FREMONT UNIFIED SCHOOL DISTRICT Hopkins Middle School Conversion October 30, 2019

Transcript of FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School...

Page 1: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

1

FREMONT UNIFIED S C H O O L D I S T R I C T

Hopkins Middle School Conversion

October 30, 2019

Page 2: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

2

Transforming Hopkins Junior High School

• Incoming sixth-graders in year 2022-23

• Design based on capacity of 1,352

• Recently received enrollment numbers

will be analyzed; design capacity can

be adjusted

Page 3: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

3

Assessment – Site

• Inadequate main campus entry

• Site path of travel not fully ADA compliant

• Maintenance heavy landscaping

• Campus flooding

• Worn site features and furnishings

• Poor pick-up and drop-off circulation

• Insufficient parking

• Portable classrooms located across

parking lot

Page 4: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

4

Assessment – Architectural

• Degradation of building exterior

• Outdated classrooms

• Extensive dry rot at building eaves

• Toilet room and buildings not ADA

compliant

• Outdated food service facilities and

equipment

• Clogged roof drains and ponding water

• Lack of a true multipurpose building

• Undersized gym and locker, unused

showers

Page 5: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

5

Assessment – Structural, Mechanical,

Electrical and Plumbing (MEP) System

• Inadequate electrical service

• Mechanical systems at the end of

useful life

• Inefficient lighting, at the end of useful

life

• Inadequate campus Information

Technology network

• Worn campus infrastructure

• Outdated public address system and

clock

• Outdated fire alarm system

Page 6: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

6

Transforming an Existing Campus

• New campus entry

• Improved parking, drop-off and pick-

up

• Construct student union and optional

music room

• Construct two-story classroom

building

• Expanded administration

• Modernize existing buildings

• Middle School Conversion fall 2022

Page 7: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

7

LEGEND

NEW CONSTRUCTION

VERY MINOR MODERNIZATION

MINOR MODERNIZATION

MODERATE MODERNIZATION

MAJOR MODERNIZATION / RECONFIGURED

PLAY YARD/SITE ENHANCEMENT

MODERATE SITE ENHANCEMENT

FUTURE PORTABLES

REMOVED PORTABLES

Housed in Existing Permanent Structures 931

Housed in Existing Temporary Portables 0

Housed in New Permanent Structures 421

Total Capacity 1,352

Estimated Project Cost (1,352 Capacity) $ 68,874,728

Design Option 11,352 Capacity

Net Classroom add = 3

Page 8: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

8

LEGEND

NEW CONSTRUCTION

VERY MINOR MODERNIZATION

MINOR MODERNIZATION

MODERATE MODERNIZATION

MAJOR MODERNIZATION / RECONFIGURED

PLAY YARD/SITE ENHANCEMENT

MODERATE SITE ENHANCEMENT

FUTURE PORTABLES

REMOVED PORTABLES

Housed in Existing Permanent Structures 964

Housed in Existing Temporary Portables 0

Housed in New Permanent Structures 388

Total Capacity 1,352

Estimated Project Cost (1,352 Capacity) $ 82,388,131

Design Option 2A1,352 Capacity + More Mod + Music Classroom

Net Classroom add = 3

Page 9: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

9

LEGEND

NEW CONSTRUCTION

VERY MINOR MODERNIZATION

MINOR MODERNIZATION

MODERATE MODERNIZATION

MAJOR MODERNIZATION / RECONFIGURED

PLAY YARD/SITE ENHANCEMENT

MODERATE SITE ENHANCEMENT

FUTURE PORTABLES

REMOVED PORTABLES

Housed in Existing Permanent Structures 964

Housed in Existing Temporary Portables 0

Housed in New Permanent Structures 388

Total Capacity 1,352

Estimated Project Cost (1,352 Capacity) $ 84,061,263

Design Option 2BOption 2A + Larger Student Union

Net Classroom add = 3

Page 10: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

10

Option 11,352 Capacity

Option 2A 1,352 Capacity + More

Modernization + New Music Classroom

Option 2BOption 2A + Larger Student Union

Estimate

Budget

Difference

Est. (1,352 Enrollment)

$ 68,874,728

$ 68,100,344

$ (774,384)

$ 68,874,728

$ 82,388,121

$ 68,100,344

$ (14,278,787)

$ 82,388,121

$ 84,061,263

$ 68,100,344

$ (15,960,919)

$ 84,061,263

Options &

Budget

Page 11: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

11

Middle School Conversion Budget

• Board authorized additional $45.5 million for Centerville

and Hopkins middle school conversion projects

• Board authorized Option 2d for Centerville, using $19.7

million from the additional allocation

• $25.8 million remains unallocated

Page 12: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

12

TBD

• Receive Board input on desired options

• Reevaluate number of classrooms

• Receive Board approval to move into

schematic design

• Procure construction manager

• Procure lease-lease back contractor

Next Steps

Page 13: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

13

Reference Slides

Page 14: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

14

Very Minor Minor Modernization Moderate Modernization Major Modernization

Architectural • Repair roofing, caps• Patch & paint ceilings, walls• Accessibility compliance –

bathrooms, door hardware, thresholds, casework

• Repair dry rot

• Everything in +• Paint 100%

• Everything in +• Replace selective

replacement of classroom wall finishes, flooring

• Upgrade locker rooms • Selective replacement of

casework

• Everything in +• Replace full roofing• Replace all doors and

windows• New non-bearing

walls, interior finishes.• New casework

Structural None None, unless necessary to support new HVAC units

Same as Everything in

Mechanical None Replace outdated HVAC w/new efficient units

Replace outdated HVAC w/new efficient units

• Everything in +• Full mech. upgrade

Electrical Replace/repair non-functioning and non-compliant fixtures, switches, receptacles, etc.

• Everything in +• Replace fixtures in poor

condition

• Everything in +• New wiring, lighting,

controls, life safety at reconfigured areas

• Everything in +• Full electrical upgrade

Plumbing None Replace & relocate fixtures where necessary

Replace & relocate fixtures where necessary

• Everything in +• Full plumbing

upgrade

/ Reconfigured

Modernization Scope

Page 15: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

15

Design Approach

Page 16: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

16

Design Approach

Page 17: FREMONT UNIFIED · 2019-10-26 · FREMONT UNIFIED S C H O O L D I S T R I C T Hopkins Middle School Conversion October 30, 2019. 2 Transforming Hopkins Junior High School • Incoming

17

Design Approach