July 27, 2011 MEMORANDUM TO: Mark Tonacci, Chief BWR Projects Branch Division of New Reactor Licensing Office of New Reactors FROM: Jerry Hale, Project Manager /RA/ BWR Projects Branch Division of New Reactor Licensing Office of New Reactors SUBJECT: SUMMARY OF JULY 21, 2011, CATEGORY I MEETING WITH DETROIT EDISON REGARDING THE FERMI 3 SOIL-STRUCTURE INTERACTION ANALYSIS On July 21, 2011, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of Detroit Edison (DTE), at the NRC Headquarters, Rockville, MD. The purpose of the meeting was to provide DTE an opportunity to present information related to the structure interaction (SSI) analysis for Fermi 3. This meeting summary, the meeting agenda, and attendance roster are available through the Agencywide Documents Access and Management System (ADAMS) as a package at Accession Number ML112020420. The meeting slides are available as ADAMS Accession Nos. ML112020426 and ML112020435. The meeting began with opening remarks from staff in the Office of New Reactors, followed by a brief introduction of all parties. DTE staff led the discussion and presented background information on the DTE SSI analysis. DTE staff presented information on the changes to the combined license application related to design control document, Rev. 9 soil properties. The staff queried DTE about use of backfill materials, minimum shear wave velocity and the SASSI2000 analysis. One member of the public called in via the bridge line and requested copies of the slides used during the meeting. Please direct any inquiries to me, at 301-415-8148, or [email protected] . Docket No. 52-033 Enclosures As stated cc w/encl: See next page

Transcript of FROM: Jerry Hale, Project Manager /RA/ › docs › ML1120 › ML112030375.pdf · FROM: Jerry Hale,...

July 27, 2011 MEMORANDUM TO: Mark Tonacci, Chief

BWR Projects Branch Division of New Reactor Licensing Office of New Reactors

FROM: Jerry Hale, Project Manager /RA/

BWR Projects Branch Division of New Reactor Licensing Office of New Reactors

SUBJECT: SUMMARY OF JULY 21, 2011, CATEGORY I MEETING WITH

DETROIT EDISON REGARDING THE FERMI 3 SOIL-STRUCTURE INTERACTION ANALYSIS

On July 21, 2011, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of Detroit Edison (DTE), at the NRC Headquarters, Rockville, MD. The purpose of the meeting was to provide DTE an opportunity to present information related to the structure interaction (SSI) analysis for Fermi 3. This meeting summary, the meeting agenda, and attendance roster are available through the Agencywide Documents Access and Management System (ADAMS) as a package at Accession Number ML112020420. The meeting slides are available as ADAMS Accession Nos. ML112020426 and ML112020435. The meeting began with opening remarks from staff in the Office of New Reactors, followed by a brief introduction of all parties. DTE staff led the discussion and presented background information on the DTE SSI analysis. DTE staff presented information on the changes to the combined license application related to design control document, Rev. 9 soil properties. The staff queried DTE about use of backfill materials, minimum shear wave velocity and the SASSI2000 analysis. One member of the public called in via the bridge line and requested copies of the slides used during the meeting. Please direct any inquiries to me, at 301-415-8148, or [email protected]. Docket No. 52-033 Enclosures As stated cc w/encl: See next page

July 27, 2011 MEMORANDUM TO: Mark Tonacci, Chief

BWR Projects Branch Division of New Reactor Licensing Office of New Reactors

FROM: Jerry Hale, Project Manager /RA/

BWR Projects Branch Division of New Reactor Licensing Office of New Reactors

SUBJECT: SUMMARY OF JULY 21, 2011, CATEGORY I MEETING WITH

DETROIT EDISON REGARDING THE FERMI 3 SOIL-STRUCTURE INTERACTION ANALYSIS

On July 21, 2011, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of Detroit Edison (DTE), at the NRC Headquarters, Rockville, MD. The purpose of the meeting was to provide DTE an opportunity to present information related to the structure interaction (SSI) analysis for Fermi 3. This meeting summary, the meeting agenda, and attendance roster are available through the Agencywide Documents Access and Management System (ADAMS) as a package at Accession Number ML112020420. The meeting slides are available as ADAMS Accession Nos. ML112020426 and ML112020435. The meeting began with opening remarks from staff in the Office of New Reactors, followed by a brief introduction of all parties. DTE staff led the discussion and presented background information on the DTE SSI analysis. DTE staff presented information on the changes to the combined license application related to design control document, Rev. 9 soil properties. The staff queried DTE about use of backfill materials, minimum shear wave velocity and the SASSI2000 analysis. One member of the public called in via the bridge line and requested copies of the slides used during the meeting. Please direct any inquiries to me, at 301-415-8148, or [email protected]. Docket No. 52-033 Enclosures As stated cc w/encl: See next page Distribution: See next page ADAMS ACCESSION NO: ML112020420-Package Office PM:NRO/DNRL/BWR LA:NRO/DNRL/BWR BC:NRO/DNRL/BWR Name JHale BAbeywickrama MTonacci Date 7/25/11 7/25/11 07/26/2011

OFFICIAL RECORD COPY

SUBJECT: SUMMARY OF JULY 21, 2011, CATEGORY I MEETING WITH DETROIT EDISON REGARDING THE FERMI 3 SOIL-STRUCTURE INTERACTION ANALYSIS DATED JULY 27, 2011

DISTRIBUTION: PUBLIC BWR R/F BAbeywickrama, NRO RidsOgcMailCenter RidsACRSAcnwMailCenter MTonacci, NRO JHale, NRO AMuniz, NRO ZXi, NRO MChakravorty, NRO BThomas, NRO STabatabai, NRO CCook, NRO RKaras, NRO Y. Li, NRO LCandelario, NRO JCaverly, NRO JGiacinto, NRO

Fermi - Mailing List (Revised 07/21/2011) cc: Wayne County Department of Homeland Security & Emergency Management 10250 Middlebelt Road Detroit, MI 48242 Supervisor-Electric Operators Michigan public Service Commission P.O. Box 30221 Lansing, MI 48909 U. S. Nuclear Regulatory Commission Resident Inspectors' Office 6450 North Dixie Highway Newport, MI 48166 Michigan Department of Environmental Waste and Hazardous Materials Division Radiological Protection & Medical Waste Sec. Nuclear Facilities Unit - Constitution Hall 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7747 Mr. Jack M. Davis Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166 Mr. Bruce R. Maters Director - Legal Detroit Edison Company 688 WCB 1 Energy Plaza Detroit, MI 48226-1279 Mr. Ronnie A. May Senior Vice President-Major Enterprise Proj. Detroit Edison Company 2402 WCB 1 Energy Plaza Detroit, MI 48226-1279 Page 1 of 2

Fermi - Mailing List

Email [email protected] (LaShawn G. Green) [email protected] (David B. Harwood) [email protected] (M. Keegan) [email protected] (Patricia L. Campbell) [email protected] (Peter W. Smith) [email protected] (Thomas Bilik) [email protected] Waler Schumitsch)

Page 2 of 2

Meeting Agenda for Public Meeting Location - NRC Headquarters

One White Flint North, Room OWFN-10-A01 Rockville, MD 20852

Thursday, July 21, 2011 8:30 a.m. – 11:30 a.m.

Purpose: The purpose of this public meeting is to provide DTE an opportunity to discuss the

backfill analysis for the Fermi 3 COL site TIME TOPIC PRESENTER 8:30 a.m. Opening Remarks

NRC

8:40 a.m. Discussion of background information related to the Fermi 3 backfill analysis.

DTE

9:00 a.m. Discussion of Fermi 3 backfill analysis.

DTE

10:00 a.m. Break

10:15 a.m. Continued discussion of the Fermi 3 backfill analysis.

DTE

11:00 a.m. Closing Remarks

NRC/DTE

11:15 a.m. Public Comments

Public Participants

11:30 a.m. Adjourn