Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
Forward looking statements – Caution advised
• Certain statements in this presentation are forward-looking and are made in reliance on the safe harbour provisions of the US Private Securities litigation Reform Act of 1995. These statements include, without limitation, those concerning: BT's plans for transformation of its networks; benefits to customers of the 21CN programme; key milestones and expected timetable for delivery of 21CN; and the benefits in relation to, for example interconnect, convergence and broadband.
• Although BT believes that the expectations reflected in these forward-looking statements are reasonable, it can give no assurance that these expectations will prove to have been correct. Because these statements involve risks and uncertainties, actual outcomes may differ materially from those expressed or implied by these forward-looking statements.
• Factors that could cause differences between actual outcomes and those implied by the forward-looking statements include, but are not limited to: material adverse changes in economic and financial markets conditions in the markets served by BT; supplier arrangements; future regulatory actions and conditions in BT’s operating areas; technological innovations; developments in the convergence of technologies and the anticipated benefits and advantages of new technologies, products and services, including broadband, not being realised.
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
CONTENT
•Update on TSR obligations for IPstream
•Plan for existing IPstream migrating to 21CN
•Update on 21CN trajectory for IPstream
•Report on Requirements capture
•Downstream BB products on 21CN
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
TSR Impacts - 1
BTW
IPSTREAM – Current Position
CPsSPs
Transaction boundary
Current Network Platform
IPSTREAM
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
TSR Impacts - 2
BTS (IPSTREAM)
OPENREACH
CPsSPs
Twotransaction boundaries
Current Network Platform
Interaction with Openreach
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
TSR Impacts - 3
BTS (IPSTREAM)
IPSTREAM supply during 21CN roll-outEnd to End service is the same in both cases
OPENREACH
CPsSPs
BTS(IPSTREAM)
OPENREACH
CPsSPs
BTWS(FAS)
Non 21CN Areascurrent network(two transactionboundaries)
21CN AreasNew Network(three transactionboundaries)
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
IPSTREAM WITH NEW INTERNAL TRANSACTION BOUNDARIES
LLU Flexible Access Services (~ 21CN Datastream)
IPstream
‘management’ layer
End to End offeringWith IP Applications,etc.
End to End offeringbasic connectivity
Metro node ‘core’ BRAS etcLocal Loop MSAN
All internal transaction boundaries will remain invisible to customers
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
Current BT Position
Note
Service Structure Will not change The baseline position is the list of services available now and the list of planned enhancements in the February 2005 Broadband and LLU Roadmap
Physical Interfaces
Will not change SP will see no change
Customer Ordering Systems
Customer Billing Systems
Customer Repair Systems
21CN network upgrade will not change customer facing systems
Some underlying BT systems will change as part of 21CN network migration but SPs will see no change.
Work is ongoing to upgrade the systems to drive improved customer satisfaction. This is BAU activity which will be managed as normal.
Note that the solutions to deliver TSR undertakings will impact customer experience. Further work being done to assess impacts.
IPSTREAM MIGRATION TO 21CN
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
Current BT Position
Note
Service Performance
Expect to remain unchanged (please see note below on potential TSR impacts)
This can only be confirmed when new network platform is used to carry the service and end to end tests have been performed - expected early 2006.
IPstream services will be re-purposed for delivery on a new 21CN Ethernet platform. All BT Centrals will be delivered on the legacy network, to be replaced by new products that are delivered on 21CN and are TSR compliant. Requirements for New Centrals will be captured as part of ongoing 21CN requirements capture process.
Mass migrations to 21CN
No detailed information available mass migration at this time
Recognition that this information is required by customers
Pricing, Commercials and Documentation
Expect to remain unchanged.
Inputs taken to provide IPstream in order to be TSR compliant may mean that aspects of the IPstream Service and its documentation may need to change.
IPSTREAM ON 21CN
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
MIGRATION OF IPSTREAM ON TO 21CNConfirmation of IPstream product migration plan 31/01/2005
Communication to Industry on Product migrations 31/03/2005
21CN Vendor Selection 29/04/2005
Update product trajectory (Cannot be completed pending rework of Network Design rework due to TSR) 15/09/2005
Confirm High Level design, using FAS as an input 31/10/2005
Details of 21CN roll-out plan and mass migration plan 30/12/2005
SIN / SPIN update (if required) 28/04/2006
Update product trajectory 01/05/2006
Feedback on end to end testing 30/06/2006
Feedback on the Alpha trial of IPS on new 21CN platform 30/06/2006
Customer trial of IPS on new platform Summer 06
Pathfinder - Start of mass migrations 2nd half 06
(Including but not limited to changes to FAS timescales) .
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
Potential Vision of IPstream “NEW”
Central
Local caching for content with multi castMSAN or BRAS?
Internet
ISP
256k-20MbHigh bandwidth to MSAN up to 1Gb+
ISP
VoIP
As an option ISP controls on a per end user basis: Traffic profiling – http, P2P,news Packet prioritisation (use of DPI), time of day. Assured rate QoSSpeed controls, session steering.Weightings/contentionSets up multicast and controls Content delivery
ISP provides content -Segregated per ISP service
ISP provision all orders, repair,testing on one system.Enabled end user self service ordering and profiling via internet.Customer reports, MIS, Billing in real time.
Multiple sessions per end user accessUp to 20?
Range of centrals up to 10GbWith optional resilience
Copper resilience options
Central resilience options
Content cache
Will include SP empowered
configurability
IN “REQUIREMENTS CAPTURE” PHASE
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
Enhanced IPstream
•This is an evolution of IPstream that will only be available in 21CN areas
•Enhanced IPstream will consume the same FAS module as that consumed by “regular” IPStream on 21CN
•Enhanced IPstream will offer as a minimum the same functionality that is intended to be available on regular IPstream (including DSL Max, QoS, EUSC etc)
•Enhanced IPstream may incorporate a new generation of “IPCentral” products to connect to customers and content, as an evolution of the existing “IPstream Centrals” family.
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
ENHANCED IPSTREAM
ENHANCED IPSTREAM
BTSEnhanced IPstream
OPENREACH
CPsSPs
BTWSFAS21CN Areas
(three transactionboundaries)
New IPstream is the proposed evolution of existing IPstream.
Once again the CP/SPs will buy an end to end service andwill not see the internal transaction boundaries
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
POTENTIAL LAUNCH PLAN FOR NEW IP BROADBAND on 21CN
Requirements capture 31/10/2005
High level product design 30/11/2005
Product Description published 30/11/2005
Detailed Product description published 31/03/2006
Pricing and Ts and Cs 31/06/2006
Handbook, SINs, SPINs, CRF published 31/06/2007
Alpha trial complete 30/08/2006
Customer trial (on 21CN) Autumn 06
Launch (in 21CN areas) 2nd half of 06
(Including but not limited to changes to FAS timescales) .
Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject to
changeConsult21
IPstream within 21CN – Requirements Capture
•Announce intent to capture requirements to BB/LLU Working Group 29/9/05
•Set up BB/LLU Working Group IPstream Sub-Group 29/9/05
•Elect Industry Chairman 29/9/05
•Bilaterals (1:1 meetings with ISPs and CPs) w/c 3/10/05
•First Sub –Group Meeting, F2F or audio w/c 10/10/05
•First draft of Industry Requirements circulated to all end of w/c 10/10/05
•Bilaterals (1:1 meetings with ISPs and CPs) w/c 10/10/05
•Second Sub-Group Meeting, F2F or audio w/c 17/10/05
•Second draft of Industry Requirements circulated to all end of w/c 17/10/05
•Bilaterals (1:1 meetings with ISPs and CPs) w/c 17/10/05
•Report back on Final Set of Requirements to BB/LLU WG 28/10/05
•BB/LLU Working Group agrees Requirements 28/10/05
•Regular Report back to Industry on Product development versus
set of Requirements Ongoing