FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL...

34
FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire Prepared for: Regeneration Holdings Ltd Issue 2: 7 March 2011 Ref: TR8100196/JR/DW/035

Transcript of FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL...

Page 1: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development

Site F, Thame, Oxfordshire

Prepared for: Regeneration Holdings Ltd Issue 2: 7 March 2011

Ref: TR8100196/JR/DW/035

Page 2: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 Issue 2: 7 March 2011

Document History

Issue Date Description Prepared By Checked By

1 2 March 2011 Working draft to aid discussion at meeting with SODC 3 March 2011

Jordan Rayner J Birch

2 7 March 2011 Final version issued as technical appendix to concept masterplan

Jordan Rayner J Birch

Glanville Glanville Consultants is a multi-disciplinary consultancy with the following expertise:

− Civil and Structural Engineers

− Building Surveyors

− Highway and Traffic Engineers

− Transport Planners

− Land Surveyors

− Building Investigation Experts

− CDM Co-ordinators For further advice contact: Cornerstone House Offices also at: 575-599 Maxted Road 62 Foxhall Road Hemel Hempstead Didcot Hertfordshire Oxfordshire OX11 7AD HP2 7ED

Telephone: 01235 515550 Telephone: 01442 202600 Fax: 01235 817799 Fax: 01442 212599

[email protected] www.glanvillegroup.com

Glanville Consultants Ltd. All rights reserved. This report contains confidential information intended solely for the recipient. No part of this report may be copied, reproduced or stored electronically without prior written permission from Glanville Consultants Ltd. This report has been prepared in accordance with the commissioning brief and is for the client’s exclusive use unless otherwise agreed in writing. Glanville Consultants Ltd does not accept liability for any use of this report, other than for the purposes for which it is was originally prepared and provided. Third parties should not use or rely on the contents of this report without written permission from Glanville Consultants Ltd.

Page 3: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 Issue 2: 7 March 2011

Contents

Executive Summary .............................................................................................................. 1

1.0 Introduction ................................................................................................................ 2

2.0 The Proposed Development Site................................................................................ 3

3.0 Utilities........................................................................................................................ 4

4.0 Foul Water Drainage .................................................................................................. 6

5.0 Summary and Conclusions......................................................................................... 7

Appendices Appendix A: Site Location Plan

Appendix B: Concept Masterplan

Appendix C: Linesearch Enquiry Result

Appendix D: Southern Gas Networks

Appendix E: Thames Water

Appendix F: EDF Energy

Appendix G: British Telecom

Appendix H: Proposed Foul Water Drainage Strategy

Page 4: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 1 Issue 2: 7 March 2011

Executive Summary

Site F has been selected by South Oxfordshire District Council (SODC) as the preferred site for large-scale housing development in Thame following consultation on the Council’s Core Strategy Options. A Foul Drainage & Utilities Assessment has been prepared as a technical appendix to the concept masterplan that will accompany SODC’s Core Strategy submission for Site F in mid-March 2011. The principal public utility companies which serve the Thame area are Southern Gas Networks, Thames Water (potable water and sewerage), EDF Energy (electricity) and British Telecom (BT). Gas, potable water, electricity and telecommunication services all exist adjacent to the site along Oxford Road. Supplies of gas are present in both medium and low pressure mains. Potable water pipework exists in both local distribution mains and a large trunk main. Electricity supply is present in both high voltage and low voltage networks. BT ducts exist on both sides of Oxford Road and along the south side of the A418. A public foul sewer exists past the site on Oxford Road. Once planning approval is granted, detailed plans and service loadings will be submitted to each service provider so that proposals and quotations can be obtained for new supplies. None of the utility searches has indicated apparatus within the boundary of Site F and thus it is unlikely that service diversions will be necessary to enable the site to be developed. However, two vehicular accesses are proposed to serve Site F from Oxford Road and both accesses cross existing underground and/or overhead services which may require diversion and/or protection. Detailed proposals and cost estimates for the accommodation works required to facilitate the construction of the site accesses will be obtained from the affected utility companies. Due to the local topography it is likely that foul water from Site F will drain under gravity to the south-eastern corner of the site where a new foul water pumping station will be provided that will discharge to the public foul sewer in Oxford Road. The capacity of existing foul water infrastructure in the Thame area is currently being reviewed by Thames Water in view of the proposed development of Site F. Thames Water is expected to report on the need for any infrastructure upgrades in March 2011. In conclusion, it is considered that there should be no significant difficulty in providing new infrastructure to serve Site F or any significant abnormal costs that would prevent the site from being developed for residential purposes.

Page 5: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 2 Issue 2: 7 March 2011

1.0 Introduction

1.1 Site F has been selected by South Oxfordshire District Council (SODC) as the

preferred site for large-scale housing development in Thame following consultation on the Council’s Core Strategy Options. SODC’s Core Strategy submission is to be subject of Examination in Public in Summer 2011.

1.2 Glanville Consultants has been engaged by Regeneration Holdings Ltd to prepare a

Foul Drainage & Utilities Assessment as a technical appendix to the concept masterplan that will accompany SODC’s Core Strategy submission for Site F in mid-March 2011.

1.3 This report considers all existing services known to be located in the vicinity of the

site. It examines the existing situation, the feasibility of providing new connections and the need for diversionary work. The utility services considered include:

• Gas

• Water

• Electricity

• Telecommunications 1.4 The report also outlines a strategy for the disposal of foul water from the site once

developed for residential purposes. 1.5 The surface water drainage strategy can be found in the Flood Risk Assessment,

which has been prepared as a separate technical appendix to the concept masterplan for Site F.

Page 6: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 3 Issue 2: 7 March 2011

2.0 The Proposed Development Site

2.1 The site is located approximately 1.2km north-west of Thame town centre. It is

bounded by the River Thame to the north, the A418 Thame bypass to the west, Oxford Road to the south and Cuttle Brook, residential properties and open fields to the east.

2.2 The site is located at Landranger Grid Reference SP 695 061. 2.3 A site location plan can be found at Appendix A. Existing Site Description 2.4 The total site area is 34.7Ha, all of which is farmland and used for grazing livestock. 2.5 The site falls steadily from south-west to north-east towards the River Thame and

Cuttle Brook. Approximately 7.6Ha of land adjacent to these watercourses is within the flood plain, and so the area suitable for accommodating residential development is 27.1Ha, including roads and green spaces

Proposed Development 2.6 The proposed development is known as “Site F”. Site F has been selected by South

Oxfordshire District Council (SODC) as the preferred site for large-scale housing development in Thame following consultation on the Council’s Core Strategy Options. SODC’s Core Strategy submission is to be subject of Examination in Public in Summer 2011.

2.7 It is proposed to provide a total of 530 residential dwellings on Site F. Of these, 60%

will be designated as ‘open market’ and 40% will be designated as ‘affordable’. 2.8 A concept masterplan has been developed for Site F to show how the various land

uses can be accommodated to meet SODC’s adopted standards. A copy of the concept masterplan for Site F is included at Appendix B.

Page 7: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 4 Issue 2: 7 March 2011

3.0 Utilities

Existing Services 3.1 Records have been obtained from utility companies known to have sewers, plant and

apparatus within and surrounding the site. The principal public utility companies that serve the Thame area are:

• Southern Gas Networks (gas)

• Thames Water (potable water & sewerage)

• EDF (electricity)

• British Telecom (telecommunications) 3.2 Copies of the service records obtained are included in the appendices stated below. 3.3 An internet based enquiry using www.linesearch.org was also concluded to ascertain

the presence of more obscure or confidential utilities such as Government Pipelines (GPSS) and High Pressure Pipelines. A list of utilities not found to be present in the area is included in Appendix C for reference.

Gas 3.4 Records obtained from Southern Gas Networks are included in Appendix D for

reference. Record information indicates there are medium pressure (MP) and low pressure (LP) gas mains running the length of Oxford Road, serving Thame to the south and east of the site.

3.5 The LP main runs from the centre of Thame on the south side of Oxford Road and

ends in Highfield Close at the south-western end of the site. This main serves properties to the south of Oxford Road. The MP main runs from Thame on the north side of Oxford Road and continues to the west of the site along the A418.

3.6 There is no Southern Gas Networks apparatus indicated within the development site

boundary. Potable Water 3.7 Record information obtained from Thames Water is included at Appendix E. The

records indicate there is an existing network of water mains serving Thame, with a distribution main running along the south side of Oxford Road and south along Rycote Lane, south of the site. There is also a trunk main, used for the bulk distribution of water, running along the north side of Oxford Road, crossing to the south side of Oxford Road immediately to the east of Highfield Close and then running west along the A418.

3.8 There is no Thames Water apparatus indicated within the development site

boundary.

Electricity 3.9 Record information obtained from EDF Energy is included at Appendix F. The

records indicate that there are existing networks of both high and low voltage supplies along Oxford Road.

Page 8: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 5 Issue 2: 7 March 2011

3.10 There are three sub-stations positioned along Oxford Road located adjacent to the water main booster station in Highfield Close, at Lord Williams School and at the foul water pumping station near Cuttle Brook.

Telecommunications

3.10 Record information obtained from British Telecom (BT) is included at Appendix G.

This information indicates there are two ducts running along Oxford Road serving Thame to the south and east of the site, and a single duct following the western boundary in the verge of the A418 bypass.

3.11 There is no BT apparatus indicated within the development site boundary.

New Supplies 3.12 Gas, water, electricity and telecommunication services exist adjacent to the site

along Oxford Road and serving the main urban area of Thame to the south and east of the site. Proposals for servicing the site have not yet been obtained from the utility companies.

3.13 Given the scale of the development and the extra demand it will generate to existing

services, a detailed assessment will be required in order to determine if any reinforcement of local supply networks is required. It is likely that new electricity sub stations will be required, however, the adjacent supplies of gas and water are relatively large scale installations (medium pressure gas and trunk water main), and so may already have sufficient capacity to serve Site F.

3.14 Thames Water's potable supply is provided from Long Crendon reservoir. The effect

of the extra demand will need to be modelled at the detailed design stage. 3.15 Once planning approval is granted for residential development on Site F, detailed

plans and service loadings will be submitted to each service provider so that proposals and quotations can be obtained for new supplies.

3.16 A more in depth investigation will be required to ascertain the precise location and

depths of the utilities when there are plans to make connections.

Diversions

3.17 None of the utility searches has indicated apparatus within the boundary of Site F and thus it is unlikely that service diversions will be necessary to enable the site to be developed.

3.18 Two vehicular accesses are proposed to serve Site F from Oxford Road and both accesses cross existing underground and/or overhead services which may require diversion and/or protection. Detailed proposals and cost estimates for the accommodation works required to facilitate the construction of the site accesses will be obtained from the affected utility companies at the detailed design stage.

Page 9: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 6 Issue 2: 7 March 2011

4.0 Foul Water Drainage

Existing Situation 4.1 Sewer records obtained from Thames Water are included in Appendix E and indicate

a comprehensive network of public foul sewers serving Thame. These records only show those sewers that are maintained by Thames Water. Other privately owned sewers may be present in the vicinity of the site, but these are not shown on public records.

4.2 A single foul water gravity sewer exists adjacent to the site, which runs along the

south side of Oxford Road and crosses to the north side of the road to the east of Town Farm Close. This sewer serves properties to the north and south of Oxford Road and discharges to a pumping station near the south-eastern end of the site, just to the west of the road bridge over Cuttle Brook. A rising main from this pumping station discharges to a gravity sewer to the east of Cuttle Brook from where it flows east through the town centre.

4.3 Thame’s sewage treatment works is located to the north of the town, to the north of

Kingsey Road and to the west of Moorend Lane. 4.4 No public foul sewers are located within the development boundary. Proposed Foul Water Drainage Strategy 4.5 Thames Water has been contacted and has indicated that Site F would be the

preferred location for large-scale housing in Thame, in terms of sewage treatment infrastructure; because Site F is closer to the sewage treatment works than the alternative sites.

4.6 Thames Water has also indicated that detailed modelling will be required to assess

the capacity of existing infrastructure and the impact the development of Site F will have on demand to establish whether any upgrading will be required. A detailed report with costings is expected from Thames Water in March 2011.

4.7 Due to the local topography, it is likely that foul water from Site F will drain under

gravity to the south-eastern corner of the site where a new foul water pumping station will be provided that will discharge to the existing public foul sewer in Oxford Road. The foul water drainage strategy is outlined in the drawing included at Appendix H.

4.8 The proposals will be reviewed during development of the detailed design and with

the results of Thames Water’s modelling to ensure that Site F can be integrated with the wider infrastructure requirements of Thames Water.

4.9 All additional foul water infrastructure constructed to serve Site F will be designed in

accordance with sewers for Adoption, 6th Edition and current best practice. It is envisaged that the new infrastructure will be offered to Thames Water for adoption under Section 104 of the Water Industry Act, 1991.

Page 10: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 7 Issue 2: 7 March 2011

5.0 Summary and Conclusions

5.1 Site F has been selected by South Oxfordshire District Council as the preferred site

for a large-scale housing development in Thame. It is proposed to provide a total of 530 residential dwellings on the site.

5.2 The feasibility of providing the proposed development with gas, water, electricity and

telecommunication supplies has been considered, along with a strategy for the disposal of foul water from the site once developed.

5.3 Gas, water, electricity and telecommunication services exist adjacent to the site

along Oxford Road. 5.4 Given the scale of the development, and the extra demand it would generate, a

detailed assessment is required in order to establish if any upgrading of services are required. However, the adjacent supplies of gas and water are relatively large size installations and may therefore already have sufficient capacity to serve Site F.

5.5 A more in depth investigation will be required to ascertain the precise location and

depths of the utilities when there are plans to make a connection. 5.6 It is likely that service diversions and/or protection will be necessary to facilitate the

construction of the two proposed accesses to the site from Oxford Road. 5.7 Once planning approval is granted for residential development on Site F, detailed

plans and service loadings will be submitted to each service provider so that proposals and quotations can be obtained for new supplies.

5.8 The capacity of existing foul water infrastructure in Thame is currently being reviewed

by Thames Water and a report on the need for any infrastructure upgrades to serve Site F is expected in March 2011.

5.9 In conclusion, it is considered that there should be no significant difficulty in providing

new infrastructure to serve Site F or any significant abnormal costs that would prevent the site from being developed for residential purposes.

Page 11: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 Issue 2: 7 March 2011

Appendices

Page 12: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 Issue 2: 7 March 2011

Appendix A

Location Plan

Page 13: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire
Page 14: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 Issue 2: 7 March 2011

Appendix B

Concept Masterplan

Page 15: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire
Page 16: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 Issue 2: 7 March 2011

Appendix C

Linesearch Enquiry Result

Page 17: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Search Results

Thank you for your enquiry: LS-110223-YT-170-PHN

Thank you for your enquiry, there is no further action necessary.

Please note

The Linesearch.org system only contains information on National Grid's Transmission assets. All other

National Grid or other local high pressure (above 7 bar) gas pipelines and lower pressure gas mains

are not included.

For all other energy network operators' information and contact details see http://2010.energynetworks.org/

Please quote the Linesearch enquiry reference number in *all* correspondence

Please print this screen for your records.

Subject always to our standard terms and conditions, this enquiry result is valid for 28 days only

from the date of enquiry and is based on the confirmed information you entered. If the location of

the work changes then a further enquiry must be made. Should the work not be undertaken within

28 days of the enquiry then a further enquiry must be made.

ENQUIRER DETAILS

Name: Miss Jordan Rayner

Company: Glanville

Email: [email protected]

Tel: 01235515550

ENQUIRY DETAILS

Your reference: 8100196

Your location: 469584 206185

Confirmed location: OS grid reference (469584

206185)

Estimated start date: 25th February 2011

Planned works: No

Type of work: Development Projects - Housing

Distance covered: 500 metres

NOT IN THE ZONE OF INTEREST

BOC Limited (A Member of the Linde Group)

BP Exploration Purbeck Southampton

Pipeline

BPA

Centrica Energy

ConocoPhillips (UK) Ltd

ConocoPhillips Ltd Humber Refinery

Coryton Energy Co Ltd (Gas Pipeline)

E-on UK Plc (Gas Pipelines Only)

Esso Petroleum Company Limited

FibreSpeed Limited

Geo Networks Limited

Government Pipelines & Storage System

INEOS Manufacturing (Scotland and TSEP)

Ineos Enterprises Limited

Mainline Pipelines Limited

Manchester Jetline Limited

Marchwood Power Ltd (Gas Pipeline)

NPower CHP Pipelines

National Grid Gas and Electricity

Transmission

Oikos Storage Limited

Premier Transmission Ltd (SNIP)

SABIC UK Petrochemicals

Scottish Power Generation

Shell UK Ltd

Star Energy

Total UK (Finaline, Colnbrook & Colwick

Pipelines)

Wingas Storage UK Ltd

This service is brought to you by Fisher German ©2011

System by eShopworks

Page 1 of 1Linesearch

01/03/2011mhtml:file://M:\2010\0100-0199\8100196\Services\Linesearch.mht

Page 18: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 Issue 2: 7 March 2011

Appendix D

Southern Gas Networks

Page 19: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire
Page 20: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 Issue 2: 7 March 2011

Appendix E

Thames Water

Page 21: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨٨

٨

٨٨

٨

??

??

??

??

??

??

??

??

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

??

??

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

!

!

!

!

!

!

=

!

!!! !!

!!

!

!

!

!

!

!

!

!

!

!

= =!!

!=

!

=

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!!

!!

!

!!

!!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

Scale:

Width: 1328m

The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any

kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified before any works are undertaken. Crown copyright Reserved

Based on the Ordnance Survey Map with thesanction of the Controller of H.M StationaryOffice License Number 10019345

CDWS/CDWS Standard/2011_1940117

0 60 120 180 24030Meters

DRUBINID

SP6906SE

28/01/2011

469624,206198

Printed By:

Print Date:

Map Centre:

Grid Reference:

Comments:1:4753

Page 22: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

CDWS/CDWS Standard/2011_1940117

NB: Level quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates no Survey information is available.

REFERENCE COVER LEVEL INVERT LEVEL REFERENCE COVER LEVEL INVERT LEVEL

0005 64.18 62.65 1102 66.23 65.56

1101 67.18 64.31 2201 67.96 64.18

2202 67.76 64.08 2203 66.11 63.87

9503 63.7 62.84 0502 63.45 62.09

9515 63.81 63.33 9512 64.19 63.21

9509 64.05 63.02 9517 63.9 61.78

0503 63.9 60.97 9615

9616 64.54 63.6 0704

9702 69.7 68.56 9801 70.02 68.55

9802 70.48 68.97 9504 64.03 62.63

9701 69.7 68.72 8702 70.89 69.23

8703 70.99 69.54 8901 68.07 66.86

991A 7502 65.38 63.48

8503 65.09 63.28 8510 65 63.47

8509 65.35 63.63 7503 65.52 63.75

7501 65.62 63.82 8508 65.82 64.15

8501 65.93 64.13 8707 68.6 67.61

8708 7701

7704 7902 73.24 72.22

7705 7702

7703 7901 72.22 70.42

4804 77.32 75.58 4802 76.71 75.14

4803 76.71 75.04 4801 76.44 74.87

5801 77.21 74.67 5802 77.07 74.65

6902 76.46 74.6 6901 74.6 73.18

9502 63.82 61.97 9501 63.99 62.06

961B 64.47 62.435 961C 64.42 62.41

961A 64.47 62.455 9603 64.38 62.19

961D 64.81 62.312 861A 64.97 62.54

0601 66.71 64.79 8602 66.19 64.65

0602 67.73 65.8 9604 67.79 66.39

8601 67.33 65.89 0701 69.82 68.66

8701 68.18 67.04 0702 70.49 68.31

0705 0703 69.43 67.73

0801 68.53 66.72 8902 69.62 68.23

0902 64.45 0903 64.45

0001 64.46 62.81 0007

0002 64.87 64.18 1801 66.43 64.26

191A 64.665 63.5 0901 64.327 63.318

The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability ofany kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified before any works are undertaken. Crown copyright Reserved

Page 23: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Pag

e 1

2 o

f 24

Se

we

r K

ey -

Co

mm

erc

ial D

rain

ag

e a

nd

Wa

ter

Fo

ul:

Asew

er

desig

ned

toconvey

waste

wate

rfr

om

dom

estic

and

industr

ial sourc

es to a

tre

atm

ent w

ork

s.

Su

rface

Wate

r:A

sew

er

desig

ned

toconvey

surf

ace

wate

r(e

.g.

rain

wate

r fr

om

roofs

, yard

s a

nd c

ar

park

s)

to r

ivers

or

wate

rcours

es.

Co

mb

ined

:A

sew

er

desig

ned

toconvey

both

waste

wate

rand

surf

ace

wate

r fr

om

dom

estic a

nd industr

ial sourc

es to a

tre

atm

ent w

ork

s.

Tru

nk S

urf

ace W

ate

r

Sto

rm R

elie

f

Ve

nt P

ipe

Pro

posed

Tham

es

Surf

ace

Wate

r S

ew

er

Galle

ry

Surf

ace

Wate

rR

isin

g

Main

Slu

dge R

isin

g M

ain

Vacuum

Pu

bli

c S

ew

er

Ty

pe

s(O

pera

ted &

Main

tain

ed b

y T

ham

es W

ate

r)

No

tes:

1)

All

levels

associa

ted w

ith the p

lans a

re to O

rdnance D

atu

m N

ew

lyn.

2)

All

measure

ments

on the p

lans a

re m

etr

ic.

3)

Arr

ow

s(o

ngra

vity

fed

sew

ers

)or

flecks

(on

risin

gm

ain

s)

indic

ate

direction

of

flow

.

4)

Mostprivate

pip

es

are

notshow

non

our

pla

ns,as

inth

epast,

this

info

rmation

has

not been r

ecord

ed.

5)

‘na’ or

‘0’ on a

manhole

level in

dic

ate

s that data

is u

navaila

ble

.

Tru

nk F

oul

Tru

nk C

om

bin

ed

Bio

-solid

s (

Slu

dge)

Pro

posed

Tham

es

Wate

r

Foul S

ew

er

Foul R

isin

g M

ain

Com

bin

ed R

isin

g M

ain

Pro

posed

Tham

es

Wate

r

Ris

ing M

ain

Se

we

r F

itti

ng

s

Afe

atu

rein

asew

er

thatdoes

notaffectth

eflow

inth

epip

e.E

xam

ple

:a

vent

is a

fitting a

s the function o

f a v

ent is

to r

ele

ase e

xcess g

as.

Op

era

tio

na

l C

on

tro

lsA

featu

rein

asew

er

that

changes

or

div

ert

sth

eflow

inth

esew

er.

Exam

ple

:

A h

ydro

bra

ke lim

its the flo

w p

assin

g d

ow

nstr

eam

.

Air V

alv

e

Dam

Chase

Fitting

Mete

r

Vent C

olu

mn

Contr

ol V

alv

e

Dro

p P

ipe

Ancill

ary

Weir

En

d I

tem

s

End

sym

bols

appear

at

the

sta

rtor

end

of

asew

er

pip

e.

Exam

ple

s:

an

Undefined

End

at

the

sta

rtof

asew

er

indic

ate

sth

at

Tham

es

Wate

rhas

no

know

ledge

of

the

positio

nof

the

sew

er

upstr

eam

of

that

sym

bol,

Outfall

on

a

surf

ace w

ate

r sew

er

indic

ate

s that th

e p

ipe d

ischarg

es into

a s

tream

or

river.

Outfall

Undefined E

nd

Inle

t

Oth

er

Sy

mb

ols

Sym

bols

used o

n m

aps w

hic

h d

o n

ot fa

ll under

oth

er

genera

l cate

gories

Sum

mit

Public

/Private

Pum

pin

g S

tation

/

Invert

Level

Change o

f chara

cte

ristic indic

ato

r (C

.O.C

.I.)

Oth

er

Se

we

r T

yp

es

(Not O

pera

ted o

r M

ain

tain

ed b

y T

ham

es W

ate

r)

Are

as

Lin

es d

enoting a

reas o

f underg

round s

urv

eys, etc

.

Agre

em

ent

Cham

ber

Opera

tional S

ite

Conduit B

ridge

Foul S

ew

er

Com

bin

ed S

ew

er

Culv

ert

ed W

ate

rcours

e

Surf

ace W

ate

r S

ew

er

Gulle

y

Pro

posed

Abandoned S

ew

er

Tunnel

6)

The

text

appearing

alo

ngsid

ea

sew

er

line

indic

ate

sth

ein

tern

al

dia

mete

rof

the

pip

ein

mili

metr

es.

Text

next

toa

manhole

indic

ate

sth

em

anhole

refe

rence

num

ber

and

should

not

be

taken

as

am

easure

ment.

Ifyou

are

unsure

about

any

text

or

sym

bolo

gy

pre

sent

on

the

pla

n,

ple

ase

conta

ct

a

mem

ber

of P

ropert

y Insig

ht on 0

118 9

25 1

504.

PP

M

W

Page 24: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Scale:

Width: 1328m

The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any

kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified before any works are undertaken. Crown copyright Reserved

Based on the Ordnance Survey Map with thesanction of the Controller of H.M StationaryOffice License Number 10019345

CDWS/CDWS Standard/2011_1940117

0 60 120 180 24030Meters

DRUBINID

SP6906SE

28/01/2011

469624,206198

Printed By:

Print Date:

Map Centre:

Grid Reference:

Comments:1:4753

Page 25: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Pag

e 1

4 o

f 24

Wa

terw

ork

s K

ey -

Co

mm

erc

ial D

rain

ag

e a

nd

Wa

ter

En

qu

iry

PIP

E D

IAM

ET

ER

DE

PT

H B

EL

OW

GR

OU

ND

Up to 3

00m

m (

12”)

900m

m (

3’)

300m

m -

600m

m (

12”

- 24”)

1100m

m (

3’ 8”)

600m

m a

nd b

igger

(24”

plu

s)

1200m

m (

4’)

Dis

trib

uti

on

Ma

in:T

he

mo

stco

mm

on

pip

esh

ow

no

nw

ate

rm

ap

s.

With

few

exce

ptio

ns,

do

me

stic

co

nn

ectio

ns

are

on

lym

ad

eto

dis

trib

utio

n m

ain

s.

Tru

nk

Ma

in:

Am

ain

ca

rryin

gw

ate

rfr

om

aso

urc

eo

fsu

pp

lyto

atr

ea

tme

ntp

lan

torre

se

rvo

ir,o

rfr

om

on

etr

ea

tme

ntp

lan

torre

se

rvo

irto

an

oth

er.A

lso

am

ain

tra

nsfe

rrin

gw

ate

rin

bu

lkto

sm

alle

rw

ate

rm

ain

s u

se

d fo

r su

pp

lyin

g in

div

idu

al cu

sto

me

rs.

Su

pp

lyM

ain

:A

su

pp

lym

ain

ind

ica

tes

tha

tth

ew

ate

rm

ain

isu

se

da

s a

su

pp

ly fo

r a

sin

gle

pro

pe

rty o

r g

rou

p o

f p

rop

ert

ies.

Fir

eM

ain

:W

he

rea

pip

eis

use

da

sa

fire

su

pp

ly,th

ew

ord

FIR

Ew

illb

e d

isp

laye

d a

lon

g th

e p

ipe

.

Me

tere

dP

ipe

:A

me

tere

dm

ain

ind

ica

tes

tha

tth

ep

ipe

inq

ue

stio

nsu

pp

lies

wa

terfo

ra

sin

gle

pro

pe

rty

or

gro

up

ofp

rop

ert

ies

an

dth

at

qu

an

tity

ofw

ate

rp

assin

gth

rou

gh

the

pip

eis

me

tere

de

ve

nth

ou

gh

the

re m

ay b

e n

o m

ete

r sym

bo

l sh

ow

n.

Tra

ns

mis

sio

nTu

nn

el:

Ave

ryla

rge

dia

me

ter

wa

ter

pip

e.

Mo

st

tun

ne

lsa

reb

uri

ed

ve

ryd

ee

pu

nd

erg

rou

nd

.T

he

se

pip

es

are

no

te

xp

ecte

dto

affe

ctth

estr

uctu

rali

nte

gri

tyo

fb

uild

ing

ssh

ow

no

nth

em

ap

pro

vid

ed

.

Pro

po

se

dM

ain

:A

ma

inth

atis

still

inth

ep

lan

nin

gsta

ge

so

rin

the

pro

ce

ss

of

be

ing

laid

.M

ore

de

tails

of

the

pro

po

se

dm

ain

an

dits

refe

ren

ce

nu

mb

er

are

ge

ne

rally

in

clu

de

d n

ea

r th

e m

ain

.

Wa

ter

Pip

es

(Op

era

ted

& M

ain

tain

ed

by T

ha

me

s W

ate

r)

Hy

dra

nts

Sin

gle

Hyd

ran

t

Me

ters

Me

ter

Va

lve

s

Ge

ne

ral P

urp

oseV

alv

e

Air

Va

lve

En

d I

tem

s

Sym

bo

l in

dic

atin

g w

ha

t h

ap

pe

ns a

t th

e e

nd

of $

a w

ate

r m

ain

.

Bla

nk F

lan

ge

Ca

pp

ed

En

d

Un

de

fin

ed

En

d

Ma

nifo

ld

Cu

sto

me

r S

up

ply

Fir

e S

up

ply

Em

pty

ing

Pit

Op

era

tio

na

l S

ite

s

Bo

oste

r S

tatio

n

Oth

er

Oth

er

(Pro

po

se

d)

Pu

mp

ing

Sta

tio

n

Se

rvic

e R

ese

rvo

ir

Sh

aft In

sp

ectio

n

Tre

atm

en

tWo

rks

Un

kn

ow

n

Oth

er

Sy

mb

ols

Oth

er

Wa

ter

Pip

es

(No

t O

pe

rate

d o

r M

ain

tain

ed

by T

ha

me

s W

ate

r)

Da

ta L

og

ge

r

Oth

er

Wate

rC

om

pan

yM

ain

:O

ccasio

nally

oth

er

wate

rcom

pany

wate

rpip

es

may

overl

ap

the

bord

er

of

our

cle

an

wate

rcovera

ge

are

a.

These

main

sare

denote

din

purp

leand

inm

ost

cases

have

the o

wner

of th

e p

ipe d

ispla

yed a

long them

.

Pri

vate

Main

:In

dia

tes

thatth

ew

ate

rm

ain

inquestion

isnotow

ned

by

Tham

es

Wate

r.T

hese

main

snorm

ally

have

textassocia

ted

with

them

indic

ating the d

iam

ete

r and o

wner

of th

e p

ipe.

3”

SU

PP

LY

3”

FIR

E

3”

ME

TE

RE

D

L

C F

4”

16”

Wa

terTo

we

r

?

Pre

ssu

re C

on

tro

lVa

lve

Cu

sto

me

rVa

lve

Page 26: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 Issue 2: 7 March 2011

Appendix F

EDF Electricity

Page 27: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire
Page 28: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire
Page 29: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire
Page 30: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 Issue 2: 7 March 2011

Appendix G

British Telecom

Page 31: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire
Page 32: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Ref: TR8100196/JR/DW/035 Issue 2: 7 March 2011

Appendix H

Proposed Foul Water Drainage Strategy

Page 33: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire
Page 34: FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential ... Drainage Utilities.pdf · FOUL DRAINAGE & UTILITIES ASSESSMENT Proposed Residential Development Site F, Thame, Oxfordshire

Cornerstone House, 62 Foxhall Road, Didcot, Oxon OX11 7AD Tel: (01235) 515550 Fax: (01235) 817799 [email protected] www.glanvillegroup.com

− Civil and Structural Engineers − Building Surveyors − Highway and Traffic Engineers − Transport Planners − Land Surveyors − Building Investigation Experts − CDM Co-ordinators