From ATV to ATV Evolution
description
Transcript of From ATV to ATV Evolution
Page 1 Presentation title – file name – date
From ATV to ATV Evolution
February 2004
Hans-Jörg Heidmann
Transportation for In-Orbit Infrastructure and beyond
Page 2 Presentation title – file name – date
ISS ATTITUDE CONTROL
Major features of ATV mission
GYRODYNES/CMG DESATURATION
RETRIEVAL OF WASTE AND DESTRUCTION DURING REENTRY
ISS REFUELING
DRY CARGO
WATER AND GAS
ISS ORBIT CONTROL
DEBRIS AVOIDANCE BY
ISS
Page 3 Presentation title – file name – date
General layout and characteristics
Mass = 20.5 tons at launch
• dry mass : 11 tons
• gross cargo : 9.5 tons
• up to 8 tons of propellant at launch
Sizes
• 10.3 m length
• 4.5 m diameter
• 22.3 m with deployed solar wings (4.8 kW)
• 22 m3 pressurized module (16 m3 for pressurized cargo)
Page 4 Presentation title – file name – date
ATV subsystems
• Power supply : - 4 independent distribution chains with rotative solar panels (Si) and rechargeable batteries (NiCd)
• Data Management System : - 3 Failure Tolerant Computers running the main Flight Applicative Software
• Monitoring and Safety Chain : - 2 independent and autonomous chains for Rendezvous monitoring and Collision Avoidance Maneuver with specific means (data processor, category A software, primary power sources, thrusters…)
• Propulsion Subsystem : - 28 ACS thruster (240N) - 4 OCS thrusters (490 N)- 8 propellant tanks (8 tons of MON + MMH)
• Semi passive TCS : - 40 Variable Conductance Heat Pipes
Page 5 Presentation title – file name – date
ATV subsystems (cont’d)
• External Rendezvous monitoring by the ISS : - Visual Video Target- RF Kurs navigation transponder - Visual Ranging Cues
• Navigation and Monitoring of RV :- Relative GPS- Laser sensors (2 Telegoniometer + 2 Videometers)
• General navigation equipment : - Star Tracker, Accelerometer, Gyrometer, Sun Sensor for survival
• Communication subsystem : - 2 chains compatible TDRSS/Artemis for ATV-CC - 2 chains (S-band) for proximity link with ISS
Page 6 Presentation title – file name – date
ATV subsystems (cont’d)
• Pressurized Module : - 22 m3 pressurized module- up to 8 Standard Racks
- Environment and Control Life Support (fan, smoke detector, light)
• Unpressurized Cargo Tanks : - 3 water tanks- 3 Gas tanks- 2 refueling kits
• Russian Docking System : - Active Docking Unit featuring mechanical, fluidic, electrical and
data interface
• Russian Equipment Control Set : - 2 redundant equipment chains to control interfaces with ISS
Page 7 Presentation title – file name – date
ESAESA
ATV Flight Segment Prime Contractorship.System engineering.Verification of ATV FS.Development of Flight Software.Development and Procurement of Propulsion and Reboost subsystem and of Avionics Chains. ATV assembly, integration and testing.Support to ESA for external interfaces.
Cargo Carrier development and integration.Russian equipment set procurementThermal control studies.
Development of Spacecraft structure subsystem.
Development of Solar Generation subsystem.
EADS-ST (F+D)EADS-ST (F+D)
ATV INDUSTRIAL TEAM
Development of Videometer and Star Tracker.
Development of Telegoniometer
ALENIA SPAZIO (I)ALENIA SPAZIO (I)
CONTRAVES SPACE (CH)CONTRAVES SPACE (CH)
DUTCH SPACE (NL)DUTCH SPACE (NL)
EADS SODERN (F)EADS SODERN (F)
DJO (D)DJO (D)
Page 8 Presentation title – file name – date
1st ATV flight model at overall integration
EquippedAvionics Bay
IntegratedCargo Carrier
EquippedPropulsion Bay
Launcher adapterwith separation system
ATV sub-assembliesdelivered at EADS-ST Bremen - Nov. 2003
1st ATV launch by Ariane 5 (Jules-Verne)
scheduled May 2005
Page 9 Presentation title – file name – date
Servicing of the US-Segment
The NASA Shuttle fleet will be retired from up to 2010, which could lead to a logistical gap for the ISS at least until 2014
This logistical gap could be overcome by ATV derived unmanned transportation vehicles such as:
- ATV Download System
- Cargo Capsule System
- Unpressurized Logistic Carrier
For the logistic supply of the US-Segment by ATV could be developed a special docking mechanism called IBDM (International Docking and Berthing Mechanism).
Page 10 Presentation title – file name – date
2. Scenario Description (6) PTV Scenario
•Lift-off•Separation of Ariane 5 EAPs•Fairing jettisoning•Separation of the EPC•Ignition of the ESP•Separation of the ESP•Separation completed•PTV attitude stabilized•Solar panels deployed•Antennas deployed•Check-up by the PTV control centre•Transfer to the phasing orbit
•Maneuver 1•Drift period 1•Maneuver 2
•Phasing•Drift period 2•Mid course correction•Drift period 3
•Transfer to the ISS vicinity – •Interface with the RV scenario
Page 11 Presentation title – file name – date
-V-bar Approach Scenario
RF linkvolume
Approach ellipsoid
Stabilisation burn2 burn transfer
closingFinal approach
drift
S2S3
RF linkvolume
Approach ellipsoid
Stabilisation burn2 burn transfer
closingFinal approach
drift
S2S3
GPSRFSTR
VDM
+V-BAR APPROACH SCENARIO
YAW REORIENTATION
GPSRFSTR
VDM
+V-BAR APPROACH SCENARIO
YAW REORIENTATION
2. Scenario Description (7)PTV Scenario
Page 12 Presentation title – file name – date
2. Scenario Description (8) ISS Attached and Return Phase
Connections Repressurization of inter volume and
tightness control Hatch opening PTV power down to stand by mode Payload operations PTV power up out of stand by mode Check out Hatch closing Depressurization of inter volume Unlatch Separation Distancing Orbit correction Drift Reentry vehicle power-up (avionics / GNC) Wetting of propulsion system of the reentry
vehicle (pyro valve) Pyros armed Checkout prior to reentry Transfer of the state vector and reentry
information to GNC of reentry vehicle Deorbit impulse Separation of the ATV Propulsion part Separation of the docking adapter
•Checkout prior to reentry•Transfer of the state vector and reentry information to GNC of reentry vehicle •Deorbit impulse•Separation of the ATV Propulsion part•Separation of the docking adapterReentry•Hypersonic flareDescent•Back cover jettison•Parachute sequence deployment •(for instance, extractor, drogue chute, main chute)•Heat shield jettisonLanding•Landing system deployment (airbag)•Touch downVehicle passivation and safingBeacon and post-landing systems deploymentArrival of ground crewManual vehicle safingHatch opening and express payload removalHoisting on transport vehicleTransport
Page 13 Presentation title – file name – date
2. Scenario Description (9)CTV scenario
• Mission Scenario similar To PTV
• Safeguard Scenario during Launch phase
• Two-Failure Tolerance Required
• ATV S/C Modification Analysis led to the Result that it would be the design of a new Vehicle
Page 14 Presentation title – file name – date
ULC Mission Scenario•Launch by Ariane 5 ECA•After nominal separation from AR5 upper stage jettisoning of ULC cover/cargo door•ULC operates in a safe orbit below ISS orbit•ULC conducts ISS approach similar to the ATV after ISS okay•Final Approach differs from ATV due to different docking locations•ULC approach is similar with PTVULC will be docked at Node 2 Port•Exchange of complete platform pallets or of single ORUs by SSRMS and/or Special Purpose Dexterous System•Pallets attachment places are at the truss (starboard, port) via PAS, UCCAS or ULCAS•De-docking Leaving approach ellipsoidBraking manoeuvres for initiating of de-orbiting
2. Scenario Description (10)
Page 15 Presentation title – file name – date
Capsule adaptor module upper I/F close to capsule intermediate diameter,
CoG of capsule close to I/F plane
CoG of complete vehicle below I/F plane
I/F on a 20° cone structure No separation interference
I/F as far as possible from nose (Reentry thermal aspect)
Front docking module
Capsule adapter module
4. PTV System Architect. & ATV S/CModifications (2)
Same configuration for CTV but with Additional redundancies
Page 16 Presentation title – file name – date
4. PTV System Architect. & ATV S/CModifications (3)
Page 17 Presentation title – file name – date
4. CTV System Architect. & ATV S/CModifications (1) Global architecture choice (1)
Capsule adaptor module slightly modified compared to PTV
Same Front Docking module
Emergency Escape module added
Modified Ariane5 fairing added
Vehicle launch with Ariane5 ESC-B (23.0 tons capacity)US-port (V-bar as baseline, -R-bar as back-up treated by delta compared to V-bar)IBDM deviceSame reentry capsule as PTV configuration Autonomous reentry capsule (no power, thermal regulation, … deliveries)No refuel, no reboostNo emergency detachment requirements1 month docking phase
Page 18 Presentation title – file name – date
Blunt Biconic shape launched “nose-down”, 4.4 m ext. diameter, 5 crew member
PC internal volume of 25.8 m³ PC equipment volume 9.1 m³ (preliminary figure) Considering 2 m³ per crew member of free volume, 6.7 m³ can be
occupied by payload. Considering:
20% volume margin to account for secondary structures and packaging factors
payload density of about 300 Kg per cubic meter the theoretical P/L occupying all the residual volume of about 6.7 m³ is 1600 Kg
Considering a Capsule mass of 13.1 tons: The mass w/o P/L is 10.32 tons Potential P/L Mass is 2.78 tons
Also assuming a tilting of 30 deg for seats in landing configuration the biconic shape can easily accommodate a crew of 5
CTV Crew & P/L Accommodation Results (Crew of 5)
4. CTV System Architect. & ATV S/CModifications (5)
Page 19 Presentation title – file name – date
6. ULC System Architect. & ATV S/CModifications (1)
ATV-ULC Layout and Configuration Unpressurized cargo bay Doors jettisoned before circularization Cargo on 2 Express pallets (Boeing)
or ICC pallets (EADS-ST) Front cone with stan-
dard RV equipment and
Common Berthing Mech-
anism (CBM) SSRMS grapple on aft
bay wall