2

Agenda

1. Risk Management Goals

2. 2011 Annual Monitoring Reports

3. Landfill Environmental Management Plan

4. Work Plan for 2012 - 2015

Page 3: Former Landfill Environmental Management Plan Update May 8, 2012.

3

Former Landfill

Page 4: Former Landfill Environmental Management Plan Update May 8, 2012.

4

Risk Management Strategy Goals

1. Maximize Containment of Leachate

2. Minimize Leachate Generation

3. Monitor Contaminants of Concern

Page 5: Former Landfill Environmental Management Plan Update May 8, 2012.

5

Risk Management Strategy Goal

1. Maximize Containment of Leachate

Page 6: Former Landfill Environmental Management Plan Update May 8, 2012.

6

Maximize Containment – 2011 Actions

Continue the seep water quality monitoring program at 3 recurring seeps, as part of EBA’s biannual groundwater monitoring program

Investigated unknown structure adjacent to south berm near soccer fields

Page 7: Former Landfill Environmental Management Plan Update May 8, 2012.

7

Unknown Structure

Page 8: Former Landfill Environmental Management Plan Update May 8, 2012.

8

Recommendations for 2012

Continue the seep water quality monitoring program at 3 recurring seeps, as part of EBA’s biannual groundwater monitoring program.

Ensure any construction on site does not compromise the containment berms or the constructed cap

Page 9: Former Landfill Environmental Management Plan Update May 8, 2012.

9

Risk Management Goal

2. Minimize Leachate Generation

Page 10: Former Landfill Environmental Management Plan Update May 8, 2012.

10

Riel Park Master Plan

• Former landfill capping and grading requirements

• Recreation Improvements

Page 11: Former Landfill Environmental Management Plan Update May 8, 2012.

11

Phases 3 and 4 Investigation • 13 test pits investigations

were used to evaluate existing surface cover materials at the Soccer and Rugby fields

• Test pit logs from the Soccer fields showed 0.3 – 0.65 m of topsoil followed by 0.3 – 1.4 m of silty clay material

• Test pit logs from the Rugby fields showed 0.1 – 0.2 m of topsoil followed by 1.1 – 1.3 m of silty clay

Page 12: Former Landfill Environmental Management Plan Update May 8, 2012.

12

Conclusions - 2011

Landfill cover construction (including subsoil and topsoil placement) and surface water management plan is 65% complete for the Site (19 ha of the 29 ha)

Completed the preliminary design to cap and redevelop the remaining areas of the Site (Soccer and Rugby Fields), to begin in fall of 2012

Page 13: Former Landfill Environmental Management Plan Update May 8, 2012.

13

Recommendations for 2012

Complete final design for remaining portions of the Site.

Continue with methane monitoring program during any future subsurface investigations.

Page 14: Former Landfill Environmental Management Plan Update May 8, 2012.

14

Risk Management Strategy Goal

3. Monitor Contaminants of Concern

Page 15: Former Landfill Environmental Management Plan Update May 8, 2012.

15

Groundwater Monitoring - EBA

Initiated in 1993; annual program started in 2000

Comprehensive semi-annual program since 2004

Monitor groundwater levels and chemistry

18 wells sampled in 2009 (2 duplicates each event)

6 well pairs on either side of west berm

Two background wells (one fairly shallow)

Page 16: Former Landfill Environmental Management Plan Update May 8, 2012.

16

Groundwater Well Locations

Page 17: Former Landfill Environmental Management Plan Update May 8, 2012.

17

Groundwater Monitoring

• Similar results to previous years

• Groundwater elevations (0.2 -1.2 m elevation difference across berm) were similar to 2009. Fall data same or slightly higher.

• Fe, Mn, Na, Cl, SO4, TDS, and periodic metals (Cu, Ni, Se, occasionally Zn) elevated in groundwater in landfill and adjacent to berm

Page 18: Former Landfill Environmental Management Plan Update May 8, 2012.

18

Groundwater Monitoring

• No impacts at deep well MW-8 (45m) Chloride <2 mg/L

• Background wells had elevated Cu, Se, TDS, SO4 and Zn

• 5 wells decommissioned in winter 2010 (1 deep, 3 old background wells, MW-5 near river – artesian)

Page 19: Former Landfill Environmental Management Plan Update May 8, 2012.

19

Seep Quality Monitoring - EBA

• Initiated in 2004 at three former culvert locations

• 8 prominent seeps from both sides of the Sturgeon River were sampled twice during 2006, 2007 and 2008

• Program reduced to 3 seeps in 2009-10 (three former culvert locations and one background seep on the opposite bank)

Page 20: Former Landfill Environmental Management Plan Update May 8, 2012.

20

Seep Sampling Locations

Page 21: Former Landfill Environmental Management Plan Update May 8, 2012.

21

Seep Quality Monitoring

• Data for spring and fall (wet summer)

• Mn, Phenol, TDS, SO4 elevated on both sides of the river

• Fe and Cl higher on landfill side (Chloride100-200 vs. 55-60 mg/L)

Page 22: Former Landfill Environmental Management Plan Update May 8, 2012.

22

Conclusions - 2011

Sufficient groundwater and seep data exists to continue with present monitoring program. (Could consider one event/year once site completely capped)

Focus on contaminants of concern: metals, sulphate and chloride. This is covered by analyzing for routine parameters and ICP metals

Page 23: Former Landfill Environmental Management Plan Update May 8, 2012.

23

Recommendations - 2012

Sampling for VOCs, PAHs, PCBs, BTEX and F1 and F2 fractions at two wells only. No detections in 2009 and 2010 and therefore could discontinue or do once per year.

Continue with 6 well pairs along berm and 3 seep locations.

Page 24: Former Landfill Environmental Management Plan Update May 8, 2012.

24

Landfill Management Plan

Review each risk management goal and its recommended actions for 2012

Review the proposed work plan for 2012 – 2014

Page 25: Former Landfill Environmental Management Plan Update May 8, 2012.

25

Landfill Management Plan

Page 26: Former Landfill Environmental Management Plan Update May 8, 2012.

26

Landfill Management Plan

Questions?