Cedar Springs Road from Britannia Rd to Kilbride St from Britannia Rd to Kilbride St Minor Reconstruction Public Information Centre (PIC) September 28, 2016

Transcript of from Britannia Rd to Kilbride St

Page 1: from Britannia Rd to Kilbride St

Cedar Springs Roadfrom Britannia Rd to Kilbride Stfrom Britannia Rd to Kilbride St

Minor Reconstruction

Public Information Centre (PIC)September 28, 2016

Page 2: from Britannia Rd to Kilbride St

Project Team

City of Burlington

John Taylor, Councillor, Ward 3Scott Hamilton, Manager of Design and ConstructionDave Meyer, Project ManagerTom Georgiadis, Contract AdministratorAna Maria Troncoso, Senior Design Technician

Page 3: from Britannia Rd to Kilbride St

2. PROJECT OVERVIEWCedar Springs Road 

2. PROJECT OVERVIEW

Page 4: from Britannia Rd to Kilbride St
Page 5: from Britannia Rd to Kilbride St

Project Overview

• Road resurfacing and reconstruction with proposed shoulder pavement (width variesproposed shoulder pavement  (width varies from 1.00 to 1.50m) for bikes.

• Replacement of road crossing and driveway CSP culverts. 

• Replacement of 1000mm concrete culvert.l d d l• Spot replacements and some new guide rails.

• Spot driveway apron replacements.• Areas to be re graded to improve drainage• Areas to be re‐graded to improve drainage.

Page 6: from Britannia Rd to Kilbride St

Existing Conditions 

Page 7: from Britannia Rd to Kilbride St

Existing Conditions 

Page 8: from Britannia Rd to Kilbride St

Proposed Cross‐Sectionp

Page 9: from Britannia Rd to Kilbride St

Project BudgetRoad Reconstruction $2,800,000Concrete Culvert 1000mm $975,000

TOTAL BUDGET $3,775,000

T t ti S h d lTentative SchedulePublic Information Centre: September 2016*Road Construction: 2017*Concrete Culvert 1000mm Construction 2017*Ti i bj t t di ti ith Ni E t*Timing subject to co-ordination with Niagara Escarpment Commission and Conservation Halton for permits, and property acquisition.

Page 10: from Britannia Rd to Kilbride St

PIC LOCATION 

Date: Wednesday, September 28, 2016Location: Conservation HaltonLocation: Conservation Halton,

Grindstone Room2596 Britannia Road West

Time: 6:00 pm to 7:30 pm.

Page 11: from Britannia Rd to Kilbride St

Communications

• Keep up to date on the project by:• Keep up to date on the project by:– Visiting project webpage (Coming Soon)– Project updates by ad mailj p y– Sign up for email notifications– Contact project team

Page 12: from Britannia Rd to Kilbride St

Project Team ContactsCit f B li tCity of Burlington

John Taylor 905‐335‐7600 Ext. 7459Councillor Ward 3 [email protected] @ g

Dave Meyer 905‐335‐7600 Ext. 7818Project Manager [email protected]

Tom Georgiadis 905‐335‐7600 Ext. 7806Contract Administrator [email protected]

Ana Maria Troncoso 905 335 7600 Ext 7665Ana Maria Troncoso 905‐335‐7600 Ext. 7665Senior Designer [email protected]

Page 13: from Britannia Rd to Kilbride St

Comments

• Take a project information package:• Take a project information package:– Fill out comments form here or submit latersubmit later

• Project team contacts provided in handouthandout