Fountainhead Regional Park Fairfax Station, Virginia Stair and Dock Improvements 100% Construction Documents Specifications 29 September | 2017

Transcript of Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents...

Page 1: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

Fountainhead Regional Park Fairfax Station, Virginia

Stair and Dock Improvements

100% Construction Documents Specifications

29 September | 2017

Page 2: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

OWNER:

NOVA Parks 5400 Ox Road

Fairfax Station, Virginia 22039

PRIME CONSULTANT:

Rhodeside & Harwell Landscape Architecture

________________________________ Kevin Fisher

VA Licensed Landscape Architect Lic. No. 0406001938

29 September | 2017 – Construction Documents Specifications

Page 3: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

Fountainhead Regional Park Stair and Dock Improvements

FAIRFAX STATION, VIRGINIA IN THE COUNTY OF FAIRFAX

SCOPE OF WORK

Furnishing of all labor, equipment and materials to complete in every detail of the work indicated on the plans and/or outlined in the specifications and for all work incidental thereto for the rehabilitation of stairs, walkways, and a portion of the existing deck and docks at the Fountainhead Regional Park, including:

Demolition, Earthwork Tree Preservation Walkways and Paving Improvements Stairs, Decking, and Railings

Consultants include:

Site Surveying and Civil Engineering: RC Fields & Associates, Inc. (RC Fields) Structural Engineering: McMullan & Associates (McMullan)

Page 4: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

TABLE OF CONTENTS

TECHNICAL SPECIFICATIONS NUMBER SECTION ................................................................................................................. AUTHOR(S) DIVISION 01 011000 Summary .................................................................................................................. RHI 012300 Alternates ................................................................................................................. RHI 012600 Contract Modification Procedures ............................................................................ RHI 012900 Payment Procedures................................................................................................ RHI 013100 Project Management and Coordination ................................................................... RHI 013200 Construction Progress Documentation .................................................................... RHI 013233 Photographic Documentation ................................................................................... RHI 013300 Submittal Procedures ............................................................................................... RHI 014000 Quality Requirements............................................................................................... RHI 015639 Temporary Tree and Plant Protection ...................................................................... RHI 016000 Product Requirements ............................................................................................. RHI 017300 Execution ................................................................................................................. RHI 017700 Closeout Procedures................................................................................................ RHI 017839 Project Record Documents ...................................................................................... RHI DIVISION 03 033000 Cast in Place Concrete ............................................................................................ RHI/McMullan DIVISION 05 057300 Decorative Metal Railings ........................................................................................ RHI DIVISION 06 061063 Exterior Stone Carpentry ......................................................................................... RHI/McMullan 061533 Wood Decking .......................................................................................................... RHI/McMullan DIVISION 31 311000 Site Clearing ............................................................................................................. RHI 312000 Earth Moving ............................................................................................................ RHI DIVISION 32 321216 Asphalt Paving ......................................................................................................... RHI 321373 Concrete Paving Joint Sealants ............................................................................... RHI

Page 5: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUMMARY 011000 - 1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section and all other Specification Sections.

1.2 SUMMARY

A. Section Includes:

1. Project information. 2. Document Hierarchy. 3. Summary of Contract Documents. 4. Work covered by Contract Documents. 5. Contractor's Responsibilities. 6. Access to site. 7. Coordination with occupants. 8. Work restrictions. 9. Specification and drawing conventions. 10. Alternates. 11. Construction Progress Documentation. 12. Construction Waste Management and Disposal 13. Quality Requirements 14. Warranties 15. Extra Materials

1.3 PROJECT INFORMATION

A. Project Identification: Fountainhead Regional Park – Stair & Dock Improvements

1. Project Location: 10875 Hampton Road, Fairfax Station, VA, 22039

B. Owner: Northern Virginia Regional Parks Authority (NOVA Parks)

C. Landscape Architect: Whenever the terms “Consultant”, “Landscape Architect”, “Architect”, “Engineer”, “Designer” or similar is used in the contract documents or elsewhere, it shall be understood as referring to the Landscape Architect (Rhodeside & Harwell, Incorporated) for the purposes of this Contract.

1. Point of Contact: Kevin Fisher (703-683-7447)

D. Landscape Architect's Consultants: The Landscape Architect has retained the following design professionals who have prepared designated portions of the Contract Documents:

Page 6: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUMMARY 011000 - 2

1. Land Surveying & Civil Engineering: RC Fields & Associates, Inc. (730 Washington Street, Alexandria, VA 22314)

2. Structural Engineering: McMullan & Associates (1861 Wiehle Avenue, Suite 125, Reston, VA 20190)

1.4 DOCUMENT HEIRARCHY

A. The Notice to Bidders, Bid Form / Proposal, General Conditions, Special Provisions, and/or Supplementary Specifications shall govern and prevail in the case of conflict between them and the any other specification Section (Divisions 1 through 32).

B. The following Standard Specifications and Codes shall be considered a part of each Specification where such specifications are applicable, and shall include all current changes and revisions. Specifications contained herein shall prevail; items not covered in specifications contained herein shall be governed by the following, in order of priority:

1. Ordinances and Laws of the State of Virginia, County of Fairfax, City of Vienna. 2. American Society for Testing and Materials. 3. Virginia Erosion and Sediment Control Law, Regulations, and Certification Regulations.

1.5 SUMMARY OF CONTRACT DOCUMENTS

A. Contract Documents include:

1. Owner-Contractor Agreement, 2. General Conditions, 3. Supplemental Conditions, 4. Project Manual (Bidding & Contract Requirements and Technical Specifications), and 5. Drawings, dated 16 May 2017.

B. Bidders should satisfy themselves that they have a complete set of printed contract documents. Bidders shall review available exhibits. Missing contract document pages, lack of review of existing site conditions, and/or lack of review of available exhibits will not constitute the basis for a valid claim

C. Items noted as "N.I.C." or "Not In Contract" or "By Others" within the Contract Documents are items to be constructed by other parties before, during or after the work of this project, and are not required to be constructed by Contractor. Contractor is required to coordinate his or her work with the work of other parties.

1.6 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists of the following:

1. Landscape and site improvements including new brick walls, stairs and handrails, sidewalks, and lighting.

B. Type of Contract:

Page 7: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUMMARY 011000 - 3

1. Project will be constructed under a single prime contract.

1.7 CONTRACTOR'S RESPONSIBILITIES

A. Permits, Fees, Notices, and Taxes: Secure and pay for all required permits, licenses, approvals, inspections, and taxes and shall give all notices and comply with all laws and government regulations in connection with the performance of this Contract.

B. Utility Coordination: Make all arrangements with, contract with, and schedule the work of utility companies to complete this work by the project Date of Substantial Completion. Conduct a Pre-installation Conference with each engaged utility company.

C. Include all Contractor related costs, including overhead and profit, for all other electrical work and patching and repair of streets, paving, curbing and other surface materials (labor, equipment, materials, and incidentals) that is not provided by the utility company in Contract Lump Sum Bid.

1.8 ACCESS TO SITE

A. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.

B. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to Limits of Disturbance (L.O.D) indicated on the Contract Drawings.

2. Driveways, Walkways and Entrances: Keep driveways, parking areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials, unless otherwise allowed by written proof from Owner.

a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

1.9 COORDINATION WITH OCCUPANTS

A. Full Owner Occupancy: Owner will occupy site and building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.

Page 8: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUMMARY 011000 - 4

2. Notify Owner not less than 72 hours in advance of activities that will affect Owner's operations.

3. Before construction commences, Contractor to consult with Owner to provide detailed plan for maintaining accessible entry to alternate building entrance while Work is being performed.

1.10 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction. Work should not commence before stated time in City Ordinance.

B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:00a.m. to 5:00 p.m., Monday through Friday, unless otherwise indicated.

1. Weekend Hours: Must be approved by Owner in writing in advance. 2. Early Morning Hours: Must be in compliance with regulations by authorities having

jurisdiction for noisy or loud work and approved by Owner in writing in advance. 3. Hours for Utility Shutdowns: Must be approved by Owner in writing in advance.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

1. Notify Landscape Architect/Owner not less than three (3) days in advance of proposed utility interruptions.

2. Obtain Owner's written permission before proceeding with utility interruptions.

D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.

1. Notify Landscape Architect/Owner not less than three (3) days in advance of proposed disruptive operations.

2. Obtain Owner's written permission before proceeding with disruptive operations.

E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of entrances, operable windows, or outdoor-air intakes.

F. Employee Identification: Provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times.

G. Employee Screening: Comply with Owner's requirements for background screening of Contractor personnel working on Project site.

Page 9: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUMMARY 011000 - 5

1.11 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

C. Organization of Drawings and Specifications: Organization of the Specifications into divisions and sections, and arrangement or numbering of Drawings is intended solely for the convenience of the Contractor in locating information within the Contract Documents, and shall not control the Contractor in his responsibilities to divide the Work among subcontractors or to establish the extent of work to be performed by any trade. Neither the Owner nor the Landscape Architect assumes any liability arising out of jurisdictional issues or claims advanced by trade organizations or other interested parties based on the arrangement or organization of Drawings or Specifications.

D. Singular vs. Plural: Materials, products, equipment, or other items of work referred to in the singular shall be construed as plural where applicable by the intent of the Contract Documents, and shall not limit quantities to be provided by the Contractor.

E. References to Subcontractors or Trades: References to subcontractors, trades, or other entities which are not parties to the Owner-Contractor Agreement shall be construed as meaning the Contractor, whose responsibility it shall be to divide the Work among subcontractors or trades. Such references are used as a matter of convention, and are not intended to preclude or direct the Contractor's responsibility to divide the Work.

F. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard and as scheduled on Drawings.

3. The drawings and specifications, taken together, describe the design for this project. The drawings and specifications shall be used as complimentary to each other.

4. That which is shown on the drawings but not in the specifications, or shown in the specifications but not on the drawings, shall be provided as if shown in both places and to the same standard of quality for similar items.

5. Drawings show extent, location, dimensions, relationships among various parts, and quantity of items. In case of conflict with the specifications in these matters, the drawings shall govern.

Page 10: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUMMARY 011000 - 6

6. Specifications show quality, trade name, generic names and workmanship. In case of conflict with the drawings in these matters, the specifications shall govern.

7. The larger the scale of the drawing, the greater precedence; e.g. a 1-inch-equals-1-foot drawing governs over a 1-inch-equals-10-feet drawing.

8. Do not scale drawings. Use explicitly written dimensions, lines of layout and layout points of beginning for project horizontal control.

1.12 ALTERNATES

A. Alternate: An Alternate is an amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.

B. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.

C. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.

D. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.

E. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated revisions to alternates.

F. Execute accepted alternates under the same conditions as other work of the Contract.

1.13 CONSTRUCTION PROGRESS DOCUMENTATION

A. Within ten days after the execution of the Contract, Provide a detailed construction schedule. Update construction schedule every 2 weeks for reissue to the Owner and Landscape Architect, including the following information:

1. Each task required for completion of the Work; including all work by Contractor and subcontractors and allowing for coordination with work done by others

2. Start date and end date of each task, with duration in calendar days; 3. Indicate the number of days that each task is ahead of schedule or behind schedule. 4. Indicate critical path for completion of the Work. Critical path shall demonstrate the

order of Contractor’s operations for items whose completion is critical to the completion of other items.

5. Indicate on construction schedule time for preparation and review of submittals. List only “Action Submittals” (See Division 1 Section “Submittal Procedures”). Include submittals as critical path items for associated trade work.

Page 11: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUMMARY 011000 - 7

B. Changes to the construction schedule shall be subject to the approval of the Landscape Architect, but such action by the Landscape Architect or the failure so to act shall not relieve the Contractor of any responsibility under this Contract.

C. Authorization to proceed with the Work will not be issued until Production Schedule has been received and approved by the Landscape Architect.

D. Progress payments will not be approved in the event progress of the Work deviates significantly from the current approved Production Schedule.

E. Photographic Documentation:

1. Digital Images:

a. Provide images in JPG format, produced by a digital camera with minimum sensor size of six (6) megapixels, and at an image resolution of not less than 3200 by 2400pixels.

b. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-editing software.

c. Date and Time: Include date and time in file name for each image.

2. Photographer: Engage a qualified photographer to take construction photographs. 3. General: Take photographs using the maximum range of depth of field, and that are in

focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted.

a. Maintain key plan with each set of construction photographs that identifies each photographic location.

4. Preconstruction Photographs: Before starting construction, take photographs of Project site and surrounding properties, including existing items to remain during construction, from different vantage points.

a. Take photographs to show existing conditions adjacent to property before starting the Work.

5. Periodic Construction Photographs: Take photographs with the cutoff date associated with each Application for Payment. Select vantage points to show status of construction and progress since last photographs were taken.

a. Take photographs representative of all work to be concealed, included but not limited to: 1) Footings, 2) Reinforcement, and 3) Earthwork operations

Page 12: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUMMARY 011000 - 8

1.14 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

A. General: Achieve end-of-Project rates for salvage/recycling of 75percent by weight of total non-hazardous solid waste generated by the Work. Practice efficient waste management in the use of materials in the course of the Work. Use all reasonable means to divert construction and demolition waste from landfills and incinerators. Facilitate recycling and salvage of materials.

1.15 QUALITY REQUIREMENTS

A. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and -control procedures that facilitate compliance with the Contract Document requirements.

B. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, Owner will engage a qualified testing agency to perform these services.

C. Mockups: Construct full-size physical assemblies on-site. Construct mockups to verify selections made under Sample submittals; to demonstrate aesthetic effects and, where indicated, qualities of materials and execution; to review coordination, testing, or operation; to show interface between dissimilar materials; and to demonstrate compliance with specified installation tolerances. Mockups are not Samples. Unless otherwise indicated, approved mockups establish the standard by which the Work will be judged.

1. Mockups: Before installing portions of the Work requiring mockups, build mockups for each form of construction and finish required to comply with the following requirements, using materials indicated for the completed Work:

a. Build mockups in location and of size indicated or, if not indicated, as directed by Landscape Architect.

b. Notify Landscape Architect three (3) days in advance of dates and times when mockups will be constructed.

c. Employ supervisory personnel who will oversee mockup construction. Employ workers that will be employed during the construction at Project.

d. Demonstrate the proposed range of aesthetic effects and workmanship. e. Obtain Landscape Architect's approval of mockups before starting work,

fabrication, or construction. 1) Allow three (3) days for initial review and each re-review of each mockup.

f. Maintain mockups during construction in an undisturbed condition as a standard for judging the completed Work.

2. Demolish and remove mockups when directed unless otherwise indicated.

D. Experienced Constructors: When used with an entity or individual, "experienced" means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

Page 13: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUMMARY 011000 - 9

E. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer conflicting requirements that are different, but apparently equal, to Landscape Architect for a decision before proceeding.

F. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Landscape Architect for a decision before proceeding.

1.16 PRODUCT WARRANTIES

A. Warrant for a one-year period (unless another period is specified for a particular item) commencing on the date of Substantial Completion:

B. Warrant that the work contains no faulty or imperfect material or equipment or any imperfect, careless, or unskilled workmanship.

C. Warrant that all work, utility systems, equipment, machines, devices, plant materials, and all other work shall be adequate for the use to which they are intended, and shall operate or survive with ordinary care and attention in a satisfactory and efficient manner.

D. Re-execute, correct, repair, or remove and replace with proper Work, without cost to the Owner, any Work found by the Owner not to be as warranted by this section. Repair all damages caused to other work or materials in the process of complying with this Section.

E. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents.

F. Submittal Time: Comply with requirements in Division 01 Section "Closeout Procedures."

1.17 EXTRA MATERIALS

A. Deliver extra materials in unopened original manufacturer's packaging, undamaged and clearly labeled. Deliver materials to the Project Site. Do not install extra materials.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

Page 14: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

ALTERNATES 012300 - 1

SECTION 012300 - ALTERNATES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for Alternates.

1.3 DEFINITIONS

A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.

1. Alternates described in this Section are part of the Work only if enumerated in the Agreement.

2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.

1.4 PROCEDURES

A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.

1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.

B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated revisions to alternates.

C. Execute accepted alternates under the same conditions as other work of the Contract.

D. Schedule: A schedule of alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.

Page 15: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

ALTERNATES 012300 - 2

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF ALTERNATES

A. Add Alternate No. 1

1. Base Bid: Treated Southern Yellow Pine decking boards and guardrail as specified in Division 06 Section "Wood Decking."

2. Alternate: Cedar Hardwood decking boards and guardrail as specified in Division 06 Section "Wood Decking."

END OF SECTION 012300

Page 16: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONTRACT MODIFICATION PROCEDURES 012600 - 1

SECTION 012600 - CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for handling and processing

Contract modifications.

B. Related Requirements:

1. Division 01 Section "Product Requirements" for administrative procedures for handling

requests for substitutions made after the Contract award.

1.3 MINOR CHANGES IN THE WORK

A. Landscape Architect will issue supplemental instructions authorizing minor changes in the

Work, not involving adjustment to the Contract Sum or the Contract Time, in a format

determined by the Landscape Architect.

1.4 PROPOSAL REQUESTS

A. Owner-Initiated Proposal Requests: Landscape Architect will issue a detailed description of

proposed changes in the Work that may require adjustment to the Contract Sum or the Contract

Time. If necessary, the description will include supplemental or revised Drawings and

Specifications.

1. Work Change Proposal Requests issued by Landscape Architect are not instructions

either to stop work in progress or to execute the proposed change.

2. Within 20 days, when not otherwise specified, after receipt of Proposal Request, submit a

quotation estimating cost adjustments to the Contract Sum and the Contract Time

necessary to execute the change.

a. Include a list of quantities of products required or eliminated and unit costs, with

total amount of purchases and credits to be made. If requested, furnish survey data

to substantiate quantities.

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade

discounts.

c. Include costs of labor and supervision directly attributable to the change.

d. Include an updated Contractor's construction schedule that indicates the effect of

the change, including, but not limited to, changes in activity duration, start and

Page 17: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONTRACT MODIFICATION PROCEDURES 012600 - 2

finish times, and activity relationship. Use available total float before requesting

an extension of the Contract Time.

B. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the

Contract, Contractor may initiate a claim by submitting a request for a change to Landscape

Architect.

1. Include a statement outlining reasons for the change and the effect of the change on the

Work. Provide a complete description of the proposed change. Indicate the effect of the

proposed change on the Contract Sum and the Contract Time.

2. Include a list of quantities of products required or eliminated and unit costs, with total

amount of purchases and credits to be made. If requested, furnish survey data to

substantiate quantities.

3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade

discounts.

4. Include costs of labor and supervision directly attributable to the change.

5. Include an updated Contractor's construction schedule that indicates the effect of the

change, including, but not limited to, changes in activity duration, start and finish times,

and activity relationship. Use available total float before requesting an extension of the

Contract Time.

6. Proposal Request Form: Use AIA Document G709 for Proposal Requests, or a format

approved by the Landscape Architect.

1.5 CHANGE ORDER PROCEDURES

A. On Owner's approval of a Work Changes Proposal Request, the Landscape Architect will issue

a Change Order for signatures of Owner and Contractor on an Owner-specified form.

1.6 CONSTRUCTION CHANGE DIRECTIVE

A. Construction Change Directive: Owner may issue a Construction Change Directive. Change

Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in

a Change Order.

1. Construction Change Directive contains a complete description of change in the Work. It

also designates method to be followed to determine change in the Contract Sum or the

Contract Time.

B. Documentation: Maintain detailed records on a time and material basis of work required by the

Construction Change Directive.

1. After completion of change, submit an itemized account and supporting data necessary to

substantiate cost and time adjustments to the Contract.

Page 18: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONTRACT MODIFICATION PROCEDURES 012600 - 3

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 012600

Page 19: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PAYMENT PROCEDURES 012900 - 1

SECTION 012900 - PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements necessary to prepare and process

Applications for Payment.

B. Related Requirements:

1. Division 01 Section "Contract Modification Procedures" for administrative procedures

for handling changes to the Contract.

2. Division 01 Section "Construction Progress Documentation" for administrative

requirements governing the preparation and submittal of the Contractor's construction

schedule.

1.3 DEFINITIONS

A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract

Sum to various portions of the Work and used as the basis for reviewing Contractor's

Applications for Payment.

1.4 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's

construction schedule.

1. Coordinate line items in the schedule of values with other required administrative forms

and schedules, including the following:

a. Bid Form

b. Application for Payment forms with continuation sheets.

c. Submittal schedule.

d. Items required to be indicated as separate activities in Contractor's construction

schedule.

1) Separate costs for work to be completed following Substantial Completion

(e.g. maintenance and warranty phases) from work to be completed prior to

Substantial Completion.

Page 20: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PAYMENT PROCEDURES 012900 - 2

2. Submit the schedule of values to Landscape Architect at earliest possible date, but no

later than seven days after contract execution.

3. Subschedules for Phased Work: Where the Work is separated into phases requiring

separately phased payments, provide subschedules showing values coordinated with each

phase of payment.

4. Subschedules for Separate Elements of Work: Where the Contractor's construction

schedule defines separate elements of the Work, provide subschedules showing values

coordinated with each element.

B. Format and Content: Use Project Manual table of contents as a guide to establish line items for

the schedule of values. Provide at least one line item for each Specification Section.

1. Identification: Include the following Project identification on the schedule of values:

a. Project name and location: Fountainhead Regional Park – Stair and Dock

Improvements; Fairfax Station, VA

b. Name of Landscape Architect: Rhodeside & Harwell

c. Landscape Architect's project number: #45512

d. Contractor's name and address.

e. Date of submittal.

2. Arrange schedule of values consistent with format of AIA Document G703.

3. Arrange the schedule of values in tabular form with separate columns to indicate the

following for each item listed:

a. Related Specification Section or Division.

b. Description of the Work.

c. Name of subcontractor.

d. Name of manufacturer or fabricator.

e. Name of supplier.

f. Change Orders (numbers) that affect value.

g. Dollar value of the following, as a percentage of the Contract Sum to nearest one-

hundredth percent, adjusted to total 100 percent.

1) Labor.

2) Materials.

3) Equipment.

4. Provide a breakdown of the Contract Sum in enough detail to facilitate continued

evaluation of Applications for Payment and progress reports. Coordinate with Project

Manual table of contents. Provide multiple line items for principal subcontract amounts

in excess of five percent of the Contract Sum.

a. Include separate line items under Contractor and principal subcontracts for Project

closeout requirements in an amount totaling five percent of the Contract Sum and

subcontract amount.

5. Round amounts to nearest whole dollar; total shall equal the Contract Sum.

6. Provide a separate line item in the schedule of values for each part of the Work where

Applications for Payment may include materials or equipment purchased or fabricated

and stored, but not yet installed.

Page 21: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PAYMENT PROCEDURES 012900 - 3

a. Differentiate between items stored on-site and items stored off-site. If required,

include evidence of insurance.

7. Provide separate line items in the schedule of values for initial cost of materials, for each

subsequent stage of completion, and for total installed value of that part of the Work.

8. Each item in the schedule of values and Applications for Payment shall be complete.

Include total cost and proportionate share of general overhead and profit for each item.

a. Temporary facilities and other major cost items that are not direct cost of actual

work-in-place may be shown either as separate line items in the schedule of values

or distributed as general overhead expense, at Contractor's option.

9. Schedule Updating: Update and resubmit the schedule of values before the next

Applications for Payment when Change Orders or Construction Change Directives result

in a change in the Contract Sum.

1.5 APPLICATIONS FOR PAYMENT

A. Each Application for Payment following the initial Application for Payment shall be consistent

with previous applications and payments as certified by Landscape Architect and paid for by

Owner.

1. Initial Application for Payment, Application for Payment at time of Substantial

Completion, and final Application for Payment involve additional requirements.

B. Payment Application Times: Submit Application for Payment to Landscape Architect by the

last day of the month. The period covered by each Application for Payment is one month,

ending on the last day of the month

1. Submit draft copy of Application for Payment seven days prior to due date for review by

Landscape Architect.

C. Application for Payment Forms: Use AIA Document G702 and AIA Document G703 as form

for Applications for Payment.

D. Application Preparation: Complete every entry on form. Notarize and execute by a person

authorized to sign legal documents on behalf of Contractor. Landscape Architect will return

incomplete applications without action.

1. Entries shall match data on the schedule of values and Contractor's construction schedule.

Use updated schedules if revisions were made.

2. Include amounts for work completed following previous Application for Payment,

whether or not payment has been received. Include only amounts for work completed at

time of Application for Payment.

3. Include amounts of Change Orders and Construction Change Directives issued before last

day of construction period covered by application.

4. Indicate separate amounts for work being carried out under Owner-requested project

acceleration.

Page 22: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PAYMENT PROCEDURES 012900 - 4

E. Stored Materials: Include in Application for Payment amounts applied for materials or

equipment purchased or fabricated and stored, but not yet installed. Differentiate between items

stored on-site and items stored off-site.

1. Provide certificate of insurance, evidence of transfer of title to Owner, and consent of

surety to payment, for stored materials.

2. Provide supporting documentation that verifies amount requested, such as paid invoices.

Match amount requested with amounts indicated on documentation; do not include

overhead and profit on stored materials.

3. Provide summary documentation for stored materials indicating the following:

a. Value of materials previously stored and remaining stored as of date of previous

Applications for Payment.

b. Value of previously stored materials put in place after date of previous Application

for Payment and on or before date of current Application for Payment.

c. Value of materials stored since date of previous Application for Payment and

remaining stored as of date of current Application for Payment.

F. Transmittal: Submit two signed and notarized original copies of each Application for Payment

to Landscape Architect by a method ensuring receipt within 24 hours. One copy shall include

waivers of lien and similar attachments if required.

1. Transmit each copy with a transmittal form listing attachments and recording appropriate

information about application.

G. Initial Application for Payment: Administrative actions and submittals that must precede or

coincide with submittal of first Application for Payment include the following:

1. List of subcontractors.

2. Schedule of values.

3. Contractor's construction schedule (preliminary if not final).

4. Products list (preliminary if not final).

5. Schedule of unit prices.

6. Submittal schedule (preliminary if not final).

7. List of Contractor's staff assignments.

8. List of Contractor's principal consultants.

9. Copies of building permits.

10. Copies of authorizations and licenses from authorities having jurisdiction for

performance of the Work.

11. Initial progress report.

12. Report of preconstruction conference.

13. Certificates of insurance and insurance policies.

14. Performance and payment bonds.

15. Data needed to acquire Owner's insurance.

H. Application for Payment at Substantial Completion: After Landscape Architect issues the

Certificate of Substantial Completion, submit an Application for Payment showing 100 percent

completion for portion of the Work claimed as substantially complete.

1. Include documentation supporting claim that the Work is substantially complete and a

statement showing an accounting of changes to the Contract Sum.

Page 23: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PAYMENT PROCEDURES 012900 - 5

2. This application shall reflect Certificate(s) of Substantial Completion issued previously

for Owner occupancy of designated portions of the Work.

I. Final Payment Application: After completing Project closeout requirements, submit final

Application for Payment with releases and supporting documentation not previously submitted

and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements.

2. Insurance certificates for products and completed operations where required and proof

that taxes, fees, and similar obligations were paid.

3. Updated final statement, accounting for final changes to the Contract Sum.

4. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims."

5. AIA Document G706A, "Contractor's Affidavit of Release of Liens."

6. AIA Document G707, "Consent of Surety to Final Payment."

7. Evidence that claims have been settled.

8. Final meter readings for utilities, a measured record of stored fuel, and similar data as of

date of Substantial Completion or when Owner took possession of and assumed

responsibility for corresponding elements of the Work.

9. Final liquidated damages settlement statement.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 012900

Page 24: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT MANAGEMENT AND COORDINATION 013100 - 1

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project

including, but not limited to, the following:

1. General coordination procedures.

2. Coordination drawings.

3. Requests for Information (RFIs).

4. Project meetings.

B. Each contractor shall participate in coordination requirements. Certain areas of responsibility

are assigned to a specific contractor.

C. Related Requirements:

1. Division 01 Section "Construction Progress Documentation" for preparing and

submitting Contractor's construction schedule.

2. Division 01 Section "Execution" for procedures for coordinating general installation and

field-engineering services, including establishment of benchmarks and control points.

3. Division 01 Section "Closeout Procedures" for coordinating closeout of the Contract.

1.3 DEFINITIONS

A. RFI: Request from Owner, Landscape Architect, or Contractor seeking information required by

or clarifications of the Contract Documents.

1.4 INFORMATIONAL SUBMITTALS

A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each

portion of the Work, including plant suppliers and those who are to furnish products or

equipment fabricated to a special design. Include the following information in tabular form:

1. Name, address, and telephone number of entity performing subcontract or supplying

products.

2. Number and title of related Specification Section(s) covered by subcontract.

3. Drawing number and detail references, as appropriate, covered by subcontract.

Page 25: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT MANAGEMENT AND COORDINATION 013100 - 2

B. Key Personnel Names: Within 10 days of starting construction operations, submit a list of key

personnel assignments, including superintendent and other personnel in attendance at Project

site. Identify individuals and their duties and responsibilities; list addresses and telephone

numbers, including home, office, and cellular telephone numbers and e-mail addresses. Provide

names, addresses, and telephone numbers of individuals assigned as alternates in the absence of

individuals assigned to Project.

1. Post copies of list in project meeting room, in temporary field office, and by each

temporary telephone. Keep list current at all times.

1.5 GENERAL COORDINATION PROCEDURES

A. General Contractor shall coordinate construction operations of each subcontractor with those of

other contractors and entities to ensure efficient and orderly installation of each part of the

Work. Coordinate the work of each subcontractor, especially work of subcontractors whose

different trades depend on each other for proper installation, connection, and operation.

1. General Contractor shall communicate directly with Owner and Landscape Architect for

all construction related issues. Owner and Landscape Architect will refuse submittals,

RFI’s or other formal correspondence received directly from Subcontractors.

B. Coordination: Coordinate construction operations included in different Sections of the

Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate

construction operations, included in different Sections that depend on each other for proper

installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where

installation of one part of the Work depends on installation of other components, before

or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and

accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

C. Prepare memoranda for distribution to each party involved, outlining special procedures

required for coordination. Include such items as required notices, reports, and list of attendees

at meetings.

1. Prepare similar memoranda for Owner and separate contractors if coordination of their

Work is required.

D. Administrative Procedures: Coordinate scheduling and timing of required administrative

procedures with other construction activities to avoid conflicts and to ensure orderly progress of

the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule.

2. Preparation of the schedule of values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Preinstallation conferences.

Page 26: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT MANAGEMENT AND COORDINATION 013100 - 3

7. Project closeout activities.

8. Startup and adjustment of systems.

E. Conservation: Coordinate construction activities to ensure that operations are carried out with

consideration given to conservation of energy, water, and materials. Coordinate use of

temporary utilities to minimize waste.

1. Salvage materials and equipment involved in performance of, but not actually

incorporated into, the Work. See other Sections for disposition of salvaged materials that

are designated as Owner's property.

1.6 COORDINATION DRAWINGS – (Not Used)

1.7 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of

the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

1. Landscape Architect will return RFIs submitted to Landscape Architect by other entities

controlled by Contractor with no response.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's

work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing information or

interpretation and the following:

1. Project name: Fountainhead Regional Park – Stair and Dock Improvements

2. Project number: #45512

3. Date.

4. Name of Contractor.

5. Name of Landscape Architect: Rhodeside & Harwell

6. RFI number, numbered sequentially.

7. RFI subject.

8. Specification Section number and title and related paragraphs, as appropriate.

9. Drawing number and detail references, as appropriate.

10. Field dimensions and conditions, as appropriate.

11. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

12. Contractor's signature.

13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items

needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected

materials, assemblies, and attachments on attached sketches.

C. RFI Forms: AIA Document G716,Software-generated form with substantially the same content

as indicated above, acceptable to Landscape Architect.

Page 27: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT MANAGEMENT AND COORDINATION 013100 - 4

1. Attachments shall be electronic files in Adobe Acrobat PDF format.

D. Landscape Architect's Action: Landscape Architect will review each RFI, determine action

required, and respond. Allow seven (7) working days for Landscape Architect's response for

each RFI. RFIs received by Landscape Architect after 1:00 p.m. will be considered as received

the following working day.

1. The following Contractor-generated RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract

Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Landscape Architect's actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

h. Requests for information received directly from subcontractors rather than from

the General Contractor.

2. Landscape Architect's action may include a request for additional information, in which

case Landscape Architect's time for response will date from time of receipt of additional

information.

3. Landscape Architect's action on RFIs that may result in a change to the Contract Time or

the Contract Sum may be eligible for Contractor to submit Change Proposal according to

Division 01 Section "Contract Modification Procedures."

a. If Contractor believes the RFI response warrants change in the Contract Time or

the Contract Sum, notify Landscape Architect and Owner in writing within 10 days

of receipt of the RFI response.

E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.

Submit log at 25%, 50%, 75%, 90%, and 100% of job completion as determined by the

Landscape Architect. Use CSI Log Form 13.2B, including the following:

1. Project name: Fountainhead Regional Park – Stair and Dock Improvements

2. Name and address of Contractor.

3. Name and address of Landscape Architect.

4. RFI number including RFIs that were returned without action or withdrawn.

5. RFI description.

6. Date the RFI was submitted.

7. Date Landscape Architect's response was received.

F. On receipt of Landscape Architect's action, update the RFI log and immediately distribute the

RFI response to affected parties. Review response and notify Landscape Architect within seven

days if Contractor disagrees with response.

1. Identification of related Minor Change in the Work, Construction Change Directive, and

Proposal Request, as appropriate.

2. Identification of related Field Order, Work Change Directive, and Proposal Request, as

appropriate.

Page 28: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT MANAGEMENT AND COORDINATION 013100 - 5

1.8 PROJECT MEETINGS

A. General: Construction Manager will schedule and conduct meetings and conferences at Project

site unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is

required, of date and time of each meeting. Notify Owner and Landscape Architect of

scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.

3. Minutes: Entity responsible for conducting meeting will record significant discussions

and agreements achieved. Distribute the meeting minutes to everyone concerned,

including Owner and Landscape Architect, within five (5) days of the meeting.

B. Preconstruction Conference: Construction Manager will schedule and conduct a

preconstruction conference before starting construction, at a time convenient to Owner and

Landscape Architect, but no later than fifteen (15) days after execution of the Agreement.

1. Conduct the conference to review responsibilities and personnel assignments.

2. Attendees: Authorized representatives of Owner, Landscape Architect, and their

consultants; Contractor and its superintendent; major subcontractors; and other concerned

parties shall attend the conference. Participants at the conference shall be familiar with

Project and authorized to conclude matters relating to the Work.

3. Agenda: Discuss items of significance that could affect progress, including the

following:

a. Protection of existing landscape.

b. Tentative construction schedule.

c. Phasing.

d. Critical work sequencing and long-lead items.

e. Coordination with other work and avoiding potential conflicts.

f. Designation of key personnel and their duties.

g. Lines of communications.

h. Procedures for processing field decisions and Change Orders.

i. Procedures for RFIs.

j. Procedures for testing and inspecting.

k. Procedures for processing Applications for Payment.

l. Distribution of the Contract Documents.

m. Submittal procedures.

n. Preparation of record documents.

o. Use of the premises.

p. Work restrictions.

q. Working hours.

r. Weather limitations.

s. Owner's occupancy requirements.

t. Responsibility for temporary facilities and controls.

u. Procedures for moisture and mold control.

v. Procedures for disruptions and shutdowns.

w. Construction waste management and recycling.

x. Parking availability.

y. Office, work, and storage areas.

z. Equipment deliveries and priorities.

Page 29: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT MANAGEMENT AND COORDINATION 013100 - 6

aa. Security.

bb. Progress cleaning.

cc. Submittal and mockup reviews.

dd. Maintenance and warranty requirements.

ee. Regulations of authorities having jurisdiction.

4. Minutes: Entity responsible for conducting meeting will record and distribute meeting

minutes.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each

construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or

affected by the installation and its coordination or integration with other materials and

installations that have preceded or will follow, shall attend the meeting. Advise

Landscape Architect of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the

particular activity under consideration, including requirements for the following:

a. Protection of existing landscape.

b. Contract Documents.

c. Options.

d. Related RFIs.

e. Related Change Orders.

f. Purchases.

g. Deliveries.

h. Submittals.

i. Review of mockups.

j. Possible conflicts.

k. Compatibility requirements.

l. Time schedules.

m. Weather limitations.

n. Manufacturer's written instructions.

o. Warranty requirements.

p. Compatibility of materials.

q. Acceptability of substrates.

r. Temporary facilities and controls.

s. Space and access limitations.

t. Regulations of authorities having jurisdiction.

u. Testing and inspecting requirements.

v. Installation procedures.

w. Coordination with other work.

x. Required performance results.

y. Protection of adjacent work.

z. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including

required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties

requiring information.

Page 30: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT MANAGEMENT AND COORDINATION 013100 - 7

5. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to performance of the

Work and reconvene the conference at earliest feasible date.

D. Project Closeout Conference: Construction Manager will schedule and conduct a project

closeout conference, at a time convenient to Owner and Landscape Architect, but no later than

45 days prior to the scheduled date of Substantial Completion.

1. Conduct the conference to review requirements and responsibilities related to Project

closeout.

2. Attendees: Authorized representatives of Owner, Landscape Architect, and their

consultants; Contractor and its superintendent; major subcontractors; suppliers; and other

concerned parties shall attend the meeting. Participants at the meeting shall be familiar

with Project and authorized to conclude matters relating to the Work.

3. Agenda: Discuss items of significance that could affect or delay Project closeout,

including the following:

a. Preparation of record documents.

b. Procedures required prior to inspection for Substantial Completion and for final

inspection for acceptance.

c. Submittal of written warranties.

d. Requirements for preparing operations and maintenance data.

e. Requirements for delivery of material samples, attic stock, and spare parts.

f. Requirements for demonstration and training.

g. Preparation of Contractor's punch list.

h. Procedures for processing Applications for Payment at Substantial Completion and

for final payment.

i. Submittal procedures.

j. Coordination of separate contracts.

k. Owner's partial occupancy requirements.

l. Responsibility for removing temporary facilities and controls.

4. Minutes: Entity conducting meeting will record and distribute meeting minutes.

E. Progress Meetings: Construction Manager will conduct progress meetings at weekly intervals.

1. Coordinate dates of meetings with preparation of payment requests.

2. Attendees: In addition to representatives of Owner and Landscape Architect, each

contractor, subcontractor, supplier, and other entity concerned with current progress or

involved in planning, coordination, or performance of future activities shall be

represented at these meetings. All participants at the meeting shall be familiar with

Project and authorized to conclude matters relating to the Work.

3. Agenda: Review and correct or approve minutes of previous progress meeting. Review

other items of significance that could affect progress. Include topics for discussion as

appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting.

Determine whether each activity is on time, ahead of schedule, or behind schedule,

in relation to Contractor's construction schedule. Determine how construction

behind schedule will be expedited; secure commitments from parties involved to

Page 31: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT MANAGEMENT AND COORDINATION 013100 - 8

do so. Discuss whether schedule revisions are required to ensure that current and

subsequent activities will be completed within the Contract Time.

1) Review schedule for next period.

b. Review present and future needs of each entity present, including the following:

1) Interface requirements.

2) Sequence of operations.

3) Resolution of BIM component conflicts.

4) Status of submittals.

5) Deliveries.

6) Off-site fabrication.

7) Access.

8) Site utilization.

9) Temporary facilities and controls.

10) Progress cleaning.

11) Quality and work standards.

12) Status of correction of deficient items.

13) Field observations.

14) Status of RFIs.

15) Status of proposal requests.

16) Pending changes.

17) Status of Change Orders.

18) Pending claims and disputes.

19) Documentation of information for payment requests.

4. Minutes: Entity responsible for conducting the meeting will record and distribute the

meeting minutes to each party present and to parties requiring information.

a. Schedule Updating: Revise Contractor's construction schedule after each progress

meeting where revisions to the schedule have been made or recognized. Issue

revised schedule concurrently with the report of each meeting.

F. Coordination Meetings: Construction Manager will conduct Project coordination meetings as

needed. Project coordination meetings are in addition to specific meetings held for other

purposes, such as progress meetings and preinstallation conferences.

1. Attendees: In addition to representatives of Owner Landscape Architect, each contractor,

subcontractor, supplier, and other entity concerned with current progress or involved in

planning, coordination, or performance of future activities shall be represented at these

meetings. All participants at the meetings shall be familiar with Project and authorized to

conclude matters relating to the Work.

2. Agenda: As determined by Construction Manager and Landscape Architect.

a. Schedule Updating: Revise combined Contractor's construction schedule after

each coordination meeting where revisions to the schedule have been made or

recognized. Issue revised schedule concurrently with report of each meeting.

3. Reporting: Record meeting results and distribute copies to everyone in attendance and to

others affected by decisions or actions resulting from each meeting.

Page 32: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT MANAGEMENT AND COORDINATION 013100 - 9

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 013100

Page 33: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 1

SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for documenting the progress of

construction during performance of the Work, including the following:

1. Startup construction schedule.

2. Contractor's construction schedule.

3. Construction schedule updating reports.

4. Daily construction reports.

5. Material location reports.

6. Site condition reports.

7. Special reports.

B. Related Requirements:

1. Division 01 Section "Submittal Procedures" for submitting schedules and reports.

2. Division 01 Section "Quality Requirements" for submitting a schedule of tests and

inspections.

1.3 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring,

and controlling the construction project. Activities included in a construction schedule consume

time and resources.

1. Critical Activity: An activity on the critical path that must start and finish on the planned

early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network.

3. Successor Activity: An activity that follows another activity in the network.

B. Cost Loading: The allocation of the schedule of values for the completion of an activity as

scheduled. The sum of costs for all activities must equal the total Contract Sum unless

otherwise approved by Landscape Architect.

C. CPM: Critical path method, which is a method of planning and scheduling a construction

project where activities are arranged based on activity relationships. Network calculations

determine when activities can be performed and the critical path of Project.

Page 34: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 2

D. Critical Path: The longest connected chain of interdependent activities through the network

schedule that establishes the minimum overall Project duration and contains no float.

E. Event: The starting or ending point of an activity.

F. Float: The measure of leeway in starting and completing an activity.

1. Float time is not for the exclusive use or benefit of either Owner or Contractor, but is a

jointly owned, expiring Project resource available to both parties as needed to meet

schedule milestones and Contract completion date.

2. Free float is the amount of time an activity can be delayed without adversely affecting the

early start of the successor activity.

3. Total float is the measure of leeway in starting or completing an activity without

adversely affecting the planned Project completion date.

G. Resource Loading: The allocation of manpower and equipment necessary for the completion of

an activity as scheduled.

1.4 INFORMATIONAL SUBMITTALS

A. Format for Submittals: Submit required submittals in the following format:

1. Working electronic copy of schedule file, where indicated.

2. PDF electronic file.

B. Startup construction schedule.

1. Approval of cost-loaded, startup construction schedule will not constitute approval of

schedule of values for cost-loaded activities.

C. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule

for entire construction period.

1. Submit a working electronic copy of schedule, using software indicated, and labeled to

comply with requirements for submittals. Include type of schedule (initial or updated)

and date on label.

D. CPM Reports: Concurrent with CPM schedule, submit each of the following reports. Format

for each activity in reports shall contain activity number, activity description, cost and resource

loading, original duration, remaining duration, early start date, early finish date, late start date,

late finish date, and total float in calendar days.

1. Activity Report: List of all activities sorted by activity number and then early start date,

or actual start date if known.

2. Logic Report: List of preceding and succeeding activities for all activities, sorted in

ascending order by activity number and then early start date, or actual start date if known.

3. Total Float Report: List of all activities sorted in ascending order of total float.

4. Earnings Report: Compilation of Contractor's total earnings from commencement of the

Work until most recent Application for Payment.

Page 35: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 3

E. Construction Schedule Updating Reports: Submit with Applications for Payment.

F. Daily Construction Reports: Submit at weekly intervals.

G. Site Condition Reports: Submit at time of discovery of differing conditions.

H. Special Reports: Submit at time of unusual event.

I. Qualification Data: For scheduling consultant.

1.5 QUALITY ASSURANCE

A. Prescheduling Conference: Conduct conference at Project site to comply with requirements in

Division 01 Section "Project Management and Coordination." Review methods and procedures

related to the preliminary construction schedule and Contractor's construction schedule,

including, but not limited to, the following:

1. Review format for reports.

2. Verify availability of qualified personnel needed to develop and update schedule.

3. Discuss constraints, including partial Owner occupancy.

4. Review delivery dates for Owner-furnished products.

5. Review schedule for work of Owner's separate contracts.

6. Review submittal requirements and procedures.

7. Review time required for review of submittals and resubmittals.

8. Review requirements for tests and inspections by independent testing and inspecting

agencies.

9. Review time required for Project closeout and Owner startup procedures.

10. Review and finalize list of construction activities to be included in schedule.

11. Review procedures for updating schedule.

1.6 COORDINATION

A. Coordinate preparation and processing of schedules and reports with performance of

construction activities and with scheduling and reporting of separate contractors.

B. Coordinate Contractor's construction schedule with the schedule of values, list of subcontracts,

submittal schedule, progress reports, payment requests, and other required schedules and

reports.

1. Secure time commitments for performing critical elements of the Work from entities

involved.

2. Secure time commitments for long lead items.

3. Coordinate each construction activity in the network with other activities and schedule

them in proper sequence.

Page 36: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 4

PART 2 - PRODUCTS

2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Time Frame: Extend schedule from date established for commencement of the Work to date of

final completion.

1. Contract completion date shall not be changed by submission of a schedule that shows an

early completion date, unless specifically authorized by Change Order.

B. Activities: Treat each story or separate area as a separate numbered activity for each main

element of the Work. Comply with the following:

1. Activity Duration: Define activities so no activity is longer than 20days, unless

specifically allowed by Landscape Architect.

2. Procurement Activities: Include procurement process activities for the following long

lead items and major items, requiring a cycle of more than 60 days, as separate activities

in schedule. Procurement cycle activities include, but are not limited to, submittals,

approvals, purchasing, fabrication, and delivery.

3. Submittal Review Time: Include review and resubmittal times indicated in Division 01

Section "Submittal Procedures" in schedule. Coordinate submittal review times in

Contractor's construction schedule with submittal schedule.

4. Substantial Completion: Indicate completion in advance of date established for

Substantial Completion, and allow time for Landscape Architect's administrative

procedures necessary for certification of Substantial Completion.

5. Punch List and Final Completion: Include not more than 30days for completion of punch

list items and final completion. Final time allowed will be determined by Landscape

Architect based on punch list items.

C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and

as follows in schedule, and show how the sequence of the Work is affected.

1. Products Ordered in Advance: Include a separate activity for each product. Include

delivery date indicated in Division 01 Section "Summary." Delivery dates indicated

stipulate the earliest possible delivery date.

2. Work Restrictions: Show the effect of the following items on the schedule:

a. Limitations of continued occupancies.

b. Uninterruptible services.

c. Partial occupancy before Substantial Completion.

d. Use of premises restrictions.

e. Seasonal variations.

f. Environmental control.

3. Work Stages: Indicate important stages of construction for each major portion of the

Work, including, but not limited to, the following:

a. Subcontract awards.

b. Submittals.

c. Purchases.

Page 37: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 5

d. Mockups.

e. Fabrication.

f. Sample testing.

g. Deliveries.

h. Installation.

i. Tests and inspections.

j. Adjusting.

k. Curing.

l. Startup and placement into final use and operation.

D. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but

not limited to, the Notice to Proceed, Substantial Completion, and final completion, and the

following interim milestones:

1. Installation of brick walls and stone stairs.

2. Installation of brick and concrete paving

E. Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or

commence prior to submittal of next schedule update. Summarize the following issues:

1. Unresolved issues.

2. Unanswered Requests for Information.

3. Rejected or unreturned submittals.

4. Notations on returned submittals.

5. Pending modifications affecting the Work and Contract Time.

F. Recovery Schedule: When periodic update indicates the Work is 14or more calendar days

behind the current approved schedule, submit a separate recovery schedule indicating means by

which Contractor intends to regain compliance with the schedule. Indicate changes to working

hours, working days, crew sizes, and equipment required to achieve compliance, and date by

which recovery will be accomplished.

2.2 STARTUP CONSTRUCTION SCHEDULE

A. Bar-Chart Schedule: Submit startup, horizontal, bar-chart-type construction schedule within

seven (7) days of date established for commencement of the Work.

B. Preparation: Indicate each significant construction activity separately. Identify first workday of

each week with a continuous vertical line. Outline significant construction activities for first 30

days of construction. Include skeleton diagram for the remainder of the Work and a cash

requirement prediction based on indicated activities.

2.3 REPORTS

A. Daily Construction Reports: Prepare a daily construction report recording the following

information concerning events at Project site:

1. List of subcontractors at Project site.

2. List of separate contractors at Project site.

Page 38: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 6

3. Approximate count of personnel at Project site.

4. Equipment at Project site.

5. Material deliveries.

6. High and low temperatures and general weather conditions, including presence of rain or

snow.

7. Accidents.

8. Meetings and significant decisions.

9. Unusual events (see special reports).

10. Stoppages, delays, shortages, and losses.

11. Meter readings and similar recordings.

12. Emergency procedures.

13. Orders and requests of authorities having jurisdiction.

14. Change Orders received and implemented.

15. Work Change Directives received and implemented.

16. Services connected and disconnected.

17. Equipment or system tests and startups.

18. Partial completions and occupancies.

19. Substantial Completions authorized.

B. Site Condition Reports: Immediately on discovery of a difference between site conditions and

the Contract Documents, prepare and submit a detailed report. Submit with a Request for

Information. Include a detailed description of the differing conditions, together with

recommendations for changing the Contract Documents.

2.4 SPECIAL REPORTS

A. General: Submit special reports directly to Owner within one (1) day(s) of an occurrence.

Distribute copies of report to parties affected by the occurrence.

B. Reporting Unusual Events: When an event of an unusual and significant nature occurs at

Project site, whether or not related directly to the Work, prepare and submit a special report.

List chain of events, persons participating, response by Contractor's personnel, evaluation of

results or effects, and similar pertinent information. Advise Owner in advance when these

events are known or predictable.

PART 3 - EXECUTION

3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Contractor's Construction Schedule Updating: Update schedule to reflect actual construction

progress and activities. Issue schedule two (2) days before each regularly scheduled progress

meeting.

1. Revise schedule immediately after each meeting or other activity where revisions have

been recognized or made. Issue updated schedule concurrently with the report of each

such meeting.

2. Include a report with updated schedule that indicates every change, including, but not

limited to, changes in logic, durations, actual starts and finishes, and activity durations.

Page 39: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 7

3. As the Work progresses, indicate final completion percentage for each activity.

B. Distribution: Distribute copies of approved schedule to Landscape Architect, Owner, separate

contractors, testing and inspecting agencies, and other parties identified by Contractor with a

need-to-know schedule responsibility.

1. When revisions are made, distribute updated schedules to the same parties and post in the

same locations. Delete parties from distribution when they have completed their assigned

portion of the Work and are no longer involved in performance of construction activities.

END OF SECTION 013200

Page 40: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PHOTOGRAPHIC DOCUMENTATION 013233 - 1

SECTION 013233 - PHOTOGRAPHIC DOCUMENTATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for the following:

1. Preconstruction photographs.

2. Periodic construction photographs.

3. Final completion construction photographs.

4. Web-based construction photographic documentation.

B. Related Requirements:

1. Division 01 Section "Submittal Procedures" for submitting photographic documentation.

2. Division 01 Section "Closeout Procedures" for submitting photographic documentation

as project record documents at Project closeout.

3. Division 31 Section "Site Clearing" for photographic documentation before site clearing

operations commence.

1.3 INFORMATIONAL SUBMITTALS

A. Key Plan: Submit key plan of Project site and building with notation of vantage points marked

for location and direction of each photograph. Indicate area of construction. Include same

information as corresponding photographic documentation.

B. Digital Photographs: Submit image files within three (3)days of taking photographs.

1. Digital Camera: Minimum sensor resolution of 6 megapixels.

2. Format: Minimum 3200 by 2400pixels, in unaltered original files, with same aspect ratio

as the sensor, uncropped, date and time stamped, in folder named by date of photograph,

accompanied by key plan file.

3. Identification: Provide the following information with each image description in file

metadata tag:

a. Name of Project: Fountainhead Regional Park – Stair and Dock Improvements

b. Name and contact information for photographer.

c. Name of Landscape Architect: Rhodeside & Harwell

d. Name of Contractor.

e. Date photograph was taken.

Page 41: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PHOTOGRAPHIC DOCUMENTATION 013233 - 2

f. Description of vantage point, indicating location, direction (by compass point), and

elevation or story of construction.

g. Unique sequential identifier keyed to accompanying key plan.

C. Construction Photographs: Submit electronic copies within three (3) days of taking

photographs.

1. Identification: Provide an applied label and text description for each image with the

following information:

a. Name of Project: Meadowlark Botanical Gardens – Entrance Improvements

b. Name and contact information for photographer.

c. Name of Landscape Architect: Rhodeside & Harwell

d. Name of Contractor.

e. Date photograph was taken if not date stamped by camera.

f. Description of vantage point, indicating location, direction (by compass point), and

elevation or story of construction.

g. Unique sequential identifier keyed to accompanying key plan.

1.4 QUALITY ASSURANCE

A. Photographer Qualifications for Pre and Post construction photos: An individual who has been

regularly engaged as a professional photographer of construction projects for not less than three

years.

1.5 USAGE RIGHTS

A. Obtain and transfer copyright usage rights from photographer to Owner for unlimited

reproduction of photographic documentation.

PART 2 - PRODUCTS

2.1 PHOTOGRAPHIC MEDIA

A. Digital Images: Provide images in JPG format, produced by a digital camera with minimum

sensor size of 6 megapixels, and at an image resolution of not less than 3200 by 2400 pixels.

PART 3 - EXECUTION

3.1 CONSTRUCTION PHOTOGRAPHS

A. Photographer: Engage a qualified photographer to take construction photographs.

B. General: Take photographs using the maximum range of depth of field, and that are in focus, to

clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted.

Page 42: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PHOTOGRAPHIC DOCUMENTATION 013233 - 3

1. Maintain key plan with each set of construction photographs that identifies each

photographic location.

C. Digital Images: Submit digital images exactly as originally recorded in the digital camera,

without alteration, manipulation, editing, or modifications using image-editing software.

1. Date and Time: Include date and time in file name for each image.

2. Field Office Images: Maintain one set of images accessible in the field office at Project

site, available at all times for reference. Identify images in the same manner as those

submitted to Landscape Architect.

D. Preconstruction Photographs: Before starting construction, take photographs of Project site and

surrounding properties, including existing items to remain during construction, from different

vantage points, as directed by Landscape Architect.

1. Flag excavation areas before taking construction photographs.

2. Take thirty (30) photographs to show existing conditions adjacent to property before

starting the Work.

3. Take ten (10) photographs of existing buildings either on or adjoining property to

accurately record physical conditions at start of construction.

4. Take additional photographs as required to record settlement or cracking of adjacent

structures, pavements, and improvements.

E. Periodic Construction Photographs: Take photographs at 10%, 25%, 50%, 75%, and 90%

completion. Photograph all underground work before it is covered up, timed with the cutoff date

associated with each Application for Payment. Select vantage points to show status of

construction and progress since last photographs were taken.

F. Landscape Architect -Directed Construction Photographs: From time to time, Landscape

Architect will instruct Construction Manager about number and frequency of photographs and

general directions on vantage points. Select actual vantage points and take photographs to show

the status of construction and progress since last photographs were taken.

G. Final Completion Construction Photographs: Take thirty (30) color photographs after date of

Substantial Completion for submission as project record documents. Landscape Architect will

inform Construction Manager of desired vantage points.

1. Do not include date stamp.

H. Additional Photographs: Landscape Architect may request photographs in addition to periodic

photographs specified. Additional photographs will be paid for by Change Order and are not

included in the Contract Sum.

1. Three days' notice will be given, where feasible.

2. In emergency situations, take additional photographs within 24 hours of request.

3. Circumstances that could require additional photographs include, but are not limited to,

the following:

a. Special events planned at Project site.

b. Immediate follow-up when on-site events result in construction damage or losses.

Page 43: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PHOTOGRAPHIC DOCUMENTATION 013233 - 4

c. Photographs to be taken at fabrication locations away from Project site. These

photographs are not subject to unit prices or unit-cost allowances.

d. Substantial Completion of a major phase or component of the Work.

e. Extra record photographs at time of final acceptance.

f. Owner's request for special publicity photographs.

END OF SECTION 013233

Page 44: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUBMITTAL PROCEDURES 013300 - 1

SECTION 013300 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes requirements for the submittal schedule and administrative and procedural

requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

B. Related Requirements:

1. Division 01 Section "Payment Procedures" for submitting Applications for Payment and

the schedule of values.

2. Division 01 Section "Construction Progress Documentation" for submitting schedules

and reports, including Contractor's construction schedule.

3. Division 01 Section "Project Record Documents" for submitting record Drawings, record

Specifications, and record Product Data.

1.3 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require

Landscape Architect’s responsive action. Action submittals are those submittals indicated in

individual Specification Sections as "Action Submittals."

B. Informational Submittals: Written and graphic information and physical samples that do not

require Landscape Architect’s responsive action. Submittals may be rejected for not complying

with requirements. Informational submittals are those submittals indicated in individual

Specification Sections as "Informational Submittals."

C. Shop Drawings: drawings, schedules, and diagrams prepared specifically for this project by the

Contractor, subcontractor, manufacturer, supplier or distributor to illustrate a portion of the

Work.

D. Product Data: illustrations, standard schedules, performance charts, instructions, brochures,

diagrams, manufacturer’s descriptive literature and catalogue data illustrating a material,

product or system for a portion of the Work.

E. Samples: physical examples of materials, equipment, assemblies, or workmanship establishing

standards for evaluating finished work.

Page 45: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUBMITTAL PROCEDURES 013300 - 2

1.4 SUBMITTALS

A. No portion of the Work shall commence until all related submittals are reviewed by the

Landscape Architect.

1. All portions of the Work shall conform to the reviewed submittals.

B. Submittal Schedule: Submit a schedule of submittals, arranged in order by Specification

Section. Include dates required by construction schedule; factor in time required for review,

ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional

time required for making corrections or revisions to submittals noted by Landscape Architect

and additional time for handling and reviewing submittals required by those corrections.

1. Completion: Submittals shall be complete for each portion of the Work. The Landscape

Architect may refuse to act, when submittal acceptability is dependent upon conditions,

items, or materials included in separate or subsequent submittals, until sufficient

additional information is provided to permit proper evaluation.

2. Format: Identify submittals with the following applicable information permanently

adhered to or noted on each submittal:

a. Project title and location.

b. Owner’s name and project number.

c. Landscape Architect’s name and project number.

d. Contractor’s name.

e. Related Specification Section.

f. Subcontractor’s, vendor’s, and manufacturer’s name, address, and telephone

number.

g. Product identification and location in project.

h. Applicable drawing and project manual section number references.

3. Review: Submittal review by the Landscape Architect shall not relieve the Contractor of

responsibility of the following:

a. Submittal errors and omissions.

b. Deviations from the Contract Documents, without prior written approval from the

Landscape Architect.

1.5 SUBMITTAL ADMINISTRATIVE REQUIREMENTS

A. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.

Time for review shall commence on Landscape Architect's receipt of submittal. No extension

of the Contract Time will be authorized because of failure to transmit submittals enough in

advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time

if coordination with subsequent submittals is required. Landscape Architect will advise

Contractor when a submittal being processed must be delayed for coordination.

2. Resubmittal Review: Allow 15 days for review of each resubmittal.

Page 46: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUBMITTAL PROCEDURES 013300 - 3

B. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block and clearly indicate extent of

revision.

3. Resubmit submittals until they are marked with approval notation from Landscape

Architect's action stamp.

C. Use for Construction: Retain complete copies of submittals on Project site. Use only final

action submittals that are marked with approval notation from Landscape Architect's action

stamp.

PART 2 - PRODUCTS

2.1 SUBMITTAL PROCEDURES

A. General Submittal Procedure Requirements: Prepare and submit submittals required by

individual Specification Sections. Types of submittals are indicated in individual Specification

Sections.

1. Submit electronic submittals, shop drawings, and product data via email as PDF

electronic files.

a. Landscape Architect will return annotated file. Annotate and retain one copy of

file as an electronic Project record document file.

B. Product Data: Collect information into a single submittal for each element of construction and

type of product or equipment.

1. If information must be specially prepared for submittal because standard published data

are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's catalog cuts.

b. Manufacturer's product specifications.

c. Standard color charts.

d. Statement of compliance with specified referenced standards.

e. Testing by recognized testing agency.

f. Application of testing agency labels and seals.

g. Notation of coordination requirements.

h. Availability and delivery time information.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base

Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the

following information, as applicable:

Page 47: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUBMITTAL PROCEDURES 013300 - 4

a. Identification of products.

b. Schedules.

c. Compliance with specified standards.

d. Notation of coordination requirements.

e. Notation of dimensions established by field measurement.

f. Relationship and attachment to adjoining construction clearly indicated.

g. Seal and signature of professional engineer if specified.

D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these

characteristics with other elements and for a comparison of these characteristics between

submittal and actual component as delivered and installed.

1. Transmit Samples that contain multiple, related components such as accessories together

in one submittal package.

2. Identification: Attach label on unexposed side of Samples that includes the following:

a. Product name and name of manufacturer.

b. Number and title of applicable Specification Section.

E. Coordination Drawing Submittals: Comply with requirements specified in Division 01 Section

"Project Management and Coordination."

F. Contractor's Construction Schedule: Comply with requirements specified in Division 01

Section "Construction Progress Documentation."

G. Application for Payment and Schedule of Values: Comply with requirements specified in

Division 01 Section "Payment Procedures."

H. Test and Inspection Reports and Schedule of Tests and Inspections Submittals: Comply with

requirements specified in Division 01 Section "Quality Requirements."

I. Closeout Submittals and Maintenance Material Submittals: Comply with requirements

specified in Division 01 Section "Closeout Procedures."

J. Maintenance Data: Comply with requirements specified in Division 01 Section "Operation and

Maintenance Data."

K. Qualification Data: Prepare written information that demonstrates capabilities and experience

of firm or person. Include lists of completed projects with project names and addresses, contact

information of Landscape Architects and owners, and other information specified.

L. Product Certificates: Submit written statements on manufacturer's letterhead certifying that

product complies with requirements in the Contract Documents.

M. Material Certificates: Submit written statements on manufacturer's letterhead certifying that

material complies with requirements in the Contract Documents.

N. Field Test Reports: Submit written reports indicating and interpreting results of field tests

performed either during installation of product or after product is installed in its final location,

for compliance with requirements in the Contract Documents.

Page 48: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SUBMITTAL PROCEDURES 013300 - 5

PART 3 - EXECUTION

3.1 CONTRACTOR'S REVIEW

A. Review each submittal and check for coordination with other Work of the Contract and for

compliance with the Contract Documents. Determine and verify all field measurements and

field construction criteria, and note corrections and field dimensions.

B. Review each submittal for conformance with the means, methods, techniques, sequences, and

operations of construction, and safety precautions and programs incidental thereto, all of which

are the sole responsibility of the Contractor.

C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name

and location, submittal number, Specification Section title and number, name of reviewer, date

of Contractor's approval, and statement certifying that submittal has been reviewed, checked,

and approved for compliance with the Contract Documents.

D. Advise the Landscape Architect in writing of any submittal deviation from the Contract

Documents. The Landscape Architect shall assume that no shop drawings or submittals

comprises a variation from the Contract Documents unless Contractor advises Landscape

Architect otherwise in writing, and receive in writing the approval from the Landscape

Architect.

3.2 LANDSCAPE ARCHITECT'S ACTION

A. The Landscape Architect shall review and take appropriate action on submittals, shop drawings,

product data, and samples required by the Contract Documents. Such review shall be only for

general conformance with the design concept and general compliance with the information

given in the Contract Documents. It shall not include review of quantities, dimensions, weights

or gauges, fabrication processes, construction methods, coordination of work with other trades,

or construction safety precautions, all of which are the sole responsibility of the Contractor.

B. The Landscape Architect’s review shall be conducted with reasonable promptness consistent

with sound professional practice. Review of a specific item shall not indicate acceptance of an

assembly of which the item is a component. The Landscape Architect shall not be required to

review or be responsible for any deviation from the Contract Documents not clearly noted by

the Contractor. Nor shall the Landscape Architect be required to review partial submissions or

those for which submissions for correlated items have not been reviewed.

END OF SECTION 013300

Page 49: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

QUALITY REQUIREMENTS 014000 - 1

SECTION 014000 - QUALITY REQUIREMENTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality

control, including:

1. Testing and inspection services

2. Mockups

3. Constructors’ qualifications

4. Quality control plan

B. Testing and inspecting services are required to verify compliance with requirements specified or

indicated. These services do not relieve Contractor of responsibility for compliance with the

Contract Document requirements.

1. Specific quality-assurance and -control requirements for individual construction activities

are specified in the Sections that specify those activities. Requirements in those Sections

may also cover production of standard products.

2. Specified tests, inspections, and related actions do not limit Contractor's other quality-

assurance and -control procedures that facilitate compliance with the Contract Document

requirements.

3. Requirements for Contractor to provide quality-assurance and -control services required

by Landscape Architect, Owner, or authorities having jurisdiction are not limited by

provisions of this Section.

C. Related Requirements:

1. Divisions 02 through 33 Sections for specific test and inspection requirements.

1.3 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during

execution of the Work to guard against defects and deficiencies and substantiate that proposed

construction will comply with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after

execution of the Work to evaluate that actual products incorporated into the Work and

completed construction comply with requirements. Services do not include contract

enforcement activities performed by Landscape Architect.

Page 50: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

QUALITY REQUIREMENTS 014000 - 2

C. Mockups: Full-size physical assemblies that are constructed on-site. Mockups are constructed

to verify selections made under Sample submittals; to demonstrate aesthetic effects and, where

indicated, qualities of materials and execution; to review coordination, testing, or operation; to

show interface between dissimilar materials; and to demonstrate compliance with specified

installation tolerances. Mockups are not Samples. Unless otherwise indicated, approved

mockups establish the standard by which the Work will be judged.

1. Laboratory Mockups: Full-size physical assemblies constructed at testing facility to

verify performance characteristics.

2. Exterior Mockups: Mockups of the exterior envelope erected separately from the

building but on Project site, consisting of multiple products, assemblies, and

subassemblies.

D. Preconstruction Testing: Tests and inspections performed specifically for Project before

products and materials are incorporated into the Work, to verify performance or compliance

with specified criteria.

E. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing

agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to

establish product performance and compliance with specified requirements.

F. Source Quality-Control Testing: Tests and inspections that are performed at the source, e.g.,

plant, mill, factory, or shop.

G. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation

of the Work and for completed Work.

H. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing

laboratory shall mean the same as testing agency.

I. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an

employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation,

including installation, erection, application, and similar operations.

1. Use of trade-specific terminology in referring to a trade or entity does not require that

certain construction activities be performed by accredited or unionized individuals, or

that requirements specified apply exclusively to specific trade(s).

J. Experienced: When used with an entity or individual, "experienced" means having successfully

completed a minimum of five (5)previous projects similar in nature, size, and extent to this

Project; being familiar with special requirements indicated; and having complied with

requirements of authorities having jurisdiction.

1.4 CONFLICTING REQUIREMENTS

A. Referenced Standards: If compliance with two or more standards is specified and the standards

establish different or conflicting requirements for minimum quantities or quality levels, comply

with the most stringent requirement. Refer conflicting requirements that are different, but

apparently equal, to Landscape Architect for a decision before proceeding.

Page 51: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

QUALITY REQUIREMENTS 014000 - 3

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be

the minimum provided or performed. The actual installation may comply exactly with the

minimum quantity or quality specified, or it may exceed the minimum within reasonable limits.

To comply with these requirements, indicated numeric values are minimum or maximum, as

appropriate, for the context of requirements. Refer uncertainties to Landscape Architect for a

decision before proceeding.

1.5 INFORMATIONAL SUBMITTALS

A. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to

demonstrate their capabilities and experience. Include proof of qualifications in the form of a

recent report on the inspection of the testing agency by a recognized authority.

B. Schedule of Tests and Inspections: Prepare in tabular form and include the following:

1. Specification Section number and title.

2. Entity responsible for performing tests and inspections.

3. Description of test and inspection.

4. Identification of applicable standards.

5. Identification of test and inspection methods.

6. Number of tests and inspections required.

7. Time schedule or time span for tests and inspections.

8. Requirements for obtaining samples.

9. Unique characteristics of each quality-control service.

1.6 REPORTS AND DOCUMENTS

A. Test and Inspection Reports: Prepare and submit certified written reports specified in other

Sections. Include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples and tests or inspections.

5. Names of individuals making tests and inspections.

6. Description of the Work and test and inspection method.

7. Identification of product and Specification Section.

8. Complete test or inspection data.

9. Test and inspection results and an interpretation of test results.

10. Record of temperature and weather conditions at time of sample taking and testing and

inspecting.

11. Comments or professional opinion on whether tested or inspected Work complies with

the Contract Document requirements.

12. Name and signature of laboratory inspector.

13. Recommendations on retesting and re-inspecting.

B. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses,

certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee

Page 52: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

QUALITY REQUIREMENTS 014000 - 4

payments, judgments, correspondence, records, and similar documents, established for

compliance with standards and regulations bearing on performance of the Work.

1.7 QUALITY ASSURANCE

A. General: Qualifications paragraphs in this article establish the minimum qualification levels

required; individual Specification Sections specify additional requirements.

B. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar

to those indicated for this Project and with a record of successful in-service performance, as

well as sufficient production capacity to produce required units.

C. Fabricator Qualifications: A firm experienced in producing products similar to those indicated

for this Project and with a record of successful in-service performance, as well as sufficient

production capacity to produce required units.

D. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling

work similar in material, design, and extent to that indicated for this Project, whose work has

resulted in construction with a record of successful in-service performance.

E. Professional Engineer Qualifications: A professional engineer who is legally qualified to

practice in jurisdiction where Project is located and who is experienced in providing

engineering services of the kind indicated. Engineering services are defined as those performed

for installations of the system, assembly, or product that are similar in material, design, and

extent to those indicated for this Project.

F. Specialists: Certain Specification Sections require that specific construction activities shall be

performed by entities who are recognized experts in those operations. Specialists shall satisfy

qualification requirements indicated and shall be engaged for the activities indicated.

1. Requirements of authorities having jurisdiction shall supersede requirements for

specialists.

G. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the

experience and capability to conduct testing and inspecting indicated, as documented according

to ASTM E 329; and with additional qualifications specified in individual Sections; and, where

required by authorities having jurisdiction, that is acceptable to authorities.

1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7.

2. NVLAP: A testing agency accredited according to NIST's National Voluntary

Laboratory Accreditation Program.

H. Manufacturer's Technical Representative Qualifications: An authorized representative of

manufacturer who is trained and approved by manufacturer to observe and inspect installation

of manufacturer's products that are similar in material, design, and extent to those indicated for

this Project.

I. Factory-Authorized Service Representative Qualifications: An authorized representative of

manufacturer who is trained and approved by manufacturer to inspect installation of

Page 53: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

QUALITY REQUIREMENTS 014000 - 5

manufacturer's products that are similar in material, design, and extent to those indicated for this

Project.

J. Mockups: Before installing portions of the Work requiring mockups, build mockups for each

form of construction and finish required to comply with the following requirements, using

materials indicated for the completed Work:

1. Build mockups in location and of size indicated or, if not indicated, as directed by

Landscape Architect.

2. Notify Landscape Architect seven (7) days in advance of dates and times when mockups

will be constructed.

3. Employ supervisory personnel who will oversee mockup construction. Employ workers

that will be employed during the construction at Project.

4. Demonstrate the proposed range of aesthetic effects and workmanship.

5. Obtain Landscape Architect's approval of mockups before starting work, fabrication, or

construction.

a. Allow three (3) days for initial review and each re-review of each mockup.

6. Maintain mockups during construction in an undisturbed condition as a standard for

judging the completed Work.

7. Demolish and remove mockups when directed unless otherwise indicated.

K. Integrated Exterior Mockups: Construct integrated exterior mockup according to approved

Shop Drawings. Coordinate installation of exterior envelope materials and products for which

mockups are required in individual Specification Sections, along with supporting materials.

1.8 QUALITY CONTROL

A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility,

Owner will engage a qualified testing agency to perform these services.

1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing

agencies engaged and a description of types of testing and inspecting they are engaged to

perform.

2. Payment for these services will be made from testing and inspecting allowances, as

authorized by Change Orders.

3. Costs for retesting and re-inspecting construction that replaces or is necessitated by work

that failed to comply with the Contract Documents will be charged to Contractor, and the

Contract Sum will be adjusted by Change Order.

B. Contractor Responsibilities: Tests and inspections not explicitly assigned to Owner are

Contractor's responsibility. Perform additional quality-control activities required to verify that

the Work complies with requirements, whether specified or not.

1. Unless otherwise indicated, provide quality-control services specified and those required

by authorities having jurisdiction. Perform quality-control services required of

Contractor by authorities having jurisdiction, whether specified or not.

2. Where services are indicated as Contractor's responsibility, engage a qualified testing

agency to perform these quality-control services.

Page 54: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

QUALITY REQUIREMENTS 014000 - 6

a. Contractor shall not employ same entity engaged by Owner, unless agreed to in

writing by Owner.

3. Notify testing agencies at least 24 hours in advance of time when Work that requires

testing or inspecting will be performed.

4. Where quality-control services are indicated as Contractor's responsibility, submit a

certified written report, in duplicate, of each quality-control service.

5. Testing and inspecting requested by Contractor and not required by the Contract

Documents are Contractor's responsibility.

6. Submit additional copies of each written report directly to authorities having jurisdiction,

when they so direct.

C. Manufacturer's Field Services: Where indicated, engage a factory-authorized service

representative to inspect field-assembled components and equipment installation, including

service connections. Report results in writing as specified in Division 01 Section "Submittal

Procedures."

D. Manufacturer's Technical Services: Where indicated, engage a manufacturer's technical

representative to observe and inspect the Work. Manufacturer's technical representative's

services include participation in preinstallation conferences, examination of substrates and

conditions, verification of materials, observation of Installer activities, inspection of completed

portions of the Work, and submittal of written reports.

E. Retesting/Re-inspecting: Regardless of whether original tests or inspections were Contractor's

responsibility, provide quality-control services, including retesting and re-inspecting, for

construction that replaced Work that failed to comply with the Contract Documents.

F. Testing Agency Responsibilities: Cooperate with Landscape Architect , Construction Manager,

and Contractor in performance of duties. Provide qualified personnel to perform required tests

and inspections.

1. Notify Landscape Architect and Contractor promptly of irregularities or deficiencies

observed in the Work during performance of its services.

2. Determine the location from which test samples will be taken and in which in-situ tests

are conducted.

3. Conduct and interpret tests and inspections and state in each report whether tested and

inspected work complies with or deviates from requirements.

4. Submit a certified written report, in duplicate, of each test, inspection, and similar

quality-control service through Contractor.

5. Do not release, revoke, alter, or increase the Contract Document requirements or approve

or accept any portion of the Work.

6. Do not perform any duties of Contractor.

G. Associated Services: Cooperate with agencies performing required tests, inspections, and

similar quality-control services, and provide reasonable auxiliary services as requested. Notify

agency sufficiently in advance of operations to permit assignment of personnel. Provide the

following:

1. Access to the Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

Page 55: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

QUALITY REQUIREMENTS 014000 - 7

3. Adequate quantities of representative samples of materials that require testing and

inspecting. Assist agency in obtaining samples.

4. Facilities for storage and field curing of test samples.

5. Delivery of samples to testing agencies.

6. Preliminary design mix proposed for use for material mixes that require control by testing

agency.

7. Security and protection for samples and for testing and inspecting equipment at Project

site.

H. Coordination: Coordinate sequence of activities to accommodate required quality-assurance

and -control services with a minimum of delay and to avoid necessity of removing and

replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 TEST AND INSPECTION LOG

A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following:

1. Date test or inspection was conducted.

2. Description of the Work tested or inspected.

3. Date test or inspection results were transmitted to Landscape Architect.

4. Identification of testing agency or special inspector conducting test or inspection.

B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test

and inspection log for Landscape Architect's reference during normal working hours.

3.2 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair

damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other

Specification Sections or matching existing substrates and finishes. Restore patched

areas and extend restoration into adjoining areas with durable seams that are as invisible

as possible. Comply with the Contract Document requirements for cutting and patching

in Division 01 Section "Execution."

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of

responsibility for quality-control services.

Page 56: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

QUALITY REQUIREMENTS 014000 - 8

END OF SECTION 014000

Page 57: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

TEMPORARY TREE AND PLANT PROTECTION 015639 - 1

SECTION 015639 - TEMPORARY TREE AND PLANT PROTECTION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes general protection and pruning of existing trees and plants that are affected by

execution of the Work, whether temporary or permanent construction.

B. Related Requirements:

1. Section 311000 "Site Clearing" for removing existing trees and shrubs.

1.3 DEFINITIONS

A. Caliper: Diameter of a trunk measured by a diameter tape at a height 6 inches (150 mm) above

the ground for trees up to and including 4-inch (100-mm) size at this height and as measured at

a height of 12 inches (300 mm) above the ground for trees larger than 4-inch (100-mm) size.

B. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected

during construction and indicated on Drawings.

C. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.

1.4 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site with Landscape Architect and

Owner.

1. Review methods and procedures related to temporary tree and plant protection including,

but not limited to, the following:

a. Engaging a certified Arborist if required.

b. Existing condition of trees and proximity of proposed Work.

c. Coordination of Work and equipment movement with the locations of protection

zones.

d. Trenching by hand or with air-spade within protection zones.

e. Field quality control.

Page 58: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

TEMPORARY TREE AND PLANT PROTECTION 015639 - 2

1.5 INFORMATIONAL SUBMITTALS

A. Existing Conditions: Documentation of existing trees and plantings indicated to remain, which

establishes preconstruction conditions that might be misconstrued as damage caused by

construction activities.

1. Use sufficiently detailed photographs.

2. Include plans and notations to indicate specific wounds and damage conditions of each

tree or other plants designated to remain.

B. Product Data: For each type of product

1.6 QUALITY ASSURANCE

A. Arborist Qualifications (if required by Landscape Architect and Owner): Licensed arborist in

jurisdiction where Project is located.

B. Quality-Control Program: Prepare a written program to systematically demonstrate the ability of

personnel to properly follow procedures and handle materials and equipment during the Work

without damaging trees and plantings. Include dimensioned diagrams for placement of

protection zone fencing and signage, the arborist's and tree-service firm's responsibilities,

instructions given to workers on the use and care of protection zones, and enforcement of

requirements for protection zones.

1.7 FIELD CONDITIONS

A. The following practices are prohibited within protection zones:

1. Storage of construction materials, debris, or excavated material.

2. Moving or parking vehicles or equipment.

3. Heavy foot traffic.

4. Erection of sheds or structures.

5. Impoundment of water.

6. Excavation or other digging unless otherwise indicated.

7. Attachment of signs to or wrapping materials around trees or plants unless otherwise

indicated.

B. Do not direct vehicle or equipment exhaust toward protection zones.

C. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones and

organic mulch.

D. Contractor shall not prune crown of trees.

E. The results of poor protection may not show for a number of years following the completion of

the Work, therefore, the health of the trees and condition of the soil in the protection zone as

indicated on the Demolition and Tree Preservation Plan, is warrantied for two (2) years.

Page 59: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

TEMPORARY TREE AND PLANT PROTECTION 015639 - 3

PART 2 - PRODUCTS

2.1 MATERIALS

A. Backfill Soil: Stockpiled soil of suitable moisture content and granular texture for placing

around tree; free of stones, roots, plants, sod, clods, clay lumps, pockets of coarse sand, concrete

slurry, concrete layers or chunks, cement, plaster, building debris, and other extraneous

materials harmful to plant growth.

B. Organic Mulch: Free from deleterious materials and suitable as a top dressing for trees and

shrubs, consisting of one of the following:

1. Type: Ground or shredded hardwood bark

2. Size Range: 3 inches (76 mm) maximum, 1/2 inch (13 mm) minimum

3. Color: Natural.

C. Protection-Zone Fencing: Fencing fixed in position and meeting the following

requirements: Previously used materials may be used when approved by Landscape Architect.

1. Wood Protection-Zone Fencing: Constructed of two 2-by-4-inch (50-by-100-mm)

horizontal rails, with 4-by-4-inch (100-by-100-mm) preservative-treated wood posts

spaced not more than 96 inches (2400 mm) apart, and lower rail set halfway between top

rail and ground.

a. Height: 48 inches (1200 mm)

b. Lumber: Whole, unsplintered, and free of cracks that could lessen the durability of

the fence or present a safety hazard.

c. Fencing: Plastic construction fencing, high-visibility orange; secured to wood

posts and rails with plastic bands, galvanized steel or stainless steel wire ties, or

heavy duty staples.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Erosion and Sedimentation Control: Examine the site to verify that temporary erosion- and

sedimentation-control measures are in place. Verify that flows of water redirected from

construction areas or generated by construction activity do not enter or cross protection zones.

3.2 PREPARATION

A. Coordinate with Landscape Architect and Owner prior to installation of tree protection fencing

to verify any special preservation or protection requirements.

B. Locate and clearly identify trees to remain. Tie a 1-inch (25-mm) blue vinyl tape around each

tree trunk at 54 inches (1372 mm) above the ground.

Page 60: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

TEMPORARY TREE AND PLANT PROTECTION 015639 - 4

C. Protect tree root systems from damage caused by runoff or spillage of noxious materials while

mixing, placing, or storing construction materials. Protect root systems from ponding, eroding,

or excessive wetting caused by dewatering operations.

D. Tree-Protection Zones: Mulch areas inside tree-protection zones and other areas indicated. Do

not exceed indicated thickness of mulch.

1. Apply 2-inch (50-mm) uniform thickness of organic mulch unless otherwise indicated.

Do not place mulch within 6 inches (150 mm) of tree trunks.

3.3 PROTECTION ZONES

A. Protection-Zone Fencing: Install protection-zone fencing along edges of protection zones in a

manner that will prevent people from easily entering protected areas except by entrance gates.

Construct fencing so as not to obstruct safe passage or visibility at vehicle intersections where

fencing is located adjacent to pedestrian walkways or in close proximity to street intersections,

drives, or other vehicular circulation.

1. Posts: Set or drive posts into ground one-third the total height of the fence without

concrete footings.

B. Maintain protection zones free of weeds and trash.

C. Maintain protection-zone fencing and signage in good condition as acceptable to Architect and

remove when construction operations are complete and equipment has been removed from the

site.

1. Do not remove protection-zone fencing, even temporarily, to allow deliveries or

equipment access through the protection zone.

3.4 EXCAVATION

A. General: Excavate at edge of protection zones and for trenches indicated within protection

zones according to requirements in Section 312000 "Earth Moving" unless otherwise indicated.

B. Redirect roots in backfill areas where possible. If encountering large, main lateral roots, expose

roots beyond excavation limits as required to bend and redirect them without breaking. If

encountered immediately adjacent to location of new construction and redirection is not

practical, cut roots approximately 3 inches (75 mm) back from new construction and as required

for root pruning.

C. Do not allow exposed roots to dry out before placing permanent backfill. Provide temporary

earth cover or pack with peat moss and wrap with burlap. Water and maintain in a moist

condition. Temporarily support and protect roots from damage until they are permanently

relocated and covered with soil.

Page 61: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

TEMPORARY TREE AND PLANT PROTECTION 015639 - 5

3.5 ROOT PRUNING

A. Prune tree roots that are affected by temporary and permanent construction. Prune roots as

follows:

1. Cut roots manually by digging a trench and cutting exposed roots with sharp pruning

instruments; do not break, tear, chop, or slant the cuts. Do not use a backhoe or other

equipment that rips, tears, or pulls roots.

2. Cut Ends: Do not paint cut root ends.

3. Temporarily support and protect roots from damage until they are permanently redirected

and covered with soil.

4. Cover exposed roots with burlap and water regularly.

5. Backfill as soon as possible according to requirements in Section 312000 "Earth

Moving."

B. Root Pruning at Edge of Protection Zone: Prune tree roots 4 inches (100 mm) outside of the

protection zone by cleanly cutting all roots to the depth of the required excavation.

3.6 REGRADING

A. Lowering Grade: Where new finish grade is indicated below existing grade around trees, slope

grade beyond the protection zone. Maintain existing grades within the protection zone.

B. Lowering Grade within Protection Zone: Grading within tree protection areas is not allowed.

C. Raising Grade: Where new finish grade is indicated above existing grade around trees, slope

grade beyond the protection zone. Maintain existing grades within the protection zone.

D. Minor Fill within Protection Zone: Grading within tree protection areas is not allowed.

3.7 REPAIR AND REPLACEMENT

A. General: Repair or replace trees, shrubs, and other vegetation indicated to remain or to be

relocated that are damaged by construction operations, in a manner approved by Architect.

1. Submit details of proposed pruning and repairs.

2. Perform repairs of damaged trunks, branches, and roots within 24 hours according to

arborist's written instructions.

3. Replace trees and other plants that cannot be repaired and restored to full-growth status,

as determined by Architect.

B. Trees: Remove and replace trees indicated to remain that are more than 25percent dead or in an

unhealthy condition before the date of substantial completion, or are damaged during

construction operations that Landscape Architect or Owner determines are incapable of

restoring to normal growth pattern.

1. Small Trees: Provide new trees of same size and species as those being replaced for each

tree that measures 6 inches (150 mm) or smaller in caliper size.

Page 62: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

TEMPORARY TREE AND PLANT PROTECTION 015639 - 6

2. Large Trees: Provide one new tree(s) of 6-inch (150-mm) caliper size for each tree being

replaced that measures more than 6 inches (150 mm) in caliper size.

a. Species: As determined by Landscape Architect.

C. Excess Mulch: Rake mulched area within protection zones, being careful not to injure roots.

Rake to loosen and remove mulch that exceeds a 2-inch (50-mm) > uniform thickness to

remain.

D. Soil Aeration: Where directed by Architect, aerate surface soil compacted during construction.

Aerate 10 feet (3 m) beyond drip line and no closer than 36 inches (900 mm) to tree trunk. Drill

2-inch- (50-mm-)diameter holes a minimum of 12 inches (300 mm) deep at 24 inches (600 mm)

o.c. Backfill holes with an equal mix of augured soil and sand.

3.8 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Disposal: Remove excess excavated material, displaced trees, trash, and debris and legally

dispose of them off Owner's property.

END OF SECTION 015639

Page 63: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PRODUCT REQUIREMENTS 016000 - 1

SECTION 016000 - PRODUCT REQUIREMENTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for selection of products for use in

Project; product delivery, storage, and handling; manufacturers' standard warranties on

products; special warranties; and comparable products.

B. Related Requirements:

1. Division 01 Section "Alternates" for products selected under an alternate.

1.3 DEFINITIONS

A. Products: Items obtained for incorporating into the Work, whether purchased for Project or

taken from previously purchased stock. The term "product" includes the terms "material,"

"equipment," "system," and terms of similar intent.

1. Named Products: Items identified by manufacturer's product name, including make or

model number or other designation shown or listed in manufacturer's published product

literature that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or

facility. Products salvaged or recycled from other projects are not considered new

products.

3. Comparable Product: Product that is demonstrated and approved through submittal

process to have the indicated qualities related to type, function, dimension, in-service

performance, physical properties, appearance, and other characteristics that equal or

exceed those of specified product.

B. Basis-of-Design Product Specification: A specification in which a specific manufacturer's

product is named and accompanied by the words "basis-of-design product," including make or

model number or other designation, to establish the significant qualities related to type,

function, dimension, in-service performance, physical properties, appearance, and other

characteristics for purposes of evaluating comparable products of additional manufacturers

named in the specification.

Page 64: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PRODUCT REQUIREMENTS 016000 - 2

1.4 ACTION SUBMITTALS

A. Comparable Product Requests: Submit request for consideration of each comparable product.

Identify product or fabrication or installation method to be replaced. Include Specification

Section number and title and Drawing numbers and titles.

1. Include data to indicate compliance with the requirements specified in "Comparable

Products" Article.

2. Landscape Architect's Action: If necessary, Landscape Architect will request additional

information or documentation for evaluation within one week of receipt of a comparable

product request. Landscape Architect will notify Contractor of approval or rejection of

proposed comparable product request within fifteen (15) days of receipt of request, or

seven (7) days of receipt of additional information or documentation, whichever is later.

a. Form of Approval: As specified in Division 01 Section "Submittal Procedures."

b. Use product specified if Landscape Architect does not issue a decision on use of a

comparable product request within time allocated.

B. Basis-of-Design Product Specification Submittal: Submit manufacturer’s standard published

data. Mark each copy to identify applicable products, models, options, and other data.

Supplement manufacturers’ standard data to provide information specific to this Project.

Comply with requirements in Division 01 Section "Submittal Procedures." Show compliance

with requirements.

1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle products using means and methods that will prevent damage,

deterioration, and loss, including theft and vandalism. Comply with manufacturer's written

instructions.

B. Delivery and Handling:

1. Schedule delivery to minimize long-term storage at Project site and to prevent

overcrowding of construction spaces.

2. Coordinate delivery with installation time to ensure minimum holding time for items that

are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other

losses.

3. Deliver products to Project site in an undamaged condition in manufacturer's original

sealed container or other packaging system, complete with labels and instructions for

handling, storing, unpacking, protecting, and installing.

4. Inspect products on delivery to determine compliance with the Contract Documents and

to determine that products are undamaged and properly protected.

C. Storage:

1. Store products to allow for inspection and measurement of quantity or counting of units.

2. Store materials in a manner that will not endanger Project structure.

3. Store products that are subject to damage by the elements, under cover in a weathertight

enclosure above ground, with ventilation adequate to prevent condensation.

Page 65: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PRODUCT REQUIREMENTS 016000 - 3

4. Protect foam plastic from exposure to sunlight, except to extent necessary for period of

installation and concealment.

5. Comply with product manufacturer's written instructions for temperature, humidity,

ventilation, and weather-protection requirements for storage.

6. Protect stored products from damage and liquids from freezing.

7. Provide a secure location and enclosure at Project site for storage of materials and

equipment by Owner's construction forces. Coordinate location with Owner.

1.6 PRODUCT WARRANTIES

A. Warrant for a one-year period (unless another period is specified for a particular item)

commencing on the date of Substantial Completion:

B. Warrant that the work contains no faulty or imperfect material or equipment or any imperfect,

careless, or unskilled workmanship.

C. Warrant that all work, utility systems, equipment, machines, devices, plant materials, and all

other work shall be adequate for the use to which they are intended, and shall operate or survive

with ordinary care and attention in a satisfactory and efficient manner.

D. Re-execute, correct, repair, or remove and replace with proper Work, without cost to the Owner,

any Work found by the Owner not to be as warranted by this section. Repair all damages

caused to other work or materials in the process of complying with this Section.

E. Warranties specified in other Sections shall be in addition to, and run concurrent with, other

warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on

product warranties do not relieve Contractor of obligations under requirements of the Contract

Documents.

1. Manufacturer's Warranty: Written warranty furnished by individual manufacturer for a

particular product and specifically endorsed by manufacturer to Owner.

2. Special Warranty: Written warranty required by the Contract Documents to provide

specific rights for Owner.

F. Special Warranties: Prepare a written document that contains appropriate terms and

identification, ready for execution.

1. Manufacturer's Standard Form: Modified to include Project-specific information and

properly executed.

2. Specified Form: When specified forms are included with the Specifications, prepare a

written document using indicated form properly executed.

3. See Divisions 02 through 33 Sections for specific content requirements and particular

requirements for submitting special warranties.

G. Submittal Time: Comply with requirements in Division 01 Section "Closeout Procedures."

Page 66: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PRODUCT REQUIREMENTS 016000 - 4

PART 2 - PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES

A. General Product Requirements: Provide products that comply with the Contract Documents,

are undamaged and, unless otherwise indicated, are new at time of installation.

1. Provide products complete with accessories, trim, finish, fasteners, and other items

needed for a complete installation and indicated use and effect.

2. Standard Products: If available, and unless custom products or nonstandard options are

specified, provide standard products of types that have been produced and used

successfully in similar situations on other projects.

3. Owner reserves the right to limit selection to products with warranties not in conflict with

requirements of the Contract Documents.

4. Where products are accompanied by the term "as selected," Landscape Architect will

make selection.

5. Descriptive, performance, and reference standard requirements in the Specifications

establish salient characteristics of products.

B. Product Selection Procedures:

1. Product: Where Specifications name a single manufacturer and product, provide the

named product that complies with requirements. Comparable products or substitutions

for Contractor's convenience will not be considered.

2. Manufacturer/Source: Where Specifications name a single manufacturer or source,

provide a product by the named manufacturer or source that complies with requirements.

Comparable products or substitutions for Contractor's convenience will not be

considered.

3. Products:

a. Restricted List: Where Specifications include a list of names of both

manufacturers and products, provide one of the products listed that complies with

requirements. Comparable products or substitutions for Contractor's convenience

will not be considered unless otherwise indicated.

b. Nonrestricted List: Where Specifications include a list of names of both available

manufacturers and products, provide one of the products listed, or an unnamed

product, that complies with requirements. Comply with requirements in

"Comparable Products" Article for consideration of an unnamed product.

4. Manufacturers:

a. Restricted List: Where Specifications include a list of manufacturers' names,

provide a product by one of the manufacturers listed that complies with

requirements. Comparable products or substitutions for Contractor's convenience

will not be considered unless otherwise indicated.

b. Nonrestricted List: Where Specifications include a list of available manufacturers,

provide a product by one of the manufacturers listed, or a product by an unnamed

manufacturer, that complies with requirements. Comply with requirements in

"Comparable Products" Article for consideration of an unnamed manufacturer's

product.

Page 67: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PRODUCT REQUIREMENTS 016000 - 5

5. Basis-of-Design Product: Where Specifications name a product, or refer to a product

indicated on Drawings, and include a list of manufacturers, provide the specified or

indicated product or a comparable product by one of the other named manufacturers.

Drawings and Specifications indicate sizes, profiles, dimensions, and other characteristics

that are based on the product named. Comply with requirements in "Comparable

Products" Article for consideration of an unnamed product by one of the other named

manufacturers.

C. Visual Selection Specification: Where Specifications include the phrase "as selected by

Landscape Architect from manufacturer's full range" or similar phrase, select a product that

complies with requirements. Landscape Architect will select color, gloss, pattern, density, or

texture from manufacturer's product line that includes both standard and premium items.

2.2 COMPARABLE PRODUCTS

A. Conditions for Consideration: Landscape Architect will consider Contractor's request for

comparable product when the following conditions are satisfied. If the following conditions are

not satisfied, Landscape Architect may return requests without action, except to record

noncompliance with these requirements:

1. Evidence that the proposed product does not require revisions to the Contract Documents,

that it is consistent with the Contract Documents and will produce the indicated results,

and that it is compatible with other portions of the Work.

a. In the event that the Landscape Architect is required to consider a product as a

Comparable Product, even though said product requires revisions to the Contract

Documents, the Contractor shall assume all costs associated with changes to any

and all affected aspects of the Contract Documents, including plan and detail

revisions, specification revisions, documentation of compatibility, calculations,

and permitting. Further, the Contractor shall provide revised Contract Drawings,

signed and sealed by all applicable licensed, certified or registered professions, at

the Contractor’s expense.

2. Detailed comparison of significant qualities of proposed product with those named in the

Specifications. Significant qualities include attributes such as performance, weight, size,

durability, visual effect, and specific features and requirements indicated.

3. Evidence that proposed product provides specified warranty.

4. List of similar installations for completed projects with project names and addresses and

names and addresses of Landscape Architects and owners, if requested.

5. Samples, if requested.

PART 3 - EXECUTION (Not Used)

END OF SECTION 016000

Page 68: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXECUTION 017300 - 1

SECTION 017300 - EXECUTION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes general administrative and procedural requirements governing execution of the

Work including, but not limited to, the following:

1. Construction layout.

2. Field engineering and surveying.

3. Installation of the Work.

4. Cutting and patching.

5. Progress cleaning.

6. Starting and adjusting.

7. Protection of installed construction.

8. Correction of the Work.

B. Related Requirements:

1. Division 01 Section "Summary" for limits on use of Project site.

2. Division 01 Section "Submittal Procedures" for submitting surveys.

3. Division 01 Section "Closeout Procedures" for submitting final property survey with

Project Record Documents, recording of Owner-accepted deviations from indicated lines

and levels, and final cleaning.

1.3 DEFINITIONS

A. Cutting: Removal of in-place construction necessary to permit installation or performance of

other work.

B. Patching: Fitting and repair work required to restore construction to original conditions after

installation of other work.

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: For land surveyor or professional engineer.

B. Certificates: Submit certificate signed by land surveyor or professional engineer certifying that

location and elevation of improvements comply with requirements.

Page 69: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXECUTION 017300 - 2

1. Electrical Systems: List services and systems that cutting and patching procedures will

disturb or affect. List services and systems that will be relocated and those that will be

temporarily out of service. Indicate length of time permanent services and systems will

be disrupted.

a. Include description of provisions for temporary services and systems during

interruption of permanent services and systems.

C. Certified Surveys: Submit two (2) copies signed by land surveyor or professional engineer.

1.5 QUALITY ASSURANCE

A. Land Surveyor Qualifications: A professional land surveyor who is legally qualified to practice

in jurisdiction where Project is located and who is experienced in providing land-surveying

services of the kind indicated.

B. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of

construction elements.

1. Structural Elements: When cutting and patching structural elements, notify Landscape

Architect of locations and details of cutting and await directions from Landscape

Architect before proceeding. Shore, brace, and support structural elements during cutting

and patching. Do not cut and patch structural elements in a manner that could change

their load-carrying capacity or increase deflection

2. Operational Elements: Do not cut and patch operating elements and related components

in a manner that results in reducing their capacity to perform as intended or that results in

increased maintenance or decreased operational life or safety.

3. Other Construction Elements: Do not cut and patch other construction elements or

components in a manner that could change their load-carrying capacity, that results in

reducing their capacity to perform as intended, or that results in increased maintenance or

decreased operational life or safety. Other construction elements include but are not

limited to the following:

a. Tree roots.

4. Visual Elements: Do not cut and patch construction in a manner that results in visual

evidence of cutting and patching. Do not cut and patch exposed construction in a manner

that would, in Landscape Architect's opinion, reduce the building's aesthetic qualities.

Remove and replace construction that has been cut and patched in a visually

unsatisfactory manner.

C. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written

recommendations and instructions for installation of products and equipment.

Page 70: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXECUTION 017300 - 3

PART 2 - PRODUCTS

2.1 MATERIALS

A. General: Comply with requirements specified in other Sections.

B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed

surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent

possible.

1. If identical materials are unavailable or cannot be used, use materials that, when installed,

will provide a match acceptable to Landscape Architect for the visual and functional

performance of in-place materials.

a. Submit these materials to the Landscape Architect no less than five (5) working

days in advance of their proposed use in the project using contract submittal

procedures described in Division 01 Section “Submittal Procedures”.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Existing Conditions: Before beginning any work of this Contract, carefully study and compare

the Contract Documents with existing conditions at the Project site and report immediately in

writing to the Landscape Architect if any errors, inconsistencies, or omissions are discovered.

Do not proceed with any work in such areas until written instructions are received from the

Landscape Architect.

B. Existing Subsurface Conditions: The existence and location of underground and other utilities

and construction indicated as existing are not guaranteed. Before beginning sitework,

investigate and verify the existence and location of underground utilities, mechanical and

electrical systems, and other construction affecting the Work.

1. Before construction, verify the location and invert elevation at points of connection of

sanitary sewer, storm sewer, and water-service piping; underground electrical services,

and other utilities.

a. Before beginning any excavation, contact public utility locator: Miss Utility 1-800-

257-7777 (MD & VA) at least three (3) working days prior to starting work so

that utility locator may mark horizontal locations of underground utilities.

b. If public utility locator will not or is not able to verify horizontal locations of

utilities or provide Contractor with sufficient utility information, Contractor is

responsible for retaining the services of a private utility locator at Contractor’s

expense.

2. Furnish location data for work related to Project that must be performed by public

utilities serving Project site.

Page 71: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXECUTION 017300 - 4

3. Notify Landscape Architect immediately if discovered conditions differ from conditions

as shown in the Contract Documents.

C. Examination and Acceptance of Conditions: Before proceeding with each component of the

Work, examine substrates, areas, and conditions, with Installer or Applicator present where

indicated, for compliance with requirements for installation tolerances and other conditions

affecting performance. Record observations.

1. Examine roughing-in for electrical systems to verify actual locations of connections

before equipment and fixture installation.

2. Examine walls, floors, and roofs for suitable conditions where products and systems are

to be installed.

3. Verify compatibility with and suitability of substrates, including compatibility with

existing finishes or primers.

D. Written Report: Where a written report listing conditions detrimental to performance of the

Work is required by other Sections, include the following:

1. Description of the Work.

2. List of detrimental conditions, including substrates.

3. List of unacceptable installation tolerances.

4. Recommended corrections.

E. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding

with the Work indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Existing Utility Information: Furnish information to Owner that is necessary to adjust, move, or

relocate existing utility structures, utility poles, lines, services, or other utility appurtenances

located in or affected by construction. Coordinate with authorities having jurisdiction.

B. Field Measurements: Take field measurements as required to fit the Work properly. Recheck

measurements before installing each product. Where portions of the Work are indicated to fit to

other construction, verify dimensions of other construction by field measurements before

preparation of shop drawings or fabrication. Coordinate fabrication schedule with construction

progress to avoid delaying the Work.

C. Space Requirements: Verify space requirements and dimensions of items shown

diagrammatically on Drawings.

D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for

clarification of the Contract Documents caused by differing field conditions outside the control

of Contractor, submit a request for information to Landscape Architect according to

requirements in Division 01 Section "Project Management and Coordination."

Page 72: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXECUTION 017300 - 5

3.3 CONSTRUCTION LAYOUT

A. Verification: Before proceeding to lay out the Work, verify layout information shown on

Drawings, in relation to the property survey and existing benchmarks. If discrepancies are

discovered, notify Landscape Architect promptly.

B. General: Engage a land surveyor or professional engineer to lay out the Work using accepted

surveying practices.

1. Establish benchmarks and control points to set lines and levels at each story of

construction and elsewhere as needed to locate each element of Project.

2. Establish limits on use of Project site.

3. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain

required dimensions.

4. Inform installers of lines and levels to which they must comply.

5. Check the location, level and plumb, of every major element as the Work progresses.

6. Notify Landscape Architect when deviations from required lines and levels exceed

allowable tolerances.

7. Close site surveys with an error of closure equal to or less than the standard established

by authorities having jurisdiction.

C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill

and topsoil placement, utility slopes, and rim and invert elevations.

D. Record Log: Maintain a log of layout control work. Record deviations from required lines and

levels. Include beginning and ending dates and times of surveys, weather conditions, name and

duty of each survey party member, and types of instruments and tapes used. Make the log

available for reference by Landscape Architect.

3.4 FIELD ENGINEERING

A. Reference Points: Locate existing permanent benchmarks, control points, and similar reference

points before beginning the Work. Preserve and protect permanent benchmarks and control

points during construction operations.

1. Do not change or relocate existing benchmarks or control points without prior written

approval of Landscape Architect. Report lost or destroyed permanent benchmarks or

control points promptly. Report the need to relocate permanent benchmarks or control

points to Landscape Architect before proceeding.

2. Replace lost or destroyed permanent benchmarks and control points promptly. Base

replacements on the original survey control points.

B. Benchmarks: Establish and maintain a minimum of two (2)permanent benchmarks on Project

site, referenced to data established by survey control points. Comply with authorities having

jurisdiction for type and size of benchmark.

1. Record benchmark locations, with horizontal and vertical data, on Project Record

Documents.

2. Where the actual location or elevation of layout points cannot be marked, provide

temporary reference points sufficient to locate the Work.

Page 73: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXECUTION 017300 - 6

3. Remove temporary reference points when no longer needed. Restore marked

construction to its original condition.

3.5 INSTALLATION

A. General: Locate the Work and components of the Work accurately, in correct alignment and

elevation, as indicated.

1. Make vertical work plumb and make horizontal work level.

2. Where space is limited, install components to maximize space available for maintenance

and ease of removal for replacement.

B. Comply with manufacturer's written instructions and recommendations for installing products in

applications indicated.

C. Install products at the time and under conditions that will ensure the best possible results.

Maintain conditions required for product performance until Substantial Completion.

D. Conduct construction operations so no part of the Work is subjected to damaging operations or

loading in excess of that expected during normal conditions of occupancy.

E. Sequence the Work and allow adequate clearances to accommodate movement of construction

items on site and placement in permanent locations.

F. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.

G. Templates: Obtain and distribute to the parties involved templates for work specified to be

factory prepared and field installed. Check Shop Drawings of other work to confirm that

adequate provisions are made for locating and installing products to comply with indicated

requirements.

H. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size

and number to securely anchor each component in place, accurately located and aligned with

other portions of the Work. Where size and type of attachments are not indicated, verify size

and type required for load conditions.

1. Mounting Heights: Where mounting heights are not indicated, mount components at

heights directed by Landscape Architect.

2. Allow for building movement, including thermal expansion and contraction.

3. Coordinate installation of anchorages. Furnish setting drawings, templates, and

directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and

items with integral anchors, that are to be embedded in concrete or masonry. Deliver

such items to Project site in time for installation.

I. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated,

arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.

J. Hazardous Materials: Use products, cleaners, and installation materials that are not considered

hazardous.

Page 74: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXECUTION 017300 - 7

3.6 CUTTING AND PATCHING

A. Cutting and Patching, General: Employ skilled workers to perform cutting and patching.

Proceed with cutting and patching at the earliest feasible time, and complete without delay.

1. Cut in-place construction to provide for installation of other components or performance

of other construction, and subsequently patch as required to restore surfaces to their

original condition.

B. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged

during installation or cutting and patching operations, by methods and with materials so as not

to void existing warranties.

C. Temporary Support: Provide temporary support of work to be cut.

D. Protection: Protect in-place construction during cutting and patching to prevent damage.

Provide protection from adverse weather conditions for portions of Project that might be

exposed during cutting and patching operations.

E. Adjacent Occupied Areas: Where interference with use of adjoining areas or interruption of

free passage to adjoining areas is unavoidable, coordinate cutting and patching according to

requirements in Division 01 Section "Summary."

F. Existing Utility Services and Electrical Systems: Where existing services/systems are required

to be removed, relocated, or abandoned, bypass such services/systems before cutting to prevent

interruption to occupied areas.

G. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar

operations, including excavation, using methods least likely to damage elements retained or

adjoining construction. If possible, review proposed procedures with original Installer; comply

with original Installer's written recommendations.

1. In general, use hand or small power tools designed for sawing and grinding, not

hammering and chopping. Cut holes and slots neatly to minimum size required, and with

minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. Tree Roots: Use sharp pruning tools – do not break, tar, or chop. Comply with

requirements in Division 01 Section “Temporary Tree and Soil Protection”.

3. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.

4. Concrete Masonry and Paved Surfaces: Cut using a cutting machine, such as an abrasive

saw or a diamond-core drill.

5. Excavating and Backfilling: Comply with requirements in applicable Division 31

Sections where required by cutting and patching operations.

6. Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap,

valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of

moisture or other foreign matter after cutting.

7. Proceed with patching after construction operations requiring cutting are complete.

H. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations

following performance of other work. Patch with durable seams that are as invisible as

practicable. Provide materials and comply with installation requirements specified in other

Sections, where applicable.

Page 75: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXECUTION 017300 - 8

1. Inspection: Where feasible, test and inspect patched areas after completion to

demonstrate physical integrity of installation.

2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish

restoration into retained adjoining construction in a manner that will minimize evidence

of patching and refinishing.

a. Clean piping, conduit, and similar features before applying paint or other finishing

materials.

b. Restore damaged pipe covering to its original condition.

3. Paved Surfaces: Patch paved surfaces and / or pave to abut existing paved surfaces

providing smooth and consistent transitions. Abrupt changes in grade or line will not be

accepted.

I. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint,

mortar, oils, putty, and similar materials from adjacent finished surfaces.

3.7 PROGRESS CLEANING

A. General: Clean Project site and work areas daily, including common areas. Enforce

requirements strictly. Dispose of materials lawfully.

1. Comply with requirements in NFPA 241 for removal of combustible waste materials and

debris.

2. Do not hold waste materials more than seven days during normal weather or three days if

the temperature is expected to rise above 80 deg F (27 deg C).

3. Containerize hazardous and unsanitary waste materials separately from other waste.

Mark containers appropriately and dispose of legally, according to regulations.

a. Use containers intended for holding waste materials of type to be stored.

B. Site: Maintain Project site free of waste materials and debris.

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for

proper execution of the Work.

1. Remove liquid spills promptly.

2. Where dust would impair proper execution of the Work, broom-clean or vacuum the

entire work area, as appropriate.

D. Installed Work: Keep installed work clean. Clean installed surfaces according to written

instructions of manufacturer or fabricator of product installed, using only cleaning materials

specifically recommended. If specific cleaning materials are not recommended, use cleaning

materials that are not hazardous to health or property and that will not damage exposed surfaces.

E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.

F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure

freedom from damage and deterioration at time of Substantial Completion.

Page 76: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXECUTION 017300 - 9

G. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials

down sewers or into waterways. Comply with all federal, state, and local waste disposal

requirements.

H. During handling and installation, clean and protect construction in progress and adjoining

materials already in place. Apply protective covering where required to ensure protection from

damage or deterioration at Substantial Completion.

I. Clean and provide maintenance on completed construction as frequently as necessary through

the remainder of the construction period. Adjust and lubricate operable components to ensure

operability without damaging effects.

J. Limiting Exposures: Supervise construction operations to assure that no part of the

construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise

deleterious exposure during the construction period.

3.8 STARTING AND ADJUSTING

A. Start equipment and operating components to confirm proper operation. Remove

malfunctioning units, replace with new units, and retest.

B. Adjust equipment for proper operation. Adjust operating components for proper operation

without binding.

C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties.

Replace damaged and malfunctioning controls and equipment.

D. Manufacturer's Field Service: Comply with qualification requirements in Division 01 Section

"Quality Requirements."

3.9 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide final protection and maintain conditions that ensure installed Work is without damage

or deterioration at time of Substantial Completion.

3.10 CORRECTION OF THE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up

with matching materials, and properly adjusting operating equipment.

B. Restore permanent facilities used during construction to their specified condition.

C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired

without visible evidence of repair.

D. Repair components that do not operate properly. Remove and replace operating components

that cannot be repaired.

Page 77: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXECUTION 017300 - 10

E. Remove and replace chipped, scratched, and broken glass or reflective surfaces.

F. Repair to the satisfaction of the Owner and Utility Owner, any damage to any utility caused by

Contractor’s work.

END OF SECTION 017300

Page 78: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CLOSEOUT PROCEDURES 017700 - 1

SECTION 017700 - CLOSEOUT PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for contract closeout, including,

but not limited to, the following:

1. Substantial Completion procedures.

2. Final completion procedures.

3. Warranties.

4. Final cleaning.

5. Repair of the Work.

B. Related Requirements:

1. Division 01 Section "Photographic Documentation" for submitting final completion

construction photographic documentation.

2. Division 01 Section "Execution" for progress cleaning of Project site.

3. Division 01 Section "Project Record Documents" for submitting record Drawings, record

Specifications, and record Product Data.

4. Divisions 02 through 33 Sections for specific closeout and special cleaning requirements

for the Work in those Sections.

1.3 SUBSTANTIAL COMPLETION PROCEDURES

A. Procedures Prior to Substantial Completion: Complete the following prior to requesting

inspection for determining date of Substantial Completion. List items below that are incomplete

at time of request.

1. Advise Owner of pending insurance changeover requirements.

2. Submit specific warranties, workmanship bonds, maintenance service agreements, final

certifications, and other similar documents.

3. Obtain and submit releases permitting Owner unrestricted use of the Work and access to

services and utilities. Include occupancy permits, operating certificates, and similar

releases.

4. Perform preventive maintenance on equipment used prior to Substantial Completion.

5. Terminate and remove temporary facilities from Project site, along with mockups,

construction tools, and similar elements.

6. Complete final cleaning requirements, including touchup painting.

7. Complete “Final Cleaning” requirements.

Page 79: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CLOSEOUT PROCEDURES 017700 - 2

B. Inspection: Submit a written request for inspection to determine Substantial Completion. On

receipt of request, Landscape Architect will either proceed with inspection or notify Contractor

of unfulfilled requirements. Landscape Architect will prepare the Certificate of Substantial

Completion after inspection or will notify Contractor of items, either on Contractor's list or

additional items identified by Landscape Architect, that must be completed or corrected before

certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as

incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for final completion.

1.4 FINAL COMPLETION PROCEDURES

A. Submittals Prior to Final Completion: Before requesting final inspection for determining final

completion, complete the following:

1. Submit a final Application for Payment according to Division 01 Section "Payment

Procedures."

2. Certified List of Incomplete Items (Punch List): Submit certified copy of Landscape

Architect's Substantial Completion inspection list of items to be completed or corrected

(punch list), endorsed and dated by Landscape Architect. Certified copy of the list shall

state that each item has been completed or otherwise resolved for acceptance.

3. Certificate of Insurance: Submit evidence of final, continuing insurance coverage

complying with insurance requirements.

4. Submit pest-control final inspection report.

5. Instruct Owner’s personnel in operation, adjustment, and maintenance of products,

equipment, and systems.

B. Inspection: Submit a written request for final inspection to determine acceptance a minimum of

10 days prior to date the work will be completed and ready for final inspection and tests. On

receipt of request, Landscape Architect will either proceed with inspection or notify Contractor

of unfulfilled requirements. Landscape Architect will prepare a final Certificate for Payment

after inspection or will notify Contractor of construction that must be completed or corrected

before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as

incomplete is completed or corrected.

1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Organization of List: Include name and identification of each space and area affected by

construction operations for incomplete items and items needing correction including, if

necessary, areas disturbed by Contractor that are outside the limits of construction.

1. Organize list of spaces in sequential order.

2. Include the following information at the top of each page:

a. Project name: Meadowlark Botanical Gardens – Entrance Improvements

b. Date.

Page 80: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CLOSEOUT PROCEDURES 017700 - 3

c. Name of Landscape Architect: Rhodeside & Harwell

d. Name of Contractor.

e. Page number.

3. Submit list of incomplete items in the following format:

a. PDF electronic file. Landscape Architect will return annotated file.

1.6 SUBMITTAL OF PROJECT WARRANTIES

A. Division 1 Section “Submittal Procedures”

PART 2 - PRODUCTS – (Not Used)

PART 3 - EXECUTION

3.1 FINAL CLEANING

A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply

with local laws and ordinances and Federal and local environmental and antipollution

regulations.

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each

surface or unit to condition expected in an average commercial building cleaning and

maintenance program. Comply with manufacturer's written instructions.

1. Complete the following cleaning operations before requesting inspection for certification

of Substantial Completion for entire Project or for a designated portion of Project:

a. Clean Project site, yard, and grounds, in areas disturbed by construction activities,

including landscape development areas, of rubbish, waste material, litter, and other

foreign substances.

b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other

foreign deposits.

c. Rake grounds that are neither planted nor paved to a smooth, even-textured

surface.

d. Remove tools, construction equipment, machinery, and surplus material from

Project site.

e. Remove labels that are not permanent.

f. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency.

g. Leave Project clean and ready for occupancy.

3.2 REPAIR OF THE WORK

A. Complete repair and restoration operations before requesting inspection for determination of

Substantial Completion.

Page 81: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CLOSEOUT PROCEDURES 017700 - 4

B. Repair or remove and replace defective construction. Repairing includes replacing defective

parts, refinishing damaged surfaces, touching up with matching materials, and properly

adjusting operating equipment. Where damaged or worn items cannot be repaired or restored,

provide replacements. Remove and replace operating components that cannot be repaired.

Restore damaged construction and permanent facilities used during construction to specified

condition.

END OF SECTION 017700

Page 82: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT RECORD DOCUMENTS 017839 - 1

SECTION 017839 - PROJECT RECORD DOCUMENTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for project record documents,

including the following:

1. Record Drawings.

2. Record Specifications.

3. Record Product Data.

4. Miscellaneous record submittals.

B. Related Requirements:

1. Division 01 Section "Execution" for final property survey.

2. Division 01 Section "Closeout Procedures" for general closeout procedures.

3. Divisions 02 through 33 Sections for specific requirements for project record documents

of the Work in those Sections.

1.3 CLOSEOUT SUBMITTALS

A. Record Drawings: Comply with the following:

1. Number of Copies: Submit copies of record Drawings as follows:

a. Initial Submittal:

1) Submit PDF electronic files of scanned record prints and one (1) of file

prints.

2) Landscape Architect will indicate whether general scope of changes,

additional information recorded, and quality of drafting are acceptable.

b. Final Submittal:

1) Submit three (3) paper-copy set(s) of marked-up record prints.

2) Submit PDF electronic files of scanned record prints and three (3) set(s) of

prints.

3) Print each drawing, whether or not changes and additional information were

recorded.

Page 83: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT RECORD DOCUMENTS 017839 - 2

B. Record Specifications: Submit annotated PDF electronic files of Project's Specifications,

including addenda and contract modifications.

C. Record Product Data: Submit annotated PDF electronic files and directories of each submittal.

1. Where record Product Data are required as part of operation and maintenance manuals,

submit duplicate marked-up Product Data as a component of manual.

D. Reports: Submit written report bi-weekly indicating items incorporated into project record

documents concurrent with progress of the Work, including revisions, concealed conditions,

field changes, product selections, and other notations incorporated.

PART 2 - PRODUCTS

2.1 RECORD DRAWINGS

A. Record Prints: Maintain one set of marked-up paper copies of the Contract Drawings and Shop

Drawings, incorporating new and revised drawings as modifications are issued.

1. Preparation: Mark record prints to show the actual installation where installation varies

from that shown originally. Require individual or entity who obtained record data,

whether individual or entity is Installer, subcontractor, or similar entity, to provide

information for preparation of corresponding marked-up record prints.

a. Give particular attention to information on concealed elements that would be

difficult to identify or measure and record later.

b. Accurately record information in an acceptable drawing technique.

c. Record data as soon as possible after obtaining it.

d. Record and check the markup before enclosing concealed installations.

e. Cross-reference record prints to corresponding archive photographic

documentation.

2. Content: Types of items requiring marking include, but are not limited to, the following:

a. Dimensional changes to Drawings.

b. Revisions to details shown on Drawings.

c. Depths of foundations.

d. Changes made by Change Order or Construction Change Directive.

e. Changes made following Landscape Architect's written orders.

f. Details not on the original Contract Drawings.

g. Field records for variable and concealed conditions.

h. Record information on the Work that is shown only schematically.

3. Mark the Contract Drawings and Shop Drawings completely and accurately. Use

personnel proficient at recording graphic information in production of marked-up record

prints.

4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish

between changes for different categories of the Work at same location.

Page 84: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT RECORD DOCUMENTS 017839 - 3

5. Mark important additional information that was either shown schematically or omitted

from original Drawings.

6. Note Construction Change Directive numbers, alternate numbers, Change Order

numbers, and similar identification, where applicable.

B. Record Digital Data Files: Immediately before inspection for Certificate of Substantial

Completion, review marked-up record prints with Landscape Architect. When authorized,

prepare a full set of corrected digital data files of the Contract Drawings, as follows:

1. Format: Annotated PDF electronic file with comment function enabled.

2. Incorporate changes and additional information previously marked on record prints.

Delete, redraw, and add details and notations where applicable.

3. Refer instances of uncertainty to Landscape Architect for resolution.

C. Newly Prepared Record Drawings: Prepare new Drawings instead of preparing record

Drawings where Landscape Architect determines that neither the original Contract Drawings

nor Shop Drawings are suitable to show actual installation.

1. New Drawings may be required when a Change Order is issued as a result of accepting

an alternate, substitution, or other modification.

2. Consult Landscape Architect for proper scale and scope of detailing and notations

required to record the actual physical installation and its relation to other construction.

Integrate newly prepared record Drawings into record Drawing sets; comply with

procedures for formatting, organizing, copying, binding, and submitting.

D. Format: Identify and date each record Drawing; include the designation "PROJECT RECORD

DRAWING" in a prominent location.

1. Record Prints: Organize record prints and newly prepared record Drawings into

manageable sets. Bind each set with durable paper cover sheets. Include identification

on cover sheets.

2. Format: Annotated PDF electronic file with comment function enabled.

3. Record Digital Data Files: Organize digital data information into separate electronic files

that correspond to each sheet of the Contract Drawings. Name each file with the sheet

identification. Include identification in each digital data file.

4. Identification: As follows:

a. Project name: Fountainhead Regional Park – Stair and Dock Improvements

b. Date.

c. Designation "PROJECT RECORD DRAWINGS."

d. Name of Landscape Architect: Rhodeside & Harwell

e. Name of Contractor.

2.2 RECORD SPECIFICATIONS

A. Preparation: Mark Specifications to indicate the actual product installation where installation

varies from that indicated in Specifications, addenda, and contract modifications.

1. Give particular attention to information on concealed products and installations that

cannot be readily identified and recorded later.

Page 85: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT RECORD DOCUMENTS 017839 - 4

2. For each principal product, indicate whether record Product Data has been submitted in

operation and maintenance manuals instead of submitted as record Product Data.

B. Format: Submit record Specifications as annotated PDF electronic file.

2.3 RECORD PRODUCT DATA

A. Preparation: Mark Product Data to indicate the actual product installation where installation

varies substantially from that indicated in Product Data submittal.

1. Give particular attention to information on concealed products and installations that

cannot be readily identified and recorded later.

2. Include significant changes in the product delivered to Project site and changes in

manufacturer's written instructions for installation.

3. Note related Change Orders, record Specifications, and record Drawings where

applicable.

B. Format: Submit record Product Data as annotated PDF electronic file.

1. Include record Product Data directory organized by Specification Section number and

title, electronically linked to each item of record Product Data.

2.4 MISCELLANEOUS RECORD SUBMITTALS

A. Assemble miscellaneous records required by other Specification Sections for miscellaneous

record keeping and submittal in connection with actual performance of the Work. Bind or file

miscellaneous records and identify each, ready for continued use and reference.

B. Format: Submit miscellaneous record submittals as scanned PDF electronic file(s) of marked-

up miscellaneous record submittals.

1. Include miscellaneous record submittals directory organized by Specification Section

number and title, electronically linked to each item of miscellaneous record submittals.

PART 3 - EXECUTION

3.1 RECORDING AND MAINTENANCE

A. Recording: Maintain one copy of each submittal during the construction period for project

record document purposes. Post changes and revisions to project record documents as they

occur; do not wait until end of Project.

B. Maintenance of Record Documents and Samples: Store record documents and Samples in the

field office apart from the Contract Documents used for construction. Do not use project record

documents for construction purposes. Maintain record documents in good order and in a clean,

dry, legible condition, protected from deterioration and loss. Provide access to project record

documents for Landscape Architect's reference during normal working hours.

Page 86: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

PROJECT RECORD DOCUMENTS 017839 - 5

END OF SECTION 017839

Page 87: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CAST-IN-PLACE CONCRETE 033000 - 1

SECTION 033000 - CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes cast-in-place concrete, including formwork, reinforcement, concrete materials,

mixture design, placement procedures, and finishes, for the following:

1. Footings.

2. Foundation walls.

3. Stairs and Walks.

B. Related Sections:

1. Division 32 Section “Concrete Paving Joint Sealants” for joint sealants in isolation,

expansion and contraction joints within or against concrete pours.

1.3 DEFINITIONS

A. Cementitious Materials: Portland cement alone or in combination with one or more of the

following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-

furnace slag, and silica fume; subject to compliance with requirements.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Design Mixtures: For each concrete mixture. Submit alternate design mixtures when

characteristics of materials, Project conditions, weather, test results, or other circumstances

warrant adjustments.

1. Indicate amounts of mixing water to be withheld for later addition at Project site.

C. Steel Reinforcement Shop Drawings: Placing drawings that detail fabrication, bending, and

placement. Include bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar

diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing,

and supports for concrete reinforcement.

D. Construction Joint Layout: Indicate proposed construction joints required to construct the

structure.

Page 88: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CAST-IN-PLACE CONCRETE 033000 - 2

1. Location of construction joints is subject to approval of the Landscape Architect.

1.5 INFORMATIONAL SUBMITTALS

A. Welding certificates.

B. Material Certificates: For each of the following, signed by manufacturers:

1. Cementitious materials.

2. Admixtures.

3. Steel reinforcement and accessories.

4. Curing compounds.

5. Floor and slab treatments.

6. Bonding agents.

7. Adhesives.

8. Repair materials.

C. Material Test Reports: For the following, from a qualified testing agency, indicating compliance

with requirements:

1. Aggregates.

D. Field quality-control reports.

E. Minutes of preinstallation conference.

1.6 QUALITY ASSURANCE

A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete

products and that complies with ASTM C 94 requirements for production facilities and

equipment.

B. Testing Agency Qualifications: An independent agency, acceptable to authorities having

jurisdiction, qualified according to ASTM C 1077 and ASTM E 329 for testing indicated.

1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing

Technician, Grade 1, according to ACI CP-1 or an equivalent certification program.

2. Personnel performing laboratory tests shall be ACI-certified Concrete Strength Testing

Technician and Concrete Laboratory Testing Technician - Grade I. Testing Agency

laboratory supervisor shall be an ACI-certified Concrete Laboratory Testing Technician -

Grade II.

C. Source Limitations: Obtain each type or class of cementitious material of the same brand from

the same manufacturer's plant, obtain aggregate from single source, and obtain admixtures from

single source from single manufacturer.

D. ACI Publications: Comply with the following unless modified by requirements in the Contract

Documents:

1. ACI 301, "Specifications for Structural Concrete," Sections 1 through 5.

Page 89: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CAST-IN-PLACE CONCRETE 033000 - 3

2. ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."

E. Concrete Testing Service: Engage a qualified independent testing agency to perform material

evaluation tests and to design concrete mixtures.

F. Preinstallation Conference: Conduct conference at Project site.

1. Before submitting design mixtures, review concrete design mixture and examine

procedures for ensuring quality of concrete materials. Require representatives of each

entity directly concerned with cast-in-place concrete to attend, including the following:

a. Contractor's superintendent.

b. Independent testing agency responsible for concrete design mixtures.

c. Ready-mix concrete manufacturer.

d. Concrete subcontractor.

2. Review special inspection and testing and inspecting agency procedures for field quality

control, cold- and hot-weather concreting procedures, vapor-retarder installation, steel

reinforcement installation, concrete repair procedures, and concrete protection.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and

damage.

PART 2 - PRODUCTS

2.1 BASE MATERIALS: Reference Division 31 Section “Earth Moving”.

2.2 STEEL REINFORCEMENT

A. Recycled Content of Steel Products: Postconsumer recycled content plus one-half of

preconsumer recycled content not less than 25 percent.

B. Reinforcing Bars: ASTM A 615, Grade 60, deformed.

C. Deformed-Steel Welded Wire Reinforcement: ASTM A185.

2.3 REINFORCEMENT ACCESSORIES

A. Joint Dowel Bars: ASTM A 615, Grade 60, plain-steel bars, cut true to length with ends square

and free of burrs.

B. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening

reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel

wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice," of greater

compressive strength than concrete and as follows:

Page 90: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CAST-IN-PLACE CONCRETE 033000 - 4

1. For concrete surfaces exposed to view where legs of wire bar supports contact forms, use

CRSI Class 1 plastic-protected steel wire or CRSI Class 2 stainless-steel bar supports.

2.4 CONCRETE MATERIALS

A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and

source, throughout Project:

1. Portland Cement: ASTM C 150, Type I or III

2. Fly Ash: ASTM C 618, Class F or C.

a. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.

B. Normal-Weight Aggregates: ASTM C 33, Class 3S coarse aggregate or better, graded. Provide

aggregates from a single source.

1. Maximum Coarse-Aggregate Size: 1-1/2 inches nominal.

2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

C. Water: ASTM C 94 and potable.

2.5 ADMIXTURES

A. Air-Entraining Admixture: ASTM C 260.

B. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with

other admixtures and that will not contribute water-soluble chloride ions exceeding those

permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium

chloride.

1. Water-Reducing Admixture: ASTM C 494, Type A.

2. Retarding Admixture: ASTM C 494, Type B.

3. Water-Reducing and Retarding Admixture: ASTM C 494, Type D.

4. High-Range, Water-Reducing Admixture: ASTM C 494, Type F.

5. High-Range, Water-Reducing and Retarding Admixture: ASTM C 494, Type G.

6. Plasticizing and Retarding Admixture: ASTM C 1017, Type II.

2.6 CURING MATERIALS

A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing

approximately 9 oz./sq. yd. when dry.

B. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

C. Water: Potable.

Page 91: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CAST-IN-PLACE CONCRETE 033000 - 5

2.7 RELATED MATERIALS

A. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene

butadiene.

B. Epoxy Bonding Adhesive: ASTM C 881, two-component epoxy resin, capable of humid curing

and bonding to damp surfaces, of class suitable for application temperature and of grade to suit

requirements, and as follows:

1. Types IV and V, load bearing, for bonding hardened or freshly mixed concrete to

hardened concrete.

2.8 REPAIR MATERIALS

A. Repair Overlayment: Cement-based, polymer-modified, self-leveling product that can be

applied in thicknesses from 1/4 inch and that can be filled in over a scarified surface to match

adjacent elevations.

1. Cement Binder: ASTM C 150, portland cement or hydraulic or blended hydraulic cement

as defined in ASTM C 219.

2. Primer: Product of topping manufacturer recommended for substrate, conditions, and

application.

3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand as recommended

by topping manufacturer.

4. Compressive Strength: Not less than 5000 psi at 28 days when tested according to

ASTM C 109.

2.9 CONCRETE MIXTURES, GENERAL

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of

laboratory trial mixture or field test data, or both, according to ACI 301.

1. Use a qualified independent testing agency for preparing and reporting proposed mixture

designs based on laboratory trial mixtures.

B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than

portland cement in concrete as follows:

1. Fly Ash: 25 percent.

2. Combined Fly Ash and Pozzolan: 25 percent.

3. Ground Granulated Blast-Furnace Slag: 50 percent.

4. Combined Fly Ash or Pozzolan and Ground Granulated Blast-Furnace Slag: 50 percent

portland cement minimum, with fly ash or pozzolan not exceeding 25 percent.

C. Limit water-soluble, chloride-ion content in hardened concrete to 0.06 percent by weight of

cement.

D. Admixtures: Use admixtures according to manufacturer's written instructions.

Page 92: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CAST-IN-PLACE CONCRETE 033000 - 6

1. Use water-reducing, high-range water-reducing, or plasticizing admixture in concrete, as

required, for placement and workability.

2. Use water-reducing and retarding admixture when required by high temperatures, low

humidity, or other adverse placement conditions.

3. Use water-reducing admixture in pumped concrete and concrete with a water-

cementitious materials ratio below 0.50.

2.10 CONCRETE MIXTURES FOR BUILDING ELEMENTS

A. All Concrete: Proportion normal-weight concrete mixture as follows:

1. Minimum Compressive Strength: As indicated.

2. Maximum Water-Cementitious Materials Ratio: 0.45.

3. Slump Limit: 4 inches, plus or minus 1 inch.

4. Air Content: 5.5 percent, plus or minus 1.5 percent at point of delivery for 1-1/2-inch

nominal maximum aggregate size.

5. Air Content: 6 percent, plus or minus 1.5 percent at point of delivery for 3/4-inch

nominal maximum aggregate size.

2.11 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

2.12 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to

ASTM C 94/C 94M, and furnish batch ticket information.

1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from

1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and

delivery time to 60 minutes.

B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to

ASTM C 94/C 94M. Mix concrete materials in appropriate drum-type batch machine mixer.

1. For mixer capacity of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not

more than 5 minutes after ingredients are in mixer, before any part of batch is released.

2. For mixer capacity larger than 1 cu. yd., increase mixing time by 15 seconds for each

additional 1 cu. yd.

3. Provide batch ticket for each batch discharged and used in the Work, indicating Project

identification name and number, date, mixture type, mixture time, quantity, and amount

of water added. Record approximate location of final deposit in structure.

Page 93: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CAST-IN-PLACE CONCRETE 033000 - 7

PART 3 - EXECUTION

3.1 EMBEDDED ITEMS

A. Place and secure anchorage devices and other embedded items required for adjoining work that

is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams,

instructions, and directions furnished with items to be embedded.

3.2 STEEL REINFORCEMENT

A. General: Comply with CRSI's "Manual of Standard Practice" for placing reinforcement.

B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that

would reduce bond to concrete.

C. Accurately position, support, and secure reinforcement against displacement. Locate and

support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld

crossing reinforcing bars.

D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.

E. Install welded wire reinforcement in longest practicable lengths on bar supports spaced to

minimize sagging. Lap edges and ends of adjoining sheets at least one mesh spacing. Offset laps

of adjoining sheet widths to prevent continuous laps in either direction. Lace overlaps with wire.

F. Do not use wood or other material that will rot to maintain the required positions of the

reinforcement. Metal chairs must be epoxy coated.

3.3 JOINTS

A. General: Construct joints true to line with faces perpendicular to surface plane of concrete.

B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations

indicated or as approved by Landscape Architect.

1. Place joints perpendicular to main reinforcement. Continue reinforcement across

construction joints unless otherwise indicated. Do not continue reinforcement through

sides of strip placements of slabs.

2. Use epoxy-bonding adhesive at locations where fresh concrete is placed against hardened

or partially hardened concrete surfaces.

C. Contraction Joints in Slabs-on-Grade: Form weakened-plane contraction joints, sectioning

concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-

fourth of concrete thickness as follows:

1. Sawed Joints: Form contraction joints with power saws equipped with shatterproof

abrasive or diamond-rimmed blades. Cut 1/8-inch- wide joints into concrete when cutting

action will not tear, abrade, or otherwise damage surface and before concrete develops

random contraction cracks.

Page 94: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CAST-IN-PLACE CONCRETE 033000 - 8

D. Doweled Joints: Install dowel bars and support assemblies at joints where indicated. Lubricate

or asphalt coat one-half of dowel length to prevent concrete bonding to one side of joint.

3.4 CONCRETE PLACEMENT

A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded

items is complete and that required inspections have been performed.

B. Do not add water to concrete during delivery, at Project site, or during placement unless

approved by Landscape Architect.

C. Before test sampling and placing concrete, water may be added at Project site, subject to

limitations of ACI 301.

1. Do not add water to concrete after adding high-range water-reducing admixtures to

mixture.

D. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of

construction joints, until placement of a panel or section is complete.

1. Consolidate concrete during placement operations so concrete is thoroughly worked

around reinforcement and other embedded items and into corners.

2. Maintain reinforcement in position on chairs during concrete placement.

3. Screed slab surfaces with a straightedge and strike off to correct elevations.

4. Slope surfaces uniformly to drains where required.

5. Begin initial floating using bull floats or darbies to form a uniform and open-textured

surface plane, before excess bleedwater appears on the surface. Do not further disturb

slab surfaces before starting finishing operations.

E. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from

physical damage or reduced strength that could be caused by frost, freezing actions, or low

temperatures.

1. When average high and low temperature is expected to fall below 40 deg F for three

successive days, maintain delivered concrete mixture temperature within the temperature

range required by ACI 301.

2. Do not use frozen materials or materials containing ice or snow. Do not place concrete on

frozen subgrade or on subgrade containing frozen materials.

3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or

chemical accelerators unless otherwise specified and approved in mixture designs.

F. Hot-Weather Placement: Comply with ACI 301 and as follows:

1. Maintain concrete temperature below 90 deg F at time of placement. Chilled mixing

water or chopped ice may be used to control temperature, provided water equivalent of

ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is

Contractor's option.

2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep

subgrade uniformly moist without standing water, soft spots, or dry areas.

Page 95: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CAST-IN-PLACE CONCRETE 033000 - 9

3.5 MISCELLANEOUS CONCRETE ITEMS

A. Filling In: Fill in holes and openings left in concrete structures after work of other trades is in

place unless otherwise indicated. Mix, place, and cure concrete, as specified, to blend with in-

place construction. Provide other miscellaneous concrete filling indicated or required to

complete the Work.

3.6 CONCRETE PROTECTING AND CURING

A. General: Protect freshly placed concrete from premature drying and excessive cold or hot

temperatures. Comply with ACI 306.1 for cold-weather protection and ACI 301 for hot-weather

protection during curing.

B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or

windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing

operations. Apply according to manufacturer's written instructions after placing, screeding, and

bull floating or darbying concrete, but before float finishing.

C. Formed Surfaces: Cure formed concrete surfaces, including underside of beams, supported

slabs, and other similar surfaces. If forms remain during curing period, moist cure after

loosening forms. If removing forms before end of curing period, continue curing for the

remainder of the curing period.

D. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure unformed

surfaces, including floors and slabs, concrete floor toppings, and other surfaces.

E. Cure concrete according to ACI 308.1, by one or a combination of the following methods:

1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with the

following materials:

a. Water.

b. Continuous water-fog spray.

c. Absorptive cover, water saturated, and kept continuously wet. Cover concrete

surfaces and edges with 12-inch lap over adjacent absorptive covers.

2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover

for curing concrete, placed in widest practicable width, with sides and ends lapped at

least 12 inches, and sealed by waterproof tape or adhesive. Cure for not less than seven

days. Immediately repair any holes or tears during curing period using cover material and

waterproof tape.

a. Moisture cure or use moisture-retaining covers to cure concrete surfaces to receive

floor coverings.

b. Moisture cure or use moisture-retaining covers to cure concrete surfaces to receive

penetrating liquid floor treatments.

c. Cure concrete surfaces to receive floor coverings with either a moisture-retaining

cover or a curing compound that the manufacturer certifies will not interfere with

bonding of floor covering used on Project.

Page 96: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CAST-IN-PLACE CONCRETE 033000 - 10

3.7 CONCRETE SURFACE REPAIRS

A. Defective Concrete: Repair and patch defective areas when approved by Landscape Architect.

Remove and replace concrete that cannot be repaired and patched to Landscape Architect's

approval.

B. Patching Mortar: Mix dry-pack patching mortar, consisting of one part portland cement to two

and one-half parts fine aggregate passing a No. 16 sieve, using only enough water for handling

and placing.

C. Repairing Unformed Surfaces: Test unformed surfaces, such as floors and slabs, for finish and

verify surface tolerances specified for each surface. Correct low and high areas. Test surfaces

sloped to drain for trueness of slope and smoothness; use a sloped template.

1. Repair finished surfaces containing defects. Surface defects include spalls, popouts,

honeycombs, rock pockets, crazing and cracks in excess of 0.01 inch wide or that

penetrate to reinforcement or completely through unreinforced sections regardless of

width, and other objectionable conditions.

2. After concrete has cured at least 14 days, correct high areas by grinding.

3. Correct localized low areas during or immediately after completing surface finishing

operations by cutting out low areas and replacing with patching mortar. Finish repaired

areas to blend into adjacent concrete.

4. Correct other low areas scheduled to receive floor coverings with a repair underlayment.

Prepare, mix, and apply repair underlayment and primer according to manufacturer's

written instructions to produce a smooth, uniform, plane, and level surface. Feather edges

to match adjacent floor elevations.

5. Correct other low areas scheduled to remain exposed with a repair topping. Cut out low

areas to ensure a minimum repair topping depth of 1/4 inch to match adjacent floor

elevations. Prepare, mix, and apply repair topping and primer according to manufacturer's

written instructions to produce a smooth, uniform, plane, and level surface.

6. Repair defective areas, except random cracks and single holes 1 inch or less in diameter,

by cutting out and replacing with fresh concrete. Remove defective areas with clean,

square cuts and expose steel reinforcement with at least a 3/4-inch clearance all around.

Dampen concrete surfaces in contact with patching concrete and apply bonding agent.

Mix patching concrete of same materials and mixture as original concrete except without

coarse aggregate. Place, compact, and finish to blend with adjacent finished concrete.

Cure in same manner as adjacent concrete.

7. Repair random cracks and single holes 1 inch or less in diameter with patching mortar.

Groove top of cracks and cut out holes to sound concrete and clean off dust, dirt, and

loose particles. Dampen cleaned concrete surfaces and apply bonding agent. Place

patching mortar before bonding agent has dried. Compact patching mortar and finish to

match adjacent concrete. Keep patched area continuously moist for at least 72 hours.

D. Perform structural repairs of concrete, subject to Landscape Architect's approval, using epoxy

adhesive and patching mortar.

E. Repair materials and installation not specified above may be used, subject to Landscape

Architect's approval.

Page 97: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CAST-IN-PLACE CONCRETE 033000 - 11

3.8 FIELD QUALITY CONTROL

A. Testing and Inspecting: Contractor will engage a special inspector and qualified testing and

inspecting agency to perform field tests and inspections and prepare test reports.

B. Testing and Inspecting: Engage a qualified testing and inspecting agency to perform tests and

inspections and to submit reports.

C. Inspections:

1. Steel reinforcement placement.

2. Verification of use of required design mixture.

3. Concrete placement, including conveying and depositing.

4. Curing procedures and maintenance of curing temperature.

D. Concrete Tests: Testing of composite samples of fresh concrete obtained according to

ASTM C 172 shall be performed according to the following requirements:

1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete

mixture exceeding 5 cu. yd., but less than 25 cu. yd., plus one set for each additional 50

cu. yd. or fraction thereof.

2. Testing Frequency: Obtain at least one composite sample for each 100 cu. yd. or fraction

thereof of each concrete mixture placed each day.

a. When frequency of testing will provide fewer than five compressive-strength tests

for each concrete mixture, testing shall be conducted from at least five randomly

selected batches or from each batch if fewer than five are used.

3. Slump: ASTM C 143, one test at point of placement for each composite sample, but not

less than one test for each day's pour of each concrete mixture. Perform additional tests

when concrete consistency appears to change.

4. Air Content: ASTM C 231, pressure method, for normal-weight concrete; one test for

each composite sample, but not less than one test for each day's pour of each concrete

mixture.

5. Concrete Temperature: ASTM C 1064; one test hourly when air temperature is 40 deg F

and below and when 80 deg F and above, and one test for each composite sample.

6. Unit Weight: ASTM C 567, fresh unit weight of structural lightweight concrete; one test

for each composite sample, but not less than one test for each day's pour of each concrete

mixture.

7. Compression Test Specimens: ASTM C 31/C 31M.

a. Cast and laboratory cure two sets of two standard cylinder specimens for each

composite sample.

b. Cast and field cure two sets of two standard cylinder specimens for each composite

sample.

8. Compressive-Strength Tests: ASTM C 39; test one set of two laboratory-cured specimens

at 7 days and one set of two specimens at 28 days.

a. Test one set of two field-cured specimens at 7 days and one set of two specimens

at 28 days.

Page 98: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CAST-IN-PLACE CONCRETE 033000 - 12

b. A compressive-strength test shall be the average compressive strength from a set of

two specimens obtained from same composite sample and tested at age indicated.

9. When strength of field-cured cylinders is less than 85 percent of companion laboratory-

cured cylinders, Contractor shall evaluate operations and provide corrective procedures

for protecting and curing in-place concrete.

10. Strength of each concrete mixture will be satisfactory if every average of any three

consecutive compressive-strength tests equals or exceeds specified compressive strength

and no compressive-strength test value falls below specified compressive strength by

more than 500 psi.

11. Test results shall be reported in writing to Landscape Architect, concrete manufacturer,

and Contractor within 48 hours of testing. Reports of compressive-strength tests shall

contain Project identification name and number, date of concrete placement, name of

concrete testing and inspecting agency, location of concrete batch in Work, design

compressive strength at 28 days, concrete mixture proportions and materials, compressive

breaking strength, and type of break for both 7- and 28-day tests.

12. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may

be permitted by Landscape Architect but will not be used as sole basis for approval or

rejection of concrete.

13. Additional Tests: Testing and inspecting agency shall make additional tests of concrete

when test results indicate that slump, air entrainment, compressive strengths, or other

requirements have not been met, as directed by Landscape Architect. Testing and

inspecting agency may conduct tests to determine adequacy of concrete by cored

cylinders complying with ASTM C 42 or by other methods as directed by Landscape

Architect.

14. Additional testing and inspecting, at Contractor's expense, will be performed to determine

compliance of replaced or additional work with specified requirements.

15. Correct deficiencies in the Work that test reports and inspections indicate do not comply

with the Contract Documents.

END OF SECTION 033000

Page 99: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

DECORATIVE METAL RAILINGS 057300 - 1

SECTION 057300 - DECORATIVE METAL RAILINGS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Galvanized Steel Handrails (Type A, Type B, and Type C).

2. Handrail Bracket Mounts and Post Mounting Flanges, and Escutcheons.

3. Handrail Post Sleeves.

B. Related Sections:

1. Division 03 Section "Cast-in-Place Concrete" for footing conditions.

2. Division 06 Section “Wood Decking and Stairs” and “Exterior Rough Carpentry” for

wood stairs, decking, and guardrails.

1.3 DEFINITIONS

A. Railings: Guards, handrails, and similar devices used for protection of occupants at open-sided

floor areas, pedestrian guidance and support, visual separation, or wall protection.

1.4 PERFORMANCE REQUIREMENTS

A. Delegated Design: Design railings to conform to the following loads and stresses, using

performance requirements and design criteria indicated.

B. General: In engineering railings to withstand structural loads indicated, determine allowable

design working stresses of railing materials based on the following:

1. Steel: 72 percent of minimum yield strength.

C. Structural Performance: Railings shall withstand the effects of gravity loads and the following

loads and stresses within limits and under conditions indicated:

1. Handrails:

a. Uniform load of 50 lbf/ft. (0.73 kN/m) applied in any direction.

b. Concentrated load of 200 lbf (0.89 kN) applied in any direction.

c. Uniform and concentrated loads need not be assumed to act concurrently.

Page 100: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

DECORATIVE METAL RAILINGS 057300 - 2

D. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals

and other materials from direct contact with incompatible materials.

1.5 ACTION SUBMITTALS

A. Product Data: For the following:

1. Manufacturer's product lines of railings assembled from standard components.

2. Non-shrink, non-metallic grout, galvanized post sleeve, and mounting products.

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

1.6 PROJECT CONDITIONS

A. Field Measurements: Verify actual locations of walls and other construction contiguous with

railings by field measurements before fabrication and indicate measurements on Shop

Drawings.

1.7 COORDINATION AND SCHEDULING

A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint

and coating manufacturers' written recommendations to ensure that shop primers and topcoats

are compatible with one another.

B. Coordinate installation of anchorages for railings. Furnish setting drawings, templates, and

directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items

with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to

Project site in time for installation.

C. Do not support railings temporarily by any means that do not suit structural performance

requirements.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the

following:

1. Galvanized Steel Handrail, Brackets, Post Sleeves and Mounting Flanges, Escutcheons

a. Blum, Julius & Co., Inc.

b. Wagner, R & B, Inc.; a division of the Wagner Companies.

Page 101: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

DECORATIVE METAL RAILINGS 057300 - 3

2.2 METALS, GENERAL

A. Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller

marks, rolled trade names, stains, discolorations, or blemishes.

B. Post Sleeves: Same metal and finish as supported rails unless otherwise indicated.

C. Post Flanges: Round heavy base, surface mount, galvanized steel flange for 2” O.D. pipe with

four mounting holes and set screw.

D. Handrail Brackets: 3” Reach galvanized stamped steel handrail bracket with predrilled holes

for exposed bolt anchorage

E. Escutcheons: Round heavy base, galvanized steel cover flange for 2” O.D. pipe to conceal

anchorage (4” Max. total O.D.)

2.3 STEEL

A. Tubing: ASTM A 500 (cold formed).

2.4 MISCELLANEOUS MATERIALS

A. Low-Emitting Paints and Coatings: Paints and coatings shall comply with the testing and

product requirements of the California Department of Health Services' "Standard Practice for

the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale

Environmental Chambers."

B. Etching Cleaner for Galvanized Metal: Complying with MPI#25.

C. Galvanizing Repair Paint: High-zinc-dust-content paint complying with SSPC-Paint 20 and

compatible with paints specified to be used over it.

D. Universal Latex Shop Primer: Fast-curing, lead- and chromate-free, universal modified-alkyd

primer complying with MPI#79 and compatible with topcoat.

1. Use primer containing pigments that make it easily distinguishable from zinc-rich primer.

E. Epoxy Intermediate Coat: Complying with MPI#77 and compatible with primer and topcoat.

F. Polyurethane Topcoat: Complying with MPI#72 and compatible with undercoat.

G. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout

complying with ASTM C 1107. Provide grout specifically recommended by manufacturer for

interior and exterior applications.

Page 102: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

DECORATIVE METAL RAILINGS 057300 - 4

2.5 FABRICATION

A. General: Fabricate railings to comply with requirements indicated for design, dimensions,

member sizes and spacing, details, finish, and anchorage, but not less than that required to

support structural loads.

B. Assemble railings in the shop to greatest extent possible to minimize field splicing and

assembly. Disassemble units only as necessary for shipping and handling limitations. Clearly

mark units for reassembly and coordinated installation. Use connections that maintain

structural value of joined pieces.

C. Cut metals cleanly and accurately. Remove sharp or rough areas on exposed surfaces.

D. Form work true to line and level with accurate angles and surfaces.

E. Fabricate connections that will be exposed to weather in a manner to exclude water.

F. Welded Connections: Cope components at connections to provide close fit, or use fittings

designed for this purpose. Weld all around at connections, including at fittings.

1. Use materials and methods that minimize distortion and develop strength and corrosion

resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove flux immediately.

4. At exposed connections, finish exposed surfaces to be smooth and blended so no

roughness shows after welding, and no evidence of adjoining surfaces at welded joint

exists.

G. Form changes in direction as follows:

1. As detailed.

2. By radius bends of radius indicated.

H. Bend members in jigs to produce uniform curvature for each configuration required; maintain

cross section of member throughout entire bend without buckling, twisting, cracking, or

otherwise deforming exposed surfaces of components.

I. For railing posts set in concrete, provide galvanized steel sleeves not less than 6 inches (150

mm) long with inside dimensions not less than 1/2 inch (13 mm) greater than outside

dimensions of post, with metal plate forming bottom closure.

2.6 GENERAL FINISH REQUIREMENTS

A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for

recommendations for applying and designating finishes.

B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable,

temporary protective covering before shipment.

C. Appearance of Finished Work: Noticeable variations in same piece are not acceptable.

Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half

Page 103: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

DECORATIVE METAL RAILINGS 057300 - 5

of the range of approved Samples. Variations in appearance of other components are acceptable

if they are within the range of approved Samples and are assembled or installed to minimize

contrast.

2.7 STEEL AND IRON FINISHES

A. Galvanized Railings:

1. Hot-dip galvanize steel and iron railings, after fabrication.

2. Comply with ASTM A 123/A 123M for hot-dip galvanized railings.

3. Comply with ASTM A 153/A 153M for hot-dip galvanized hardware.

4. Fill vent and drain holes that are exposed in the finished Work, unless indicated to remain

as weep holes, by plugging with zinc solder and filing off smooth.

B. For galvanized railings, provide hot-dip galvanized fittings, brackets, fasteners, sleeves, and

other ferrous components.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify conditions for post embedment are acceptable. Notify Landscape Architect immediately

if the conditions are not acceptable.

B. Correct any conditions that are not acceptable before commencing work.

3.2 INSTALLATION, GENERAL

A. Install in accordance with shop drawings as approved by Landscape Architect.

B. Erect work square and level, horizontal or parallel to rake of steps and free from distortion or

defects detrimental to appearance or performance.

C. Perform cutting, drilling, and fitting required for installing railings. Set railings accurately in

location, alignment, and elevation; measured from established lines and levels and free of rack.

1. Do not weld, cut, or abrade surfaces of railing components that have been coated or

finished after fabrication and that are intended for field connection by mechanical or

other means without further cutting or fitting.

2. Set posts plumb within a tolerance of 1/16 inch in 3 feet (2 mm in 1 m).

3. Align rails so variations from level for horizontal members and variations from parallel

with rake of steps and ramps for sloping members do not exceed 1/4 inch in 12 feet (5

mm in 3 m).

Page 104: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

DECORATIVE METAL RAILINGS 057300 - 6

3.3 RAILING CONNECTIONS

A. Welded Connections: Use fully welded joints for permanently connecting handrail sections.

Comply with requirements for welded connections in "Fabrication" Article whether welding is

performed in the shop or in the field.

3.4 ANCHORING POSTS

A. Concrete Conditions:

1. Use galvanized steel pipe sleeves, preset and anchored into concrete for installing posts.

After posts have been inserted into sleeves, fill annular space between post and sleeve

with nonshrink, nonmetallic grout, mixed and placed to comply with anchoring material

manufacturer's written instructions.

2. Cover anchorage joint with escutcheon of same metal as post.

B. Wood Conditions:

1. Anchor posts to wood surfaces with galvanized steel flanges and anchorage hardware, as

required by conditions.

2. Secure post within flange via set screw.

3.5 ATTACHING RAILINGS

A. Attach handrails to wood guardrail with brackets on underside of rails. Provide brackets as

indicated in Section 2.2 D, ensuring a 2” (50-mm) clearance from inside face of handrail and

finished wood surface.

1. Locate brackets as indicated and secure to wood guardrail with lag bolts.

3.6 CLEANING

A. Clean steel by washing thoroughly with clean water and soap, rinsing with clean water, and

wiping dry.

1. Do not use acid solution, steel wool, or other harsh abrasives.

B. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair

galvanizing to comply with ASTM A 780.

3.7 PROTECTION

A. Protect finishes of railings from damage during construction period with temporary protective

coverings approved by railing manufacturer. Remove protective coverings at time of

Substantial Completion.

END OF SECTION 057300

Page 105: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXTERIOR ROUGH CARPENTRY 061063 - 1

SECTION 061063 - EXTERIOR ROUGH CARPENTRY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Wood Framing for Stairs

2. Wood Deck Support Posts

B. Related Requirements:

1. Section 061533 "Wood Decking" for wood decking planks and railing posts and caps.

1.3 DEFINITIONS

A. Boards: Lumber of less than 2 inches nominal (38 mm actual) in thickness and 2 inches nominal

(38 mm actual) or greater in width.

B. Dimension Lumber: Lumber of 2 inches nominal (38 mm actual) or greater but less than 5

inches nominal (114 mm actual) in least dimension.

C. Timber: Lumber of 5 inches nominal (114 mm actual) or greater in least dimension.

D. Lumber grading agencies, and the abbreviations used to reference them, include the following:

1. NeLMA: Northeastern Lumber Manufacturers' Association.

2. NLGA: National Lumber Grades Authority.

3. RIS: Redwood Inspection Service.

4. SPIB: The Southern Pine Inspection Bureau.

5. WCLIB: West Coast Lumber Inspection Bureau.

6. WWPA: Western Wood Products Association.

1.4 ACTION SUBMITTALS

A. Product Data: For preservative-treated wood products. Include chemical treatment

manufacturer's written instructions for handling, storing, installing, and finishing treated

material.

Page 106: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXTERIOR ROUGH CARPENTRY 061063 - 2

B. Forest Stewardship Council Chain of Custody (COC) Certification: Chain-of-custody

certificates indicating that wood products comply with the FCS (Forest Stewardship Council)

COC requirements.

1.5 INFORMATIONAL SUBMITTALS

A. Material Certificates:

1. For preservative-treated wood products. Indicate type of preservative used and net

amount of preservative retained. For products receiving a waterborne treatment, include

statement that moisture content of treated materials was reduced to levels specified before

shipment to Project site.

B. Certificates of Inspection: Issued by lumber grading agency for exposed wood products not

marked with grade stamp.

C. Evaluation Reports: For preservative-treated wood products, from ICC-ES.

1.6 QUALITY ASSURANCE

A. Lumber Manufacturer Qualifications: A qualified manufacturer that is certified for chain of

custody by an FSC-accredited certification body.

B. Lumber Vendor Qualifications: A vendor that is certified for chain of custody by an FSC-

accredited certification body.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Store materials under cover and protected from weather and contact with damp or wet surfaces.

Stack lumber flat with spacers between each bundle to provide air circulation. Provide for air

circulation around stacks and under coverings.

PART 2 - PRODUCTS

2.1 LUMBER, GENERAL

A. Comply with DOC PS 20 and with grading rules of lumber grading agencies certified by

ALSC's Board of Review as applicable. If no grading agency is indicated, comply with the

applicable rules of any rules-writing agency certified by ALSC's Board of Review.

1. Factory mark each item with grade stamp of grading agency.

2. For items that are exposed to view in the completed Work, mark grade stamp on end or

back of each piece.

3. Where nominal sizes are indicated, provide actual sizes required by DOC PS 20 for

moisture content specified. Where actual sizes are indicated, they are minimum dressed

sizes for dry wood products.

Page 107: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXTERIOR ROUGH CARPENTRY 061063 - 3

B. Regional Materials: Wood products shall be milled within 500 miles (800 km) of Project site

from wood that has been harvested within 500 miles (800 km) of Project site.

C. Certified Wood: Boards and dimension lumber shall be certified as "FSC Pure" according to

FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship," and to FSC STD-40-

004, "FSC Standard for Chain of Custody Certification."

D. Maximum Moisture Content:

1. Boards: 19 percent.

2. Dimension Lumber: 19 percent for 2-inch nominal (38-mm actual) thickness or less; no

limit for more than 2-inch nominal (38-mm actual) thickness.

3. Timber. 19 percent.

2.2 LUMBER

A. Dimension Lumber: Species and Grade as Indicated on Drawings.

B. Boards:

1. Southern pine, B & B finish; SPIB.

2.3 POSTS

A. Dimension Lumber Posts: Species and grade as Indicated on Drawings.

2.4 PRESERVATIVE TREATMENT

A. Pressure treat boards and dimension lumber with waterborne preservative according to

AWPA U1; Use Category UC3b for exterior construction not in contact with the ground, and

Use Category UC4a for items in contact with the ground.

B. Pressure treat timber and poles with waterborne preservative according to AWPA U1; Use

Category UC4a.

1. Wood shall be seasoned, either by air-drying or kiln-drying, and the moisture content

prior to treatment shall not be more than 19%.

2. Wood shall be treated to a net retention of .40 pounds per cubic foot with ACQ

(ammoniacal copper quaternary), or approved equal. The preservative shall penetrate to

85% of the sapwood.

3. Treatment with ACQ shall include post-treatment fixation process.

4. If any other preservative treatment is proposed, the Contractor shall submit

documentation that such treatment conforms to the AWPA Standards for treatment of

wood for the intended use. CCA (chromated copper arsenate) is not an acceptable

preservative treatment.

C. After treatment, redry boards and dimension lumber for at least thirty days or to 19 percent

maximum moisture content.

Page 108: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXTERIOR ROUGH CARPENTRY 061063 - 4

D. Mark treated wood with treatment quality mark of an inspection agency approved by ALSC's

Board of Review.

E. Application: Treat all wood unless otherwise indicated.

2.5 FASTENERS

A. General: Provide fasteners of size and type indicated, acceptable to authorities having

jurisdiction, and that comply with requirements specified in this article for material and

manufacture. Provide nails or screws, in sufficient length, to penetrate not less than 1-1/2 inches

(38 mm) into wood substrate.

1. For pressure-preservative-treated wood, all fastener and anchor types and sizes, including

nuts and washers, must be stainless-steel, Grade 316.

B. Nails: ASTM F 1667.

C. Power-Driven Fasteners: ICC-ES AC70.

D. Wood Screws and Lag Screws: ASME B18.2.1, ASME B18.6.1, or ICC-ES AC233.

E. Stainless-Steel Bolts: ASTM F 593, Alloy Group 1 or 2 (ASTM F 738M, Grade A1 or

Grade A4); with ASTM F 594, Alloy Group 1 or 2 (ASTM F 836M, Grade A1 or Grade A4)

hex nuts and, where indicated, flat washers.

F. Postinstalled Anchors: Stainless-steel, chemical or torque-controlled expansion anchors with

capability to sustain, without failure, a load equal to 6 times the load imposed when installed in

unit masonry assemblies and equal to 4 times the load imposed when installed in concrete as

determined by testing according to ASTM E 488, conducted by a qualified independent testing

and inspecting agency.

1. Stainless-steel bolts and nuts complying with ASTM F 593 and ASTM F 594, Alloy

Group 1 or 2 (ASTM F 738M and ASTM F 836M, Grade A1 or Grade A4).

2.6 METAL ACCESSORIES

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering

products that may be incorporated into the Work include, but are not limited to, the following:

B. Basis-of-Design Products: Subject to compliance with requirements, provide comparable

products by one of the following:

1. Cleveland Steel Specialty Co.

2. KC Metals Products, Inc.

3. Phoenix Metal Products, Inc.

4. R. H. Tamlyn & Sons LP.

5. Simpson Strong-Tie Company, Inc.

6. USP Structural Connectors.

C. Stainless-Steel Sheet: ASTM A 666, Type 316.

Page 109: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EXTERIOR ROUGH CARPENTRY 061063 - 5

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Set work to required levels and lines, with members plumb, true to line, cut, and fitted. Fit work

to other construction; scribe and cope as needed for accurate fit.

B. Framing Standard: Comply with AF&PA WCD1 unless otherwise indicated.

C. Install metal framing anchors to comply with manufacturer's written instructions.

D. Do not splice structural members between supports unless otherwise indicated.

E. Provide blocking and framing as indicated and as required to support facing materials, fixtures,

specialty items, and trim.

F. Sort and select lumber so that natural characteristics do not interfere with installation or with

fastening other materials to lumber. Do not use materials with defects that interfere with

function of members or pieces that are too small to use with minimum number of joints or

optimum joint arrangement.

G. Apply copper naphthenate field treatment to comply with AWPA M4, to cut surfaces of

preservative-treated lumber.

H. Securely attach exterior rough carpentry work to substrate by anchoring and fastening as

indicated, complying with the following:

1. ICC-ES AC70 for power-driven fasteners.

2. "Fastening Schedule" in ICC's International Building Code.

3. "Fastener Schedule for Structural Members" and "Alternate Attachments" in ICC's

International Residential Code for One- and Two-Family Dwellings.

I. Use common wire nails unless otherwise indicated. Select fasteners of size that do not fully

penetrate members where opposite side is exposed to view. Make tight connections between

members. Install fasteners without splitting wood; do not countersink nail heads unless

otherwise indicated.

END OF SECTION 061063

Page 110: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

WOOD PATIO DECKING 061533 - 1

SECTION 061533 - WOOD DECKING AND STAIRS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Wood decking and stair treads. 2. Guardrails for elevated decks (Wood with Chain Link Infill).

B. Related Requirements:

1. Section 061063 "Exterior Rough Carpentry" for wood stair framing and support post construction.

1.3 DEFINITIONS

A. Boards: Lumber of less than 2 inches nominal (38 mm actual) in thickness and 2 inches nominal (38 mm actual) or greater in width.

B. Dimension Lumber: Lumber of 2 inches nominal (38 mm actual) or greater but less than 5 inches nominal (114 mm actual) in least dimension.

C. Timber: Lumber of 5 inches nominal (114 mm actual) or greater in least dimension.

D. Lumber grading agencies, and the abbreviations used to reference them, include the following:

1. NeLMA: Northeastern Lumber Manufacturers' Association. 2. NLGA: National Lumber Grades Authority. 3. RIS: Redwood Inspection Service. 4. SPIB: The Southern Pine Inspection Bureau. 5. WCLIB: West Coast Lumber Inspection Bureau. 6. WWPA: Western Wood Products Association.

1.4 ACTION SUBMITTALS

A. Product Data: For preservative-treated wood products.

Page 111: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

WOOD PATIO DECKING 061533 - 2

1. Include chemical treatment manufacturer's written instructions for handling, storing, installing, and finishing treated material.

B. Forest Stewardship Council Chain of Custody (COC) Certification: Chain-of-custody certificates indicating that wood products comply with the FCS (Forest Stewardship Council) COC requirements.

1.5 INFORMATIONAL SUBMITTALS

A. Material Certificates:

1. For preservative-treated wood products. Indicate type of preservative used and net amount of preservative retained. For products receiving a waterborne treatment, include statement that moisture content of treated materials was reduced to levels specified before shipment to Project site.

B. Certificates of Inspection: Issued by lumber grading agency for exposed wood products not marked with grade stamp.

C. Evaluation Reports: For the following, from ICC-ES:

1. Preservative-treated wood products. 2. Decking fasteners.

1.6 QUALITY ASSURANCE

A. Lumber Manufacturer Qualifications: A qualified manufacturer that is certified for chain of custody by an FSC-accredited certification body.

B. Lumber Vendor Qualifications: A vendor that is certified for chain of custody by an FSC-accredited certification body.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Store materials under cover and protected from weather and contact with damp or wet surfaces. Stack lumber flat with spacers between each bundle to provide air circulation. Provide for air circulation around stacks and under coverings.

PART 2 - PRODUCTS

2.1 LUMBER, GENERAL

A. Comply with DOC PS 20 and with grading rules of lumber grading agencies certified by ALSC's Board of Review as applicable. If no grading agency is indicated, comply with the applicable rules of any rules-writing agency certified by ALSC's Board of Review.

1. Factory mark each item with grade stamp of grading agency.

Page 112: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

WOOD PATIO DECKING 061533 - 3

2. For items that are exposed to view in the completed Work, mark grade stamp on end or back of each piece.

3. Where nominal sizes are indicated, provide actual sizes required by DOC PS 20 for moisture content specified. Where actual sizes are indicated, they are minimum dressed sizes for dry wood products.

B. Regional Materials: Wood products shall be milled within 500 miles (800 km) of Project site from wood that has been harvested within 500 miles (800 km) of Project site.

C. Certified Wood: Boards and dimension lumber shall be certified as "FSC Pure" according to FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship," and to FSC STD-40-004, "FSC Standard for Chain of Custody Certification."

D. Maximum Moisture Content:

1. Boards: 19 percent. 2. Dimension Lumber: 19 percent for 2-inch nominal (38-mm actual) thickness or less; no

limit for more than 2-inch nominal (38-mm actual) thickness 3. Timber. 19 percent

2.2 WOOD DECKING AND STAIR TREADS

A. Hand select wood for freedom from characteristics, on exposed surfaces and edges, that would impair finish appearance, including decay, honeycomb, knot holes, shake, splits, torn grain, and wane.

B. Board Decking and Stair Treads: 1-1/2-inch (37-mm) actual thickness decking of the following species and grades:

1. Southern pine, B&B finish; SPIB.

C. Board Stair Risers: 3/4-inch (19-mm) actual thickness of the following species and grades:

1. Southern pine, B&B finish; SPIB.

D. ADD ALTERNATE #1:

1. Board Decking, Stair Treads, and Risers: Thickness as noted above of any of the following species and grades.

a. Western red cedar, Custom Clear; WRCLA. b. Western red cedar (North), Select Patio; NLGA.

2.3 WOOD RAILINGS

A. Hand select wood for freedom from characteristics, on exposed surfaces and edges, that would impair finish appearance, including decay, honeycomb, knot holes, shake, splits, torn grain, and wane.

B. Dimension Lumber Railing Members: Select Structural No. 1 grade and the following species:

Page 113: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

WOOD PATIO DECKING 061533 - 4

1. Southern pine (dense, Select Structural No.1), B&B finish; SPIB.

C. Railing Boards: Radius-edged same grade as decking, clear, straight grained and parallel cut.

D. ADD ALTERNATE #1:

1. Dimension Lumber Railing Members and Railing Boards: Select Structural grade of any of the following species:

a. Western red cedar, Commercial Dex; WCLIB. b. Western red cedar (North), Commercial Patio; NLGA.

2.4 DIMENSION LUMBER FRAMING

A. Deck and Stair Framing: See Section 129300 for Rough Carpentry.

2.5 PRESERVATIVE TREATMENT

A. Pressure treat boards and dimension lumber with waterborne preservative according to AWPA U1; Use Category UC3b for exterior construction not in contact with the ground, and Use Category UC4a for items in contact with the ground.

B. Pressure treat timber and poles with waterborne preservative according to AWPA U1; Use Category UC4a.

1. Wood shall be seasoned, either by air-drying or kiln-drying, and the moisture content prior to treatment shall not be more than 19%.

2. Wood shall be treated to a net retention of .40 pounds per cubic foot with ACQ (ammoniacal copper quaternary), or approved equal. The preservative shall penetrate to 85% of the sapwood.

3. Treatment with ACQ shall include post-treatment fixation process. 4. If any other preservative treatment is proposed, the Contractor shall submit

documentation that such treatment conforms to the AWPA Standards for treatment of wood for the intended use. CCA (chromated copper arsenate) is not an acceptable preservative treatment.

C. After treatment, redry boards and dimension lumber for at least thirty days or to 19 percent maximum moisture content.

D. Mark treated wood with treatment quality mark of an inspection agency approved by ALSC's Board of Review.

E. Application: Treat all wood unless otherwise indicated.

2.6 CHAIN LINK FABRIC FOR GUARDRAIL INFILL

A. General: Provide fabric in one-piece heights measured between top and bottom of outer edge of selvage knuckle or twist according to "CLFMI Product Manual" and requirements indicated below:

Page 114: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & HarwellFOUNTAINHEAD REGIONAL PARK 100% Construction Documents

WOOD PATIO DECKING 061533 - 5

1. Fabric Height: As indicated on Drawings.2. Steel Wire for Fabric: Wire diameter of 0.113 inch (2.87 mm).

a. Mesh Size: 1 inch (25 mm).b. Zinc-Coated Fabric: ASTM A 392, Type II, Class 1, 1.2 oz./sq. ft. (366 g/sq. m)

with zinc coating applied before weaving.

3. Polymer coating over metallic zinc-coating.

a. Color: Black, according to ASTM F 934.

4. Selvage: Knuckled at both selvages.

B. Tension Wire:

1. Metallic-Coated Steel Wire: 0.177-inch- (4.5-mm-) diameter, smooth tension wire according to ASTM A 817 or ASTM A 824, with the following metallic coating:

2. Type II: Zinc coated (galvanized) by hot-dip process, with the following minimum coating weight:

a. Matching chain-link fabric coating weight.

3. Polymer coating over metallic zinc-coating.

a. Color: Black, according to ASTM F 934.

2.7 FASTENERS

A. General: Provide fasteners of size and type indicated, acceptable to authorities havingjurisdiction, and that comply with requirements specified in this article for material andmanufacture. Provide nails or screws, in sufficient length, to penetrate not less than 1-1/2 inches(38 mm) into wood substrate.

1. For pressure-preservative-treated wood, all fastener and anchor types and sizes, includingnuts and washers, must be stainless-steel, Grade 316.

B. Nails: ASTM F 1667.

C. Power-Driven Fasteners: ICC-ES AC70.

D. Wood Screws and Lag Screws: ASME B18.2.1, ASME B18.6.1, or ICC-ES AC233.

E. Stainless-Steel Bolts: ASTM F 593, Alloy Group 1 or 2 (ASTM F 738M, Grade A1 or GradeA4); with ASTM F 594, Alloy Group 1 or 2 (ASTM F 836M, Grade A1 or Grade A4) hex nutsand, where indicated, flat washers.

F. Post-installed Anchors: Stainless-steel, chemical or torque-controlled expansion anchors withcapability to sustain, without failure, a load equal to 6 times the load imposed when installed inunit masonry assemblies and equal to 4 times the load imposed when installed in concrete as

Page 115: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

WOOD PATIO DECKING 061533 - 6

determined by testing according to ASTM E 488 conducted by a qualified independent testing and inspecting agency.

1. Stainless-steel bolts and nuts complying with ASTM F 593 and ASTM F 594, Alloy Group 1 or 2 (ASTM F 738M and ASTM F 836M, Grade A1 or Grade A4).

G. Fencing Staples: Pressure Point Galvanized Fencing Staples; BS EN10244 – 40mm x 4.0mm

2.8 METAL ACCESSORIES

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

B. Basis-of-Design Products: Subject to compliance with requirements, provide comparable products by one of the following:

1. Cleveland Steel Specialty Co. 2. KC Metals Products, Inc. 3. Phoenix Metal Products, Inc. 4. R. H. Tamlyn & Sons LP. 5. Simpson Strong-Tie Company, Inc. 6. USP Structural Connectors.

C. Stainless-Steel Sheet: ASTM A 666, Type 316.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION, GENERAL

A. Set work to required levels and lines, with members plumb, true to line, cut, and fitted. Fit work to other construction; scribe and cope as needed for accurate fit.

B. Framing Standard: Comply with AF&PA WCD1 unless otherwise indicated.

C. Secure decking to framing with screws as Indicated in the Drawings.

D. Install metal framing anchors to comply with manufacturer's written instructions.

E. Do not splice structural members between supports unless otherwise indicated.

Page 116: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

WOOD PATIO DECKING 061533 - 7

F. Provide blocking and framing as indicated and as required to support facing materials, fixtures, specialty items, and trim.

G. Sort and select lumber so that natural characteristics do not interfere with installation or with fastening other materials to lumber. Do not use materials with defects that interfere with function of members or pieces that are too small to use with minimum number of joints or optimum joint arrangement.

H. Apply copper naphthenate field treatment to comply with AWPA M4, to cut surfaces of preservative-treated lumber.

I. Securely attach exterior rough carpentry work to substrate by anchoring and fastening as indicated, complying with the following:

1. ICC-ES AC70 for power-driven fasteners. 2. "Fastening Schedule" in ICC's International Building Code. 3. "Fastener Schedule for Structural Members" and "Alternate Attachments" in ICC's

International Residential Code for One- and Two-Family Dwellings.

J. Use common wire nails unless otherwise indicated. Select fasteners of size that do not fully penetrate members where opposite side is exposed to view. Make tight connections between members. Install fasteners without splitting wood; do not countersink nail heads unless otherwise indicated.

K. For exposed work, arrange fasteners in straight rows parallel with edges of members, with fasteners evenly spaced and with adjacent rows staggered.

3.3 ELEVATED DECK JOIST FRAMING INSTALLATION

A. General: Install joists with crown edge up and support ends of each member with not less than 1-1/2 inches (38 mm) of bearing on wood or metal, or 3 inches (76 mm) on masonry. Attach floor joists where framed into wood supporting members by using wood ledgers as indicated or, if not indicated, by using metal joist hangers. Do not notch joists.

B. Frame openings with headers and trimmers supported by metal joist hangers; double headers and trimmers where span of header exceeds 48 inches (1200 mm).

C. Lap members framing from opposite sides of beams or girders not less than 4 inches (102 mm,) or securely tie opposing members together. Provide solid blocking of 2-inch nominal (38-mm actual) thickness by depth of joist over supports.

D. Provide solid blocking of 2-inch nominal (38-mm actual) thickness by depth of joist at intervals of 96 inches (2438 mm) o.c., between joists.

3.4 STAIR INSTALLATION

A. Provide stair framing members of size, space, and configuration indicated on Drawings.

Page 117: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

WOOD PATIO DECKING 061533 - 8

B. Provide stair framing with no more than 3/16-inch (4.7-mm) variation between adjacent treads and risers and no more than 3/8-inch (9.5-mm) variation between largest and smallest treads and risers within each flight.

C. Treads and Risers: Secure by gluing and screwing to carriages. Countersink fastener heads, fill flush, and sand filler. Extend treads over carriages.

3.5 RAILING INSTALLATION

A. Railings: Secure rails to posts with countersunk-head wood screws and/or anchor bolts as Indicated in the Drawings.

3.6 CHAIN LINK FABRIC INSTALLATION

A. Tension Wire: Install according to ASTM F 567, maintaining plumb position and alignment of fence posts. Pull wire taut, without sags. Fasten fabric to tension wire with 0.120-inch- (3.05-mm-) diameter hog rings of same material and finish as fabric wire, spaced a maximum of 24 inches (610 mm) o.c. Install tension wire in locations indicated before stretching fabric. Provide tension wire at the following locations:

1. Extended horizontally along top and bottom of fence fabric. Install top tension wire at top of fabric, secured on posts with fencing staples at 6” o.c. Install bottom tension wire at bottom of fabric, secured on posts with fencing staples at 6” o.c.

2. Extended vertically along posts at intersection of stairs and landings as Indicated on Drawings; secured on posts with fencing staples at 6” o.c.

B. Chain-Link Fabric: Apply fabric to inside of wood guardrail framework. Leave 2-inch (50-mm) bottom clearance, as Indicated on Drawings, between finish grade or surface and bottom selvage unless otherwise indicated. Pull fabric taut and tie to posts, rails, and tension wires. Anchor to framework so fabric remains under tension after pulling force is released.

END OF SECTION 061533

Page 118: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SITE CLEARING 3311000 - 1

SECTION 311000 - SITE CLEARING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Protecting existing vegetation to remain.

2. Removing existing vegetation.

3. Clearing and grubbing.

4. Removing above- and below-grade site improvements.

5. Disconnecting, capping or sealing, and removing or maintaining site utilities.

6. Temporary erosion- and sedimentation-control measures.

7. Salvaging existing bench.

B. Related Sections:

1. Division 01 Section "Execution" for field engineering and surveying.

2. Division 01 Section “Temporary Tree and Plant Protection” for protecting, trimming,

pruning, repairing, and replacing existing trees to remain that interfere with, or are

affected by, the execution of the Work.

1.3 DEFINITIONS

A. Subsoil: All soil beneath the topsoil layer of the soil profile, and typified by the lack of organic

matter and soil organisms.

B. Surface Soil: Soil that is present at the top layer of the existing soil profile at the Project site.

In undisturbed areas, the surface soil is typically topsoil; but in disturbed areas such as urban

environments, the surface soil can be subsoil.

C. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-

place surface soil and is the zone where plant roots grow.

D. Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other

vegetation to be protected during construction, and indicated on Drawings.

E. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected

during construction, and indicated on Drawings.

F. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.

Page 119: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SITE CLEARING 3311000 - 2

1.4 MATERIAL OWNERSHIP

A. Except for stripped topsoil and other materials indicated to be stockpiled or otherwise remain

Owner's property, cleared materials shall become Contractor's property and shall be removed

from Project site.

1.5 ACTION SUBMITTALS

A. Contract to provide demolition and work plans.

1. Indicate the location of project staging and material storage areas.

2. Delineate pathways by which vehicles and other machinery will move about once inside

the work area to remove or install material in order to preserve trees.

B. No work may begin until demolition and work plans are approved by the Landscape Architect.

1. All vehicular movement and work will be restricted to the approved plan

1.6 INFORMATIONAL SUBMITTALS

A. Existing Conditions: Documentation of existing trees and plantings, adjoining construction, and

site improvements that establishes preconstruction conditions that might be misconstrued as

damage caused by site clearing.

1. Use sufficiently detailed photographs.

2. Include plans and notations to indicate specific wounds and damage conditions of each

tree or other plants designated to remain.

1.7 PROJECT CONDITIONS

A. Existing Conditions:

1. Contract includes all demolition required to construct new work, including applicable

permits or fees for demolition or disposal. Completely remove and dispose of items from

site in accordance with local laws. Do not burn or bury any demolished items on site.

2. Demolition and tree preservation drawings are provided for the contractor’s convenience,

and to identify existing items which shall remain in-place and which the contractor shall

protect, and to identify items which the contractor shall salvage within the limits of work.

Contractor is responsible for visiting the site prior to bidding to verify demolition

requirements.

3. Notify the Landscape Architect immediately if existing conditions differ from conditions

as shown on drawings.

B. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied

or used facilities during site-clearing operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities

without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Owner or

authorities having jurisdiction.

Page 120: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SITE CLEARING 3311000 - 3

C. Utility Locator Service: Notify utility locator service, Miss Utility, or utility service having

jurisdiction, for area where Project is located before site clearing.

D. Do not commence site clearing operations until temporary erosion- and sedimentation-

control and tree-protection measures are in place and approved by the landscape architect.

1. Protect trees according to the requirements set forth in Division 01 Section “Temporary

Tree and Plant Protection” and tree preservation sheets in the drawings.

E. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones.

F. Soil Stripping, Handling, and Stockpiling: Perform only when the soil is dry or slightly moist.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Satisfactory Soil Material: Requirements for satisfactory soil material are specified in

Division 31 Section "Earth Moving."

1. Obtain approved borrow soil material off-site when satisfactory soil material is not

available on-site.

B. Antirust Coating: Fast-curing, lead- and chromate-free, self-curing, universal modified-alkyd

primer complying with MPI #79, Alkyd Anticorrosive Metal Primer

1. Use coating with a VOC content of 420 g/L (3.5 lb/gal.) or less when calculated

according to 40 CFR 59, Subpart D (EPA Method 24).

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect and maintain benchmarks and survey control points from disturbance during

construction.

B. Verify trees, shrubs, and other vegetation to remain or to be relocated have been flagged and

that protection zones have been identified and erected in accordance with the requirement set

forth in Division 01 Section “Temporary Tree and Plant Protection”.

C. Protect existing site improvements to remain from damage during construction.

1. Restore damaged improvements to their original condition, as acceptable to Landscape

Architect and Owner.

Page 121: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SITE CLEARING 3311000 - 4

3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL

A. Provide temporary erosion- and sedimentation-control measures to prevent soil erosion and

discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways,

according to erosion- and sedimentation-control Drawings and in compliance with VESCH

(Virginia Erosion and Sediment Control Handbook) for acceptable methods and standards of

erosion control.

B. Verify that flows of water redirected from construction areas or generated by construction

activity do not enter or cross protection zones.

C. Verify that flows of water redirected from construction areas or generated by construction

activity do not enter open curb inlets. Curb inlet protection measures should comply with

VESCH (Virginia Erosion and Sediment Control Handbook) for acceptable methods and

standards of erosion control.

D. Inspect, maintain, and repair erosion- and sedimentation-control measures during construction

until permanent vegetation has been established.

E. Remove erosion and sedimentation controls and restore and stabilize areas disturbed during

removal.

3.3 TREE AND PLANT PROTECTION

A. General: Protect trees and plants remaining on-site according to requirements in Division 01

Section "Temporary Tree and Plant Protection."

B. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are

damaged by construction operations, in accordance with the requirements set forth in Division

01 Section “Temporary Tree and Plant Protection”.

3.4 EXISTING UTILITIES

A. Interrupting Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or

others unless permitted under the following conditions and then only after arranging to provide

temporary utility services according to requirements indicated:

1. Notify Owner and Landscape Architect not less than three (3) days in advance of

proposed utility interruptions.

2. Do not proceed with utility interruptions without Owner’s written permission.

B. Excavate for and remove underground utilities indicated to be removed, and maintain

underground utilities indicated to remain.

3.5 CLEARING AND GRUBBING

A. Remove obstructions, trees, shrubs, and other vegetation approved by the Landscape Architect

to permit installation of new construction.

Page 122: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SITE CLEARING 3311000 - 5

1. Do not remove trees, shrubs, and other vegetation indicated to remain or to be relocated.

2. Grind down stumps and remove roots, obstructions, and debris to a depth of 18 inches

(450 mm) below exposed subgrade.

3. Use only hand methods for grubbing within protection zones.

B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material

unless further excavation or earthwork is indicated.

1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches (200 mm),

and compact each layer to a density equal to adjacent original ground.

3.6 SITE IMPROVEMENTS

A. Remove existing above- and below-grade improvements as indicated and necessary to facilitate

new construction.

B. Remove timber, paving, footings, and aggregate bases as indicated on the plans.

1. Unless existing full-depth joints coincide with line of demolition, neatly saw-cut along

line of existing pavement to remain before removing adjacent existing pavement. Saw-

cut faces vertically.

2. Paint cut ends of steel reinforcement in concrete to remain with two coats of antirust

coating, following coating manufacturer's written instructions. Keep paint off surfaces

that will remain exposed.

3.7 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Transport surplus soil and topsoil material as required by the Owner to location designated by

Owner or Landscape Architect.

B. Remove surplus soil material, unsuitable topsoil not disposed as above, obstructions,

demolished materials, and waste materials including trash and debris, and legally dispose of

them off Owner's property.

C. Burning of tree, shrub, or other vegetation and deleterious material waste is not permitted.

D. Separate recyclable materials produced during site clearing from other nonrecyclable materials.

Store or stockpile without intermixing with other materials and transport them to recycling

facilities. Do not interfere with other Project work.

E. Do not allow demolished material waste to accumulate on site.

F. Remove and transport debris and waste is a manner that will prevent damage or spillage on

adjacent surfaces and areas.

3.8 SALVAGING OF EXISTING BENCH

A. Carefully remove bench without damage and harm prior to any other site clearing measures.

Page 123: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

SITE CLEARING 3311000 - 6

1. Notify Owner and Landscape Architect not less than three (3) days in advance of removal

to allow preparations be made for bench storage as determined by Owner.

END OF SECTION 311000

Page 124: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EARTH MOVING 312000 - 1

SECTION 312000 - EARTH MOVING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Preparing subgrades for slabs-on-grade, walks, pavements,

2. Excavating and backfilling for structures.

3. Drainage course for concrete slabs-on-grade.

4. Subbase course for concrete walks, pavements.

5. Subbase course and base course, for asphalt paving and repair.

6. Subsurface drainage backfill for footings.

B. Related Sections:

1. Division 01 Sections "Construction Progress Documentation and Photographic

Documentation" for recording pre-excavation and earth moving progress.

2. Division 31 Section "Site Clearing" for site stripping, grubbing, stripping and stockpiling

topsoil, and removal of above- and below-grade improvements and utilities.

3. Division 32 Section "Soil Preparation" for finish grading in planting areas.

1.3 DEFINITIONS

A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to

support sides of pipe.

2. Final Backfill: Backfill placed over initial backfill to fill a trench.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

C. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying

pipe.

D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.

E. Drainage Course: Aggregate layer supporting the slab-on-grade that also minimizes upward

capillary flow of pore water.

Page 125: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EARTH MOVING 312000 - 2

F. Excavation: Removal of material encountered above subgrade elevations and to lines and

dimensions indicated.

1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond

indicated lines and dimensions as directed by Landscape Architect.

2. Bulk Excavation: Excavation more than 10 feet (3 m) in width and more than 30 feet

(9 m) in length.

3. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated

lines and dimensions without direction by Landscape Architect. Unauthorized

excavation, as well as remedial work directed by Landscape Architect, shall be without

additional compensation.

G. Fill: Soil materials used to raise existing grades.

H. Rock: Rock material in beds, ledges, unstratified masses, conglomerate deposits, and boulders

of rock material that exceed 1 cu. yd. (0.76 cu. m)for bulk excavation or 3/4 cu. yd. (0.57 cu. m)

for footing, trench, and pit excavation that cannot be removed by rock excavating equipment

equivalent to the following in size and performance ratings, without systematic drilling, ram

hammering, ripping, or blasting, when permitted:

1. Equipment for Excavation of Footings, Trenches, and Pits: Late-model, track-mounted

hydraulic excavator; equipped with a 42-inch- (1065-mm-) wide, maximum, short-tip-

radius rock bucket; rated at not less than 138-hp (103-kW) flywheel power with bucket-

curling force of not less than 28,700 lbf (128 kN) and stick-crowd force of not less than

18,400 lbf (82 kN) with extra-long reach boom.

2. Equipment for Bulk Excavation: Late-model, track-mounted loader; rated at not less than

230-hp (172-kW) flywheel power and developing a minimum of 47,992-lbf (213.3-kN)

breakout force with a general-purpose bare bucket; measured according to SAE J-732.

I. Rock: Rock material in beds, ledges, unstratified masses, conglomerate deposits, and boulders

of rock material 3/4 cu. yd. (0.57 cu. m) or more in volume that exceed a standard penetration

resistance of 100 blows/2 inches (97 blows/50 mm) when tested by a geotechnical testing

agency, according to ASTM D 1586.

J. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical

and electrical appurtenances, or other man-made stationary features constructed above or below

the ground surface.

K. Subbase Course: Aggregate layer placed between the subgrade and base course for hot-mix

asphalt pavement, or aggregate layer placed between the subgrade and a cement concrete

pavement or a cement concrete or hot-mix asphalt walk.

L. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill

immediately below subbase, drainage fill, drainage course, or topsoil materials.

M. Utilities: On-site underground pipes, conduits, ducts, and cables, as well as underground

services within buildings.

Page 126: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EARTH MOVING 312000 - 3

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified testing agency.

B. Material Test Reports: For each on-site and borrow soil material proposed for fill and backfill

as follows:

1. Classification according to ASTM D 2487.

2. Laboratory compaction curve according to ASTM D 698.

1.5 QUALITY ASSURANCE

A. Codes and Standards: Perform earthwork complying with the requirements of the authorities

having jurisdiction.

1. Standards:

a. Virginia Department of Transportation (VDOT) current “Road and Bridge

Specification”

b. Virginia Test Methods Manual (VTM), current edition.

c. Virginia Uniform Statewide Building Code.

B. Geotechnical Testing Agency Qualifications: Qualified according to ASTM E 329 and

ASTM D 3740 for testing indicated.

1.6 PROJECT CONDITIONS

A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied

or used facilities during earth moving operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities

without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Owner or

authorities having jurisdiction.

B. Utility Locator Service: Notify “Miss Utility" for area where Project is located before

beginning earth moving operations.

1. Existing water, sanitary, and electrical line depths must be verified before any excavation

begins. Conflicts found between depth of utilities and proposed work, including footings

and foundations, should be brought to the attention of the Owner and Landscape

Architect immediately.

C. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others

unless permitted in writing by Owner or Landscape Architect and then only after arranging to

provide temporary utility services according to requirements indicated:

1. Notify Owner and Landscape Architect not less than three (3) days in advance of

proposed utility interruptions

Page 127: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EARTH MOVING 312000 - 4

2. Do not proceed with utility interruptions without Owner’s and Landscape Architect’s

written permission.

3. Contact utility-locator service for area where Project site is located before excavating.

D. Do not commence earth moving operations until plant-protection measures specified in

Division 01 Section "Temporary Tree and Plant Protection" are in place.

1. See aforementioned Section to review practices prohibited within protection zones.

PART 2 - PRODUCTS

2.1 SOIL MATERIALS

A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not

available from excavations.

B. Satisfactory Soils: Soil Classification Groups GW, GP, GM, SW, SP, and SM according to

ASTM D 2487, or a combination of these groups; free of rock or gravel larger than 3 inches (75

mm) in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.

1. Wet soils, which are otherwise suitable, are not considered as unsuitable soils.

Contractor shall bring these soils to within +/- 2% of optimum moisture content at no

additional cost to the Owner.

2. Stockpile soil at on-site location indicated by Owner.

C. Unsatisfactory Soils: Soil Classification Groups GC, SC, CL, ML, OL, CH, MH, OH, and PT

according to ASTM D 2487, or a combination of these groups.

1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of

optimum moisture content at time of compaction.

D. Subbase Material: In accordance with VDOT Specification Section 208.

E. Base Course: In accordance with VDOT Specification Section 208.

F. Engineered Fill: Subbase or Base material.

G. Bedding Course: Coarse, open graded gravel or crushed stone meeting the requirements for

VDOT No.57 coarse aggregate.

H. Drainage Course: Narrowly graded mixture of washed, crushed stone, or crushed or uncrushed

gravel; ASTM D 448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2-inch

(37.5-mm) sieve and 0 to 5 percent passing a No. 8 (2.36-mm) sieve.

I. Filter Material: Narrowly graded mixture of natural or crushed gravel, or crushed stone and

natural sand; ASTM D 448; coarse-aggregate grading Size 67; with 100 percent passing a 1-

inch (25-mm) sieve and 0 to 5 percent passing a No. 4 (4.75-mm) sieve.

J. Sand: ASTM C 33/C 33M; fine aggregate.

Page 128: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EARTH MOVING 312000 - 5

K. Impervious Fill: Clayey gravel and sand mixture capable of compacting to a dense state.

PART 3 - EXECUTION

3.1 PREPARATION

A. Notify Landscape Architect to assess the health of existing trees and to determine root pruning

measures. Complete all Tree protection measures including root pruning and install tree

protection fencing before any operations commence.

B. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by

settlement, lateral movement, undermining, washout, and other hazards created by earth moving

operations.

C. Protect and maintain erosion and sedimentation controls during earth moving operations.

D. Protect subgrades and foundation soils from freezing temperatures and frost. Remove

temporary protection before placing subsequent materials.

3.2 DEWATERING

A. Prevent surface water and ground water from entering excavations, from ponding on prepared

subgrades, and from flooding Project site and surrounding area.

B. Protect subgrades from softening, undermining, washout, and damage by rain or water

accumulation.

1. Reroute surface water runoff away from excavated areas. Do not allow water to

accumulate in excavations. Do not use excavated trenches as temporary drainage ditches.

3.3 EXPLOSIVES

A. Explosives: Do not use explosives.

3.4 EXCAVATION, GENERAL

A. Classified Excavation: Excavate to subgrade elevations. Material to be excavated will be

classified as earth and rock.

1. Earth excavation includes excavating pavements and obstructions visible on surface;

underground structures, utilities, and other items indicated to be removed; together with

soil, boulders, and other materials not classified as rock or unauthorized excavation.

a. Intermittent drilling; blasting, if permitted; ram hammering; or ripping of material

not classified as rock excavation is earth excavation.

Page 129: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EARTH MOVING 312000 - 6

2. Rock excavation includes removal and disposal of rock. Remove rock to lines and

subgrade elevations indicated to permit installation of permanent construction without

exceeding the following dimensions:

a. 24 inches (600 mm) outside of concrete forms other than at footings.

b. 12 inches (300 mm) outside of concrete forms at footings.

c. 6 inches (150 mm) outside of minimum required dimensions of concrete cast

against grade.

d. 6 inches (150 mm) beneath bottom of concrete slabs-on-grade.

e. 6 inches (150 mm) beneath pipe in trenches, and the greater of 24 inches (600 mm)

wider than pipe or 42 inches (1065 mm) wide.

3.5 EXCAVATION FOR STRUCTURES

A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 1 inch (25

mm). If applicable, extend excavations a sufficient distance from structures for placing and

removing concrete formwork, for installing services and other construction, and for inspections.

1. Excavations for Footings and Foundations: Do not disturb bottom of excavation.

Excavate by hand to final grade just before placing concrete reinforcement. Trim

bottoms to required lines and grades to leave solid base to receive other work.

2. Excavation for Underground Tanks, Basins, and Mechanical or Electrical Utility

Structures: Excavate to elevations and dimensions indicated within a tolerance of plus or

minus 1 inch (25 mm). Do not disturb bottom of excavations intended as bearing

surfaces.

B. Excavations at Edges of Tree- and Plant-Protection Zones:

1. Excavate by hand and/or airspade to indicated lines, cross sections, elevations, and

subgrades. Use hand excavation exclusively where Indicated in Drawings. Use narrow-

tine spading forks to comb soil and expose roots. Do not break, tear, or chop exposed

roots. Do not use mechanical equipment that rips, tears, or pulls roots.

2. Cut and protect roots according to requirements in Division 01 Section "Temporary Tree

and Plant Protection."

3.6 EXCAVATION FOR WALKS AND PAVEMENTS

A. Excavate surfaces under walks and pavements to indicated lines, cross sections, elevations, and

subgrades.

3.7 SUBGRADE INSPECTION

A. Notify Landscape Architect when excavations have reached required subgrade.

B. If Landscape Architect determines that unsatisfactory soil is present, continue excavation and

replace with compacted backfill or fill material as directed.

Page 130: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EARTH MOVING 312000 - 7

C. Authorized additional excavation and replacement material will be paid for according to

Contract provisions for changes in the Work.

D. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or

construction activities, as directed by Landscape Architect, without additional compensation.

3.8 STORAGE OF SOIL MATERIALS

A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing.

Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.

1. Stockpile soil at on-site location indicated by Owner.

3.9 BACKFILL

A. Place and compact backfill in excavations promptly, but not before completing the following:

1. Construction below finish grade including, where applicable, subdrainage, dampproofing,

waterproofing, and perimeter insulation.

2. Surveying locations of underground utilities for Record Documents.

3. Testing and inspecting underground utilities.

4. Removing concrete formwork.

5. Removing trash and debris.

6. Removing temporary shoring and bracing, and sheeting.

7. Installing permanent or temporary horizontal bracing on horizontally supported walls.

B. Place backfill on subgrades free of mud, frost, snow, or ice.

3.10 SOIL FILL

A. Place and compact fill material in layers to required elevations as follows:

1. Under walks and pavements, use satisfactory soil material.

2. Under steps and ramps, use engineered fill.

3. Under footings and foundations, use engineered fill.

B. Place soil fill on subgrades free of mud, frost, snow, or ice.

3.11 SOIL MOISTURE CONTROL

A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill soil layer before

compaction to within 2 percent of optimum moisture content.

1. Do not place backfill or fill soil material on surfaces that are muddy, frozen, or contain

frost or ice.

2. Remove and replace, or scarify and air dry, otherwise satisfactory soil material that

exceeds optimum moisture content by 2 percent and is too wet to compact to specified

dry unit weight.

Page 131: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EARTH MOVING 312000 - 8

3.12 COMPACTION OF SOIL BACKFILLS AND FILLS

A. Place backfill and fill soil materials in layers not more than 8 inches (200 mm) in loose depth

for material compacted by heavy compaction equipment, and not more than 4 inches (100 mm)

in loose depth for material compacted by hand-operated tampers.

B. Place backfill and fill soil materials evenly on all sides of structures to required elevations, and

uniformly along the full length of each structure.

C. Compact soil materials to not less than the following percentages of maximum dry unit weight

according to ASTM D 698:

1. Under structures, building slabs, steps, and pavements, scarify and recompact top 12

inches (300 mm) of existing subgrade and each layer of backfill or fill soil material at

95percent.

2. Under walkways, scarify and recompact top 6 inches (150 mm) below subgrade and

compact each layer of backfill or fill soil material at 92percent.

3. Under turf or unpaved areas, scarify and recompact top 6 inches (150 mm) below

subgrade and compact each layer of backfill or fill soil material at 85percent.

4. For utility trenches, compact each layer of initial and final backfill soil material at

85percent.

3.13 GRADING

A. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply

with compaction requirements and grade to cross sections, lines, and elevations indicated.

1. Provide a smooth transition between adjacent existing grades and new grades.

2. Cut out soft spots, fill low spots, and trim high spots to comply with required surface

tolerances.

B. Site Rough Grading: Slope grades to direct water away from buildings and to prevent ponding.

Finish subgrades to required elevations within the following tolerances:

1. Walks: Plus or minus 1 inch (25 mm).

2. Pavements: Plus or minus 1/2 inch (13 mm).

3.14 SUBBASE AND BASE COURSES UNDER PAVEMENTS AND WALKS

A. Place subbase course and base course on subgrades free of mud, frost, snow, or ice.

B. On prepared subgrade, place subbase course and base course under pavements and walks as in

accordance with VDOT Section 308 and 309.

3.15 DRAINAGE COURSE UNDER CONCRETE SLABS-ON-GRADE

A. Place drainage course on subgrades free of mud, frost, snow, or ice.

Page 132: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

EARTH MOVING 312000 - 9

B. On prepared subgrade, place and compact drainage course under cast-in-place concrete slabs-

on-grade as follows:

1. Install subdrainage geotextile on prepared subgrade according to manufacturer's written

instructions, overlapping sides and ends.

2. Place drainage course 6 inches (150 mm) or less in compacted thickness in a single layer.

3. Place drainage course that exceeds 6 inches (150 mm) in compacted thickness in layers of

equal thickness, with no compacted layer more than 6 inches (150 mm) thick or less than

3 inches (75 mm) thick.

4. Compact each layer of drainage course to required cross sections and thicknesses to not

less than 95percent of maximum dry unit weight according to ASTM D 698.

3.16 PROTECTION

A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep

free of trash and debris.

B. Repair and reestablish grades to specified tolerances where completed or partially completed

surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent

construction operations or weather conditions.

1. Scarify or remove and replace soil material to depth as directed by Landscape Architect;

reshape and recompact.

C. Where settling occurs before Project correction period elapses, remove finished surfacing,

backfill with additional soil material, compact, and reconstruct surfacing.

1. Restore appearance, quality, and condition of finished surfacing to match adjacent work,

and eliminate evidence of restoration to greatest extent possible.

3.17 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Remove surplus satisfactory soil and waste materials, including unsatisfactory soil, trash, and

debris, and legally dispose of them off Owner's property.

B. Transport surplus satisfactory soil to designated storage areas on Owner's property. Stockpile or

spread soil as directed by Landscape Architect.

1. Remove waste materials, including unsatisfactory soil, trash, and debris, and legally

dispose of them off Owner's property.

END OF SECTION 312000

Page 133: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

ASPHALT PAVING 321216 - 1

SECTION 321216 - ASPHALT PAVING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Hot-mix asphalt patching and repair.

2. Hot-mix asphalt paving.

3. Natural Stone Band.

B. Related Sections:

1. Division 03 Section "Site Clearing" for demolition and removal of existing asphalt

pavements.

2. Division 31 Section "Earth Moving" for aggregate subbase and base courses.

3. Division 32 Section "Concrete Paving Joint Sealants" for joint sealants and fillers at

paving terminations.

1.3 DEFINITION

A. Hot-Mix Asphalt Paving Terminology: Refer to ASTM D 8 for definitions of terms.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product indicated. Include technical data and tested physical

and performance properties.

1. Job-Mix Designs: For each job mix proposed for the Work.

B. Samples for Verification:

1. Full-size units of indicated natural stone.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified manufacturer and testing agency.

Page 134: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

ASPHALT PAVING 321216 - 2

B. Material Certificates: For each paving material, from manufacturer. Include statement for

mixes containing recycled materials that performance of recycled material will perform equal to

or exceed mixes produced by new materials.

C. Material Test Reports: For each paving material, by a qualified testing agency

1.6 QUALITY ASSURANCE

A. Manufacturer Qualifications: A paving-mix manufacturer registered with and approved by

VDOT.

B. Testing Agency Qualifications: Qualified according to ASTM D 3666 for testing indicated.

C. Regulatory Requirements: Comply with materials, workmanship, and other applicable

requirements of VDOT for asphalt paving work.

1. Measurement and payment provisions and safety program submittals included in standard

specifications do not apply to this Section.

D. Preinstallation Conference: Conduct conference at Project site to comply with requirements set

forth in Division 1 Section “Project Management and Coordination.”.

1. Review methods and procedures related to hot-mix asphalt paving including, but not

limited to, the following:

a. Review proposed sources of paving materials, including capabilities and location

of plant that will manufacture hot-mix asphalt.

b. Review requirements for protecting paving work, including restriction of traffic

during installation period and for remainder of construction period.

1.7 PROJECT CONDITIONS

A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively

damp, if rain is imminent or expected before time required for adequate cure, or if the following

conditions are not met:

1. Prime Coat: Minimum surface temperature of 60 deg F (15.6 deg C).

2. Tack Coat: Minimum surface temperature of 60 deg F (15.6 deg C).

3. Slurry Coat: Comply with weather limitations in ASTM D 3910.

4. Asphalt Base Course: Minimum surface temperature of 40 deg F (4.4 deg C) and rising

at time of placement.

5. Asphalt Surface Course: Minimum surface temperature of 60 deg F (15.6 deg C) at time

of placement.

Page 135: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

ASPHALT PAVING 321216 - 3

PART 2 - PRODUCTS

2.1 AGGREGATES

A. General: Use materials and gradations that have performed satisfactorily in previous

installations.

B. Coarse Aggregate: ASTM D 692, sound; angular crushed stone, crushed gravel, or cured,

crushed blast-furnace slag.

C. Fine Aggregate: AASHTO M 29, sharp-edged natural sand or sand prepared from stone,

gravel, cured blast-furnace slag, or combinations thereof.

1. For hot-mix asphalt, limit natural sand to a maximum of 20 percent by weight of the total

aggregate mass.

D. Mineral Filler: AASHTO M 17, rock or slag dust, hydraulic cement, or other inert material.

2.2 ASPHALT MATERIALS

A. Asphalt Binder: AASHTO M 320, PG 64-22..

B. Prime Coat: ASTM D 2027, medium-curing cutback asphalt, MC-30 or MC-70.

C. Tack Coat: AASHTO M 140 emulsified asphalt, or AASHTO M 208 cationic emulsified

asphalt, slow setting, diluted in water, of suitable grade and consistency for application.

D. Water: Potable.

2.3 AUXILIARY MATERIALS

A. Paving Geotextile: PETROMAT 4598, needlepunched nonwoven geotextile composed of 75%

polypropylene and 25% recycled polyester, staple fiber, calendared on one side. Resistant to

ultraviolet degradation. The geotextile should meet the following Minimum Average Roll

Values (MARV) for woven geotextile:

Property Test Method Units Property Require-

ment

Grab Tensile Strength ASTM D 4632 N

(lbs)

450

(101)

Grab Elongation ASTM D 4632 percent 50

Mass Per Unit Area ASTM D 5261 g/m2

(oz/yd2)

140

(4.1)

Asphalt Retention ASTM D 6140 l/m2

(gal/yd2)

0.9

(0.20)

Page 136: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

ASPHALT PAVING 321216 - 4

Melting Point ASTM D 276

Degrees C

(Degrees

F)

160

(320)

UV Resistance ASTM D 4355 percent 70 at 150 hrs

1. Manufacturer:

a. Propex Operating Company, LLC, Chattanooga, Tennessee, 37419. Phone: (800)

621-1273

B. Joint Sealant: ASTM D 6690, hot-applied, single-component, polymer-modified bituminous

sealant.

1. For sealing cracks in hot-mix asphalt, use Type II sealer.

2. For sealing cracks in hot-mix asphalt ‘saw-and-seal’ applications, use Type IV sealer.

2.4 MIXES

A. Hot-Mix Asphalt: Dense, hot-laid, hot-mix asphalt as specified by VDOT Road and Bridge

standards, and complying with the following requirements:

1. Base Course: 19M64.

2. Surface Course: 9.5M64.

B. Emulsified-Asphalt Slurry: ASTM D 3910, Type 2.

2.5 NATURAL STONE BAND

A. Natural Stone Units: Carderock Drywall Stone, roughly rectangular and somewhat flat quarried

stone, with one good face.

1. Width: Select units 10 to 12 inches (254 to 356 mm) wide.

2. Depth: Select units 8 to 10 inches (203 to 254 mm) high.

3. Length: Random lengths up to 24 inches (610 mm).

4. Coverage: 12 to 15 square feet (1.1 to 1.4 square meters) per ton.

5. Color Range: Full color range, various shades of blues, browns, greys, and greens.

6. Material shall conform to the following properties:

a. Minimum density of 170 lbs/cu ft (2.72 grams per cubic cm) when tested in

accordance with ASTM C 97.

b. Minimum compressive strength of 13,100 average psi (921 kg/cm) when tested in

accordance with ASTM C 170

7. Techniques for achieving size requirements:

Page 137: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

ASPHALT PAVING 321216 - 5

a. If stone must be altered to meet size requirements for installation where an

adjacent condition or direction change in the stone band warrants it, the stone may

be broken to maintain a consistent natural-looking face.

b. No cutting and/or sawing of stone is acceptable.

B. Manufacturer:

1. Carderock® Quarries P. O. Box 34300 Bethesda, MD 20827 Quarry and Yard are

located at: 8200 Seven Locks Rd. Bethesda, MD 20817 Phone: 301-365-2100 Fax:

301-365-5524 Email: [email protected] Web: http://www.carderock.com.

2.6 AGGREGATE SETTING-BED MATERIALS (FOR NATURAL STONE BAND)

A. Graded Aggregate for Subbase: Sound, crushed stone or gravel complying with ASTM D 448

for Size No. 57

B. Stone Screenings for Leveling Course: Sound stone screenings complying with ASTM D 448

for Size No. 10.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that subgrade is dry and in suitable condition to begin paving.

B. Proof-roll subgrade below pavements with heavy pneumatic-tired equipment to identify soft

pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.

1. Completely proof-roll subgrade in one direction. Limit vehicle speed to 3 mph (5 km/h).

2. Proof roll with a loaded 10-wheel, tandem-axle dump truck weighing not less than 15

tons (13.6 tonnes).

3. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as

determined by Landscape Architect, and replace with compacted backfill or fill as

directed.

C. Proceed with paving only after unsatisfactory conditions have been corrected.

3.2 PATCHING

A. Hot-Mix Asphalt Pavement: Saw cut perimeter of patch and excavate existing pavement

section to sound base. Excavate rectangular or trapezoidal patches, extending 12 inches (300

mm) into adjacent sound pavement, unless otherwise indicated. Cut excavation faces vertically.

Remove excavated material. Re-compact existing unbound-aggregate base course to form new

subgrade.

B. Tack Coat: Apply uniformly to vertical surfaces abutting or projecting into new, hot-mix

asphalt paving at a rate of 0.05 to 0.15 gal./sq. yd. (0.2 to 0.7 L/sq. m).

1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.

Page 138: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

ASPHALT PAVING 321216 - 6

2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings.

Remove spillages and clean affected surfaces.

C. Patching: Partially fill excavated pavements with hot-mix asphalt base mix and, while still hot,

compact. Cover asphalt base course with compacted, hot-mix surface layer finished flush with

adjacent surfaces.

3.3 SURFACE PREPARATION

A. General: Immediately before placing asphalt materials, remove loose and deleterious material

from substrate surfaces. Ensure that prepared subgrade is ready to receive paving.

B. Prime Coat: Apply uniformly over surface of compacted unbound-aggregate base course at a

rate of 0.15 to 0.50 gal./sq. yd. (0.7 to 2.3 L/sq. m). Apply enough material to penetrate and

seal but not flood surface. Allow prime coat to cure.

1. If prime coat is not entirely absorbed within 24 hours after application, spread sand over

surface to blot excess asphalt. Use enough sand to prevent pickup under traffic. Remove

loose sand by sweeping before pavement is placed and after volatiles have evaporated.

2. Protect primed substrate from damage until ready to receive paving.

C. Tack Coat: Apply uniformly to surfaces of existing pavement at a specified rate to satisfy the

asphalt retention properties of the geotextile.

1. Application of the sealant shall be by distributor spray bar, with hand spraying kept to a

minimum. Temperature of the asphalt sealant shall be sufficiently high to permit uniform

spray pattern. For asphalt cements the minimum temperature shall be 150oC (300oF). To

avoid damage to the geotextile, however, the distributor tank temperatures shall not

exceed 160oC (320oF).

2. A spray pattern for asphalt emulsion is improved by heating. Temperatures in the 55oC

(130oF) to 70oC (160oF) range are desirable. A temperature of 70oC (160oF) shall not be

exceeded since higher temperatures may break emulsion.

3. The target width of asphalt sealant application shall be the geotextile width. The asphalt

sealant shall not be applied any farther in advance of geotextile placement than the

distance the Contractor can maintain free of traffic.

4. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings.

Remove spillages and clean affected surfaces. Any sealant on top face of natural stone

band must be promptly removed, and advised to be kept covered during asphalt

installation.

D. Paving Geotextile: The geotextile shall be placed onto the asphalt tack coat (calendared or

smooth side up) with minimum wrinkling prior to the time the asphalt has cooled and lost

tackiness. Wrinkles or folds in excess of 25 mm (1 in) shall be slit and laid flat.

1. Blooming and/or pneumatic rolling will be required to maximize geotextile contact with

the pavement surface.

2. Overlap of geotextile joints shall be sufficient to ensure full closure of the joint, but

should not exceed 150 mm. Transverse joints shall be lapped in the direction of paving

to prevent edge pickup by the paver. A second application of asphalt sealant to the

Page 139: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

ASPHALT PAVING 321216 - 7

geotextile overlaps will be required if in the judgement of the Engineer additional asphalt

sealant is needed to ensure proper bonding of the double geotextile layer.

3. Removal and replacement of geotextile that is damaged will be the responsibility of the

Contractor.

3.4 HOT-MIX ASPHALT PLACING

A. Machine place hot-mix asphalt on prepared surface, spread uniformly, and strike off. Place

asphalt mix by hand to areas inaccessible to equipment in a manner that prevents segregation of

mix. Place each course to required grade, cross section, and thickness when compacted.

1. Place hot-mix asphalt base course in single lift.

2. Place hot-mix asphalt surface course in single lift.

3. Spread mix at minimum temperature of 250 deg F (121 deg C).

4. Regulate paver machine speed and/or hand placement to obtain smooth, continuous

surface free of pulls and tears in asphalt-paving geotextile.

B. Promptly correct surface irregularities in paving course behind paver. Use suitable hand tools

to remove excess material forming high spots. Fill depressions with hot-mix asphalt to prevent

segregation of mix; use suitable hand tools to smooth surface.

3.5 JOINTS

A. Construct joints to ensure a continuous bond between adjoining paving sections. Construct

joints free of depressions, with same texture and smoothness as other sections of hot-mix

asphalt course.

1. Clean contact surfaces and apply tack coat to joints.

2. Offset longitudinal joints, in successive courses, a minimum of 6 inches (150 mm).

3. Offset transverse joints, in successive courses, a minimum of 24 inches (600 mm).

4. Compact joints as soon as hot-mix asphalt will bear roller weight without excessive

displacement.

5. Compact asphalt at joints to a density within 2 percent of specified course density.

3.6 COMPACTION

A. General: Begin compaction as soon as placed hot-mix paving will bear roller weight without

excessive displacement. Compact hot-mix paving with hot, hand tampers or with vibratory-

plate compactors in areas inaccessible to rollers.

1. Complete compaction before mix temperature cools to 185 deg F (85 deg C).

B. Breakdown Rolling: Complete breakdown or initial rolling immediately after rolling joints and

outside edge. Examine surface immediately after breakdown rolling for indicated crown, grade,

and smoothness. Correct laydown and rolling operations to comply with requirements.

Page 140: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

ASPHALT PAVING 321216 - 8

C. Intermediate Rolling: Begin intermediate rolling immediately after breakdown rolling while

hot-mix asphalt is still hot enough to achieve specified density. Continue rolling until hot-mix

asphalt course has been uniformly compacted to the following density:

1. Average Density: 96 percent of reference laboratory density according to

AASHTO T 245, but not less than 94 percent nor greater than 100 percent.

2. Average Density: 92 percent of reference maximum theoretical density according to

ASTM D 2041, but not less than 90 percent nor greater than 96 percent.

D. Finish Rolling: Finish roll paved surfaces to remove roller marks while hot-mix asphalt is still

warm.

E. Edge Shaping: While surface is being compacted and finished, trim edges of pavement to

proper alignment. Completely compact areas around the stoneband while asphalt is still hot;

compact thoroughly using hand tools as necessary. Clean stone of any excess asphalt.

F. Repairs: Remove paved areas that are defective or contaminated with foreign materials and

replace with fresh, hot-mix asphalt. Compact by rolling to specified density and surface

smoothness.

G. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled

and hardened.

H. Erect barricades to protect paving from traffic until mixture has cooled enough not to become

marked.

3.7 INSTALLATION TOLERANCES

A. Pavement Thickness: Compact each course to produce the thickness indicated within the

following tolerances:

1. Base Course: Plus or minus 1/2 inch (13 mm).

2. Surface Course: Plus 1/2 inch (6 mm), no minus.

B. Pavement Surface Smoothness: Compact each course to produce a surface smoothness within

the following tolerances as determined by using a 10-foot (3-m) straightedge applied

transversely or longitudinally to paved areas:

1. Base Course: 1/4 inch (6 mm).

2. Surface Course: 1/8 inch (3 mm).

3.8 SURFACE TREATMENTS

A. Slurry Seals: Apply slurry coat in a uniform thickness according to ASTM D 3910 and allow to

cure.

1. Roll slurry seal to remove ridges and provide a uniform, smooth surface.

Page 141: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

ASPHALT PAVING 321216 - 9

3.9 DISPOSAL

A. Except for material indicated to be recycled, remove excavated materials from Project site and

legally dispose of them in an EPA-approved landfill.

END OF SECTION 321216

Page 142: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONCRETE PAVING JOINT SEALANTS 321373 - 1

SECTION 321373 - CONCRETE PAVING JOINT SEALANTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Cold-applied joint sealants (Joints within cement concrete pavement).

2. Hot-applied joint sealants (Joints between cement concrete and asphalt pavement).

B. Related Sections:

1. Division 32 Section "Asphalt Paving" for constructing joints between concrete and

asphalt pavement.

2. Division 32 Section "Concrete Paving" for constructing joints in concrete pavement.

1.3 PRECONSTRUCTION TESTING

A. Preconstruction Compatibility and Adhesion Testing: Submit to joint-sealant manufacturers,

for testing indicated below, Samples of materials that will contact or affect joint sealants.

1. Use VDOT approved testing methods to determine whether priming and other specific

joint-preparation techniques are required to obtain rapid, optimum adhesion of joint

sealants to joint substrates.

2. Submit no fewer than four (4) pieces of each type of material, including joint substrates,

shims, joint-sealant backings, secondary seals, and miscellaneous materials.

3. Schedule sufficient time for testing and analyzing results to prevent delaying the Work.

4. For materials failing tests, obtain joint-sealant manufacturer's written instructions for

corrective measures including use of specially formulated primers.

5. Testing will not be required if joint-sealant manufacturers submit joint-preparation data

that are based on previous testing, not older than 24 months, of sealant products for

compatibility with and adhesion to joint substrates and other materials matching those

submitted.

1.4 ACTION SUBMITTALS

A. Product Data: For each joint-sealant product indicated.

B. Samples for Verification: For each kind and color of joint sealant required, provide Samples

with joint sealants in 1/2-inch (13-mm) wide joints formed between two 6-inch (150-mm) long

strips of material matching the appearance of exposed surfaces adjacent to joint sealants.

Page 143: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONCRETE PAVING JOINT SEALANTS 321373 - 2

C. Pavement-Joint-Sealant Schedule: Include the following information:

1. Joint-sealant application, joint location, and designation.

2. Joint-sealant manufacturer and product name.

3. Joint-sealant formulation.

4. Joint-sealant color.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified Installer.

B. Product Certificates: For each type of joint sealant and accessory, from manufacturer.

C. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified

testing agency, for joint sealants.

D. Preconstruction Compatibility and Adhesion Test Reports: From joint-sealant manufacturer,

indicating the following:

1. Materials forming joint substrates and joint-sealant backings have been tested for

compatibility with and adhesion to joint sealants.

2. Interpretation of test results and written recommendations for primers and substrate

preparation needed for adhesion.

1.6 QUALITY ASSURANCE

A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved

for installation of units required for this Project.

B. Source Limitations: Obtain each type of joint sealant from single source from single

manufacturer.

C. Product Testing: Test joint sealants using a qualified testing agency.

1. Testing Agency Qualifications: An independent testing agency qualified according to

VDOT to conduct the testing indicated.

D. Preinstallation Conference: Conduct conference at Project site to comply with requirements set

forth in Division 1 Section “Project Management and Coordination.”

1.7 PROJECT CONDITIONS

A. Do not proceed with installation of joint sealants under the following conditions:

1. When ambient and substrate temperature conditions are outside limits permitted by joint-

sealant manufacturer or are below 40 deg F (5 deg C).

2. When joint substrates are wet.

3. Where joint widths are less than those allowed by joint-sealant manufacturer for

applications indicated.

Page 144: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONCRETE PAVING JOINT SEALANTS 321373 - 3

4. Where contaminants capable of interfering with adhesion have not yet been removed

from joint substrates.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Compatibility: Provide joint sealants, backing materials, and other related materials that are

compatible with one another and with joint substrates under conditions of service and

application, as demonstrated by joint-sealant manufacturer based on testing and field

experience.

B. Colors of Exposed Joint Sealants: As selected by Landscape Architect from manufacturer's full

range.

2.2 COLD-APPLIED JOINT SEALANTS

A. Multicomponent, Pourable, Traffic-Grade, Self-leveling, Polyurethane Joint Sealant for

Concrete: ASTM C 920, Type M, Grade P, Class 25, for Use T.

1. Products: Subject to compliance with requirements, provide one of the following:

a. MasterSeal 733 primer with MasterSeal SL2.

b. Sikaflex 429 primer with Sikaflex 2C 2L

2.3 HOT-APPLIED JOINT SEALANTS

A. Hot-poured, Joint Sealant for joints and cracks in both hot-mixed asphalt and Portland concrete

surface: shall be low modulus rubberized asphalt conforming with applicable VDOT

subsections and AASHTO M 301 with one of the following:

1. Cone penetration, Non-Immersed: shall be between 90-150

2. Flow: shall be 3.00mm maximum

3. Resilience: recovery shall be maximum 60%

4. Bond Test: shall conform at 200% extension

2.4 JOINT-SEALANT BACKER MATERIALS

A. General: Provide joint-sealant backer materials that are nonstaining; are compatible with joint

substrates, sealants, primers, and other joint fillers; and are approved for applications indicated

by joint-sealant manufacturer based on field experience and laboratory testing.

B. Round Backer Rods for Cold- and Hot-Applied Joint Sealants: ASTM D 5249, Type 1, of

diameter and density required to control sealant depth and prevent bottom-side adhesion of

sealant.

Page 145: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONCRETE PAVING JOINT SEALANTS 321373 - 4

2.5 PRIMERS

A. Primers: Product recommended by joint-sealant manufacturer where required for adhesion of

sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate

tests and field tests.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with

requirements for joint configuration, installation tolerances, and other conditions affecting joint-

sealant performance.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to

comply with joint-sealant manufacturer's written instructions.

B. Joint Priming: Prime joint substrates where indicated or where recommended in writing by

joint-sealant manufacturer, based on preconstruction joint-sealant-substrate tests or prior

experience. Apply primer to comply with joint-sealant manufacturer's written instructions.

Confine primers to areas of joint-sealant bond; do not allow spillage or migration onto adjoining

surfaces.

3.3 INSTALLATION OF JOINT SEALANTS

A. General: Comply with joint-sealant manufacturer's written installation instructions for products

and applications indicated unless more stringent requirements apply.

B. Joint-Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of

joint sealants as applicable to materials, applications, and conditions indicated.

C. Install joint-sealant backings of kind indicated to support joint sealants during application and at

position required to produce cross-sectional shapes and depths of installed sealants relative to

joint widths that allow optimum sealant movement capability.

1. Do not leave gaps between ends of joint-sealant backings.

2. Do not stretch, twist, puncture, or tear joint-sealant backings.

3. Remove absorbent joint-sealant backings that have become wet before sealant application

and replace them with dry materials.

D. Install joint sealants using proven techniques that comply with the following and at the same

time backings are installed:

1. Place joint sealants so they directly contact and fully wet joint substrates.

Page 146: Fountainhead Regional Park - Nova Parks · FOUNTAINHEAD REGIONAL PARK 100% Construction Documents SUMMARY 011000 - 3 1. Project will be constructed under a single prime contract.

© 2017 Rhodeside & Harwell FOUNTAINHEAD REGIONAL PARK 100% Construction Documents

CONCRETE PAVING JOINT SEALANTS 321373 - 5

2. Completely fill recesses in each joint configuration.

3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow

optimum sealant movement capability.

E. Quality Control: Joint sealants will be examined by Landscape Architect one year after

installation. Joint sealants not adhering will be replaced by Contractor at no cost to Owner.

3.4 CLEANING

A. Clean off excess joint sealant or sealant smears adjacent to joints as the Work progresses, by

methods and with cleaning materials approved in writing by manufacturers of joint sealants and

of products in which joints occur.

3.5 PROTECTION

A. Protect joint sealants, during and after curing period, from contact with contaminating

substances and from damage resulting from construction operations or other causes so sealants

are without deterioration or damage at time of Substantial Completion. If, despite such

protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint

sealants immediately and replace with joint sealant so installations in repaired areas are

indistinguishable from the original work.

3.6 PAVEMENT-JOINT-SEALANT SCHEDULE

A. Joint-Sealant Application: Joints within cement concrete pavement.

1. Joint Location:

a. Expansion joints in concrete pavement.

2. Cold-Applied Joint Sealant for Concrete: Multi-component, self-leveling.

3. Joint-Sealant Color: As selected by Landscape Architect from manufacturer's full range.

B. Joint-Sealant Application: Joints between cement concrete and asphalt pavement.

1. Joint Location:

a. Joints between concrete and asphalt pavement.

2. Hot-Applied Joint Sealant for Concrete and Asphalt: Single component.

3. Joint-Sealant Color: As selected by Landscape Architect from manufacturer's full range.

END OF SECTION 321373