FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC...

18

Transcript of FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC...

Page 1: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 2: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 3: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 4: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 5: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 6: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.

FOUNDATIONPiling foundation and/or as per Geo Technical engineers recommendation

STRUCTURERCC framed structure

WALLSExternal – 10” includingPlaster Internal – 5” and/or 3” with POP finish

TREATMENTAnti termite treatment during various stages of construction.Water proofing treatment in toilet, kitchen & roof.

DOORSEntrance door – Solid core polished teak door finish.Internal door – Front side polished teak finish flushdoors, back side painted.

WINDOWS Anodized aluminium windows with clear glass.

FLOORSFlat interior – Vitrified mirror finish tilesEntrance lobby – Fully marbled or ceramic tiles flooring.Lift & stair lobby – Combination of kota , marble flooring & ceramic tiles at lift facade.

KITCHENDesigner anti skid ceramic floor tiles.Kitchen walls – designer ceramic wall tiles upto 2.5 feet above kitchen counter and in wash area below kitchen sink.Kitchen counter – Black granite top with SS sink.

TOILETSAnti skid ceramic designer floor tilesHot & cold line in basin & shower area White sanitary ware of reputed brand such as Parryware or equivalent brand.CP fittings of reputed brand Walls – designer ceramic tiles upto door height.

ELECTRICALS Concealed copper wiring with modular switchesPlug points at all switchboards2 L.P , 1 F.P, &1 A.C point in all bedrooms3 L.P , 2 F.P in liv/din1 L.P , 1 F.P in verandahTV & Telephone point in Hall & in master BedroomCCTV with intercom facility in Hall1 15Amp point, 2 L.P , Aqua guard, refrigerator & exhaust fan point in kitchenWashing machine point and 1 tap point in service verandah2L.P, Geyser points and exhaust points in toilet.

ELEVATORTwo hi–speed passenger lifts of OTIS/KONE or equivalent make

HARDWARE FITTINGS Quality Locks & Hardware fittings of reputed brands

Specifications

Page 7: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 8: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 9: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 10: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 11: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 12: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 13: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 14: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 15: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Page 16: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.

SL NO. PERCENTAGE OF CONSIDERATION PARTICULARS

1 15% ON BOOKING / SIGNING OF AGREEMENT

2 15% ON COMPLETION OF FOUNDATION WORK

3 10% ON COMPLETION OF 2ND FLOOR CASTING

4 10% ON COMPLETION OF 4TH FLOOR CASTING

5 10% ON COMPLETION OF 6TH FLOOR CASTING

6 10% ON COMPLETION OF 8TH FLOOR CASTING

7 5% ON COMPLETION OF 11TH FLOOR CASTING

8 5% ON COMPLETION OF BRICK WORK

9 5% ON COMMENCEMENT OF FLOORING

10 5% ON COMPLETION OF PLASTERING

11 5% ON COMMENCEMENT PLUMBING WORK

12 5% ON POSSESSION

PAYMENT SCHEDULE

 Note: Rates as of Sep’ 08 and are subject to revision from time to time.

Page 17: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.

PAYMENT SCHEDULE

EXTRA DEVELOPMENT CHARGES 2BR 3 BR 4 BR

Generator charges 15,000 20,000 25,000

EPABX System 5,000 5,000 5,000

Water Treatment Plant 10,000 15,000 20,000

Apportionment & Mutation of the property in the KMC 10,000 10,000 10,000

CESC transformer & meter (Excluding individual meter deposit) 15,000 20,000 25,000

Documentation & Legal charges 5,000 5,000 5,000

Separate KMC water line in Kitchen 5,000 5,000 5,000

Corpus Fund 20,000 25,000 30,000

 Note: Rates as of Sep’ 08 and are subject to revision from time to time.

Page 18: FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.

Thank You