Frimley Lodge Park Towpath Works
Undertaken by the Surrey and Hampshire Canal SocietyFeb – Nov 2012
![Page 2: Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfd81a28abf838caee49/html5/thumbnails/2.jpg)
Location of works
CanalCentre
Model RailwayClub
FrimleyLodge Park
New 40m landing stage
Bank protection andpaving of towpath
Existing landing stage refurbished
100m
GUILDFORD ROAD
One of the most popular sectionsof the Canal with the general public
![Page 3: Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfd81a28abf838caee49/html5/thumbnails/3.jpg)
Workundertaken
Installation of fabric on posts (“soft”) bank protection, and widening of the towpath
![Page 4: Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfd81a28abf838caee49/html5/thumbnails/4.jpg)
Workundertaken
Construction of new sheet-piled landing stage near Guildford Road bridge
![Page 5: Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfd81a28abf838caee49/html5/thumbnails/5.jpg)
Workundertaken
Refurbishment of existing landingstage (near model railway club), including installation of bollards
![Page 6: Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfd81a28abf838caee49/html5/thumbnails/6.jpg)
Workundertaken
Paving of entire length (about 400m)with hard-wearing roadstone
![Page 7: Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfd81a28abf838caee49/html5/thumbnails/7.jpg)
Workundertaken
Donation and installation ofhard-wood seat near the newlanding stage
![Page 8: Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfd81a28abf838caee49/html5/thumbnails/8.jpg)
£25K funded from Steljesenvironmental fine (administeredby SHBC)
Costs
![Page 9: Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfd81a28abf838caee49/html5/thumbnails/9.jpg)
Costs
330 man days by the Canal Society,equivalent to £27K value in kind, plus around £1K in cash donation
![Page 10: Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfd81a28abf838caee49/html5/thumbnails/10.jpg)
However, please note…
A long section of towpath down tothe Canal Centre still needs repair…