FOUNDATIONPiling foundation and/or as per Geo Technical engineers recommendation
STRUCTURERCC framed structure
WALLSExternal – 10” includingPlaster Internal – 5” and/or 3” with POP finish
TREATMENTAnti termite treatment during various stages of construction.Water proofing treatment in toilet, kitchen & roof.
DOORSEntrance door – Solid core polished teak door finish.Internal door – Front side polished teak finish flushdoors, back side painted.
WINDOWS Anodized aluminium windows with clear glass.
FLOORSFlat interior – Vitrified mirror finish tilesEntrance lobby – Fully marbled or ceramic tiles flooring.Lift & stair lobby – Combination of kota , marble flooring & ceramic tiles at lift facade.
KITCHENDesigner anti skid ceramic floor tiles.Kitchen walls – designer ceramic wall tiles upto 2.5 feet above kitchen counter and in wash area below kitchen sink.Kitchen counter – Black granite top with SS sink.
TOILETSAnti skid ceramic designer floor tilesHot & cold line in basin & shower area White sanitary ware of reputed brand such as Parryware or equivalent brand.CP fittings of reputed brand Walls – designer ceramic tiles upto door height.
ELECTRICALS Concealed copper wiring with modular switchesPlug points at all switchboards2 L.P , 1 F.P, &1 A.C point in all bedrooms3 L.P , 2 F.P in liv/din1 L.P , 1 F.P in verandahTV & Telephone point in Hall & in master BedroomCCTV with intercom facility in Hall1 15Amp point, 2 L.P , Aqua guard, refrigerator & exhaust fan point in kitchenWashing machine point and 1 tap point in service verandah2L.P, Geyser points and exhaust points in toilet.
ELEVATORTwo hi–speed passenger lifts of OTIS/KONE or equivalent make
HARDWARE FITTINGS Quality Locks & Hardware fittings of reputed brands
Specifications
SL NO. PERCENTAGE OF CONSIDERATION PARTICULARS
1 15% ON BOOKING / SIGNING OF AGREEMENT
2 15% ON COMPLETION OF FOUNDATION WORK
3 10% ON COMPLETION OF 2ND FLOOR CASTING
4 10% ON COMPLETION OF 4TH FLOOR CASTING
5 10% ON COMPLETION OF 6TH FLOOR CASTING
6 10% ON COMPLETION OF 8TH FLOOR CASTING
7 5% ON COMPLETION OF 11TH FLOOR CASTING
8 5% ON COMPLETION OF BRICK WORK
9 5% ON COMMENCEMENT OF FLOORING
10 5% ON COMPLETION OF PLASTERING
11 5% ON COMMENCEMENT PLUMBING WORK
12 5% ON POSSESSION
PAYMENT SCHEDULE
Note: Rates as of Sep’ 08 and are subject to revision from time to time.
PAYMENT SCHEDULE
EXTRA DEVELOPMENT CHARGES 2BR 3 BR 4 BR
Generator charges 15,000 20,000 25,000
EPABX System 5,000 5,000 5,000
Water Treatment Plant 10,000 15,000 20,000
Apportionment & Mutation of the property in the KMC 10,000 10,000 10,000
CESC transformer & meter (Excluding individual meter deposit) 15,000 20,000 25,000
Documentation & Legal charges 5,000 5,000 5,000
Separate KMC water line in Kitchen 5,000 5,000 5,000
Corpus Fund 20,000 25,000 30,000
Note: Rates as of Sep’ 08 and are subject to revision from time to time.
Thank You