FPSO Floating Production Technology Workshop
DAY ONE
INTRODUCTION TO FLOATING PRODUCTION SYSTEMS
o Background and General Trends in Offshore Production o Review of Fields developed with Floaters and Subsea Production Systems o Influence of Pressure, Temperature and Field Chemistry on Production Systems o Geographic Requirements o Typical Field Development Contracts
GLOBAL ENERGY REVIEW - 2014
o World Oil Reserves and Production o World Gas Reserves and Production o What Oil Price? o World Energy Consumption o The Important Future for Gas and LNG
o Alternative Energy Approaches FPSO / Floater Basic Systems
FPSO SYSTEM REQUIREMENTS
o Functional Requirements o Monohull, Semi-Submersible, Deep Draught Semi-Sub, SPAR and TLP Options o Layout and Safety o Newbuild or Conversion o New Developments (Sevan)
• FPSO MONOHULL DESIGN REQUIREMENTS & MODEL TESTING o Design Requirements o Hydrodynamic Studies o Wave Tank Model Testing o Wind Tunnel Testing o Computational Fluid Dynamics (CFD) o Response Amplitude Operators (RAO) o FPSO Motions and Current Forces o Operational Studies
• MOORING SYSTEMS
o Typical Systems
o Components o Analysis / Design & Safety Factors o Materials o Anchors & Piles o Installation o New System
• TURRET DESIGN
o Definition of Functions o FPSO Layout (External & Internal Turrets) o Vessel Motions and Mooring Forces o Turret Size vs Capacity
o Disconnectable Systems o Bearing Systems o Mooring Lines and Riser Connections and Handling o Fluid Transfer Systems - Swivels & Drag Chains
• Q&A’s on Day One Topics
DAY TWO
FPSO as part of a Field Development
• SUMMARY OF SUBSEA PRODUCTION BUILDING BLOCKS:– As part of FPSO Field System- Main building blocks o Well Completions and Xmas Trees o Manifolds and Templates o Flowlines and Pipelines o Subsea Control Systems o Umbilicals
• RISERS (FLEXIBLE DYNAMIC/TOWERS/STEEL CATENARY)
o Systems requirements o Flexible Dynamic Risers – Design & Fabrication o Computer Models o Integrity Monitoring o Deepwater requirements o Integrated Production Bundle Risers o Hybrid Risers and Riser Towers o Steel Catenary Risers
• FPSO FIELD LAYOUT REQUIREMENTS
o Field Layout Requirements o Subsea Wells
o Mooring Patterns o Operations and Vessel Movements in the Field o Drilling Issues o Seabed / Geohazards o Workovers
• FIXED PLATFORM HOSTS
o Functional Requirements o Fixed Platforms o Layout and Safety
Topsides Processing
• INTRODUCTION TO FPSO TOPSIDES PROCESSING SYSTEMS o Introduction to Offshore Production Systems o Development concepts o Reservoirs o Typical Well Fluids Compositions o Function of process and utility plant (Reservoir Interaction, Typical Reservoir Fluids, Product
Specifications, Environmental Constraints) o Processing Facilities (Separation, Compression, Produced Water, Water Injection, Utilities) o Effect of Motion
OIL SEPARATION SYSTEM o Process Flow Diagram o Slug Catchers o HP and LP Separator Vessels o Inter Heater Systems o Electrostatic Caolescers o Oil Storage o Examples of Equipment and Suppliers
• Q&A’s on Day Two Topics
DAY THREE
• GAS COMPRESSION AND TREATMENT SYSTEM o Process Flow Diagram o Gas Compressors o Gas Scrubbers
o Gas Coolers
o Gas Dehydration o Gas Cleaning (Amine treatments and Mercury Removal) o Examples of Equipment and Suppliers
• PRODUCED WATER TREATMENT SYSTEM
o Process Flow Diagram o Oil Removal - Hydrocyclones o De-Gassers o Examples of Equipment and Suppliers
• WATER INJECTION SYSTEM
o Process Flow Diagram
o Seawater Lift Pumps o Filtration o Sterilisation o Sulphate Removal o Dearation o Injection Pumps o Examples of Equipment and Suppliers
• FPSO POWER GENERATION
o Production Host Requirements o Gas Turbine Suppliers and Range o Diesel Generators
o Examples of Equipment and Suppliers
• OTHER PROCESS FUNCTIONS - UTILITIES o Cooling Medium o Heating Medium o Fuel Gas System o Flare and Vent Systems o Diesel System o Drains System o Chemical Injection System o Compressed Air System
o Potable / Fresh Water System o Inert Gas System o Fire Water System o VOC Recovery System o Examples of Equipment and Suppliers
• ASANG FPSO MODULE CONSTRUCTION
o Asang Field o Module Frame Construction o Lifting
• TOPSIDES EQUIPMENT LAYOUT
o Operational & Safety requirements o Topsides Process and Utilities Layout o Accommodation & Helideck o Cranes & Laydown Areas
TOPSIDES PROCESS PLANT EXAMPLES
o West African Deepwater FPSOs o Shallow water FPSOs
FPSO TANKER CONVERSION ACTIVITIES
o Tanker Selection o Hull Conversion – Turret or Spread Moored Conversion Activities
o Tanker deck Preparations for Topsides Process Equipment o Addition of Accommodation, Helideck, Flares Stack and Cranes o Vessel Coating Requirements
Q&A’s on Day Three Topics
DAY FOUR
FPSO Operations
FPSO COMMISSIONING ACTIVITIES o Yard Construction o Mechanical Completion o Pre-Commissioning o Yard Commissioning o Examples
FPSO TOPSIDES EXAMPLES - GAS & CONDENSATE FPSOs
o AKPO Field and FPSO - Nigeria
o ARTHIT Field and FPSO - Thailand
SHUTTLE TANKER AND EXPORT OPTIONS o Types of Tankers (Shuttle Tankers with DP Thrusters, Standard Trading Tankers, Capacities) o Loading/Offloading Rates o Operational Schedules o Offloading Transfer Systems (Direct or Remote) o Metering Systems o Safety Records
CASE STUDY No 1. PIERCE FIELD (NORTH SEA)
o North Sea Location
o Reservoir Characteristics and Drilling o FPSO o Field Layout and Subsea Equipment o Costs
• CASE STUDY No 2. ALBA FIELD FSO (NORTH SEA)
o Detailed Analysis of an FSO o Field Layout o FSO Vessel o Turret / Swivel o Deck Piping System
o Export System
FPSO INSTALLATION AND HUC o Dalia Field Installation o Vessels Employes o FPSIO Hook-Up o FPSO Start-Up
LPG FPSOs
o LPG FPSO Systems o Field Examples o Belanaka Field
o Sanha / Bomboco Field o LPG FSO Systems o Escravos Gas Field
FPSO SAFETY REQUIREMENTS
o Offshore Safety Incidents o Safety Case Regulations o Design and Safety Assessment for Floating Installations o Certification/Verification/Classification o Discussion with Examples o Environmental Issues
• Q&A’s on Day Four Topics
DAY FIVE
• CASE STUDY DEEPWATER FIELDS – Including West Africa
o Deepwater issues and Range of Production Systems o Current Worldwide Status – Brazil, Gulf of Mexico, North Sea, West Africa, South East Asia
and Australia
• CASE STUDY – DEEPWATER W AFRICA o Angola Blocks 15, 17, 18 and 31
• FPSO OPERATIONS MANUALS
o Organisation and Management o FPSO Processing Operations
o Field Operations o Safety Matters
• LNG/FLOATING LIQUIFACTION NATUREAL GAS (FLNG) VESSELS LNG TECHNOLOGIES
o Offshore Requirements o Liquefaction Process o Past studies and Findings o LNG Transport o LNG Terminals (Loading & Offloading) o Supply Chain Options o Examples of Technology
• FLOATING STORAGE AND REGASSIFICATION (FSRU) VESSELS o LNG Re-Gasification Requirements o Technical and Security Issues o Land Based or Offshore Based Approaches o Requirements for Floating Offshore Re-Gasification Vessels o Seawater Heating o Hydrocarbon Combustion Heaters o Certifying Authorities Roles and Activities
• FIELD BOD – FPSO vs Tie-Back
o Review of Field Basis of Design (BoD)
o Definition of Development Requirements o FPSO Development Options o Tie-Back Development Options o Field Hardware o FPSO Purchase or Rental o Option Selection Criteria
• COST DATA BASE & FPSO CONTRACTS
o Economic Criteria o Development Plan Selection o CAPEX Estimation and Evaluation o Field Cost Examples
o OPEX Expenditure o Subsea Production Systems and FPSO Systems Cost Data Base o Small and Large Field Contract Approaches o Q&A’s on Day Five Topics & Close of Course