Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap...
Transcript of Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap...
![Page 1: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)](https://reader033.fdocuments.in/reader033/viewer/2022060907/60a1d235ee704977ba3d1e07/html5/thumbnails/1.jpg)
Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015
Installation of the Forward Endcap EMC
Fritz-Herbert Heinsius Ruhr-Universität Bochum
![Page 2: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)](https://reader033.fdocuments.in/reader033/viewer/2022060907/60a1d235ee704977ba3d1e07/html5/thumbnails/2.jpg)
Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015
Installation Procedure • Assembly and beam
test at FZJ (PANDA preassembly)
• Transport to FAIR • Need lab space at
GSI to setup and test all channels: At least 6x8 m2 (+large door) for 3 months
• Forward endcap size with support structure about 5.8x2.4x3.4 m3
![Page 3: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)](https://reader033.fdocuments.in/reader033/viewer/2022060907/60a1d235ee704977ba3d1e07/html5/thumbnails/3.jpg)
Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015
Rails for Support Structure • Rails for precise
mounting of forward endcap EMC
• 6.8 m length possible without crossing forward spectrometer rails
• Support structure to move endcap EMC into solenoid needs space
• Question: Space requirement, overlap with forward spectrometer (3.6 m when in parking pos.)
![Page 4: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)](https://reader033.fdocuments.in/reader033/viewer/2022060907/60a1d235ee704977ba3d1e07/html5/thumbnails/4.jpg)
Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015
Connect Detector to Mounting Support Requirements • Space in hall • Crane
Forward endcap EMC with • Insulation cover & ADCs • Cooling lines • Cables & fibres up to patch panel (not shown)
2.4 m
3.5 m
![Page 5: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)](https://reader033.fdocuments.in/reader033/viewer/2022060907/60a1d235ee704977ba3d1e07/html5/thumbnails/5.jpg)
Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015
Move Detector into Magnet
• Cables connected – They pass the
insulation – Cooling lines up to
mixing boxes next to detector
• Problem – Doors are in the way!
![Page 6: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)](https://reader033.fdocuments.in/reader033/viewer/2022060907/60a1d235ee704977ba3d1e07/html5/thumbnails/6.jpg)
Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015
Doors open: no Space for Cables etc.
![Page 7: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)](https://reader033.fdocuments.in/reader033/viewer/2022060907/60a1d235ee704977ba3d1e07/html5/thumbnails/7.jpg)
Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015
Larger Opening of Magnet Doors
Need 516 mm more On both sides
![Page 8: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)](https://reader033.fdocuments.in/reader033/viewer/2022060907/60a1d235ee704977ba3d1e07/html5/thumbnails/8.jpg)
Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015
Doors
![Page 9: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)](https://reader033.fdocuments.in/reader033/viewer/2022060907/60a1d235ee704977ba3d1e07/html5/thumbnails/9.jpg)
Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015
To be discussed • Rails on floor for mounting forward endcap EMC
and DISC DIRC • Larger opening of doors to facilitate mounting of
EMC