FRPD CLAMSHELL DREDGING CRANE AND...

1
N FILL SITE TURNING BASIN NAVIGATION CHANNEL CONTAINMENT BERM COLUMBIA CSD (AT ANCHOR) DIFFUSER PIPE COLUMBIA CSD (DREDGING) COLUMBIA CSD FLOATING PIPELINE (AT ANCHOR) COLUMBIA CSD FLOATING PIPELINE (DREDGING) FRPD 309 THSD (DREDGING) FRPD 309 THSD (DISCHARGING) PIPELINE REMOVAL PHASE 3 PHASE 1 PHASE 4 BERM CONSTRUCTION FILL SITE EXISTING BERM EXISTING PIPELINE PHASE 2 FRPD CLAMSHELL DREDGING CRANE AND SCOW ROCK SCOW (AT ANCHOR) B A ROCK SCOW (AT ANCHOR) S:\Dredging\Survey\00 Dredge Progress\2015-2016\07 Major Projects\01 PCT\01 PCT Methodology Plan\2015 PCT Methodology-Columbia_Non-Working.dwg, Methodology Plan Columbia Working, 29/06/2015 11:30:44 AM

Transcript of FRPD CLAMSHELL DREDGING CRANE AND...

Page 1: FRPD CLAMSHELL DREDGING CRANE AND SCOWpct.ca/wp-content/uploads/2014/12/Dredge-Project-Revised...S:\Dredging\Survey\00 Dredge Progress\2015-2016\07 Major Projects\01 PCT\01 PCT Methodology

N

FILL SITE

TURNING BASIN

NAVIGATION CHANNEL

CONTAINMENT BERM

COLUMBIA CSD (AT ANCHOR)

DIFFUSER PIPE

COLUMBIA CSD (DREDGING)

COLUMBIA CSD FLOATING PIPELINE (AT ANCHOR)

COLUMBIA CSD FLOATING PIPELINE (DREDGING)

FRPD 309 THSD (DREDGING)

FRPD 309 THSD (DISCHARGING)

PIPELINE REMOVAL

PHASE 3

PHASE 1

PHASE 4

BERM CONSTRUCTION

FILL SITE

EXISTING BERM

EXISTING PIPELINE

PHASE 2

FRPD CLAMSHELL DREDGINGCRANE AND SCOW

ROCK SCOW (AT ANCHOR)

B

A

ROCK SCOW (AT ANCHOR)

S:\Dredging\Survey\00 Dredge Progress\2015-2016\07 Major Projects\01 PCT\01 PCT Methodology Plan\2015 PCT Methodology-Columbia_Non-Working.dwg, Methodology Plan Columbia Working, 29/06/2015 11:30:44 AM