction Contingency 137283.52 ‐ ‐ 137,284 Total Construction Cost 6,297,284$ ‐$ 5,985$ 6,291,299$
GRAND TOTAL 425,137,284$ 8,730,430$ 2,423,174$ 413,983,681$
30
2003/2005 Limited Tax Bonds 2003 2005 TotalBond counsel fees 150,000 57,000 207,000Underwriters' discount 814,813 57,000 871,813Insurance premium 558,764 558,764Financial advisory fee 205,391 68,081 273,472Rating agencies fees 114,350 16,000 130,350Printing costs 10,386 4,506 14,892CPA consent letter fee 1,500 1,500 3,000Verification fees 3,500 3,500Paying agent fee 300 5,432 5,732
1,855,504 213,018 2,068,522
2006 Jr Lien Revenue BondsBond counsel fees 79,500Underwriters' discount 509,509Insurance premium 117,904Financial advisory fee 137,910Rating agencies fees 54,850Printing costs 3,502CPA consent letter fee 1,500Verification fees 3,500Paying agent fee 4,974
913,149
2008 Maintenance Tax NotesBond counsel fees 63,500Underwriters' discount 342,526Insurance premium 498,600Financial advisory fee 95,105Rating agencies fees 47,100Printing costs 9,617Paying agent fee 463
1,056,912
Limited Tax General Obligation Bonds, Series 2013Bond counsel fees 698,040Underwriters' discount 1,213,220Financial advisory fee 462,628Rating agencies fees 190,000Printing costs 2,273CPA consent letter fee 4,000Paying agent fee 500
2,570,661
31
HOUSTON COMMUNITY COLLEGE2004 & 2013 CIP Projects Footnotes
as of July 31, 2013
Total Budget to
Date
Total
Expenditures to
Date Encumbrances Unexpended
Sources:Transferred CIP Funds 20,712,314
Uses:
Central Learning Hub/Science Bldg:
Site Infrastructure Improvements 6,599,554$ 252,464$ 33$ 6,347,057$
South Campus:
Site Infrastructure Improvements 11,000 11,000 ‐ ‐
NEC ‐ Science Engineering & Technology:
Site Infrastructure Improvements 367,959 254,897 113,063 ‐
SEC ‐ Learning Hub:
Site Infrastructure Improvements 2,002,604 1,498,589 504,015 ‐
Material Testing 23,368 22,077 1,291 ‐
Katy Campus:
Architecture 155,200 ‐ 155,200 ‐
System ‐ Network:
IT Infrastructure Capital Projects 7,569,405 7,431,911 102,018 35,476
Site Infrastructure Improvements 96,600 64,722 31,878 ‐
Construction Contingency 851,755 ‐ 851,755
Contingency* 3,034,869 ‐ 3,034,869
Total Construction Cost 20,712,314$ 9,535,661$ 907,497$ 10,269,157$
Anticipated Budget Shortfall/Surplus (0)
*All of these funds, except for the Coningency of $3,034,869, arose from Maintenance Tax Notes which are intended
for infrastructure and maintenance and repairs (capital‐related). The unexpended balance of $10,271,546 can be used
throughout the district.
32
HOUSTON COMMUNITY COLLEGE SYSTEMResidual CIP Funds
as of 7/31/13
Total Budget
to Date
Total
Revenues /
Expenditures
To Date
Encumbrances To
Date Unexpended
Sources of funds:
Proceeds from
2006 Tax Maintenance Notes 12,000,000$
Discount (88,756)
Bond Issuance Cost (256,244)
Interest Income 835,395
Funds Available 12,490,395$
Uses of funds:
Site Infrastructure 341,092$ 327,728$ 13,364$ ‐$
Project Management 450,479 450,479 ‐ ‐
Construction 8,805,292 8,805,292 ‐ ‐
Design Phase 1,117,820 1,117,820 ‐ ‐
Architecture 17,822 17,822 ‐
Material Testing & Inspection 6,399 6,399 ‐ ‐
Land/Demolition 420,541 420,541 ‐ ‐
Survey 9,473 9,473 ‐ ‐
Construction‐Maintenance 1,259,003 1,247,114 11,889 ‐
Contingency 62,473 46,700 15,773
Grand Total Uses 12,490,395$ 12,449,368$ 25,253$ 15,773$
Net Available 0$
33
HOUSTON COMMUNITY COLLEGEMaintenance Tax Notes 2006 (Central Utility Plant Project)
as of July 31, 2013
Note: Budgets are adjusted as contracts are awarded; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances To
Date Unexpended
Sources:
2008 Maintenance Tax Notes 39,780,489$
2008 Maintenance Tax Notes‐Phase 1 Infrastructure 15,078,286
Transferred to CIP Residual Fund (7170) (17,522,242)
Interest Earned To date 1,679,542
Funds Available for Projects 39,016,075$
Uses:
Site Infrastructure Improvements 5,679,383$ 5,410,266$ 269,117$ ‐$
Architectural/Engineering Fees 165,537 151,654 13,883 ‐
IT Infrastructure Master Plan 19,553,388 19,243,543 309,845 ‐
Furniture, Fixtures & Equipment 5,043,248 4,572,572 470,676 ‐
Material Testing 33,351 29,035 4,316 ‐
Construction 5,437,915 5,425,796 12,119 ‐
Construction Management 132,478 132,478 ‐
Campus Security 243,116 242,415 600 101
Truck Driving School 99,200 99,200 ‐
Land 517,306 517,306 ‐
Energy Services 8,860 8,860 ‐
Design GEOTECH 5,189 5,189 ‐ ‐
Surveying 16,310 16,310 ‐ ‐
Contracted Services 2,079,239 2,079,239 ‐ ‐
Residual Funds for Completion of CIP Projects 1,555 1,555
Total 39,016,075$ 37,933,863$ 1,080,556$ 1,656$
Bond Issuance Cost:
Bond counsel fees 63,500$
Underwriters' discount 342,526
Insurance premium 498,600
Financial advisory fee 95,105
Rating agencies fees 47,100
Printing costs 9,617
CPA consent letter fee 463
Total 1,056,912$
HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds
as of July 31, 2013
Fund 7203
Fund 7203 ‐ Maintenance Tax Notes
34
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances To
Date Unexpended
Source:
2008 Senior Lien Bonds:
Southeast Workforce Project 14,300,000$
Emergency Preparedness 1,000,000
Interest Earned To date 470,997
Funds Available for Projects 15,770,997$
Uses:
Operation and Maintenance 77,034 77,034 ‐
Major Repairs and Renovation 821,560 820,726 834 ‐
South East Work Force Project 3,838,668 3,732,470 106,198 ‐
Land Purchase (Rosalie Property) 2,314,967 2,314,967 ‐
Material Engineering and Testing 8,380 4802 3,578 ‐
Construction of Workforce Building 7,267,592 7,222,409 45,183 ‐
Residual Funds for All Projects 1,442,796 1,442,796
15,770,997$ 14,172,408$ 155,793$ 1,442,796$
Bond Issuance Cost:
Bond counsel fees 123,267$
Underwriters' discount 336,128
Insurance premium 620,827
Financial advisory fee 100,981
Rating agencies fees 51,750
Printing costs 5,880
Paying agent fee 460
Verification fee 5,000
Escrow agent fee 4,600
1,248,893$
35
Fund 7308 ‐ Senior Lien Bonds
HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds
Fund 7308as of July 31, 2013
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances To
Date Unexpended
Central
San Jacinto Memorial 21,391,231$ 10,148,893 7,619,849 3,622,489$
J.B. Whitely Bldg. 4,540,000 1,588,086 632,832 2,319,083
Theater One 1,699,500 216,728 20,979 1,461,793
Staff Instructional Services 846,921 203,839 ‐ 643,082
Curriculum Innovation Center 249,549 48,403 201,146 ‐
Fine Arts Parking Structure 190,000 171,082 5,100 13,818
Crawford Annex 68,200 18,138 ‐ 50,062
Learning Hub/Science Bldg. 132,214 121,553 10,661 ‐
Planned Parenthood Renovation 1,697,585 1,647,211 50,374 ‐
Total Central 30,815,200$ 14,163,933$ 8,540,942$ 8,110,327$
Northeast
Automotive Tech. Training Ctr. 4,000,000$ 669,400$ 163,107$ 3,167,493$
Pinemont 66,558 39,237 ‐ 27,321
Codwell Hall 438,000 376,108 55,067 6,826
Codwell Hall Shower (Temp) 150,000 ‐ 150,000
Roland Smith Truck Driving Ctr. 140,000 54,406 ‐ 85,594
Northline 120,000 34,602 2,235 83,163
Public Safety Institute 115,000 86,245 14,906 13,849
NE Science and Tech. Bldg 49,500 ‐ 49,500
NE Learning Hub 47,500 6,309 ‐ 41,191
Total Northeast 5,126,558$ 1,266,306$ 235,314$ 3,624,937$
Southeast
Angela Morales 599,000$ 562,862$ 616$ 35,521$
Office City 38,500 ‐ ‐ 38,500
Total Southeast 637,500$ 562,862$ 616$ 74,021$
Southwest
Stafford Campus (7 Bldgs) 4,279,423$ 4,212,447$ 66,451$ 525$
Scarcella Center 890,339 448,740 183,491 258,108
Alief 138,680 132,664 ‐ 6,016
Academic Ctr Sienna Plantation 93,500 93,396 ‐ 104
Stafford Learning Hub 54,000 10,294 1,112 42,594
Applied Technology Center 50,000 1,715 ‐ 48,285
Greenbriar Annex 30,000 22,033 ‐ 7,967
Total Southwest 5,535,942$ 4,921,290$ 251,054$ 363,599$
System
System Building 3,034,547$ 2,179,517$ 855,029$ ‐$
Teaching Enhancement Renovations 2,719,072 1,216,870 296,375 1,205,827
Surface Parking & Civil Infrastructure 1,743,001 1,600,867 16,146 125,988
Parking Structure 2,403,380 2,294,506 108,874$ ‐
Total System 9,900,000$ 7,291,759$ 1,276,425$ 1,331,815$
Grand Total 52,015,200$ 28,206,150$ 10,304,350$ 13,504,699$
HOUSTON COMMUNITY COLLEGE SYSTEM2010 Maintenance Tax Notes
as of July 31, 2013
36
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources:
2011 Maintenance Tax Notes 40,000,000
Uses:
San Jacinto College Renovation
Construction 35,000,000$ 18,958,784$ 16,041,216$ ‐$
Architect & Engineering ‐ ‐
Site Infrastructure Improvements ‐ ‐
Inspection ‐
IT Infrastructure ‐ ‐
Furniture ‐ ‐
Contingency 5,000,000 5,000,000
40,000,000$ 18,958,784 16,041,216 5,000,000
37
HOUSTON COMMUNITY COLLEGE SYSTEM2011 Maintenance Tax Notes: Fund 7207
As of July 31, 2013
Total Budget to Date
Total Revenues /
Expenditures To
Date
Encumbrances To
Date Unexpended
Sources:
2011A Maintenance Tax Notes 21,000,000
Uses:Alief ‐ Hayes Road 3,479,754$ 3,479,754$
Architect & Engineering 1,208,820 1,172,760 36,060 ‐ Construction 7,988,362 6,207,884 1,780,478 ‐ Site Infrastructure Improvements 6,402 6,402 ‐ ‐ Material Testing 21,647 16,795 4,852 IT Infrastructure 197,649 ‐ 197,649 ‐ Inspection 163,318 112,678 50,640 ‐ Furniture 934,049 118,801 815,248 ‐
14,000,000$ 7,635,319 2,884,927 3,479,754
NE ‐ North ForestArchitect & Engineering 136,695 104,536 32,159 ‐ Construction ‐ ‐ ‐ Site Infrastructure Improvements ‐ ‐ ‐ IT Infrastructure ‐ ‐ ‐ Furniture ‐ ‐ ‐
136,695 104,536 32,159 ‐
SW ‐ West Loop 2,575,591 2,575,591 Architect & Engineering 13,000 10,000 3,000 ‐ Construction 951,767 524,174 427,593 ‐ Site Infrastructure Improvements ‐ ‐ ‐ IT Infrastructure ‐ ‐ ‐ Furniture ‐ ‐ ‐ Painting 262,257 239,064 23,193 ‐
3,802,616 773,238 453,786 2,575,591
SW ‐ Alief BissonnetArchitect & Engineering 186,225 115,443 70,782 ‐ Construction 6,083 ‐ 6,083 ‐ Site Infrastructure Improvements 5,076 ‐ 5,076 ‐ IT Infrastructure ‐ ‐ ‐ Furniture ‐ ‐ ‐
197,384 115,443 81,941 ‐
SE ‐ Workforce BldgArchitect & Engineering 154,594 129,211 25,383 ‐ Construction ‐ ‐ ‐ Site Infrastructure Improvements ‐ ‐ ‐ IT Infrastructure ‐ ‐ ‐ Furniture ‐ ‐ ‐
154,594 129,211 25,383 ‐
3100 Main System BldgArchitect & Engineering 10,000 6,000 4,000 ‐ Construction 376,316 269,779 106,537 ‐ Site Infrastructure Improvements ‐ ‐ ‐ IT Infrastructure ‐ ‐ ‐ Furniture 79,483 71,535 7,948 ‐ Painting 11,597 10,437 1,160 ‐
477,396 357,751 119,645 ‐
Contingency 2,231,315 2,231,315
Total Construction Cost 21,000,000$ 9,115,498$ 3,597,842$ 8,286,661$
38
HOUSTON COMMUNITY COLLEGE SYSTEM2011A Maintenance Tax Notes: Fund 7208
As of July 31, 2013
DescriptionOriginal Bond
AmountPrincipal Payments Principal Balance
Principal & Interest FYE
2013
Revenue Bonds 255,830,000 (51,675,000) 204,155,000 23,689,199
Limited Tax Bonds 652,420,000 (143,700,000) 508,720,000 13,753,759
Maintenance Tax Notes 189,600,000 (22,225,000) 167,375,000 15,180,595
PFC Lease Revenue Bonds 126,595,000 (20,940,000) 105,655,000 8,957,391
1,224,445,000 (238,540,000) 985,905,000 61,580,944
Note: This schedule represents all bonds and maintenance tax notes with outstanding principal balances as of 7/31/13; previously retired debt issues are not shown
39
HOUSTON COMMUNITY COLLEGE SYSTEM
Summary Schedule of Bonds and Maintenance Tax NotesAs of July 31, 2013
Description Date Issued
Original Bond
Amount
Principal
Payments Principal Balance
Principal &
Interest FY12
Final Due
Date Call Dates
Foot‐
note
2005 Senior Lien Revenue/Refunding Bonds 04/15/05 51,285,000 (18,240,000) 33,045,000 6,676,363 04/15/20 04/15/15 (A)
2006 Junior Lien Revenue/Refunding Bonds 11/01/06 72,815,000 (18,885,000) 53,930,000 6,274,230 04/15/30 04/15/16 (A) (B)
2008 Senior Lien Revenue Bonds 05/14/08 54,540,000 (7,810,000) 46,730,000 4,075,100 04/15/30 04/15/18 (A)
2010 Senior Lien Revenue Bonds 07/29/10 27,250,000 (1,775,000) 25,475,000 2,124,275 04/15/31 04/15/20 (A)
2011 Junior Lien Revenue Refunding Bonds 03/10/11 33,940,000 (4,965,000) 28,975,000 4,150,431 04/15/25 04/15/21 (A)
2011T Senior Lien Revenue Bond 11/15/11 16,000,000 16,000,000 388,800 04/15/21 11/15/13 (A)
2003 Limited Tax Bonds 12/01/03 144,155,000 (143,700,000) 455,000 782,175 02/15/14 (C)
2011 Limited Tax Refunding Bonds 10/20/11 109,490,000 109,490,000 5,308,300 02/15/28 02/15/21 (C)
2013 Limited Tax General Obligation Bonds 03/19/13 398,775,000 398,775,000 7,663,284 02/15/43 02/15/15 (E)
2006 Maintenance Tax Notes 02/01/06 12,000,000 (3,165,000) 8,835,000 890,550 02/15/26 02/15/16 (C)
2008 Maintenance Tax Notes 03/01/08 54,975,000 (9,825,000) 45,150,000 4,171,426 02/15/28 02/15/18 (C)
2009 Maintenance Tax Notes 09/01/09 13,830,000 (2,200,000) 11,630,000 1,242,569 02/15/25 02/15/19 (C)
2010 Maintenance Tax Notes 07/29/10 47,645,000 (3,720,000) 43,925,000 3,998,400 02/15/29 02/15/20 (C)
2011 Maintenance Tax Notes 03/10/11 41,560,000 (2,645,000) 38,915,000 3,293,775 02/15/31 02/15/21 (C)
2011A Maintenance Tax Notes 10/12/11 19,590,000 (670,000) 18,920,000 1,583,875 02/15/31 02/15/21 (C)
PFC Series 2005A Lease Revenue Bonds 06/01/05 11,605,000 (2,880,000) 8,725,000 837,663 04/15/28 04/15/15 (A)
PFC Series 2005C Lease Revenue Bonds 12/01/05 19,155,000 (3,755,000) 15,400,000 1,313,456 04/15/30 04/15/15 (A)
PFC Series 2006 Lease Revenue Bonds 10/01/06 36,950,000 (6,290,000) 30,660,000 2,484,773 04/15/31 04/15/16 (A) (D)
PFC Series 2007 Lease Revenue Bonds 02/01/07 58,885,000 (8,015,000) 50,870,000 4,321,500 04/15/31 04/15/17 (A) 1,224,445,000 (238,540,000) 985,905,000 61,580,944
Note: This schedule represents all bonds and maintenance tax notes with outstanding principal balances as of 7/31/13;
previously retired debt issues are not shown (i.e. 1997, 1998, 1999, 2001, 2001A, 2003 LTD, 2005 LTD)
Footnotes:
(A) Funded from current operations, Fund 1110
(B) Approximately $3.4 MM annually through 8/31/17 to be funded from student technology fees, Fund 8110; remainder from
current operations
(C) Funded from real estate taxes, Fund 8300
(D) $1,329,772 of interest expense to be funded from real estate taxes
(E) Funded from capitalized interest
Schedule of Bonds and Maintenance Tax Notes
For the Month Ended July 31, 2013
Houston Community College
40
3101‐3100 Main
Leasing
**3102‐
Conference
Training Center3103‐HCC‐TV
Auxiliary
3105‐HCCS ‐ PFC
Leasing **3110‐Auxiliary
3111‐ Auxiliary
Student Services
3201‐Cafe Club
NEO 3100 Main
3202‐Fitness
Center‐Central
3204‐Heinen
Theater
3207‐
International
Initiatives
3208‐Saudi
Consulting
Services 3209‐Qatar Subtotal
Fund Balance 8/31/12 16,575,935$ (744,125)$ 36,165$ 898,968$ (6,225,160)$ (724,173)$ (1,362,924)$ (76,298)$ 33,917 (82,495) 203,712 807,349 9,340,870
FY2013 Revenue 4,878,918 81,840 ‐ 19,862 2,845,733 365 469,942 13,197 21,885 46,666 6,526,299 14,904,707
Salaries 210,279 7,335 554,589 252,263 244,210 597 1,600 4,000 5,082,166 6,357,039
Benefits 53,620 2,406 108,400 55,553 55,998 3 911,614 1,187,595
Supplies Gen Exp 21,563 26,789 328,982 7,394 13,222 7,870 8,945 6,485 19,975 441,225
Travel 68,892 71,427 9,122 57,253 206,694
Marketing Costs 412,441 412,441
Rental & Leases 4,899 39,790 1,518 46,207
Contract Services 1,453,120 835,525 850 140,080 2,429,575
Utilities 360,774 913 361,687
Departmental Expenses 2,750 3,868,792 270 7,050 598 3,879,460
Instructional & Other Materials 600 3,763 213,092 2,817 220,273
Maintenance & Repair 3,551 6,297 1,245 2,384 13,477
Insurance/Risk Mgmt ‐
Exemptions and Waivers 1,738 150 1,888
Transfer ‐
Capital Outlay 792,309 9,666 306,234 1,108,209
Total Expense 2,895,016 41,429 9,666 ‐ 6,532,698 386,637 535,250 9,715 14,048 29,624 ‐ 6,211,685 16,665,770
Contribution to Fund Balance 1,983,903 40,411 (9,666) 19,862 (3,686,965) (386,272) (65,308) 3,482 7,837 17,042 ‐ 314,614 (1,761,063)
18,559,838 (703,714) 26,499 918,830 (9,912,125) (1,110,446) (1,428,233) (72,816) 41,753 (65,454) 203,712 1,121,963 7,579,808
*Restricted by limitations; must comply with laws, statues and regulations.
**Common Area Expense
41
HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund
as of July 31, 2013
Auxiliary Funds*
Net Fund Balance
HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund
as of July 31, 2013
3110‐ Student
Vending
Commission
3111‐Auxiliary
Student
Activities
3112‐Auxiliary
Student Athletic
Fee Subtotal Grand Total
Fund Balance 8/31/12 227,335 594,123 1,584,968 2,406,426 11,747,296
FY2013 Revenue 120,099 1,106,272 887,951 2,114,322 17,019,029
Salaries 10,730 25,566 190,355 226,651 6,583,691
Benefits 68 32,462 32,530 1,220,125
Supplies Gen Exp 40,523 602,007 249,130 891,660 1,332,885
Travel 5,995 72,387 67,089 145,471 352,166
Marketing Costs ‐ 412,441
Rental & Leases ‐ 46,207
Contract Services 1,800 60,087 202,790 264,677 2,694,252
Utilities ‐ 361,687
Departmental
Expenses
12,434 19,130 9,820 41,384 3,920,844
Instructional &
Other Materials
‐ 220,273
Maintenance &
Repair
140 140 13,617
Insurance ‐ Risk
Mgmt
70 1,327 6,944 8,341 8,341
Exemptions and
Waivers
12,484 30,025 42,509 44,397
Transfer 935,555 935,555 935,555
Capital Outlay 932 932 1,109,141
Total Expense 84,177 810,597 1,695,077 2,589,851 19,255,620
Contribution to Fund Balance 35,923 295,675 (807,126) (475,529) (2,236,591)
263,258 889,798 777,842 1,930,897 9,510,705
*Funds can only be used for services related to students
42
Net Fund Balance
Student Auxiliary Funds ‐ Restricted*
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total Award DeobligatedProgram Title Period Number Expenditures Amount Amount** Ends Starts Budget
U. S. Department of Education
Direct Programs:
Higher Education ‐ Institutional Aid 5 yrs. 84.031A 115,846 450,183 1,542,133 9/30/2014 10/1/2009
TRIO ‐ Student Support Services 5 yrs. 84.042 379,287 436,682 2,065,270 8/31/2015 9/1/2010
TRIO ‐ Upward Bound ‐ Southeast 4 yrs. 84.047 1,399 16,669 1,172,562 ^^ 8/31/2012 9/1/2007 15,271
TRIO ‐ Upward Bound ‐ Southeast 5 yrs. 84.047 256,493 291,335 1,465,615 8/31/2017 9/1/2012
TRIO ‐ Upward Bound ‐ Central 5 yrs. 84.047A 486,715 949,456 2,845,845 5/31/2017 6/1/2012
Astra Stem Grant 3 yrs. 84.120A 141,465 293,375 881,873 9/30/2014 10/1/2011
Vast Academy TPSID 5 yrs. 84.407A 407,456 862,617 2,498,250 9/30/2015 10/1/2010
Pass‐Through From:
Texas Educational Agency
Adult Education ‐ State Grant Program 1 yr. 84.002 4,772,875 5,508,680 5,542,104 * 9/15/2013 7/1/2012
Adult Education ‐ State Grant Program 1 yr. 84.002 116,451 128,780 128,780 * 9/15/2013 7/1/2012
University of St. Thomas
Higher Education ‐ Institutional Aid 5 yrs. 84.031C 687,421 870,174 3,243,025 9/30/2016 10/1/2011
Texas Higher Education Coordinating Board
Vocational Education ‐ Basic Grants to States 1 yr. 84.048 631,037 1,171,019 1,171,019 8/31/2013 9/1/2012
College Access Challenge Grant Program 1 yr. 4 mos. 84.378A 15,000 26,707 208,548 ^^ 8/31/2012 4/6/2011 11,707
College Access Challenge Grant Program 1 yr. 84.378A 140,017 154,140 171,798 8/13/2013 8/14/2012
Total Department of Education 8,151,461$ 11,159,817$ 22,936,822$
U.S. Department of Agriculture
Direct Programs:
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 15,497 36,414 298,538 ^ 8/31/2013 8/1/2009
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 17,180 26,428 244,000 ^ 8/14/2013 8/15/2010
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 119,239 135,610 445,000 ^ 8/31/2013 9/1/2010
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 115,329 202,726 245,000 8/31/2013 9/1/2011
Pass‐Through From:
Texas A & M University‐Corpus Christi 2 yrs 10.223 16,770 30,435 48,700 ^ 8/31/2013 40,422
Sam Houston State University 1,417 39,264 39,264 8/15/2015 9/1/2012
Total Department of Agriculture 285,432$ 470,877$ 1,320,502$
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension
^^ Grant is Over
43
HOUSTON COMMUNITY COLLEGE
as of July 31, 2013
Date Grant
Schedule of Federal Awards *
FY12 ‐ 13
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total Award Deobligated
Program Title Period Number Expenditures Amount Amount** Ends Starts Budget
U.S. Department of Housing and Urban Development
Direct Programs:
Pass‐Through From:
Child Care Council of Greater Hous. Inc
Community Development Block Grant‐Entitlement Grant 1 yr 14.218 10,787 17,309 32,000 ^^12/31/12 8/1/2011 6,522
Total Department of Housing And Urban Development 10,787$ 17,309$ 32,000$
Department of Justice
Direct Program: Bulletproof Vest Partnership Program 1 yr‐cont. 16.607 ‐ ‐ 11,078 until expended 9/1/2004
Total Department of Justice ‐$ ‐$ 11,078$
U.S. Department of Labor
DOL‐Logistics Technician Training 3yrs. 104,352$ 159,097 327,404 12/31/2013 7/1/2010
Pass‐Through From:
Harris County Department of Education
Integrated Career Awareness 10 mos. 17.278 53,729 53,800 53,800 6/30/2013 8/1/2012
Counseling to Career 17.278 9,991 10,000 10,000 6/30/2013 2/1/2013
Texas Workforce Commission
Recovery ‐ WIA Dislocated Worker Formula Grant 1 yr. 17.278 10,261 61,804 243,163 ^^9/30/2012 7/1/2011 51,543
Total Department of Labor 178,334$ 284,701$ 634,367$
U.S. Department of State
Pass‐Through From:
Northern Virginia Community College 1 yr 19.009 74,580 73537.51 109830 41455 40976
Northern Virginia Community College 1 yr 19.009 5,447 159,707 159,707 6/30/2014 7/1/2013
Total Department of State 80,027$ 233,245$ 269,537$
U.S. Department of Transportation
Commerical Truck Driving Training 18 mos. 20.235 6,432 175,529 175,529 3/31/2014 9/1/2012
Total Department of Transportation 6,432$ 175,529$ 175,529$
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension
^^ Grant is Over
44
as of July 31, 2013
HOUSTON COMMUNITY COLLEGE
Schedule of Federal Awards *
Date Grant
FY12 ‐ 13
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total Award Deobligated
Program Title Period Number Expenditures Amount Amount** Ends Starts Budget
Institute of Museum & Library Services
Pass‐Through From:
Texas State Library Archive Commission
Libraries for ALL 1 yr 45.310 25,859 75,000 75,000 8/31/2013 9/1/2012
Tex Share Mobile Project 1 yr 45.310 7500 7500 15000 41517 41310
Total Department of State 33,359$ 82,500$ 90,000$
National Science Foundation
Direct Programs:
Education and Human Resources 4 yrs. 47.076 55,702 64,204 491,728 ^5/31/2013 2/15/2009 8,502
Pass‐Through From:
University of Houston System
Education and Human Resources 5 yrs. 47.076 40,983 47,212 190,000 8/31/2013 9/1/2011
Total National Science Foundation 96,685$ 111,415$ 681,728$
U. S. Department of Energy
Energy Sector Grant (SECO) 8 mos 81.041 37,180 63,836 460,480 ^^9/30/2012 5/10/2010 26,656
Solar Energy Technical Program 13 mos 81.087 194,657 591,069 750,000 12/30/14 11/1/2012
Pass Through From:
City of San Antonio 4.5 mos. 81.117
Energy Efficiency & Rene Energy Info Dissen Outrea,Train,&Tech Analy/Assist 14,465 15,000 15,000 02/14/13 9/1/2012 535
Total U. S. Department of Energy 246,302$ 669,905$ 1,225,480$
U. S. Department of Health and Human Services
Direct Programs:
Head Start 5 yrs. 93.600 14,472 16,045 936,660 9/29/2013 9/30/2008
Head Start 5 yrs. 93.600 152,184 207,477 936,660 9/29/2013 9/30/2008
Pass‐Through From:
Texas Education Agency
Temporary Assistance for Needy Families 1 yr. 93.558 10,178 10,200 208,614 ^^8/31/2012 9/1/2011 22
Temporary Assistance for Needy Families 1 yr. 93.558 211,233 253,850 244,749 * 9/15/2013 9/1/2012
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension
^^ Grant is Over
45
as of July 31, 2013
FY12 ‐ 13
Date Grant
HOUSTON COMMUNITY COLLEGE
Schedule of Federal Awards *
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total Award Deobligated
Program Title Period Number Expenditures Amount Amount** Ends Starts Budget
U. S. Department of Health and Human Services
YMCA of Greater Houston
Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 19,869 82,578 374,938 ^^9/30/2012 10/1/2011 62,709
Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 255,125 342,105 342,105 9/30/2013 10/1/2012
Pitt Community College
Health Information Tech Professionals 2 yrs. 93.721 348,218 490,362 1,287,568 9/30/2013 4/2/2010
University of Texas at Austin
Block Grant‐Prevent & Treatment of Substance Abuse 1 yr. 93.959 12,730 22,000 22,000 9/30/2013 9/29/2012
Total Department of Health and Human Services 1,024,010$ 1,424,617$ 4,353,294$
U. S. Department of Homeland Security
Direct Programs:
Homeland Security 2 yrs. 97.062 16,497 58,856 250,000 ^^12/31/12 9/1/2010 42,359
Total Department of Homeland Security 16,497$ 58,856$ 250,000$
Total Federal Financial Assistance 10,129,325$ 14,688,771$ 31,980,336$
* Scholarship grants are not included in this schedule.
**Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension
^^ Grant is Over
as of July 31, 2013
FY12 ‐ 13
Date Grant
46
HOUSTON COMMUNITY COLLEGE
Schedule of Federal Awards *
HOUSTON COMMUNITY COLLEGE
Schedule of Federal Awards *
as of July 31, 2013
Perform‐
ance Total Budget Total Award Deobligated
Program Title ‐ State Grantor Period Expenditures Amount Amount** Ends Starts Budget
Texas Education Agency
Adult Education 1 yr. 24,618$ 24,615$ 1,165,635$ ^^ 8/31/2012 9/1/2011 (3)
Adult Education 1 yr. 1,223,433 1,292,271 1,165,635 * 9/15/2013 9/1/2012
Drop‐Out Recovery Performance Pay 1 yr. 58,433 94,334 181,784 until expended 6/1/2010
Temporary Assistance for Needy Families 1 yr. 16,311 16,869 111,445 ^^ 8/31/2012 9/1/2011 558
Temporary Assistance for Needy Families 1 yr. 106,768 122,182 131,283 8/31/2013 9/1/2012
Total Texas Education Agency 1,429,562$ 1,550,271$ 2,755,782$
Texas Higher Education Coordinating Board
Adult Basic Education Innovation Grant 1 yr. 155,110$ 158,314 500,000 8/31/2013 9/1/2012
Collegiate G‐Force Mentorship 1 yr. 17,856 27,148 50,000 8/31/2013 9/1/2009
First Year Experience 13 mos. 5,577 8,709 50,000 until expended 7/18/2011
HPI 1 yr. 7,200 10,000 10,000 8/31/2013 9/1/2012
Nursing Shortage Reduction Program 4 yrs. 37,147 112,280 157,314 8/31/2014 9/1/2010
Nursing Shortage Under 70 Program 1 yr. 72,564 383,891 383,891 8/31/2013 9/1/2012
Rider 58 ATCP School Grant 8 1/2 mos. 4,800 13,960 46,360 until expended 12/18/2009
Pass‐Through From:
University of Tex Health Science Center
Navigator Grant 1 yr. 30,466 51,452 129,195 ^^11/30/2012 6/1/2011 20,986
Total Texas Higher Education Coordinating Board 330,720$ 765,754$ 1,326,760$
Texas Workforce Commission
Skills Development ‐ Skills for Small Business Initiatives 1 yr. 410 18,791 20,000 5/31/2014 6/1/2012
Ben E Keith Co. 1 yr. 60,626 103,469 103,469 2/28/2014 2/11/2013
The Methodist 14 mos. 519,266 902,965 902,965 10/31/2013 8/20/2012
TSTC TYCO 12 1/2 mos. 7,138 236,633 236,633 2/28/2014 2/11/2013
VITAS 13 mos. 56,500 389,051 389,051 4/30/2014 3/1/2013
Pass‐Through From:
Total Texas Workforce Commission 643,940$ 1,650,909$ 1,652,118$
Total State Financial Assistance 2,404,222$ 3,966,934$ 5,734,660$
* Scholarship grants are not included in this schedule.** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension^^ Grant is Over
47
Date Grant
as of July 31, 2013
Schedule of State Awards *
FY12 ‐ 13
HOUSTON COMMUNITY COLLEGE
Deobligated
Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts Budget
Achieving the Dream ‐ Initiative 1 yr.‐cont. ‐ 9,433 20,000 until expended 12/1/2009
Achieving the Dream ‐ Gates Foundation 3 yrs. 195,658 262,135 743,000 ^^12/31/2012 7/1/2009 66,478
Adult Education/We Can Work 1 yr. ‐ ‐ 11,500 until expended 1/1/2010
American Chemical Society 8 mos 177 248 500 until expended 9/1/2011
AT&T High School Success Grant 1 yr. 7 mos. ‐ 25,216 35,000 until expended 1/31/2010
Bank of America 2 yrs. ‐ 316 50,000 until expended 5/1/2008
Baylor Summer Interns 1 yr. ‐ 1,638 60,000 until expended 5/1/2010
Brown Foundation 1 yr.‐cont. ‐ ‐ 100,000 until expended 2/1/2008
Capital Idea project 1 yr. 115,410 73,794 341,000 until expended 8/1/2010
Carnegie FDTN 1 yr 15,599 30,901 67,500 until expended 1/1/2012
Citibank ‐ College Connection Program 1 yr. 3,433 20,475 41,718 until expended 8/15/2007
Civic Ventures 1 yr. 1 mo. 1,233 1,246 25,000 until expended 7/1/2010
Dow Male Minority Initiative Summer Prog. 1 yr. ‐ 12,588 23,986 until expended 1/2/2012
Early College High School (Southeast) ‐ Gates/Dell 5 yrs. ‐ 6,779 400,000 until expended 6/10/2005
Financial Empowerment Strat. Student Success 2 yrs. 28,413 60,808 63,050 12/31/2013 1/1/2012
Goldman Sachs Grant ‐ Phase I 5 yrs. 1,104,517 1,955,011 1,955,011 5/31/2016 1/3/2011
Gulf Coast Pass 3 yrs. 268,188 602,625 1,175,000 12/31/2014 1/1/2012
Hammill FDTN ‐ Veterans Grants 2 yrs. ‐ 11 18,191 until expended 9/1/2010
Houston Endowment Grant 3 yrs. ‐ 814 267,000 until expended 11/16/2005
Houston Pathways Initiative 2 yrs. 121,503 345,471 1,580,000 8/31/2013 3/26/2009
Interlocal Metro (PSI) 10 yrs. ‐ 45,000 200,000 8/23/2017 8/23/2008
Interlocal Stafford ‐ City of Stafford 1 yr. 64,000 161,986 161,986 until expended 10/1/2010
KBR Veterans Orientation 1 yr.‐cont. ‐ 5,540 19,685 until expended 9/1/2008
Kresge Fdtn‐Coordinator/Evaluation 1 yr. 56,090 72,187 82,450 until expended 9/1/2011
Kresge Fdtn‐Parent Academy 1 yr. 50,962 89,881 89,881 until expended 9/1/2011
Kresge Fdtn‐Veterans Grant 1 yr. 89,547 136,698 136,698 until expended 9/1/2011
MDRC ‐ Learning Community Demonstration Grant ‐ Northeast 4 yrs. ‐ 26,495 60,233 until expended 11/1/2007
MDRC ‐ Learning Community Demonstration Grant ‐ Southeast 4 yrs. ‐ 738 75,000 until expended 11/1/2007
MDRC ‐ Learning Community Demonstration Grant ‐ Central 4 yrs. ‐ 385 33,000 until expended 11/1/2007
Metlife Caregiving for Older Americans 1 yr.‐cont. ‐ 18,012 23,855 until expended 7/1/2007
Microsoft Elevate America 1 yr. 3,261 31,985 34,969 until expended 3/20/2012
* Scholarship grants are not included in this schedule.
**Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension
^^ Grant is Over
48
FY12 ‐ 13
HOUSTON COMMUNITY COLLEGE
Schedule of Local Government and Private Awards *
as of July 31, 2013
Deobligated
Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts Budget
Mobile Go Center ‐ Valero 1 yr.‐cont. ‐ 494 7,293 until expended 9/1/2007
National Articulation & Transfer Network Council(NATN) 1 yr.‐cont. ‐ 29,273 29,273 until expended 4/1/2005
North Forest GED Preparation 3 mos 330 6,799 25,000 until expended 10/1/2011
St. Luke's Episcopal Health Charities Immunization Fellowship 2 yrs. ‐ 4,178 142,650 until expended 9/10/2008
Susan B Komen Breast Cancer Initiative 1 yr. ‐ 6,610 123,230 until expended 4/1/2010
Texas Pioneer Foundation Grant 1 yr. 846 22,851 23,117 8/31/2013 1/26/2012
TG‐ATD Texas Peer Coaching 1 yr. 9,998 10,000 10,000 8/31/2013 9/1/2012
THECB_TG‐T‐STEM Challenge Scholarship Program 20 mos. 44,218 323,700 323,700 1/31/2015 5/1/2013
Vast Job Developer 1 yr. 9,304 20,299 94,898 until expended 11/1/2009
Verizon Foundation Grant 1 yr. ‐ 510 12,510 until expended 1/1/2010
Verizon‐Simmons CAST 14 mos. 2,665 12,500 12,500 12/18/2013 10/12/2012
Walmart ‐ Minority Male Initiative 1 yr. ‐ 25,215 40,000 until expended 9/1/2009
Washington Mutual 1 yr.‐cont. 2,740 16,717 31,700 until expended 9/1/2006Total Private Financial Assistance 2,188,090$ 4,477,563$ 8,771,085$
* Scholarship grants are not included in this schedule.
**Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension
^^ Grant is Over
49
HOUSTON COMMUNITY COLLEGE ‐ Schedule of Local Government and Private Awards *
Schedule of Local Government and Private Awards * continued
as of July 31, 2013
FY12 ‐ 13
Salary
CHANCELLOR97,613$
51,923$
70,469$
70,469$
46,448$
46,000$
46,000$
45,000$
46,000$
55,000$
55,000$
50,000$
45,555$
71,761$
58,000$
39,900$
96,000$
75,000$
60,000$
62,000$
92,834$
50,000$
22 1,330,972$
DEPUTY CHANCELLOR45,857$
45,857$
45,857$
48,150$
24,473$
25,000$
24,473$
24,473$
27,000$
61,074$
45,746$
39,504$
66,578$
34,908$
34,908$
37,943$
65,540$
49,500$
169,195$
142,503$
48,806$
New Postions
Houston College Community Systems
2012‐2013 Positions
Employee Name Department Job Title Comments Month
Wanda Pleasant Procurement Sr. Buyer
Alfred Kessellie, II Procurement Supervisor New Position‐Budget 12‐13‐Hired External Nov
Kerry Doucette Procurement Supervisor New Position‐Budget 12‐13‐Hired External Nov
New Position‐Budget 12‐13‐Hired External Nov
50
Michael Schurwon Procurement Sr. Buyer New Position‐Budget 12‐13‐Hired External Jan
Barlett Sheinberg Resource & Economic Dev Interim Dir., Resource & Economic Dev New Position‐Budget 12‐13‐Hired Internal Sep
Thomas Richardson Procurement Buyer New Position‐Budget 12‐13‐Hired External Nov
Mimi Lemmons Procurement Sr. Buyer New Position‐Budget 12‐13‐Hired External Nov
Andrea Stroller Foundation Alumni Specialist New Position‐Budget 12‐13‐Hired External Nov
Freddy Conde Procurement Buyer New Position‐Budget 12‐13‐Hired External Nov
Armand Villacorte Procurement Sr. Buyer New Position‐Budget 12‐13‐Hired External Jan
Reginald Harmon Procurement Sr. Buyer Repl Sheila Perla‐Hired External Nov
Victor Camargo Business Services Inventory Control Supervisor New Position‐Budget 12‐13‐Hired External Nov
Christopher Burton Procurement Dir., Procurement Operations Repl Jeffery Bonnardel‐Hired External Apr
Ching Hua Procurement Sr. Buyer New Position‐Budget 12‐13‐Hired External Mar
Olivia Harris Records Retention Records Retention Technician New Position‐Budget 12‐13‐Hired External Apr
Sharon Flowers General Counsel Legal Assistant New Position‐Budget 12‐13‐Hired External Feb
Sandra Garica General Counsel Assistant General Counsel I Repl Jessica Saldivar‐Hired External Mar
Beatrice Emanuel‐Sims Foundation Coordinator, Dev Workforce New Position‐Budget 12‐13‐Hired External Jul
Cydney Peters Foundation Interim Executive Director Repl Kelly Zuniga‐Hired Internal Jul
Susana Rodriquez Internal Audit Sr., Internal Auditor New Position‐Budget 12‐13‐Hired External May
Frank Khan Internal Audit Internal Auditor New Position‐Budget 12‐13‐Hired External May
Severin Zindler Procurement Buyer Repl Wanda Pleasant‐Hired External Jul
1 New Position‐External 15 Interim 1
Edwin Johnson Police Department Corporal Repl Anthony Maxie‐Hired Internal Sep
Chancellor Replacement‐Internal 1 Replacement‐External 4 New Position‐Internal
Shirley Voisin Police Department Corporal New Position‐Budget 11‐12‐Hired Internal Sep
My'Keshia Robinson Police Department Security Officer Repl Victor Fisher‐Hired External Oct
Tobin Anderson Police Department Corporal Repl Timothy Ramirez‐Hired Internal Sep
Navidad Martinez Police Department Corporal New Position‐Budget 11‐12‐Hired Internal Sep
James Lindsey Police Department Security Officer Repl Grayland Jones‐Hired External Oct
Antonio Hill Police Department Security Officer Repl Kenneth Bridges‐Hired External Oct
Ules Harris Police Department Security Officer Repl Majid Iqbal‐Hired External Oct
Katherine McCabe Police Department Security Officer Repl Willie Rostan‐Hired External Oct
Maria Alarcon Accounts Payable Accounting Specialist Repl Norma Jackson‐Hired Internal Oct
Manhal Chbat QEP Instructor New Position‐Hired Internal Jan
Patricia Thompson HR‐Compensation Manager Repl John Chen‐Hired External‐Temp Oct
Aracelia Saucedo Business Affairs Executive Secretary Repl Alice Binkley‐Hired Internal Oct
Bapakaye Tamuno Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Nov
Shirley Parish Human Resources Interim HRIS Manager Repl Tasharra Pickens‐Hired Internal Nov
Jeremy Hardeway Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Nov
Keith Harris Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Nov
Karen Edwards Human Resources Interim Chief HR Officer Repl Willie Williams‐Hired Internal Jan
William Thomson Student Financial Svs Accountant II New Position‐Budget 12‐13‐Hired Internal Feb
Brittany Kaighen HR‐Payroll Payroll Support Specialist Repl Juanita Mei‐Hired External Jan
Willie Williams Deputy Chancellor VC, Administrative Special Projects New Position‐Hired Internal Jan
Salary
Houston College Community Systems
2012‐2013 Positions
Employee Name Department Job Title Comments Month
DEPUTY CHANCELLOR continued47,492$
37,943$
142,000$
32,500$
66,130$
101,000$
38,000$
85,680$
37,943$
66,130$
51,132$
55,000$
61,074$
31,579$
37,740$
43,174$
86,621$
45,857$
45,857$
45,857$
50,953$
50,953$
50,953$
50,953$
47,000$
86,621$
70,469$
23,600$
34,908$
34,908$
40,979$
52 2,808,351$
VICE CHANCELLOR INSTRUCTION52,423$
41,427$
53,320$
43,557$
36,220$
52,000$
35,000$
43,174$
48,010$
35,982$
34,500$
64,500$
New Postions
51
Maya Durnovo Economic Dev & Entrep AVC, Economic Dev & Entrep. Initiatives New Position‐Budget 12‐13‐Hired Internal Feb
Alobidey Mohammed Broadcasting Media Videographer Repl Joseph Smith‐Hired External Feb
Delphine Campbell Student Financial Svcs Accountant II New Position‐Budget 12‐13‐Hired Internal Feb
Hector Silva Police Department Peace Officer Repl Tobin Anderson‐Hired External Feb
Shante Kelley Business Affairs Accounting Specialist Repl Polly Cooper‐Hired Internal Feb
Lesa Spivey Community Relations Dir, Community Relations & Small Bus. Dev New Position‐Budget 12‐13‐Hired Internal Feb
Jonathan Brook Police Department Lieutenant New Position‐Budget 10‐11‐Hired External Feb
Ricardo Solis Economic Development Exec. Dir of Economic Development New Position‐Budget 12‐13‐Hired External‐Temp Feb
Alden Tiggs Audio Visual AutoCAD Specialist Repl Alden Tiggs‐Hired External Apr
James Leftwich Office Fiscal Planning & Budgeting Sr., Financial Analyst Repl Dawn Wilton‐Hired External Apr
Samoan Scott Police Department Peace Officer Repl Edwin Johnson‐Hired External Mar
Alfred Postel Police Department Lieutenant Repl James Young‐Hired Internal Mar
Gisselia Torre Business Affairs Accounting Specialist Repl Delphine Campbell‐Hired Internal May
Mary Hinojosa Grant Accounting Specialist Repl Kathy Chapnick‐Hired Internal Jun
Diana Sanders Communications Interim, Dir., Public & Media Relations Repl Lesa Spivey‐Hired Internal Apr
Roy Castleberry Business Services Distribution Rep II Repl Elbert Newsome‐Hired External Apr
Demitra Thompson Police Department Corporal Repl Tobin Anderson‐Hired Internal Jul
David Quan Police Department Corporal Repl Lawrence Wheeler‐Hired Internal Jul
Christopher Bourne Communications Interim Dir., HCCTV Repl Debra Mcgaughery‐Hired External Jun
Louis Ybarra Police Department Corporal Repl Shirley Voisin‐Hired Internal Jul
Lawrence Wheeler Police Department Peace Officer Sr. New Position‐Budget 12‐13‐Hired Internal Jul
Edwin Johnson Police Department Peace Officer Sr. Repl Alfred Postel‐Hired Internal Jul
Shirley Voisin Police Department Peace Officer Sr. New Position‐Budget 12‐13‐Hired Internal Jul
Tobin Anderson Police Department Peace Officer Sr. New Position‐Budget 12‐13‐Hired Internal Jul
Elizabeth Semien Human Resources Human Resource Generalist Sr. Repl James Mitchell‐Hired External Jul
Benjamin Portillo Facilities Campus Service Technician Repl Michael Collins‐Hired External Jul
Viola Poinsette Police Department Police Coordinator Repl Cindy Lee‐Hired External Jul
Christopher Bourne Communications Interim Dir., HCCTV Repl Debra McGaughey‐Hired External Jul
Landon Davis Police Department Peace Officer Repl David Quan‐Hired External Jul
April Pikes Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Jul
Joshua Phillips Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Jul
Kimberly Davis Instructional Instructional Designer New Position‐Hired External Oct
Scott Godley Workforce Initiatives Program Manager Repl Deshaunta Stewart‐Hired Internal Oct
New Position‐Internal 11 New Position‐External 8 Interim 2 Deputy Chancell Replacement‐Internal 13 Replacement‐External 18
Latrish Tarhini DOEL English Language Skills Instructor New Position‐Budget 12‐13‐Hired External Nov
Jesse Shelton TLR Instructional Designer New Position‐Budget 12‐13‐Hired External Nov
Somaye Najafi‐Shostari ESL English Language Skills Instructor New Position‐Budget 12‐13‐Hired External Oct
Manuel Ramos DOEL English Language Skills Instructor New Position‐Budget 12‐13‐Hired External Nov
James Heironimus Police In‐Service Instructor New Position‐Budget 12‐13‐Hired External Jan
Anamaria Lopez Opeerations of CTCE Financial Aid Associate Repl Shanetta Burke‐Hired Internal Feb
Israel Salazar Distance Education Advisor New Position‐Budget 12‐13‐Hired External Nov
Touhid Chowdhury Distance Education Advisor New Position‐Budget 12‐13‐Hired Internal Dec
Marion Davis Business Dvlp&Outreach Student Recruiter Repl Scott Godley‐Hired External Feb
Thomas Tynan Continuing Education Director Program Construction Repl Fred Woolridge‐Hired External Feb
Salary
Houston College Community Systems
2012‐2013 Positions
Employee Name Department Job Title Comments Month
VICE CHANCELLOR INSTRUCTION continued32,538$
101,000$
35,000$
35,000$
45,967$
47,743$
48,000$
35,000$
20
920 361$VICE CHANCELLOR STUDENT SUCCESS
65,000$
38,000$
39,960$
37,000$
35,500$
37,000$
34,374$
27,165$
34,374$
45,546$
40,000$
40,000$
34,006$
34,374$
117,300$
35,676$
43,321$
17
738,596$
VICE CHANCELLOR INFORMATION TECHNOLOGY61,074$
60,000$
63,240$
114,000$
48,000$
67,002$
59,382$
52,200$
53,013$
61,074$
65,000$
11
703,985$
New Postions
52
Exec. Dir of International Initiatives FebRicardo Solis International Initiatives See Original hire on Deputy Chancellor (Title Change)
Patricia Hernandez Academic Resource Dev Secretary II New Position‐Budget 12‐13‐Hired Internal Feb
Shirley Santibanez SCE CE Records Specialist Repl Rosa Huerta‐Hired External Mar
Mekussa Martinez Operations CTCE Operations Compliance Specialist Repl Karmesha Sargent‐Hired External Feb
Latash Hussey Distance Educational Systens Administrator I Repl Feliciano Arrazolo‐Hired External Jul
Blanca Perez Operations of CTCE CE Records Specialist Repl Anamaria Lopez‐Hired Internal (Grant) Jul
Veronica Medina Research & Inn Research Analyst I, Data Warehouse Repl Hazel Milan‐Hired Internal Apr
Linh Tran Instructional Executive Secretary Repl Gail Beach‐Hired Internal Apr
‐ New Position‐External 10 Interim ‐
Paul Donaldson Outreach & Student Dev Dir., Outreach & Student Development Repl Shantay Grays‐Hired External Sep
VC Instr Replacement‐Internal 5 Replacement‐External 5 New Position‐Internal
Randi Sprouse Registrar Transcript Evaluator New Position‐Hired External Oct
Leslie Dye Registrar Transcript Evaluator New Position‐Hired External Oct
Larke Clishe Student Information Svcs Advisor Repl Laura Collins‐Hired External Sep
Henry Thomas Registrar Transcript Evaluator New Position‐Hired External Oct
Kevin Lacey International Student Recording Imaging New Position‐Budget 12‐13‐Hired Internal‐Temp Nov
Cassandra Millhouse Financial Aid Financial Aid Associate Repl Victoria Thomas‐Hired Internal‐Temp Nov
Mona Terrell Registrar Transcript Evaluator New Position‐Hired External Oct
Ashley Martin VA/Student Support Svcs Advisor New Position‐Budget 12‐13‐Hired Internal Nov
Leila Abdullahi International Student DSO/Advisor New Position‐Budget 12‐13‐Hired External Jan
Clairta Duron Student Information Svcs Student Information Representative New Position‐Budget 12‐13‐Hired Internal Jan
Liliana Silva Admissions Student Records Specialist New Position‐Budget 12‐13‐Hired Internal Dec
Gabrielle Kay International Student DSO/Advisor New Position‐Budget 12‐13‐Hired External Jan
Delbert Adivnovak International Student Office Manager Repl Gail Battiest‐Hired Internal Jul
Constance McDaniel Financial Aid Financial Aid Coordinator Repl Letricia Gallegos‐Hired External Jul
Tamara Jones Advisor Online Student Services Repl Helen McMillan‐Hired External‐Temp Jan
JoEllen Soucier Financial Aid Executive Director of Financial Aid Repl Scott Moore‐Hired External Jul
New Position‐Internal 4 New Position‐External 6 Interim ‐ VCSS Replacement‐Internal 1 Replacement‐External 6
Katie Herod System Support Sr. Network Analyst New Position‐Hired Internal‐Temp Jan
Bieu Nguyen Administrative Services Director, Administrative Services Repl Celia Gee‐Hired External Feb
Wanda Taft Application Dev System Analyst Repl David Lin‐Hired Internal Sep
Hazel Milan Inst Research & Innovation Research Analyst II‐Special Projects Repl Emily Leffler‐Hired Internal Oct
LaMont Humphrey Communications Multi‐Media Coordinator New Position‐Hired Internal Apr
Ijeoma Ezebuilo Application Dev Business Analyst II Repl Wanda Taft‐Hired External Apr
Demeita Johnson Administrative Services Contract Analyst Repl Amando Jasso‐Hired External Apr
Kimberly Monroe Application Dev Sr. Programmer Analyst/PS Student Repl Zulma Alvarado‐Hired Internal Apr
Swetha Ennamuri Application Dev Sr. Programmer Analyst Repl Jordan Nguyen‐Hired External Jul
Karmesha Sargent Application Dev Business Analyst II Repl Juan Medrano‐Hired Internal May
Melissa Anderson Application Dev Sr., Business Analyst PS Student Repl Maria Garica‐Hired Internal Jun
New Position‐Internal 2 New Position‐External 1 Interim ‐ VCIT Replacement‐Internal 5 Replacement‐External 3
Salary
Houston College Community Systems
2012‐2013 Positions
Employee Name Department Job Title Comments Month
CENTRAL82,681$
45,555$
56,000$
34,996$
48,954$
25,513$
28,000$
58,077$
41,839$
34,374$
55,000$
45,000$
36,000$
77,794$
14
669,783$
NORTHWEST41,447$
44,339$
53,244$
31,312$
27,709$
44,615$
41,004$
43,469$
39,270$
41,004$
43,469$
34,374$
27,165$
38,678$
35,053$
38,300$
43,452$
39,960$
35,000$
35,000$
38,000$
39,000$
35,780$
45,008$
58,255$
42,631$
38,000$
101,501$
33,000$
New Postions
53
Dora Whiteside Student Services ADA Counselor New Position‐Hired External Oct
James Connery Construction Instructor Repl Johnny Watson‐Hired External‐Temp Oct
Jason Wilson Student Services Interim Dean of Student Dev Repl Cheryl Johnson‐Hired Internal Sep
Sonya Sneed Student Services Student Life Coordinator Repl Danny Smith‐Hired External Oct
Saqueena Sutton Child Care Child Care Specialist II Repl Kinaya Palmer‐Hired Internal Jan
Erica Hubbard Library Librarian Repl Marcia Braun‐Hired Internal Jan
Brigid Wilson VAST Instructor Repl Frank Colmenero‐Hired External Nov
Rodney Sam Library Library Assistant I Repl Marion Kennedy‐Hired External Jan
Senta Eastern Counseling Counselor Repl Dora Whiteside‐Hired External Feb
Karl Mayes Student Services Advisor Repl Mirna Romero‐Hired External Mar
Kevin Hamby Interior Design Instructor Repl Benjamin Johnston‐Hired External Jan
Isabel Zamora Student Services Financial Aid Associate Repl Maria Dabrowski‐Hired Enternal Feb
Meishon Bell Student Services Advisor Repl Touhid Chowdury‐Hired External Mar
Debra McGaughey Public Relations Director of Public Relations Repl Lamont Humphrey‐Hired Internal Apr
‐ New Position‐External 1 Interim 1
Eva Foster English Instructor Repl Joaquin Torres‐Hired External‐Temp Sep
Central Replacement‐Internal 2 Replacement‐External 10 New Position‐Internal
Anika Chowdhury COO Cashier II Repl Stella Villarreal‐Hired External‐Temp Sep
Sandra Brooks Admissions Enrollment Service Assistant Repl Makeba Brown‐Hired External‐Temp Sep
Steven Cohan Biology Instructor Repl Manhal Chbat‐Hired External‐Temp Sep
Nellie Bradley Public Relations Director of Public Relations Repl Kimberly Crocker Montgomery‐Hire External‐Temp Sep
Natalia Noland English Instructor New Position‐Budget 12‐13‐Hired External Oct
Christine Moore Student Services Senior Advisor New Position‐Budget 12‐13‐Hired Internal Oct
Rima Adil COO Community Outreach Coordinator Repl Nellie Bradley‐Hired Internal‐Temp Sep
Anthony Hilliard Fine Arts Instructor Repl Bonnie Gallup‐Hired External‐Temp Oct
Laleh Golestani Instruction‐Testing Testing Associate Repl Rima Adil‐Hired External‐Temp Oct
Lusinda Eshelman Student Services Enrollment Service Assistant Repl Carlana Brooks‐Hired External‐Temp Oct
Paul Brady Accounting Instructor Repl Mallikarjun Shintri‐Hired External‐Temp Oct
Vimlarani Chopra Biology Instructor Repl Ida Huard‐Hire External Dec
Sherin Isaac Student Services Advisor Repl Laura Wilborn‐Hired External Nov
Goddrick Austin Student Services Senior Advisor New Position‐Budget 12‐13‐Hired Internal Nov
Bharat Sutaria Engineering Instructor New Position‐Budget 12‐13‐Hired External‐Temp Oct
Thomas Tankersley Technician Services Hardware/Software Technician Repl Samuel Sannl‐Hired External Oct
Pamela Walls Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov
Jaime Flores Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov
Sherhonda Le Financial Aid Financial Aid Associate Repl Diane Wilborn‐Hired External Nov
Courtney Martinez Public Relations Student Recruiter New Position‐Budget 12‐13‐Hired Internal Nov
Corey Aeck Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov
Manhal Chbat Biology Instructor Repl Steven Cohan‐Hired Internal Dec
Contrice Kendall Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov
Olivia Blake COO Secretary II Repl Adriana Jimenez‐Hired External Nov
Mark Tiller Student Services Associate Dean, Instruction New Position‐Budget 12‐13‐Hired Internal Jan
Walter Oduk Technician Services Hardware/Software Technician Repl Joseph Ogbechie‐Hired External Jan
Eva Foster English Instructor Repl James Bishop‐Hired External‐Temp Jan
Fidel Simmons Student Services Advisor New Position‐Budget 12‐13‐Hired External Jan
Salary
Houston College Community Systems
2012‐2013 Positions
Employee Name Department Job Title Comments Month
NORTHWEST continued30,500$
43,469$
34,374$
27,708$
79,112$
89,364$
43,469$
34,374$
44,615$
39,171$
30,153$
35,000$
27,165$
44,615$
42,613$
35,276$
34,374$
37,074$
47
$ 1 961 465NORTHEAST
99,000$
38,344$
40,124$
48,010$
37,981$
47,085$
37,061$
45,762$
38,415$
31,312$
38,000$
35,982$
38,678$
41,810$
52,200$
43,544$
36,791$
40,214$
41,004$
60,000$
27,165$
55,000$
21,500$
34,374$
42,018$
25
New Postions 1,071,374$
54
Deborah Adesokan Counseling Advisor Repl Christine Battle Moore‐Hired External‐Temp Jan
Sandra Brooks Student Services Enrollment Service Assistant Repl Augie Sanchez‐Hired Internal Jan
Shahrooz Torkian Far Technician Services Hardware/Software Technician Repl Pradip Patel‐Hired External Jan
Gina Calderone Philosophy Instructor Repl Thomas Urban Hired External‐Temp Jan
Richard Mottram English Instructor Repl Betty Shine‐Hired External‐Temp Mar
Brandon Davidson Student Services Advisor New Position‐Budget 12‐13‐Hired External Mar
Evelyn Velasquez Workforce Development Interim Dean, Workforce Repl Maya Durnovo‐Hired Internal Feb
Robert Harris Student Development Interim Associate Dean, Student Dev Repl Maria Cisneros‐Hired External Feb
Jonathan Smith Technician Services Hardware/Software Technician New Position‐Hired External‐Temp Apr
Giang Pham COO Procurement Liaison Repl Jackie Nguyen‐Hired External Apr
Susan Thompson Student Services Program Director Repl Bartlett Sheinberg‐Hired External‐Temp Apr
Samuel Thomas Biology Lab Assistant Senior Repl Kristy Mueck‐Hired Internal Apr
Gerald Faler, Jr. Student Services Enrollment Service Associate Repl Corey Aeck‐Hired Internal May
Latasha Henderson Student Services Enrollment Service Associate Repl Liza Chau‐Hired Internal May
Lisa Padilla Student Services Enrollment Service Assistant Repl Carlana Brooks‐Hired External May
Antonio Nutall COO Evening Campus Manager II New Position‐Hired External May
John Harrell II Student Services Enrollment Service Associate Repl Makeba Brown‐Hired External‐Temp May
LaToya Smith‐Jiles COO Office Manager Repl Gerald Faler‐Hired Internal Jul
7 New Position‐External 7 Interim 2
Ronald Dewlen Instructional Dean Instruction Repl Lois Avery‐Hired External Sep
Northwest Replacement‐Internal 7 Replacement‐External 23 New Position‐Internal
Hosein Tahvilian Electronic Engineering Instructor Repl Pratap Talusani‐Hired External Sep
Nicki Norman Student Services Office Manager Repl Barbara Smith‐Hired Internal Sep
Ifeanyi Oramulu Technology Instructor Repl Homer Stewart‐Hired External‐Temp Sep
Khansaa Almansor Electronic Engineering Instructor Repl Nicky Haddock‐Hired External Sep
David Jones Student Services Advising Manager New Position‐Budget 12‐13‐Hired Internal Oct
Lesley Savoy‐Green Student Services Enrollment Services Associate Repl Alonia Whitmore‐Hired Internal Oct
William Nicholson Technology Instructor Repl John Jagdish‐Hired External‐Temp Sep
Betty Keller Student Services Retention Specialist Repl Joseph Willis‐Hired Internal Sep
Hoang Nguyen Student Services Advisor Repl Ana Canek‐Hired Internal Dec
Sazar Ali Process Technology Instructor Repl Homer Stewart‐Hired External Jan
Cybele Ayaquica COO Secretary II Repl Bridgette Bauman‐Hired External Nov
Jose Cordero Student Services Advisor Repl David Jones‐Hired External Nov
Randall Murphy Psychology Instructor Repl Tamara LeDuc‐Hired External Feb
Gregory Dock Automotive Instructor Repl Martin See‐Hired External Feb
Kristin Wallace Business Administration Instructor Repl Philip Palese‐Hired External Jan
Leroy Chevalier COO Manager Weekend/Evening Repl Keffus Falls‐Hired External‐Temp Feb
Ayesha Farr Counselor Counseling New Position‐Budget 12‐13‐Hired External Feb
Francis Pollo Testing Testing Assistant/Proctor Repl Lesley Savoy Green‐Hired External Feb
Shawket Alnakkash Petroleum Engineering Instructor New Position‐Budget 12‐13‐Hired External Feb
Farrish Betton Petroleum Engineering Instructor New Position‐Budget 12‐13‐Hired External Feb
Rodney Harrison Student Services Enrollment Services Associate Repl Rosa Martinez‐Hired External Jul
Ann Le COO Student Accounts Representative Sr. Repl Bertha Lauve‐Hired External Jul
Tamara Petty Counseling Counselor New Position‐Hired External Jul
Jose Gonzalez Science Engineering Lab Assistant I Repl Betty Keller‐Hired External Jul
1 New Position‐External 4 Interim ‐ Northeast Replacement‐Internal 4 Replacement‐External 16 New Position‐Internal
Salary
Houston College Community Systems
2012‐2013 Positions
Employee Name Department Job Title Comments Month
SOUTHWEST13,810$
47,647$
38,678$
24,800$
48,954$
49,511$
57,000$
42,631$
45,555$
60,500$
35,000$
41,810$
41,141$
40,695$
40,000$
47,085$
39,824$
84,866$
31,906$
36,791$
43,557$
27,165$
35,406$
26,000$
27,000$
45,225$
35,044$
43,173$
39,187$
44,615$
45,780$
31,312$
22,300$
106,759$
34
1,440,727$
SOUTHEAST39,960$
32,538$
35,000$
42,000$
40,769$
53,706$
37,981$
98,566$
8
380,520$ New Postions
55
Lorraine Donovan Academic Instructor Repl Adballah Cherif‐Hired External‐Temp Sep
Jose Cruz COO Campus Service Technician Repl Belinda Defalco‐Hired Internal Oct
Jennifer Williams English Instructor Repl Panqing Wu‐Hired External Oct
Kelli Caraway Student Dev/Advising Senior Advisor New Position‐Budget 12‐13‐Hired Internal Oct
Brandi Gaza English Instructor Repl Margie Ricks‐Hired External‐Temp Oct
Wendy Allen Digital Communication Instructor Repl Paul Roberts‐Hired External‐Temp Nov
David Stacy Student Dev/Advising Senior Advisor New Position‐Budget 12‐13‐Hired External Nov
Christine Moore Student Dev/Advising Senior Advisor New Position‐Budget 12‐13‐Hired Internal Oct
Dashiel Geyen Counseling Counselor New Position‐Budget 12‐13‐Hired Internal Nov
Wendy Robbins Digital Communication Instructor Repl Margo Reece‐Hired External‐Temp Nov
Sabiha Mir Student Development Advisor New Position‐Budget 12‐13‐Hired External Nov
Todd Duplantis Public Relations Director, Public Relations Repl Martha Barrera‐Hired External Nov
Aketa Guillory Student Dev/Advising Advisor New Position‐Budget 12‐13‐Hired External Nov
Wendy Robbins Digital Communication Instructor Repl Margo Reece‐Hired External Jan
Nicol Alexander Digital Communication Instructor Repl Lloyd Schuh‐Hired External Jan
Emilio Mendoza Student Development Advisor Repl Kelli Caraway‐Hired Internal Dec
Lucille Gore Student Dev/Advising Senior Advisor New Position‐Budget 12‐13‐Hired External Jan
Johanne Huber Digital Communication Instructor Repl Ian Mayer‐Hired External‐Temp Jan
Juanna Shin Library Librarian Repl Bill Hord‐Hired External Jan
Gholam Pahlavan Physical Science Instructor Repl Abdallah Cherif‐Hired Internal Jan
Lanny Kwan Computer Science Secretary II Repl Dipal Parekh‐Hired External‐Temp Jan
Lliya Lliev COO A/V Technician New Position‐Budget 12‐13‐Hired External Feb
Ramiro Monsivais Castorena COO A/V Technician New Position‐Budget 12‐13‐Hired External Feb
Ansonia Jones Student Services Enrollment Service Assistant Repl Ngoc Tien Nguyen‐Hired External Feb
Ashley Martin Student Development Advisor Repl Hoang Minh Thi Nguyen‐Hired Internal Feb
Rhonda Tripeaux Student Services Advisor Repl Johnny Martinez‐Hired Internal Apr
Rita Majidi COO Budget Analyst Repl Patrick Muhammad‐Hired External‐Temp Apr
Zhiqin Jiang Drafting & Design Instructor Repl Seymour Tatar‐Hired External Feb
Sherry Hill Student Services Financial Aid Associate Repl Thomas Sneed‐Hired Internal Apr
Mayra Herrera Student Dev Secretary II Repl Sabiha Mir‐Hired Internal Jun
Troy Tabner COO Campus Service Technician Repl Jose Cruz‐Hired External Jun
Melaine Knight Public Relations Community Outreach Cordinator Repl Susie Molina‐Hired External May
Piper Butler Student Services Testing Associate Repl Gretchen Johnson‐Hired Internal Jun
Betty Fortune Instruction & Student Svcs Executive Dean, Instruction & Student Svcs New Position‐Budget 12‐13‐Hired Internal Jul
3 New Position‐External 6 Interim ‐
Micalyn Flagg Financial Aid Financial Aid Associate Repl Verlicia Pope‐Hired External Oct
Southwest Replacement‐Internal 9 Replacement‐External 16 New Position‐Internal
LaTrista Funchez Student Services Student Life Coordinator Repl Tara Webb‐Hired External Nov
Araceli Alvarez Workforce Office Manager Repl Mercedes Gonzales‐Hired Internal Jun
Nancy Garcia Natural Sciences Secretary II New Position‐Hired External Oct
Christy Muniz Student Services Advisor Repl Vivian Flores‐Hired External Oct
Grisel Cano Instructional Support Associate Dean of Instructional Support New Position‐Budget 12‐13‐Hired Internal Jul
Antonio Quintero Educational Technology Svc Sr., Web Developer Repl Johnny Pea‐Hired Internal Jun
Gloria Ruiz Public Relations Office Manager Repl Marco Calderon‐Hired External Jul
New Position‐Internal 1 New Position‐External 1 Interim ‐ Southeast Replacement‐Internal 3 Replacement‐External 3
Salary
Houston College Community Systems
2012‐2013 Positions
Employee Name Department Job Title Comments Month
COLEMAN35,754$
56,900$
62,781$
30,000$
65,272$
65,272$
44,615$
38,000$
35,000$
35,500$
53,618$
52,200$
63,993$
13 New Postions 638,905$
Adm. Totals Replacement‐Internal Replacement‐External New Position‐Internal New Position‐External Interim 122
College Totals Replacement‐Internal Replacement‐External New Position‐Internal New Position‐External Interim 141
Grand Total Replacement‐Internal Replacement‐External New Position‐Internal New Position‐External Interim 263
Over all Total 12,665,039$
56
Grand Total Salaries
Charmaine Lewinson‐Evans Vocational Nursing Instructor Repl Pearlie Watts‐Hired External Sep
Caroline Couto‐Ortiz Health Science Dental Hygiene Operations Assistant New Position‐Budget 12‐13‐Hired External Sep
Daniel Guzman Simulation Center Clinical Simulation Lab Technician New Position‐Budget 12‐13‐Hired Internal Sep
Ashley Nichols Vocational Nursing Instructor Repl Sharon McCowan‐Hired External Sep
Veronica Mckissic Student Services Learning Success Coordinator Repl Roxine Simms‐Hired External‐Temp Nov
Carmela Blackshear Student Services Advisor Repl Carmen Gentry‐Hired Internal Jan
Rita Callahan Vocational Nursing Instructor Repl Maria Reyes‐Hired External Nov
Jason Smith Vocational Nursing Instructor Repl Independencia Delacruz‐Hired External Nov
Virginia Otieno Health Science Instructor Repl Linda Williams‐Hired External‐Temp Jan
Hope Pamplin Student Services Counselor, Disability Services New Position‐Budget 12‐13‐Hired External‐Temp Feb
David Pereida Student Services Advisor Repl Lorenzo Walker‐Hired Internal Jan
John Smith Student Services Enrollment Service Associate Repl Rory Gupta‐Hired External Jan
Turquessa Francis Occupational Therapy Instructor Repl Naydean Blair‐Hired External Apr
Coleman Replacement‐Internal 2 Replacement‐External 8 New Position‐Internal
263
52 112 31 61 6
27 76 13 21 3
1 New Position‐External 2 Interim ‐
25 36 18 40 3
HOUSTON COMMUNITY COLLEGEFTE Comparison Year‐To‐Date Thru July 31, 2013 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 1,361 1,514 1,534 1,487 828 1,480 1,533 1,575 1,548 1,009 1,108
2011‐2012 1,451 1,582 1,598 1,564 823 1,530 1,573 1,598 1,576 1,003 1,098 955
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 1,401 1,426 1,449 1,351 1,438 1,456 1,383 1,476 1,447 1,441 1,456
2011‐2012 1,429 1,415 1,425 1,327 1,407 1,429 1,396 1,404 1,410 1,397 1,391 1,429
F
T
E
F
T
E
57
‐
200
400
600
800
1,000
1,200
1,400
1,600
1,800
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
200
400
600
800
1,000
1,200
1,400
1,600
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
CENTRAL COLLEGEFTE Comparison Year‐To‐Date Thru July 31, 2013 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 238 270 272 270 153 256 274 281 278 166 199
2011‐2012 254 293 296 293 159 279 298 300 291 184 204 178
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 155 159 164 145 161 164 153 169 159 161 160
2011‐2012 161 158 165 145 155 163 157 157 158 156 154 161
58
F
T
E
F
T
E
‐
50
100
150
200
250
300
350
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
COLEMAN COLLEGEFTE Comparison Year‐To‐Date Thru July 31, 2013 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 108 107 113 110 78 106 107 109 104 95 98
2011‐2012 115 112 113 109 82 109 107 110 110 99 98 84
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 56 55 55 52 58 58 55 58 55 53 54
2011‐2012 58 58 59 55 56 58 55 55 57 54 54 55
F
T
E
F
T
E
59
‐
20
40
60
80
100
120
140
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
10
20
30
40
50
60
70
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
NORTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru July 31, 2013 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 281 310 310 306 156 306 316 319 317 200 230
2011‐2012 267 292 293 307 155 323 330 334 335 198 224 190
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 131 135 143 125 142 145 129 151 147 147 147
2011‐2012 104 106 108 108 129 138 122 129 130 132 131 138
F
T
E
F
T
E
60
‐
50
100
150
200
250
300
350
400
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
NORTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru July 31, 2013 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 187 208 212 205 119 199 211 218 215 146 150
2011‐2012 200 211 216 207 112 204 212 212 211 129 137 124
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 126 125 128 118 124 128 119 128 128 124 126
2011‐2012 127 126 128 118 121 128 124 127 126 126 126 128
F
T
E
F
T
E
61
‐
50
100
150
200
250
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
SOUTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru July 31, 2013 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 318 385 375 370 187 364 376 381 377 224 249
2011‐2012 380 433 435 422 183 377 382 386 382 229 252 217
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 152 154 161 142 154 163 150 168 160 161 163
2011‐2012 185 184 182 145 146 155 144 150 152 151 147 153
62
F
T
E
F
T
E
‐
50
100
150
200
250
300
350
400
450
500
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
SOUTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru July 31, 2013 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 130 160 164 163 74 158 174 180 179 105 115
2011‐2012 143 168 173 169 77 161 178 183 179 101 120 95
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 96 103 104 95 102 105 95 106 105 101 103
2011‐2012 99 96 97 86 94 98 91 95 96 99 96 101
F
T
E
F
T
E
63
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
Division of Extended Learning (DOEL)FTE Comparison Year‐To‐Date Thru July 31, 2013 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 90 67 79 57 58 73 67 77 70 67 63
2011‐2012 85 69 68 56 55 72 63 67 64 59 57 64
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 79 81 81 76 80 86 82 88 87 86 87
2011‐2012 78 79 79 75 79 80 77 79 79 79 78 81
F
T
E
F
T
E
64
‐
10
20
30
40
50
60
70
80
90
100
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
10
20
30
40
50
60
70
80
90
100
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
DISTRICTFTE Comparison Year‐To‐Date Thru July 31, 2013 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 8 7 8 5 3 9 9 10 8 5 4
2011‐2012 7 4 4 1 ‐ 5 4 5 3 4 4 3
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 606 612 614 598 617 609 600 609 605 607 615
2011‐2012 616 609 608 595 627 609 625 612 614 601 605 612
F
T
E
F
T
E
65
‐
2
4
6
8
10
12
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
100
200
300
400
500
600
700
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
HOUSTON COMMUNITY COLLEGEDuplicated Headcount Comparison Year‐To‐Date Thru July 31, 2013 by Type
FACULTY HEADCOUNT
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
12‐13 FT 787 795 795 797 794 796 797 796 796 768 763
12‐13 PT 1,992 2,361 2,491 2,224 409 2,207 2,291 2,383 2,311 932 1,274
12‐13 Total Fac 2,779 3,156 3,286 3,021 1,203 3,003 3,088 3,179 3,107 1,700 2,037 ‐
11‐12 FT 792 797 793 788 793 785 784 782 783 768 757 794
11‐12 PT 1,911 2,334 2,390 2,331 275 2,387 2,391 2,351 2,367 1,075 1,372 679
11‐12 Total Fac 2,703 3,131 3,183 3,119 1,068 3,172 3,175 3,133 3,150 1,843 2,129 1,473
STAFF HEADCOUNT
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
12‐13 FT 1,238 1,250 1,264 1,260 1,263 1,279 1,277 1,289 1,276 1,273 1,292
12‐13 PT 840 833 851 842 703 801 820 851 858 769 826
12‐13 Total Staff 2,078 2,083 2,115 2,102 1,966 2,080 2,097 2,140 2,134 2,042 2,118 ‐
11‐12 FT 1,256 1,256 1,238 1,235 1,253 1,242 1,249 1,235 1,240 1,201 1,240 1,250
11‐12 PT 877 879 883 839 629 822 834 828 846 767 790 790
11‐12 Total Staff 2,133 2,135 2,121 2,074 1,882 2,064 2,083 2,063 2,086 1,968 2,030 2,040
66
S
t
a
f
f
Headcount
F
a
c
u
l
t
y
Headcount
‐
500
1,000
1,500
2,000
2,500
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
200
400
600
800
1,000
1,200
1,400
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
HOUSTON COMMUNITY COLLEGEUnduplicated* Headcount Comparison Year‐To‐Date Thru July 31, 2013 by Type
UNDUPLICATED HEADCOUNT
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
12‐13 Total 4,475 4,446 4,551 4,726 3,085 4,629 4,717 4,550 4,775 3,467 3,702
11‐12 Total 4,543 4,902 4,917 4,833 2,891 4,728 4,814 4,805 4,806 3,373 3,575 3,303
* Includes Full‐time and Part‐time Faculties, Librarians, Counselors, and Staffs
67
Unduplicated* Headcount
‐
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
Non‐current assets:
Restricted cash 6,811$
Restricted investment in trust accounts 2,033,119
Lease receivable from HCCS 165,775,579
Deferred charges ‐ bond issuance costs ‐
Capital Assets:
Land ‐
Other Structures ‐
Furniture & equipment ‐
Leasehold improvements ‐
Construction in process 1,361,614
1,361,614
TOTAL ASSETS 169,177,123$
Current liabilities:
Accounts payable ‐ HCC 144,304$
Accounts payable 239,526
Accrued liabilities ‐ interest ‐
Current bond payable ‐
Total current liabilities 383,831$
Non‐current liabilities:
Deposits 440
Arbitrage payable ‐
Unearned interest income (23 years) ‐ HCC 67,759,804
Premium on bonds 2,209,548
Bonds payable 105,655,000
Total non‐current liabilities 175,624,793$
TOTAL LIABILITIES 176,008,623
TOTAL NET ASSETS ‐ restricted (6,831,500)$
PFC 1
Houston Community College ‐ Public Facility CorporationStatement of Net Assets
Cash Basis ‐ Interim Period
as of July 31, 2013
ASSETS
LIABILITIES
Cash Flows from Capital Financing Activities
Receipt from HCCS for lease payment 8,956,434$
Purchases of capital assets (1,082,251)
Payment on capital debt ‐ principal and interest (8,957,391)
Net cash provided (used by) in financing activities (1,083,209)
Cash Flows from Investing Activities
Interest income 2,426
Increase (decrease) in restricted cash and
restricted investment in trust accounts (1,080,783)
Restricted cash and restricted investment in
trust accounts ‐ beginning of year 3,120,712
Restricted cash and restricted investment in
trust accounts ‐ end of period 2,039,929$
Houston Community College System Public Facility CorporationStatement of Cash Flows
Cash Basis ‐ Interim Period
Eleven Month Ended as of July 31, 2013
PFC 2
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources of funds:
Proceeds from
2005C Lease Revenue Bond 19,155,000$
Discount (170,064) Land Purchase (4,212,644) Bond Issuance Cost (606,201) Interest Expense (524,785)
13,641,306$ Interest Income 1,003,844 Vendor Contract Refund 102,706 Transfer to Payment Account (1,354,990)
Funds Available 13,392,866$
Uses of funds:4,092$ 4,092$ ‐$ ‐$
11,550,643 11,550,643 ‐ ‐ Maintenance 408,920 380,017 28,903 ‐
6,443 6,443 ‐ 563,928 563,928 ‐
7,200 7,200 ‐ ‐ 27,403 26,326 1,077 ‐ 24,940 24,940 ‐ 44,695 44,695 ‐ ‐
596,787 596,787 ‐ ‐
157,815 8,100 149,715
Grand Total Uses 13,392,866$ 13,213,171$ 29,980$ 149,715$
Net Available ‐$
PFC requires GMP before inception.
Total Proceeds from Bond
Houston Community College ‐ Public Facility CorporationPublic Safety Institute
as of July 31, 2013
PFC 3
Bank Service ChargesConstruction
Waste Water Management *Geo Technical Services*
Survey*Architect
Engineering ServicesFFE
Contingency
* Included in GMP
Site Infrasturcture
Total Budget to
Date
Total Revenues
/ Expenditures
to Date
Encumbrances
to Date Unexpended
Sources of funds:
Proceeds from
2005 A Bonds 11,605,000$
Premium Received 492,931
Accrued Interest Received 53,425
Interest Income 998
Bond Issuance Costs (391,474)
Repayment of Loans (11,392,147)
Funds Available 368,733$
Uses of funds:
Debt Service 53,425$ 53,425$ ‐$ ‐$
Renovation & Construction 169,759 169,759 ‐ ‐
Demolish & Renovate Office 56,244 56,244 ‐ ‐
Furniture & Fixtures 46,857 46,857 ‐ ‐
Legal Fees 42,448 42,448 ‐
Grand Total Uses 368,733$ 368,733$ ‐$ ‐$
Net Available ‐$
Note 1: PFC requires GMP before inception.
Houston Community College ‐ Public Facility CorporationWestgate (Katy)as of July 31, 2013
PFC 4
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources of funds:
Principal Amount on Bonds 36,950,000$
Discount on Bonds (546,238)
Underwriter's Discount (209,273)
Accrued Interest on Bonds 98,080
Amount Available 36,292,569$
Issuance Costs (490,131)
Accrued and Capitalized Interest (1,449,023)
Repair and Replacement (1,000,000)
Title Fees Capitalized (81,379)
Amount Available for Project 33,272,036$
Repayment to HCC (188,006)
Project Account Balance 33,084,030$
Administrative & Legal Fees (29,486)
Interest Income 836,883
Transfer Cost Issuance 85,509
Interest Expense on Notes (135,299)
Funds Available 33,841,637$
Uses of funds:
Land & Building 17,807,972$ 17,807,972$ ‐$ ‐$
Maintenance Rehabilitation &
Deferred Maintenance
12,856,469 12,856,469 ‐
CPMS PGAL 211,959 211,959 ‐
Facilities Space Programming 214,620 214,620 ‐
Furniture, Fixtures & Equipment 1,006,277 1,006,277 ‐ ‐
Site Infrastructure 859,844 854,984 4,859 ‐
Architect and Engineering 428,355 428,355 ‐ ‐
Repair & Maintenance Contingency ‐
per bond requirement
456,141 83,089 ‐ 373,052
Grand Total Uses 33,841,637$ 33,463,726$ 4,859$ 373,052$
Net Available ‐$
PFC requires GMP before inception.
Houston Community College ‐ Public Facility CorporationHayes Road ‐ Alief Project
as of July 31, 2013
PFC 5
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources of funds:
Principal Amount of 2007 Series Bonds 58,885,000$
Premium on Bonds 3,094,498
Underwriter's Discount (346,244)
Accrued Interest Income‐ Bonds 173,733
Total Amount Available 61,806,987$
Issuance Cost (839,837)
Accrued and Capitalized Interest (4,632,122)
Repair and Maintenance Account ‐
Amount Available for Project 56,335,028$
Interest Income on Trust Account 2,499,031
Interest Expense on Notes (414,601)
Transfer to Trustee Payment Account (4,715,422)
Vendor Contract Refunds 230,035
Sale of Land 569,890
Funds Available 54,503,961$
Uses of funds:
Land & Building 10,671,234$ 10,671,234$ ‐$ ‐$
Construction Cost‐ Building 18,200,000 18,200,000 ‐ ‐
Construction‐Demolition 494,972 ‐ ‐ 494,972
Constuction‐ Site 640,988 636,957 4,030 ‐
Site Improvement 14,221,544 13,888,633 332,911 ‐
Site Demolition & Abatement 791,298 791,298 ‐
CPMS PGAL 1,391,958 1,391,958 ‐ ‐
Site and Infrastructure Design 2,334,840 2,334,840 ‐ ‐
Facilities Space Programming 29,274 29,274 ‐ ‐
Architect and Engineering 1,256,727 1,256,727 ‐
Furniture, Fixtures & Equipment 1,828,332 1,818,281 10,051 ‐
Library 66,564 66,182 382 ‐
Inspections 214,981 214,981 ‐ ‐
Design Geotech 17,500 17,500 ‐ ‐
Material Testing 24,503 24,503 ‐ ‐
Communications IT‐ PGAL 253,614 253,614 ‐
IT Telephone & Communications 790,467 790,467 ‐
Surveying 62,398 59,124 3,274 ‐
Administrative Expenses 34,505 34,505 ‐
Preconstruction Costs 886,377 886,377 ‐
Contingency 291,833 186 ‐ 291,649
Grand Total Uses 54,503,907$ 53,366,640$ 350,647$ 786,621$
Net Available 54$
PFC requires GMP before inception.
as of July 31, 2013
PFC 6
Houston Community College ‐ Public Facility CorporationNorthline Mall Project