FORM 1 & 1 A
Transcript of FORM 1 & 1 A
FORM 1 & 1 A
For
PROPOSED EXPANSION OF RESIDENTIAL DEVELOPMENT
(Obtained prior environmental clearance vide letter no. SEAC-2010/CR.486/TC.2 dt 7th April 2011)
At
PlotbearingG.No.205(P),221(P),225(P),226(P),227(P),228to247,248(P),249(P),251,252,253to256,258(P),264(P),265,267(P),268(P),269(P),270,358(P),359(P),360at
Village:Gahunje,Taluka:Maval,Dist.Pune,Maharashtra
Proposed By
SSAAHHAAJJAANNAANNDD HHII--TTEECCHH CCOONNSSTTRRUUCCTTIIOONNSS PPVVTT.. LLTTDD
Application form for Expansion in Environmental Clearance Project Name Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 1
APPENDIX‐I
(Seeparagraph–6)FORM1
(I) BasicInformation
Sr.No. Item Details
1 Nameoftheproject/s ProposedExpansionofResidentialdevelopment
2 S.No.intheSchedule 8(b)
3 Proposedcapacity/area/length/tonnagetobehandled/commandarea/leasearea/numberofwellstobedrilled.
AsperearlierEC
Proposed(AfterExpansion)
Total Plot Area(m2)
4,12,700 5,43,861
FSIArea(m2) 2,35,660.88 3,64,947.69
Totalconstructionarea
4,33,443.22 5,80,983.22
DetailedAreaStatementisattachedasAnnexureI
4 New/Expansion/Modernization
ExpansionProject
5 ExistingCapacity/Areaetc. ECobtainedfortotalconstructionareaof4,33,443.22m2 vide letter no. SEAC 2010/ CR.486/ TC.2 dt 7thApril2011
6 Categoryofprojecti.e.AorB BCategory
7 Does it attract the generalcondition?ifyes,pleasespecify
No
8 Does it attract the specificcondition?Ifyes,pleasespecify
No
9 Location At Village: Gahunje, Taluka: Maval, Dist. Pune,Maharashtra.
Plot/Survey/KhasraNo. PlotbearingG.No.205(P),221(P),225(P),226(P),227(P),228to247,248(P),249(P),251,252,253to256,258(P),264(P),265,267(P),268(P),269(P),270,358(P),359(P),360atVillage:Gahunje,Taluka:Maval,Dist.Pune,Maharashtra
Village Gahunje
Tehsil Maval
District Pune
State Maharashtra
10 Nearest railway station/portalongwithdistanceinkms.
NearestRailwayStation:Pimpri‐Chinchwad7KmNearestAirport:Pune25km
11 Nearest Town, city, DistrictHeadquartersalongwithdistanceinkms.
NearestCity:Pune15kmDistrictHeadquarters:14.92km
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 2
12 VillagePanchayat,ZillaParishad,MunicipalCorporation,Localbody(completepostaladdresseswithtelephonenos.tobegiven)
TheCollectorPune,Collectoroffice,Opp.SassoonHospital,Pune‐411001.Phn.020‐26114949.
13 Nameoftheapplicant AtulJangam
14 Registeredaddress AtulJangamSahajanandHi‐TechConstructionsPvt.Ltd.216,Shah&NaharEstate,Dr.E.MosesRoad,Worli,Mumbai‐400018
15 Addressforcorrespondence: AtulJangamSahajanandHi‐TechConstructionsPvt.Ltd.216,Shah&NaharEstate,Dr.E.MosesRoad,Worli,Mumbai‐400018
Name AtulJangam
Designation(Owner/ Partner/CEO)
AuthorisedSignatory
Address SahajanandHi‐TechConstructionsPvt.Ltd.216,Shah&NaharEstate,Dr.E.MosesRoad,Worli,Mumbai‐400018
Pincode 400018
E‐mail [email protected]
TelephoneNo. 23024400
FaxNo. 23000693
16 Details of alternative sitesexamined, if any. Location ofthesesitesshouldbeshownonatoposheet.
Village‐District‐State
1.
2.
3.
We are developing residential development on ourownland
17 Interlinedprojects NotApplicable
18 Whether separate application ofinterlinked project has beensubmitted?
No
19 Ifyes,dateofsubmission ‐
20 IfNo,Reason Standaloneconstructionproject
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 3
21 Whethertheproposalinvolvesapproval/clearanceunder:if,yesdetailsofthesameandtheirstatustobegiven
a) TheForest(Conservation)Act,1980?
b) The wildlife (protection)Act,1972?
c) The CRZ Notification,1991?
No
22 WhetherthereisanyGovernmentOrder/policyrelevant/relatingtothesite?
No
23 Forestlandinvolved(hectares) Noforestlandinvolvedinproposedprojectsite
24 Whether there is any litigationpending against the projectand/or land inwhich theprojectisproposetobesetup?
a) Nameofthecourtb) CaseNo.c) Orders/Directionsofthe
courtifanyanditsrelevancewiththeproposedproject.
Nosuchlitigationpendingagainsttheproject
Capacity corresponding to sectoral activity (such as production capacity for manufacturing,miningleaseareaandproductioncapacityformineralproduction,areaformineralexploration,lengthforlineartransportinfrastructure,generationcapacityforpowergenerationetc.,)(II)Activity1. Construction, operation or decommissioning of the Project involving actions,
whichwillcausephysicalchangesinthelocality(topography,landuse,changesinwaterbodies,etc.)
Sr.No. Information/Checklist
confirmationYes/No Detailsthereof(withapproximatequantities
/rates, wherever possible) with source ofinformationdata
1.1 Permanentortemporarychangeinlanduse,landcoverortopographyincludingincreaseinintensityoflanduse(withrespecttolocallanduseplan)
No Therewillbenosignificantchanges inexistingland use pattern by proposed project. Theproposed project is in accordance with townplanningofPune.
1.2 Clearance of existingland, vegetation andbuildings?
Yes The existing open land will be levelled andgraded and site preparation shall involveclearingofshrubsandvegetation.
1.3 Creation of new landuses?
No The existing land use already has littleResidential area in close vicinity to proposedsitesothereshallbenochangeinlanduseafterproposedproject.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 4
1.4 Pre‐constructioninvestigations e.g. borehouses,soiltesting?
Yes Soilsamplestakenwithintheplotpremisesforgeotechnicalinvestigation
1.5 Constructionworks?
Yes The development will have residentialbuildings, Convenience shops, MeditationCentre,ClubHouse,FireStation,StaffQuartersforFirestation
1.6 Demolitionworks?
No
1.7 TemporarysitesusedforconstructionworksorHousingofconstructionworkers?
Yes Temporary sheds and sanitation facilities forconstruction workers has been provided forworkers.
1.8 Abovegroundbuildings,structuresorearthworksincludinglinearstructures,cutandfillorexcavations
Yes Mostoftheexcavatedsoilwillbeusedforbackfillingatprojectsiteonly
1.9 Underground worksincluding mining ortunneling?
No
1.10 Reclamationworks? No
1.11 Dredging?
No
1.12 Offshorestructures? No
1.13 Productionandmanufacturingprocesses?
No
1.14 Facilities for storage ofgoodsormaterials?
Yes Only construction material will be stored intemporarystoragesite
1.15 Facilitiesfortreatmentordisposalofsolidwasteorliquideffluents?
Yes Onsitemechanicalcompostingisproposedfortreatment of biodegradable solid waste andthecompostwillbeusedasmanureingarden.Nonbiodegradablewastewillbehandedovertoauthorizedvendorforfinaldisposal.SewageTreatmentPlants(STP)oftotalcapacity2200m3/dayisproposedtotreatthegeneratedsewage and reuse the treated sewage withinprojectforflushingandlandscaping.The treated sewage will be used for flushingandgardening.The dried sludge and compostwill be used asmanureforlandscaping.
1.16 Facilitiesforlongtermhousingofoperationalworkers?
No
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 5
1.17 Newroad,railorseatrafficduringconstructionoroperation?
No Existing road network will be used duringconstruction and operation phase of project.The site is accessible by 18 m wide road andMumbaiPuneexpressway.
1.18 New road, rail, airwaterborne or othertransport infrastructureincluding new or alteredroutes and stations,ports,airportsetc?
No Existing road will be used for the transportpurpose.
1.19 Closure or diversion ofexisting transport routesor infrastructure leadingto changes in trafficmovements?
No
1.20 New or divertedtransmission lines orpipelines?
No
1.21 Impoundment, damming,culverting, realignmentor other changes to thehydrology ofwatercourses oraquifers?
No
1.22 Streamcrossings? No
1.23 Abstraction or transfersof water form ground orsurfacewaters?
No
1.24 Changes in water bodiesor the land surfaceaffectingdrainageorrun‐off?
No Therewill not be any changes inwaterbodiesorthelandsurface
1.25 Transport of personnelor materials forconstruction, operationordecommissioning?
Yes Construction workers and constructionmaterialduringconstructionphase
1.26 Long‐termdismantlingordecommissioning orrestorationworks?
No
1.27 Ongoing activity duringdecommissioning whichcould have an impact ontheenvironment?
Yes There will not be any impact on theEnvironment
1.28 Influx of people to anarea in eithertemporarily orpermanently?
Yes Construction workers during constructionphaseandofficepersonnelandresidentsduringoperationphase
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 6
1.29 Introduction of alienspecies?
No No introduction of alien species will occur asthisispurelyresidentialproject
1.30 Loss of native species orgeneticdiversity?
No Nothreatofspecieslosswilloccur
1.31 Anyotheractions?
No No
2. Use ofNatural resources for construction or operation of the Project (such asland,water,materialsorenergy,especiallyanyresourceswhicharenon‐renewableorinshortsupply):Sr.No. Information/checklist
confirmationYes/No Details thereof (with approximate
quantities /rates, wherever possible)withsourceofinformationdata
2.1 Landespeciallyundevelopedoragriculturalland(ha)
No Noagriculturalland
2.2 Water(expectedsource&competingusers)unit:KLD
Yes WaterSource:PawanaRiver
TotalWaterRequirement
2220m3/d
ThedetailedwaterbalanceforoperationphaseofprojectisattachedasAnnexureIV
2.3 Minerals(MT) NA 2.4 constructionmaterial–
stone,aggregates,sand/soil(expectedsource–MT)
Yes Stoneaggregatesdemandwillbemetfromtheclay/soilgeneratedafterexcavationandcuttingofrocksorfromopenmarket
2.5 Forestsandtimber(source–MT)
Yes Onlydoorframes(ifsoplanned)
2.6 Energyincludingelectricityandfuels(source,competingusers)Unit:fuel(MT),energy(MW)
Yes Source:MSEDCL
Energyconsumption
ProposedResidential
TotalPowerRequirement
27MW
2.7 Anyothernaturalresources(useappropriatestandardunits)
No
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 7
3. Use,storage,transport,handlingorproductionofsubstancesormaterials,whichcouldbeharmfultohumanhealthortheenvironmentorraiseconcernsaboutactualorperceivedriskstohumanhealth.
Sr.No.
Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
3.1 Useofsubstancesormaterials,whicharehazardous(asperMSIHCrules)tohumanhealthortheenvironment(flora,fauna,andwatersupplies)
Yes Used oil from DG set will be storedseparately and will be given to authorisedrecyclers
3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insectorwaterbornediseases)
No
3.3 Affectthewelfareofpeoplee.g.bychanginglivingconditions?
No
Proposed Projectwill not effect thewelfareofpeople
3.4 Vulnerablegroupsofpeoplewhocouldbeaffectedbytheprojecte.g.hospitalpatients,children,theelderlyetc.,
No
Proposed Project will not affect hospitalpatients,childrenetc.
3.5 Anyothercauses No
4. Productionofsolidwastesduringconstructionoroperationordecommissioning(MT/month)
Sr.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates,whereverpossible)withsourceofinformationdata
4.1 Spoil, overburden or minewastes
No
4.2 Municipalwaste(domesticandorcommercialwastes)
Yes MunicipalSolidWaste
ProposedResidentialprojectTotalSolidWaste 8183kg/d
4.3 Hazardouswastes(asperHazardousWasteManagementRules)
Yes Used oil from DG set will be given toauthorisedrecyclers
4.4 Other industrial processwastes
No No,ThisisResidentialProject
4.5 Surplusproduct No NotApplicable
4.6 Sewagesludgeorothersludgefromeffluenttreatment
Yes 21 m3/d of sludge will be used as manureafterdrying.
4.7 Constructionordemolitionwastes
Yes Construction debris during constructionphase. The debris generated from theConstructionactivitieswillbereusedassubbaseofinternalroadanddriveways.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 8
4.8 Redundantmachineryorequipment
No NotApplicable
4.9 Contaminatedsoilsorothermaterials
No NotApplicable
4.10 Agriculturalwastes No NotApplicable4.11 Othersolidwastes No NotApplicable
5. Releaseofpollutantsoranyhazardous,toxicornoxioussubstancestoair(Kg/hr)Sr.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates, wherever possible)withsourceofinformationdata
5.1 Emissions fromcombustion of fossil fuelsfrom stationary or mobilesources
Yes EmissionfromDGsetsduringpowerfailureand movement of vehicle during operationphaseoftheproject
5.2 Emissions fromproductionprocesses
No NotApplicable
5.3 Emissions from materialshandling including storageortransport
Yes Fugitiveemissionfromhandlingsuchassandandotherconstructionmaterial
5.4 Emissions fromconstruction activitiesincluding plant andequipment
Yes Transportationofconstructionmaterial&handlingofsand,aggregates,cement,DGsetsetc.Theemissionsfromconstructionmachinerywouldcontainparticulates,SOx,NOxandCO
5.5 Dustorodoursfromhandlingofmaterialsincludingconstructionmaterials,sewageandwaste
Yes Transportation, loading and unloading ofmaterialwillgeneratedustOdour from Solid waste management andSTPareaifnothandleditproperly
5.6 Emissionsfromincinerationofwaste
No NotApplicable
5.7 Emissions from burning ofwasteinopenair(e.g.slashmaterials, constructiondebris)
No NotApplicable
5.8 Emissions from any othersources
No NotApplicable
6. GenerationofNoiseandVibration,andEmissionsofLightandHeat:
Sr.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsource of information data with source ofinformationdata
6.1 Fromoperationofequipmente.g.engines,ventilationplant,crushers
Yes Increase in noise levels due to operations ofconstructionequipments&vehicularmovement
6.2 From industrial orsimilarprocesses
No NotApplicable
6.3 Fromconstructionordemolition
Yes Increaseinnoiselevelsduringconstruction.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 9
6.4 Fromblastingorpiling Yes Noiseduringconstructionwork.6.5 Fromconstructionor
operationaltrafficYes Duringconstructionandoperationphaseof the
project.Existing road network will be used duringconstructionandoperationphaseofprojectIntheoperationphasetherewillbe increase inthe vehicular movement because of theresidentsandvisitors
6.6 Fromlightingorcoolingsystems
No As the proposed project will be the residentialhence therewill be no such centralised coolingsystem
6.7 Fromanyothersources No NotApplicable
7. Risks of contamination of land or water from releases of pollutants into thegroundorintosewers,surfacewaters,groundwater,coastalwatersorthesea:
Sr.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates, wherever possible) withsourceofinformationdata
7.1 Fromhandling,storage,useorspillageofhazardousmaterials
No The used oil from DG sets will be given toauthorisedrecyclers
7.2 From discharge ofsewage or othereffluentstowaterortheland (expected modeandplaceofdischarge)
No STPwillbeusedfortreatingsewage.Treated sewage will be used for flushing andgardening.
7.3 By deposition ofpollutantsemittedtoairinto the land or intowater
No NotApplicable
7.4 Fromanyothersources No NotApplicable
7.5 Is there a risk of longterm build up ofpollutants in theenvironmentfromthesesources?
No NotApplicable
8. RiskofaccidentsduringconstructionoroperationoftheProject,which
couldaffecthumanhealthortheenvironmentSr.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates, wherever possible) withsourceofinformationdata
8.1 Fromexplosions,spillages,firesetcfromstorage,handling,useorproductionofhazardoussubstances
Yes Spillageofusedoil fromDG setsandexplosioninDiesel storagearea.Adequate fireprotectionmeasureswill be taken up as per the fire NOCfromMaharashtraFireServices
8.2 Fromanyothercauses
Yes Accidents during construction phase (Slips,fallfromheight,fallingofobjects/materialonworkers, fire, cut and burns, electric shockandcollapseofshuttering
Fireduetoshortcircuiting
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 10
Terrorism8.3 Couldtheprojectbe
affectedbynaturaldisasterscausingenvironmentaldamage(e.g.floods,earthquakes,landslides,cloudburstetc)?
Yes The proposed structure is designed as perSeismicZoneIIIstandards.Theprojectareadoesn’thavehistoryofflooding
9. Factorswhichshouldbeconsidered(suchasconsequentialdevelopment)which
couldleadtoenvironmentaleffectsorthepotentialforcumulativeimpactswithotherexistingorplannedactivitiesinthelocality
Sr.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates, wherever possible) withsourceofinformationdata
9.1 Leadtodevelopmentofsupporting. facilities,ancillarydevelopmentordevelopmentstimulatedbytheprojectwhichcouldhaveimpactontheenvironmente.g.:•Supportinginfrastructure(roads,powersupply,wasteorwastewatertreatment,etc.)•housingdevelopment•extractiveindustries•supplyindustries•other
Yes
Theproposedexpansionoftheprojectislocatedat village Gahunje, Tal Maval, Pune. As theExisting road network will be used duringconstructionandoperationphaseofproject
9.2 Lead to after‐use of thesite, which could havean impact on theenvironment
No NotApplicable
9.3 Setaprecedentforlaterdevelopments
No NotApplicable
9.4 Havecumulativeeffectsduetoproximitytootherexistingorplannedprojectswithsimilareffects
Yes There are many upcoming projects in thevicinity of the area. Hence there is increase intraffic, water consumption, sewage generationandstormwatergeneration
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 11
(III)EnvironmentalSensitivity
Sr.No.
Areas Name/Identity
Aerialdistance(within15km.)Proposedprojectlocationboundary
1 Areasprotectedunderinternationalconventions,nationalorlocallegislationfortheirecological,landscape,culturalorotherrelatedvalue
No Notapplicable
2 Areas which are important orsensitive for ecological reasons‐ Wetlands, watercourses orother water bodies, coastalzone, biospheres, mountains,forests
Yes Pawana river is abutting to the proposedsiteIndrayaniRiver:5kmKasariDam:7.3kmAndraDam:14kmJadhavwadiDam:12km
3 Areas used by protected,important or sensitive speciesof flora or fauna for breeding,nesting, foraging, resting, overwintering,migration
No Notapplicable
4 Inland, coastal, marine orundergroundwaters
Yes Pawana river is abutting to the proposedsiteIndrayaniRiver:5kmKasariDam:7.3kmAndraDam:14kmJadhavwadiDam:12km
5 State,Nationalboundaries No 6 Routesorfacilitiesusedbythe
publicforaccesstorecreationorothertourist,pilgrimareas
No
7 Defenceinstallations No 8 Densely populated or built‐up
areaNo Notapplicable
9 Areasoccupiedbysensitiveman‐madelanduses(hospitals,schools,placesofworship,communityfacilities)
No Nigadi is about 7 km form proposeddevelopmentSaharastadium:1.1km
10 Areascontainingimportant,highqualityorscarceresources(groundwaterresources,surfaceresources,forestry,agriculture,fisheries,tourism,minerals)
No Notapplicable
11 Areasalreadysubjectedtopollutionorenvironmentaldamage.(thosewhereexistinglegalenvironmentalstandardsareexceeded)
No
12 Areas susceptible to naturalhazard which could cause theproject to presentenvironmental problems
No
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 12
(earthquakes, subsidence,landslides,erosion,floodingor extremeor adverse climaticconditions)
(IV). ProposedTermsofReferenceforEIAstudiesIherebygivenundertaking that thedata& informationgiven in theapplication&enclosuresare true to thebest ofmyknowledge&belief& I amaware that if anypartof thedata andinformation submitted is found to be false or misleading at any stage, the project will berejectedandclearancegive,ifanytotheprojectwillberevokedatourriskandcost.Date:09.05.2017 Place:Mumbai
AtulJangam
M/SSahajanandHi‐TechConstructionsPvt.Ltd.LodhaExcelus,ApolloMillsCompound,N.M.
JoshiMarg,Mahalaxmi,Mumbai400011.
Signatureoftheapplicant Withname&fulladdress (Projectproponent/Authorisedsignatory)NOTE:
1) The projects involving clearance under Coastal Regulation Zone Notification, 1991shall submit with the application a C.R.Z map duly demarcated by one of theauthorizedagencies,showingtheprojectactivities,w.r.tC.R.Z(atthestageofTOR)andtherecommendationsoftheStateCoastalZonemanagementAuthority(atthestageofEC).SimultaneousactionshallalsobetakentoobtaintherequisiteclearanceundertheprovisionsoftheC.R.ZNotification,1991fortheactivitiestobelocatedintheCRZ.
2) Theprojectstobelocatedwithin10kmofthenationalParks,Sanctuaries,Biosphere
Reserves,MigratoryCorridorsofWildAnimals,theprojectproponentshallsubmitthemapdulyauthenticatedbyChiefWildlifeWardenshowingthesefeaturesvis‐avistheproject location and the recommendations or comments of the chief Wildlifethereon.(atthestageofEC)
3) AllcorrespondencewiththeministryofEnvironment&ForestsincludingsubmissionofapplicationforTOR/EnvironmentalClearance,subsequentclarificationsasmayberequiredfromtimetotime;participationintheEACmeetingonbehalfoftheprojectproponentshallbemadeby theauthorisedsignatoryonly.Theauthorisedsignatoryshouldalsosubmitadocumentinsupportofhisclaimofbeinganauthorisedsignatoryforthespecificproject.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 13
APPENDIX‐II(Seeparagraph6)
FORM‐1A(onlyforconstructionprojectslistedunderitem8oftheSchedule)
CHECKLISTOFENVIRONMENTALIMPACTS
(ProjectproponentsarerequiredtoprovidefullinformationandwherevernecessaryattachexplanatorynoteswiththeFormand
submitalongwithproposedenvironmentalmanagementplan&monitoringprogramme)
1. LANDENVIRONMENT
(Attachpanoramicviewoftheprojectsiteandthevicinity)
1.1 Willtheexistinglandusegetsignificantlyalteredfromtheprojectthatisnotconsistentwiththesurroundings?(ProposedlandusemustconformtotheapprovedMasterPlan/DevelopmentPlanofthearea.Changeoflanduseifanyandthestatutoryapprovalfromthecompetentauthoritybesubmitted).AttachMapsof(i)sitelocation,(ii)surroundingfeaturesoftheproposedsite(within500meters)and(iii)thesite(indicatinglevels&contours)toappropriatescales.Ifnotavailableattachonlyconceptualplans.
Theexistinglandusewillnotgetalteredfromtheproject.Asperthezoningstructuretheareacomesunderresidentialarea.
ProposeddevelopmentisinlinewithD.PofFollowingdocumentsareattachedassupportingdocuments.
1. ConceptualPlanandDetailedTenementstatementareattachedasANNEXUREII
2. LocationPlanisattachedasANNEXUREIII
1.2 Listoutallthemajorprojectrequirementsintermsofthelandarea,builtuparea,waterconsumption,powerrequirement,connectivity,communityfacilities,parkingneeds,etc.
AsperearlierEC
Total
TotalPlotArea 4,12,700 5,43,861
PermissibleBuilt‐UpArea(m2)
2,35,660.88 3,64,947.69
Totalconstructionarea(m2)
4,33,443.22 5,80,983.22
Waterconsumption
Proposed
TotalWaterConsumption
2220m3/day
EnergyConsumption
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 14
Proposed
TotalEnergyConsumption
26.72MW
ParkingProvided
Proposed
FourWheeler3460Nos.
TwoWheelernos.3191Cycle:3191nos.
Connectivity Proposedsiteisaccessibleby‐18mwideServiceRoadandMumbaiPuneexpressway.LocationPlanisattachedasANNEXUREIII
1.3 Whatarethelikelyimpactsoftheproposedactivityontheexistingfacilitiesadjacenttotheproposedsite?(Suchasopenspaces,communityfacilities,detailsoftheexistinglanduse,disturbancetothelocalecology).
Theprojectbeingawellplannedactivitywillresultin organized open spaces and green areas. Therewill be minor negative impact on flora presentaround the project site during construction phasemainlyduetodust.
1.4. Willtherebeanysignificantlanddisturbanceresultinginerosion,subsidence&instability?(Detailsofsoiltype,slopeanalysis,vulnerabilitytosubsidence,seismicityetcmaybegiven).
Themain reasons for erosion are overexploitationof groundwater, instable slopes, landslidesetc.Theproposed construction will involve cutting andfilling operations. The project will involveconstruction of roads and development of greenareas, which would reduce the chances of erosionandsubsidence.Subsidence is not anticipated as ground waterwouldnotbeusedasasourceofwatersupply.Asperseismic‐zoningmapofIndia,theprojectsitefallsunderzoneIII.StructuraldesignrequirementswillbeasperzoneIII.
1.5 Willtheproposalinvolvealterationofnaturaldrainagesystems?(Givedetailsonacontourmapshowingthenaturaldrainageneartheproposedprojectsite)
No.Thelandisflat.Thenaturalslopeoftheareaistowardseastside.Therewillnotbeanyalterationofnaturaldrainagesystem.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 15
1.6 Whatarethequantitiesofearthworkinvolvedintheconstructionactivity‐cutting,filling,reclamationetc.(Givedetailsofthequantitiesofearthworkinvolved,transportoffillmaterialsfromoutsidethesite,etc.)
The proposed project’s excavation quantity will bearound1,50,000m3.Therewillnotbeanytransportoffillmaterialsfromoutside.
1.7 Givedetailsregardingwatersupply,wastehandlingetcduringtheconstructionperiod.
Supply Source: Water for Domestic consumptionwillbeavailablefromtreatedRiverWaterwhereasforConstructionpurposeborewellorTankerwaterwillbeused.Storage:Water forconstructionwillbestored inatank constructed temporarily at site whereasDomesticwaterwillbestoredinHDPEtanks.
1.8 Willthelowlyingareas&wetlandsgetaltered?(Providedetailsofhowlowlyingandwetlandsaregettingmodifiedfromtheproposedactivity)
Nowetlandsandlow‐lyingareasonthesite.
1.9 Whetherconstructiondebris&wasteduringconstructioncausehealthhazard?(Givequantitiesofvarioustypesofwastesgeneratedduringconstructionincludingtheconstructionlabourandthemeansofdisposal)
Nohealthhazardisanticipated.Minorquantityofconstructiondebriswillbegeneratedwhichwillbedisposedtodesignatedlandfill.
2. WATERENVIRONMENT
2.1 Givethetotalquantityofwaterrequirementfortheproposedprojectwiththebreakupofrequirementsforvarioususes.Howwillthewaterrequirementmet?Statethesources&quantitiesandfurnishawaterbalancestatement.
EnclosedasANNEXUREIV
2.2 Whatisthecapacity(dependablefloworyield)oftheproposedsourceofwater?
Theproposedwaterdemandwillbemetfromtreatedriverwater.
2.3 Whatisthequalityofwaterrequired,incase,thesupplyisnotfromamunicipalsource?(Providephysical,chemical,biologicalcharacteristicswithclassofwaterquality)
Watersupplyisfromtreatedriverwater.
2.4 Howmuchofthewaterrequirementcanbemetfromthe
TreatedwaterfromSTPwillbeusedforflushingintoiletandgardening
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 16
recyclingoftreatedwastewater?(Givethedetailsofquantities,sourcesandusage)
Totalsewagegenerated 2058m3/day
TotalSTPcapacity 2200m3
Treatedwaterrecycledforflushing
745m3/day
Treatedwaterforgardening 858m3/day
Sludgeforcomposting 21m3/day
Excesstreatedwater 434m3/day
2.5 Willtherebediversionofwaterfromotherusers?(Pleaseassesstheimpactsoftheprojectonotherexistingusesandquantitiesofconsumption)
Nodiversionisanticipated
2.6 Whatistheincrementalpollutionloadfromwastewatergeneratedfromtheproposedactivity?(Givedetailsofthequantitiesandcompositionofwastewatergeneratedfromtheproposedactivity)
The total sewage of about 2058 m3/day will begenerated from the complex. The composition ofwaste water is given in the table indicating thequalityofrawwastewaterbeforetreatment
Parameters Values Units
pH 7‐8 mg/l
BOD 250‐300 mg/l
COD 450‐600 mg/l
O&G/ABS 10‐20 mg/l
TSS 100‐200 mg/l
Mitigation measures: Domestic Effluent will betreated in the TOTAL Sewage Treatment plant ofcapacity2200m3/daycapacityofSTPforresidentialbuildings.The treatedsewagewaterwillbe reusedforflushingandgardening.
2.7 Givedetailsofthewaterrequirementsmetfromwaterharvesting?Furnishdetailsofthefacilitiescreated.
Harvestedwaterwillusedforsecondarypurpose.
2.8. Whatwouldbetheimpactofthelandusechangesoccurringduetotheproposedprojectontherunoffcharacteristics(quantitativeaswellasqualitative)oftheareainthepostconstructionphaseonalongtermbasis?Woulditaggravatetheproblemsoffloodingorwaterlogginginanyway?
Theprojectwill haveproper stormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.Sotherewillbenoproblemofwaterloggingduetothisproject.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 17
2.9 Whataretheimpactsoftheproposalonthegroundwater?(Willtherebetappingofgroundwater;givethedetailsofgroundwatertable,rechargingcapacity,andapprovalsobtainedfromcompetentauthority,ifany)
In the proposed development there will be notapping of groundwater. Water demand for theconstruction as well as operational phase will bemet from sources such as PawanaRiver or tankerwater
2.10 Whatprecautions/measuresaretakentopreventtherun‐offfromconstructionactivitiespollutingland&aquifers?(Givedetailsofquantitiesandthemeasurestakentoavoidtheadverseimpacts)
Followingmeasureswillbetakenuptopreventthe
runofffrompollutinglandandgroundwater
Noexcavationduringmonsoonseason.
Catch drainage all along the periphery of plot topreventsurfacerunoff.
Useofsiltfenceandtrapstoreducetherunoff
2.11 Howisthestormwaterfromwithinthesitemanaged?(Statetheprovisionsmadetoavoidfloodingofthearea,detailsofthedrainagefacilitiesprovidedalongwithasitelayoutindicationcontourlevels)
Theprojectwill haveproper stormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.
The storm water drains will be provided atbasements, and ground levels. So therewill not beproblemofwaterloggingduetothisproject.
2.12 Willthedeploymentofconstructionlabourersparticularlyinthepeakperiodleadtounsanitaryconditionsaroundtheprojectsite(Justifywithproperexplanation)
No, the deployment of construction labourers willnot lead to any unsanitary condition. Theconstruction labourers will be provided withtemporary shelter shades within the projectpremises.Theunsanitaryconditionwillberemovedby means of providing readymade septic tanks &soakpits.Solidwastewillbedisposedoff inmunicipalwastedisposalsystem.
2.13 Whaton‐sitefacilitiesareprovidedforthecollection,treatment&safedisposalofsewage?(Givedetailsofthequantitiesofwastewatergeneration,treatmentcapacitieswithtechnology&facilitiesforrecyclinganddisposal)
ConstructionPhase:Sewagewillbe treated inseptic tank.Theoverflowofseptictankisdischargedinsoakpits.OperationPhase:The Sewage Treatment Plant (STP) with capacity2200KLDisdesignedto treat therawwastewatergeneratedfromResidentialbuilding
2.14 Givedetailsofdualplumbingsystemiftreatedwasteusedisusedforflushingoftoiletsoranyotheruse.
Yes,Theproposeddevelopmentwillhavethedualplumbingsystemasthetreatedsewagewillbeusedforrecycling.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 18
3. VEGETATION
3.1 Isthereanythreatoftheprojecttothebiodiversity?(Giveadescriptionofthelocalecosystemwithit’suniquefeatures,ifany)
Thereisnosensitiveecosystempresentatsitethatwillbedisturbedbytheproject
3.2 Willtheconstructioninvolveextensiveclearingormodificationofvegetation?(Provideadetailedaccountofthetrees&vegetationaffectedbytheproject)
No.15treeshavebeencutaspertheTreecuttingNOC for Phase I of Project for which EC wasobtained.Existingtrees:85nos.Treestobecut18nos.
3.3 Whatarethemeasuresproposedtobetakentominimizethelikelyimpactsonimportantsitefeatures(Givedetailsofproposalfortreeplantation,landscaping,creationofwaterbodiesetcalongwithalayoutplantoanappropriatescale)
About 1,71,600 m2 areas are provided for thedevelopment of landscape in the premises. Thegreenbeltwillbedevelopedforcontrolofpollutionandaestheticviewofthecomplex.Total1700treeswillbeplantedinthepremises.
4. FAUNA
4.1 Istherelikelytobeanydisplacementoffauna‐bothterrestrialandaquaticorcreationofbarriersfortheirmovement?Providethedetails.
No.Theproposedsiteanditssurroundingsdonotsupportanyhabitatforanygroupofwildanimals
4.2 Anydirectorindirectimpactsontheavifaunaofthearea?Providedetails.
No.Therewillbenodirectorindirectimpactontheavifaunaofthearea.
4.3 Prescribemeasuressuchascorridors,fishladdersetctomitigateadverseimpactsonfauna
SincetheProposedProjectwouldnothaveanyadverseimpactonfaunahencemitigationmeasurenotrelevant
5. AIRENVIRONMENT
5.1 Willtheprojectincreaseatmosphericconcentrationofgases&resultinheatislands?(Givedetailsofbackgroundairqualitylevelswithpredictedvaluesbasedondispersionmodelstakingintoaccounttheincreasedtrafficgenerationasaresultoftheproposedconstructions)
TheProjectwillresult innegligible increase intheatmospheric concentrations of gases due to D.G.operations(backuppoweronly)andtheincreasedtraffic. Theproposed activitywill not result in theformationofanyheatislands,asitdoesnotinvolveanysignificantchangeinthelandusepatternortheconcretingofareas.
5.2 Whataretheimpactsongenerationofdust,smoke,odorousfumesorotherhazardousgases?Givedetailsinrelationtoallthemeteorologicalparameters.
Diesel generator sets operated for back‐up powersupply are identified as the onlymajor sources ofgaseous and particulate emission. Impact ofvehicular is not significant. SO2, SPM, NOX and COemissions are expected due to fuel combustion ingeneratorsets.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 19
5.3 Willtheproposalcreateshortageofparkingspaceforvehicles?Furnishdetailsofthepresentleveloftransportinfrastructureandmeasuresproposedforimprovementincludingthetrafficmanagementattheentry&exittotheprojectsite.
Theprojectwillhaveproperentryandexitforthevehicles.Theprojectsiteisaccessedby90mwideroad.Therewillnotanytrafficcongestionduetoprojectsite.Inproposedprojectprovisionof3460(fourwheeler)and3191nos(twowheelers)parkingspaceshasbeenmade.
5.4 Providedetailsofthemovementpatternswithinternalroads,bicycletracks,pedestrianpathways,footpathsetc.,withareasundereachcategory.
Internalroads,footpaths/pedestrianpathwayshavebeenplannedwithintheproposedcomplex
5.5 Willtherebesignificantincreaseintrafficnoise&vibrations?Givedetailsofthesourcesandthemeasuresproposedformitigationoftheabove.
Considering the addition of vehicles due to theproposed project with the existing roads andvehicles plying on them, there will be marginalincreaseinthenoiselevelsbutwillnotresultinanimpact.
5.6 WhatwillbetheimpactofDGsets&otherequipmentonnoiselevels&vibrationin&ambientairqualityaroundtheprojectsite?Providedetails.
DGsetwillbeusedinconstructionandoperationphaseonlyincaseofpowerfailure.The DG Sets shall be as per the guide lines laiddownbyEPRforspecificnoiseemissionstandards.Measures shall be taken for reduction of noise byusingacousticenclosures.Increase innoise levels are expected fromvariousconstructionequipmentandmachinery.
6. AESTHETICS
6.1 Willtheproposedconstructionsinanywayresultintheobstructionofaview,scenicamenityorlandscapes?Aretheseconsiderationstakenintoaccountbytheproponents?
Theproposedlanduseofthesitewouldbemainlyresidential and will not result in obstruction ofview, scenic amenity or landscape. However, thebuildings will be planned in such a way that theorganised open areas and landscaped areas are atthecentresothatallcanenjoythegreenareas.
6.2 Willtherebeanyadverseimpactsfromnewconstructionsontheexistingstructures?Whataretheconsiderationstakenintoaccount?
Therewillnotbeanyadverseimpact
6.3 Whetherthereareanylocalconsiderationsofurbanform&urbandesigninfluencingthedesigncriteria?Theymaybeexplicitlyspeltout.
The Project has been designed as per thedepartment of town planning, Government ofMaharashtra.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 20
6.4 Arethereanyanthropologicalorarchaeologicalsitesorartefactsnearby?Stateifanyothersignificantfeaturesinthevicinityoftheproposedsitehavebeenconsidered.
No anthropological or archaeological sites orartefactsarefoundnearthesitearea.
7. SOCIO‐ECONOMICASPECTS
7.1 Willtheproposalresultinanychangestothedemographicstructureoflocalpopulation?Providethedetails.
No.Majorityof the labourwillbe recruited locallyand only minimal skilled workers would be fromoutside,which is anticipated to be very small andwill not alter the existing demographic profile ofthearea.
7.2 Givedetailsoftheexistingsocialinfrastructurearoundtheproposedproject.
The Project comes in Residential area and has allbasic infrastructural facilities as schools, medicalestablishments, shops, etc within 10 km radius ofprojectsite.
7.3 Willtheprojectcauseadverseeffectsonlocalcommunities,disturbancetosacredsitesorotherculturalvalues?Whatarethesafeguardsproposed?
No. The Projectwill have positive impact on localcommunities.
8. BUILDINGMATERIALS
8.1 Mayinvolvetheuseofbuildingmaterialswithhigh‐embodiedenergy.Aretheconstructionmaterialsproducedwithenergyefficientprocesses?(Givedetailsofenergyconservationmeasuresintheselectionofbuildingmaterialsandtheirenergyefficiency)
Yesthebuildingmaterialswithhighembodiedenergywillbeused
8.2 Transportandhandlingofmaterialsduringconstructionmayresultinpollution,noise&publicnuisance.Whatmeasuresaretakentominimizetheimpacts?
Adequatemitigativemeasureswillbeadopted.Constructionequipmentwithidlingcontroltechnologieswillbeused.Regularmaintenanceoftheequipmentswillbecarriedout.Theconstructionactivitieswillbecarriedoutduringthedaytimeonly.Theconstructionsmaterials/excavatedsoil/constructiondebriswillbecarriedthoroughcoveredtrucks.Theworkersexposedtohighnoisegeneratingwouldbeprovidedwithearplugs.
8.3 Arerecycledmaterialsusedinroadsandstructures?Statetheextentofsavingsachieved?
Flyashincementconcrete.Typically20‐25%offlyashissubstitutedincement.
8.4 Givedetailsofthemethodsofcollection,segregation&disposalofthegarbagegeneratedduringtheoperationphasesoftheproject.
Thebio‐degradableandnon‐biodegradablewastewillbesegregatedatsourceofwastegeneration.Totalsolidwastegeneration:8183kg/day Thebiodegradablewaste4909.8kg/daywillbe
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 21
treatedbycompostingmethod Thenon‐biodegradablewaste3273.2kg/daywillbedisposedoffthroughrecyclers.
9. ENERGYCONSERVATION
9.1 Givedetailsofthepowerrequirements,sourceofsupply,backupsourceetc.Whatistheenergyconsumptionassumedpersquarefootofbuilt‐uparea?Howhaveyoutriedtominimizeenergyconsumption?
Sourceofpowersupply:MSEDCLDGSetwillbeprovidedasemergencybackup.
Proposed
27MWTotalEnergyConsumption
9.2 Whattypeof,andcapacityof,powerback‐uptoyouplantoprovide?
DGSetwillbeprovidedasemergencybackupforlightingincommonareas,oneliftperbuildingandfirepumpineachbuilding.DGsetsof6x1010kVA,&1x350kVA
9.3 Whatarethecharacteristicsoftheglassyouplantouse?Providespecificationsofitscharacteristicsrelatedtobothshortwaveandlongwaveradiation?
Notapplicable
9.4 Whatpassivesolararchitecturalfeaturesarebeingusedinthebuilding?Illustratetheapplicationsmadeintheproposedproject.
The building structure will be designed in such awaythatsolarlightcanbeutilisedmaximumfordaytime.
9.5 Doesthelayoutofstreets&buildingsmaximisethepotentialforsolarenergydevices?Haveyouconsideredtheuseofstreetlighting,emergencylightingandsolarhotwatersystemsforuseinthebuildingcomplex?Substantiatewithdetails.
Solar street lights are proposed in areas such asopenspaces,pathways,RGetc.Apartfromsolarhotwatersystem.
9.6 Isshadingeffectivelyusedtoreducecooling/heatingloads?WhatprincipleshavebeenusedtomaximizetheshadingofWallsontheEastandtheWestandtheRoof?Howmuchenergysavinghasbeeneffected?
Theproposedbuildingdoesn’thaveshadingarrangement.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 22
9.7 Dothestructuresuseenergy‐efficientspaceconditioning,lightingandmechanicalsystems?Providetechnicaldetails.Providedetailsofthetransformersandmotorefficiencies,lightingintensityandair‐conditioningloadassumptions?AreyouusingCFCandHCFCfreechillers?Providespecifications.
Yes.Theroomswillbesodimensionedthateffectiveairconditioningcanbecarriedout.Publicareaswillbe cooled by natural ventilation. The design of thebuildingwill be such thatmaximumuse of naturalventilation can be achieved. The walls, roofs andopenings will be so designed that influx of heat isminimum.
9.8. Whatarethelikelyeffectsofthebuildingactivityinalteringthemicro‐climates?Provideaselfassessmentonthelikelyimpactsoftheproposedconstructiononcreationofheatisland&inversioneffects?
Heat emission from the proposed construction canbefromthefollowingsources:Heat absorbed from the concrete structures, heatgeneratedfromequipments/appliances,andduetoincreasedpopulationintheproposeddevelopment.However the heat generatedwill not be significantandwill be dissipated in the lush greens and openareas provided within. Hence it can be concludedthattheheatislandeffectshallnotbeaconcernfortheproposedproject.
9.9. Whatarethethermalcharacteristicsofthebuildingenvelope?(a)roof;(b)externalwalls;and(c)fenestration?GivedetailsofthematerialusedandtheU‐valuesortheRvaluesoftheindividualcomponents.
UvalueinWatts/hr/m2/C
Roof 0.409 Watts/hr/m2/C
Wall 0.352 Watts/hr/m2/C
9.10 Whatprecautions&safetymeasuresareproposedagainstfirehazards?Furnishdetailsofemergencyplans.
The fire fighting system shall compromise ofhydrant system and portable extinguishers. Smokedetectors will be provided along with manual callpoints. External yard hydrants shall be installedaround all buildings in the complex in galvanizedsteel firehosecabinet (weatherproof).Allexternalyard hydrants shall be at one meter height fromfinishedgroundlevelasperNationalBuildingCode.External firehydrantsshallbe locatedsuchthatnoportion of any building is more than 45m from ahydrant, and the external hydrants are notvulnerabletomechanicalorvehiculardamage.
9.11 Ifyouareusingglassaswallmaterialprovidesdetailsandspecificationsincludingemissivityandthermalcharacteristics.
NotApplicable
9.12 Whatistherateofairinfiltrationintothebuilding?Providedetailsofhowyouaremitigatingtheeffectsofinfiltration.
Thefollowingmeasureswillbeadoptedtomitigatetheeffectsofinfiltration: Aluminiumwindowswithrubbergasket,sothat
thewindowsaresealed,willbeprovided. Summer cross section ventilation will be
maximum.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 23
9.13 Towhatextentthenon‐conventionalenergytechnologiesareutilisedintheoverallenergyconsumption?Providedetailsoftherenewableenergytechnologiesused.
NotApplicable
10. EnvironmentManagementPlan
TheEnvironmentManagementPlanwouldconsistofallmitigationmeasuresforeachitemwiseactivitytobeundertakenduringtheconstruction,operationandtheentirelifecycletominimizeadverseenvironmentalimpactsasaresultoftheactivitiesoftheproject.Itwouldalsodelineatetheenvironmentalmonitoringplanforcomplianceofvariousenvironmentalregulations.Itwillstatethestepstobetakenincaseofemergencysuchasaccidentsatthesiteincludingfire.
EnclosedasAnnexureV
Application form for Expansion in Environmental Clearance Project Name Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 24
ANNEXUREI
AREASTATEMENT
SR.NO. DETAILS AREA UNIT
1 FSIareaproposed 3,64,947.69 m2
2 NonFSIarea 2,16,035.53 m2
3 TotalConstructionarea 5,80,983.22 m2
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 25
ANNEXUREII
CONCEPTUALPLAN
Application form for Expansion in Environmental Clearance Project Name Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 26
TenementDetails
BuildingNos. Noofbuildings Floors Tenements1,2,3 3 S+22 2554 1 S+22 855 1 S+22 856,7,8,9,29,30 4+2 S+23 352+17610,11,27,28 4 S+23 70412,16,17 3 S+22 25213.14 2 S+22 16815 1 S+21 8121 1 S+22 8522 1 S+22 8518,20 2 S+23 35219 1 S+23 17623,24 2 S+21 16225,26 2 S+19 40SubTotal 28 2882+176=3058Villas 28+105 28+105=133Convenienceshops(50Nos)shopping/Retail
1
MeditationCentre 1 ClubHouse 1 4368.34sqmBUA FireStation 1 1436.04sqmBUA StaffQuartersforFirestation
1
Application form for Expansion in Environmental Clearance Project Name Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 27
ANNEXUREIIILOCATIONPLAN
PROJECT SITE
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 28
GOOGLEIMAGE
Application form for Expansion in Environmental Clearance Project Name Expansion of Residential development Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 29
ANNEXUREIV
WATERBALANCESTATEMENT
ParticularsNoofFlats
/rooms/CarsOccupancy
TotalPopulation
TotalWaterRequirement/
person
WaterDemandKLD
Domestic Flushing
SaleFlats 3,058 5 15,290 90 45 135 2,064
Villa 133 5 665 90 45 135 90
StaffQuartersforFireStation
28 5 140 90 45 135 19
ClubHouse 4,368 436 15 30 45 20
Firestation 1,436 143 15 30 45 6
Shops 50 2 100 15 30 45 5
Swimmingpoolmakeup
Volume675m3 17
Total 16,774 2,220
SewageGeneration
2,058
Sludge1%ofSewageGeneration
21
RecyclingforFlushing
SaleFlats 3,058 5 15,290 45 45 688
Villa 133 5 665 45 45 30
StaffQuartersforFireStation
28 5 140 45 45 6
ClubHouse 4,368 436 30 30 13
Firestation 1,436 143 30 30 4
Shops 50 2 100 30 30 3
Total 16,774 745
Gardening 1,71,600 5l/m2 858
ExcessTreated
WatertoPond434
WaterRequirementBasis(inlpcd)*
90%ofFreshand100%ofFlushingWaterRequirement
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 30
ANNEXUREVI
EnvironmentalManagementPlanduringConstructionPhaseSr.No.
EnvironmentalComponents
PredictedImpacts
ProbablesourceofImpact
MitigationMeasures Remarks
CONSTRUCTIONPHASE
1.AmbientAirQuality
Negativeimpactinsideconstructionsitepremises.Nonegativeimpactoutsidesite.
Dustemissionsfromexcavation,airemissionsfrommachineryandotherconstructionactivitiesatsite.
Dustreductionmeasuressuchasroadwatering.Periodicmaintenanceofconstructionequipment.Useofgoodqualityfuels.UseofPersonalProtectiveEquipments
Impactsaretemporaryduringconstructionphase.Impactswillbeconfinedtoshortdistances,ascoarseparticleswillsettlewithintheshortdistancefromactivities.
2. Noise GenerationsourcesinsidePremises.NosignificantimpactonambientnoiselevelsintheSurroundingarea.
NoisegeneratedfromconstructionactivitiesandoperationofconstructionequipmentandDGsets
Useofwell‐maintainedequipment.Heavyconstructionactivitylimitedtoday‐timehoursonly.Useofnoisemufflersinandconstructionvehicle.Useofearplugs/muffsbyconstructionstaff.
TemporaryimpactsduringConstructionphase.Noblastingorotherhighnoiseactivitiesenvisaged
3. WaterNosignificantnegativeimpact.
Surfacerunofffromprojectsite.Oil/fuelandwastespills.Improperdebrisdisposal.Dischargeofsewagefromlabourcamp.
Siltfencestoreducerun‐offSecondarycontainmentanddykesinmaterialstorageareas.Sewagetreatmentinseptictanks.
Labourwillbeemployedtoreducesizeoflabourcamps.Noperennialsurfacewaterresourceadjacenttosite.Noexcavationworkwillbe
4. Land Minornegativeimpact
Excavation,Constructiondebris,wastefromlabourcamp.
ReutilizationandrecyclingofconstructiondebrisWastefromlabourcampswillbecollectedandcompostedonsite.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 31
Noncompostablewastewillbetransportedtolandfillsite.Topsoilwillbeconservedandusedforlandscapinginfunctionalphase.
‐
5. AestheticsMinornegativeimpacts
ConstructionactivitiesandExcavation
Theimpactswillbecompensatedbyextensivetreeplantationandgardeningintheusephase.
Shorttermimpactrestrictedonlyintheinitialstagesofconstruction.
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 32
EnvironmentalManagementPlanduringFunctionalPhase
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbableSourceOfImpact MitigationMeasures Remarks
FUNCTIONALPHASE
1.AmbientAirQuality
MinorNegativeimpact
ParticulateandgaseousemissionsfromDGsetsandvehiclemovement
Useoflowsulphur
goodfuel
Periodicmaintenance
ofDGsets
UseofCNG/LPGasa
fuelshouldbe
encouraged.
DGsetswillbeused.
2. Noise
Minornegativeimpactinsidepremises.
Noisefromvehiclemovementandoperationofdieselgeneratorsetsduringpowerfailure.
HousingofDGsetsin
buildingswith
appropriateacoustics.
Trafficmanagement
measurestoreduce
noise
Appropriatetrees
whichwillactas
noisesbarrierswillbe
plantedinthe
premisesandalong
roadside.
‐‐
3. Water
Nosignificantadverseimpact
Oil/fuelandwastespillsinvehicleparkingarea.Dischargeofsewage.Dischargeofcontaminatedstormwater
Sewagewaterwillbe
treatedandrecycled.
Rainwaterharvesting
isproposed.
Goodhousekeeping
andstormwater
managementwillbe
followed.
Recycledwaterwillbeusedforgardeningandflushingpurpose.
4. LandNonegativeimpact
Storageanddisposalofsolidwastes.Dischargeofsewage.Fuelandmaterialspills.
Treatmentandreuse
ofsewagewater.
Integratedwaste
managementandspill
controlplan
Drygarbagewillbe
sentforrecyclingand
wetgarbagewillbe
composted.
Segregationofdryandwetgarbagebeforewillbedonebeforedisposal.
5. BiologicalOverallPositive
Habitat
disturbance
Greenspacesinside
thepremiseswillhelp
Landscaping
willhelpin
Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential Project, Pune
Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 33
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbableSourceOfImpact MitigationMeasures Remarks
impact tocompensatethe
earliereffectfrom
vegetation.
Landscapingand
extensiveplantationin
thepremises.
reducingany
adverse
impactson
airandnoise
quality.
6.Socio‐economic
Overallpositiveimpact
Increasedjobopportunityinhouseholdmaintenanceandancillaryservices.
‐‐Positiveandlongtermimpact‐
FUNCTIONALPHASE
7.TrafficPattern
NosignificantImpact
Thecomplexislikelytoaddmoderatelytothetrafficflowconsideredduringpeakhour.
TrafficManagement
practiseswillbe
employed.
Adequateparking
spacewillbeprovided
inthepremises.
27
A
BLUE LINE
GAT
NO
.249
PAR
TG
AT N
O.2
50
GAT NO.251 PART
GAT NO.225 PART
GAT NO.226 PART
GAT NO.227 PART
ADJ. GAT NO.259
ADJ. GAT NO.260
ADJ. GAT NO.261
ADJ. GAT NO.262
ADJ. GAT NO.263
ADJ. GAT NO.266
ADJ.
GAT
NO
.257
AREA NOT UNDER OWNERSHIP & NOT PROPOSED N.A
AREA NOT UNDER OWNERSHIP & NOT PROPOSED N.A
B
18.00 MT WIDE R O A D
59.17M
153.
15M
54.18M
13.58M
12.00M
37.42M
27.27M
162.23M
132.56M
54.1
9M
86.3
1M
63.69M
179.47M
266.
63M
AGRICULTURAL &NO DEVELOPMENT ZONE49744.95 SQ.M.
A D J. P A W A N A R I V
E R
18.00M.W.PROPOSED ROAD
18.0
0
10.00M.W.59.17M
18.00
HIGH FLOOD LINE (RED LINE)
GREEN BELT LINE
ENTRANCE
PLO
T BO
UN
DR
Y
PLO
T BO
UN
DR
Y
PLOT BOUNDRY
PLO
T BO
UNDR
Y
PLOT BOUNDRY
LAYOUT PLAN
C
91.7
1M
59.17M
18.0
0
59.17M
PROPOSEDEHV SUBSTATION
OPEN SPACE - 114,667.72 SQ.M.
108.0
0
90.00
90.00M.W. MUMBAI-PUNE EXPRESS W
AY (AS PER SITE)
18.00 M W. SERVICE R O A D
18.00 M W. RP R O A D
18.00 M W INTERNAL ROAD
15.0
0 M
W I
NTE
RN
AL R
OAD
12.70
12.40
51.03
12.87
CULB HOUSE
31.07
BLDG '20'
17.00
17.00
U.G.TANK
09
10
17
19
20
21
22
24
25
28
51.6
933.83
16.8
4
15.00 M W INTERNAL RD.
12.00 M W INTERNAL ROAD
7.52
11.29
14.07
38.1
5
CULB HOUSE(L.G+G+1)
21.7
8
21.8
0
21.7
8
38.10
14.3212.34
32.82 16.84
33.83
16.8
4
38.1
5
25.79
51.6
9
25.69
41.2
0
25.69
18.5
0
41.2
0
190.16M
116.
92M
49.87 21.6
9
85.08
63.5
1
56.21
97.1
7
38.00
51.0
0
99.8
7
49.29
25.0
055
.90
10.10
BLDG '1'ST+22ND
HT.69.85M.
BLDG '2'
BLDG '11'
ST+22NDHT.69.85M.
BLDG '3'ST+22NDHT.69.85M.
BLDG '4'ST+22NDHT.69.85M.
BLDG '5'ST+22NDHT.69.85M.
BLDG '6'ST+23RDHT.72.85M.
BLDG '7'
HT.72.85M.
BLDG '8'
HT.72.85M.
BLDG '9'
HT.72.85M.
BLDG '10'
ST+23
HT.72.85M
BLDG '12'
BLDG '13'
BLD
G '1
5'
BLD
G '1
6'
BLDG '18'
BLDG '14'
BLD
G '1
7'
ST+23RD
ST+23RD
ST+23RD
BLDG '19'
5.00
14.02
13.86
26.26
23.73
51.06
48.86
51.03
41.08
14.92
38.15
21.86
38.15
21.86
17.00
17.00
ST+2
2ND
BLD
G '2
1'
BLD
G '2
2'
BLD
G '2
3'
BLD
G '2
4'
BLD
G '2
5'
BLD
G '2
6'ST
+19T
HH
T.69
.30M
.
BLDG '28'BLDG '27'
ST+2
2TH
HT.
73.0
5M.
ST+2
2ST
HT.
73.0
5 M
.
ST+2
1ST
HT.
70.0
0M.
ST+22ST
HT.73.05M.
ST+22ST
HT.73.05M.
ST+2
1ST
HT.
70.0
0M.
HT.72.85M.H
T.73
.05M
.
ST+23RD
ST+22ST
HT.73.05 M.
ST+23RDHT.72.85M.
ST+23RDHT.72.85M.
ST+23
HT.72.85M
ST+23HT.72.85MST+23HT.72.85M
ST+2
1ST
HT.
70.0
0M.
ST+2
2ND
HT.
73.0
5M.
15.0
0 M
W I
NTE
RN
AL R
OAD
8.11
7.98
10.10
32.25
15.30
15.30
21.00
14.31
14.32
14.30
14.32
14.88
12.0
0
12.0
0 M
W I
NTE
RN
AL R
OAD
43.20
ST+1
9TH
HT.
69.3
0M.
16.00
16.00
16.00
16.8
4
32.83
32.8215.94
18.07
11.44
19.12
14.42
14.43
14.43
14.97
15.66
12.2
0
12.2
0
12.2
0
15.2
3
13.18
14.2
3
14.2
3
14.2
3
24.0
1
13.65
13.83
31.7
5
19.1
118.8
3
17.7
0
12.0
3
12.0
0
17.97
13.75
13.75
13.74
13.74
18.72
13.71
13.71
12.01
12.00
12.00
14.54
12.65
12.28
12.13
12.00
12.00
13.03
13.03
13.00
13.03
21.79
21.79
12.5
0
12.5
0
25.79
50.7
9
12.00 M W INTERNAL ROAD
HTMETERING
SHOPPINGCENTERGR+1ST
14.73
9.84
9.84
5.00
5.00
5.00
4.92
4.92
4.92
4.92
5.04
4.92
4.92
5.03
5.04
22.0
7 ROAD
15.00 M W INTERNAL RD.
WTP
PLOT BOUNDRY
12.64
14.75
U.G.TANK
17.0
0
AMENITY-56926.09 SQ.M.
F
AGRICULTURAL &NO DEVELOPMENT ZONE2028.28 SQ.M.
GAT NO.258
37.87M
GAT NO.232
GAT NO.265
GAT NO.269(P)
GAT NO.268(P)
GAT NO.267(P)
GAT NO.264(P)
271.
94M
48.9
3M
45.97M
89.76M
48.27M
136.95M
101.07M
43.12M
81.02M
175.90M114.71M
138.61M
86.78M
23.22M33.86M
33.95M
14.1
3M
113.90M39.63M 28.65M
GAT NO.270
75.9
4M
53.63M
68.7
1M
85.4
6M
187.
75M
49.05 M.
90.3
2M
39.19 M.
C
AGRICULTURAL &NO DEVELOPMENT ZONE3996.26 SQ.M.
DAGRICULTURAL &NO DEVELOPMENT ZONE135.30 SQ.M.
BAGRICULTURAL &NO DEVELOPMENT ZONE69100.00 SQ.M.
AGRICULTURAL &NO DEVELOPMENT ZONE1585.83 SQ.M.
E
122.45 M.
122.14 M.
99.6
0 M
20.33M.
28.26M.
33.0
9M
77.7
8M
45.05 M. 25.4
6M
124.27M
146.50M
104.
19M
27.58 M
TEMP. LABOURCOLONY(TO BE DEMOLISHED)=1350.00 SQ.MT.
BUILDING LINEFOR RESI. & COMM. AS PER1) MSRDC / EE / F.NO.133-G / 1817LETTER DTD. 20 JUNE 2012.2) MSRDC/04/2015/NOC-133(G)/1306LETTER DTD. 25 MARCH 2015
15.87
25% OPEN OFAMENITY-4
957.00SQ.M.
6.00
PROPOSEDFIRE STATION
AMENITY-119556.02 SQ.M.
25% OPENOF AMENITY-14891.00SQ.M.
33.83
48.28
6.00
6.00
3.00
3.00
3.00
3.00
3.00
ENTRY / EXIT
24.95
32.7
0
18.00
18.0
0
AMENITY-43822.72 SQ.M.
25.0
7
26.7
5
ROO
M
9.67
29.1
9
6.7955
.22
38.1
7
13.77
18.35
12.00
MLCPGR+3RD
18.79
25% OPEN OFAMENITY-2
1742.00SQ.M.
6.00
3.00
STP-1
243.25
222.38
207.48
201.66
6.00
ROOM
21.70
25.63
ENTRY / EXIT FORSHOPPING CENTERFROM 18.MTR RP ROAD
65.51 M.
AREA NOT UNDER OWNERSHIP& NOT PROPOSED N.A
70.47M 12.9
5M
60.5
8
15.42
SPACE FOR HELICOPTER LANDING
9.00
21.4
8
39.5
6
72.00
13.13
9.00
9.00
72.00
7.50
15.83
9.00
9.00
AMENITY-311833.53 SQ.M.
25% OPEN OFAMENITY-3
1217.75SQ.M.
25% OPEN OFAMENITY-3
1741.60SQ.M.
6.00
MEDITATION CENTER
BUILDING LINEFOR RESI. & COMM. AS PER1) MSRDC / EE / F.NO.133-G / 1817LETTER DTD. 20 JUNE 2012.2) MSRDC/04/2015/NOC-133(G)/1306LETTER DTD. 25 MARCH 2015
9.00
M W
IN
TER
NA
L R
OA
D
12.00
51.03
OPEN SPACE - 21407.75 SQ.M.
OPEN SPACE - 46,916.81 SQ.M.
OPEN SPACE - 31407.75 SQ.M.
CONCEPTUAL PLAN