Activity ID Activity Name Original Duration Start Finish Quantity Unit Measure Predecessors Successors UPGRADING OF FAL UPGRADING OF FALAJ AL QABIL ROUNDABOUT 916 30-Oct-13 A 02-May-16 939607 PREPARATORY WO PREPARATORY WORKS 916 30-Oct-13 A 02-May-16 0 GENERAL GENERAL 916 30-Oct-13 A 02-May-16 0 CONTRACTUAL & PR CONTRACTUAL & PRELIMINARIES 916 30-Oct-13 A 02-May-16 0 MILESTONE & MO MILESTONE & MOBILIZATION 916 30-Oct-13 A 02-May-16 0 MILESTONES MILESTONES 916 30-Oct-13 A 02-May-16 0 CONTRACTU CONTRACTUAL DATES 916 30-Oct-13 A 02-May-16 0 A0000 Contract Award Date 0 30-Oct-13 A 0 0 A6230, A6080, A6670, A6630 A6080 Mobilization 60 30-Oct-13 A 28-Dec-13 A 0 0 A0000 A6230, A6240, A6255, A6250 A6720 Construction Duration 855 29-Dec-13 A 02-May-16 0 0 A6080, A6680 A6100 A6100 Project Completion Date 0 02-May-16 0 0 A5780, A10230, A9830, A CONSTRUCT CONSTRUCTIONAL DATES 916 30-Oct-13 A 02-May-16 0 A6670 Project Commencement 0 30-Oct-13 A 0 0 A0000 A6680 A6680 Mobilization Completion 0 28-Dec-13 A 0 0 A6230, A6240, A6255, A6 A1260, A6110, A6720 A6800 Resolution of all Expropriations about SR-2 0 28-Feb-14 A 0 0 A1330, A1340, A1400, A1 A10580 Resolution of Falaj Location under Bridge 0 13-Jul-14 A 0 0 A11720 A6710 Complete Traffic Diversion from Temporary Roads to Batinah Highway 0 07-Jun-15 0 0 A5490, A6790, A3940 A9900 A6730 Complete Traffic Diversion from Temporary Roads to Sohar-Buraimi Road 0 23-Sep-15 0 0 A5640 A1530 A6690 Completion of all works 0 02-May-16 0 0 A6740 A6700 Commence Traffic Diversions from Existing Roads to Temporary Roads 0 02-May-16 0 0 A1010 A9930 A6740 Complete Traffic Diversion from Temporary Roads to New Service Roads 0 02-May-16 0 0 A5780, A5940, A9640 A6690 MOBILIZATION MOBILIZATION 60 30-Oct-13 A 28-Dec-13 A 0 GENERAL GENERAL 60 30-Oct-13 A 28-Dec-13 A 0 A6230 Obtain NOC's 60 30-Oct-13 A 28-Dec-13 A 0 0 A0000, A6080 A6240, A6260, A6255, A6680 A6240 Setting-up Engineer's Offices 38 09-Nov-13 A 16-Dec-13 A 0 0 A6230, A6080 A6250, A6680 A6260 Erection of Laboratory & Store 45 14-Nov-13 A 28-Dec-13 A 0 0 A6230, A6080 A6680 A6250 Setting-up Contractor's Offices 38 16-Nov-13 A 23-Dec-13 A 0 0 A6240, A6080 A6680 A6255 Setting-up of Contractor's Camp 35 24-Nov-13 A 28-Dec-13 A 0 0 A6230, A6080 A6680 TRAFFIC MANA TRAFFIC MANAGEMENT 53 06-Nov-13 A 28-Dec-13 A 0 GENERAL GENERAL 53 06-Nov-13 A 28-Dec-13 A 0 A6630 Submit Traffic Mangement Plans 15 06-Nov-13 A 20-Nov-13 A 0 0 A0000 A6640 A6640 Approve Traffic Mnagement Plans 15 17-Nov-13 A 01-Dec-13 A 0 0 A6630 A6650 A6650 Obtain Traffic NOC's 15 02-Dec-13 A 16-Dec-13 A 0 0 A6640 A6660 A6660 Obtain Approval from RO P Police 12 17-Dec-13 A 28-Dec-13 A 0 0 A6650, A6230 A1260, A1070 SHOP DRAWING SHOP DRAWINGS 789 11-Jan-14 A 27-Jun-15 0 VEHICULAR U VEHICULAR UNDERPASSES 526 23-Sep-14 A 14-Oct-14 0 A13070 Prepare & Submit Shop Drawings 15 23-Sep-14 A 01-Oct-14 A A13080 A13080 Approval of Shop Drawings 15 02-Oct-14 A 14-Oct-14 A13070 A12550 RETAINING W RETAINING WALLS @ SOL4 & SOL7 30 29-May-15 27-Jun-15 0 A13090 Prepare & Submit Shop Drawings 15 29-May-15 12-Jun-15 A13100 A13100 Approval of Shop Drawings 15 13-Jun-15 27-Jun-15 A13090 A12690 BOX CULVER BOX CULVERT 3 CELL @ CH 21+260 30 17-Aug-14 A 15-Sep-14 A 0 A12510 Prepare & Submit Shop Drawings 15 17-Aug-14 A 31-Aug-14 A A12520 A12520 Approval of Shop Drawings 15 01-Sep-14 A 15-Sep-14 A A12510 A11780 BOX CULVER BOX CULVERT 1 CELL @ CH 21+485 45 12-Aug-14 A 30-Aug-14 A 0 A10800 Prepare & Submit Shop Drawings 15 12-Aug-14 A 15-Aug-14 A A10810 A10810 Approval of Shop Drawings 15 16-Aug-14 A 30-Aug-14 A A10800 A2240 BOX CULVER BOX CULVERT 8 CELL @ CH 21+838 30 25-Aug-14 A 23-Sep-14 A 0 A10880 Prepare & Submit Shop Drawings 15 25-Aug-14 A 08-Sep-14 A A10890 A10890 Approval of Shop Drawings 15 09-Sep-14 A 23-Sep-14 A A10880 A2870 BOX CULVER BOX CULVERT 44 CELL @ CH 21+985 30 03-Mar-14 A 01-Apr-14 A 0 A10620 Prepare & Submit Shop Drawings 15 03-Mar-14 A 17-Mar-14 A A6230 A10630, A10640 A10630 Approval of Shop Drawings 15 18-Mar-14 A 01-Apr-14 A A10620 A2940 BOX CULVER BOX CULVERT 9 CELL @ CH 22+650 68 16-Mar-14 A 22-May-14 A 0 J J J J J J J J J 2014 2015 2016 02-May-16, 02-May-16, 02-May-16, 02-May-16, 02-May-16, 02-May-16, 02-May-16, Contract Award Date Mobilization Constructio Project Com 02-May-16, Project Commencement Mobilization Completion Resolution of all Expropriations about SR-2 Resolution of Falaj Location under Bridge Complete Traffic Diversion fr Complete Traffic Divers Completion Commence Complete T 28-Dec-13 A, MOBILIZATION 28-Dec-13 A, GENERAL Obtain NOC's Setting-up Engineer's Offices Erection of Laboratory & Store Setting-up Contractor's Offices Setting-up of Contractor's Camp 28-Dec-13 A, TRAFFIC MANAGEMENT 28-Dec-13 A, GENERAL Submit Traffic Mangement Plans Approve Tr affic Mnagement Plans Obtain Traffic NOC's Obtain Appr oval from RO P Police 27-Jun-15, SHOP DRAWIN 14-Oct-14, VEHICULAR UNDERPASSES Prepare & Submit Shop Drawings Approval of Shop Drawings 27-Jun-15, RETAINING WA Prepare & Submit Shop Draw Approval of Shop Drawings 15-Sep-14 A, BOX CULVERT 3 CELL @ CH Prepare & Submit Shop Drawings Approval of Shop Drawings 30-Aug-14 A, BOX CULVERT 1 CELL @ CH Prepare & Submit Shop Drawings Approval of Shop Drawings 23-Sep-14 A, BOX CULVERT 8 CELL @ C Prepare & Submit Shop Drawings Approval of Shop Drawings 01-Apr-14 A, BOX CULVERT 44 CELL @ CH 21+98 Prepare & Submit Shop Drawings Approval of Shop Drawings 22-May-14 A, BOX CULVERT 9 CELL @ CH 22+6 CCC OMAN LLC Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary UPGRADING OF FALAJ AL QABAIL ROUNDABOUT Page 1 of 18 Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM Date Revision Checked Approved 13-Apr-14 FQI - REV2 18 September 2014 12-Oct-14 FQI - REV3 02-Feb-15 FQI - REV3 A

description

Revision 3 of Construction program for Falaj al Qabail Interchange project. The latest revision is in accordance with the extension of time granted recently.

Transcript of FQI - Programme Rev. 3

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    UPGRADING OF FALAJ AL QABIL ROUNDABOUTUPGRADING OF FALAJ AL QABIL ROUNDABOUT 916 30-Oct-13 A 02-May-16 939607

    PREPARATORY WORKSPREPARATORY WORKS 916 30-Oct-13 A 02-May-16 0

    GENERALGENERAL 916 30-Oct-13 A 02-May-16 0

    CONTRACTUAL & PRELIMINARIESCONTRACTUAL & PRELIMINARIES 916 30-Oct-13 A 02-May-16 0

    MILESTONE & MOBILIZATIONMILESTONE & MOBILIZATION 916 30-Oct-13 A 02-May-16 0

    MILESTONESMILESTONES 916 30-Oct-13 A 02-May-16 0

    CONTRACTUAL DATESCONTRACTUAL DATES 916 30-Oct-13 A 02-May-16 0

    A0000 Contract Award Date 0 30-Oct-13 A 0 0 A6230, A6080, A6670, A6630, A6300

    A6080 Mobilization 60 30-Oct-13 A 28-Dec-13 A 0 0 A0000 A6230, A6240, A6255, A6250, A6260, A6680, A6720

    A6720 Construction Duration 855 29-Dec-13 A 02-May-16 0 0 A6080, A6680 A6100

    A6100 Project Completion Date 0 02-May-16 0 0 A5780, A10230, A9830, A9460, A5880, A5930, A9750, A9820, A5490, A5940, A6960, A6720

    CONSTRUCTIONAL DATESCONSTRUCTIONAL DATES 916 30-Oct-13 A 02-May-16 0

    A6670 Project Commencement 0 30-Oct-13 A 0 0 A0000 A6680

    A6680 Mobilization Completion 0 28-Dec-13 A 0 0 A6230, A6240, A6255, A6250, A6260, A6080, A6670A1260, A6110, A6720

    A6800 Resolution of all Expropriations about SR-2 0 28-Feb-14 A 0 0 A1330, A1340, A1400, A1410

    A10580 Resolution of Falaj Location under Bridge 0 13-Jul-14 A 0 0 A11720

    A6710 Complete Traffic Diversion from Temporary Roads to Batinah Highway 0 07-Jun-15 0 0 A5490, A6790, A3940 A9900

    A6730 Complete Traffic Diversion from Temporary Roads to Sohar-Buraimi Road 0 23-Sep-15 0 0 A5640 A1530

    A6690 Completion of all works 0 02-May-16 0 0 A6740

    A6700 Commence Traffic Diversions from Existing Roads to Temporary Roads 0 02-May-16 0 0 A1010 A9930

    A6740 Complete Traffic Diversion from Temporary Roads to New Service Roads 0 02-May-16 0 0 A5780, A5940, A9640 A6690

    MOBILIZATIONMOBILIZATION 60 30-Oct-13 A 28-Dec-13 A 0

    GENERALGENERAL 60 30-Oct-13 A 28-Dec-13 A 0

    A6230 Obtain NOC's 60 30-Oct-13 A 28-Dec-13 A 0 0 A0000, A6080 A6240, A6260, A6255, A6680,

    A6240 Setting-up Engineer's Offices 38 09-Nov-13 A 16-Dec-13 A 0 0 A6230, A6080 A6250, A6680

    A6260 Erection of Laboratory & Store 45 14-Nov-13 A 28-Dec-13 A 0 0 A6230, A6080 A6680

    A6250 Setting-up Contractor's Offices 38 16-Nov-13 A 23-Dec-13 A 0 0 A6240, A6080 A6680

    A6255 Setting-up of Contractor's Camp 35 24-Nov-13 A 28-Dec-13 A 0 0 A6230, A6080 A6680

    TRAFFIC MANAGEMENTTRAFFIC MANAGEMENT 53 06-Nov-13 A 28-Dec-13 A 0

    GENERALGENERAL 53 06-Nov-13 A 28-Dec-13 A 0

    A6630 Submit Traffic Mangement Plans 15 06-Nov-13 A 20-Nov-13 A 0 0 A0000 A6640

    A6640 Approve Traffic Mnagement Plans 15 17-Nov-13 A 01-Dec-13 A 0 0 A6630 A6650

    A6650 Obtain Traffic NOC's 15 02-Dec-13 A 16-Dec-13 A 0 0 A6640 A6660

    A6660 Obtain Approval from ROP Police 12 17-Dec-13 A 28-Dec-13 A 0 0 A6650, A6230 A1260, A1070

    SHOP DRAWINGSSHOP DRAWINGS 789 11-Jan-14 A 27-Jun-15 0

    VEHICULAR UNDERPASSESVEHICULAR UNDERPASSES 526 23-Sep-14 A 14-Oct-14 0

    A13070 Prepare & Submit Shop Drawings 15 23-Sep-14 A 01-Oct-14 A A13080

    A13080 Approval of Shop Drawings 15 02-Oct-14 A 14-Oct-14 A13070 A12550

    RETAINING WALLS @ SOL4 & SOL7RETAINING WALLS @ SOL4 & SOL7 30 29-May-15 27-Jun-15 0

    A13090 Prepare & Submit Shop Drawings 15 29-May-15 12-Jun-15 A13100

    A13100 Approval of Shop Drawings 15 13-Jun-15 27-Jun-15 A13090 A12690

    BOX CULVERT 3 CELL @ CH 21+260BOX CULVERT 3 CELL @ CH 21+260 30 17-Aug-14 A 15-Sep-14 A 0

    A12510 Prepare & Submit Shop Drawings 15 17-Aug-14 A 31-Aug-14 A A12520

    A12520 Approval of Shop Drawings 15 01-Sep-14 A 15-Sep-14 A A12510 A11780

    BOX CULVERT 1 CELL @ CH 21+485BOX CULVERT 1 CELL @ CH 21+485 45 12-Aug-14 A 30-Aug-14 A 0

    A10800 Prepare & Submit Shop Drawings 15 12-Aug-14 A 15-Aug-14 A A10810

    A10810 Approval of Shop Drawings 15 16-Aug-14 A 30-Aug-14 A A10800 A2240

    BOX CULVERT 8 CELL @ CH 21+838BOX CULVERT 8 CELL @ CH 21+838 30 25-Aug-14 A 23-Sep-14 A 0

    A10880 Prepare & Submit Shop Drawings 15 25-Aug-14 A 08-Sep-14 A A10890

    A10890 Approval of Shop Drawings 15 09-Sep-14 A 23-Sep-14 A A10880 A2870

    BOX CULVERT 44 CELL @ CH 21+985BOX CULVERT 44 CELL @ CH 21+985 30 03-Mar-14 A 01-Apr-14 A 0

    A10620 Prepare & Submit Shop Drawings 15 03-Mar-14 A 17-Mar-14 A A6230 A10630, A10640

    A10630 Approval of Shop Drawings 15 18-Mar-14 A 01-Apr-14 A A10620 A2940

    BOX CULVERT 9 CELL @ CH 22+650BOX CULVERT 9 CELL @ CH 22+650 68 16-Mar-14 A 22-May-14 A 0

    J J J J J J J J J

    2014 2015 2016

    02-May-16,

    02-May-16,

    02-May-16, GENERAL

    02-May-16,

    02-May-16,

    02-May-16,

    02-May-16,

    Contract Award Date

    Mobilization

    Construction DurationProject Completion Date

    02-May-16,

    Project Commencement

    Mobilization Completion

    Resolution of all Expropriations about SR-2

    Resolution of Falaj Location under Bridge

    Complete Traffic Diversion fro

    Complete Traffic Divers

    Completion of all works

    Commence

    Complete Tr

    28-Dec-13 A, MOBILIZATION

    28-Dec-13 A, GENERAL

    Obtain NOC's

    Setting-up Engineer's Offices

    Erection of Laboratory & Store

    Setting-up Contractor's Offices

    Setting-up of Contractor's Camp28-Dec-13 A, TRAFFIC MANAGEMENT

    28-Dec-13 A, GENERAL

    Submit Traffic Mangement Plans

    Approve Traffic Mnagement Plans

    Obtain Traffic NOC's

    Obtain Approval from ROP Police27-Jun-15, SHOP DRAWINGS

    14-Oct-14, VEHICULAR UNDERPASSES

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings

    27-Jun-15, RETAINING WA

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings

    15-Sep-14 A, BOX CULVERT 3 CELL @ CH 21+260

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings30-Aug-14 A, BOX CULVERT 1 CELL @ CH 21+485

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings23-Sep-14 A, BOX CULVERT 8 CELL @ CH 21+838

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings01-Apr-14 A, BOX CULVERT 44 CELL @ CH 21+985

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings22-May-14 A, BOX CULVERT 9 CELL @ CH 22+650

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 1 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014

    12-Oct-14 FQI - REV3

    02-Feb-15 FQI - REV3 A

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    A10640 Prepare & Submit Shop Drawings 15 16-Mar-14 A 30-Mar-14 A A10620 A10650

    A10650 Approval of Shop Drawings 15 08-May-14 A 22-May-14 A A10640 A2800

    BOX CULVERT 5 CELL @ 23+500BOX CULVERT 5 CELL @ 23+500 30 30-Jun-14 A 29-Jul-14 A 0

    A10700 Prepare & Submit Shop Drawings 15 30-Jun-14 A 14-Jul-14 A A10710

    A10710 Approval of Shop Drawings 15 15-Jul-14 A 29-Jul-14 A A10700 A2660

    BOX CULVERT 1 CELL @ CH 23+760BOX CULVERT 1 CELL @ CH 23+760 30 17-Aug-14 A 15-Sep-14 A 0

    A10680 Prepare & Submit Shop Drawings 15 17-Aug-14 A 31-Aug-14 A A10690

    A10690 Approval of Shop Drawings 15 01-Sep-14 A 15-Sep-14 A A10680 A2590

    BOX CULVERT 1 CELL @ CH 23+997BOX CULVERT 1 CELL @ CH 23+997 30 01-Jul-14 A 30-Jul-14 A 0

    A10760 Prepare & Submit Shop Drawings 15 01-Jul-14 A 15-Jul-14 A A10770

    A10770 Approval of Shop Drawings 15 16-Jul-14 A 30-Jul-14 A A10760 A2380

    BOX CULVERT 1 CELL @ CH 24+235BOX CULVERT 1 CELL @ CH 24+235 30 15-Jul-14 A 13-Aug-14 A 0

    A10840 Prepare & Submit Shop Drawings 15 15-Jul-14 A 29-Jul-14 A A10850

    A10850 Approval of Shop Drawings 15 30-Jul-14 A 13-Aug-14 A A10840 A2450

    BOX CULVERT 1 CELL @ 24+570BOX CULVERT 1 CELL @ 24+570 30 19-Aug-14 A 17-Sep-14 A 0

    A10860 Prepare & Submit Shop Drawings 15 19-Aug-14 A 02-Sep-14 A A10870

    A10870 Approval of Shop Drawings 15 03-Sep-14 A 17-Sep-14 A A10860 A2520

    PEDESTRIAN UNDERPASS 1 @ CH 22+800 - SOL1PEDESTRIAN UNDERPASS 1 @ CH 22+800 - SOL1 30 29-May-14 A 27-Jun-14 A 0

    A12530 Prepare & Submit Drawings 15 29-May-14 A 12-Jun-14 A A12540

    A12540 Approval of Shop Drawings 15 13-Jun-14 A 27-Jun-14 A A12530 A11850

    PEDESTRIAN UNDERPASS 2 @ CH 23+300 - SOL1PEDESTRIAN UNDERPASS 2 @ CH 23+300 - SOL1 30 27-Aug-14 A 25-Sep-14 A 0

    A10900 Prepare & Submit Shop Drawings 15 27-Aug-14 A 10-Sep-14 A A10910

    A10910 Approval of Shop Drawings 15 11-Sep-14 A 25-Sep-14 A A10900 A1795

    PEDESTRIAN UNDERPASS 3 @ CH 00+050- SOL3PEDESTRIAN UNDERPASS 3 @ CH 00+050- SOL3 30 24-Aug-14 A 22-Sep-14 A 0

    A10940 Prepare & Submit Shop Drawings 15 24-Aug-14 A 07-Sep-14 A A10950

    A10950 Approval of Shop Drawings 15 08-Sep-14 A 22-Sep-14 A A10940 A5210

    PIER 1 - NBPIER 1 - NB 30 26-Feb-14 A 27-Mar-14 A 0

    A10960 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A6230 A10970

    A10970 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A10960 A3210

    FALAJ RELOCATIONFALAJ RELOCATION 30 19-Mar-14 A 23-Mar-14 A 0

    A11470 Prepare & Submit Shop Drawings 15 19-Mar-14 A 22-Mar-14 A A6230 A11480

    A11480 Approval of Shop Drawings 15 23-Mar-14 A 23-Mar-14 A A11470 A3160, A999

    PIER 2 - NBPIER 2 - NB 30 26-Feb-14 A 27-Mar-14 A 0

    A10980 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A6230 A10990

    A10990 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A10980 A3160

    PIER 3 - NBPIER 3 - NB 30 26-Feb-14 A 27-Mar-14 A 0

    A11000 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A11010, A11020, A11060

    A11010 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A11000 A1540

    PIER 4 - NBPIER 4 - NB 30 26-Feb-14 A 27-Mar-14 A 0

    A11020 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A11000 A11030, A11040

    A11030 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A11020 A3310

    PIER 5 - NBPIER 5 - NB 30 26-Feb-14 A 27-Mar-14 A 0

    A11040 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A11020 A11050

    A11050 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A11040 A3260

    AB1 - NBAB1 - NB 30 26-Feb-14 A 27-Mar-14 A 0

    A11060 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A11000 A11070, A11080

    A11070 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A11060 A1590

    AB2 - NBAB2 - NB 30 26-Feb-14 A 27-Mar-14 A 0

    A11080 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A11060 A11090, A11100

    A11090 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A11080 A3360

    PIER 1 - SBPIER 1 - SB 30 26-Feb-14 A 27-Mar-14 A 0

    A11100 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A11080 A11110, A11120

    A11110 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A11100 A3750

    PIER 2 - SBPIER 2 - SB 30 26-Feb-14 A 27-Mar-14 A 0

    A11120 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A11100 A11130

    J J J J J J J J J

    2014 2015 2016

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings29-Jul-14 A, BOX CULVERT 5 CELL @ 23+500

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings15-Sep-14 A, BOX CULVERT 1 CELL @ CH 23+760

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings30-Jul-14 A, BOX CULVERT 1 CELL @ CH 23+997

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings13-Aug-14 A, BOX CULVERT 1 CELL @ CH 24+235

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings17-Sep-14 A, BOX CULVERT 1 CELL @ 24+570

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Jun-14 A, PEDESTRIAN UNDERPASS 1 @

    Prepare & Submit Drawings

    Approval of Shop Drawings25-Sep-14 A, PEDESTRIAN UNDERPASS

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings22-Sep-14 A, PEDESTRIAN UNDERPASS

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, PIER 1 - NB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings23-Mar-14 A, FALAJ RELOCATION

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, PIER 2 - NB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, PIER 3 - NB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, PIER 4 - NB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, PIER 5 - NB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, AB1 - NB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, AB2 - NB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, PIER 1 - SB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, PIER 2 - SB

    Prepare & Submit Shop Drawings

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 2 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014

    12-Oct-14 FQI - REV3

    02-Feb-15 FQI - REV3 A

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    A11130 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A11120 A4000

    PIER 3 - SBPIER 3 - SB 30 26-Feb-14 A 27-Mar-14 A 0

    A11140 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A6230 A11150, A11160

    A11150 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A11140 A4100

    PIER 4 -SBPIER 4 -SB 30 26-Feb-14 A 27-Mar-14 A 0

    A11160 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A11140 A11170, A11180, A11200, A11220

    A11170 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A11160 A4050

    PIER 5 - SBPIER 5 - SB 30 26-Feb-14 A 27-Mar-14 A 0

    A11180 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A11160 A11190

    A11190 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A11180 A3950

    AB 1 - SBAB 1 - SB 30 26-Feb-14 A 27-Mar-14 A 0

    A11200 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A11160 A11210

    A11210 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A11200 A3800

    AB2 - SBAB2 - SB 30 26-Feb-14 A 27-Mar-14 A 0

    A11220 Prepare & Submit Shop Drawings 15 26-Feb-14 A 12-Mar-14 A A11160 A11230

    A11230 Approval of Shop Drawings 15 13-Mar-14 A 27-Mar-14 A A11220 A4170

    BRIDGE DECK SPAN AB1 & P3 - NBBRIDGE DECK SPAN AB1 & P3 - NB 30 22-Jun-14 A 21-Jul-14 A 0

    A11240 Prepare & Submit Shop Drawings 15 22-Jun-14 A 06-Jul-14 A A11250

    A11250 Approval of Shop Drawings 15 07-Jul-14 A 21-Jul-14 A A11240 A1640

    BRIDGE DECK SPAN AB2 & P3 - NBBRIDGE DECK SPAN AB2 & P3 - NB 30 22-Jun-14 A 21-Jul-14 A 0

    A11260 Prepare & Submit Shop Drawings 15 22-Jun-14 A 06-Jul-14 A A11270

    A11270 Approval of Shop Drawings 15 07-Jul-14 A 21-Jul-14 A A11260 A3500

    BRIDGE DECK SPAN AB2 & P3 - SBBRIDGE DECK SPAN AB2 & P3 - SB 30 22-Jun-14 A 21-Jul-14 A 0

    A11280 Prepare & Submit Shop Drawings 15 22-Jun-14 A 06-Jul-14 A A11290

    A11290 Approval of Shop Drawings 15 07-Jul-14 A 21-Jul-14 A A11280 A3850

    BRIDGE DECK SPAN AB1 & P3- SBBRIDGE DECK SPAN AB1 & P3- SB 30 22-Jun-14 A 21-Jul-14 A 0

    A11490 Prepare & Submit Shop Drawings 15 22-Jun-14 A 06-Jul-14 A A11500

    A11500 Approval of Shop Drawings 15 07-Jul-14 A 21-Jul-14 A A11490 A4310

    MSE WALLSMSE WALLS 30 11-Jan-14 A 09-Feb-14 A 0

    A11320 Prepare & Submit Shop Drawings 15 11-Jan-14 A 25-Jan-14 A A6230 A11330

    A11330 Approval of Shop Drawings 15 26-Jan-14 A 09-Feb-14 A A11320 A5020

    GANTRY & CANTILEVER SIGNSGANTRY & CANTILEVER SIGNS 30 11-Nov-14 10-Dec-14 0

    A13150 Prepare & Submit Shop Drawings 15 11-Nov-14 25-Nov-14 A13160

    A13160 Approval of Shop Drawings 15 26-Nov-14 10-Dec-14 A13150 A6400

    PROCUREMENTPROCUREMENT 510 29-Nov-13 A 22-Apr-15 0

    MATERIALMATERIAL 491 18-Dec-13 A 22-Apr-15 0

    PRECAST MSE WALL PANELSPRECAST MSE WALL PANELS 75 18-Dec-13 A 02-Mar-14 A 0

    A6300 Submit Material for Approval 15 18-Dec-13 A 01-Jan-14 A 0 0 A0000 A6310

    A6310 Obtain Material Approval 20 02-Jan-14 A 21-Jan-14 A 0 0 A6300 A6320

    A6320 Delivery to Site 40 22-Jan-14 A 02-Mar-14 A 0 0 A6310 A5020

    POT BEARINGSPOT BEARINGS 172 01-Mar-14 A 09-Jan-15 0

    A6450 Submit Material for Approval 20 01-Mar-14 A 20-Mar-14 A 0 0 A6230 A6460

    A6460 Obtain Material Approval 30 21-Mar-14 A 21-Apr-14 A 0 0 A6450 A6470

    A6470 Delivery to Site 120 22-Apr-14 A 09-Jan-15 0 0 A6460 A3500, A3850

    EXPANSION JOINTEXPANSION JOINT 170 16-Oct-14 03-Apr-15 0

    A10590 Submit Material for Approval 20 16-Oct-14 04-Nov-14 0 0 A6230 A10600

    A10600 Obtain Material Approval 30 05-Nov-14 04-Dec-14 0 0 A10590 A10610

    A10610 Delivery to Site 120 05-Dec-14 03-Apr-15 0 0 A10600 A3570

    LIGHTING POLES & LUMINARIESLIGHTING POLES & LUMINARIES 140 26-Jul-14 A 19-Jan-15 0

    A6330 Submit Material for Approval 20 26-Jul-14 A 14-Aug-14 A 0 0 A6230 A6340

    A6340 Obtain Material Approval 20 15-Aug-14 A 03-Sep-14 A 0 0 A6330 A6350

    A6350 Delivery to Site 100 04-Sep-14 A 19-Jan-15 0 0 A6340 A4670, A5990, A5010

    PRECAST CONC. BARRIER MOLDSPRECAST CONC. BARRIER MOLDS 83 30-Aug-14 A 20-Nov-14 0

    A6270 Submit Material for Approval 15 30-Aug-14 A 13-Sep-14 A 0 0 A6230 A6280

    A6280 Obtain Material Approval 20 14-Sep-14 A 03-Oct-14 A 0 0 A6270 A6290

    J J J J J J J J J

    2014 2015 2016

    Approval of Shop Drawings27-Mar-14 A, PIER 3 - SB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, PIER 4 -SB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, PIER 5 - SB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, AB 1 - SB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings27-Mar-14 A, AB2 - SB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings21-Jul-14 A, BRIDGE DECK SPAN AB1 & P3 - NB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings21-Jul-14 A, BRIDGE DECK SPAN AB2 & P3 - NB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings21-Jul-14 A, BRIDGE DECK SPAN AB2 & P3 - SB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings21-Jul-14 A, BRIDGE DECK SPAN AB1 & P3- SB

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings09-Feb-14 A, MSE WALLS

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings10-Dec-14, GANTRY & CANTILEVER SIGNS

    Prepare & Submit Shop Drawings

    Approval of Shop Drawings

    22-Apr-15, PROCUREMENT

    22-Apr-15, MATERIAL

    02-Mar-14 A, PRECAST MSE WALL PANELS

    Submit Material for Approval

    Obtain Material Approval

    Delivery to Site09-Jan-15, POT BEARINGS

    Submit Material for Approval

    Obtain Material Approval

    Delivery to Site03-Apr-15, EXPANSION JOINT

    Submit Material for Approval

    Obtain Material Approval

    Delivery to Site19-Jan-15, LIGHTING POLES & LUMINARIES

    Submit Material for Approval

    Obtain Material Approval

    Delivery to Site20-Nov-14, PRECAST CONC. BARRIER MOLDS

    Submit Material for Approval

    Obtain Material Approval

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 3 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014

    12-Oct-14 FQI - REV3

    02-Feb-15 FQI - REV3 A

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    A6290 Delivery to Site 40 12-Oct-14 20-Nov-14 0 0 A6280 A4550, A3920, A5400

    RC STORM SEWERRC STORM SEWER 50 26-Jun-14 A 14-Aug-14 A 0

    A6360 Submit Material for Approval 15 26-Jun-14 A 10-Jul-14 A 0 0 A6230 A6370

    A6370 Obtain Material Approval 15 11-Jul-14 A 25-Jul-14 A 0 0 A6360 A6380

    A6380 Delivery to Site 20 26-Jul-14 A 14-Aug-14 A 0 0 A6370 A5140

    GUARDRAILGUARDRAIL 100 13-Jan-15 22-Apr-15 0

    A6420 Submit Material for Approval 20 13-Jan-15 01-Feb-15 0 0 A6230 A6430

    A6430 Obtain Material Approval 20 02-Feb-15 21-Feb-15 0 0 A6420 A6440

    A6440 Delivery to Site 60 22-Feb-15 22-Apr-15 0 0 A6430 A5460

    ROAD SIGNS & GANTRYROAD SIGNS & GANTRY 160 12-Oct-14 20-Mar-15 0

    A6390 Submit Material for Approval 20 12-Oct-14 31-Oct-14 0 0 A6400

    A6400 Obtain Material Approval 40 01-Nov-14 10-Dec-14 0 0 A6390, A13160 A6410

    A6410 Delivery to Site 100 11-Dec-14 20-Mar-15 0 0 A6400 A5470, A5930, A5620, A5760, A5480

    BITUMINOUS PAINTBITUMINOUS PAINT 60 15-Jan-14 A 15-Mar-14 A 0

    A11510 Submit Material for Approval 15 15-Jan-14 A 29-Jan-14 A 0 0 A6230 A11520

    A11520 Obtain Material Approval 15 30-Jan-14 A 13-Feb-14 A 0 0 A11510 A11530

    A11530 Delivery to Site 30 14-Feb-14 A 15-Mar-14 A 0 0 A11520 A1570

    WATERSTOPWATERSTOP 116 10-Feb-14 A 05-Jun-14 A 0

    A11540 Submit Material for Approval 15 10-Feb-14 A 24-Feb-14 A 0 0 A6230 A11550

    A11550 Obtain Material Approval 15 25-Feb-14 A 11-Mar-14 A 0 0 A11540 A11560

    A11560 Delivery to Site 40 27-Apr-14 A 05-Jun-14 A 0 0 A11550 A2940

    GEOTEXTILEGEOTEXTILE 60 24-May-14 A 22-Jul-14 A 0

    A11570 Submit Material for Approval 15 24-May-14 A 07-Jun-14 A 0 0 A6230 A11580

    A11580 Obtain Material Approval 15 08-Jun-14 A 22-Jun-14 A 0 0 A11570 A11590

    A11590 Delivery to Site 30 23-Jun-14 A 22-Jul-14 A 0 0 A11580 A5070

    JOINT SEALANTJOINT SEALANT 97 02-Jul-14 A 17-Sep-14 A 0

    A11600 Submit Material for Approval 15 02-Jul-14 A 17-Aug-14 A 0 0 A6230 A11610

    A11610 Obtain Material Approval 20 18-Aug-14 A 31-Aug-14 A 0 0 A11600 A11620

    A11620 Delivery to Site 40 01-Sep-14 A 17-Sep-14 A 0 0 A11610 A4550, A3920, A5400

    S/CS/C 318 29-Nov-13 A 24-Sep-14 A 0

    ELECTRICAL S/CELECTRICAL S/C 40 02-Feb-14 A 13-Mar-14 A 0

    A6510 Select S/C 15 02-Feb-14 A 16-Feb-14 A 0 0 A6230 A6520

    A6520 Approve S/C 15 17-Feb-14 A 03-Mar-14 A 0 0 A6510 A6530

    A6530 Mobilization to Site 10 04-Mar-14 A 13-Mar-14 A 0 0 A6520 A1360, A1100, A4800, A4910

    WATER S/CWATER S/C 35 01-Mar-14 A 04-Apr-14 A 0

    A6540 Select S/C 15 01-Mar-14 A 15-Mar-14 A 0 0 A6230 A6550

    A6550 Approve S/C 15 16-Mar-14 A 30-Mar-14 A 0 0 A6540 A6560

    A6560 Mobilization to Site 5 31-Mar-14 A 04-Apr-14 A 0 0 A6550 A1020

    TELEPHONE S/CTELEPHONE S/C 40 05-Feb-14 A 16-Mar-14 A 0

    A6570 Select S/C 15 05-Feb-14 A 19-Feb-14 A 0 0 A6230 A6580

    A6580 Approve S/C 15 20-Feb-14 A 06-Mar-14 A 0 0 A6570 A6590

    A6590 Mobilization to Site 10 07-Mar-14 A 16-Mar-14 A 0 0 A6580 A1450

    PILING S/CPILING S/C 75 29-Nov-13 A 11-Feb-14 A 0

    A6480 Select S/C 15 29-Nov-13 A 13-Dec-13 A 0 0 A6230 A6490

    A6490 Approve S/C 15 14-Dec-13 A 28-Dec-13 A 0 0 A6480 A6500

    A6500 Mobilization to Site 45 29-Dec-13 A 11-Feb-14 A 0 0 A6490 A1540, A3160

    POST TENSIONING S/CPOST TENSIONING S/C 240 15-Feb-14 A 24-Sep-14 A 0

    A6600 Select S/C 15 15-Feb-14 A 01-Mar-14 A 0 0 A6230 A6610

    A6610 Approve S/C 15 14-Aug-14 A 28-Aug-14 A 0 0 A6600 A6620

    A6620 Mobilization to Site 45 29-Aug-14 A 24-Sep-14 A 0 0 A6610 A1670

    BATINAH HIGHWAYBATINAH HIGHWAY 856 29-Dec-13 A 02-May-16 842266

    HIGHWAY & SLIP ROADSHIGHWAY & SLIP ROADS 809 29-Dec-13 A 16-Mar-16 806295

    SOL1, SOL5, SOL6SOL1, SOL5, SOL6 526 29-Dec-13 A 07-Jun-15 638735

    TEMPORARY DIVERSION FOR EXISTING NORTHERN SERVICE ROADTEMPORARY DIVERSION FOR EXISTING NORTHERN SERVICE ROAD 23 29-Dec-13 A 20-Jan-14 A 327

    J J J J J J J J J

    2014 2015 2016

    Delivery to Site14-Aug-14 A, RC STORM SEWER

    Submit Material for Approval

    Obtain Material Approval

    Delivery to Site22-Apr-15, GUARDRAIL

    Submit Material for Approval

    Obtain Material Approval

    Delivery to Site20-Mar-15, ROAD SIGNS & GANTRY

    Submit Material for Approval

    Obtain Material Approval

    Delivery to Site15-Mar-14 A, BITUMINOUS PAINT

    Submit Material for Approval

    Obtain Material Approval

    Delivery to Site05-Jun-14 A, WATERSTOP

    Submit Material for Approval

    Obtain Material Approval

    Delivery to Site22-Jul-14 A, GEOTEXTILE

    Submit Material for Approval

    Obtain Material Approval

    Delivery to Site17-Sep-14 A, JOINT SEALANT

    Submit Material for Approval

    Obtain Material Approval

    Delivery to Site24-Sep-14 A, S/C

    13-Mar-14 A, ELECTRICAL S/C

    Select S/C

    Approve S/C

    Mobilization to Site04-Apr-14 A, WATER S/C

    Select S/C

    Approve S/C

    Mobilization to Site16-Mar-14 A, TELEPHONE S/C

    Select S/C

    Approve S/C

    Mobilization to Site11-Feb-14 A, PILING S/C

    Select S/C

    Approve S/C

    Mobilization to Site24-Sep-14 A, POST TENSIONING S/C

    Select S/C

    Approve S/C

    Mobilization to Site02-May-16,

    16-Mar-16, HI

    07-Jun-15, SOL1, SOL5, SOL6

    20-Jan-14 A, TEMPORARY DIVERSION FOR EXISTING

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 4 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014

    12-Oct-14 FQI - REV3

    02-Feb-15 FQI - REV3 A

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    SR1 (CH 0+000 to CH 0+797)SR1 (CH 0+000 to CH 0+797) 23 29-Dec-13 A 20-Jan-14 A 327

    GENERALGENERAL 23 29-Dec-13 A 20-Jan-14 A 327

    A1260 Laying of Asphalt of Temp. Road over SR-1 17 29-Dec-13 A 15-Jan-14 A 327 M3 A6660, A6680 A10330

    A10330 Placing Plastic Barriers 5 16-Jan-14 A 20-Jan-14 A 0 0 A1260 A1270

    A1270 Shift Traffic from Existing Northern Service Road to Temp. SR-1 0 20-Jan-14 A 0 0 A10330 A1010

    TEMPORARY DIVERSION FOR EXISTING HIGHWAY - NORTH BOUNDTEMPORARY DIVERSION FOR EXISTING HIGHWAY - NORTH BOUND 120 05-Jan-14 A 30-Apr-14 A 655

    SOL1-NORTH (CH 21+100 to CH 25+300)SOL1-NORTH (CH 21+100 to CH 25+300) 120 05-Jan-14 A 30-Apr-14 A 655

    GENERALGENERAL 120 05-Jan-14 A 30-Apr-14 A 655

    A1070 Protection of services 40 05-Jan-14 A 13-Feb-14 A 0 0 A6660 A1000, A1080

    A1000 Laying of Asphalt on Temp. new Road Adjacent to SOL1-NB 30 13-Jan-14 A 25-Apr-14 A 655 M3 A1070, A999, A1090 A10490, A1005

    A1080 Extension of Existing Drainage under Highway 30 14-Feb-14 A 15-Mar-14 A A1070 A999

    A999 Construction of Falaj Under Temp. Diversion 18 12-Mar-14 A 30-Mar-14 A A11480, A1080 A1000, A9910, A1090, A11630

    A1090 Repairs due to Heavy Rainfalls on the 26/27 of March 2014 17 30-Mar-14 A 13-Apr-14 A A999 A1000

    A1005 Placing of Plastic Barriers 8 23-Apr-14 A 30-Apr-14 A 0 0 A1000 A1010

    A1010 Shift Traffic from Existing Main Road NB to Temp. diversion 0 30-Apr-14 A 0 0 A1005, A1270 A6700, A2940, A2800, A1540, A2660, A3160, A5310, A1590

    TEMPORARY DIVERSION FOR EXISTING SOUTHERN SERVICE ROADTEMPORARY DIVERSION FOR EXISTING SOUTHERN SERVICE ROAD 56 19-Jan-14 A 15-Mar-14 A 655

    SR2 (CH 0+000 to CH 1+450)SR2 (CH 0+000 to CH 1+450) 56 19-Jan-14 A 15-Mar-14 A 655

    GENERALGENERAL 56 19-Jan-14 A 15-Mar-14 A 655

    A10490 Protection of services 21 19-Jan-14 A 08-Feb-14 A 0 0 A1000 A9940, A10500, A1330, A1340, A1400, A1410

    A9940 Laying of Asphalt Adjacent to SR-2 30 09-Feb-14 A 10-Mar-14 A 655 M3 A10490, A1330, A1340, A1400, A1410A9950

    A1330 Resolution of expropriation of Fuel Station (SR-2 CH 1+140) 0 28-Feb-14 A 0 0 A10490 A6800, A9940

    A1340 Resolution of expropriation of Graveyard (SR-2 CH 0+900) 0 28-Feb-14 A 0 0 A10490 A6800, A9940

    A1400 Resolution of expropriation of Al-Falaj Shopping (SR-2 CH 0+380) 0 28-Feb-14 A 0 0 A10490 A6800, A9940

    A1410 Resolution of expropriation of Shopping Buildings (SR-2 CH 0+300) 0 28-Feb-14 A 0 0 A10490 A6800, A9940

    A9950 Placing Plastic Barriers 5 11-Mar-14 A 15-Mar-14 A 0 0 A9940 A10340

    A10340 Shift Traffic from Existing Southern Service Road Temp. SR-2 0 15-Mar-14 A 0 0 A9950 A9910

    TEMPORARY DIVERSION FOR EXISTING HIGHWAY - SOUTH BOUNDTEMPORARY DIVERSION FOR EXISTING HIGHWAY - SOUTH BOUND 96 25-Jan-14 A 30-Apr-14 A 764

    SOL1-SOUTH (CH 25+300 to CH 21+100)SOL1-SOUTH (CH 25+300 to CH 21+100) 96 25-Jan-14 A 30-Apr-14 A 764

    GENERALGENERAL 96 25-Jan-14 A 30-Apr-14 A 764

    A10500 Protection of services 15 25-Jan-14 A 05-Mar-14 A 0 0 A10490, A10470 A9910, A10660

    A10660 Extension of Existing Drainage under Highway 30 01-Feb-14 A 10-Mar-14 A A10500 A10670

    A9910 Laying of Asphalt on Temp. Road Adjacent to SOL-1 SB over SOLs 4&7 35 09-Feb-14 A 23-Apr-14 A 764 M3 A10340, A10500, A10670, A999A9920

    A10470 Construction of Falaj Under Temp Diversion 27 10-Mar-14 A 05-Apr-14 A A10500

    A10670 Repairs due to Heavy Rainfalls on the 26/27 of March 2014 15 31-Mar-14 A 15-Apr-14 A A10660 A9910

    A9920 Placing Plastic Barriers 7 24-Apr-14 A 30-Apr-14 A 0 0 A9910 A9930

    A9930 Shift Traffic from Existing Main Road SB to Temp. diversion 0 30-Apr-14 A 0 0 A9920, A6700 A2940, A2800, A2660, A4000, A1360, A4100, A1450, A5020, A11780

    INVESTIGATIONINVESTIGATION 45 29-Dec-13 A 11-Feb-14 A 0

    GEOTECHNICAL INVESTIGATIONGEOTECHNICAL INVESTIGATION 45 29-Dec-13 A 11-Feb-14 A 0

    GENERALGENERAL 45 29-Dec-13 A 11-Feb-14 A 0

    A6110 Site Survey 10 29-Dec-13 A 07-Jan-14 A 0 0 A6680 A6120

    A6120 Setting up Drilling Rigs 7 08-Jan-14 A 14-Jan-14 A 0 0 A6110 A6130, A1540, A3160, A6140

    A6130 Execution of Trial Pits 7 15-Jan-14 A 21-Jan-14 A 0 0 A6120 A6140

    A6140 Execution of Boreholes 15 15-Jan-14 A 29-Jan-14 A 0 0 A6130, A6120 A6150

    A6150 (SPT) Test 5 30-Jan-14 A 03-Feb-14 A 0 0 A6140 A6160

    A6160 Submission of Prelim. Laboratory Testing Report Submission 4 04-Feb-14 A 07-Feb-14 A 0 0 A6150 A6170

    A6170 Receipt Confirmation of Pile Length from Engineer 4 08-Feb-14 A 11-Feb-14 A A6160 A1540

    GENERAL CIVIL WORKSGENERAL CIVIL WORKS 174 09-May-14 A 29-Oct-14 A 11743

    CLEARING & EXCAVATIONCLEARING & EXCAVATION 174 09-May-14 A 29-Oct-14 A 11743

    GENERALGENERAL 174 09-May-14 A 29-Oct-14 A 11743

    A5310 Clearing & Grubbing 30 09-May-14 A 07-Jun-14 A 4259 M2 A1010 A5320, A11850

    A5320 Removal of Structures & Obstructures 60 23-May-14 A 21-Jul-14 A 1 LS A5310 A5330

    A5330 Utilities Trench Ear thworks 60 22-Jul-14 A 01-Sep-14 A 1641 M3 A5320 A5340, A1450

    A5340 Structural & Road Way Excavation 100 22-Jul-14 A 29-Oct-14 A 5842 M3 A5330 A11740

    UTILITIESUTILITIES 232 28-May-14 A 14-Jan-15 19737

    GENERALGENERAL 232 28-May-14 A 14-Jan-15 19737

    J J J J J J J J J

    2014 2015 2016

    20-Jan-14 A, SR1 (CH 0+000 to CH 0+797)

    20-Jan-14 A, GENERAL

    Laying of Asphalt of Temp. Road over SR-1

    Placing Plastic BarriersShift Traffic from Existing Northern Service Road to Temp. SR-1

    30-Apr-14 A, TEMPORARY DIVERSION FOR EXIS

    30-Apr-14 A, SOL1-NORTH (CH 21+100 to CH 25+300)

    30-Apr-14 A, GENERAL

    Protection of services

    Laying of Asphalt on Temp. new Road Adjacent to SOL1-NB

    Extension of Existing Drainage under Highway

    Construction of Falaj Under Temp. Diversion

    Repairs due to Heavy Rainfalls on the 26/27 of March 2014

    Placing of Plastic BarriersShift Traffic from Existing Main Road NB to Temp. diversion

    15-Mar-14 A, TEMPORARY DIVERSION FOR EXIST

    15-Mar-14 A, SR2 (CH 0+000 to CH 1+450)

    15-Mar-14 A, GENERAL

    Protection of services

    Laying of Asphalt Adjacent to SR-2Resolution of expropriation of Fuel Station (SR-2 CH 1+140)

    Resolution of expropriation of Graveyard (SR-2 CH 0+900)

    Resolution of expropriation of Al-Falaj Shopping (SR-2 CH 0+380)

    Resolution of expropriation of Shopping Buildings (SR-2 CH 0+300)

    Placing Plastic BarriersShift Traffic from Existing Southern Service Road Temp. SR-2

    30-Apr-14 A, TEMPORARY DIVERSION FOR EXIS

    30-Apr-14 A, SOL1-SOUTH (CH 25+300 to CH 21+100)

    30-Apr-14 A, GENERAL

    Protection of services

    Extension of Existing Drainage under Highway

    Laying of Asphalt on Temp. Road Adjacent to SOL-1

    Construction of Falaj Under Temp Diversion

    Repairs due to Heavy Rainfalls on the 26/27 of March 2014

    Placing Plastic BarriersShift Traffic from Existing Main Road SB to Temp. diversion

    11-Feb-14 A, INVESTIGATION

    11-Feb-14 A, GEOTECHNICAL INVESTIGATION

    11-Feb-14 A, GENERAL

    Site Survey

    Setting up Drilling Rigs

    Execution of Trial Pits

    Execution of Boreholes

    (SPT) Test

    Submission of Prelim. Laboratory Testing Report Submission

    Receipt Confirmation of Pile Length from Engineer29-Oct-14 A, GENERAL CIVIL WORKS

    29-Oct-14 A, CLEARING & EXCAVATION

    29-Oct-14 A, GENERAL

    Clearing & Grubbing

    Removal of Structures & Obstructures

    Utilities Trench Ear thworks

    Structural & Road Way Excavation14-Jan-15, UTILITIES

    14-Jan-15, GENERAL

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 5 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014

    12-Oct-14 FQI - REV3

    02-Feb-15 FQI - REV3 A

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    FUTURE DUCTS - STAGE 1FUTURE DUCTS - STAGE 1 65 28-May-14 A 31-Jul-14 A 5117

    A11760 Install Irrigation Ducts 30 28-May-14 A 26-Jun-14 A 807 LM A11750 A11770

    A11740 Install Electrical Ducts 60 02-Jun-14 A 31-Jul-14 A 3854 LM A5340 A11750

    A11750 Install Water Ducts 30 17-Jun-14 A 16-Jul-14 A 216 LM A11740 A11760

    A11770 Install Telephone Ducts 30 22-Jun-14 A 21-Jul-14 A 240 LM A11760 A5030, A5350

    TELEPHONETELEPHONE 95 12-Oct-14 14-Jan-15 5100

    A1460 Installation of Ducts in Trechs 90 12-Oct-14 09-Jan-15 A1450

    A1450 Installation of New (GTO) Omantal Line 90 17-Oct-14 14-Jan-15 5100 LM A5330, A6590, A9930, A1460A1360, A1335, A1280

    ELECTRICAL (11 KV)ELECTRICAL (11 KV) 90 17-Oct-14 14-Jan-15 7000

    A1360 Installation of New 11 Kv & 33 Kv Overhead Lines 40 17-Oct-14 25-Nov-14 4500 LM A1450, A6530, A9930 A1365, A1376

    A1365 Obtain Shutdown & Connect to Existing 15 26-Nov-14 10-Dec-14 0 0 A1360 A1367

    A1367 Remove & Dispose Existing 11 Kv Overhead Lines 25 11-Dec-14 04-Jan-15 1800 LM A1365 A1376, A1315

    A1376 Remove & Dispose Existing 11 Kv Under Ground Lines 25 21-Dec-14 14-Jan-15 700 LM A1367, A1360 A5030, A5350

    ELECTRICAL (33 KV)ELECTRICAL (33 KV) 35 21-Nov-14 25-Dec-14 920

    A1335 Obtain Shutdown & Connect to Existing 20 21-Nov-14 10-Dec-14 0 0 A1450 A1315, A5350

    A1315 Remove & Dispose Existing 33 Kv Ovehead Lines 15 11-Dec-14 25-Dec-14 920 LM A1367, A1335 A5350

    WATERLINESWATERLINES 134 15-Jul-14 A 25-Nov-14 1600

    A1280 Installation of Water Pipe 60 15-Jul-14 A 10-Nov-14 1600 LM A1450 A1290

    A1290 Obtain Shutdown & Connect to Existing 15 11-Nov-14 25-Nov-14 0 0 A1280 A5350

    BOX CULVERTS - STAGE 1BOX CULVERTS - STAGE 1 204 21-May-14 A 10-Dec-14 32129

    GENERALGENERAL 204 21-May-14 A 10-Dec-14 32129

    3 CELL BOX CULVERT AT CH 21+2603 CELL BOX CULVERT AT CH 21+260 63 07-Oct-14 A 17-Nov-14 1067

    A11780 Structural Excavation 3 07-Oct-14 A 13-Oct-14 117 M3 A9930, A2720, A12520 A11790

    A11790 Blinding of Concrete 1 14-Oct-14 14-Oct-14 35 M3 A11780 A11800

    A11800 Casting of Base Slab 6 15-Oct-14 20-Oct-14 107 M3 A11790 A11810

    A11810 Casting of Walls 12 21-Oct-14 01-Nov-14 94 M3 A11800 A11820

    A11820 Casting of Top Slab 6 02-Nov-14 07-Nov-14 36 M3 A11810 A11840, A11830

    A11830 Casting of Apron Slab & W ing Walls 10 08-Nov-14 17-Nov-14 107 M3 A11820 A11840

    A11840 Backfilling 1 17-Nov-14 17-Nov-14 571 M3 A11820, A11830 A2240, A5350

    1 CELL BOX CULVERT AT CH 21+4851 CELL BOX CULVERT AT CH 21+485 24 01-Jul-14 A 24-Jul-14 A 848

    A2240 Structural Excavation 2 01-Jul-14 A 02-Jul-14 A 117 M3 A10810, A11840 A2250

    A2250 Blinding of Concrete 1 03-Jul-14 A 03-Jul-14 A 16 M3 A2240 A2260

    A2260 Casting of Base Slab 4 04-Jul-14 A 07-Jul-14 A 45 M3 A2250 A2270

    A2270 Casting of Walls 8 08-Jul-14 A 15-Jul-14 A 54 M3 A2260 A2280

    A2280 Casting of Top Slab 4 16-Jul-14 A 19-Jul-14 A 45 M3 A2270 A2290

    A2290 Backfilling 1 24-Jul-14 A 24-Jul-14 A 571 M3 A2280, A2710 A5350, A2500

    8 CELLS BOX CULVERT AT CH 21+8388 CELLS BOX CULVERT AT CH 21+838 91 01-Sep-14 A 30-Nov-14 3775

    A2870 Structural Excavation 6 01-Sep-14 A 06-Sep-14 A 351 M3 A3000, A10890 A2880

    A2880 Blinding of Concrete 4 07-Sep-14 A 10-Sep-14 A 107 M3 A2870 A2890

    A2890 Casting of Base Slab 18 11-Sep-14 A 28-Sep-14 A 353 M3 A2880 A2900

    A2900 Casting of Walls 32 12-Oct-14 12-Nov-14 324 M3 A2890 A2910

    A2910 Casting of Top Slab 18 09-Nov-14 26-Nov-14 354 M3 A2900 A2920, A2920

    A2920 Backfilling 4 27-Nov-14 30-Nov-14 2286 M3 A2910, A2570, A2910 A5350

    44 CELLS BOX CULVERT AT CH 21+98544 CELLS BOX CULVERT AT CH 21+985 204 21-May-14 A 10-Dec-14 15414

    A2940 Structural Excavation 16 21-May-14 A 05-Jun-14 A 1110 M3 A1010, A9930, A10630, A11560A2950

    A2950 Blinding of Concrete 14 21-May-14 A 03-Jun-14 A 760 M3 A2940 A2960

    A2960 Casting of Base Slab 80 26-May-14 A 19-Oct-14 2519 M3 A2950 A2970

    A2970 Casting of Walls 77 13-Jun-14 A 29-Oct-14 1984 M3 A2960 A2980

    A2980 Casting of Top Slab 79 29-Jun-14 A 07-Nov-14 2519 M3 A2970 A2990, A3000

    A3000 Casting of Apron Slab & W ing Walls 51 12-Oct-14 01-Dec-14 236 M3 A2980 A2990, A2870

    A2990 Backfilling 9 02-Dec-14 10-Dec-14 6286 M3 A2980, A3000 A5350

    9 CELLS BOX CULVERT AT CH 22+6509 CELLS BOX CULVERT AT CH 22+650 164 23-May-14 A 02-Nov-14 4888

    A2800 Structural Excavation 6 23-May-14 A 28-May-14 A 351 M3 A1010, A9930, A10650 A2810, A2660

    A2810 Blinding of Concrete 4 10-Jul-14 A 14-Jul-14 A 189 M3 A2800 A2820

    J J J J J J J J J

    2014 2015 2016

    31-Jul-14 A, FUTURE DUCTS - STAGE 1

    Install Irrigation Ducts

    Install Electrical Ducts

    Install Water Ducts

    Install Telephone Ducts14-Jan-15, TELEPHONE

    Installation of Ducts in Trechs

    Installation of New (GTO) Omantal Line14-Jan-15, ELECTRICAL (11 KV)

    Installation of New 11 Kv & 33 Kv Overhead Lines

    Obtain Shutdown & Connect to Existing

    Remove & Dispose Existing 11 Kv Overhead Lines

    Remove & Dispose Existing 11 Kv Un25-Dec-14, ELECTRICAL (33 KV)

    Obtain Shutdown & Connect to Existing

    Remove & Dispose Existing 33 Kv Ovehead Lines25-Nov-14, WATERLINES

    Installation of Water Pipe

    Obtain Shutdown & Connect to Existing10-Dec-14, BOX CULVERTS - STAGE 1

    10-Dec-14, GENERAL

    17-Nov-14, 3 CELL BOX CULVERT AT CH 21+260

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Casting of Apron Slab & W ing Walls

    Backfilling24-Jul-14 A, 1 CELL BOX CULVERT AT CH 21+485

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Backfilling30-Nov-14, 8 CELLS BOX CULVERT AT CH 21+838

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Backfilling10-Dec-14, 44 CELLS BOX CULVERT

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Casting of Apron Slab & W ing Walls

    Backfilling02-Nov-14, 9 CELLS BOX CULVERT AT CH 22+650

    Structural Excavation

    Blinding of Concrete

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 6 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014

    12-Oct-14 FQI - REV3

    02-Feb-15 FQI - REV3 A

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    A2820 Casting of Base Slab 38 15-Jul-14 A 21-Aug-14 A 625 M3 A2810 A2830

    A2830 Casting of Walls 32 22-Aug-14 A 22-Sep-14 A 703 M3 A2820 A2840, A2860

    A2840 Casting of Top Slab 32 22-Aug-14 A 27-Sep-14 A 625 M3 A2830 A2850

    A2860 Casting of Apron Slab & W ing Walls 22 12-Oct-14 02-Nov-14 109 M3 A2830 A2850

    A2850 Backfilling 4 30-Oct-14 02-Nov-14 2286 M3 A2840, A2860 A5350, A2640, A2660

    5 CELLS BOX CULVERT AT CH 23+5005 CELLS BOX CULVERT AT CH 23+500 48 30-Jul-14 A 15-Sep-14 A 2767

    A2660 Structural Excavation 5 30-Jul-14 A 03-Aug-14 A 292 M3 A9930, A1010, A10710, A2800, A2850A2670

    A2670 Blinding of Concrete 1 04-Aug-14 A 04-Aug-14 A 110 M3 A2660 A2680

    A2680 Casting of Base Slab 8 05-Aug-14 A 12-Aug-14 A 420 M3 A2670 A2690

    A2690 Casting of Walls 14 11-Aug-14 A 24-Aug-14 A 346 M3 A2680 A2700

    A2700 Casting of Top Slab 8 25-Aug-14 A 01-Sep-14 A 420 M3 A2690 A2710, A2720

    A2720 Casting of Apron Slab & W ing Walls 14 02-Sep-14 A 15-Sep-14 A 36 M3 A2700 A2710, A2590, A11780

    A2710 Backfilling 2 14-Sep-14 A 15-Sep-14 A 1143 M3 A2700, A2720 A5350, A2290

    1 CELLS BOX CULVERT AT CH 23+7601 CELLS BOX CULVERT AT CH 23+760 24 07-Jul-14 A 30-Jul-14 A 845

    A2590 Structural Excavation 2 07-Jul-14 A 08-Jul-14 A 117 M3 A2720, A10690 A2600

    A2600 Blinding of Concrete 1 09-Jul-14 A 09-Jul-14 A 14 M3 A2590 A2610

    A2610 Casting of Base Slab 4 10-Jul-14 A 13-Jul-14 A 45 M3 A2600 A2620

    A2620 Casting of Walls 8 14-Jul-14 A 21-Jul-14 A 53 M3 A2610 A2630

    A2630 Casting of Top Slab 4 22-Jul-14 A 25-Jul-14 A 45 M3 A2620 A2380, A2640

    A2640 Backfilling 1 30-Jul-14 A 30-Jul-14 A 571 M3 A2850, A2630 A5350, A2430

    1 CELL BOX CULVERT AT CH 23+9971 CELL BOX CULVERT AT CH 23+997 24 06-Aug-14 A 29-Aug-14 A 844

    A2380 Structural Excavation 2 06-Aug-14 A 07-Aug-14 A 117 M3 A10770, A2630 A2390

    A2390 Blinding of Concrete 1 08-Aug-14 A 08-Aug-14 A 16 M3 A2380 A2400

    A2400 Casting of Base Slab 4 09-Aug-14 A 12-Aug-14 A 44 M3 A2390 A2410

    A2410 Casting of Walls 8 13-Aug-14 A 20-Aug-14 A 52 M3 A2400 A2420

    A2420 Casting of Top Slab 4 21-Aug-14 A 24-Aug-14 A 44 M3 A2410 A2430

    A2430 Backfilling 1 29-Aug-14 A 29-Aug-14 A 571 M3 A2420, A2640 A5350

    1 CELL BOX CULVERT AT CH 24+2351 CELL BOX CULVERT AT CH 24+235 24 18-Aug-14 A 10-Sep-14 A 827

    A2450 Structural Excavation 2 18-Aug-14 A 19-Aug-14 A 117 M3 A10850 A2460

    A2460 Blinding of Concrete 1 20-Aug-14 A 20-Aug-14 A 12 M3 A2450 A2470

    A2470 Casting of Base Slab 4 21-Aug-14 A 24-Aug-14 A 40 M3 A2460 A2480

    A2480 Casting of Walls 8 25-Aug-14 A 01-Sep-14 A 47 M3 A2470 A2490

    A2490 Casting of Top Slab 4 02-Sep-14 A 05-Sep-14 A 40 M3 A2480 A2500

    A2500 Backfilling 1 10-Sep-14 A 10-Sep-14 A 571 M3 A2490, A2290 A5350, A2570

    1 CELL BOX CULVERT AT CH 24+5701 CELL BOX CULVERT AT CH 24+570 26 01-Oct-14 A 26-Oct-14 A 854

    A2520 Structural Excavation 2 01-Oct-14 A 02-Oct-14 A 117 M3 A10870 A2530

    A2530 Blinding of Concrete 1 03-Oct-14 A 03-Oct-14 A 16 M3 A2520 A2540

    A2540 Casting of Base Slab 5 04-Oct-14 A 08-Oct-14 A 47 M3 A2530 A2550

    A2550 Casting of Walls 8 09-Oct-14 A 16-Oct-14 A 56 M3 A2540 A2560

    A2560 Casting of Top Slab 5 17-Oct-14 A 21-Oct-14 A 47 M3 A2550 A2570, A2570

    A2570 Backfilling 1 26-Oct-14 A 26-Oct-14 A 571 M3 A2560, A2500, A2560 A5350, A2920

    PEDESTRIAN UNDERPASS 1 (SOL1 CH 24+325) - STAGE 1PEDESTRIAN UNDERPASS 1 (SOL1 CH 24+325) - STAGE 1 72 18-Sep-14 A 28-Nov-14 4405

    GENERALGENERAL 72 18-Sep-14 A 28-Nov-14 4405

    UNDERPASS STRUCTUREUNDERPASS STRUCTURE 72 18-Sep-14 A 28-Nov-14 4405

    A11850 Structural Excavation 5 18-Sep-14 A 22-Sep-14 A 584 M3 A5310, A12540 A11860

    A11860 Blinding of Concrete 6 22-Sep-14 A 27-Sep-14 A 26 M3 A11850 A11870

    A11870 Casting of Base Slab 11 28-Sep-14 A 08-Oct-14 A 93 M3 A11860 A11880

    A11880 Casting of Walls 35 13-Oct-14 16-Nov-14 180 M3 A11870 A11890, A12550

    A11890 Casting of Top Slab 30 26-Oct-14 24-Nov-14 93 M3 A11880 A11900, A1795

    A11900 Backfilling 4 25-Nov-14 28-Nov-14 3429 M3 A11890 A5050

    PEDESTRIAN UNDERPASS 2 (SOL1 CH 23+300) - STAGE 1PEDESTRIAN UNDERPASS 2 (SOL1 CH 23+300) - STAGE 1 129 25-Nov-14 02-Apr-15 4877

    GENERALGENERAL 129 25-Nov-14 02-Apr-15 4877

    UNDERPASS STRUCTUREUNDERPASS STRUCTURE 129 25-Nov-14 02-Apr-15 4727

    A1795 Structural Excavation 10 25-Nov-14 04-Dec-14 3508 M3 A10910, A11890 A1800

    J J J J J J J J J

    2014 2015 2016

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Casting of Apron Slab & W ing Walls

    Backfilling15-Sep-14 A, 5 CELLS BOX CULVERT AT CH 23+500

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Casting of Apron Slab & W ing Walls

    Backfilling30-Jul-14 A, 1 CELLS BOX CULVERT AT CH 23+760

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Backfilling29-Aug-14 A, 1 CELL BOX CULVERT AT CH 23+997

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Backfilling10-Sep-14 A, 1 CELL BOX CULVERT AT CH 24+235

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Backfilling26-Oct-14 A, 1 CELL BOX CULVERT AT CH 24+570

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Backfilling28-Nov-14, PEDESTRIAN UNDERPASS

    28-Nov-14, GENERAL

    28-Nov-14, UNDERPASS STRUCTURE

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Backfilling02-Apr-15, PEDESTRIAN UNDE

    02-Apr-15, GENERAL

    02-Apr-15, UNDERPASS STRUCTURE

    Structural Excavation

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 7 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014

    12-Oct-14 FQI - REV3

    02-Feb-15 FQI - REV3 A

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    A1800 Blinding of Concrete 12 28-Nov-14 09-Dec-14 52 M3 A1795 A1810

    A1810 Casting of Base Slab 35 07-Dec-14 10-Jan-15 89 M3 A1800 A1820, A11950

    A1820 Casting of Walls 70 28-Dec-14 07-Mar-15 123 M3 A1810 A1830

    A1830 Casting of Top Slab 50 06-Feb-15 27-Mar-15 94 M3 A1820 A3010

    A3010 Backfilling 6 28-Mar-15 02-Apr-15 861 M3 A1830 A5380

    ENTRANCE & EXIT - LHS (South Bound)ENTRANCE & EXIT - LHS (South Bound) 77 07-Dec-14 21-Feb-15 150

    A11950 Casting of Floor Slab 22 07-Dec-14 28-Dec-14 32 M3 A1810 A11960

    A11960 Casting of Walls 35 29-Dec-14 01-Feb-15 54 M3 A11950 A11980, A11970

    A11970 Casting of Landing Slabs & Stair Case 35 18-Jan-15 21-Feb-15 17 M3 A11960 A11980

    A11980 Casing of Beams & Roof Slab 20 02-Feb-15 21-Feb-15 47 M3 A11960, A11970 A5370

    VEHICULAR UNDERPASSES - STAGE 1VEHICULAR UNDERPASSES - STAGE 1 148 15-Oct-14 11-Mar-15 13260

    VEHICULAR UNDERPASS @ CH 21+300VEHICULAR UNDERPASS @ CH 21+300 77 15-Oct-14 30-Dec-14 6630

    A12550 Structural Excavation 10 15-Oct-14 24-Oct-14 3500 M3 A11880, A13080 A12560

    A12560 Blinding 3 25-Oct-14 27-Oct-14 40 M3 A12550 A12570

    A12570 Casting of Base Slab 18 28-Oct-14 14-Nov-14 240 M3 A12560 A12580

    A12580 Casting of Walls 20 15-Nov-14 04-Dec-14 110 M3 A12570 A12590

    A12590 Casting of Top Slab 20 05-Dec-14 24-Dec-14 240 M3 A12580 A12610

    A12610 Backfilling 6 25-Dec-14 30-Dec-14 2500 M3 A12590 A5350, A12840

    VEHICULAR UNDERPASS @ CH 24+600VEHICULAR UNDERPASS @ CH 24+600 77 25-Dec-14 11-Mar-15 6630

    A12840 Structural Excavation 10 25-Dec-14 03-Jan-15 3500 M3 A12610 A12850

    A12850 Blinding 3 04-Jan-15 06-Jan-15 40 M3 A12840 A12860

    A12860 Casting of Base Slab 18 07-Jan-15 24-Jan-15 240 M3 A12850 A12870

    A12870 Casting of Walls 20 25-Jan-15 13-Feb-15 110 M3 A12860 A12880

    A12880 Casting of Top Slab 20 14-Feb-15 05-Mar-15 240 M3 A12870 A12900

    A12900 Backfilling 6 06-Mar-15 11-Mar-15 2500 M3 A12880 A5350

    FLYOVER AT FALAJ AL QABIL (NORTH BOUND)FLYOVER AT FALAJ AL QABIL (NORTH BOUND) 425 12-Mar-14 A 16-May-15 49235

    SUBSTRUCTURESSUBSTRUCTURES 275 12-Mar-14 A 17-Dec-14 15892

    PIER P3PIER P3 58 07-Apr-14 A 03-Jun-14 A 1686

    A1540 Boring & Casting of Piles 14 07-Apr-14 A 15-Apr-14 A 225 LM A6500, A1010, A6120, A11010, A6170A1550, A5020, A3260

    A1550 Blinding for Pier Pile Cap 3 16-Apr-14 A 18-Apr-14 A 9 M3 A1540 A1560, A3260

    A1560 Casting of Pier Pile Cap 15 19-Apr-14 A 03-May-14 A 170 M3 A1550 A1570

    A1570 Bituminous Paint 3 04-May-14 A 06-May-14 A 1221 M2 A1560, A11530 A1580

    A1580 Casting of Pier & Pier Cap 28 07-May-14 A 03-Jun-14 A 61 M3 A1570 A1640, A3500

    PIER P5PIER P5 60 19-Apr-14 A 17-Jun-14 A 1686

    A3260 Boring & Casting of Piles 11 19-Apr-14 A 29-Apr-14 A 225 LM A11050, A1540, A1550 A3270, A1590

    A3270 Blinding for Pier Pile Cap 3 30-Apr-14 A 02-May-14 A 9 M3 A3260 A3280

    A3280 Casting of Pier Pile Cap 15 03-May-14 A 17-May-14 A 170 M3 A3270 A3290

    A3290 Bituminous Paint 3 18-May-14 A 20-May-14 A 1221 M2 A3280 A3300

    A3300 Casting of Pier & Pier Cap 28 21-May-14 A 17-Jun-14 A 61 M3 A3290 A3500

    ABUTMENT AB1ABUTMENT AB1 199 02-May-14 A 12-Oct-14 A 3419

    A1590 Boring & Casting of Piles 5 02-May-14 A 06-May-14 A 115 LM A11070, A1010, A3260 A1600, A3310, A3360

    A1620 Bituminous Paint 7 06-May-14 A 15-May-14 A 2848 M2 A1610

    A3030 Fixing of MSE Wall 46 29-Jun-14 A 17-Sep-14 A 380 M2 A1600 A3110, A3410

    A3110 Backfilling 91 03-Jul-14 A 17-Sep-14 A 0 M3 A3030 A5350

    A1600 Blinding for Abutment Pile Cap 7 18-Sep-14 A 24-Sep-14 A 0 M3 A1590 A1610, A3030

    A1610 Casting of Abutment Pile Cap 42 25-Sep-14 A 12-Oct-14 A 76 M3 A1600 A1620, A1640

    ABUTMENT AB2ABUTMENT AB2 225 07-May-14 A 17-Dec-14 3419

    A3360 Boring & Casting of Piles 5 07-May-14 A 11-May-14 A 115 LM A11090, A1590 A3160

    A3390 Bituminous Paint 7 13-May-14 A 15-May-14 A 2848 M2 A3380, A3420 A3500

    A3410 Fixing of MSE Wall 46 03-Sep-14 A 19-Nov-14 380 M2 A3030 A3420

    A3420 Backfilling 46 29-Sep-14 A 24-Nov-14 0 M3 A3410 A5350, A3390, A3370

    A3370 Blinding for Abutment Pile Cap 7 25-Nov-14 01-Dec-14 0 M3 A3420 A3380

    A3380 Casting of Abutment Pile Cap 16 02-Dec-14 17-Dec-14 76 M3 A3370 A3390, A3500

    PIER P2PIER P2 60 12-May-14 A 10-Jul-14 A 1686

    J J J J J J J J J

    2014 2015 2016

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Backfilling21-Feb-15, ENTRANCE & EXIT - L

    Casting of Floor Slab

    Casting of Walls

    Casting of Landing Slabs & Stair Case

    Casing of Beams & Roof Slab11-Mar-15, VEHICULAR UNDERP

    30-Dec-14, VEHICULAR UNDERPAS

    Structural Excavation

    Blinding

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Backfilling

    11-Mar-15, VEHICULAR UNDERP

    Structural Excavation

    Blinding

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Backfilling

    16-May-15, FLYOVER AT FALA

    17-Dec-14, SUBSTRUCTURES

    03-Jun-14 A, PIER P3

    Boring & Casting of Piles

    Blinding for Pier Pile Cap

    Casting of Pier Pile Cap

    Bituminous Paint

    Casting of Pier & Pier Cap17-Jun-14 A, PIER P5

    Boring & Casting of Piles

    Blinding for Pier Pile Cap

    Casting of Pier Pile Cap

    Bituminous Paint

    Casting of Pier & Pier Cap12-Oct-14 A, ABUTMENT AB1

    Boring & Casting of Piles

    Bituminous Paint

    Fixing of MSE Wall

    Backfilling

    Blinding for Abutment Pile Cap

    Casting of Abutment Pile Cap17-Dec-14, ABUTMENT AB2

    Boring & Casting of Piles

    Bituminous Paint

    Fixing of MSE Wall

    Backfilling

    Blinding for Abutment Pile Cap

    Casting of Abutment Pile Cap10-Jul-14 A, PIER P2

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 8 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014

    12-Oct-14 FQI - REV3

    02-Feb-15 FQI - REV3 A

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    A3160 Boring & Casting of Piles 11 12-May-14 A 22-May-14 A 225 LM A6500, A6120, A1010, A10990, A11480, A3360A3170, A3210

    A3170 Blinding for Pier Pile Cap 3 23-May-14 A 25-May-14 A 9 M3 A3160 A3180

    A3180 Casting of Pier Pile Cap 15 26-May-14 A 09-Jun-14 A 170 M3 A3170 A3190

    A3190 Bituminous Paint 3 10-Jun-14 A 12-Jun-14 A 1221 M2 A3180 A3200

    A3200 Casting of Pier & Pier Cap 28 13-Jun-14 A 10-Jul-14 A 61 M3 A3190 A1640

    PIER P1PIER P1 60 23-May-14 A 21-Jul-14 A 1684

    A3210 Boring & Casting of Piles 11 23-May-14 A 02-Jun-14 A 225 LM A10970, A3160 A3220, A4000

    A3220 Blinding for Pier Pile Cap 3 03-Jun-14 A 05-Jun-14 A 9 M3 A3210 A3230

    A3230 Casting of Pier Pile Cap 15 06-Jun-14 A 20-Jun-14 A 169 M3 A3220 A3240

    A3240 Bituminous Paint 3 21-Jun-14 A 23-Jun-14 A 1221 M2 A3230 A3250

    A3250 Casting of Pier & Pier Cap 28 24-Jun-14 A 21-Jul-14 A 60 M3 A3240 A1640

    Falaj RelocationFalaj Relocation 125 12-Mar-14 A 20-Jul-14 A 627

    A11630 Section 1 - Inside Existing Roundabout 45 LM 32 12-Mar-14 A 12-Mar-14 A 120 M3 A999 A11670, A11720

    A11670 Section 5 - RHS (Between Existing Service Roads) - 24 LM 24 10-Apr-14 A 07-May-14 A 64 M3 A11630 A11640, A11660, A11690, A11720

    A11660 Section 4 - LHS(Between Diversion - Existing Service Road) - 55 LM 38 20-Apr-14 A 28-May-14 A 146 M3 A11670 A11680, A11720

    A11640 Section 2 - LHS (Between Diversion - Existing Service Road) -40 LM 28 08-May-14 A 04-Jun-14 A 106 M3 A11670 A11650, A11690, A11720

    A11650 Section 3 - RHS (Between Diversion - Roundabout) - 32 LM 25 18-May-14 A 11-Jun-14 A 85 M3 A11640 A11720

    A11690 Section 7 - RHS(Under Service Road) - 10 LM 20 18-May-14 A 06-Jun-14 A 26 M3 A11640, A11670 A11700, A11720

    A11680 Section 6 - LHS (Under Service Road) - 15 LM 22 07-Jun-14 A 28-Jun-14 A 40 M3 A11660, A11700 A11720

    A11700 Section 8 - (Under Service Road) - 15 LM 22 07-Jun-14 A 28-Jun-14 A 40 M3 A11690 A11680, A11720

    A11720 Shifting Water in New Falaj 15 29-Jun-14 A 13-Jul-14 A A11700, A11690, A11680, A11670, A11660, A11650, A11640, A11630A11730, A10580

    A11730 Demolition & Removal of Existing Falaj 7 14-Jul-14 A 20-Jul-14 A A11720 A3310

    PIER P4PIER P4 60 21-Jul-14 A 18-Sep-14 A 1685

    A3310 Boring & Casting of Piles 11 21-Jul-14 A 31-Jul-14 A 225 LM A1590, A11030, A11730 A3320, A4050

    A3320 Blinding for Pier Pile Cap 3 01-Aug-14 A 03-Aug-14 A 9 M3 A3310 A3330

    A3330 Casting of Pier Pile Cap 15 04-Aug-14 A 18-Aug-14 A 169 M3 A3320 A3340

    A3340 Bituminous Paint 3 19-Aug-14 A 21-Aug-14 A 1221 M2 A3330 A3350

    A3350 Casting of Pier & Pier Cap 28 22-Aug-14 A 18-Sep-14 A 61 M3 A3340 A3500

    SUPERSTRUCTURESUPERSTRUCTURE 256 11-Jul-14 A 03-Apr-15 32624

    SPAN BETWEEN AB1 & P3SPAN BETWEEN AB1 & P3 156 11-Jul-14 A 24-Dec-14 16312

    A1640 Erection of Scaffold & Shutter 44 11-Jul-14 A 26-Oct-14 14700 0 A3250, A1580, A1610, A3200, A11250A1650

    A1650 Fixing of Pot Bearings 7 27-Oct-14 02-Nov-14 12 NO. A1640 A1660

    A1660 Casting of Box Girder 21 03-Nov-14 23-Nov-14 1600 M3 A1650 A1670, A6030

    A1670 Prestressing Operation 10 24-Nov-14 03-Dec-14 0 0 A1660, A6620 A6760, A6790, A4550

    A6760 Deshuttering of Scaffold 21 04-Dec-14 24-Dec-14 0 0 A1670 A3500

    SPAN BETWEEN AB2 & P3SPAN BETWEEN AB2 & P3 114 11-Dec-14 03-Apr-15 16312

    A3500 Erection of Scaffold & Shutter 55 11-Dec-14 03-Feb-15 14700 0 A1580, A3300, A3380, A3350, A6470, A11270, A3390, A6760A3510

    A3510 Fixing of Pot Bearings 7 04-Feb-15 10-Feb-15 12 NO. A3500 A3520

    A3520 Casting of Box Girder 21 11-Feb-15 03-Mar-15 1600 M3 A3510 A3530

    A3530 Prestressing Operation 10 04-Mar-15 13-Mar-15 0 0 A3520 A3570, A4550

    A3570 Deshuttering of Scaffold 21 14-Mar-15 03-Apr-15 0 0 A3530, A10610 A3930

    FINISHING WORKSFINISHING WORKS 56 22-Mar-15 16-May-15 719

    GENERALGENERAL 56 22-Mar-15 16-May-15 719

    A4550 Concrete Bridge Parapet (N.J Barrier) 22 22-Mar-15 12-Apr-15 480 M A6290, A3530, A1670, A11620A4560

    A4560 Laying of Bituminous Wearing Course 6 07-Apr-15 12-Apr-15 180 M3 A4550 A4570, A5450

    A4570 Fixing of Expansion Joints 30 17-Apr-15 16-May-15 59 M A4560 A5490

    FLYOVER AT FALAJ AL QABIL (SOUTH BOUND)FLYOVER AT FALAJ AL QABIL (SOUTH BOUND) 358 03-Jun-14 A 26-May-15 48437

    SUBSTRUCTURESSUBSTRUCTURES 222 03-Jun-14 A 10-Jan-15 15320

    PIER P2PIER P2 60 03-Jun-14 A 01-Aug-14 A 1689

    A4000 Boring & Casting of Piles 11 03-Jun-14 A 13-Jun-14 A 225 LM A9930, A11130, A3210 A4010, A3800

    A4010 Blinding for Pier Pile Cap 3 14-Jun-14 A 16-Jun-14 A 9 M3 A4000 A4020

    A4020 Casting of Pier Pile Cap 15 17-Jun-14 A 01-Jul-14 A 169 M3 A4010 A4030

    A4030 Bituminous Paint 3 02-Jul-14 A 04-Jul-14 A 1221 M2 A4020 A4040, A4310

    A4040 Casting of Pier & Pier Cap 28 05-Jul-14 A 01-Aug-14 A 65 M3 A4030 A4310, A3790

    J J J J J J J J J

    2014 2015 2016

    Boring & Casting of Piles

    Blinding for Pier Pile Cap

    Casting of Pier Pile Cap

    Bituminous Paint

    Casting of Pier & Pier Cap21-Jul-14 A, PIER P1

    Boring & Casting of Piles

    Blinding for Pier Pile Cap

    Casting of Pier Pile Cap

    Bituminous Paint

    Casting of Pier & Pier Cap20-Jul-14 A, Falaj Relocation

    Section 1 - Inside Existing Roundabout 45 LM

    Section 5 - RHS (Between Existing Service Roads) - 24 LM

    Section 4 - LHS(Between Diversion - Existing Ser

    Section 2 - LHS (Between Diversion - Existing Se

    Section 3 - RHS (Between Diversion - Roundabout) - 32 LM

    Section 7 - RHS(Under Service Road) - 10 LM

    Section 6 - LHS (Under Service Road) - 15 LM

    Section 8 - (Under Service Road) - 15 LM

    Shifting Water in New Falaj

    Demolition & Removal of Existing Falaj18-Sep-14 A, PIER P4

    Boring & Casting of Piles

    Blinding for Pier Pile Cap

    Casting of Pier Pile Cap

    Bituminous Paint

    Casting of Pier & Pier Cap03-Apr-15, SUPERSTRUCTURE

    24-Dec-14, SPAN BETWEEN AB1 & P3

    Erection of Scaffold & Shutter

    Fixing of Pot Bearings

    Casting of Box Girder

    Prestressing Operation

    Deshuttering of Scaffold03-Apr-15, SPAN BETWEEN AB2 & P3

    Erection of Scaffold & Shutter

    Fixing of Pot Bearings

    Casting of Box Girder

    Prestressing Operation

    Deshuttering of Scaffold16-May-15, FINISHING WORKS

    16-May-15, GENERAL

    Concrete Bridge Parapet (N.J Barrier)

    Laying of Bituminous Wearing Course

    Fixing of Expansion Joints26-May-15, FLYOVER AT FAL

    10-Jan-15, SUBSTRUCTURES

    01-Aug-14 A, PIER P2

    Boring & Casting of Piles

    Blinding for Pier Pile Cap

    Casting of Pier Pile Cap

    Bituminous Paint

    Casting of Pier & Pier Cap

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 9 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014

    12-Oct-14 FQI - REV3

    02-Feb-15 FQI - REV3 A

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    ABUTMENT AB1ABUTMENT AB1 147 14-Jun-14 A 07-Nov-14 3419

    A3800 Boring & Casting of Piles 5 14-Jun-14 A 18-Jun-14 A 115 LM A4000, A11210 A3810, A3950, A3830

    A3830 Bituminous Paint 7 19-Jun-14 A 25-Jun-14 A 2848 M2 A3800 A4310, A4150

    A4150 Fixing of MSE Wall 46 30-Jun-14 A 07-Oct-14 A 380 M2 A3830 A4160

    A4160 Backfilling 46 06-Sep-14 A 14-Oct-14 0 M3 A4150 A5350, A3810

    A3810 Blinding for Abutment Pile Cap 7 15-Oct-14 21-Oct-14 0 M3 A3800, A4160 A3820

    A3820 Casting of Abutment Pile Cap 17 22-Oct-14 07-Nov-14 76 M3 A3810 A4320

    PIER P5PIER P5 60 19-Jun-14 A 17-Aug-14 A 1688

    A3950 Boring & Casting of Piles 11 19-Jun-14 A 29-Jun-14 A 225 LM A3800, A11190 A3960, A4100

    A3960 Blinding for Pier Pile Cap 3 30-Jun-14 A 02-Jul-14 A 9 M3 A3950 A3970

    A3970 Casting of Pier Pile Cap 15 03-Jul-14 A 17-Jul-14 A 169 M3 A3960 A3980

    A3980 Bituminous Paint 3 18-Jul-14 A 20-Jul-14 A 1221 M2 A3970 A3990, A4310

    A3990 Casting of Pier & Pier Cap 28 21-Jul-14 A 17-Aug-14 A 64 M3 A3980 A3850

    PIER P3PIER P3 60 30-Jun-14 A 28-Aug-14 A 1728

    A4100 Boring & Casting of Piles 11 30-Jun-14 A 10-Jul-14 A 225 LM A11150, A9930, A3950 A4110, A3750

    A4110 Blinding for Pier Pile Cap 3 11-Jul-14 A 13-Jul-14 A 9 M3 A4100 A4120

    A4120 Casting of Pier Pile Cap 15 14-Jul-14 A 28-Jul-14 A 169 M3 A4110 A4130

    A4130 Bituminous Paint 3 29-Jul-14 A 31-Jul-14 A 1221 M2 A4120 A4140

    A4140 Casting of Pier & Pier Cap 28 01-Aug-14 A 28-Aug-14 A 104 M3 A4130 A3850, A4310

    PIER P1PIER P1 60 11-Jul-14 A 08-Sep-14 A 1688

    A3750 Boring & Casting of Piles 11 11-Jul-14 A 21-Jul-14 A 225 LM A4100, A11110 A3760, A4170

    A3760 Blinding for Pier Pile Cap 3 22-Jul-14 A 24-Jul-14 A 9 M3 A3750 A3770

    A3770 Casting of Pier Pile Cap 15 25-Jul-14 A 08-Aug-14 A 169 M3 A3760 A3780

    A3780 Bituminous Paint 3 09-Aug-14 A 11-Aug-14 A 1221 M2 A3770 A3790

    A3790 Casting of Pier & Pier Cap 28 12-Aug-14 A 08-Sep-14 A 64 M3 A3780, A4040 A4310

    ABUTMENT AB2ABUTMENT AB2 91 12-Oct-14 10-Jan-15 3419

    A4170 Boring & Casting of Piles 5 12-Oct-14 16-Oct-14 115 LM A11230, A3750 A4200

    A4200 Bituminous Paint 7 17-Oct-14 23-Oct-14 2848 M2 A4170 A4220

    A4220 Fixing of MSE Wall 46 24-Oct-14 08-Dec-14 380 M2 A4200 A4230

    A4230 Backfilling 46 03-Nov-14 18-Dec-14 0 M3 A4220 A5350, A4180

    A4180 Blinding for Abutment Pile Cap 7 19-Dec-14 25-Dec-14 0 M3 A4230 A4190

    A4190 Casting of Abutment Pile Cap 16 26-Dec-14 10-Jan-15 76 M3 A4180 A3850, A3860

    PIER P4PIER P4 60 01-Aug-14 A 29-Sep-14 A 1689

    A4050 Boring & Casting of Piles 11 01-Aug-14 A 11-Aug-14 A 225 LM A11170, A3310 A4060

    A4060 Blinding for Pier Pile Cap 3 12-Aug-14 A 14-Aug-14 A 9 M3 A4050 A4070

    A4070 Casting of Pier Pile Cap 15 15-Aug-14 A 29-Aug-14 A 169 M3 A4060 A4080

    A4080 Bituminous Paint 3 30-Aug-14 A 01-Sep-14 A 1221 M2 A4070 A4090

    A4090 Casting of Pier & Pier Cap 28 02-Sep-14 A 29-Sep-14 A 65 M3 A4080 A3850

    SUPERSTRUCTURESUPERSTRUCTURE 231 08-Oct-14 A 10-May-15 32406

    SPAN BETWEEN AB1 & P3SPAN BETWEEN AB1 & P3 133 08-Oct-14 A 01-Feb-15 16203

    A4310 Erection of Scaffold & Shutter 55 08-Oct-14 A 04-Dec-14 14700 0 A4040, A4140, A3790, A11500, A3830, A4030, A3980A4320

    A4320 Fixing of Pot Bearings 7 05-Dec-14 11-Dec-14 12 NO. A4310, A3820 A4330

    A4330 Casting of Box Girder 21 12-Dec-14 01-Jan-15 1491 M3 A4320 A4340

    A4340 Prestressing Operation 10 02-Jan-15 11-Jan-15 0 0 A4330 A6790, A3920

    A6790 Deshuttering of Scaffold 21 12-Jan-15 01-Feb-15 0 0 A4340, A1670 A6710, A3850

    SPAN BETWEEN AB2 & P3SPAN BETWEEN AB2 & P3 114 17-Jan-15 10-May-15 16203

    A3850 Erection of Scaffold & Shutter 55 17-Jan-15 12-Mar-15 14700 0 A4140, A4090, A4190, A3990, A6470, A11290, A6790A3860

    A3860 Fixing of Pot Bearings 7 13-Mar-15 19-Mar-15 12 NO. A3850, A4190 A3870

    A3870 Casting of Box Girder 21 20-Mar-15 09-Apr-15 1491 M3 A3860 A3880

    A3880 Prestressing Operation 10 10-Apr-15 19-Apr-15 0 0 A3870 A6770, A3920

    A6770 Deshuttering of Scaffold 21 20-Apr-15 10-May-15 0 0 A3880 A3940

    FINISHING WORKSFINISHING WORKS 41 16-Apr-15 26-May-15 711

    GENERALGENERAL 41 16-Apr-15 26-May-15 711

    A3920 Concrete Bridge Parapet (N.J Barrier) 24 16-Apr-15 09-May-15 480 M A6290, A3880, A4340, A11620A3930

    J J J J J J J J J

    2014 2015 2016

    07-Nov-14, ABUTMENT AB1

    Boring & Casting of Piles

    Bituminous Paint

    Fixing of MSE Wall

    Backfilling

    Blinding for Abutment Pile Cap

    Casting of Abutment Pile Cap17-Aug-14 A, PIER P5

    Boring & Casting of Piles

    Blinding for Pier Pile Cap

    Casting of Pier Pile Cap

    Bituminous Paint

    Casting of Pier & Pier Cap28-Aug-14 A, PIER P3

    Boring & Casting of Piles

    Blinding for Pier Pile Cap

    Casting of Pier Pile Cap

    Bituminous Paint

    Casting of Pier & Pier Cap08-Sep-14 A, PIER P1

    Boring & Casting of Piles

    Blinding for Pier Pile Cap

    Casting of Pier Pile Cap

    Bituminous Paint

    Casting of Pier & Pier Cap10-Jan-15, ABUTMENT AB2

    Boring & Casting of Piles

    Bituminous Paint

    Fixing of MSE Wall

    Backfilling

    Blinding for Abutment Pile Cap

    Casting of Abutment Pile Cap29-Sep-14 A, PIER P4

    Boring & Casting of Piles

    Blinding for Pier Pile Cap

    Casting of Pier Pile Cap

    Bituminous Paint

    Casting of Pier & Pier Cap10-May-15, SUPERSTRUCTURE

    01-Feb-15, SPAN BETWEEN AB1 & P3

    Erection of Scaffold & Shutter

    Fixing of Pot Bearings

    Casting of Box Girder

    Prestressing Operation

    Deshuttering of Scaffold10-May-15, SPAN BETWEEN AB2 & P3

    Erection of Scaffold & Shutter

    Fixing of Pot Bearings

    Casting of Box Girder

    Prestressing Operation

    Deshuttering of Scaffold26-May-15, FINISHING WORKS

    26-May-15, GENERAL

    Concrete Bridge Parapet (N.J Barrier)

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 10 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014

    12-Oct-14 FQI - REV3

    02-Feb-15 FQI - REV3 A

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    A3930 Laying of Bituminous Wearing Course 12 04-May-15 15-May-15 180 M3 A3920, A3570 A3940, A5490, A9900

    A3940 Fixing of Expansion Joints 11 16-May-15 26-May-15 51 M A3930, A6770 A6710, A9900

    MSE WALL (RAMPS OF FLYOVER) (NB&SB)MSE WALL (RAMPS OF FLYOVER) (NB&SB) 312 28-May-14 A 04-Apr-15 241440

    MSE RWs & RAMPS OF FLYOVERMSE RWs & RAMPS OF FLYOVER 312 28-May-14 A 04-Apr-15 241440

    GENERALGENERAL 312 28-May-14 A 04-Apr-15 241440

    A5020 Excavation to Reduce Level 80 28-May-14 A 15-Aug-14 A 0 0 A1540, A6320, A11330, A9930A5030

    A5030 Preparation of Foundations 160 27-Jun-14 A 10-Dec-14 0 0 A5020, A1376, A11770 A5040, A5100

    A5040 Installing & Bracing of MSE Wall Panels 190 04-Jul-14 A 16-Feb-15 13100 M2 A5030 A5050

    A5050 Place & Compact Selected Fill up 190 08-Jul-14 A 27-Feb-15 0 0 A5040, A11900 A5060

    A5060 Connect & Tighten Soil Reinforcement 190 13-Jul-14 A 06-Mar-15 0 0 A5050 A5070

    A5070 Place & Compact Random Backfill 190 23-Jul-14 A 16-Mar-15 225000 0 A5060, A11590 A5080

    A5080 Install Precast Concrete Barrier 100 26-Dec-14 04-Apr-15 2000 LM A5070 A5370, A5120

    A5120 Casting of Friction Slab 90 05-Jan-15 04-Apr-15 1340 M3 A5080 A5370

    ROAD LIGHTING & ELECTRICAL INSTALLATIONROAD LIGHTING & ELECTRICAL INSTALLATION 157 31-Dec-14 05-Jun-15 3375

    GENERALGENERAL 157 31-Dec-14 05-Jun-15 3375

    CIVIL WORKS & CABLINGCIVIL WORKS & CABLING 117 31-Dec-14 26-Apr-15 3298

    A4580 Trench for Low Voltage Cables 100 31-Dec-14 09-Apr-15 1015 M A5400 A4590

    A4590 Laying of Ducts 100 07-Jan-15 16-Apr-15 1015 M A4580 A4600

    A4600 Laying of Cables 70 06-Feb-15 16-Apr-15 1015 0 A4590 A4620

    A4620 High Masts Concrete Foundations 70 06-Feb-15 16-Apr-15 68 NO. A4600 A4630, A4670, A4610

    A4610 Lighting Columns Concrete Foundations 70 16-Feb-15 26-Apr-15 180 NO. A4620 A4670

    A4630 Concrete Foundations for Transformer Stations & Feeder Pillars 50 26-Feb-15 16-Apr-15 5 NO. A4620 A4640

    COLUMNS, HIGH MASTSCOLUMNS, HIGH MASTS 90 08-Mar-15 05-Jun-15 72

    A4670 Fixing of High Masts 90 08-Mar-15 05-Jun-15 4 NO. A4620, A6350, A4610 A4680

    A4680 Fixing of Lighting Poles 90 08-Mar-15 05-Jun-15 68 NO. A4670 A5010, A5990, A5490

    TRANSFORMERS & FEEDER PILLARSTRANSFORMERS & FEEDER PILLARS 90 08-Mar-15 05-Jun-15 5

    A4640 33 KV & 11 KV Pad Mounted & Pole Mounted Transformers Substations 60 08-Mar-15 06-May-15 0 0 A4630 A4650

    A4650 Installation of Feeder Pillar 60 23-Mar-15 21-May-15 5 NO. A4640 A4660

    A4660 Power Supply Connections to Feeder Pillar 60 07-Apr-15 05-Jun-15 0 0 A4650 A9460, A5490

    DRAINAGE WORKSDRAINAGE WORKS 110 06-Dec-14 25-Mar-15 5731

    RC PIPESRC PIPES 110 06-Dec-14 25-Mar-15 5731

    GENERALGENERAL 110 06-Dec-14 25-Mar-15 5731

    A5090 Trench Excavation Work 100 06-Dec-14 15-Mar-15 1641 M3 A5350 A5100

    A5100 Laying of Drainage Pipes (RCC) 100 16-Dec-14 25-Mar-15 4000 LM A5090, A5030 A5370, A5110

    A5110 Construction of Manholes 80 05-Jan-15 25-Mar-15 90 No. A5100 A5370

    ROAD FINISHING WORKS (NB & SB)ROAD FINISHING WORKS (NB & SB) 280 01-Sep-14 A 07-Jun-15 201965

    GENERALGENERAL 280 01-Sep-14 A 07-Jun-15 201965

    EMBANKMENT, SUBBASE & AGGREGATE BASEEMBANKMENT, SUBBASE & AGGREGATE BASE 246 01-Sep-14 A 04-May-15 140506

    A5350 Backfilling to Embankment 120 01-Sep-14 A 15-Mar-15 81000 M3 A2990, A2920, A2850, A26 A5370, A5090, A5480

    A5370 Preparation of Granular Subbase 110 04-Oct-14 A 19-Apr-15 18355 M3 A5350, A5080, A11980, A5100, A5110, A5120, A5480A5380

    A5380 Preparation of Aggregate Base Course 120 05-Jan-15 04-May-15 41151 M3 A5370, A3010 A5390, A5430

    MEDIAN & SIDEWALK PAVINGMEDIAN & SIDEWALK PAVING 157 21-Dec-14 26-May-15 42833

    A5390 Installation of Precast Concrete Curbs 150 21-Dec-14 19-May-15 15393 M A5380 A5400

    A5400 Installation of Concrete Barriers 150 21-Dec-14 19-May-15 6600 M A5390, A6290, A11620 A5410, A4580

    A5410 Installation of Interlocking Tiles 150 28-Dec-14 26-May-15 20840 M2 A5400 A5450

    NEW BITUMINOUS LAYERSNEW BITUMINOUS LAYERS 87 07-Mar-15 01-Jun-15 17242

    A5430 Bituminous Base Course 75 07-Mar-15 20-May-15 12483 M3 A5380 A5450

    A5450 Bituminous Wearing Course 38 25-Apr-15 01-Jun-15 4759 M3 A5430, A4560, A5410 A5460, A5490, A9900

    GUARDRAILS, HIGHWAY SIGNS & ROAD MARKINGGUARDRAILS, HIGHWAY SIGNS & ROAD MARKING 79 21-Mar-15 07-Jun-15 1384

    A5480 Fixing of Overhead & Gantry Signs 30 21-Mar-15 19-Apr-15 4 NO. A5350, A6410 A5490, A5370

    A5460 Fixing of Guardrails 45 23-Apr-15 06-Jun-15 1315 M A5450, A6440 A5470

    A5470 Fixing of Highway Signs Single & Multiple Poles 45 23-Apr-15 06-Jun-15 65 NO. A5460, A6410

    A5490 Traffic Lines & Road Studs 30 09-May-15 07-Jun-15 0 0 A3930, A5450, A5480, A4680, A4660, A4570A6710, A6100, A9900

    SOL2, SOL4, SOL7,SOL5,SOL6SOL2, SOL4, SOL7,SOL5,SOL6 283 08-Jun-15 16-Mar-16 167560

    SHIFT TRAFFIC TO SOL1- SB & TEMP SERVICE ROAD SR-2SHIFT TRAFFIC TO SOL1- SB & TEMP SERVICE ROAD SR-2 7 08-Jun-15 14-Jun-15 0

    J J J J J J J J J

    2014 2015 2016

    Laying of Bituminous Wearing Course

    Fixing of Expansion Joints04-Apr-15, MSE WALL (RAMPS

    04-Apr-15, MSE RWs & RAMPS

    04-Apr-15, GENERAL

    Excavation to Reduce Level

    Preparation of Foundations

    Installing & Bracing of MSE Wall Panels

    Place & Compact Selected Fill up

    Connect & Tighten Soil Reinforcement

    Place & Compact Random Backfill

    Install Precast Concrete Barrier

    Casting of Friction Slab05-Jun-15, ROAD LIGHTING

    05-Jun-15, GENERAL

    26-Apr-15, CIVIL WORKS & CABLING

    Trench for Low Voltage Cables

    Laying of Ducts

    Laying of Cables

    High Masts Concrete Foundations

    Lighting Columns Concrete Foundations

    Concrete Foundations for Trans05-Jun-15, COLUMNS, HIGH MASTS

    Fixing of High Masts

    Fixing of Lighting Poles05-Jun-15, TRANSFORMER

    33 KV & 11 KV Pad Mounted &

    Installation of Feeder Pillar

    Power Supply Connections to Feeder Pillar25-Mar-15, DRAINAGE WORKS

    25-Mar-15, RC PIPES

    25-Mar-15, GENERAL

    Trench Excavation Work

    Laying of Drainage Pipes (RCC)

    Construction of Manholes07-Jun-15, ROAD FINISHING

    07-Jun-15, GENERAL

    04-May-15, EMBANKMENT, SU

    Backfilling to Embankment

    Preparation of Granular Subbase

    Preparation of Aggregate Base Course26-May-15, MEDIAN & SIDEWALK PAVING

    Installation of Precast Concrete Curbs

    Installation of Concrete Barriers

    Installation of Interlocking Tiles01-Jun-15, NEW BITUMINOUS LAYERS

    Bituminous Base Course

    Bituminous Wearing Course07-Jun-15, GUARDRAILS, H

    Fixing of Overhead & Gantry Signs

    Fixing of Guardrails

    Fixing of Highway Signs Single

    Traffic Lines & Road Studs16-Mar-16, SO

    14-Jun-15, SHIFT TRAFFIC

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 11 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014

    12-Oct-14 FQI - REV3

    02-Feb-15 FQI - REV3 A

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    Start (CH 25+300) & End (CH 21+100)Start (CH 25+300) & End (CH 21+100) 7 08-Jun-15 14-Jun-15 0

    GENERALGENERAL 7 08-Jun-15 14-Jun-15 0

    A9900 Placing of Plastic Barriers 7 08-Jun-15 14-Jun-15 0 0 A6710, A5450, A5490, A3930, A3940A6810

    A6810 Shift Traffic from Southern & Northeren Temp. Diversions back to new Main Road 0 14-Jun-15 0 0 A9900 A9650

    GENERAL CIVIL WORKSGENERAL CIVIL WORKS 95 18-Jun-15 20-Sep-15 11159

    CLEARING & EXCAVATIONCLEARING & EXCAVATION 95 18-Jun-15 20-Sep-15 11159

    GENERALGENERAL 95 18-Jun-15 20-Sep-15 11159

    A9650 Clearing & Grubbing 30 18-Jun-15 17-Jul-15 4259 M2 A6810 A9660, A12060

    A9660 Removal of Structures & Obstructures 60 20-Jun-15 19-Aug-15 1 LS A9650 A9670

    A9670 Utilities Trench Ear thworks 60 23-Jun-15 21-Aug-15 1641 M3 A9660 A9680, A7010

    A9680 Structural & Road Way Excavation 90 23-Jun-15 20-Sep-15 5258 M3 A9670 A9390, A12690

    UTILITIESUTILITIES 125 27-Jun-15 29-Oct-15 24200

    GENERALGENERAL 125 27-Jun-15 29-Oct-15 24200

    TELEPHONETELEPHONE 75 27-Jun-15 09-Sep-15 12400

    A7010 Installation of New (GTO) Omantal Line 30 27-Jun-15 26-Jul-15 11300 LM A9670 A7030, A6920, A6960

    A7030 Obtain Shutdown & Connect to Existing 30 27-Jul-15 25-Aug-15 0 0 A7010 A7040

    A7040 Remove & Dispose Existing (GTO) Omantal Line 15 26-Aug-15 09-Sep-15 1100 0 A7030 A6960

    ELECTRICAL (11 KV)ELECTRICAL (11 KV) 125 27-Jun-15 29-Oct-15 8800

    A6920 Installation of New 11 Kv UG Lines 30 27-Jun-15 26-Jul-15 5400 M A7010 A6890, A6840, A6960, A6900

    A6890 Obtain Shutdown & Connect to Existing 30 27-Jul-15 25-Aug-15 0 0 A6920 A6970

    A6970 Remove & Dispose Existing 11 Kv Overhead Lines 15 26-Aug-15 09-Sep-15 400 M A6890 A6960, A7290

    A6960 Remove & Dispose Existing 11 Kv Under Ground Lines 40 20-Sep-15 29-Oct-15 3000 M A6970, A6920, A7040, A7010A6100, A9690

    ELECTRICAL (33 KV)ELECTRICAL (33 KV) 10 10-Sep-15 19-Sep-15 400

    A7290 Obtain Shutdown & Connect to Existing 7 10-Sep-15 16-Sep-15 0 0 A6970 A6900

    A6900 Remove & Dispose Existing 33 Kv Ovehead Lines 3 17-Sep-15 19-Sep-15 400 M A6920, A7290 A9690

    WATERLINESWATERLINES 85 02-Jul-15 24-Sep-15 2600

    A6840 Installation of New Irrigation Pipes 25 02-Jul-15 26-Jul-15 2600 LM A6920 A6850

    A6850 Obtain Shutdown & Connect to Existing 60 27-Jul-15 24-Sep-15 0 0 A6840 A9690

    BOX CULVERTS - STAGE 2BOX CULVERTS - STAGE 2 96 04-Jul-15 07-Oct-15 8956

    GENERALGENERAL 96 04-Jul-15 07-Oct-15 8956

    8 CELLS BOX CULVERT AT CH 21+8388 CELLS BOX CULVERT AT CH 21+838 28 13-Aug-15 09-Sep-15 1452

    A11990 Structural Excavation 3 13-Aug-15 15-Aug-15 175 M3 A12100 A12000, A7950

    A12000 Blinding of Concrete 2 16-Aug-15 17-Aug-15 37 M3 A11990 A12010

    A12010 Casting of Base Slab 4 18-Aug-15 21-Aug-15 21 M3 A12000 A12020

    A12020 Casting of Walls 7 22-Aug-15 28-Aug-15 19 M3 A12010 A12030

    A12030 Casting of Top Slab 10 29-Aug-15 07-Sep-15 21 M3 A12020 A12040

    A12040 Casting of Apron Slab & W ing Walls 4 04-Sep-15 07-Sep-15 36 M3 A12030 A12050, A8090

    A12050 Backfilling 2 08-Sep-15 09-Sep-15 1143 M3 A12040 A9690

    44 CELL BOX CULVERT AT CH 21+98544 CELL BOX CULVERT AT CH 21+985 80 04-Jul-15 21-Sep-15 2939

    A12060 Structural Excavation 10 04-Jul-15 13-Jul-15 175 M3 A9650 A12070

    A12070 Blinding of Concrete 8 14-Jul-15 21-Jul-15 156 M3 A12060 A12080

    A12080 Casting of Base Slab 15 22-Jul-15 05-Aug-15 443 M3 A12070 A12090

    A12090 Casting of Walls 15 03-Aug-15 17-Aug-15 344 M3 A12080 A12100, A12130

    A12100 Casting of Top Slab 30 13-Aug-15 11-Sep-15 443 M3 A12090 A12110, A11990

    A12110 Casting of Apron Slab & W ing Walls 10 12-Sep-15 21-Sep-15 235 M3 A12100 A12120

    A12120 Backfilling 6 16-Sep-15 21-Sep-15 1143 M3 A12110 A9690

    9 CELL BOX CULVERT AT CH 22+6509 CELL BOX CULVERT AT CH 22+650 30 08-Sep-15 07-Oct-15 1719

    A8090 Structural Excavation 3 08-Sep-15 10-Sep-15 175 M3 A12040 A8100

    A8100 Blinding of Concrete 2 11-Sep-15 12-Sep-15 35 M3 A8090 A8110

    A8110 Casting of Base Slab 4 13-Sep-15 16-Sep-15 87 M3 A8100 A8120

    A8120 Casting of Walls 7 17-Sep-15 23-Sep-15 138 M3 A8110 A8130

    A8130 Casting of Top Slab 10 24-Sep-15 03-Oct-15 87 M3 A8120 A8140

    A8140 Casting of Apron Slab & W ing Walls 4 04-Oct-15 07-Oct-15 54 M3 A8130 A9610, A8150

    A8150 Backfilling 2 06-Oct-15 07-Oct-15 1143 M3 A8140 A9690

    5 CELL BOX CULVERT AT CH 23+5005 CELL BOX CULVERT AT CH 23+500 10 16-Aug-15 25-Aug-15 1329

    J J J J J J J J J

    2014 2015 2016

    14-Jun-15, Start (CH 25+300

    14-Jun-15, GENERAL

    Placing of Plastic BarriersShift Traffic from Southern &

    20-Sep-15, GENERAL C

    20-Sep-15, CLEARING

    20-Sep-15, GENERAL

    Clearing & Grubbing

    Removal of Structures & Obstructures

    Utilities Trench Ear thworks

    Structural & Road Way Excavation29-Oct-15, UTILITIES

    29-Oct-15, GENERAL

    09-Sep-15, TELEPHONE

    Installation of New (GTO) Omantal Line

    Obtain Shutdown & Conn

    Remove & Dispose Exis29-Oct-15, ELECTRICAL (11 KV)

    Installation of New 11 Kv UG Lines

    Obtain Shutdown & Conn

    Remove & Dispose Exis

    Remove & Dispose E19-Sep-15, ELECTRICAL (33 KV)

    Obtain Shutdown & Con

    Remove & Dispose Exis24-Sep-15, WATERLINES

    Installation of New Irrigation Pipes

    Obtain Shutdown & Con07-Oct-15, BOX CULV

    07-Oct-15, GENERAL

    09-Sep-15, 8 CELLS BO

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Casting of Apron Slab & W ing Walls

    Backfilling21-Sep-15, 44 CELL BO

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Casting of Apron Slab & W ing Walls

    Backfilling07-Oct-15, 9 CELL BO

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Casting of Apron Slab & W ing Walls

    Backfilling25-Aug-15, 5 CELL BOX

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 12 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014

    12-Oct-14 FQI - REV3

    02-Feb-15 FQI - REV3 A

  • Activity ID Activity Name OriginalDuration

    Start Finish Quantity UnitMeasure

    Predecessors Successors

    A7950 Structural Excavation 2 16-Aug-15 17-Aug-15 117 M3 A11990 A7960

    A7960 Blinding of Concrete 1 18-Aug-15 18-Aug-15 33 M3 A7950 A8000

    A8000 Casting of Apron Slab & W ing Walls 7 19-Aug-15 25-Aug-15 36 M3 A7960 A8010, A7600

    A8010 Backfilling 2 24-Aug-15 25-Aug-15 1143 M3 A8000 A9690

    1 CELL BOX CULVERT AT CH 23+7601 CELL BOX CULVERT AT CH 23+760 13 26-Aug-15 07-Sep-15 767

    A7600 Structural Excavation 2 26-Aug-15 27-Aug-15 117 M3 A8000 A7610

    A7610 Blinding of Concrete 1 28-Aug-15 28-Aug-15 7 M3 A7600 A7620

    A7620 Casting of Base Slab 2 29-Aug-15 30-Aug-15 16 M3 A7610 A7630

    A7630 Casting of Walls 3 31-Aug-15 02-Sep-15 19 M3 A7620 A7640, A7670

    A7640 Casting of Top Slab 1 03-Sep-15 03-Sep-15 16 M3 A7630 A7690, A7650

    A7650 Casting of Apron Slab & W ing Walls 4 04-Sep-15 07-Sep-15 21 M3 A7640 A7660

    A7660 Backfilling 1 07-Sep-15 07-Sep-15 571 M3 A7650 A9690

    1 CELL BOX CULVERT AT CH 23+9971 CELL BOX CULVERT AT CH 23+997 14 01-Sep-15 14-Sep-15 750

    A7670 Structural Excavation 2 01-Sep-15 02-Sep-15 117 M3 A7630 A7680

    A7680 Blinding of Concrete 1 03-Sep-15 03-Sep-15 3 M3 A7670 A7690

    A7690 Casting of Base Slab 2 04-Sep-15 05-Sep-15 20 M3 A7680, A7640 A7700

    A7700 Casting of Walls 3 06-Sep-15 08-Sep-15 18 M3 A7690 A7710

    A7710 Casting of Top Slab 1 09-Sep-15 09-Sep-15 9 M3 A7700 A7720

    A7720 Casting of Apron Slab & W ing Walls 4 10-Sep-15 13-Sep-15 12 M3 A7710 A7730

    A7730 Backfilling 1 14-Sep-15 14-Sep-15 571 M3 A7720 A9690

    PEDESTRIAN UNDERPASS 1 (SOL1 CH 24+325) - STAGE 2PEDESTRIAN UNDERPASS 1 (SOL1 CH 24+325) - STAGE 2 138 03-Aug-15 18-Dec-15 856

    GENERALGENERAL 138 03-Aug-15 18-Dec-15 856

    UNDERPASS STRUCTUREUNDERPASS STRUCTURE 64 03-Aug-15 05-Oct-15 603

    A12130 Structural Excavation 10 03-Aug-15 12-Aug-15 459 M3 A12090 A12140, A8300

    A12140 Blinding of Concrete 12 06-Aug-15 17-Aug-15 8 M3 A12130 A12150

    A12150 Casting of Base Slab 21 12-Aug-15 01-Sep-15 11 M3 A12140 A12160

    A12160 Casting of Walls 21 22-Aug-15 11-Sep-15 15 M3 A12150 A12170

    A12170 Casting of Top Slab 21 12-Sep-15 02-Oct-15 12 M3 A12160 A12180, A12190

    A12180 Backfilling 3 03-Oct-15 05-Oct-15 98 M3 A12170 A9690

    ENTRANCE & EXIT - RHSENTRANCE & EXIT - RHS 77 03-Oct-15 18-Dec-15 253

    A12190 Casting of Floor Slab 22 03-Oct-15 24-Oct-15 65 M3 A12170 A12200

    A12200 Casting of Walls 35 25-Oct-15 28-Nov-15 108 M3 A12190 A12220, A12210

    A12210 Casting of Landing Slabs & Stair Case 35 14-Nov-15 18-Dec-15 35 M3 A12200 A12220

    A12220 Casing of Beams & Roof Slab 20 29-Nov-15 18-Dec-15 45 0 A12200, A12210

    PEDESTRIAN UNDERPASS 2 (SOL1 CH 23+300) - STAGE 2PEDESTRIAN UNDERPASS 2 (SOL1 CH 23+300) - STAGE 2 127 06-Aug-15 10-Dec-15 1411

    GENERALGENERAL 127 06-Aug-15 10-Dec-15 1411

    UNDERPASS STRUCTUREUNDERPASS STRUCTURE 65 06-Aug-15 09-Oct-15 1261

    A8300 Structural Excavation 8 06-Aug-15 13-Aug-15 1023 M3 A12130 A7220, A1510

    A7220 Blinding of Concrete 7 12-Aug-15 18-Aug-15 10 M3 A8300 A7230

    A7230 Casting of Base Slab 15 23-Aug-15 06-Sep-15 17 M3 A7220 A7240

    A7240 Casting of Walls 15 07-Sep-15 21-Sep-15 24 M3 A7230 A7250

    A7250 Casting of Top Slab 15 22-Sep-15 06-Oct-15 19 M3 A7240 A8310, A12230, A12910

    A8310 Backfilling 3 07-Oct-15 09-Oct-15 168 M3 A7250 A9690

    ENTRANCE & EXIT - RHS (North Bound)ENTRANCE & EXIT - RHS (North Bound) 65 07-Oct-15 10-Dec-15 150

    A12230 Casting of Floor Slab 22 07-Oct-15 28-Oct-15 32 M3 A7250 A12240

    A12240 Casting of Walls 35 17-Oct-15 20-Nov-15 54 M3 A12230 A12260, A12250

    A12250 Casting of Landing Slabs & Stair Case 35 06-Nov-15 10-Dec-15 17 M3 A12240 A12260

    A12260 Casing of Beams & Roof Slab 20 21-Nov-15 10-Dec-15 47 M3 A12240, A12250 A5860

    VEHICULAR UNDERPASSES - STAGE 2VEHICULAR UNDERPASSES - STAGE 2 80 07-Oct-15 25-Dec-15 802

    VEHICULAR UNDERPASS @ CH 21+300VEHICULAR UNDERPASS @ CH 21+300 40 07-Oct-15 15-Nov-15 401

    A12910 Structural Excavation 10 07-Oct-15 16-Oct-15 400 M3 A7250 A12980

    A12980 Construction of Approach Ramps 30 17-Oct-15 15-Nov-15 1 LOT A12910 A12990

    VEHICULAR UNDERPASS @ CH 24+600VEHICULAR UNDERPASS @ CH 24+600 40 16-Nov-15 25-Dec-15 401

    A12990 Structural Excavation 10 16-Nov-15 25-Nov-15 400 M3 A12980 A13060

    J J J J J J J J J

    2014 2015 2016

    Structural Excavation

    Blinding of Concrete

    Casting of Apron Slab & W ing Walls

    Backfilling07-Sep-15, 1 CELL BOX

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Casting of Apron Slab & W ing Walls

    Backfilling14-Sep-15, 1 CELL BOX

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Casting of Apron Slab & W ing Walls

    Backfilling18-Dec-15, PEDES

    18-Dec-15, GENERAL

    05-Oct-15, UNDERPAS

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Backfilling18-Dec-15, ENTRA

    Casting of Floor Slab

    Casting of Walls

    Casting of Landing

    Casing of Beams & Roof Slab10-Dec-15, PEDES

    10-Dec-15, GENERAL

    09-Oct-15, UNDERPAS

    Structural Excavation

    Blinding of Concrete

    Casting of Base Slab

    Casting of Walls

    Casting of Top Slab

    Backfilling10-Dec-15, ENTRA

    Casting of Floor Slab

    Casting of Walls

    Casting of Landing

    Casing of Beams & Roof Slab25-Dec-15, VEHIC

    15-Nov-15, VEHICU

    Structural Excavation

    Construction of Approach Ramps

    25-Dec-15, VEHIC

    Structural Excavation

    CCC OMAN LLC

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    Summary

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    Page 13 of 18

    Data Date: 12-Oct-14 UPDATES TO CLAUSE 14 PROGRAM

    Date Revision Checked Approved

    13-Apr-14 FQI - REV2 18 September 2014