1 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
FPRA & Site Star Installation Guide - PERUDavid TorresJune, 2010
2 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
FPRA & Site Star Installation guide PERU
3 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / cable entry plate removal
4 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / removing plate 1
5 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / removing plate 2
6 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / removing FOAM 1
7 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / removing inner plate 1
8 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / removing inner plate 2
9 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / cable entry
10 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / Cable entry installation
11 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / battery shelf kits, cable entry and support rails
Side & top rails
Battery shelf kits
Cable entry
12 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / Battery cable routing
13 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / Battery cable routing- A/C ACpower
14 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / PDA module overview
High-integrated power systemModularized designFlexible applications: load/battery configurationVariable AC power connectionControl via the GUIIP54/55
15 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
PDA description & functions
AC input distributionDC output distributionBattery control function: status test, LVDSystem supervisor: LCD/LED display, alarm indicationNetwork connection
16 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Delivery contents/ preparing installation
17 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Preparing Installation / Test Equipment_tools
PC Multi-meter: FLUKE 170 or equivalentDC current clamp: FLUKE I410 or equivalent
Rubber hammerChiselHydraulic crimping tool13 mm torque wrenchT10, 20, & 30 screwdriversCutting knifeProtecting gloves & glasses.
18 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / Removing PDA from shelf
19 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / General view of the PDA
20 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / PDA front panel overview
21 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / Front panel LEDS overview
22 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / rear cover removal
23 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Rear internal layout
B
C
D
A
PDA earth cableAC ground clamp
SPD ground clamp
OVP DIN Rail
AC terminal block
E
F
Rear cover Retention cable
OVP sensor connector
Cable restraint
PDA rear cover
24 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / OVP
25 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Configure the AC terminal block
Single-phase
3-Δ
3-Y
26 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Prepare the AC cable
Inserting the AC cable
Stripping the wires
27 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / One Phase AC with OVP
L1 L2 L3 N 1 2 3 4 5 6
OVP AC Terminal Block
L NPEAC mains
28 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Single-phase AC connection with the OVP
Set up the OVP
29 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Single-phase AC connection with the OVP
Connecting the SPD and AC terminal block
30 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – 3Y AC connection with the OVP
L1 L2 L3 N
1 2 3 4 5 6OVPAC Terminal Block
L1 L2PE
AC MainsL3 N
31 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – 3Y AC connection with the OVP
Connecting the OVP and AC terminal block
32 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – 3Y AC connection with the OVP
33 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – 3Δ AC connection with the OVP
L1 L2 L3 N
1 2 3 4 5 6OVPAC Terminal Block
L1 L2PE
AC mainsL3
34 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – 3Δ AC connection with the OVP
35 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Before routing the DC cables
36 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Identifying the DC terminals
37 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Configure the breakers
If connecting to separate load / battery blocks, the load / battery switch lever bar and the terminal short link have to be removed.
38 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Connecting the DC cable
Inserting the cable through front panel Securing into the clamp
39 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Configuration of DC cables
Load & return: 35mm2 2Battery & return: 35mm2 2Load grounding: 25mm2 1
Typical
Parallel loadParallel battery
40 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Finishing the DC connection
Push the front panel back and secure it
41 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Finishing the DC connection
42 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Drawer layout
43 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Connecting the temperature cable
7 TEM_GND Red8 TEM SENSE_IN White9 TEMP_VCC Black
10 EARTH Cable screen
Connect to J22
44 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Placing the temperature probe
The temperature probe should be put where might has the highest temperature
45 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Connecting the alarm cable
3 ALARM_COM4 MAINS 15 ALARM_COM6 MAINS 27 ALARM_COM8 MAINS 39 ALARM_COM10 CRITICAL11 ALARM_COM12 MAJOR13 ALARM_COM
14 MINORConnect Alarm Out cable to J22
46 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Fixing the communication cable
Correctly grounding the cable shield is crucial to the electromagnetic compatibility (EMC) of the entire system.
47 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Putting back and secure the drawer
48 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Installing the PDA into case
49 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Connecting the earth cable
PDA earth cable
System earth cable
50 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Connecting the Ethernet cable
51 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Installing the rectifiers into case
52 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Connecting the rectifiers
Connecting the power cable
Connecting the RS485 cable
53 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Connecting the rectifiers
54 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Recommended configuration of the cable through cable gland
Option 1 Option 3
Option 2
55 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Insert the cable through cable gland
56 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Installing the cable glands with cables
57 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Fixing all the cables to the case
58 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Fixing the AC cable with cable restraints
59 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Fixing the PDA earth cable to case
Fix the PDA earth cable to the cable gland with cable tie so as not to block the LCD.
60 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Exiting the alarm cable
The alarm cable is exiting from top of the case if required
61 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Finishing the cables
62 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Installing the front and back cover
Front cover
Back cover
The FPRA is IP55 after installing the front and back cover
63 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – FPRA General view after the installation without conduit pipes
64 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Fixing the two FPRA units
Stacking and fixing the two FPRA units
65 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Paralleling the two drawers - RS-422 cables
J22 #1
1
2
3
4
5
6
11
12
J22 #2
1
2
3
4
5
6
12
11
Parallel cable #1
Parallel cable #2
66 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Paralleling the two drawers
Parallel cable #1
Parallel cable #1
Parallel cable #2
Parallel cable #2
Drawer #1 Drawer #2 21
67 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Paralleling the two drawers
68 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / reccomended cable sizes
69 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Installing the two FPRA units
Installing the two FPRA units separately
70 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Installing the three drawers
1
2
3
4
5
6
11
12
1
2
3
4
5
6
11
12
Parallel cable #1
J22 #31 2 3 4 5 611 12
Parallelcable #2
Parallelcable #3
J22 #1 J22 #2
71 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Installing the three drawers
Parallel cable #1
Parallel cable #1
Parallel cable #2
Parallel cable #2
Drawer #1 Drawer #2 Drawer #3
Parallel cable #3
Parallel cable #3
2 31
72 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Installing the three FPRA units
73 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / Interface with Site Star Cabinet
74 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / 2” conduit PIPE (Battery Cables)
75 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / 1” conduit Pipes (AC input & DC output to loads)
Alluminium plates
76 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / Conduit fix to FPRA
77 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / Final view
78 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / Cable Routing
Battery string #3, alarms & temp sensor
Battery strings 1 & 2DC to BTS
AC Shelf 2
AC Shelf 1
Parallel cable
Alarms & communications
79 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / Cable routing
80 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / Cabinet alarm routing
81 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation / Alarm routing
82 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Browser and control unit setup
Configure the setup environment
83 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Change the CU IP-address
Via the LCD: change the CU IP-address into local IP range Via the GUI: Change the user PC IP-address to the CU IP rangeConnect to the CU via the GUIChange the CU IP to the local internet/intranet IP rangeChange the user PC IP-address back to the local internet/intranet IP rangeConnect the CU and user PC in the local internet/intranet via the GUI
84 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – Change the CU IP-address via GUI
After changing the CU IP-address, need reconnect the CU manually
85 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Installation – GUI home page
86 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Commissioning – DC setup
Note: the battery voltage must be over 43Vdc.
87 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Commissioning – Check the status
Check the data via the GUI or LCD
88 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Commissioning – Set up the parameters
Each FPRA has already been calibrated before the shipment
89 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Export/Import Conf.BIN file
90 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Maintenance
Checking the connector sealChecking the cable connectorsChecking the screwsChecking the rectifier fansReplacing the OVP module, when this is necessaryUpdating the system firmware
91 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Alarm definition CLARO PERU
REC AC UVP ( POR CADA MODULO)
REC GENERAL ERROR (POR CADA MODULO)REC SENSOR FAIL (POR CADA MODULO)REC NORM. TEMP HIGH (POR CADA MODULO)REC NORM TEMP LOW (POR CADA MODULO)REC EXCEP TEMP HIGH (POR CADA MODULO)REC EXCEP TEMP LOW (POR CADA MODULO)REC ELEMENT LOSS (POR CADA MODULO)REC OTP (POR CADA MODULO)REC FAN FAILURE (POR CADA MODULO)REC AC OVP (POR CADA MODULO)REC DC OVP (POR CADA MODULO)
CU/PDU BATT TEST FAIL (POR CADA FPRA)PDA OVP (POR CADA FPRA)
BATT LOW VOLTAGE (POR CADA FPRA)CU/PDUCIRCUIT BREAKER 1 (POR CADA FPRA)CU/PDUCIRCUIT BREAKER 2 (POR CADA FPRA)CU/PDUCIRCUIT BREAKER 3 (POR CADA FPRA)CU/PDUCIRCUIT BREAKER 4 (POR CADA FPRA)CU/PDUCIRCUIT BREAKER 5 (POR CADA FPRA)CU/PDU LVD ALARM (POR CADA FPRA)REC DC OVP (POR CADA MODULO)
CU/PDU BATT TEMP. LOW (POR CADA MODULO)CU/PDU BATT TEMP. HIGH (POR CADA MODULO)REC POWER LIMIT (POR CADA MODULO)
Alarma de puerta : Directa a la BTS (ALARM 1)voltaje flotacion por celda=2.27 @ 25°ccarga 1/10 de la capacidad por 10 horas por numero de bancosSe dejan los jumpers entre los puertos de load y entre los puertos de battery.
La alarma CLU failure del gabinete Site Star se cablea en serie con la alarma 14 Alarma de Fan de Site Star en serie con alarma 12Alarma de compresor de Site Star en serie con alarma 12
MAINS 1 (Alarm 16)
MAINS 2 (Alarm 15)
MAINS 3 (ALARM 14)
CRITICAL (ALARM 13)
MAJOR (ALARM 12)
92 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Alarm definition CLARO PERU (Cont)Alarmas asignadas al FPRA
J11 N# ALARMA
RELAY 1 PIN 3 Y 4 16
RELAY 2 PIN5 Y 6 15
RELAY 3 PIN7 Y 8 14
RELAY 4 PIN 9 y 10 13
RELAY 5 PIN 11 Y 12 12
RELAY 6 PIN 13 y 14
Alarma de Sensor de Temperatura
color de cable J22
Rojo PIN 7
Blanco PIN 8
negro PIN 9
tierra PIN 10
93 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Best Practices
While connecting the AC or DC cables into the FPRA system, make sure the power switches are at the OFF positionAll cables have to pass the cable glands via their indicated holes before connecting into the systemWhile inserting the cable from the front panel, be careful not to destroy the waterproofAll the screws must be tightened using proper screwdrivers with appointed torques Note the AC terminal block configuration for different AC mains typesThe battery/load breaker switch lever bar and the corresponding clamp short link should be removed when supporting different battery/load. After finishing the AC or DC cables connection, user is recommended to test at the cable inputs to ensure no short exists
94 © Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010For internal use
Best Practices
While commissioning with a battery input, make sure the battery voltage is over 43Vdc before connecting to the systemWhile removing the PDA from the case, the AC mains must be switched off, but battery could also be on to power the systemBefore install a OVP to the system, the AC mains must be switched offThe IP rating (IP54) is no longer guaranteed while connecting the Ethernet cable