Integrated Watershed Management Programme Format for State Perspective and Strategic Plan (SPSP) Department of Land Resources, Ministry of Rural Development, Government of India

Transcript of Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for...

Page 1: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

Integrated Watershed Management Programme

Format for State Perspective and

Strategic Plan (SPSP)

Department of Land Resources, Ministry of Rural Development,

Government of India

Page 2: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

State Perspective and Strategic Plan for IWMP, DoLR

1. Introduction: An overview of State.

2. Demography & Land Distribution

3. Land Use Pattern.

4. Trends in Agriculture & Food productivity.

5. Implementation of Watershed Programmes in the state at present.

6. Strategy for implementation of IWMP.

7. Livelihood Concerns.

8. Institutional Arrangement.

9. Capacity Building.

10. Monitoring and Evaluation.

11. Expected Outcomes.

Page 3: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

Format for State Perspective and Strategic Plan for IWMP – DoLR

Chapter I

1.0 Introduction

Briefly describe physical features along with physical-cum-political map of the State

1.1 Briefly describe drainage systems along with state map indicating major rivers

1.2 Brief description of all river basins

1.3 Demarcation of micro-watersheds along with code nos. on a map.

1.4 Overview of the State

Table SPSP 1: State Profile*

1 2 3 4 5 6 7

Sl. No

Name of District

No. of Blocks

Total no. of

villages

Total no. of Gram Panch-ayats

Geogr-aphical area in Ha.

Population (As per the 2001 Census)

Male Female Total % of BPL to total popul-ation

SC ST Others SC ST Others SC ST Others

*from column no.2, total no. of districts; from columns 3, total no of blocks, from columns 4, total no of villages, from

columns 5, total no of Gram Panchayats, from column no.6 to 7 the totals for the entire State may be given at the end of

the table.

Please mention source of above data:

Page 4: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

2

IWMP-SPSP-DoLR

1.5. Economic Development

a. Brief description about the economic growth of the State, Growth of net state domestic product, per capita

income and comparison to national GDP and per capita income growth rate, sectoral contribution to state

domestic product, changes in occupational structure, data for last five years, strategies for future economic

growth of the State, any other important information about the State

b. Role of watershed management in the State – Importance of watershed programme for the State, historical

background of watershed development in the State, current status, expected outcomes, etc.

Chapter 2

2.0 Agro-climatic zones

Briefly describe the agro-climatic zones of the States including the soil types, rainfall, major crops, etc.

Table SPSP 2: Details of Agro-climatic zones in the State

1 2 3 4 5 6 7

S.No Name of the Agro-

climatic zone Area in Ha.

Names of the

districts

Major soil types Average rainfall in mm (preceding 5 years average)

Major crops

a)Type b) Area in Ha.

a)Name b)Area in

Ha.

*From column no.3, Zone-wise total area, from column no.4, No. of districts, from column no. 6, district-wise

average rainfall, from column no.5&7, category-wise area, for the entire State may be indicated at the end of the

Table.

Page 5: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

3

IWMP-SPSP-DoLR

2.1 Rainfall

a) Brief description about rainfall in the State, months during which rainfall is received in the State, distribution of

rainfall over the year with average rainfall per month, type of monsoon etc.

Table SPSP 3: Details of average rainfall and altitude recorded at the District headquarters

1 2 3

S.No. Name of the District Average rainfall in mm (preceding 5 years

average)

Source of data:

b) A brief description of droughts and floods in the State in the last ten years.

Page 6: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

4

IWMP-SPSP-DoLR

Table SPSP 4: Details of drought and flood affected districts, blocks and villages in the State during

last 10 years * (MIS Table-M(SP)6)

1 2 3 4 5 6 7

Sl.No Name of the

District Particulars

Names of the Block

Villages

Periodicity

Not affected Annual

Any other (pl.specify)

Flood No.of

villages

Name (s)

of villages

Drought No.of

villages

Name(s)

of villages

* From Column no. 2, total no. of Districts; from Column nos. 6 & 7, total no. of villages, category wise, for the entire

State may be given at the end of the table.

Page 7: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

5

IWMP-SPSP-DoLR

Chapter 3

3.0 Demography and land distribution – an overview

Growth in population during the last three census’ , per capita availability of land, sex ratio, population age

group in the State, literacy level, migration, workforce available in different sectors of the economy,

demography of SC,ST, BPL and landless families in the State in the last ten years, etc.

3.1 Land reform measures – types of tenancies, distribution of ceiling surplus land, bhoodan land and wastelands

among landless, prevention of alienation of tribal land, restoration of alienated land among tribals, women’s land rights,

empowerment of PRIs, definition and proper categorization of common property resources etc.

3.2 Operational land holdings in the State under different categories and income

a) Brief description about land holdings:

Page 8: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

6

IWMP-SPSP-DoLR

Table-SPSP 5: Details of District-wise land holding pattern in the State * (MIS Table-M(SP)9)

1 2 3 4 5 6

S.

No.

Names of

Districts Type of Farmer

No. of

households No. of BPL households

Land holding (ha)

Irrigated Rainfed Total

i) Large

ii) Small

iii) Marginal

iv) Landless

Sub-total

Total for

the Districts

Total for the State

*Data for the entire State regarding each item may be given in the same format at the end of the table

Page 9: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

7

IWMP-SPSP-DoLR

Table SPSP 6: Share of Agriculture Sector to State Income/National Income at Current Prices and Total

Work Force in the State and India

Source of data:

@NSDP: Net State Domestic Product

Table SPSP 7: Sectoral Composition of Net State Domestic Product (NSDP) in State.

Sector Years

1970-71 1980-81 1990-91 2000-01

Agriculture and allied Sectors

Industrial Sector

Service Sector

1 2 3

Year

Percentage share of Agriculture in NSDP@ figure

Percentage share of Agriculture in Total Workforce

State All India State All India

1980-81

1990-91

2000-01

Page 10: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

8

IWMP-SPSP-DoLR

Chapter 4

4.0 Land Use Pattern

4.1 Brief description about land use planning and agriculture land in the state:

4.2 Mechanism in the State for land use conversion, establishment of Land Use Board in the State, conversion of

agricultural land to other uses in the last five years, brief description of other uses to which agricultural land has been

converted, extent to which area under wastelands has been reclaimed and the uses to which the reclaimed land has been

put, etc.

Table-SPSP 8: Land Use status in the State (average of preceding 5 years)*

(Area in 000 Ha.)

1 2 3 4 5 6 7 8 9 10 11 12 13

Districts Geographical Area

Forest Area

Land under Non-Agril use

Total rainfed area

Perm-anent pastu-res

Land under miscellan-eous tree crops and groves

Current

fallow

Other fallow

Net sown area

Net area sown

more than once

Net irrig-ated area

Gross crop-ped area

a)cultivated

b)cultivable waste

*Data for the entire State regarding each item may be given in the same format at the end of the table

Source of data:

Page 11: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

9

IWMP-SPSP-DoLR

4.3 Irrigated areas

a) Brief description about irrigated area in the State – major sources of irrigation – effect of climate change on

irrigation – increase or decrease in irrigated area in the last five years – effect on crop yields, productivity and

change in cropping pattern.

Table-SPSP 9: Irrigation Status (Area in 000 Ha.)*

1 2 3 4 5 6 7

Districts Gross# cultivated

area

Net cultivated

area

Gross@ irrigated area

Net irrigated area

Net irrigated %

Rainfed

Area % of net cultivated

area

Source of data:

*Data for the entire State regarding each item may be given in the same format at the end of the table

# This represents the total area sown once and/or more than once in a particular year, i.e. the area is counted as

many times as there are sowings in a year. This total area is known as gross cultivated area.

@It is the total area under crops, irrigated once and/or more than once in a year. It is counted as many times as

the number of times the areas are cropped and irrigated in a year.

Page 12: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

10

IWMP-SPSP-DoLR

Table-SPSP 10: Source-wise Area Irrigated (Area in 000Ha.)*

1 2 3 4 5 6 7 8

Districts Canal (Area)

Tanks Open wells Bore wells Lift

irrigation Others (Pl. specify)

Total

No Area No Area No Area No Area No Area No Area

Source of data:

*Data for the entire State regarding each item may be given in the same format at the end of the table

4.4. Common Property Resources (CPR):

Brief description about Common Property Resources in the State, laws regarding common property resources, access of

landless to the CPRs, management and maintenance of CPRs, brief description of CPRs which have become inoperable

due to non-maintenance, state assistance, if any, for development and maintenance of CPRs etc.

Page 13: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

11

IWMP-SPSP-DoLR

Table-SPSP 11: Details of Common Property Resources in the State *(MIS Table-M(SP)10)

1 2 3 4 5

S.

No.

Names of

Districts

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. (Specify deptt.)

PRI Any other

(Pl. Specify)

Pvt. persons

Govt. (specify deptt.)

PRI Any other

(Pl. Specify)

(i) Wasteland/ degraded land

(ii) Pastures

(iii) Orchards

(iv) Village Woodlot

(v) Forest

(vi) Village Ponds/ Tanks

(vii) Community Buildings

(viii) Weekly Markets

(ix) Permanent markets

(x) Temples/ Places of worship

(xi) Others (Pl. specify)

*Data for the entire State regarding each item may be given in the same format at the end of the table.

Page 14: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

12

IWMP-SPSP-DoLR

Chapter 5

5.0 Trends in agriculture and food productivity

Brief description about agriculture and food productivity, major crops by cropping seasons, total food-grain

production in the State, per capita availability of food-grains, comparison with national average, crops exported

from the State and crops imported in the State, share of agriculture sector in State income/national income at

current prices, total agriculture workforce in the State compared to national, changes in cropping patterns during

the last five years, etc.

Table-SPSP 12: Crops production and productivity as per Agricultural Statistics, 2008

(MIS Table-M(PO)C1, C2 & C3 pre-project status)

1. 2 3 4 5 6

Sl.

No. Names of the

Districts

Name of

crops

Kharif Rabi Zaid

Area

(ha)

Average Yield

(Qtl) per ha.

Total

Production

(Qtl)

Area

(ha)

Average

Yield per

ha (qtl)

Total

production

(qtl)

Area

(ha)

Average

Yield per

ha (qtl)

Total

production

(qtl)

Irri Rf. Irri Rf. Irri Rf. Irri Rf. Irri Rf. Irri Rf. Irri Rf. Irri Rf. Irri Rf.

Total for the District

Total for the State

* From column no. 2, total number of Districts; from column no.3, total no. of crops; from column no. 4 to 8, the

totals for the area, average yield per ha and total production, category-wise, season-wise for the entire state may be given at the end of the Table.

Irri. – Irrigated Rf. - Rainfed

Page 15: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

13

IWMP-SPSP-DoLR

Table-SPSP 13: A. comparative average yield of major crops of the State and India during Triennia

1972-73 to 1974 -75 and 1992-93 to 1994-95 (in Kg/Ha.)

1 2 3 4

Major Crop/crop group

Period I: 1972-73 to 1974-75 Period II: 1992-93 to 1994-95 Post 1994-95#

State India State India State India

# May be filled if data is available with the State Government

Source of data may be indicated for columns 2 and 3 and separately for column 4.

5.1 Give a brief description of types, area covered, production/productivity, marketing facilities and income per ha. from

cash crops grown in the State

Chapter 6

6.0 Implementation of watershed programmes in the State at present

a) Brief description about administrative structure for implementing watershed programmes in the State

b) Area covered under watershed programmes in the State

Page 16: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

14

IWMP-SPSP-DoLR

Table-SPSP 14: Status of District-wise area covered under the watershed programme (ha) * (MIS

Table-M(SP)2)

1 2 3 4 5

S. No.

Names of

Districts

Total micro-watersheds in the District

Micro-watersheds covered so far

Net watersheds to be covered

Dept. of Land Resources

Other Ministries/ Depts. Total

watersheds covered

Pre-IWMP projects (DPAP +DDP +IWDP)

Any other watershed project

No. Area (ha.)

No.

Area (ha.) No. Area (ha.) No. Area (ha.)

No. Area (ha.)

*from column no.2, total no. of districts; from columns 3 to 5 the totals for the entire State may be given at the end of

the table.

Page 17: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

15

IWMP-SPSP-DoLR

Table-SPSP 15: Details regarding the watershed projects sanctioned by DoLR in the State:

1 2 3 4

S.No. Item Total Pre-IWMP scheme details

DPAP DDP IWDP

1 Area sanctioned in ha. (as per column 4 of DoLR area in ha. Table SSP 14)

2 Names of the districts covered

3 No.of Blocks covered

4 No.of watershed projects sanctioned by DoLR

5 No. of projects completed out of those taken at Row (4)

6 No.of projects foreclosed of Row (4)

7 No.of on-going projects of Row (4)

8 Area already treated by completed projects of Row (5)

9 Area for treatment by on-going projects of Row (5)

10 Total area treated and under treatment (8)+ (9)

11 Area yet to be treated and proposed to be treated by DoLR (column 1-column 10)

Page 18: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

16

IWMP-SPSP-DoLR

Table-SPSP 16: Details of the watershed projects implemented in the State with the financial assistance

other than DoLR

1 2 3 4

S.No

Item Total

Watershed schemes of other Ministries

Ministry of Agriculture

GoI

Ministry of E & F,

GoI

Planning Commission

NABARD State Govt.

EAP #Others

(Pl. Specify)

1 Area sanctioned in ha. (as per column 4 of Table 14)

2 Names of the districts covered

3 No.of Blocks covered

4 No.of watershed projects sanctioned other than DoLR

5 No.of projects completed out of those taken at Row (4)

6 No.of projects foreclosed of Row (4)

7 No.of on-going projects of Row (4)

8 Area already treated by completed projects of Row (5)

9 Area for treatment by on-going projects of Row (5)

10 Total area treated and under treatment (8)+ (9)

11 Area yet to be treated and proposed to be treated by other than DoLR resources (column 1-column 10)

# If required please add more columns

Page 19: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

17

IWMP-SPSP-DoLR

6.1 Details of pending utilization certificates and unspent balance available with State under DPAP, DDP &

IWDP, reasons for not sending due UCs, reasons for unspent balances which should have been utilized, time-frames

proposed for clearing the backlog, fixing of responsibilities for slow progress and pendencies and also for clearing

backlog, interest earned on unspent balances and its utilization, etc.

Table- SPSP 17 : Details of pending UCs (MIS Table-M(FM)5)

1 2 3 4 5 6 7 8 9 10 11

S. No.

District Project Instal-ment no.

Financial year of release of fund

Amount released (Rs. in lakh)

Amount utilized (Rs.in lakhs)

Submission of UC

Date of submission of

UC

Reasons for not

submitting/ delayed

submission of UC

Pending UCs

Due date

Amount (Rs. In lakhs)

Date Amount (Rs. In lakhs)

Period

Amount (Rs. in

lakhs)

Page 20: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

18

IWMP-SPSP-DoLR

Table-SPSP 18: Details of Unspent balance (MIS Table-M(FM)8)

1 2 3 4 5 6 7 8

S. No.

District Project Instal-ment

no.

Financial year of release of

fund

Amount released (Rs.

in lakh)

Amount utilized

(Rs.in lakhs)

Unutilised funds (Rs. In

lakhs)

Chapter 7

7.0 Strategy for implementation of Integrated Watershed Management Programme (IWMP)

Briefly describe the following:

a) Prioritization of available area based on the criteria as per the Operational Guidelines of DoLR

b) List of watershed projects, along with area coverage, selected for treatment for the next 18

years; listing of these watershed projects and area coverage year-wise for next 18 years

Page 21: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

19

IWMP-SPSP-DoLR

Table-SPSP 19: Plan-wise phasing of physical (area in ha) & financial (Rs. in Crore) targets of IWMP

for next 18 years*:

S.No District

Remaining period of XI Plan

(2009-10 to 2011-12)

XII Plan (2012-13 to 2016-17)

XIII Plan (2017-18 to 2021-22)

XIV Plan (2022-23 to 2026-27)

Total for 18 years

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

*Data for the entire State regarding each item may be given in the same format at the end of the table

Table-SPSP 20: Year-wise phasing of physical (area in ’000 ha) & financial (Rs. in lakh) targets of

IWMP for remaining period of XI Plan *:

1 2 3

S. No

District

Remaining period of XI Plan

2009-10 2010-11 2011-12 Total

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

No. of

projects Area

No. of

projects Area

No. of

projects Area

No. of

projects Area

H&D O H&D O H&D O H&D O H&D O H&D O H&D O H&D O

H&D- Hilly & Difficult area; O- Others

*Data for the entire State regarding each item may be given in the same format at the end of the table

Page 22: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

20

IWMP-SPSP-DoLR

Table-SPSP 21: Details of district wise and category-wise area proposed to be taken up under IWMP during next

3 years i.e upto 11th Five Year Plan.

(Area in 000 Ha.)

1 2 3 4 5 6 7

S. No. District Year

Total area available

for treatment

Total area proposed to take up under IWMP in the next 3 years

Terrain of the proposed area Land use type of proposed area

Hilly

Desert

Others (Pl.

specify)

cultivated rainfed area

Uncultivated Wasteland

2009-10

2010-11

2011-12

Sub-total

Table-SPSP 21 (Conti.) : Details of district wise and category-wise area proposed to be taken up under IWMP

during next 3 years i.e upto 11th Five Year Plan.

7 8 9

Ownership pattern of the proposed area No. of beneficiaries covered Identified DPAP/ DDP Blocks

covered

Private Commu-nity

Forest Others (pl.

specify)

Total area

MF SF LF Landless Total

DPAP DDP

No. of blocks

Area No. of blocks

Area

Page 23: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

21

IWMP-SPSP-DoLR

C) Briefly describe the convergence of IWMP with other Schemes in the State

Table-SPSP 22: Details of Convergence of IWMP with other Schemes* (MIS Table-M(P)3)

1 2 3 4 5 6 7

S.

No.

Name

of the

District

Names of

Departments

with

Schemes

converging

with IWMP

Funds to be made

available to IWMP due to convergence

(Rs.)

Was this fund included in

Rs.12,000/15,000 per ha.

Name of activity/task/structure to be undertaken

with converged funds

Level at which

decision for convergence was taken$ Yes No

* from Column no. 2, total no. of districts implementing the programme, from column no. 4, total amounts may be mentioned at the end of the table for the entire State.

$ DRDA cell/ZP/DPC/SLNA/DoLR

d) Public – Private Partnership Briefly describe scope for Public – Private Partnership in watershed projects

Page 24: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

22

IWMP-SPSP-DoLR

Table-SPSP 23: Summary of Public-Private Partnership in the IWMP projects* (MIS Table-M(P)4)

1 2 3 4 5 6 7

S. No.

District Name of Private Sector Partner

Agency

Type of agreement signed

(MoU/contract others pl.specify)

Financial contribution

Partnership Interventions

Expected Outcomes

* from Column no. 2, total no. of districts implementing the programme, from Column no. 3, total no. of private companies/ agencies, from column no. 5, total amounts may be mentioned at the end of the table for the entire State.

7.1 Planning Process - Details of Scientific criteria/Inputs used in Planning (MIS Table-M(P)6)

Briefly describe about various scientific inputs used in planning watershed projects in the State.

Scientific criteria/ inputs used

(A) Planning Cluster approach

Whether technical back-stopping for the project has been arranged? If yes, mention the name of the Institute.

Baseline survey

Hydro-geological survey

Contour mapping

Participatory Net Planning (PNP)

Remote sensing data-especially soil/ crop/ run-off cover

Ridge to Valley treatment

Page 25: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

23

IWMP-SPSP-DoLR

Online IT connectivity between

(1) Project and DRDA cell/ZP

(2) DRDA and SLNA

(3) SLNA and DoLR

Availability of GIS layers

1. Cadastral map

2. Village boundaries 3. Drainage 4. Soil (Soil nutrient status) 5. Land use 6. Ground water status 7. Watershed boundaries

8. Activity Crop simulation models#

Integrated coupled analyzer/ near infrared visible spectroscopy/ medium spectroscopy for high speed soil nutrient analysis

Normalized difference vegetation index (NDVI)#

Weather Stations

(B) Inputs 1. Bio-pesticides 2. Organic manures

3. Vermicompost

4. Bio-fertilizer 5. Water saving devices

6. Mechanized tools/ implements

7. Bio-fencing 8. Nutrient budgeting 9. Automatic water level recorders & sediment samplers

Any other (please specify)

Page 26: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

24

IWMP-SPSP-DoLR

Chapter 8

8.0 Livelihood concerns:

(a) Brief description about the livelihoods in the State-traditional livelihoods-reasons for development of traditional

livelihoods-other raw materials and potential available in the State – livelihoods that can be developed on the

basis of these raw materials and potential-reasons for not developing these livelihoods so far-factors necessary

for developing these livelihoods-potential in rural areas and potential in urban areas-backward-forward linkages

available and yet to be created-facilities for capacity building available and yet to be created-workforce available

in the State by age group-per capita income in the State and comparison with national average – likely per

capita income to be generated through enhancement of livelihoods etc.

Table- SPSP 24:(A) Details of livelihoods created for landless people*(MIS Table-M(PO)D2:(i))

1 2 3 4 5 6 7 8

S. No.

District Name of

activity

No. of beneficiaries Pre-project income (Rs.)

Expected change in income from project

intervention

Funds required for the activity

(Rs.)

Sources of funding (Rs.)

SC ST Others

Women

Total

Project Fund

Benefi-ciary

Financial institution

NGO Others

* From column no.2 total number of Districts; from column no.3 total no. of activities, from column no. 4, category-wise total no. of beneficiaries, from column no. 5 to 8, categorywise totals, for the entire State may be given at the end of the Table.

Page 27: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

25

IWMP-SPSP-DoLR

Table-SPSP 25: (B) Details of other livelihoods created for farmers*(MIS Table- M(PO)D2:(ii))

1 2 3 4 5 6 7 8

S. No.

District Name of

activity

No. of beneficiaries Pre-project income (Rs.)

Expected change in income from project

intervention

Funds required for the activity

(Rs.)

Sources of funding (Rs.)

SF MF LF Other Total Project Fund

Benefi-ciary

Financial institution

NGO Others

* From column no.2 total number of Districts; from column no.3 total no. of activities, from column no. 4, category-wise total no. of beneficiaries, from column no. 5 to 8, categorywise totals, for the entire State may be given at the end of the Table.

Page 28: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

26

IWMP-SPSP-DoLR

Chapter 9 9.0 Institutional arrangements

Briefly describe the Institutional arrangements for implementation of IWMP in the State at various levels

9.1 SLNA

Briefly describe organizational structure of SLNA (total no.of persons working, no. of permanent employees, no. of

persons on contract basis, no. of persons paid from DoLR grants under IWMP, other sources of funds)

Table-SPSP 26: Details of SLNA (MIS Table-M(IS)1)

1 2 3 4 5

S. No.

Date of Notification Type of SLNA# Date of MoU with DoLR

Total no. of members of

SLNA

#Whether it is a Department/ Mission/ Society/ Authority/ Others (pl. specify)

Page 29: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

27

IWMP-SPSP-DoLR

Table-SPSP 27: Details of SLNA (MIS Table-M(IS)1) (Contd..)

6 7

Chairperson CEO

Name Designation# Name Designation Date of

Appointment Nature of

appointment $

Tenure (No. of years)

Contact Ph. No./ Fax/ E-mail

# APC/ ACS/ Dev. Commissioner/ Others (pl. specify) $ Deputation/ Contract

Table-SPSP 28: Details of functionaries in the SLNAs* (MIS Table-M(IS)2)

1 2 3 4

S. No.

Total no. of persons working in the SLNA for IWMP

Monthly emoluments of all the persons

working in the SLNA for IWMP

Details of the persons engaged in the SLNA funded by DoLR

Names & Designation

Monthly remuneration

Date of Appointment

Nature of

appoint-ment $

Tenure (No. of years)

Contact

Ph. No./

Fax/

E-mail

Subject of

Expertise

Qualifi-cation

Experience Role

* from column no. 2, total no. of persons working in the SLNA for IWMP; from column no. 3, total monthly emoluments for all the persons working in the SLNA for IWMP; from column no. 4, total no. of persons to be funded by DoLR, total monthly remuneration of the persons funded by DoLR may be indicated for the entire State at the end of the table.

* Chart indicating organizational structure of the SLNA with all the officers & staff may be enclosed

$ Deputation/ Contract

Page 30: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

28

IWMP-SPSP-DoLR

Table-SPSP 29 : Details of State Level Data Cell (SLDC) functionaries*# (MIS Table-M(IS)3)

1 2 3 4

S. No.

Total no. of persons working in the SLDC for IWMP

Monthly emoluments of all the persons

working in the SLDC for IWMP

Details of the persons engaged in the SLDC to be funded by DoLR

Names & Designation

Monthly remuneration

Date of Appointment

Nature of

appoint-ment $

Tenure (No. of years)

Contact

Ph. No./

Fax/

E-mail

Qualifi-cation

Experience Role

* from column no. 2, total no. of persons working in the SLDC for IWMP; from column no. 3, total monthly emoluments for all the persons working in the SLDC for IWMP; from column no. 4, total no. of persons to be funded by DoLR, total monthly remuneration of the persons funded by DoLR may be indicated for the entire State at the end of the table.

$ Deputation/ Contract #Chart indicating organizational structure of the SLDC with all the officers & staff may be enclosed

Briefly describe State level Monitoring/Evaluation Cell

9.2. District Level Watershed Units

A) Briefly describe organizational structure of DRDA/ZP cell for watershed programme (total no.of persons working,

no.of permanent employees, no. of persons on contract basis, no.of persons paid from DoLR grants under IWMP,

other sources of funds)

Page 31: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

29

IWMP-SPSP-DoLR

Table-SPSP 30: Details of functionaries in the DWDU/ DRDA Watershed Cell*(MIS Table-M(IS)4)

1 2 3 4 5 6 7 8

S. No.

Name of the District

Name of the

executing Agency#

Status of Chairman

@

Date of signing of MoU with SLNA

Total no. of persons working

for IWMP

Monthly emoluments of all persons

working for IWMP

Details of the two personnel engaged in the Watershed Cell funded by DoLR

Name and Designation

Monthly Remuneration

Date of Appoint-ment

Nature of appoint-ment$

Tenure (No. of years)

Contact Ph. No./ Fax/ e-mail

Qualifi-cation

Experience

Role

a) * from column no.2, no. of districts; from column no. 3, no. of executive agencies; from column no.6, no. of

persons working in the executive agencies; from column no. 7, total monthly emoluments for all the persons

working in the watershed cell, from column no. 8 total no.of persons to be funded by DoLR, total monthly

remuneration of the persons for the entire State may be indicated at the end of the table.

b) #DRDA/Zilla Parishad (ZP)/ State Department/ Any other (Please specify)

c) @collector/CEO ZP/ CDO/ DDO/ PD/ Any other (please specify)

B) Eligible districts (more than 25,000 ha area under watershed projects in the district) for

strengthening DRDA cell may be given.

Page 32: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

30

IWMP-SPSP-DoLR

9.3 PIA

Briefly describe the potential PIAs for IWMP in the State (Line Dept., Autonomous organization, Govt.

Institute, Research Bodies, Zila Parishad, Intermediate Panchayat, Voluntary Organisations, any other

(please specify) and process of selection of PIAs in the State

9.4 WDT

Briefly describe process of selection of members for WDTs in the State

9.5 Institutional arrangements at village level and people’s participation

Briefly describe the strategy for setting up Institutional arrangements (SHGs, UGs and WCs) at village level and

people’s participation

Page 33: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

31

IWMP-SPSP-DoLR

Chapter 10

10.0 Capacity building

a) Stake holders and capacity building requirements

S.No Project Stakeholder Critical capacity gaps

1

Target community

2 GPs

3 Watershed Committees

4 SHGs

5 UGs

6 WDTs

7 PIAs

8 DRDA/ZP cell

9 SLNA

b) Strategies for capacity building

Briefly describe about strategies for capacity building

c) Indicate capacity building programme to be taken up

d) Indicate institutional arrangements made for capacity building at State level, District level, Block level and

Village level.

e) Training manuals developed for training programme and field training proposed

Page 34: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

32

IWMP-SPSP-DoLR

Table-SPSP 31: List of Training Institutes@ identified for Capacity Building at State level (MIS Table-M(CB)1)

1 2 3 4 5 6 7

S. No. Name of the Training Institute

Full Address with

contact no., website & e-mail

Name & Designation of the Head of Institute

Type of Institute#

Area(s) of speciali-zation$

Accreditation details

# Central govt. Dept./ State govt. Dept./ Autonomous Body/ Research Institutes/ Universities/ Others (pl. specify)

$ Capacity Building/ Agriculture/ Horticulture/ Animal Husbandry/ Pisciculture/ Remote Sensing/ Water conservation/ Ground water/ Forestry/ livelihoods/ entrepreneurship development/ others (pl. specify)

@ The training institutes must fulfill the conditions mentioned in the operations guidelines. (i) Technical experts in fields required by IWMP (ii) Past experiences (iii) Annual Turnover (iv) Receives funds either from the Central or State Government (v) Publications (vi) Not blacklisted by any Govt. organizations (vii) Audited accounts (viii) Organizational structure

(In the same format furnish District wise, Block-wise Institutions identified for Capacity Building)

Page 35: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

33

IWMP-SPSP-DoLR

f) Information, Education & Communication (IEC) Activities:

Describe the IEC activities to be undertaken under IWMP:

Table: SPSP 32: Details of IEC activities* (MIS Table-M(CB)3)

1 2 3 4 5 6

S. No.

District Activity Executing agency

Estimated expenditure for XI Plan period (Rs. in lakh)

Expected Outcome (may quantify,

wherever possible)

* From Column no. 2, total no. of Districts implementing the programme, from column no.3 no. of activities, from Column no. 4, total no. of agencies, from column no. 5 total estimated expenditure may be given at the end of the table for the entire State.

Page 36: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

34

IWMP-SPSP-DoLR

Chapter 11

11.0 Monitoring and Evaluation (M & E)

Briefly describe plan to comply following:

a) Performance monitoring of projects

b) Institutional performance monitoring

c) Internal learning

d) Evaluation

e) Indicate institutional arrangements made for M & E at State level, District level, Block level and Village level.

Table-SPSP 33: List of Institutes@ identified for M & E at State level

1 2 3 4 5 6 7

S. No. Name of the Training Institute

Full Address with

contact no., website & e-mail

Name & Designation of the Head of Institute

Type of Institute#

Area(s) of speciali-zation$

Accreditation details

# Central govt. Dept./ State govt. Dept./ Autonomous Body/ Research Institutes/ Universities/ Others (pl. specify)

$ Capacity Building/ Agriculture/ Horticulture/ Animal Husbandry/ Pisciculture/ Remote Sensing/ Water conservation/ Ground water/ Forestry/ livelihoods/ entrepreneurship development/ others (pl. specify)

@ The M&E institutes must fulfill the conditions mentioned in the operations guidelines.

Page 37: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

35

IWMP-SPSP-DoLR

Chapter 12

12.0 Expected outcomes

a) Briefly describe expected outcomes due to implementation of IWMP in the State

b) Summarize in the table given below.

Table-SPSP 34: Expected/Estimated Outcomes (MIS Table-M(PO)F1)

1 2 3 4 5 6 7

S. No.

Name of the District

Item Unit of

measurement Pre-project Status

Expected Post-project

Status Remarks

Status of water table

Ground water structures repaired/ rejuvenated

Quality of drinking water

Availability of drinking water

Increase in irrigation potential

Change in cropping/ land use pattern

Area under agricultural crop

i Area under single crop

ii Area under double crop

iii Area under multiple crop

Net increase in crop production area

Increase in area under vegetation

Increase in area under horticulture

Increase in area under fuel & fodder

Increase in milk production

No. of SHGs

Increase in no. of livelihoods

Increase in income

Page 38: Format for State Perspective Strategic Plan SPSPupldwr.up.nic.in/pdfs/format_download/Format for State Perspective... · income and comparison to national GDP and per capita income

36

IWMP-SPSP-DoLR

Migration

SHG Federations formed

Credit linkage with banks

Resource use agreements

WDF collection & management

Summary of lessons learnt

************