FR - Soufan Engsoufaneng.com/profile.pdf · The project consisted mainly of prefabricated units...
Transcript of FR - Soufan Engsoufaneng.com/profile.pdf · The project consisted mainly of prefabricated units...
FR
Add a footer 1
About us
Soufan Engineering is specialized in International Construction projects and is
also one of the leading contract supply and service providers for foreign
assistance missions, US State Department, Department of Defense, UK Army
ISAF, NATO, UN Offices, NGOs, Embassies and Prime Contractors in Afghanistan
Iraq, South Sudan and Sierra Leone. Our skills and expertise has singled us out as a
very qualified and highly sought after Construction and logistics outfit for projects requiring
knowledge and efficiency in conflict zones and developing countries that require a vast arsenal of
technical capabilities. Due to our close working relationship with the Prime US contractors, our skills and efficiency has increased
our capabilities in providing the Client with the highest value for a subcontractor. Our end to end process management and ability
to deliver the end results in time always, gives our Clients the best value for money.
1
Soufan Engineering is
continuously extending it’s reach in
new locations any part of the world where
our clients require. We attain the specialized staff
respective and experienced of the specific region our
projects are taking place. Our multinational team is savvy and
In order to achieve our objective we are continually reevaluating the local market demands with a
view to providing global solutions in order to provide the best value to our customers. A promise given is a
promise kept. We understand customers' needs and strive to fulfill and exceed customers expectations at all times.
extremely knowledgeable of the local know-how for each project to
flow with maximum efficiency and cooperation. With the addition of our
professional and dedicated management group, our client needs to look no further
to find the 100% dedication to complete full confidence and success for the job at hand
whether be construction, supply or listed service.
2
Construction: Site Clearance & Preparation Concrete Structure Buildings Pre-fabricated Houses and K-span Buildings Warehouses
Portable Sanitary Containers Tents Building rehabilitation/reconstruction New buildings, utilizing LGS Systems Schools, Hospital & Health clinics Governmental, Commercial and Private Water and Sewage systems Power substations
and power lines Roads Construction Airport Runway, Apron and Taxi Way
Performance & Capabilities
Add a footer 3
Construction General Supplies Military & Defense
• Diesel Generators
• Heavy Equipment
• All Range of Vehicles
• Electrical Appliances
• Building Materials
• Mobile Lighting Towers
• Water and fuel tanks
• Large scale furniture
• Gym Equipments
• Military products
• Military apparel
Base Camp & Services
• Catering
• Food Supplies & Consumables
• Legal & Foreign affair Services (Visas/Permits)
• Laundry
• Waste Water Collection
• Water Supply
• Diesel/Fuel Supply
• Full Camp Maintenance
• Communications Equipment/supplies
• Concrete Structure Buildings
• Pre-fab Housing/Buildings
• K-span Buildings/Warehouses
• LGS (Light Gauge Steel) Structures
• Schools, Hospital & Health clinics
• Shipping ports, ship yard
• Water and Sewage systems
• Excavation, concrete works
• Power substations & power lines
• Roads Construction
• Airport Runway, Apron & Taxi Way
• Armored Vehicles
• Defense Barriers
• Perimeter Fencing
• Ballistic Blankets
• Body Armor
• Ballistic Helmets
• Military Speed Boats
• Military Helicopters
• Guard Towers
• Razor Wire
• Mobile Lighting Towers
FR
Add a footer 4
Summary
Afghanistan
Soufan Engineering was the first foreign company to Mobilize in Kabul in late 2001 within weeks of the US Military and NATO troops arriving in Afghanistan. Soufan Engineering representatives were present offering full life support and logistical backup services to the armed forces in place.
History & Services
• First and main supplier of Power Generator sets to all armies, foreign organizations and embassies since our arrival to Kabul, bringing in weekly air-cargo due to the high deficiency of Electricity in the region.
• Waste collection and management for US Army at Bagram Airfield and Portuguese Contingent at ISAF camp Jalalabad rd.
• Fuel supply for all UNDP staff vehicles exclusively provided by Soufan Engineering between 2003/2004
• Life support amongst a wide-range of supplies and services for DynCorp in Kabul from 2003-2005.
• Full Catering and Food Services for the US Embassy in Kabul from February 2008 – February 2009 via daughter company Ivana Logistics and Services.
• Food Services and Catering for the NIU and PAE Staff at the NIU Training Camp in Kabul from 2008-2009 exclusively providing for over 500 personnel.
FR
Organization Description of Contract Contract No. Point of Contact
US ARMY, Camp Eggers, Kabul
Supply of 54 x U.K Perkins Sound Proof Generators 140kva & 60kva
W91B4M-06-P-0501Watts, Gabriel CW5 CSTC
US ARMY, Camp Eggers, Kabul
Supply of 420 Winterization Tents, 4m x 10m, 7m x 12m & 9m x 18m
W91B4M-06-P-0436 Major Damian Wilborne
US ARMY, Camp Eggers, Kabul
5000 Genuine Bellville Military Boots, USA Made shipped in via air cargo on urgent demand
W91B4M-06-C-4008LCDR Thompson, Daniel
US ARMY, Camp Eggers, Kabul
60,000 US/NATO Standard Military Pistol Belts W91B4M-06-C-4001LT Quijano, Oscar
Add a footer 5
US Embassy, Kabul Food Service, catering & dining facility for USAID
Personnel at the Embassy W917PM-09-P0202
John A. [email protected]
UK Army Joint Forces, Camp Bastion, Helmand
Provision of furniture for Joint Forces Headquarters
8022/OPH/227J8 Vanajah Srinivasan
Brief Summary Contract ListAfghanistan
FR
Add a footer 6
US Air Force, Kandahar Air Field
Construction of Apron & Taxi Way for ANA Aircrafts
FA-8903-06-D-8250/ Task Order #0024
Chad A. Becker [email protected]
Organization Description of Contract Contract No. Point of Contact
NATO, PortugeseContingent, ISAF Kabul
Waste Water Collection / Cleaning and management of Septic Sewers
02/2005-FND/QRF- ISAF VIII
Srg. Castro, [email protected]
FLUOR INC. Bagram Air Field
Generator Supplies & Services C2TC-29-D-
93318/C2TC102739 Mike Weltz
PAE, Lockheed Martin, Kabul/Kunduz
Catering Services & dining facilities for Kabul and Kunduz
CNPA-NIU-2008- 00057 Alphonso Hunley, Deputy Program
ManagerCell: +937 0700 064474
AMC 401ST, Kandahar Air Field
Large Scale full Furniture Package W91B4L-10-P-09131st LT Adam Sanchez
US Air Force, Camp Thunder, Gardez
Construction of 42 x K-Span buildings as facilities for Afghan National Army (ANA) training center
FA-8906-D-8513/ TO 0045
FR
Add a footer 7
Soufan Engineering extended its services into the construction domain since 2006 to support it’s clients such as AFCEE, USACE (US Army Corps of Engineers), Perini, ITSI, Stallion CEG, Anham, Contract Intl, Mercury Development, ECCI,Lakeshore, Fluor Inc, URS Corp and many more Government organizations and Prime Contractors. We have executed projects in the most remote and unsecured locations of the region namely, Paktika, Helmand, Kandahar, Gardez, Kunduz, Gazni, Herat and Mazar e Sharif and even at freezing temperature conditions we have no hesitations.
Projects
• Entire man camp at FOB Zerok in the Paktika province considered as one of the most remotely unsecured and Taliban dominated regions. The project consisted mainly of prefabricated units that we transported with a security convoy from Kabul and we managed to succeed the project by hiring local dedicated engineers and labor force.
• Construction of the DoD Center, STAB building, EOD 4000 and USACE Compound in Kandahar Air Field.
• Various projects in Kandahar Air Field in support of the ANA, such as Apron Phase I and Phase II, Taxi Way Phase III, Fuel and Mogas Station, Mission Support Building and Laundry Building.
Construction
Afghanistan
FR
Add a footer 8
Apron & Taxi Way Project Kandahar Airfield
FR
Add a footer 9
Historic
IRAQ
• Full life support for ITSI in Basra from April 2005 until April 2006. (Disclosure of $ value not permitted as per contract terms and conditions) • Full life support for KBR in Baghdad from June 2004 to June 2005 with option to extend for an additional 12months. (Disclosure of $ value not permitted as per contract terms and conditions)
UAE
Soufan Engineering has been established in the Sharjah Airport Free Zone since 2002 handling our shipments to Iraq and Afghanistan all via Air Freight. Later we became known as one of the market leaders for assembly and distribution of Power Generation sets in the UAE owning and controlling two assembly lines for Generators in the Sharjah Saif Zone until 2014. We currently still export goods to our Sierra Leone branch from the UAE.
Brief Summary
Iraq & UAE
FR
Add a footer 10
Historic
Soufan Engineering has been providing logistical supplies and equipment for over two decades to the commercial and military sector in Sierra Leone. We were also the main supplier for the British forces in 2000 when they intervened in the civil war under codename Operation Palliser. Following excellent performance from our side, we had built great trust and relationship with the British henceforth they recommended we establish in Kabul, Afghanistan to support their joint forces operations.
Recent
Soufan Engineering’s involvement in South of Sudan (Juba) has been in support of the US Department of State Prime and Sub-contractors in their effort to support and transform the SPLA Military into a functioning defensive Army for over 2 years.
Soufan Engineering has supported sister company The New Millennium since their start in Southern Sudan in all capacities, logistics, manpower, supplies and construction. In addition, Soufan Engineering has extended a range of materials, supplies and services vital in any Military's daily Base operations. In particular crucial support has been shown with associated supplies including Body Armor, military gear and apparel, generators, heavy equipment, barracks and ablution units. We have successfully completed a vast amount of contracts in Juba with our sister company The New Millennium Group.
Summary
Africa
FR
Add a footer 12
Soufan Engineering has provided construction to build the Interim General Headquarters and the Chief of Staff compound in Juba, South Sudan along with SPLA FOB man camp in Molbok, Southern Sudan.
Soufan Engineering & The New Millennium constructed 17 buildings for the SPLA IGHQ in Juba via direct contract with the SPLA. These buildings accommodate 2 brigades and offices for the SPLA Military Police.
Soufan Engineering executed construction of the Presidential Compound Housing Project of 11 Executive Villas for the Chief of Command and high ranking commanders of the SPLA, GoSS, and any visiting dignitaries.
Soufan Engineering has previously and still currently constructed tented cities in several outlying areas of Southern Sudan for the SPLA.
Soufan Engineering was assigned exclusive prime contractor to design and build various significant landmarks in Upper Nile State Malakal namely the Nile Palace Hotel, the Public Stadium, Presidential Villa in 2008 among other structures. Presidential Villa pre- engineered steel structure (LGS) built on concrete foundation with high tech Interior installations as per the following photos..
Summary
South Sudan
11
FR
Add a footer 12
Presidential VillaLGS System completed in just 36 days after foundation
FR
Add a footer 13
FR
Add a footer 15
The LGS (Light Gauge Steel) Building System is a complete, turn-key framing shell package. A wide variety of choices for materials and products gives you the most economical and practical solution in the market today. From the slab and up, our system begins with design & engineering of the building stability package (i.e. shear walls). Our highly experienced team is involved throughout all phases of construction. We pre-manufacture wall panels that can be hoisted into place and screwed together. A variety of floor systems can be used based on the building's requirements for sound transmission class (STC) and impact isolation class (IIC). We then top off the building with pre-engineered roof trusses and metal sheathing to ensure non-combustibility. This system, from the slab up, offers you the best in structural simplicity to provide a stronger, lighter solution that is built to last and the fastest most economical building method.
Light Gauge Steel Building System
We can install pre-engineered, factory-built, trusses and sheathing that are a 100% non-combustible,
"Green" solution.
Sheet steel or moment-framed shear walls are introduced into the framing to meet seismic, wind and building stability requirements.
For a floor solution with better sound and fire performance, consisting of a 2.5" concrete pour over an 8" metal long-span decking, can be installed quickly and economically.
For a floor solution that is a lighter and more economical, we can integrate joists.
A wide variety of light-gauge steel framing can be used to panelize load-bearing and non-load-bearing walls both on and off-site, depending on jobsite requirements.
Pre-frabricated exterior panels can be sheathed as well to speed the erection process and eliminate the need for scaffolding on-site.
Because light-gauge steel has the strongest strength-to-weight ratio, it is by far the right choice to reduce foundation requirements saving you money and time!
14
FR
Add a footer 15
Nile Palace HotelUpper Nile State,South Sudan
FR
Add a footer 17
FR
Add a footer 16
Soufan Engineering utilizes the K-Span warehouse concept in order to provide its customers with an alternative to traditional warehouse construction methods. This concept allows for efficient speedy construction of warehouses designed around our customers’ requirements. Designed to build functional structures, the Soufan Engineering’s K-Span system meets a full range of needs at any remote site. Structures built with K-Span are rust free, watertight and fireproof and can last a lifetime. Soufan Engineering’s K-Span system allows for the construction of efficient purpose built systems in a large range of sizes and even expands existing structures.
Soufan Engineering’s K-Span system can address multi-sectoral needs:
AgriculturalCold storage, covered livestock pens, dairies, farming cooperatives, food storage, food processing, distribution and warehousing, hothouses, meatpacking plants, shade growth facilities, barns and stables.
IndustrialFactories, laboratories, office parks, refineries and other processing plants, rest stops, roofing companies and warehouses, bus and train stations, construction companies, covered storage for industrial waste and do-it-yourself retail locations.
Commercial/RetailHangars, boat sales, covered walkways, equestrian, equipment leasing companies, livestock and breeding, maintenance facilities, market places/bazaars, museums, residential common areas, self-storage facilities, stores/storefronts, gas stations, telecommunication infrastructure coverage, vehicle dealerships and warehouses.
Public WorksAdministrative buildings, dormitories, guardrails, machine shops, pumping stations and other containment facilities.
K-SpanSoufan Engineering’s K-Span Capabilities, Machines
Details & Specifications
FR
Add a footer 17
InstitutionalAirport facilities: hangars, maintenance facilities, baggage handling and storage, personnel processing; bus and train stations,churches, daycare centers, drug treatment facilities, elder care communities, medical centers/hospitals, meeting halls, reception, rest stops, gymnasiums, roadside storage, schools and tunnel lining.
MilitaryBarracks and dormitories, base construction and reconstruction, equipment maintenance and repair workshops, stores and warehouses, border posts, aircraft and helicopter hangars, covered aircraft shelters, hardened and underground bunkers, ammunition storage, prepositioning for emergency response, sport facilities, supply depots, simulator and training buildings.
Humanitarian AidClinics, disaster relief: shelters (processing, relief supplies, personnel and food distribution), storage, operational headquarters, reconstructive efforts; food distribution locales, dining and sanitary facilities, maintenance and communication hubs, homeless shelters, low-income housing and base camp facilities for support of peacekeeping and humanitarian operations.
ResidentialDormitories, low-cost housing.
ConstructionHousing for their workforce, hydroelectric projects, offices, oil and gas refineries, power plants, storage for equipment, support facilities; re-roofing existing structures.
RecreationalAmusement park shelters, camping facilities, enclosed sport facilities: tennis courts, batting ranges, golfing ranges, ice rinks; bowling alleys, fitness centers, historic landmarks/tourist shelters, swimming pools and vacation homes.
GovernmentalCustom facilities, free trade zones, facilities for maritime agencies and port authorities.
FR
Add a footer 18
Introduction of ABM 240
COIL STOCK
ENGINE
PRIMARY RUN OUT TABLE
RUN OUT TABLESWITH ADJUSTABLE LEGS
C 240 CURVING MACHINE PRODUCES CURVED PANELS
(STAGE 2)32” WHEELSFOR MOBILE TRANSPORT
OPERATING STATION(OPERATING CONTROLS)
RUN OUT TABLESWITH ADJUSTABLE LEGS
GUILLOTINE SHEARPANEL CUT-OFF
P 240 PANEL FORMING MACHINE PRODUCES STRAIGHT PANELS
(STAGE 1)
ABM 240 (SUPER SPAN)AUTOMATIC BUILDING MACHINE
SAMPLE CURVED PANEL
FR
Add a footer 19
MAIN TECHNICAL SPECIFICATION
Size: 10400mm × 2250mm × 2300mm Total Weight: Approx 15000KG Main Motor Power: 15.7KW forming power is 7.5kw ; bending power is 3.0kw; cutting power is 3.0kw; conical power is 2.2kw Working Speed: Straight sheet: 15m/min
Arch sheet: 13m/min Sewing: 6m/min
Material of rollers: 45# steel, quenched HRC 58-62 Material of roller shafts: 45# steel, adjusted Material of cutting blade: Cr12 steel (Taiwan Airline Technique) PLC Type: Germany Siemens Step of rollers: 13 steps Feeding Width: 914mm Effective Width: 610mm The depth of the groove: 203mm Thickness of the coil: 0.6-1.5mm Operating factor of the panel: 66% Proper span: ≤38m
MIC ABM 240
ABM 240UBM 240
FR
Add a footer 20
MAIN TECHNICAL SPECIFICATION Size: 9300mm × 2250mm × 2300mm Total Weight: about 11000KG Main Motor Power: 15.7KW forming power is 7.5kw; bending power is 3.0kw; cutting power is 3.0kw; conical power is 2.2kw Working Speed: Straight sheet: 15m/min
Arch sheet: 13m/min Sewing: 6m/min
Material of rollers: 45# steel, quenched HRC 58-62 Material of roller shafts: 45# steel, adjusted Material of cutting blade: Cr12 steel PLC Type: Germany Siemens Step of rollers: 13 steps Feeding Width: 600mm Effective Width: 305mm The depth of the groove: 140mm Thickness of the coil: 0.6-1.5mm Operating factor of the panel: 51% Proper span: ≤18m
RUN OUT TABLESWITH ADJUSTABLE LEGS
ABM 120 AUTOMATIC BUILDING MACHINE
Introduction of ABM 120
A. OPERATOR’S STATIONB. PANEL CURVING MACHINEC. PEIMARY CURVING RUN-OUT TABLED. STRAIGHT PANEL ROLL FORMING MACHINEE. RUN-OUT TABLES IN TRANSPORTING RACKF. COIL STOCK PAY-OUT REEL AND STANDG. ENGINE/HYDRAULIC PUMP PRIMARY POWER UNIT
GENERAL OPERATION (TOP VIEW)
1. COIL STOCK ENTERS PANEL2. FORMED STRAIGHT PANEL3. STRAIGHT PANEL ENTRY TONPANEL
CURVING MACHINE4. CURVED BUILDING PANEL
TOP VIEW
REAR VIEW SIDE VIEW
FR
Add a footer 23
ABM 120 K-SpanAUTOMATIC BUILDING MACHINE
P 120 PANEL FORMING MACHINE PRODUCES STRAIGHT PANELS
(STAGE 1)
GUILLOTINE SHEAR PANEL CUT-OFF
RUN OUT TABLESWITH ADJUSTABLE LEGS
OPERATING STATION(OPERATING CONTROLS)
WHEELS FOR MOBILE TRANSPORT
C 120 CURVING MACHINE PRODUCES CURVED PANELS
(STAGE 2)
RUN OUT TABLESWITH ADJUSTABLE LEGS
ENGINECOIL STOCK
PRIMARY RUN-OUT TABLE
21
FR
Add a footer 22
Features of our K-Span Machines
All the rollers are forged from the high quality structural steel and are processed intensely. The surfaces of the rollers are plated with hard chromium. The rollers have a high hardness and long operating life. 2. The power set to automatically transport the colored steel sheet is equipped in the forming press section, which can press the colored steel sheet with the thickness of 0.5~1.5mm. It is not needed to frequently adjust the clearance between the pressing rolls when pressing the sheet with different thickness, which can make the sheet come out from machine normally without scuffing of the coating film of the sheet. Being just like a “foolproof camera”, the operation of the machine is very simple. But the quality of the finished product can be guaranteed. The length of the finished sheet is measured by the electronic measurement instrument or mechanical measurement instrument. The helping hand wheel and the counter are used in the adjustment of the bending of arch sheet, which makes the operation simple and guarantees the quality and the dimensional precision. The hoisting tool is light and handy (The weight of hoisting tool of the United States is 30KG. And the weight of hoisting tool of our company is 2KG). It is convenient to install and uninstall the hoisting tool. Its hoisting speed is quick. The joining type of the roof is self-lock, which makes it easy to install and safe with excellent water proof and storm resistance. The curving roof can directly be produced on worksite, effectively lowering the cost.
No. Name Amount Usage
1 Sewing machine 1 Assembling the sheets
2 Straight sheets cradle 8 Plate supporter
3 Arch sheets cradle 8 Plate supporter
4 Coil cradle 1 Sheet roll supporter
5 Core shaft 1 Roll the sheets
6 Straight sheets side
cradle 8 Plate supporter
7 Suspender 1 Lifting
8 Hanger 8 Lifting
9 Clamp 8 Bait sheets
10 Super pliers 2 Bait sheets
11 VCD 2 Teach customers how to produce
12 PLC(Siemens) 1 Control the length and pieces
13 Driving chains 2 To roll the gears
List of accessories
FR
Add a footer 23
Step 1. Soufan Eng. Team load Coil Stock on Machine and feed it through
Step 2. Form the Straight Panels through Rollers
Step 3. Automatic Stop measures Panels to precise length
Step 4. Cut Panels to desired length in Guillotine Shear
Step 5. Turn Straight Panels on edge and feed back through Curver
Step 6. Seam Curved Panels together Horizontally
Step 7. Hoist and Lift Group of Panels into Position
Step 8. Seam new section of building onto existing section
Step 9. Screw newly placed Arches onto foundation/Angle Iron
Step 10. Trim and Fit End Walls into position
Step 11. Pour concrete into above Grade Foundation
Step by Step method of Producing K-Span Arch Buildings
FR
Add a footer 24
ITEM DESCRIPTION AREA (Top View)
for K-span roof
1. Mission Support Building 600 m2
2. Laundry Building 200 m2
3. Sun Shade 200 m2
4. Fuel Operations Building 270 m2
5. Fuel Administrative Building 100 m2
6. Mogas & Diesel Fuels Roofing 400 m2
Kandahar Air Field ANA Camp Extention (Phase III)A-Z Construction of:
• Mission Support Building • Laundry Building. • Fuels and Mogas Station
Sub-contract #: 31013626 Prime Contract #: FA8903-06-D-8520/ Task order #: 0026Prime Contractor: URS
Some of Soufan Engineering’s K-Span Projects in Afghanistan
FR
Add a footer
Afghan National Police Training Center, Mazar-E-Sherif
Contract No: 007114 Project No: FA8903-06-8505-0035
Prime Contractor: Lakeshore
Training facilities for Afghan National Police. This project consists of 12 Large scale 240 Profile Buildings and was completed in 48 days with round the clock work due to Lakeshore’s close deadline with AFCEE.
25
FR
Add a footer 26
Regional Military Training Center, Camp Thunder, Gardez. Contract No: FA-8906-D-8513. TO 0045. Prime Contractor: ITSI. Total Project consists of 42 K-Span Buildings. Supply, Fabrication and Erection. Facilities for the Afghan National Army as their main training center in the Gardez region.
FR
Add a footer 27
207th Compound Expansion, Camp Zafar, Herat
Contract No: W912ER-09-D-0002 Project No: 257-8019, TO 0027
Client: USACE (US Army Corps of Engineers)Prime Contactor: Contrack International Inc. assigned for design/build RMTC (Regional Military Training Center)Sub-contractor: Soufan Engineering. To Fabricate & Erect K-span Structures of 240 Profile Buildings
FR
Add a footer
207th Compound Expansion, Camp Zafar, Herat
Contract No: W5J9LE-11-C-0033 Project No: 257-8015, TO 0027
Client: USACE (US Army Corps of Engineers)Prime Contactor: Contrack International Inc. assigned for design/build RMTC (Regional Military Training Center)Sub-contractor: Soufan Engineering. To Fabricate & Erect K-span Structures of 120Profile Buildings
28
FR
Add a footer 29
FR
Add a footer 32
FRMilitary & DefenseSome of our product range
Ballistic Helmet Concealable Amour Security Amour Police Amour Ballistic Shield Military Amour Floating Amour Amour Plate
Demining Amour K9 Amour Anti-Riot Equipment Face Shield EOD Equipment Accessories Boltless Helmet Special Forces Helmet Paratroop Helmet
Combat Assault Helmet Combat Helmet Crewman Helmet Crown Mesh Harness Helmet Demining Helmet Fragmentation Helmet Pascut Helmet Field Helmet
AVAILABLE SIZES HEAD SIZE
Size cm Inches
Extra Small 6 ½ - 6 5/8 52 – 53 cm 20.5.20.9 in
Small 6 ¾ - 5 7/8 54 – 55 cm 21.3.21.7 in
Medium 7- 7 1/8 56 – 57 cm 22.0.22..4 in
Large 7 ¼ - 7 3/8 58 – 59 cm 22.8.23.2 in
X Large 7 ½ - 7 5/8 60 - 61 cm 23.6.24.0 in
XX Large 7 ¾ - 8 62 – 64 cm 24.4.25.2 in
Our ballistic helmets provide high ballistic performance with low weight through a unique manufacturing process using high tenacity ballistic aramid fibre, bound in a thermoplastic resin matrix.The Combat and PASGT helmets have an area of ballistic coverage of 0.15 m2 (6.3 in2)
The helmets are available in the following colors: White, Black, Grey, Dark Blue, UN Blue, Olive Drab, Desert Tan
31
FR
34
Military Armour Police Armour
Advanced Tactical Vest
Extreme Tactical Vest
MiitaryAssault Vest
MiitaryVest
UNTactical Vest
We can also provide made to measure garment for maximum fit and comfort and have 100 different sizing options to cater all requirements.
Colour:Our vests are available in the following colors: White, Black, Grey, Navy Blue, Olive Drab, woodland Camo, Desert Camo, UN Blue.
Outer Cover Material:We offer the following cover materials: Cotton, Polycotton, Fluorescent, Cordura, Kermel, Nylon, Ribbed Jersey, Quilted Nylon, Outlast, Coolmax, Sports Mesh, Tactel, Hifrex
We can provide the following coatings: Flame Retardant, Anti – microbial, Water Repellent, Chemical Resistant, Petrol Shedding, Heat Management, Moisture Management
Armour Plates Ballistic Shields
Ceramic Plate ICW
Level lll2.4kg
Light Weight Ceramic
Plate ICWLevel lll 2kg
Ceramic Plate Stand Alone
Level lll
Ceramic Plate Stand Alone
Level lV
PolyethylenePlate ICW Level III
PolyethylenePlate ICW Level III
Stand Alone
SteelPlate ICW Level III
Ballistic Shield
Multi Beam LightningSystem
Single Halogen LightningSystem
Back Length Chest Waist
Small 18 – 19” 34 37” 28 - 31”
Medium 18 – 19” 38 – 39” 32 - 35”
Large 18 – 19” 40 – 43” 36 -39”
X Large 20 – 21” 44 – 47” 40 - 43
XX Large 20 – 21” 48 – 51” 44 -47”
XXX Large 20 – 21” 52 – 53” 48 – 51”
Our vests are available in following standard sizes:Male
32
FRArmoured Land Cruiser Level: B6
Vehicle Specifications
Base vehicle: Toyota Land Cruiser GXR 5.7 200-Series Model year: 2018Engine model: 5.7 L V8 petrol full optionTransmission: 6 Speed automaticSeats: 8 (Leather)Color: As availableBody Type: 5-door Station Wagon
Ballistic Specifications
Security Vehicles in B6 level are armoured using materials, both opaque and transparent, that meet or exceed the requirements of the European CEN 1522/23 and CEN 1063 standards to the level FB6 for opaque areas and BR6 for transparent areas.ArmouringAll four sides of the passenger compartment and the roof of the vehicle are protected using high-quality armour steel and glass defeating 7.62x51mm M80 Nato Ball ammunition (U.S. NIJ level III, CEN level FB6/BR6) and 5.56x45 SS109 ammunition (CEN level FB5/BR5 and FB6/BR6) at 0° incidence (90° to the surface) and 10m range according to CEN1063 and CEN1522.Opaque Areas:All opaque areas including the roof are protected against the following and all lesser weapons/ ammunitions at 90° impact angle in accordance with the above specifications.
Calibre 7.62 x 39 mm, FJ/PB/FeC, AK 47 KalashnikovCalibre 5.56 x 45 mm, FJ/PB/SCP, M16 ColtCalibre 7.62 x 51 mm, FJ/PB/SC, (FN) “FAL” / “LAR” NATO rifle
Transparent Areas:
All transparent areas are multi-layer and polycarbonate coated to protect against the following and all lesser weapons/ ammunitions at 90° impact angle in accordance with the above specifications.
Calibre 7.62 x 39 mm, FJ/PB/FeC, AK 47 KalashnikovCalibre 5.56 x 45 mm, FJ/PB/SCP, M16 ColtCalibre 7.62 x 51 mm, FJ/PB/SC, (FN) “FAL” / “LAR” NATO rifle
Floor
The floor of the vehicle is designed to defeat the following hand grenadesFloor of the vehicle fitted with blast protection to protect occupants against fragmentation from simultaneous detonation of 2 DM-51 German ordnance hand grenades or equivalent. In addition, the floor also offers protection against anti-personnel mines. 33
FR
34
Armouring design:
The armouring is integrated inside the vehicle’s cab and forms a complete self-supporting structure so as to avoid excessive stress on the vehicle’s original structure.The interior armour-frame provides overlap for the large-surface armour components such as the door armour-plates and the windows.Hinge mounting points are reinforced both in the pillars and in the doors in a way that the armouring of the door is supported by the armouring of the pillar.Heavy-duty hinges with in-built door-stop.Fuel-tank(s) protected with steel armour-plates.The battery and control module of the engine are protected to the same level as the opaque areas.
Available upon request on new production order. Please let us know your specific requirements.
Warranty and after sales service
The entire vehicle carries a one year warranty on all components not including lubricants and parts which are subject to normal wear and tear, provided the vehicle is serviced according to the maintenance schedule in a Security Vehicles-approved workshop. In the event of a problem occurring that cannot be resolved by local technicians, a member of our service team will be available to assist or travel to the location of the vehicle to carry out the repair. Services under the warranty will be provided free of charge to the customer upon immediate written notification by either the authorised Toyota dealer or the vehicle owner. It is left to our discretion to replace or repair parts that have become unusable as a result of proven defects in design, material or workmanship. Replaced parts become our property.
Additional equipment included
ECM and battery protectionFuel-tank protectionUpgraded suspension to cope with the additional weight due to armouringRun-flat systems on all 5 wheels
Further optional equipment:
Further optional equipment available at extra cost, such as:
Operable front door windowsFull engine sides protectionBrake upgrade – stage 2 (slotted discs and braided hoses + HD callipers and pads)Brake upgrade – stage 3 (big discs, 6-piston callipers front, 4-piston callipers rear and pads)Suspension upgrade – stage 2 (HD antiroll bars)Suspension upgrade – stage 3 (high performance springs and dampers for high-speed driving)Heavy Duty 18” alloy rims with run-flatsGun-ports2-way intercomFront and rear strobe-lights integrated in OEM light lensesPolice siren/Public address systemBull-barElectronic Counter Measure Equipment (RF Jammer)Video recording/surveillance equipment
FR
Add a footer 35
We have a large stock of B5, B6 and B7 Models for Rent in Afghanistan. New and older models available. We facilitate Repair and Maintenance Service at our Kabul Workshop.
FR
36
FR
Add a footer 37
TygraLevel: B6
Vehicle Specifications
Base Vehicle: Toyota Landcruiser 70-Series ChassisType: 3-door Light Armored Personnel CarrierProduction Year: 2016Drivetrain: 4WDTransmission: 5-speed ManualMax Speed: 120 Km/hGround Clearance: 340mmSeats: 8 (2 + 6)Color: Blue or Camouflage Military Green / Blue or
Camouflage-Digital Green / BlueVehicle Operation Temp: -30 Degree C to +55 Degree CParking Assist System: Sonar Guided System with Back View Monitor (with Guide
Indicators, Blind Corner Monitoring System with Cameras on Front & Right Side)
TORSEN Limited Slip Central Advanced Height Control System with automatic Lowering of Vehicle (AHC & AVS)ABS, BAS, EBD, VSC, ATCS, PCS, HAC & VGRS Power Steering
Overview:
Tygra - The Ultimate Light Armored Personnel Carrier. Unique and one of its kind. Designed and Built-in own Vehicle Lab. Tygra is our quintessential creation. The military units and their artillery support can easily equip Tygrawith multi-purpose weapon systems. Remotely controlled weapon modules are great options, typical examples are 7.62 mm and 12.7 mm machine guns. Highly recommended for Cross-Country Patrol, Border Security, and Personnel Movement Situations. Installation of active and passive protection units on the vehicle is relatively easy. On the other hand, peace support missions can also benefit from the incredible armoring of Tygra in conflict zones, especially in Africa and Middle-east.
Based on the Toyota Land Cruiser 70-series Chassis, Tygra keeps heavily dressed troops from overheating in high temperatures of deserts by using dual air-conditioners with the ceramic coating (developed by NASA) that acts as a lightweight thermal barrier. It possesses superior insulation qualities for hot and cold environments and far surpasses old fashioned and conventional insulating materials. Tygra provides ample room for a driver, commander and up to 6 crew members. And there is enough room for tactical gear too. Tygra comes in various body configurations and provides protection against assault rifles in levels almost similar to BR6.We are using light-weighted high strength armor plating for all four sides of the passenger compartments and for the roof of the vehicle and it can prevail against military grade threats. All opaque areas including the roof offer protection against weapons / ammunitions.
The floor system provides protection against small IEDs and hand-grenades. The V-Hull design mitigates against blasts and it can prevail even against military grade threats. Moreover, the floor offers protection against small anti-personnel mines too. All transparent areas have multi-layered polycarbonate coating and can withstand against weapons / ammunitions too.Bullet resistant glass is 39 mm in thickness and it stays rigid in the steel frame. This helps in preventing water ingress using advanced sealing agents and forms.Tygra provides immense protection against military grade threats while offering tremendous comfort for its occupants, unlike any other vehicle in its league. Engineers of Mezcal Security Vehicles produced a magnificent vehicle with the affordable intentions to offer the finest security solutions convenient to our customers.Complete Mission Systems and Integration Packages are available upon request. Armored Turret options are available as an add-on option too. 360° Traversing turrets can be modified to meet the client's specific requirements. NATO / MIL Based Colors are available for Tygra. Additional Custom modifications are also possible. Contact us to Learn more.
FR
Add a footer 38
Armored Enhancements
Armoring Protection Level: B5 - B6Armor Plated using Hardened High-strength MaterialsMulti-layered Ballistic Glass for windshield and door windowsDurable Double Strong Floor protection for improved blast resistance Blast protected RoofingHeavy-duty hinges for all the opening elements (doors, hatches) with inbuilt door-stopMulti-layered Polycarbonate CoatingProtection for the Fuel tank, Tailpipe, Radiator, Battery and the Control Module of the EngineRun Flat TyresGun portsOptional Multi-tone siren with 2-way intercom system
FR
Add a footer 39
Riverine 9.5mMilitary Speed Boat
Length Overall: 9.27 m – 30’41”
Beam Overall: 3.17 m – 10’40”
Tube diameter: 0.56 m – 1’84”
Weight: 1450 kg – 3197 Ibs
Fuel Capacity: 211 gal
Recommended Power: 400 hp
Max Power allowed: 700 hp
Maximum speed: 121 km/h – 75 mph
No of Pax: 20
Classification: B
Principle Specifications
The Riverine boat is designed for the arduous shoal draft river environment. Responsive, fast and easily maneuverable the Riverine Boats are known for their capabilities to operate in coastal and shallow water environments.The Riverine Boats are completely customized as per the Client’s unique needs and assignments requisites. Many different configurations are available, from an automated and manually operated articulating bow-opening/ladder allowing easy dis-embarkation of troops when beached to weapons stations and countermeasure launchers. Riverine Rigid Inflatable Boats can have near full-coverage, level NIJ III Dynemma® Ballistic Protective Panels for the pilot house, troop seating areas and critical engineering spaces. Available in both forward and mid-pilothouse deck-layout configurations, the Riverine craft is transportable by fixed and rotary wing aircraft.While here we are showcasing a selection of recent manufactured Riverine rigid inflatable boats (RIB/ RHIB), Boats produces a diverse range of equipment and accessories that is available for the build of your fully customized Riverine boat.
FR
Add a footer 40
Defense BarriersWe can install Defense Barriers: T-walls, Hescos and Razor Mesh Fencing in even the most unsecured
locations our clients require
FR
41
Pre-fab Housing
Insulated Flat Pack and Container Units. Office, Bedroom/Bath, Toilet/Shower, Welfare, Kitchen, Canteen. Ready Units available in stock. We can also fabricate according to our client’s specification, size and design.
FR
Add a footer 42
Provisions, Consumables and Catering
Food Services accomplished:
US Embassy, Kabul 2008-2009 Full catering, Cafeteria and PXContract #: W917PM-09-P0202
PAE HSC CIVPOL, Kabul 2008-2009Catering Service and Dining FacilityContract #: CNPA-NIU-2008-00057
PAE, DEA-CNPA-NIU Program, KunduzFood Supply and Full Catering Service Contract #: CNPA-NIU-2008-00054K
FR
Add a footer 45
Feel free to contact us for a Quotation,Or other Inquiries. Thank you.
Sales Team
+961 71 353 262
www.soufaneng.com