FORMWORK FAILURES TENGKU ROHANI BINTI ENGKU MUDA REEZMA HAZEERA BINTI ROHIMI NURBAIDURI BINTI ABDUL HAKIM SITI SAYIDATUL DURRAH BINTI KHAZALLE MOHD NORHAFIZI BIN TUGIMIN

Transcript of Formwork Failures

Page 1: Formwork Failures

FORMWORK FAILURESTENGKU ROHANI BINTI ENGKU MUDAREEZMA HAZEERA BINTI ROHIMINURBAIDURI BINTI ABDUL HAKIMSITI SAYIDATUL DURRAH BINTI KHAZALLEMOHD NORHAFIZI BIN TUGIMIN

Page 2: Formwork Failures

INTRODUCTION

Formwork important things in completion a project impact to the cost, time, and quality of

project Formwork failures

big impact to the people involved in a project

Not occur-follow the form of design

Page 3: Formwork Failures

TYPES OF FAILURES

Dimensional inaccuracy Lifting of single faced forms Propping inadequate Loss of material Surface blemishes

Page 4: Formwork Failures

DIMENSIONAL INACCURACY

Page 5: Formwork Failures

CAUSES

Miscommunication Error in calculation Lack of supervision Unskilled worker Material did not have proper protection

Page 6: Formwork Failures

SOLUTION

The engineer should done site investigation and measure the right dimension to be used especially when steel formwork been used and need to be order from factory

Page 7: Formwork Failures

Use new technology-laser

Page 8: Formwork Failures

Each parties play their duties Supervisor supervise worker.

Page 9: Formwork Failures

Gave proper protection to material

Page 10: Formwork Failures

LOSS OF MATERIAL

Page 11: Formwork Failures

LOSS OF MATERIAL

Refer to ties and props - are not correctly spaced Formwork tying

connect the two faces of the double faced forms together and affect the balance of the force between them

Formwork props Support formwork

Page 12: Formwork Failures

CAUSES OF FAILURES

Inappropriate chose the type of ties Ties are not be installed or screw tightly Over tightening the ties The space between each props are not

correctly/sequence

Page 13: Formwork Failures

PREVENTIONS Choose the right ties Check the accuracy on formwork installation

during the ties installation Space between the installed props to avoid

any loss material from the concrete. The engineer of the record make sure

contractor has all the design data such as live loads, superimposed dead loads, any other information which related to the

project