FORM 1 & 1 A

35
FORM 1 & 1 A For PROPOSED EXPANSION OF RESIDENTIAL DEVELOPMENT (Obtained prior environmental clearance vide letter no. SEAC-2010/CR.486/TC.2 dt 7 th April 2011) At Plot bearing G. No. 205(P), 221(P), 225(P), 226(P), 227(P), 228 to 247, 248(P), 249(P), 251, 252, 253 to 256, 258(P), 264(P), 265, 267(P), 268(P), 269(P), 270, 358(P), 359(P), 360 at Village: Gahunje, Taluka : Maval, Dist. Pune, Maharashtra Proposed By SAHAJANAND HI-TECH CONSTRUCTIONS PVT. LTD

Transcript of FORM 1 & 1 A

FORM 1 & 1 A

For

PROPOSED EXPANSION OF RESIDENTIAL DEVELOPMENT

(Obtained prior environmental clearance vide letter no. SEAC-2010/CR.486/TC.2 dt 7th April 2011)

At

PlotbearingG.No.205(P),221(P),225(P),226(P),227(P),228to247,248(P),249(P),251,252,253to256,258(P),264(P),265,267(P),268(P),269(P),270,358(P),359(P),360at

Village:Gahunje,Taluka:Maval,Dist.Pune,Maharashtra

Proposed By

SSAAHHAAJJAANNAANNDD HHII--TTEECCHH CCOONNSSTTRRUUCCTTIIOONNSS PPVVTT.. LLTTDD

Application form for Expansion in Environmental Clearance Project Name Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 1

APPENDIX‐I

(Seeparagraph–6)FORM1

(I) BasicInformation

Sr.No. Item Details

1 Nameoftheproject/s ProposedExpansionofResidentialdevelopment

2 S.No.intheSchedule 8(b)

3 Proposedcapacity/area/length/tonnagetobehandled/commandarea/leasearea/numberofwellstobedrilled.

AsperearlierEC

Proposed(AfterExpansion)

Total Plot Area(m2)

4,12,700 5,43,861

FSIArea(m2) 2,35,660.88 3,64,947.69

Totalconstructionarea

4,33,443.22 5,80,983.22

DetailedAreaStatementisattachedasAnnexureI

4 New/Expansion/Modernization

ExpansionProject

5 ExistingCapacity/Areaetc. ECobtainedfortotalconstructionareaof4,33,443.22m2 vide letter no. SEAC 2010/ CR.486/ TC.2 dt 7thApril2011

6 Categoryofprojecti.e.AorB BCategory

7 Does it attract the generalcondition?ifyes,pleasespecify

No

8 Does it attract the specificcondition?Ifyes,pleasespecify

No

9 Location At Village: Gahunje, Taluka: Maval, Dist. Pune,Maharashtra.

Plot/Survey/KhasraNo. PlotbearingG.No.205(P),221(P),225(P),226(P),227(P),228to247,248(P),249(P),251,252,253to256,258(P),264(P),265,267(P),268(P),269(P),270,358(P),359(P),360atVillage:Gahunje,Taluka:Maval,Dist.Pune,Maharashtra

Village Gahunje

Tehsil Maval

District Pune

State Maharashtra

10 Nearest railway station/portalongwithdistanceinkms.

NearestRailwayStation:Pimpri‐Chinchwad7KmNearestAirport:Pune25km

11 Nearest Town, city, DistrictHeadquartersalongwithdistanceinkms.

NearestCity:Pune15kmDistrictHeadquarters:14.92km

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 2

12 VillagePanchayat,ZillaParishad,MunicipalCorporation,Localbody(completepostaladdresseswithtelephonenos.tobegiven)

TheCollectorPune,Collectoroffice,Opp.SassoonHospital,Pune‐411001.Phn.020‐26114949.

13 Nameoftheapplicant AtulJangam

14 Registeredaddress AtulJangamSahajanandHi‐TechConstructionsPvt.Ltd.216,Shah&NaharEstate,Dr.E.MosesRoad,Worli,Mumbai‐400018

15 Addressforcorrespondence: AtulJangamSahajanandHi‐TechConstructionsPvt.Ltd.216,Shah&NaharEstate,Dr.E.MosesRoad,Worli,Mumbai‐400018

Name AtulJangam

Designation(Owner/ Partner/CEO)

AuthorisedSignatory

Address SahajanandHi‐TechConstructionsPvt.Ltd.216,Shah&NaharEstate,Dr.E.MosesRoad,Worli,Mumbai‐400018

Pincode 400018

E‐mail [email protected]

TelephoneNo. 23024400

FaxNo. 23000693

16 Details of alternative sitesexamined, if any. Location ofthesesitesshouldbeshownonatoposheet.

Village‐District‐State

1.

2.

3.

We are developing residential development on ourownland

17 Interlinedprojects NotApplicable

18 Whether separate application ofinterlinked project has beensubmitted?

No

19 Ifyes,dateofsubmission ‐

20 IfNo,Reason Standaloneconstructionproject

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 3

21 Whethertheproposalinvolvesapproval/clearanceunder:if,yesdetailsofthesameandtheirstatustobegiven

a) TheForest(Conservation)Act,1980?

b) The wildlife (protection)Act,1972?

c) The CRZ Notification,1991?

No

22 WhetherthereisanyGovernmentOrder/policyrelevant/relatingtothesite?

No

23 Forestlandinvolved(hectares) Noforestlandinvolvedinproposedprojectsite

24 Whether there is any litigationpending against the projectand/or land inwhich theprojectisproposetobesetup?

a) Nameofthecourtb) CaseNo.c) Orders/Directionsofthe

courtifanyanditsrelevancewiththeproposedproject.

Nosuchlitigationpendingagainsttheproject

Capacity corresponding to sectoral activity (such as production capacity for manufacturing,miningleaseareaandproductioncapacityformineralproduction,areaformineralexploration,lengthforlineartransportinfrastructure,generationcapacityforpowergenerationetc.,)(II)Activity1. Construction, operation or decommissioning of the Project involving actions,

whichwillcausephysicalchangesinthelocality(topography,landuse,changesinwaterbodies,etc.)

Sr.No. Information/Checklist

confirmationYes/No Detailsthereof(withapproximatequantities

/rates, wherever possible) with source ofinformationdata

1.1 Permanentortemporarychangeinlanduse,landcoverortopographyincludingincreaseinintensityoflanduse(withrespecttolocallanduseplan)

No Therewillbenosignificantchanges inexistingland use pattern by proposed project. Theproposed project is in accordance with townplanningofPune.

1.2 Clearance of existingland, vegetation andbuildings?

Yes The existing open land will be levelled andgraded and site preparation shall involveclearingofshrubsandvegetation.

1.3 Creation of new landuses?

No The existing land use already has littleResidential area in close vicinity to proposedsitesothereshallbenochangeinlanduseafterproposedproject.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 4

1.4 Pre‐constructioninvestigations e.g. borehouses,soiltesting?

Yes Soilsamplestakenwithintheplotpremisesforgeotechnicalinvestigation

1.5 Constructionworks?

Yes The development will have residentialbuildings, Convenience shops, MeditationCentre,ClubHouse,FireStation,StaffQuartersforFirestation

1.6 Demolitionworks?

No

1.7 TemporarysitesusedforconstructionworksorHousingofconstructionworkers?

Yes Temporary sheds and sanitation facilities forconstruction workers has been provided forworkers.

1.8 Abovegroundbuildings,structuresorearthworksincludinglinearstructures,cutandfillorexcavations

Yes Mostoftheexcavatedsoilwillbeusedforbackfillingatprojectsiteonly

1.9 Underground worksincluding mining ortunneling?

No

1.10 Reclamationworks? No

1.11 Dredging?

No

1.12 Offshorestructures? No

1.13 Productionandmanufacturingprocesses?

No

1.14 Facilities for storage ofgoodsormaterials?

Yes Only construction material will be stored intemporarystoragesite

1.15 Facilitiesfortreatmentordisposalofsolidwasteorliquideffluents?

Yes Onsitemechanicalcompostingisproposedfortreatment of biodegradable solid waste andthecompostwillbeusedasmanureingarden.Nonbiodegradablewastewillbehandedovertoauthorizedvendorforfinaldisposal.SewageTreatmentPlants(STP)oftotalcapacity2200m3/dayisproposedtotreatthegeneratedsewage and reuse the treated sewage withinprojectforflushingandlandscaping.The treated sewage will be used for flushingandgardening.The dried sludge and compostwill be used asmanureforlandscaping.

1.16 Facilitiesforlongtermhousingofoperationalworkers?

No

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 5

1.17 Newroad,railorseatrafficduringconstructionoroperation?

No Existing road network will be used duringconstruction and operation phase of project.The site is accessible by 18 m wide road andMumbaiPuneexpressway.

1.18 New road, rail, airwaterborne or othertransport infrastructureincluding new or alteredroutes and stations,ports,airportsetc?

No Existing road will be used for the transportpurpose.

1.19 Closure or diversion ofexisting transport routesor infrastructure leadingto changes in trafficmovements?

No

1.20 New or divertedtransmission lines orpipelines?

No

1.21 Impoundment, damming,culverting, realignmentor other changes to thehydrology ofwatercourses oraquifers?

No

1.22 Streamcrossings? No

1.23 Abstraction or transfersof water form ground orsurfacewaters?

No

1.24 Changes in water bodiesor the land surfaceaffectingdrainageorrun‐off?

No Therewill not be any changes inwaterbodiesorthelandsurface

1.25 Transport of personnelor materials forconstruction, operationordecommissioning?

Yes Construction workers and constructionmaterialduringconstructionphase

1.26 Long‐termdismantlingordecommissioning orrestorationworks?

No

1.27 Ongoing activity duringdecommissioning whichcould have an impact ontheenvironment?

Yes There will not be any impact on theEnvironment

1.28 Influx of people to anarea in eithertemporarily orpermanently?

Yes Construction workers during constructionphaseandofficepersonnelandresidentsduringoperationphase

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 6

1.29 Introduction of alienspecies?

No No introduction of alien species will occur asthisispurelyresidentialproject

1.30 Loss of native species orgeneticdiversity?

No Nothreatofspecieslosswilloccur

1.31 Anyotheractions?

No No

2. Use ofNatural resources for construction or operation of the Project (such asland,water,materialsorenergy,especiallyanyresourceswhicharenon‐renewableorinshortsupply):Sr.No. Information/checklist

confirmationYes/No Details thereof (with approximate

quantities /rates, wherever possible)withsourceofinformationdata

2.1 Landespeciallyundevelopedoragriculturalland(ha)

No Noagriculturalland

2.2 Water(expectedsource&competingusers)unit:KLD

Yes WaterSource:PawanaRiver

TotalWaterRequirement

2220m3/d

ThedetailedwaterbalanceforoperationphaseofprojectisattachedasAnnexureIV

2.3 Minerals(MT) NA 2.4 constructionmaterial–

stone,aggregates,sand/soil(expectedsource–MT)

Yes Stoneaggregatesdemandwillbemetfromtheclay/soilgeneratedafterexcavationandcuttingofrocksorfromopenmarket

2.5 Forestsandtimber(source–MT)

Yes Onlydoorframes(ifsoplanned)

2.6 Energyincludingelectricityandfuels(source,competingusers)Unit:fuel(MT),energy(MW)

Yes Source:MSEDCL

Energyconsumption

ProposedResidential

TotalPowerRequirement

27MW

2.7 Anyothernaturalresources(useappropriatestandardunits)

No

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 7

3. Use,storage,transport,handlingorproductionofsubstancesormaterials,whichcouldbeharmfultohumanhealthortheenvironmentorraiseconcernsaboutactualorperceivedriskstohumanhealth.

Sr.No.

Information/Checklistconfirmation

Yes/No

Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata

3.1 Useofsubstancesormaterials,whicharehazardous(asperMSIHCrules)tohumanhealthortheenvironment(flora,fauna,andwatersupplies)

Yes Used oil from DG set will be storedseparately and will be given to authorisedrecyclers

3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insectorwaterbornediseases)

No

3.3 Affectthewelfareofpeoplee.g.bychanginglivingconditions?

No

Proposed Projectwill not effect thewelfareofpeople

3.4 Vulnerablegroupsofpeoplewhocouldbeaffectedbytheprojecte.g.hospitalpatients,children,theelderlyetc.,

No

Proposed Project will not affect hospitalpatients,childrenetc.

3.5 Anyothercauses No

4. Productionofsolidwastesduringconstructionoroperationordecommissioning(MT/month)

Sr.No. Information/Checklist

confirmationYes/No Details thereof (with approximate

quantities/rates,whereverpossible)withsourceofinformationdata

4.1 Spoil, overburden or minewastes

No

4.2 Municipalwaste(domesticandorcommercialwastes)

Yes MunicipalSolidWaste

ProposedResidentialprojectTotalSolidWaste 8183kg/d

4.3 Hazardouswastes(asperHazardousWasteManagementRules)

Yes Used oil from DG set will be given toauthorisedrecyclers

4.4 Other industrial processwastes

No No,ThisisResidentialProject

4.5 Surplusproduct No NotApplicable

4.6 Sewagesludgeorothersludgefromeffluenttreatment

Yes 21 m3/d of sludge will be used as manureafterdrying.

4.7 Constructionordemolitionwastes

Yes Construction debris during constructionphase. The debris generated from theConstructionactivitieswillbereusedassubbaseofinternalroadanddriveways.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 8

4.8 Redundantmachineryorequipment

No NotApplicable

4.9 Contaminatedsoilsorothermaterials

No NotApplicable

4.10 Agriculturalwastes No NotApplicable4.11 Othersolidwastes No NotApplicable

5. Releaseofpollutantsoranyhazardous,toxicornoxioussubstancestoair(Kg/hr)Sr.No. Information/Checklist

confirmationYes/No Details thereof (with approximate

quantities/rates, wherever possible)withsourceofinformationdata

5.1 Emissions fromcombustion of fossil fuelsfrom stationary or mobilesources

Yes EmissionfromDGsetsduringpowerfailureand movement of vehicle during operationphaseoftheproject

5.2 Emissions fromproductionprocesses

No NotApplicable

5.3 Emissions from materialshandling including storageortransport

Yes Fugitiveemissionfromhandlingsuchassandandotherconstructionmaterial

5.4 Emissions fromconstruction activitiesincluding plant andequipment

Yes Transportationofconstructionmaterial&handlingofsand,aggregates,cement,DGsetsetc.Theemissionsfromconstructionmachinerywouldcontainparticulates,SOx,NOxandCO

5.5 Dustorodoursfromhandlingofmaterialsincludingconstructionmaterials,sewageandwaste

Yes Transportation, loading and unloading ofmaterialwillgeneratedustOdour from Solid waste management andSTPareaifnothandleditproperly

5.6 Emissionsfromincinerationofwaste

No NotApplicable

5.7 Emissions from burning ofwasteinopenair(e.g.slashmaterials, constructiondebris)

No NotApplicable

5.8 Emissions from any othersources

No NotApplicable

6. GenerationofNoiseandVibration,andEmissionsofLightandHeat:

Sr.No. Information/Checklistconfirmation

Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsource of information data with source ofinformationdata

6.1 Fromoperationofequipmente.g.engines,ventilationplant,crushers

Yes Increase in noise levels due to operations ofconstructionequipments&vehicularmovement

6.2 From industrial orsimilarprocesses

No NotApplicable

6.3 Fromconstructionordemolition

Yes Increaseinnoiselevelsduringconstruction.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 9

6.4 Fromblastingorpiling Yes Noiseduringconstructionwork.6.5 Fromconstructionor

operationaltrafficYes Duringconstructionandoperationphaseof the

project.Existing road network will be used duringconstructionandoperationphaseofprojectIntheoperationphasetherewillbe increase inthe vehicular movement because of theresidentsandvisitors

6.6 Fromlightingorcoolingsystems

No As the proposed project will be the residentialhence therewill be no such centralised coolingsystem

6.7 Fromanyothersources No NotApplicable

7. Risks of contamination of land or water from releases of pollutants into thegroundorintosewers,surfacewaters,groundwater,coastalwatersorthesea:

Sr.No. Information/Checklist

confirmationYes/No Details thereof (with approximate

quantities/rates, wherever possible) withsourceofinformationdata

7.1 Fromhandling,storage,useorspillageofhazardousmaterials

No The used oil from DG sets will be given toauthorisedrecyclers

7.2 From discharge ofsewage or othereffluentstowaterortheland (expected modeandplaceofdischarge)

No STPwillbeusedfortreatingsewage.Treated sewage will be used for flushing andgardening.

7.3 By deposition ofpollutantsemittedtoairinto the land or intowater

No NotApplicable

7.4 Fromanyothersources No NotApplicable

7.5 Is there a risk of longterm build up ofpollutants in theenvironmentfromthesesources?

No NotApplicable

8. RiskofaccidentsduringconstructionoroperationoftheProject,which

couldaffecthumanhealthortheenvironmentSr.No. Information/Checklist

confirmationYes/No Details thereof (with approximate

quantities/rates, wherever possible) withsourceofinformationdata

8.1 Fromexplosions,spillages,firesetcfromstorage,handling,useorproductionofhazardoussubstances

Yes Spillageofusedoil fromDG setsandexplosioninDiesel storagearea.Adequate fireprotectionmeasureswill be taken up as per the fire NOCfromMaharashtraFireServices

8.2 Fromanyothercauses

Yes Accidents during construction phase (Slips,fallfromheight,fallingofobjects/materialonworkers, fire, cut and burns, electric shockandcollapseofshuttering

Fireduetoshortcircuiting

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 10

Terrorism8.3 Couldtheprojectbe

affectedbynaturaldisasterscausingenvironmentaldamage(e.g.floods,earthquakes,landslides,cloudburstetc)?

Yes The proposed structure is designed as perSeismicZoneIIIstandards.Theprojectareadoesn’thavehistoryofflooding

9. Factorswhichshouldbeconsidered(suchasconsequentialdevelopment)which

couldleadtoenvironmentaleffectsorthepotentialforcumulativeimpactswithotherexistingorplannedactivitiesinthelocality

Sr.No. Information/Checklist

confirmationYes/No Details thereof (with approximate

quantities/rates, wherever possible) withsourceofinformationdata

9.1 Leadtodevelopmentofsupporting. facilities,ancillarydevelopmentordevelopmentstimulatedbytheprojectwhichcouldhaveimpactontheenvironmente.g.:•Supportinginfrastructure(roads,powersupply,wasteorwastewatertreatment,etc.)•housingdevelopment•extractiveindustries•supplyindustries•other

Yes

Theproposedexpansionoftheprojectislocatedat village Gahunje, Tal Maval, Pune. As theExisting road network will be used duringconstructionandoperationphaseofproject

9.2 Lead to after‐use of thesite, which could havean impact on theenvironment

No NotApplicable

9.3 Setaprecedentforlaterdevelopments

No NotApplicable

9.4 Havecumulativeeffectsduetoproximitytootherexistingorplannedprojectswithsimilareffects

Yes There are many upcoming projects in thevicinity of the area. Hence there is increase intraffic, water consumption, sewage generationandstormwatergeneration

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 11

(III)EnvironmentalSensitivity

Sr.No.

Areas Name/Identity

Aerialdistance(within15km.)Proposedprojectlocationboundary

1 Areasprotectedunderinternationalconventions,nationalorlocallegislationfortheirecological,landscape,culturalorotherrelatedvalue

No Notapplicable

2 Areas which are important orsensitive for ecological reasons‐ Wetlands, watercourses orother water bodies, coastalzone, biospheres, mountains,forests

Yes Pawana river is abutting to the proposedsiteIndrayaniRiver:5kmKasariDam:7.3kmAndraDam:14kmJadhavwadiDam:12km

3 Areas used by protected,important or sensitive speciesof flora or fauna for breeding,nesting, foraging, resting, overwintering,migration

No Notapplicable

4 Inland, coastal, marine orundergroundwaters

Yes Pawana river is abutting to the proposedsiteIndrayaniRiver:5kmKasariDam:7.3kmAndraDam:14kmJadhavwadiDam:12km

5 State,Nationalboundaries No 6 Routesorfacilitiesusedbythe

publicforaccesstorecreationorothertourist,pilgrimareas

No

7 Defenceinstallations No 8 Densely populated or built‐up

areaNo Notapplicable

9 Areasoccupiedbysensitiveman‐madelanduses(hospitals,schools,placesofworship,communityfacilities)

No Nigadi is about 7 km form proposeddevelopmentSaharastadium:1.1km

10 Areascontainingimportant,highqualityorscarceresources(groundwaterresources,surfaceresources,forestry,agriculture,fisheries,tourism,minerals)

No Notapplicable

11 Areasalreadysubjectedtopollutionorenvironmentaldamage.(thosewhereexistinglegalenvironmentalstandardsareexceeded)

No

12 Areas susceptible to naturalhazard which could cause theproject to presentenvironmental problems

No

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 12

(earthquakes, subsidence,landslides,erosion,floodingor extremeor adverse climaticconditions)

(IV). ProposedTermsofReferenceforEIAstudiesIherebygivenundertaking that thedata& informationgiven in theapplication&enclosuresare true to thebest ofmyknowledge&belief& I amaware that if anypartof thedata andinformation submitted is found to be false or misleading at any stage, the project will berejectedandclearancegive,ifanytotheprojectwillberevokedatourriskandcost.Date:09.05.2017 Place:Mumbai

AtulJangam

M/SSahajanandHi‐TechConstructionsPvt.Ltd.LodhaExcelus,ApolloMillsCompound,N.M.

JoshiMarg,Mahalaxmi,Mumbai400011.

Signatureoftheapplicant Withname&fulladdress (Projectproponent/Authorisedsignatory)NOTE:

1) The projects involving clearance under Coastal Regulation Zone Notification, 1991shall submit with the application a C.R.Z map duly demarcated by one of theauthorizedagencies,showingtheprojectactivities,w.r.tC.R.Z(atthestageofTOR)andtherecommendationsoftheStateCoastalZonemanagementAuthority(atthestageofEC).SimultaneousactionshallalsobetakentoobtaintherequisiteclearanceundertheprovisionsoftheC.R.ZNotification,1991fortheactivitiestobelocatedintheCRZ.

2) Theprojectstobelocatedwithin10kmofthenationalParks,Sanctuaries,Biosphere

Reserves,MigratoryCorridorsofWildAnimals,theprojectproponentshallsubmitthemapdulyauthenticatedbyChiefWildlifeWardenshowingthesefeaturesvis‐avistheproject location and the recommendations or comments of the chief Wildlifethereon.(atthestageofEC)

3) AllcorrespondencewiththeministryofEnvironment&ForestsincludingsubmissionofapplicationforTOR/EnvironmentalClearance,subsequentclarificationsasmayberequiredfromtimetotime;participationintheEACmeetingonbehalfoftheprojectproponentshallbemadeby theauthorisedsignatoryonly.Theauthorisedsignatoryshouldalsosubmitadocumentinsupportofhisclaimofbeinganauthorisedsignatoryforthespecificproject.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 13

APPENDIX‐II(Seeparagraph6)

FORM‐1A(onlyforconstructionprojectslistedunderitem8oftheSchedule)

CHECKLISTOFENVIRONMENTALIMPACTS

(ProjectproponentsarerequiredtoprovidefullinformationandwherevernecessaryattachexplanatorynoteswiththeFormand

submitalongwithproposedenvironmentalmanagementplan&monitoringprogramme)

1. LANDENVIRONMENT

(Attachpanoramicviewoftheprojectsiteandthevicinity)

1.1 Willtheexistinglandusegetsignificantlyalteredfromtheprojectthatisnotconsistentwiththesurroundings?(ProposedlandusemustconformtotheapprovedMasterPlan/DevelopmentPlanofthearea.Changeoflanduseifanyandthestatutoryapprovalfromthecompetentauthoritybesubmitted).AttachMapsof(i)sitelocation,(ii)surroundingfeaturesoftheproposedsite(within500meters)and(iii)thesite(indicatinglevels&contours)toappropriatescales.Ifnotavailableattachonlyconceptualplans.

Theexistinglandusewillnotgetalteredfromtheproject.Asperthezoningstructuretheareacomesunderresidentialarea.

ProposeddevelopmentisinlinewithD.PofFollowingdocumentsareattachedassupportingdocuments.

1. ConceptualPlanandDetailedTenementstatementareattachedasANNEXUREII

2. LocationPlanisattachedasANNEXUREIII

1.2 Listoutallthemajorprojectrequirementsintermsofthelandarea,builtuparea,waterconsumption,powerrequirement,connectivity,communityfacilities,parkingneeds,etc.

AsperearlierEC

Total

TotalPlotArea 4,12,700 5,43,861

PermissibleBuilt‐UpArea(m2)

2,35,660.88 3,64,947.69

Totalconstructionarea(m2)

4,33,443.22 5,80,983.22

Waterconsumption

Proposed

TotalWaterConsumption

2220m3/day

EnergyConsumption

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 14

Proposed

TotalEnergyConsumption

26.72MW

ParkingProvided

Proposed

FourWheeler3460Nos.

TwoWheelernos.3191Cycle:3191nos.

Connectivity Proposedsiteisaccessibleby‐18mwideServiceRoadandMumbaiPuneexpressway.LocationPlanisattachedasANNEXUREIII

1.3 Whatarethelikelyimpactsoftheproposedactivityontheexistingfacilitiesadjacenttotheproposedsite?(Suchasopenspaces,communityfacilities,detailsoftheexistinglanduse,disturbancetothelocalecology).

Theprojectbeingawellplannedactivitywillresultin organized open spaces and green areas. Therewill be minor negative impact on flora presentaround the project site during construction phasemainlyduetodust.

1.4. Willtherebeanysignificantlanddisturbanceresultinginerosion,subsidence&instability?(Detailsofsoiltype,slopeanalysis,vulnerabilitytosubsidence,seismicityetcmaybegiven).

Themain reasons for erosion are overexploitationof groundwater, instable slopes, landslidesetc.Theproposed construction will involve cutting andfilling operations. The project will involveconstruction of roads and development of greenareas, which would reduce the chances of erosionandsubsidence.Subsidence is not anticipated as ground waterwouldnotbeusedasasourceofwatersupply.Asperseismic‐zoningmapofIndia,theprojectsitefallsunderzoneIII.StructuraldesignrequirementswillbeasperzoneIII.

1.5 Willtheproposalinvolvealterationofnaturaldrainagesystems?(Givedetailsonacontourmapshowingthenaturaldrainageneartheproposedprojectsite)

No.Thelandisflat.Thenaturalslopeoftheareaistowardseastside.Therewillnotbeanyalterationofnaturaldrainagesystem.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 15

1.6 Whatarethequantitiesofearthworkinvolvedintheconstructionactivity‐cutting,filling,reclamationetc.(Givedetailsofthequantitiesofearthworkinvolved,transportoffillmaterialsfromoutsidethesite,etc.)

The proposed project’s excavation quantity will bearound1,50,000m3.Therewillnotbeanytransportoffillmaterialsfromoutside.

1.7 Givedetailsregardingwatersupply,wastehandlingetcduringtheconstructionperiod.

Supply Source: Water for Domestic consumptionwillbeavailablefromtreatedRiverWaterwhereasforConstructionpurposeborewellorTankerwaterwillbeused.Storage:Water forconstructionwillbestored inatank constructed temporarily at site whereasDomesticwaterwillbestoredinHDPEtanks.

1.8 Willthelowlyingareas&wetlandsgetaltered?(Providedetailsofhowlowlyingandwetlandsaregettingmodifiedfromtheproposedactivity)

Nowetlandsandlow‐lyingareasonthesite.

1.9 Whetherconstructiondebris&wasteduringconstructioncausehealthhazard?(Givequantitiesofvarioustypesofwastesgeneratedduringconstructionincludingtheconstructionlabourandthemeansofdisposal)

Nohealthhazardisanticipated.Minorquantityofconstructiondebriswillbegeneratedwhichwillbedisposedtodesignatedlandfill.

2. WATERENVIRONMENT

2.1 Givethetotalquantityofwaterrequirementfortheproposedprojectwiththebreakupofrequirementsforvarioususes.Howwillthewaterrequirementmet?Statethesources&quantitiesandfurnishawaterbalancestatement.

EnclosedasANNEXUREIV

2.2 Whatisthecapacity(dependablefloworyield)oftheproposedsourceofwater?

Theproposedwaterdemandwillbemetfromtreatedriverwater.

2.3 Whatisthequalityofwaterrequired,incase,thesupplyisnotfromamunicipalsource?(Providephysical,chemical,biologicalcharacteristicswithclassofwaterquality)

Watersupplyisfromtreatedriverwater.

2.4 Howmuchofthewaterrequirementcanbemetfromthe

TreatedwaterfromSTPwillbeusedforflushingintoiletandgardening

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 16

recyclingoftreatedwastewater?(Givethedetailsofquantities,sourcesandusage)

Totalsewagegenerated 2058m3/day

TotalSTPcapacity 2200m3

Treatedwaterrecycledforflushing

745m3/day

Treatedwaterforgardening 858m3/day

Sludgeforcomposting 21m3/day

Excesstreatedwater 434m3/day

2.5 Willtherebediversionofwaterfromotherusers?(Pleaseassesstheimpactsoftheprojectonotherexistingusesandquantitiesofconsumption)

Nodiversionisanticipated

2.6 Whatistheincrementalpollutionloadfromwastewatergeneratedfromtheproposedactivity?(Givedetailsofthequantitiesandcompositionofwastewatergeneratedfromtheproposedactivity)

The total sewage of about 2058 m3/day will begenerated from the complex. The composition ofwaste water is given in the table indicating thequalityofrawwastewaterbeforetreatment

Parameters Values Units

pH 7‐8 mg/l

BOD 250‐300 mg/l

COD 450‐600 mg/l

O&G/ABS 10‐20 mg/l

TSS 100‐200 mg/l

Mitigation measures: Domestic Effluent will betreated in the TOTAL Sewage Treatment plant ofcapacity2200m3/daycapacityofSTPforresidentialbuildings.The treatedsewagewaterwillbe reusedforflushingandgardening.

2.7 Givedetailsofthewaterrequirementsmetfromwaterharvesting?Furnishdetailsofthefacilitiescreated.

Harvestedwaterwillusedforsecondarypurpose.

2.8. Whatwouldbetheimpactofthelandusechangesoccurringduetotheproposedprojectontherunoffcharacteristics(quantitativeaswellasqualitative)oftheareainthepostconstructionphaseonalongtermbasis?Woulditaggravatetheproblemsoffloodingorwaterlogginginanyway?

Theprojectwill haveproper stormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.Sotherewillbenoproblemofwaterloggingduetothisproject.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 17

2.9 Whataretheimpactsoftheproposalonthegroundwater?(Willtherebetappingofgroundwater;givethedetailsofgroundwatertable,rechargingcapacity,andapprovalsobtainedfromcompetentauthority,ifany)

In the proposed development there will be notapping of groundwater. Water demand for theconstruction as well as operational phase will bemet from sources such as PawanaRiver or tankerwater

2.10 Whatprecautions/measuresaretakentopreventtherun‐offfromconstructionactivitiespollutingland&aquifers?(Givedetailsofquantitiesandthemeasurestakentoavoidtheadverseimpacts)

Followingmeasureswillbetakenuptopreventthe

runofffrompollutinglandandgroundwater

Noexcavationduringmonsoonseason.

Catch drainage all along the periphery of plot topreventsurfacerunoff.

Useofsiltfenceandtrapstoreducetherunoff

2.11 Howisthestormwaterfromwithinthesitemanaged?(Statetheprovisionsmadetoavoidfloodingofthearea,detailsofthedrainagefacilitiesprovidedalongwithasitelayoutindicationcontourlevels)

Theprojectwill haveproper stormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.

The storm water drains will be provided atbasements, and ground levels. So therewill not beproblemofwaterloggingduetothisproject.

2.12 Willthedeploymentofconstructionlabourersparticularlyinthepeakperiodleadtounsanitaryconditionsaroundtheprojectsite(Justifywithproperexplanation)

No, the deployment of construction labourers willnot lead to any unsanitary condition. Theconstruction labourers will be provided withtemporary shelter shades within the projectpremises.Theunsanitaryconditionwillberemovedby means of providing readymade septic tanks &soakpits.Solidwastewillbedisposedoff inmunicipalwastedisposalsystem.

2.13 Whaton‐sitefacilitiesareprovidedforthecollection,treatment&safedisposalofsewage?(Givedetailsofthequantitiesofwastewatergeneration,treatmentcapacitieswithtechnology&facilitiesforrecyclinganddisposal)

ConstructionPhase:Sewagewillbe treated inseptic tank.Theoverflowofseptictankisdischargedinsoakpits.OperationPhase:The Sewage Treatment Plant (STP) with capacity2200KLDisdesignedto treat therawwastewatergeneratedfromResidentialbuilding

2.14 Givedetailsofdualplumbingsystemiftreatedwasteusedisusedforflushingoftoiletsoranyotheruse.

Yes,Theproposeddevelopmentwillhavethedualplumbingsystemasthetreatedsewagewillbeusedforrecycling.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 18

3. VEGETATION

3.1 Isthereanythreatoftheprojecttothebiodiversity?(Giveadescriptionofthelocalecosystemwithit’suniquefeatures,ifany)

Thereisnosensitiveecosystempresentatsitethatwillbedisturbedbytheproject

3.2 Willtheconstructioninvolveextensiveclearingormodificationofvegetation?(Provideadetailedaccountofthetrees&vegetationaffectedbytheproject)

No.15treeshavebeencutaspertheTreecuttingNOC for Phase I of Project for which EC wasobtained.Existingtrees:85nos.Treestobecut18nos.

3.3 Whatarethemeasuresproposedtobetakentominimizethelikelyimpactsonimportantsitefeatures(Givedetailsofproposalfortreeplantation,landscaping,creationofwaterbodiesetcalongwithalayoutplantoanappropriatescale)

About 1,71,600 m2 areas are provided for thedevelopment of landscape in the premises. Thegreenbeltwillbedevelopedforcontrolofpollutionandaestheticviewofthecomplex.Total1700treeswillbeplantedinthepremises.

4. FAUNA

4.1 Istherelikelytobeanydisplacementoffauna‐bothterrestrialandaquaticorcreationofbarriersfortheirmovement?Providethedetails.

No.Theproposedsiteanditssurroundingsdonotsupportanyhabitatforanygroupofwildanimals

4.2 Anydirectorindirectimpactsontheavifaunaofthearea?Providedetails.

No.Therewillbenodirectorindirectimpactontheavifaunaofthearea.

4.3 Prescribemeasuressuchascorridors,fishladdersetctomitigateadverseimpactsonfauna

SincetheProposedProjectwouldnothaveanyadverseimpactonfaunahencemitigationmeasurenotrelevant

5. AIRENVIRONMENT

5.1 Willtheprojectincreaseatmosphericconcentrationofgases&resultinheatislands?(Givedetailsofbackgroundairqualitylevelswithpredictedvaluesbasedondispersionmodelstakingintoaccounttheincreasedtrafficgenerationasaresultoftheproposedconstructions)

TheProjectwillresult innegligible increase intheatmospheric concentrations of gases due to D.G.operations(backuppoweronly)andtheincreasedtraffic. Theproposed activitywill not result in theformationofanyheatislands,asitdoesnotinvolveanysignificantchangeinthelandusepatternortheconcretingofareas.

5.2 Whataretheimpactsongenerationofdust,smoke,odorousfumesorotherhazardousgases?Givedetailsinrelationtoallthemeteorologicalparameters.

Diesel generator sets operated for back‐up powersupply are identified as the onlymajor sources ofgaseous and particulate emission. Impact ofvehicular is not significant. SO2, SPM, NOX and COemissions are expected due to fuel combustion ingeneratorsets.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 19

5.3 Willtheproposalcreateshortageofparkingspaceforvehicles?Furnishdetailsofthepresentleveloftransportinfrastructureandmeasuresproposedforimprovementincludingthetrafficmanagementattheentry&exittotheprojectsite.

Theprojectwillhaveproperentryandexitforthevehicles.Theprojectsiteisaccessedby90mwideroad.Therewillnotanytrafficcongestionduetoprojectsite.Inproposedprojectprovisionof3460(fourwheeler)and3191nos(twowheelers)parkingspaceshasbeenmade.

5.4 Providedetailsofthemovementpatternswithinternalroads,bicycletracks,pedestrianpathways,footpathsetc.,withareasundereachcategory.

Internalroads,footpaths/pedestrianpathwayshavebeenplannedwithintheproposedcomplex

5.5 Willtherebesignificantincreaseintrafficnoise&vibrations?Givedetailsofthesourcesandthemeasuresproposedformitigationoftheabove.

Considering the addition of vehicles due to theproposed project with the existing roads andvehicles plying on them, there will be marginalincreaseinthenoiselevelsbutwillnotresultinanimpact.

5.6 WhatwillbetheimpactofDGsets&otherequipmentonnoiselevels&vibrationin&ambientairqualityaroundtheprojectsite?Providedetails.

DGsetwillbeusedinconstructionandoperationphaseonlyincaseofpowerfailure.The DG Sets shall be as per the guide lines laiddownbyEPRforspecificnoiseemissionstandards.Measures shall be taken for reduction of noise byusingacousticenclosures.Increase innoise levels are expected fromvariousconstructionequipmentandmachinery.

6. AESTHETICS

6.1 Willtheproposedconstructionsinanywayresultintheobstructionofaview,scenicamenityorlandscapes?Aretheseconsiderationstakenintoaccountbytheproponents?

Theproposedlanduseofthesitewouldbemainlyresidential and will not result in obstruction ofview, scenic amenity or landscape. However, thebuildings will be planned in such a way that theorganised open areas and landscaped areas are atthecentresothatallcanenjoythegreenareas.

6.2 Willtherebeanyadverseimpactsfromnewconstructionsontheexistingstructures?Whataretheconsiderationstakenintoaccount?

Therewillnotbeanyadverseimpact

6.3 Whetherthereareanylocalconsiderationsofurbanform&urbandesigninfluencingthedesigncriteria?Theymaybeexplicitlyspeltout.

The Project has been designed as per thedepartment of town planning, Government ofMaharashtra.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 20

6.4 Arethereanyanthropologicalorarchaeologicalsitesorartefactsnearby?Stateifanyothersignificantfeaturesinthevicinityoftheproposedsitehavebeenconsidered.

No anthropological or archaeological sites orartefactsarefoundnearthesitearea.

7. SOCIO‐ECONOMICASPECTS

7.1 Willtheproposalresultinanychangestothedemographicstructureoflocalpopulation?Providethedetails.

No.Majorityof the labourwillbe recruited locallyand only minimal skilled workers would be fromoutside,which is anticipated to be very small andwill not alter the existing demographic profile ofthearea.

7.2 Givedetailsoftheexistingsocialinfrastructurearoundtheproposedproject.

The Project comes in Residential area and has allbasic infrastructural facilities as schools, medicalestablishments, shops, etc within 10 km radius ofprojectsite.

7.3 Willtheprojectcauseadverseeffectsonlocalcommunities,disturbancetosacredsitesorotherculturalvalues?Whatarethesafeguardsproposed?

No. The Projectwill have positive impact on localcommunities.

8. BUILDINGMATERIALS

8.1 Mayinvolvetheuseofbuildingmaterialswithhigh‐embodiedenergy.Aretheconstructionmaterialsproducedwithenergyefficientprocesses?(Givedetailsofenergyconservationmeasuresintheselectionofbuildingmaterialsandtheirenergyefficiency)

Yesthebuildingmaterialswithhighembodiedenergywillbeused

8.2 Transportandhandlingofmaterialsduringconstructionmayresultinpollution,noise&publicnuisance.Whatmeasuresaretakentominimizetheimpacts?

Adequatemitigativemeasureswillbeadopted.Constructionequipmentwithidlingcontroltechnologieswillbeused.Regularmaintenanceoftheequipmentswillbecarriedout.Theconstructionactivitieswillbecarriedoutduringthedaytimeonly.Theconstructionsmaterials/excavatedsoil/constructiondebriswillbecarriedthoroughcoveredtrucks.Theworkersexposedtohighnoisegeneratingwouldbeprovidedwithearplugs.

8.3 Arerecycledmaterialsusedinroadsandstructures?Statetheextentofsavingsachieved?

Flyashincementconcrete.Typically20‐25%offlyashissubstitutedincement.

8.4 Givedetailsofthemethodsofcollection,segregation&disposalofthegarbagegeneratedduringtheoperationphasesoftheproject.

Thebio‐degradableandnon‐biodegradablewastewillbesegregatedatsourceofwastegeneration.Totalsolidwastegeneration:8183kg/day Thebiodegradablewaste4909.8kg/daywillbe

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 21

treatedbycompostingmethod Thenon‐biodegradablewaste3273.2kg/daywillbedisposedoffthroughrecyclers.

9. ENERGYCONSERVATION

9.1 Givedetailsofthepowerrequirements,sourceofsupply,backupsourceetc.Whatistheenergyconsumptionassumedpersquarefootofbuilt‐uparea?Howhaveyoutriedtominimizeenergyconsumption?

Sourceofpowersupply:MSEDCLDGSetwillbeprovidedasemergencybackup.

Proposed

27MWTotalEnergyConsumption

9.2 Whattypeof,andcapacityof,powerback‐uptoyouplantoprovide?

DGSetwillbeprovidedasemergencybackupforlightingincommonareas,oneliftperbuildingandfirepumpineachbuilding.DGsetsof6x1010kVA,&1x350kVA

9.3 Whatarethecharacteristicsoftheglassyouplantouse?Providespecificationsofitscharacteristicsrelatedtobothshortwaveandlongwaveradiation?

Notapplicable

9.4 Whatpassivesolararchitecturalfeaturesarebeingusedinthebuilding?Illustratetheapplicationsmadeintheproposedproject.

The building structure will be designed in such awaythatsolarlightcanbeutilisedmaximumfordaytime.

9.5 Doesthelayoutofstreets&buildingsmaximisethepotentialforsolarenergydevices?Haveyouconsideredtheuseofstreetlighting,emergencylightingandsolarhotwatersystemsforuseinthebuildingcomplex?Substantiatewithdetails.

Solar street lights are proposed in areas such asopenspaces,pathways,RGetc.Apartfromsolarhotwatersystem.

9.6 Isshadingeffectivelyusedtoreducecooling/heatingloads?WhatprincipleshavebeenusedtomaximizetheshadingofWallsontheEastandtheWestandtheRoof?Howmuchenergysavinghasbeeneffected?

Theproposedbuildingdoesn’thaveshadingarrangement.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 22

9.7 Dothestructuresuseenergy‐efficientspaceconditioning,lightingandmechanicalsystems?Providetechnicaldetails.Providedetailsofthetransformersandmotorefficiencies,lightingintensityandair‐conditioningloadassumptions?AreyouusingCFCandHCFCfreechillers?Providespecifications.

Yes.Theroomswillbesodimensionedthateffectiveairconditioningcanbecarriedout.Publicareaswillbe cooled by natural ventilation. The design of thebuildingwill be such thatmaximumuse of naturalventilation can be achieved. The walls, roofs andopenings will be so designed that influx of heat isminimum.

9.8. Whatarethelikelyeffectsofthebuildingactivityinalteringthemicro‐climates?Provideaselfassessmentonthelikelyimpactsoftheproposedconstructiononcreationofheatisland&inversioneffects?

Heat emission from the proposed construction canbefromthefollowingsources:Heat absorbed from the concrete structures, heatgeneratedfromequipments/appliances,andduetoincreasedpopulationintheproposeddevelopment.However the heat generatedwill not be significantandwill be dissipated in the lush greens and openareas provided within. Hence it can be concludedthattheheatislandeffectshallnotbeaconcernfortheproposedproject.

9.9. Whatarethethermalcharacteristicsofthebuildingenvelope?(a)roof;(b)externalwalls;and(c)fenestration?GivedetailsofthematerialusedandtheU‐valuesortheRvaluesoftheindividualcomponents.

UvalueinWatts/hr/m2/C

Roof 0.409 Watts/hr/m2/C

Wall 0.352 Watts/hr/m2/C

9.10 Whatprecautions&safetymeasuresareproposedagainstfirehazards?Furnishdetailsofemergencyplans.

The fire fighting system shall compromise ofhydrant system and portable extinguishers. Smokedetectors will be provided along with manual callpoints. External yard hydrants shall be installedaround all buildings in the complex in galvanizedsteel firehosecabinet (weatherproof).Allexternalyard hydrants shall be at one meter height fromfinishedgroundlevelasperNationalBuildingCode.External firehydrantsshallbe locatedsuchthatnoportion of any building is more than 45m from ahydrant, and the external hydrants are notvulnerabletomechanicalorvehiculardamage.

9.11 Ifyouareusingglassaswallmaterialprovidesdetailsandspecificationsincludingemissivityandthermalcharacteristics.

NotApplicable

9.12 Whatistherateofairinfiltrationintothebuilding?Providedetailsofhowyouaremitigatingtheeffectsofinfiltration.

Thefollowingmeasureswillbeadoptedtomitigatetheeffectsofinfiltration: Aluminiumwindowswithrubbergasket,sothat

thewindowsaresealed,willbeprovided. Summer cross section ventilation will be

maximum.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 23

9.13 Towhatextentthenon‐conventionalenergytechnologiesareutilisedintheoverallenergyconsumption?Providedetailsoftherenewableenergytechnologiesused.

NotApplicable

10. EnvironmentManagementPlan

TheEnvironmentManagementPlanwouldconsistofallmitigationmeasuresforeachitemwiseactivitytobeundertakenduringtheconstruction,operationandtheentirelifecycletominimizeadverseenvironmentalimpactsasaresultoftheactivitiesoftheproject.Itwouldalsodelineatetheenvironmentalmonitoringplanforcomplianceofvariousenvironmentalregulations.Itwillstatethestepstobetakenincaseofemergencysuchasaccidentsatthesiteincludingfire.

EnclosedasAnnexureV

Application form for Expansion in Environmental Clearance Project Name Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 24

ANNEXUREI

AREASTATEMENT

SR.NO. DETAILS AREA UNIT

1 FSIareaproposed 3,64,947.69 m2

2 NonFSIarea 2,16,035.53 m2

3 TotalConstructionarea 5,80,983.22 m2

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 25

ANNEXUREII

CONCEPTUALPLAN

Application form for Expansion in Environmental Clearance Project Name Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 26

TenementDetails

BuildingNos. Noofbuildings Floors Tenements1,2,3 3 S+22 2554 1 S+22 855 1 S+22 856,7,8,9,29,30 4+2 S+23 352+17610,11,27,28 4 S+23 70412,16,17 3 S+22 25213.14 2 S+22 16815 1 S+21 8121 1 S+22 8522 1 S+22 8518,20 2 S+23 35219 1 S+23 17623,24 2 S+21 16225,26 2 S+19 40SubTotal 28 2882+176=3058Villas 28+105 28+105=133Convenienceshops(50Nos)shopping/Retail

1

MeditationCentre 1 ClubHouse 1 4368.34sqmBUA FireStation 1 1436.04sqmBUA StaffQuartersforFirestation

1

Application form for Expansion in Environmental Clearance Project Name Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 27

ANNEXUREIIILOCATIONPLAN

PROJECT SITE

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 28

GOOGLEIMAGE

Application form for Expansion in Environmental Clearance Project Name Expansion of Residential development Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 29

ANNEXUREIV

WATERBALANCESTATEMENT

ParticularsNoofFlats

/rooms/CarsOccupancy

TotalPopulation

TotalWaterRequirement/

person

WaterDemandKLD

Domestic Flushing

SaleFlats 3,058 5 15,290 90 45 135 2,064

Villa 133 5 665 90 45 135 90

StaffQuartersforFireStation

28 5 140 90 45 135 19

ClubHouse 4,368 436 15 30 45 20

Firestation 1,436 143 15 30 45 6

Shops 50 2 100 15 30 45 5

Swimmingpoolmakeup

Volume675m3 17

Total 16,774 2,220

SewageGeneration

2,058

Sludge1%ofSewageGeneration

21

RecyclingforFlushing

SaleFlats 3,058 5 15,290 45 45 688

Villa 133 5 665 45 45 30

StaffQuartersforFireStation

28 5 140 45 45 6

ClubHouse 4,368 436 30 30 13

Firestation 1,436 143 30 30 4

Shops 50 2 100 30 30 3

Total 16,774 745

Gardening 1,71,600 5l/m2 858

ExcessTreated

WatertoPond434

WaterRequirementBasis(inlpcd)*

90%ofFreshand100%ofFlushingWaterRequirement

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 30

ANNEXUREVI

EnvironmentalManagementPlanduringConstructionPhaseSr.No.

EnvironmentalComponents

PredictedImpacts

ProbablesourceofImpact

MitigationMeasures Remarks

CONSTRUCTIONPHASE

1.AmbientAirQuality

Negativeimpactinsideconstructionsitepremises.Nonegativeimpactoutsidesite.

Dustemissionsfromexcavation,airemissionsfrommachineryandotherconstructionactivitiesatsite.

Dustreductionmeasuressuchasroadwatering.Periodicmaintenanceofconstructionequipment.Useofgoodqualityfuels.UseofPersonalProtectiveEquipments

Impactsaretemporaryduringconstructionphase.Impactswillbeconfinedtoshortdistances,ascoarseparticleswillsettlewithintheshortdistancefromactivities.

2. Noise GenerationsourcesinsidePremises.NosignificantimpactonambientnoiselevelsintheSurroundingarea.

NoisegeneratedfromconstructionactivitiesandoperationofconstructionequipmentandDGsets

Useofwell‐maintainedequipment.Heavyconstructionactivitylimitedtoday‐timehoursonly.Useofnoisemufflersinandconstructionvehicle.Useofearplugs/muffsbyconstructionstaff.

TemporaryimpactsduringConstructionphase.Noblastingorotherhighnoiseactivitiesenvisaged

3. WaterNosignificantnegativeimpact.

Surfacerunofffromprojectsite.Oil/fuelandwastespills.Improperdebrisdisposal.Dischargeofsewagefromlabourcamp.

Siltfencestoreducerun‐offSecondarycontainmentanddykesinmaterialstorageareas.Sewagetreatmentinseptictanks.

Labourwillbeemployedtoreducesizeoflabourcamps.Noperennialsurfacewaterresourceadjacenttosite.Noexcavationworkwillbe

4. Land Minornegativeimpact

Excavation,Constructiondebris,wastefromlabourcamp.

ReutilizationandrecyclingofconstructiondebrisWastefromlabourcampswillbecollectedandcompostedonsite.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 31

Noncompostablewastewillbetransportedtolandfillsite.Topsoilwillbeconservedandusedforlandscapinginfunctionalphase.

5. AestheticsMinornegativeimpacts

ConstructionactivitiesandExcavation

Theimpactswillbecompensatedbyextensivetreeplantationandgardeningintheusephase.

Shorttermimpactrestrictedonlyintheinitialstagesofconstruction.

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 32

EnvironmentalManagementPlanduringFunctionalPhase

Sr.No.

EnvironmentalComponents

PredictedImpacts

ProbableSourceOfImpact MitigationMeasures Remarks

FUNCTIONALPHASE

1.AmbientAirQuality

MinorNegativeimpact

ParticulateandgaseousemissionsfromDGsetsandvehiclemovement

Useoflowsulphur

goodfuel

Periodicmaintenance

ofDGsets

UseofCNG/LPGasa

fuelshouldbe

encouraged.

DGsetswillbeused.

2. Noise

Minornegativeimpactinsidepremises.

Noisefromvehiclemovementandoperationofdieselgeneratorsetsduringpowerfailure.

HousingofDGsetsin

buildingswith

appropriateacoustics.

Trafficmanagement

measurestoreduce

noise

Appropriatetrees

whichwillactas

noisesbarrierswillbe

plantedinthe

premisesandalong

roadside.

‐‐

3. Water

Nosignificantadverseimpact

Oil/fuelandwastespillsinvehicleparkingarea.Dischargeofsewage.Dischargeofcontaminatedstormwater

Sewagewaterwillbe

treatedandrecycled.

Rainwaterharvesting

isproposed.

Goodhousekeeping

andstormwater

managementwillbe

followed.

Recycledwaterwillbeusedforgardeningandflushingpurpose.

4. LandNonegativeimpact

Storageanddisposalofsolidwastes.Dischargeofsewage.Fuelandmaterialspills.

Treatmentandreuse

ofsewagewater.

Integratedwaste

managementandspill

controlplan

Drygarbagewillbe

sentforrecyclingand

wetgarbagewillbe

composted.

Segregationofdryandwetgarbagebeforewillbedonebeforedisposal.

5. BiologicalOverallPositive

Habitat

disturbance

Greenspacesinside

thepremiseswillhelp

Landscaping

willhelpin

Application form for Expansion in Environmental Clearance Project Name: Expansion of Residential Project, Pune

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 33

Sr.No.

EnvironmentalComponents

PredictedImpacts

ProbableSourceOfImpact MitigationMeasures Remarks

impact tocompensatethe

earliereffectfrom

vegetation.

Landscapingand

extensiveplantationin

thepremises.

reducingany

adverse

impactson

airandnoise

quality.

6.Socio‐economic

Overallpositiveimpact

Increasedjobopportunityinhouseholdmaintenanceandancillaryservices.

‐‐Positiveandlongtermimpact‐

FUNCTIONALPHASE

7.TrafficPattern

NosignificantImpact

Thecomplexislikelytoaddmoderatelytothetrafficflowconsideredduringpeakhour.

TrafficManagement

practiseswillbe

employed.

Adequateparking

spacewillbeprovided

inthepremises.

27

A

BLUE LINE

GAT

NO

.249

PAR

TG

AT N

O.2

50

GAT NO.251 PART

GAT NO.225 PART

GAT NO.226 PART

GAT NO.227 PART

ADJ. GAT NO.259

ADJ. GAT NO.260

ADJ. GAT NO.261

ADJ. GAT NO.262

ADJ. GAT NO.263

ADJ. GAT NO.266

ADJ.

GAT

NO

.257

AREA NOT UNDER OWNERSHIP & NOT PROPOSED N.A

AREA NOT UNDER OWNERSHIP & NOT PROPOSED N.A

B

18.00 MT WIDE R O A D

59.17M

153.

15M

54.18M

13.58M

12.00M

37.42M

27.27M

162.23M

132.56M

54.1

9M

86.3

1M

63.69M

179.47M

266.

63M

AGRICULTURAL &NO DEVELOPMENT ZONE49744.95 SQ.M.

A D J. P A W A N A R I V

E R

18.00M.W.PROPOSED ROAD

18.0

0

10.00M.W.59.17M

18.00

HIGH FLOOD LINE (RED LINE)

GREEN BELT LINE

ENTRANCE

PLO

T BO

UN

DR

Y

PLO

T BO

UN

DR

Y

PLOT BOUNDRY

PLO

T BO

UNDR

Y

PLOT BOUNDRY

LAYOUT PLAN

C

91.7

1M

59.17M

18.0

0

59.17M

PROPOSEDEHV SUBSTATION

OPEN SPACE - 114,667.72 SQ.M.

108.0

0

90.00

90.00M.W. MUMBAI-PUNE EXPRESS W

AY (AS PER SITE)

18.00 M W. SERVICE R O A D

18.00 M W. RP R O A D

18.00 M W INTERNAL ROAD

15.0

0 M

W I

NTE

RN

AL R

OAD

12.70

12.40

51.03

12.87

CULB HOUSE

31.07

BLDG '20'

17.00

17.00

U.G.TANK

09

10

17

19

20

21

22

24

25

28

51.6

933.83

16.8

4

15.00 M W INTERNAL RD.

12.00 M W INTERNAL ROAD

7.52

11.29

14.07

38.1

5

CULB HOUSE(L.G+G+1)

21.7

8

21.8

0

21.7

8

38.10

14.3212.34

32.82 16.84

33.83

16.8

4

38.1

5

25.79

51.6

9

25.69

41.2

0

25.69

18.5

0

41.2

0

190.16M

116.

92M

49.87 21.6

9

85.08

63.5

1

56.21

97.1

7

38.00

51.0

0

99.8

7

49.29

25.0

055

.90

10.10

BLDG '1'ST+22ND

HT.69.85M.

BLDG '2'

BLDG '11'

ST+22NDHT.69.85M.

BLDG '3'ST+22NDHT.69.85M.

BLDG '4'ST+22NDHT.69.85M.

BLDG '5'ST+22NDHT.69.85M.

BLDG '6'ST+23RDHT.72.85M.

BLDG '7'

HT.72.85M.

BLDG '8'

HT.72.85M.

BLDG '9'

HT.72.85M.

BLDG '10'

ST+23

HT.72.85M

BLDG '12'

BLDG '13'

BLD

G '1

5'

BLD

G '1

6'

BLDG '18'

BLDG '14'

BLD

G '1

7'

ST+23RD

ST+23RD

ST+23RD

BLDG '19'

5.00

14.02

13.86

26.26

23.73

51.06

48.86

51.03

41.08

14.92

38.15

21.86

38.15

21.86

17.00

17.00

ST+2

2ND

BLD

G '2

1'

BLD

G '2

2'

BLD

G '2

3'

BLD

G '2

4'

BLD

G '2

5'

BLD

G '2

6'ST

+19T

HH

T.69

.30M

.

BLDG '28'BLDG '27'

ST+2

2TH

HT.

73.0

5M.

ST+2

2ST

HT.

73.0

5 M

.

ST+2

1ST

HT.

70.0

0M.

ST+22ST

HT.73.05M.

ST+22ST

HT.73.05M.

ST+2

1ST

HT.

70.0

0M.

HT.72.85M.H

T.73

.05M

.

ST+23RD

ST+22ST

HT.73.05 M.

ST+23RDHT.72.85M.

ST+23RDHT.72.85M.

ST+23

HT.72.85M

ST+23HT.72.85MST+23HT.72.85M

ST+2

1ST

HT.

70.0

0M.

ST+2

2ND

HT.

73.0

5M.

15.0

0 M

W I

NTE

RN

AL R

OAD

8.11

7.98

10.10

32.25

15.30

15.30

21.00

14.31

14.32

14.30

14.32

14.88

12.0

0

12.0

0 M

W I

NTE

RN

AL R

OAD

43.20

ST+1

9TH

HT.

69.3

0M.

16.00

16.00

16.00

16.8

4

32.83

32.8215.94

18.07

11.44

19.12

14.42

14.43

14.43

14.97

15.66

12.2

0

12.2

0

12.2

0

15.2

3

13.18

14.2

3

14.2

3

14.2

3

24.0

1

13.65

13.83

31.7

5

19.1

118.8

3

17.7

0

12.0

3

12.0

0

17.97

13.75

13.75

13.74

13.74

18.72

13.71

13.71

12.01

12.00

12.00

14.54

12.65

12.28

12.13

12.00

12.00

13.03

13.03

13.00

13.03

21.79

21.79

12.5

0

12.5

0

25.79

50.7

9

12.00 M W INTERNAL ROAD

HTMETERING

SHOPPINGCENTERGR+1ST

14.73

9.84

9.84

5.00

5.00

5.00

4.92

4.92

4.92

4.92

5.04

4.92

4.92

5.03

5.04

22.0

7 ROAD

15.00 M W INTERNAL RD.

WTP

PLOT BOUNDRY

12.64

14.75

U.G.TANK

17.0

0

AMENITY-56926.09 SQ.M.

F

AGRICULTURAL &NO DEVELOPMENT ZONE2028.28 SQ.M.

GAT NO.258

37.87M

GAT NO.232

GAT NO.265

GAT NO.269(P)

GAT NO.268(P)

GAT NO.267(P)

GAT NO.264(P)

271.

94M

48.9

3M

45.97M

89.76M

48.27M

136.95M

101.07M

43.12M

81.02M

175.90M114.71M

138.61M

86.78M

23.22M33.86M

33.95M

14.1

3M

113.90M39.63M 28.65M

GAT NO.270

75.9

4M

53.63M

68.7

1M

85.4

6M

187.

75M

49.05 M.

90.3

2M

39.19 M.

C

AGRICULTURAL &NO DEVELOPMENT ZONE3996.26 SQ.M.

DAGRICULTURAL &NO DEVELOPMENT ZONE135.30 SQ.M.

BAGRICULTURAL &NO DEVELOPMENT ZONE69100.00 SQ.M.

AGRICULTURAL &NO DEVELOPMENT ZONE1585.83 SQ.M.

E

122.45 M.

122.14 M.

99.6

0 M

20.33M.

28.26M.

33.0

9M

77.7

8M

45.05 M. 25.4

6M

124.27M

146.50M

104.

19M

27.58 M

TEMP. LABOURCOLONY(TO BE DEMOLISHED)=1350.00 SQ.MT.

BUILDING LINEFOR RESI. & COMM. AS PER1) MSRDC / EE / F.NO.133-G / 1817LETTER DTD. 20 JUNE 2012.2) MSRDC/04/2015/NOC-133(G)/1306LETTER DTD. 25 MARCH 2015

15.87

25% OPEN OFAMENITY-4

957.00SQ.M.

6.00

PROPOSEDFIRE STATION

AMENITY-119556.02 SQ.M.

25% OPENOF AMENITY-14891.00SQ.M.

33.83

48.28

6.00

6.00

3.00

3.00

3.00

3.00

3.00

ENTRY / EXIT

24.95

32.7

0

18.00

18.0

0

AMENITY-43822.72 SQ.M.

25.0

7

26.7

5

ROO

M

9.67

29.1

9

6.7955

.22

38.1

7

13.77

18.35

12.00

MLCPGR+3RD

18.79

25% OPEN OFAMENITY-2

1742.00SQ.M.

6.00

3.00

STP-1

243.25

222.38

207.48

201.66

6.00

ROOM

21.70

25.63

ENTRY / EXIT FORSHOPPING CENTERFROM 18.MTR RP ROAD

65.51 M.

AREA NOT UNDER OWNERSHIP& NOT PROPOSED N.A

70.47M 12.9

5M

60.5

8

15.42

SPACE FOR HELICOPTER LANDING

9.00

21.4

8

39.5

6

72.00

13.13

9.00

9.00

72.00

7.50

15.83

9.00

9.00

AMENITY-311833.53 SQ.M.

25% OPEN OFAMENITY-3

1217.75SQ.M.

25% OPEN OFAMENITY-3

1741.60SQ.M.

6.00

MEDITATION CENTER

BUILDING LINEFOR RESI. & COMM. AS PER1) MSRDC / EE / F.NO.133-G / 1817LETTER DTD. 20 JUNE 2012.2) MSRDC/04/2015/NOC-133(G)/1306LETTER DTD. 25 MARCH 2015

9.00

M W

IN

TER

NA

L R

OA

D

12.00

51.03

OPEN SPACE - 21407.75 SQ.M.

OPEN SPACE - 46,916.81 SQ.M.

OPEN SPACE - 31407.75 SQ.M.

CONCEPTUAL PLAN