  • GROUP4-10-R-J041

    Jacksonville District Fort Pierce Shore Protection Project, Beach Renourishment 2018 St. Lucie County, Florida Construction Solicitation and Specifications

    28 SEPTEMBER 2017

  • Fort Pierce Shore Protection Project GROUP4-10-R-J041 Beach Renourishment 2018 DESIGN AUTHENTICATION This project was designed by the Jacksonville District, U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152. ___________________________________________ JEFF E. BERGEN, P.E. CHIEF, WATERWAYS SECTION, DESIGN BRANCH ENGINEERING DIVISION ___________________________________________ DENNIS J. ZEVENEY, P.E. CHIEF, GEOTECHNICAL BRANCH ENGINEERING DIVISION ____________________________________________ DAVID DUDLEY, P.E. CHIEF, DESIGN BRANCH ENGINEERING DIVISION ____________________________________________ LAUREEN A. BOROCHANER, P.E. CHIEF, ENGINEERING DIVISION

  • GROUP4-10-R-J041 SF 1442-A1

    ADDENDUM TO THE STANDARD FORM 1442

    Fort Pierce Shore Protection Project, Beach Renourishment 2018,

    St. Lucie County, Florida SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc. (W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005); Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008); Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13- D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012); Southern Dredging Co., Inc. (W912EP-13-D-0013); Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC (W912EP-13-D-0015) PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE Group 4 Dredging MATOC Pool. TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:

    (1) Availability of technically acceptable dredge(s).

    (2) Past performance, to include the MATOC (The government reserves the right to obtain copies of all Contractor Performance Assessment Reporting System (CPARS) records contained in the US Army Corps of Engineers CPARS database for the Prime Contractor (Offeror) and all Major Sub-Contractors).

    SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

    (1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.

    (2) Completed Bid Schedule (see Section 00010A)

    (3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC

    (4) Completed “Addendum to the Standard Form 1442 with the latest revision”.

    (5) Revisions – Offers must acknowledge receipt of this Revision by completing “Notice to Offerors--Blocks 14, 15 and 20” of each revision.

    THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER: Block 9 -- For additional information contact: Claurice M. Dingle 904-232-1387 [email protected] Block 10 -- Magnitude of Construction is between $5,000,000.00 and $10,000,000.00.

  • GROUP4-10-R-J041 SF 1442-A2

    Block 11 -- The Contractor shall begin performance within 45 calendar days and complete it within 110 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance. Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order. Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than 14 Nov 2017 at 2:00 P.M. Local Time. USA Engineer District, Jacksonville Contracting Division 701 San Marco Blvd

    Jacksonville, Florida 32207-8175 NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below: Block 14 -- Name and Address of Offeror (including Zip Code): ________________________________________________ ________________________________________________ ________________________________________________ DUNS: ___________________ CAGE: _______________ Block 15 -- Telephone No. (include area code): _____________________ Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print): Type/Print ________________________________________________ Signature: ________________________________________________

    e-Mail: ________________________________________________

    Offer Date: _______________________________________________

    Block 26 -- This Task Order will be administered by:

    South Florida Area Office 4400 PGA Blvd Suite 203

    Palm Beach, FL 33410 Block 27 -- Payment will be made by:

    USACE Finance Center 5722 Integrity Drive ATTN: CEFC-AO-P Millington, TN 38054-5005

  • SECTION 00010A LINE ITEMS AND PRICING SCHEDULE

    FORT PIERCE SHORE PROTECTION PROJECT BEACH RENOURISHMENT 2018 ST. LUCIE COUNTY, FLORIDA

    GROUP4-10-R-J041 00010A-1

    LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

    BASE (R-34 TO R-38)

    0001 MOBILIZATION AND DEMOBILIZATION JOB $______________

    0002 BEACH FILL (ESTIMATED QUANTITY, SEE NOTE 2) 385,000 CUBIC YARD $______________ $______________

    0003 SCREENING (ESTIMATED QUANTITY, SEE NOTE 2 ) 385,000 CUBIC YARD $______________ $______________

    0004 BEACH TILLING (ESTIMATED QUANTITY, SEE NOTE 2) 12 ACRE $______________ $______________

    0005 REMEDIATION OF NONCOMPLIANT MATERIAL 0.8 ACRE $______________ $______________ (ESTIMATED QUANTITY, SEE NOTES 2 AND 3)

    0006 TRANSPORTATION AND DISPOSAL OF 6 CUBIC YARD $_____________ $______________ UNACCEPTABLE MATERIAL (ESTIMATED QUANTITY, SEE NOTES 2 AND 3)

    0007 CONSTRUCTION/VIBRATION CONTROLS & MONITORING JOB $______________

    0008 ENVIRONMENTAL SPECIES MONITORING JOB $______________

    0009 TURBIDITY MONITORING JOB $______________

    0010 MOBILIZATION AND DEMOBILIZATION, FOR JOB $______________ NON-CAPTURE SEA TURTLE TRAWL SWEEPING (HOPPER DREDGE ONLY)

    0011 SEA TURTLE NON-CAPTURE TRAWL SWEEPING 3 DAY $______________ $______________ (HOPPER DREDGE ONLY) (SEE NOTES 3 AND 5)

    0012 STANDBY TIME (SEE NOTES 3 AND 4) 24 HOUR $______________ $______________

    TOTAL BASE (LINE ITEMS 0001 THROUGH 0012) $______________

    OPTION A (R-38 TO R-39A)

    0013 BEACH FILL (ESTIMATED QUANTITY, SEE NOTE 2) 100,000 CUBIC YARD $______________ $______________

    0014 SCREENING (ESTIMATED QUANTITY, SEE NOTE 2 ) 100,000 CUBIC YARD $______________ $______________

    0015 BEACH TILLING (ESTIMATED QUANTITY, SEE NOTE 2) 4 ACRE $______________ $______________

    0016 REMEDIATION OF NONCOMPLIANT MATERIAL 0.1 ACRE $______________ $______________ (ESTIMATED QUANTITY, SEE NOTES 2 AND 3)

    0017 TRANSPORTATION AND DISPOSAL OF 2 CUBIC YARD $_____________ $______________ UNACCEPTABLE MATERIAL (ESTIMATED QUANTITY, SEE NOTES 2 AND 3)

    0018 CONSTRUCTION/VIBRATION CONTROLS & MONITORING JOB $______________

    0019 ENVIRONMENTAL SPECIES MONITORING JOB $______________

    0020 TURBIDITY MONITORING JOB $______________

    TOTAL OPTION A (LINE ITEMS 0013 THROUGH 0020) $______________

    TOTAL BASE PLUS OPTION A (LINE ITEMS 0001 THROUGH 0020) $______________

  • SECTION 00010A LINE ITEMS AND PRICING SCHEDULE

    FORT PIERCE SHORE PROTECTION PROJECT BEACH RENOURISHMENT 2018 ST. LUCIE COUNTY, FLORIDA

    GROUP4-10-R-J041 00010A-2

    LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

    OPTION B (R-39A TO R-41)

    0021 BEACH FILL (ESTIMATED QUANTITY, SEE NOTE 2) 75,000 CUBIC YARD $______________ $______________

    0022 SCREENING (ESTIMATED QUANTITY, SEE NOTE 2 ) 75,000 CUBIC YARD $______________ $______________

    0023 BEACH TILLING (ESTIMATED QUANTITY, SEE NOTE 2) 4 ACRE $______________ $______________

    0024 REMEDIATION OF NONCOMPLIANT MATERIAL 0.1 ACRE $______________ $______________ (ESTIMATED QUANTITY, SEE NOTES 2 AND 3)

    0025 TRANSPORTATION AND DISPOSAL OF 2 CUBIC YARD $_____________ $______________ UNACCEPTABLE MATERIAL (ESTIMATED QUANTITY, SEE NOTES 2 AND 3)

    0026 CONSTRUCTION/VIBRATION CONTROLS & MONITORING JOB $______________

    0027 ENVIRONMENTAL SPECIES MONITORING JOB $______________

    0028 TURBIDITY MONITORING JOB $______________

    TOTAL OPTION B (LINE ITEMS 0021 THROUGH 0028) $______________

    TOTAL BID (LINE ITEMS 0001 THROUGH 0028) $______________

    NOTES: (1) OFFERORS MUST BID ON ALL LINE ITEMS.

    (2) ACTUAL QUANTITIES MAY VARY.

    (3) THIS LINE ITEM IS NOT SUBJECT TO VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR ACTUAL EXECUTION OF THIS LINE ITEM AS APPROVED BY THE CONT