Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

19
# WBS WBS Name Activity ID Activity Name BL Project Duration Activity % Complete Remaining Duration BL Project Start BL Project Finish Actual Start Actual Finish Early Start Early Finish Total Float 1 Constructio Construction of NEUCP - Fo Construction of NEUCP - Forecast Sched Construction of NEUCP - Forecast Schedule_26Feb13 626 301 06-Sep-11 04-Sep-13 06-Sep-11 31-Jan-13 20-Jan-14 0 2 GENERAL GENERAL GENERAL GENERAL 626 301 06-Sep-11 04-Sep-13 06-Sep-11 31-Jan-13 20-Jan-14 0 3 MILESTONES MILESTONES (Contract) MILESTONES (Contract) MILESTONES (Contract) 626 198 06-Sep-11 04-Sep-13 06-Sep-11 30-May-13 20-Jan-14 0 4 PMS and SUB PMS and SUBSTATION EVENTS PMS and SUBSTATION EVENTS PMS and SUBSTATION EVENTS 0 0 07-Sep-12 28-Jan-13 5 MOBILIZATION MOBILIZATION MOBILIZATION MOBILIZATION 116 60 06-Sep-11 18-Jan-12 06-Sep-11 31-Jan-13 10-Apr-13 75 6 ENGINEERI ENGINEERING ENGINEERING ENGINEERING 617 285 06-Sep-11 25-Aug-13 06-Sep-11 31-Jan-13 01-Jan-14 11 7 IFC DRAWING IFC DRAWINGS IFC DRAWINGS IFC DRAWINGS 0 0 06-Sep-11 06-Sep-11 06-Sep-11 06-Sep-11 8 IFC DRAWINGS IFC DRAWINGS AVAILABILITY IFC DRAWINGS AVAILABILITY IFC DRAWINGS AVAILABILITY 0 0 06-Sep-11 06-Sep-11 06-Sep-11 06-Sep-11 9 SHOP DRAWIN SHOP DRAWING SUBMITTALS & AP SHOP DRAWING SUBMITTALS & APPROVALS SHOP DRAWING SUBMITTALS & APPROVALS 540 285 05-Dec-11 25-Aug-13 19-Jan-12 31-Jan-13 01-Jan-14 11 10 CIVIL - SHOP D CIVIL - SHOP DRAWINGS SUBMITTALS CIVIL - SHOP DRAWINGS SUBMITTALS & APPROVALS CIVIL - SHOP DRAWINGS SUBMITTALS & APPROVALS 205 48 20-Nov-12 17-Jul-13 09-Nov-12 31-Jan-13 27-Mar-13 59 11 GROUND LEV GROUND LEVEL GROUND LEVEL GROUND LEVEL 205 48 20-Nov-12 17-Jul-13 09-Nov-12 31-Jan-13 27-Mar-13 59 12 NECP-Rebas GROUND LEVEL NEENSDS1530 Retaining Wall Type 1, 2, & 3, Axis 49 12 0% 12 20-Nov-12 04-Dec-12 31-Jan-13 13-Feb-13 0 13 NECP-Rebas GROUND LEVEL NEENSDS1560 Retaining Wall Type 1, 2, & 3 Layout & Details, Axis 49 Approval 14 0% 14 14-Feb-13 03-Mar-13 14-Feb-13 02-Mar-13 18 14 NECP-Rebas GROUND LEVEL NEENSDS1550 Street Lighting Layout & Details 12 0% 12 17-Jun-13 01-Jul-13 26-Feb-13 11-Mar-13 59 15 NECP-Rebas GROUND LEVEL NEENSDS1580 Street Lighting Layout & Details Approval 14 0% 14 01-Jul-13 17-Jul-13 12-Mar-13 27-Mar-13 59 16 Issues on Ro Issues on Round About Dimensions Issues on Round About Dimensions (Elevated Roadway) Issues on Round About Dimensions (Elevated Roadway) 26 32 04-Dec-12 03-Jan-13 09-Nov-12 04-Feb-13 13-Mar-13 0 17 NECP-Reba Issues on Round Abou NEENSDS1700 Terna Rqstd (thru RFI-03-0169 Rev A dtd 03Dec12) Dimensions o 0 100% 0 03-Dec-12 18 NECP-Reba Issues on Round Abou NEENSDS1710 PIL Confirmed (thru RFI-03-0188 Rev A dtd 04Feb12) UB Column 0 0% 0 04-Feb-13 0 19 NECP-Reba Issues on Round Abou NEENSDS1720 PIL To Confirm (thru RFI-03-0188 Rev A dtd 04Feb12) GF Beams 0 0% 0 11-Feb-13 0 20 NECP-Reba Issues on Round Abou NEENSDS1540 Roadworks Layout & Details 12 0% 12 04-Dec-12 18-Dec-12 09-Nov-12 12-Feb-13 25-Feb-13 0 21 NECP-Reba Issues on Round Abou NEENSDS1570 Roadworks Layout & Details Approval 14 0% 14 18-Dec-12 03-Jan-13 21-Nov-12 26-Feb-13 13-Mar-13 0 22 MECHANICAL MECHANICAL - SHOP DRAWINGS SUB MECHANICAL - SHOP DRAWINGS SUBMITTALS & APPRO MECHANICAL - SHOP DRAWINGS SUBMITTALS & APPROVALS 465 265 01-Mar-12 25-Aug-13 24-Feb-13 01-Jan-14 11 23 LOWER BASE LOWER BASEMENT LOWER BASEMENT LOWER BASEMENT 21 21 01-Mar-12 25-Mar-12 24-Feb-13 19-Mar-13 62 24 NECP-Rebas LOWER BASEMENT NEENSDS210 HVAC Equipment Layout & Details, Lower Basement 7 0% 7 01-Mar-12 08-Mar-12 24-Feb-13 03-Mar-13 55 25 NECP-Rebas LOWER BASEMENT NEENSDS340 HVAC Equipment Layout & Details, Lower Basement Approval 14 0% 14 10-Mar-12 25-Mar-12 04-Mar-13 19-Mar-13 62 26 UPPER BASE UPPER BASEMENT UPPER BASEMENT UPPER BASEMENT 21 21 10-Mar-12 02-Apr-12 04-Mar-13 27-Mar-13 55 27 NECP-Rebas UPPER BASEMENT NEENSDS270 HVAC Equipment Layout & Details, Upper Basement 7 0% 7 10-Mar-12 17-Mar-12 04-Mar-13 11-Mar-13 55 28 NECP-Rebas UPPER BASEMENT NEENSDS400 HVAC Equipment Layout & Details, Upper Basement Approval 14 0% 14 18-Mar-12 02-Apr-12 12-Mar-13 27-Mar-13 55 29 GROUND LEV GROUND LEVEL GROUND LEVEL GROUND LEVEL 26 34 27-Jul-13 25-Aug-13 23-Nov-13 01-Jan-14 11 30 NECP-Rebas GROUND LEVEL NEENSDS1440 Chilled Water System Layout & Tie-In Details, Ground Level 3 0% 3 27-Jul-13 29-Jul-13 23-Nov-13 25-Nov-13 28 31 NECP-Rebas GROUND LEVEL NEENSDS1490 Chilled Water System Layout & Tie-In Details, Ground Level Appro 14 0% 14 10-Aug-13 25-Aug-13 26-Nov-13 11-Dec-13 28 32 NECP-Rebas GROUND LEVEL NEENSDS1470 Irrigation Main Line Layout & Tie-In Details, Ground Level 3 0% 3 06-Aug-13 08-Aug-13 12-Dec-13 15-Dec-13 11 33 NECP-Rebas GROUND LEVEL NEENSDS1520 Irrigation Main Line Layout & Tie-In Details, Ground Level Approval 14 0% 14 10-Aug-13 25-Aug-13 16-Dec-13 01-Jan-14 11 34 ELECTRICAL - ELECTRICAL - SHOP DRAWINGS SUBM ELECTRICAL - SHOP DRAWINGS SUBMITTALS & APPROV ELECTRICAL - SHOP DRAWINGS SUBMITTALS & APPROVALS 116 53 06-Dec-11 18-Apr-12 19-Jan-12 31-Jan-13 02-Apr-13 87 35 LOWER BASE LOWER BASEMENT LOWER BASEMENT LOWER BASEMENT 93 53 12-Dec-11 28-Mar-12 19-Jan-12 31-Jan-13 02-Apr-13 54 36 NECP-Rebas LOWER BASEMENT NEENSDS420 Cable Tray Layout & Details, Lower Basement 7 50% 4 20-Dec-11 27-Dec-11 02-Sep-12 31-Jan-13 04-Feb-13 54 37 NECP-Rebas LOWER BASEMENT NEENSDS800 Electrical Distribution Load Schedule, Lower Basement Approval (w 14 25% 11 22-Dec-11 07-Jan-12 24-Jun-12 31-Jan-13 12-Feb-13 7 38 NECP-Rebas LOWER BASEMENT NEENSDS710 Cable Tray Layout & Details, Lower Basement Approval 14 0% 14 28-Dec-11 12-Jan-12 04-Feb-13 20-Feb-13 54 39 NECP-Rebas LOWER BASEMENT NEENSDS490 Parking Guidance Layout & Single Line Diagram, Lower Basement 7 0% 7 12-Dec-11 19-Dec-11 20-Feb-13 27-Feb-13 0 40 NECP-Rebas LOWER BASEMENT NEENSDS460 Security System Layout & Single Line Diagram, Lower Basement 7 0% 7 26-Feb-12 04-Mar-12 26-Feb-13 05-Mar-13 0 41 NECP-Rebas LOWER BASEMENT NEENSDS780 Parking Guidance Layout & Single Line Diagram, Lower Basement 14 0% 14 20-Dec-11 04-Jan-12 28-Feb-13 16-Mar-13 0 42 NECP-Rebas LOWER BASEMENT NEENSDS470 BMS/Telemetry/SCADA Layout & Single Line Diagram, Lower Base 7 0% 7 05-Mar-12 12-Mar-12 06-Mar-13 13-Mar-13 0 43 NECP-Rebas LOWER BASEMENT NEENSDS750 Security System Layout & Single Line Diagram, Lower Basement A 14 0% 14 05-Mar-12 20-Mar-12 06-Mar-13 21-Mar-13 0 44 NECP-Rebas LOWER BASEMENT NEENSDS1620 UPS/Battery Lay out & Details, Lower Basement 7 0% 7 01-Feb-12 08-Feb-12 07-Mar-13 14-Mar-13 56 45 NECP-Rebas LOWER BASEMENT NEENSDS760 BMS/Telemetry/SCADA Layout & Single Line Diagram, Lower Base 14 0% 14 13-Mar-12 28-Mar-12 14-Mar-13 30-Mar-13 0 46 NECP-Rebas LOWER BASEMENT NEENSDS1660 UPS/Battery Lay out & Details, Lower Basement Approval 14 0% 14 09-Feb-12 25-Feb-12 16-Mar-13 31-Mar-13 56 47 IFC-9 DRAWI IFC-9 DRAWINGS (ASTAD Letter 029 IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): R IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals 49 53 22-Dec-11 16-Feb-12 19-Jan-12 31-Jan-13 02-Apr-13 0 48 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS550 Substations: HV SWGRs, XFMRs, Generators, MV Panels Layou 5 85% 1 02-Jan-12 07-Jan-12 19-Jan-12 31-Jan-13 31-Jan-13 17 49 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS840 Substations: HV SWGRs, XFMRs, Generators, MV Panels Layou 14 85% 2 08-Jan-12 23-Jan-12 30-Jan-12 14-Feb-13 17-Feb-13 17 50 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS540 LV Layout & Single Line Diagram, Lower Basement (w/ Substation 7 21.43% 6 25-Dec-11 01-Jan-12 17-Jun-12 11-Mar-13 17-Mar-13 0 51 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS830 LV Layout & Single Line Diagram, Lower Basement Approval (w/ S 14 21.43% 11 02-Jan-12 17-Jan-12 24-Jun-12 21-Mar-13 02-Apr-13 0 52 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS430 Lighting Layout & Single Line Diagram, Lower Basement 7 0% 13 28-Dec-11 04-Jan-12 08-Feb-12 31-Jan-13 14-Feb-13 0 53 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS520 HV Layout & Single Line Diagram, Lower Basement 7 0% 25 22-Dec-11 29-Dec-11 20-Aug-12 31-Jan-13 28-Feb-13 0 54 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS1670 Issue IFC-9 Drawings (MEP) 0 0% 0 04-Feb-13 0 55 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS720 Lighting Layout & Single Line Diagram, Lower Basement Approval 14 0% 14 05-Jan-12 21-Jan-12 28-Mar-12 20-Feb-13 07-Mar-13 0 56 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS1610 Bus Ducts/Bus Bars Layout & Details, Lower Basement 7 0% 7 24-Jan-12 31-Jan-12 27-Feb-13 06-Mar-13 0 57 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS810 HV Layout & Single Line Diagram, Lower Basement Approval 14 0% 14 31-Dec-11 15-Jan-12 02-Mar-13 17-Mar-13 6 58 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS1650 Bus Ducts/Bus Bars Layout & Details, Lower Basement Approval 14 0% 14 01-Feb-12 16-Feb-12 07-Mar-13 23-Mar-13 0 59 Under Revie Under Review - PIL Release Date to Under Review - PIL Release Date to ASTAD dtd 22Jan1 Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13 21 21 24-Dec-11 16-Jan-12 21-Feb-13 18-Mar-13 0 60 NECP-Reb Under Review - PIL Re NEENSDS1680 MV Switchgear Under Review by ASTAD, Assumed Approval:21Fe 0 0% 0 21-Feb-13 0 61 NECP-Reb Under Review - PIL Re NEENSDS530 MV Layout & Single Line Diagram, Lower Basement (w/ Substation 7 0% 7 24-Dec-11 31-Dec-11 23-Feb-13 02-Mar-13 0 62 NECP-Reb Under Review - PIL Re NEENSDS820 MV Layout & Single Line Diagram, Lower Basement Approval 14 0% 14 01-Jan-12 16-Jan-12 03-Mar-13 18-Mar-13 0 63 UPPER BASE UPPER BASEMENT UPPER BASEMENT UPPER BASEMENT 116 53 06-Dec-11 18-Apr-12 17-Jun-12 31-Jan-13 02-Apr-13 87 64 NECP-Rebas UPPER BASEMENT NEENSDS890 Emergency Lighting Layout & Single Line Diagram, Upper Baseme 14 20% 11 29-Feb-12 15-Mar-12 18-Jun-12 31-Jan-13 13-Feb-13 20 65 NECP-Rebas UPPER BASEMENT NEENSDS950 Electrical Distribution Load Schedule, Upper Basement Approval 14 10% 13 02-Apr-12 17-Apr-12 18-Jun-12 31-Jan-13 14-Feb-13 5 66 NECP-Rebas UPPER BASEMENT NEENSDS610 Security System Layout & Single Line Diagram, Upper Basement 7 0% 7 08-Jan-12 15-Jan-12 31-Jan-13 07-Feb-13 18 67 NECP-Rebas UPPER BASEMENT NEENSDS570 Cable Tray Layout & Details, Upper Basement 7 0% 7 06-Dec-11 13-Dec-11 04-Feb-13 12-Feb-13 67 68 NECP-Rebas UPPER BASEMENT NEENSDS620 BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Base 7 0% 7 16-Jan-12 23-Jan-12 09-Feb-13 16-Feb-13 18 69 NECP-Rebas UPPER BASEMENT NEENSDS630 Photovoltaic Layout & Single Line Diagram, PMS 7 0% 7 16-Jan-12 23-Jan-12 09-Feb-13 16-Feb-13 18 70 NECP-Rebas UPPER BASEMENT NEENSDS900 Security System Layout & Single Line Diagram, Upper Basement A 14 0% 14 08-Mar-12 24-Mar-12 09-Feb-13 24-Feb-13 22 71 NECP-Rebas UPPER BASEMENT NEENSDS860 Cable Tray Layout & Details, Upper Basement Approval 14 0% 14 22-Feb-12 08-Mar-12 12-Feb-13 28-Feb-13 67 72 NECP-Rebas UPPER BASEMENT NEENSDS640 Parking Guidance Layout & Single Line Diagram, Upper Basement 7 0% 7 24-Jan-12 31-Jan-12 17-Feb-13 24-Feb-13 18 73 NECP-Rebas UPPER BASEMENT NEENSDS910 BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Base 14 0% 14 03-Apr-12 18-Apr-12 17-Feb-13 04-Mar-13 22 74 NECP-Rebas UPPER BASEMENT NEENSDS920 Photovoltaic Layout & Single Line Diagram, PMS Approval 14 0% 14 17-Mar-12 01-Apr-12 17-Feb-13 04-Mar-13 112 75 NECP-Rebas UPPER BASEMENT NEENSDS930 Parking Guidance Layout & Single Line Diagram, Upper Basement 14 0% 14 25-Mar-12 09-Apr-12 25-Feb-13 12-Mar-13 18 76 IFC-9 DRAWI IFC-9 DRAWINGS (ASTAD Letter 029 IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): R IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals 106 53 14-Dec-11 15-Apr-12 17-Jun-12 31-Jan-13 02-Apr-13 0 77 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS690 LV Layout & Single Line Diagram, Upper Basement (w/ Substation 7 20% 6 14-Feb-12 21-Feb-12 17-Jun-12 11-Mar-13 17-Mar-13 0 78 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS980 LV Layout & Single Line Diagram, Upper Basement Approval (w/ S 14 20% 11 22-Feb-12 08-Mar-12 21-Jun-12 20-Mar-13 02-Apr-13 0 79 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS870 Lighting Layout & Single Line Diagram, Upper Basement Approval 14 10% 13 13-Feb-12 28-Feb-12 22-Jul-12 31-Jan-13 14-Feb-13 18 80 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS580 Lighting Layout & Single Line Diagram, Upper Basement 7 10% 6 14-Dec-11 21-Dec-11 17-Jul-12 07-Feb-13 14-Feb-13 18 81 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS650 Telephone/Structured Cabling Layout & Details, Upper Basement 7 0% 7 24-Jan-12 31-Jan-12 17-Feb-13 24-Feb-13 18 82 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS940 Telephone/Structured Cabling Layout & Details, Upper Basement A 14 0% 14 31-Mar-12 15-Apr-12 25-Feb-13 12-Mar-13 18 83 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS670 HV Layout & Single Line Diagram, Upper Basement (w/ Substation 7 0% 7 09-Feb-12 16-Feb-12 26-Feb-13 05-Mar-13 0 84 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS960 HV Layout & Single Line Diagram, Upper Basement Approval 14 0% 14 18-Feb-12 04-Mar-12 06-Mar-13 21-Mar-13 2 85 Under Revie Under Review - PIL Release Date to Under Review - PIL Release Date to ASTAD dtd 22Jan1 Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13 21 21 12-Feb-12 06-Mar-12 28-Feb-13 24-Mar-13 0 86 NECP-Reb Under Review - PIL Re NEENSDS680 MV Layout & Single Line Diagram, Upper Basement (w/ Substation 7 0% 7 12-Feb-12 19-Feb-12 28-Feb-13 07-Mar-13 0 87 NECP-Reb Under Review - PIL Re NEENSDS970 MV Layout & Single Line Diagram, Upper Basement Approval 14 0% 14 20-Feb-12 06-Mar-12 09-Mar-13 24-Mar-13 0 88 GROUND LEV GROUND LEVEL GROUND LEVEL GROUND LEVEL 35 43 22-Feb-12 02-Apr-12 30-Aug-12 31-Jan-13 21-Mar-13 70 89 NECP-Rebas GROUND LEVEL NEENSDS1380 Street Lighting Layout & Details, Ground Level 7 5% 7 01-Mar-12 08-Mar-12 30-Aug-12 31-Jan-13 07-Feb-13 32 90 NECP-Rebas GROUND LEVEL NEENSDS1410 Street Lighting Layout & Details, Ground Level Approval 14 0% 14 10-Mar-12 25-Mar-12 07-Feb-13 24-Feb-13 32 91 IFC-9 DRAWI IFC-9 DRAWINGS (ASTAD Letter 029 IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): R IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals 35 29 22-Feb-12 02-Apr-12 30-Aug-12 17-Feb-13 21-Mar-13 70 92 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS1370 HV Cable Routing and Details, Ground Level 7 50% 4 22-Feb-12 29-Feb-12 30-Aug-12 02-Mar-13 05-Mar-13 2 93 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS1400 HV Cable Routing and Details, Ground Level Approval 14 50% 7 01-Mar-12 17-Mar-12 06-Sep-12 14-Mar-13 21-Mar-13 2 94 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS1390 Telephone Routing & Details, Ground Level 7 0% 7 10-Mar-12 17-Mar-12 17-Feb-13 24-Feb-13 78 95 NECP-Reba IFC-9 DRAWINGS (AS NEENSDS1420 Telephone Routing & Details, Ground Level Approval 14 0% 14 18-Mar-12 02-Apr-12 25-Feb-13 12-Mar-13 78 96 FINISHES - SH FINISHES - SHOP DRAWINGS SUBMITT FINISHES - SHOP DRAWINGS SUBMITTALS & APPROVALS FINISHES - SHOP DRAWINGS SUBMITTALS & APPROVALS 221 82 05-Dec-11 18-Aug-12 13-Nov-12 31-Jan-13 06-May-13 212 97 LOWER BASE LOWER BASEMENT LOWER BASEMENT LOWER BASEMENT 221 82 05-Dec-11 18-Aug-12 13-Nov-12 31-Jan-13 06-May-13 198 98 NECP-Rebas LOWER BASEMENT NEENSDS1180 Suspended Ceiling Layout & Details, Lower Basement Approval 14 10% 13 05-Dec-11 20-Dec-11 13-Nov-12 31-Jan-13 14-Feb-13 86 99 NECP-Rebas LOWER BASEMENT NEENSDS1240 Signage & Wayfinding Layout & Details, Lower Basement Approval 14 10% 13 25-Jul-12 09-Aug-12 23-Nov-12 06-Feb-13 21-Feb-13 109 100 NECP-Rebas LOWER BASEMENT NEENSDS1000 Finishing Schedule & Details, Lower Basement 7 0% 7 05-Dec-11 12-Dec-11 31-Jan-13 07-Feb-13 13 101 NECP-Rebas LOWER BASEMENT NEENSDS1060 Furniture Layout & Details, Lower Basement 7 0% 7 25-Jul-12 01-Aug-12 31-Jan-13 07-Feb-13 259 102 NECP-Rebas LOWER BASEMENT NEENSDS1010 Door Schedule & Details, Lower Basement 7 0% 7 22-Dec-11 29-Dec-11 09-Feb-13 16-Feb-13 13 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb 2013 2014 Retaining Wall Type 1, 2, & 3, Axis 49 Retaining Wall Type 1, 2, & 3 Layout & Details, Axis 49 Approval Street Lighting Layout & Details Street Lighting Layout & Details Approval 03-0169 Rev A dtd 03Dec12) Dimensions of Round About PIL Confirmed (thru RFI-03-0188 Rev A dtd 04Feb12) UB Columns Set Out is Acceptable PIL To Confirm (thru RFI-03-0188 Rev A dtd 04Feb12) GF Beams Set Out by 11Feb13 Roadworks Layout & Details Roadworks Layout & Details Approval HVAC Equipment Layout & Details, Lower Basement HVAC Equipment Layout & Details, Lower Basement Approval HVAC Equipment Layout & Details, Upper Basement HVAC Equipment Layout & Details, Upper Basement Approval Chilled Water System Layout & Tie-In Details, Ground Level Chilled Water System Layout & Tie-In Details, Ground Level A Irrigation Main Line Layout & Tie-In Details, Ground Level Irrigation Main Line Layout & Tie-In Details, G Cable Tray Layout & Details, Lower Basement Electrical Distribution Load Schedule, Lower Basement Approval (w/ Substation Issue in UB Slab Area 13) Cable Tray Layout & Details, Lower Basement Approval Parking Guidance Layout & Single Line Diagram, Lower Basement Security System Layout & Single Line Diagram, Lower Basement Parking Guidance Layout & Single Line Diagram, Lower Basement Approval BMS/Telemetry/SCADA Layout & Single Line Diagram, Lower Basement Security System Layout & Single Line Diagram, Lower Basement Approval UPS/Battery Lay out & Details, Lower Basement BMS/Telemetry/SCADA Layout & Single Line Diagram, Lower Basement Approval UPS/Battery Lay out & Details, Lower Basement Approval Substations: HV SWGRs, XFMRs, Generators, MV Panels Layout & Details, Lower Basement Substations: HV SWGRs, XFMRs, Generators, MV Panels Layout & Details, Lower Basement Approval LV Layout & Single Line Diagram, Lower Basement (w/ Substation Issue in UB Slab Area 13) LV Layout & Single Line Diagram, Lower Basement Approval (w/ Substation Issue in UB Slab Area 13) Lighting Layout & Single Line Diagram, Lower Basement HV Layout & Single Line Diagram, Lower Basement Issue IFC-9 Drawings (MEP) Lighting Layout & Single Line Diagram, Lower Basement Approval Bus Ducts/Bus Bars Layout & Details, Lower Basement HV Layout & Single Line Diagram, Lower Basement Approval Bus Ducts/Bus Bars Layout & Details, Lower Basement Approval MV Switchgear Under Review by ASTAD, Assumed Approval:21Feb13 MV Layout & Single Line Diagram, Lower Basement (w/ Substation Issue in UB Slab Area 13) MV Layout & Single Line Diagram, Lower Basement Approval Emergency Lighting Layout & Single Line Diagram, Upper Basement Approval Electrical Distribution Load Schedule, Upper Basement Approval Security System Layout & Single Line Diagram, Upper Basement Cable Tray Layout & Details, Upper Basement BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Basement Photovoltaic Layout & Single Line Diagram, PMS Security System Layout & Single Line Diagram, Upper Basement Approval Cable Tray Layout & Details, Upper Basement Approval Parking Guidance Layout & Single Line Diagram, Upper Basement BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Basement Approval Photovoltaic Layout & Single Line Diagram, PMS Approval Parking Guidance Layout & Single Line Diagram, Upper Basement Approval LV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13) LV Layout & Single Line Diagram, Upper Basement Approval (w/ Substation Issue in UB Slab Area 13) Lighting Layout & Single Line Diagram, Upper Basement Approval Lighting Layout & Single Line Diagram, Upper Basement Telephone/Structured Cabling Layout & Details, Upper Basement Telephone/Structured Cabling Layout & Details, Upper Basement Approval HV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13) HV Layout & Single Line Diagram, Upper Basement Approval MV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13) MV Layout & Single Line Diagram, Upper Basement Approval Street Lighting Layout & Details, Ground Level Street Lighting Layout & Details, Ground Level Approval HV Cable Routing and Details, Ground Level HV Cable Routing and Details, Ground Level Approval Telephone Routing & Details, Ground Level Telephone Routing & Details, Ground Level Approval Suspended Ceiling Layout & Details, Lower Basement Approval Signage & Wayfinding Layout & Details, Lower Basement Approval Finishing Schedule & Details, Lower Basement Furniture Layout & Details, Lower Basement Door Schedule & Details, Lower Basement Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 1 of 19/27-Feb-13 09:03 Actual Work Remaining Work Critical Remaining Work Milestone TERNA Date Revision Checked Approved 26-Feb-13 Data Date: 31-Jan-13 DS AT (Based on 06Sep12 Submitted Forecast Schedule)

description

Forecast Schedule Upd 31Jan13!3!27Feb13

Transcript of Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

Page 1: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

1 Construction of NEUCP - Forecast Schedule_26Feb13Construction of NEUCP - Forecast Schedule_26Feb13Construction of NEUCP - Forecast Schedule_26Feb13Construction of NEUCP - Forecast Schedule_26Feb13 626 301 06-Sep-11 04-Sep-13 06-Sep-11 31-Jan-13 20-Jan-14 0

2 GENERALGENERALGENERALGENERAL 626 301 06-Sep-11 04-Sep-13 06-Sep-11 31-Jan-13 20-Jan-14 0

3 MILESTONES (Contract)MILESTONES (Contract)MILESTONES (Contract)MILESTONES (Contract) 626 198 06-Sep-11 04-Sep-13 06-Sep-11 30-May-13 20-Jan-14 0

4 PMS and SUBSTATION EVENTSPMS and SUBSTATION EVENTSPMS and SUBSTATION EVENTSPMS and SUBSTATION EVENTS 0 0 07-Sep-12 28-Jan-13

5 MOBILIZATIONMOBILIZATIONMOBILIZATIONMOBILIZATION 116 60 06-Sep-11 18-Jan-12 06-Sep-11 31-Jan-13 10-Apr-13 75

6 ENGINEERINGENGINEERINGENGINEERINGENGINEERING 617 285 06-Sep-11 25-Aug-13 06-Sep-11 31-Jan-13 01-Jan-14 11

7 IFC DRAWINGSIFC DRAWINGSIFC DRAWINGSIFC DRAWINGS 0 0 06-Sep-11 06-Sep-11 06-Sep-11 06-Sep-11

8 IFC DRAWINGS AVAILABILITYIFC DRAWINGS AVAILABILITYIFC DRAWINGS AVAILABILITYIFC DRAWINGS AVAILABILITY 0 0 06-Sep-11 06-Sep-11 06-Sep-11 06-Sep-11

9 SHOP DRAWING SUBMITTALS & APPROVALSSHOP DRAWING SUBMITTALS & APPROVALSSHOP DRAWING SUBMITTALS & APPROVALSSHOP DRAWING SUBMITTALS & APPROVALS 540 285 05-Dec-11 25-Aug-13 19-Jan-12 31-Jan-13 01-Jan-14 11

10 CIVIL - SHOP DRAWINGS SUBMITTALS & APPROVALSCIVIL - SHOP DRAWINGS SUBMITTALS & APPROVALSCIVIL - SHOP DRAWINGS SUBMITTALS & APPROVALSCIVIL - SHOP DRAWINGS SUBMITTALS & APPROVALS 205 48 20-Nov-12 17-Jul-13 09-Nov-12 31-Jan-13 27-Mar-13 59

11 GROUND LEVELGROUND LEVELGROUND LEVELGROUND LEVEL 205 48 20-Nov-12 17-Jul-13 09-Nov-12 31-Jan-13 27-Mar-13 59

12 NECP-Rebase_06Sep12-4.EN.SDS.1.3GROUND LEVEL NEENSDS1530 Retaining Wall Type 1, 2, & 3, Axis 49 12 0% 12 20-Nov-12 04-Dec-12 31-Jan-13 13-Feb-13 0

13 NECP-Rebase_06Sep12-4.EN.SDS.1.3GROUND LEVEL NEENSDS1560 Retaining Wall Type 1, 2, & 3 Layout & Details, Axis 49 Approval 14 0% 14 14-Feb-13 03-Mar-13 14-Feb-13 02-Mar-13 18

14 NECP-Rebase_06Sep12-4.EN.SDS.1.3GROUND LEVEL NEENSDS1550 Street Lighting Layout & Details 12 0% 12 17-Jun-13 01-Jul-13 26-Feb-13 11-Mar-13 59

15 NECP-Rebase_06Sep12-4.EN.SDS.1.3GROUND LEVEL NEENSDS1580 Street Lighting Layout & Details Approval 14 0% 14 01-Jul-13 17-Jul-13 12-Mar-13 27-Mar-13 59

16 Issues on Round About Dimensions (Elevated Roadway)Issues on Round About Dimensions (Elevated Roadway)Issues on Round About Dimensions (Elevated Roadway)Issues on Round About Dimensions (Elevated Roadway) 26 32 04-Dec-12 03-Jan-13 09-Nov-12 04-Feb-13 13-Mar-13 0

17 NECP-Rebase_06Sep12-4.EN.SDS.1.3.4Issues on Round About Dimensions (Elevated Roadway)NEENSDS1700 Terna Rqstd (thru RFI-03-0169 Rev A dtd 03Dec12) Dimensions of Round About0 100% 0 03-Dec-12

18 NECP-Rebase_06Sep12-4.EN.SDS.1.3.4Issues on Round About Dimensions (Elevated Roadway)NEENSDS1710 PIL Confirmed (thru RFI-03-0188 Rev A dtd 04Feb12) UB Columns Set Out is Acceptable0 0% 0 04-Feb-13 0

19 NECP-Rebase_06Sep12-4.EN.SDS.1.3.4Issues on Round About Dimensions (Elevated Roadway)NEENSDS1720 PIL To Confirm (thru RFI-03-0188 Rev A dtd 04Feb12) GF Beams Set Out by 11Feb130 0% 0 11-Feb-13 0

20 NECP-Rebase_06Sep12-4.EN.SDS.1.3.4Issues on Round About Dimensions (Elevated Roadway)NEENSDS1540 Roadworks Layout & Details 12 0% 12 04-Dec-12 18-Dec-12 09-Nov-12 12-Feb-13 25-Feb-13 0

21 NECP-Rebase_06Sep12-4.EN.SDS.1.3.4Issues on Round About Dimensions (Elevated Roadway)NEENSDS1570 Roadworks Layout & Details Approval 14 0% 14 18-Dec-12 03-Jan-13 21-Nov-12 26-Feb-13 13-Mar-13 0

22 MECHANICAL - SHOP DRAWINGS SUBMITTALS & APPROVALSMECHANICAL - SHOP DRAWINGS SUBMITTALS & APPROVALSMECHANICAL - SHOP DRAWINGS SUBMITTALS & APPROVALSMECHANICAL - SHOP DRAWINGS SUBMITTALS & APPROVALS 465 265 01-Mar-12 25-Aug-13 24-Feb-13 01-Jan-14 11

23 LOWER BASEMENTLOWER BASEMENTLOWER BASEMENTLOWER BASEMENT 21 21 01-Mar-12 25-Mar-12 24-Feb-13 19-Mar-13 62

24 NECP-Rebase_06Sep12-4.EN.SDS.3.1LOWER BASEMENT NEENSDS210 HVAC Equipment Layout & Details, Lower Basement 7 0% 7 01-Mar-12 08-Mar-12 24-Feb-13 03-Mar-13 55

25 NECP-Rebase_06Sep12-4.EN.SDS.3.1LOWER BASEMENT NEENSDS340 HVAC Equipment Layout & Details, Lower Basement Approval 14 0% 14 10-Mar-12 25-Mar-12 04-Mar-13 19-Mar-13 62

26 UPPER BASEMENTUPPER BASEMENTUPPER BASEMENTUPPER BASEMENT 21 21 10-Mar-12 02-Apr-12 04-Mar-13 27-Mar-13 55

27 NECP-Rebase_06Sep12-4.EN.SDS.3.2UPPER BASEMENT NEENSDS270 HVAC Equipment Layout & Details, Upper Basement 7 0% 7 10-Mar-12 17-Mar-12 04-Mar-13 11-Mar-13 55

28 NECP-Rebase_06Sep12-4.EN.SDS.3.2UPPER BASEMENT NEENSDS400 HVAC Equipment Layout & Details, Upper Basement Approval 14 0% 14 18-Mar-12 02-Apr-12 12-Mar-13 27-Mar-13 55

29 GROUND LEVELGROUND LEVELGROUND LEVELGROUND LEVEL 26 34 27-Jul-13 25-Aug-13 23-Nov-13 01-Jan-14 11

30 NECP-Rebase_06Sep12-4.EN.SDS.3.3GROUND LEVEL NEENSDS1440 Chilled Water System Layout & Tie-In Details, Ground Level 3 0% 3 27-Jul-13 29-Jul-13 23-Nov-13 25-Nov-13 28

31 NECP-Rebase_06Sep12-4.EN.SDS.3.3GROUND LEVEL NEENSDS1490 Chilled Water System Layout & Tie-In Details, Ground Level Approval 14 0% 14 10-Aug-13 25-Aug-13 26-Nov-13 11-Dec-13 28

32 NECP-Rebase_06Sep12-4.EN.SDS.3.3GROUND LEVEL NEENSDS1470 Irrigation Main Line Layout & Tie-In Details, Ground Level 3 0% 3 06-Aug-13 08-Aug-13 12-Dec-13 15-Dec-13 11

33 NECP-Rebase_06Sep12-4.EN.SDS.3.3GROUND LEVEL NEENSDS1520 Irrigation Main Line Layout & Tie-In Details, Ground Level Approval 14 0% 14 10-Aug-13 25-Aug-13 16-Dec-13 01-Jan-14 11

34 ELECTRICAL - SHOP DRAWINGS SUBMITTALS & APPROVALSELECTRICAL - SHOP DRAWINGS SUBMITTALS & APPROVALSELECTRICAL - SHOP DRAWINGS SUBMITTALS & APPROVALSELECTRICAL - SHOP DRAWINGS SUBMITTALS & APPROVALS 116 53 06-Dec-11 18-Apr-12 19-Jan-12 31-Jan-13 02-Apr-13 87

35 LOWER BASEMENTLOWER BASEMENTLOWER BASEMENTLOWER BASEMENT 93 53 12-Dec-11 28-Mar-12 19-Jan-12 31-Jan-13 02-Apr-13 54

36 NECP-Rebase_06Sep12-4.EN.SDS.2.1LOWER BASEMENT NEENSDS420 Cable Tray Layout & Details, Lower Basement 7 50% 4 20-Dec-11 27-Dec-11 02-Sep-12 31-Jan-13 04-Feb-13 54

37 NECP-Rebase_06Sep12-4.EN.SDS.2.1LOWER BASEMENT NEENSDS800 Electrical Distribution Load Schedule, Lower Basement Approval (w/ Substation Issue in UB Slab Area 13)14 25% 11 22-Dec-11 07-Jan-12 24-Jun-12 31-Jan-13 12-Feb-13 7

38 NECP-Rebase_06Sep12-4.EN.SDS.2.1LOWER BASEMENT NEENSDS710 Cable Tray Layout & Details, Lower Basement Approval 14 0% 14 28-Dec-11 12-Jan-12 04-Feb-13 20-Feb-13 54

39 NECP-Rebase_06Sep12-4.EN.SDS.2.1LOWER BASEMENT NEENSDS490 Parking Guidance Layout & Single Line Diagram, Lower Basement 7 0% 7 12-Dec-11 19-Dec-11 20-Feb-13 27-Feb-13 0

40 NECP-Rebase_06Sep12-4.EN.SDS.2.1LOWER BASEMENT NEENSDS460 Security System Layout & Single Line Diagram, Lower Basement 7 0% 7 26-Feb-12 04-Mar-12 26-Feb-13 05-Mar-13 0

41 NECP-Rebase_06Sep12-4.EN.SDS.2.1LOWER BASEMENT NEENSDS780 Parking Guidance Layout & Single Line Diagram, Lower Basement Approval 14 0% 14 20-Dec-11 04-Jan-12 28-Feb-13 16-Mar-13 0

42 NECP-Rebase_06Sep12-4.EN.SDS.2.1LOWER BASEMENT NEENSDS470 BMS/Telemetry/SCADA Layout & Single Line Diagram, Lower Basement 7 0% 7 05-Mar-12 12-Mar-12 06-Mar-13 13-Mar-13 0

43 NECP-Rebase_06Sep12-4.EN.SDS.2.1LOWER BASEMENT NEENSDS750 Security System Layout & Single Line Diagram, Lower Basement Approval 14 0% 14 05-Mar-12 20-Mar-12 06-Mar-13 21-Mar-13 0

44 NECP-Rebase_06Sep12-4.EN.SDS.2.1LOWER BASEMENT NEENSDS1620 UPS/Battery Lay out & Details, Lower Basement 7 0% 7 01-Feb-12 08-Feb-12 07-Mar-13 14-Mar-13 56

45 NECP-Rebase_06Sep12-4.EN.SDS.2.1LOWER BASEMENT NEENSDS760 BMS/Telemetry/SCADA Layout & Single Line Diagram, Lower Basement Approval14 0% 14 13-Mar-12 28-Mar-12 14-Mar-13 30-Mar-13 0

46 NECP-Rebase_06Sep12-4.EN.SDS.2.1LOWER BASEMENT NEENSDS1660 UPS/Battery Lay out & Details, Lower Basement Approval 14 0% 14 09-Feb-12 25-Feb-12 16-Mar-13 31-Mar-13 56

47 IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsIFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsIFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsIFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals 49 53 22-Dec-11 16-Feb-12 19-Jan-12 31-Jan-13 02-Apr-13 0

48 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS550 Substations: HV SWGRs, XFMRs, Generators, MV Panels Layout & Details, Lower Basement5 85% 1 02-Jan-12 07-Jan-12 19-Jan-12 31-Jan-13 31-Jan-13 17

49 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS840 Substations: HV SWGRs, XFMRs, Generators, MV Panels Layout & Details, Lower Basement Approval14 85% 2 08-Jan-12 23-Jan-12 30-Jan-12 14-Feb-13 17-Feb-13 17

50 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS540 LV Layout & Single Line Diagram, Lower Basement (w/ Substation Issue in UB Slab Area 13)7 21.43% 6 25-Dec-11 01-Jan-12 17-Jun-12 11-Mar-13 17-Mar-13 0

51 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS830 LV Layout & Single Line Diagram, Lower Basement Approval (w/ Substation Issue in UB Slab Area 13)14 21.43% 11 02-Jan-12 17-Jan-12 24-Jun-12 21-Mar-13 02-Apr-13 0

52 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS430 Lighting Layout & Single Line Diagram, Lower Basement 7 0% 13 28-Dec-11 04-Jan-12 08-Feb-12 31-Jan-13 14-Feb-13 0

53 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS520 HV Layout & Single Line Diagram, Lower Basement 7 0% 25 22-Dec-11 29-Dec-11 20-Aug-12 31-Jan-13 28-Feb-13 0

54 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS1670 Issue IFC-9 Drawings (MEP) 0 0% 0 04-Feb-13 0

55 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS720 Lighting Layout & Single Line Diagram, Lower Basement Approval 14 0% 14 05-Jan-12 21-Jan-12 28-Mar-12 20-Feb-13 07-Mar-13 0

56 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS1610 Bus Ducts/Bus Bars Layout & Details, Lower Basement 7 0% 7 24-Jan-12 31-Jan-12 27-Feb-13 06-Mar-13 0

57 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS810 HV Layout & Single Line Diagram, Lower Basement Approval 14 0% 14 31-Dec-11 15-Jan-12 02-Mar-13 17-Mar-13 6

58 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS1650 Bus Ducts/Bus Bars Layout & Details, Lower Basement Approval 14 0% 14 01-Feb-12 16-Feb-12 07-Mar-13 23-Mar-13 0

59 Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13 21 21 24-Dec-11 16-Jan-12 21-Feb-13 18-Mar-13 0

60 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5.1Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13NEENSDS1680 MV Switchgear Under Review by ASTAD, Assumed Approval:21Feb13 0 0% 0 21-Feb-13 0

61 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5.1Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13NEENSDS530 MV Layout & Single Line Diagram, Lower Basement (w/ Substation Issue in UB Slab Area 13)7 0% 7 24-Dec-11 31-Dec-11 23-Feb-13 02-Mar-13 0

62 NECP-Rebase_06Sep12-4.EN.SDS.2.1.5.1Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13NEENSDS820 MV Layout & Single Line Diagram, Lower Basement Approval 14 0% 14 01-Jan-12 16-Jan-12 03-Mar-13 18-Mar-13 0

63 UPPER BASEMENTUPPER BASEMENTUPPER BASEMENTUPPER BASEMENT 116 53 06-Dec-11 18-Apr-12 17-Jun-12 31-Jan-13 02-Apr-13 87

64 NECP-Rebase_06Sep12-4.EN.SDS.2.2UPPER BASEMENT NEENSDS890 Emergency Lighting Layout & Single Line Diagram, Upper Basement Approval14 20% 11 29-Feb-12 15-Mar-12 18-Jun-12 31-Jan-13 13-Feb-13 20

65 NECP-Rebase_06Sep12-4.EN.SDS.2.2UPPER BASEMENT NEENSDS950 Electrical Distribution Load Schedule, Upper Basement Approval 14 10% 13 02-Apr-12 17-Apr-12 18-Jun-12 31-Jan-13 14-Feb-13 5

66 NECP-Rebase_06Sep12-4.EN.SDS.2.2UPPER BASEMENT NEENSDS610 Security System Layout & Single Line Diagram, Upper Basement 7 0% 7 08-Jan-12 15-Jan-12 31-Jan-13 07-Feb-13 18

67 NECP-Rebase_06Sep12-4.EN.SDS.2.2UPPER BASEMENT NEENSDS570 Cable Tray Layout & Details, Upper Basement 7 0% 7 06-Dec-11 13-Dec-11 04-Feb-13 12-Feb-13 67

68 NECP-Rebase_06Sep12-4.EN.SDS.2.2UPPER BASEMENT NEENSDS620 BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Basement 7 0% 7 16-Jan-12 23-Jan-12 09-Feb-13 16-Feb-13 18

69 NECP-Rebase_06Sep12-4.EN.SDS.2.2UPPER BASEMENT NEENSDS630 Photovoltaic Layout & Single Line Diagram, PMS 7 0% 7 16-Jan-12 23-Jan-12 09-Feb-13 16-Feb-13 18

70 NECP-Rebase_06Sep12-4.EN.SDS.2.2UPPER BASEMENT NEENSDS900 Security System Layout & Single Line Diagram, Upper Basement Approval 14 0% 14 08-Mar-12 24-Mar-12 09-Feb-13 24-Feb-13 22

71 NECP-Rebase_06Sep12-4.EN.SDS.2.2UPPER BASEMENT NEENSDS860 Cable Tray Layout & Details, Upper Basement Approval 14 0% 14 22-Feb-12 08-Mar-12 12-Feb-13 28-Feb-13 67

72 NECP-Rebase_06Sep12-4.EN.SDS.2.2UPPER BASEMENT NEENSDS640 Parking Guidance Layout & Single Line Diagram, Upper Basement 7 0% 7 24-Jan-12 31-Jan-12 17-Feb-13 24-Feb-13 18

73 NECP-Rebase_06Sep12-4.EN.SDS.2.2UPPER BASEMENT NEENSDS910 BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Basement Approval14 0% 14 03-Apr-12 18-Apr-12 17-Feb-13 04-Mar-13 22

74 NECP-Rebase_06Sep12-4.EN.SDS.2.2UPPER BASEMENT NEENSDS920 Photovoltaic Layout & Single Line Diagram, PMS Approval 14 0% 14 17-Mar-12 01-Apr-12 17-Feb-13 04-Mar-13 112

75 NECP-Rebase_06Sep12-4.EN.SDS.2.2UPPER BASEMENT NEENSDS930 Parking Guidance Layout & Single Line Diagram, Upper Basement Approval 14 0% 14 25-Mar-12 09-Apr-12 25-Feb-13 12-Mar-13 18

76 IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsIFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsIFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsIFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals 106 53 14-Dec-11 15-Apr-12 17-Jun-12 31-Jan-13 02-Apr-13 0

77 NECP-Rebase_06Sep12-4.EN.SDS.2.2.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS690 LV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13)7 20% 6 14-Feb-12 21-Feb-12 17-Jun-12 11-Mar-13 17-Mar-13 0

78 NECP-Rebase_06Sep12-4.EN.SDS.2.2.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS980 LV Layout & Single Line Diagram, Upper Basement Approval (w/ Substation Issue in UB Slab Area 13)14 20% 11 22-Feb-12 08-Mar-12 21-Jun-12 20-Mar-13 02-Apr-13 0

79 NECP-Rebase_06Sep12-4.EN.SDS.2.2.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS870 Lighting Layout & Single Line Diagram, Upper Basement Approval 14 10% 13 13-Feb-12 28-Feb-12 22-Jul-12 31-Jan-13 14-Feb-13 18

80 NECP-Rebase_06Sep12-4.EN.SDS.2.2.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS580 Lighting Layout & Single Line Diagram, Upper Basement 7 10% 6 14-Dec-11 21-Dec-11 17-Jul-12 07-Feb-13 14-Feb-13 18

81 NECP-Rebase_06Sep12-4.EN.SDS.2.2.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS650 Telephone/Structured Cabling Layout & Details, Upper Basement 7 0% 7 24-Jan-12 31-Jan-12 17-Feb-13 24-Feb-13 18

82 NECP-Rebase_06Sep12-4.EN.SDS.2.2.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS940 Telephone/Structured Cabling Layout & Details, Upper Basement Approval 14 0% 14 31-Mar-12 15-Apr-12 25-Feb-13 12-Mar-13 18

83 NECP-Rebase_06Sep12-4.EN.SDS.2.2.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS670 HV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13)7 0% 7 09-Feb-12 16-Feb-12 26-Feb-13 05-Mar-13 0

84 NECP-Rebase_06Sep12-4.EN.SDS.2.2.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS960 HV Layout & Single Line Diagram, Upper Basement Approval 14 0% 14 18-Feb-12 04-Mar-12 06-Mar-13 21-Mar-13 2

85 Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13 21 21 12-Feb-12 06-Mar-12 28-Feb-13 24-Mar-13 0

86 NECP-Rebase_06Sep12-4.EN.SDS.2.2.1.1Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13NEENSDS680 MV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13)7 0% 7 12-Feb-12 19-Feb-12 28-Feb-13 07-Mar-13 0

87 NECP-Rebase_06Sep12-4.EN.SDS.2.2.1.1Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13NEENSDS970 MV Layout & Single Line Diagram, Upper Basement Approval 14 0% 14 20-Feb-12 06-Mar-12 09-Mar-13 24-Mar-13 0

88 GROUND LEVELGROUND LEVELGROUND LEVELGROUND LEVEL 35 43 22-Feb-12 02-Apr-12 30-Aug-12 31-Jan-13 21-Mar-13 70

89 NECP-Rebase_06Sep12-4.EN.SDS.2.3GROUND LEVEL NEENSDS1380 Street Lighting Layout & Details, Ground Level 7 5% 7 01-Mar-12 08-Mar-12 30-Aug-12 31-Jan-13 07-Feb-13 32

90 NECP-Rebase_06Sep12-4.EN.SDS.2.3GROUND LEVEL NEENSDS1410 Street Lighting Layout & Details, Ground Level Approval 14 0% 14 10-Mar-12 25-Mar-12 07-Feb-13 24-Feb-13 32

91 IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsIFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsIFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsIFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals 35 29 22-Feb-12 02-Apr-12 30-Aug-12 17-Feb-13 21-Mar-13 70

92 NECP-Rebase_06Sep12-4.EN.SDS.2.3.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS1370 HV Cable Routing and Details, Ground Level 7 50% 4 22-Feb-12 29-Feb-12 30-Aug-12 02-Mar-13 05-Mar-13 2

93 NECP-Rebase_06Sep12-4.EN.SDS.2.3.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS1400 HV Cable Routing and Details, Ground Level Approval 14 50% 7 01-Mar-12 17-Mar-12 06-Sep-12 14-Mar-13 21-Mar-13 2

94 NECP-Rebase_06Sep12-4.EN.SDS.2.3.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS1390 Telephone Routing & Details, Ground Level 7 0% 7 10-Mar-12 17-Mar-12 17-Feb-13 24-Feb-13 78

95 NECP-Rebase_06Sep12-4.EN.SDS.2.3.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEENSDS1420 Telephone Routing & Details, Ground Level Approval 14 0% 14 18-Mar-12 02-Apr-12 25-Feb-13 12-Mar-13 78

96 FINISHES - SHOP DRAWINGS SUBMITTALS & APPROVALSFINISHES - SHOP DRAWINGS SUBMITTALS & APPROVALSFINISHES - SHOP DRAWINGS SUBMITTALS & APPROVALSFINISHES - SHOP DRAWINGS SUBMITTALS & APPROVALS 221 82 05-Dec-11 18-Aug-12 13-Nov-12 31-Jan-13 06-May-13 212

97 LOWER BASEMENTLOWER BASEMENTLOWER BASEMENTLOWER BASEMENT 221 82 05-Dec-11 18-Aug-12 13-Nov-12 31-Jan-13 06-May-13 198

98 NECP-Rebase_06Sep12-4.EN.SDS.4.1LOWER BASEMENT NEENSDS1180 Suspended Ceiling Layout & Details, Lower Basement Approval 14 10% 13 05-Dec-11 20-Dec-11 13-Nov-12 31-Jan-13 14-Feb-13 86

99 NECP-Rebase_06Sep12-4.EN.SDS.4.1LOWER BASEMENT NEENSDS1240 Signage & Wayfinding Layout & Details, Lower Basement Approval 14 10% 13 25-Jul-12 09-Aug-12 23-Nov-12 06-Feb-13 21-Feb-13 109

100 NECP-Rebase_06Sep12-4.EN.SDS.4.1LOWER BASEMENT NEENSDS1000 Finishing Schedule & Details, Lower Basement 7 0% 7 05-Dec-11 12-Dec-11 31-Jan-13 07-Feb-13 13

101 NECP-Rebase_06Sep12-4.EN.SDS.4.1LOWER BASEMENT NEENSDS1060 Furniture Layout & Details, Lower Basement 7 0% 7 25-Jul-12 01-Aug-12 31-Jan-13 07-Feb-13 259

102 NECP-Rebase_06Sep12-4.EN.SDS.4.1LOWER BASEMENT NEENSDS1010 Door Schedule & Details, Lower Basement 7 0% 7 22-Dec-11 29-Dec-11 09-Feb-13 16-Feb-13 13

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Retaining Wall Type 1, 2, & 3, Axis 49

Retaining Wall Type 1, 2, & 3 Layout & Details, Axis 49 Approval

Street Lighting Layout & Details

Street Lighting Layout & Details Approval

Terna Rqstd (thru RFI-03-0169 Rev A dtd 03Dec12) Dimensions of Round About

PIL Confirmed (thru RFI-03-0188 Rev A dtd 04Feb12) UB Columns Set Out is Acceptable

PIL To Confirm (thru RFI-03-0188 Rev A dtd 04Feb12) GF Beams Set Out by 11Feb13

Roadworks Layout & Details

Roadworks Layout & Details Approval

HVAC Equipment Layout & Details, Lower Basement

HVAC Equipment Layout & Details, Lower Basement Approval

HVAC Equipment Layout & Details, Upper Basement

HVAC Equipment Layout & Details, Upper Basement Approval

Chilled Water System Layout & Tie-In Details, Ground Level

Chilled Water System Layout & Tie-In Details, Ground Level Approval

Irrigation Main Line Layout & Tie-In Details, Ground Level

Irrigation Main Line Layout & Tie-In Details, G

Cable Tray Layout & Details, Lower Basement

Electrical Distribution Load Schedule, Lower Basement Approval (w/ Substation Issue in UB Slab Area 13)

Cable Tray Layout & Details, Lower Basement Approval

Parking Guidance Layout & Single Line Diagram, Lower Basement

Security System Layout & Single Line Diagram, Lower Basement

Parking Guidance Layout & Single Line Diagram, Lower Basement Approval

BMS/Telemetry/SCADA Layout & Single Line Diagram, Lower Basement

Security System Layout & Single Line Diagram, Lower Basement Approval

UPS/Battery Lay out & Details, Lower Basement

BMS/Telemetry/SCADA Layout & Single Line Diagram, Lower Basement Approval

UPS/Battery Lay out & Details, Lower Basement Approval

Substations: HV SWGRs, XFMRs, Generators, MV Panels Layout & Details, Lower Basement

Substations: HV SWGRs, XFMRs, Generators, MV Panels Layout & Details, Lower Basement Approval

LV Layout & Single Line Diagram, Lower Basement (w/ Substation Issue in UB Slab Area 13)

LV Layout & Single Line Diagram, Lower Basement Approval (w/ Substation Issue in UB Slab Area 13)

Lighting Layout & Single Line Diagram, Lower Basement

HV Layout & Single Line Diagram, Lower Basement

Issue IFC-9 Drawings (MEP)

Lighting Layout & Single Line Diagram, Lower Basement Approval

Bus Ducts/Bus Bars Layout & Details, Lower Basement

HV Layout & Single Line Diagram, Lower Basement Approval

Bus Ducts/Bus Bars Layout & Details, Lower Basement Approval

MV Switchgear Under Review by ASTAD, Assumed Approval:21Feb13

MV Layout & Single Line Diagram, Lower Basement (w/ Substation Issue in UB Slab Area 13)

MV Layout & Single Line Diagram, Lower Basement Approval

Emergency Lighting Layout & Single Line Diagram, Upper Basement Approval

Electrical Distribution Load Schedule, Upper Basement Approval

Security System Layout & Single Line Diagram, Upper Basement

Cable Tray Layout & Details, Upper Basement

BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Basement

Photovoltaic Layout & Single Line Diagram, PMS

Security System Layout & Single Line Diagram, Upper Basement Approval

Cable Tray Layout & Details, Upper Basement Approval

Parking Guidance Layout & Single Line Diagram, Upper Basement

BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Basement Approval

Photovoltaic Layout & Single Line Diagram, PMS Approval

Parking Guidance Layout & Single Line Diagram, Upper Basement Approval

LV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13)

LV Layout & Single Line Diagram, Upper Basement Approval (w/ Substation Issue in UB Slab Area 13)

Lighting Layout & Single Line Diagram, Upper Basement Approval

Lighting Layout & Single Line Diagram, Upper Basement

Telephone/Structured Cabling Layout & Details, Upper Basement

Telephone/Structured Cabling Layout & Details, Upper Basement Approval

HV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13)

HV Layout & Single Line Diagram, Upper Basement Approval

MV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13)

MV Layout & Single Line Diagram, Upper Basement Approval

Street Lighting Layout & Details, Ground Level

Street Lighting Layout & Details, Ground Level Approval

HV Cable Routing and Details, Ground Level

HV Cable Routing and Details, Ground Level Approval

Telephone Routing & Details, Ground Level

Telephone Routing & Details, Ground Level Approval

Suspended Ceiling Layout & Details, Lower Basement Approval

Signage & Wayfinding Layout & Details, Lower Basement Approval

Finishing Schedule & Details, Lower Basement

Furniture Layout & Details, Lower Basement

Door Schedule & Details, Lower Basement

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 1 of 19/27-Feb-13 09:03

Actual Work

Remaining Work

Critical Remaining Work

Milestone TERNA

Date Revision Checked Approved

26-Feb-13 Data Date: 31-Jan-13 DS AT

(Based on 06Sep12 Submitted Forecast Schedule)

Page 2: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

103 NECP-Rebase_06Sep12-4.EN.SDS.4.1LOWER BASEMENT NEENSDS1190 Finishing Schedule & Details, Lower Basement Approval 14 0% 14 13-Dec-11 28-Dec-11 09-Feb-13 24-Feb-13 78

104 NECP-Rebase_06Sep12-4.EN.SDS.4.1LOWER BASEMENT NEENSDS1250 Furniture Layout & Details, Lower Basement Approval 14 0% 14 02-Aug-12 18-Aug-12 09-Feb-13 24-Feb-13 259

105 NECP-Rebase_06Sep12-4.EN.SDS.4.1LOWER BASEMENT NEENSDS1020 Glazing Layout & Details, Lower Basement 7 0% 7 31-Dec-11 07-Jan-12 17-Feb-13 24-Feb-13 43

106 NECP-Rebase_06Sep12-4.EN.SDS.4.1LOWER BASEMENT NEENSDS1200 Door Schedule & Details, Lower Basement Approval 14 0% 14 31-Dec-11 15-Jan-12 17-Feb-13 04-Mar-13 50

107 NECP-Rebase_06Sep12-4.EN.SDS.4.1LOWER BASEMENT NEENSDS1210 Glazing Layout & Details, Lower Basement Approval 14 0% 14 08-Jan-12 23-Jan-12 25-Feb-13 12-Mar-13 43

108 NECP-Rebase_06Sep12-4.EN.SDS.4.1LOWER BASEMENT NEENSDS1040 Stainless Steel Barrier/Detection System & Details, Lower Basement 7 0% 7 09-Jul-12 16-Jul-12 13-Apr-13 20-Apr-13 87

109 NECP-Rebase_06Sep12-4.EN.SDS.4.1LOWER BASEMENT NEENSDS1230 Stainless Steel Barrier/Detection System & Details, Lower Basement Approval14 0% 14 17-Jul-12 01-Aug-12 21-Apr-13 06-May-13 87

110 UPPER BASEMENTUPPER BASEMENTUPPER BASEMENTUPPER BASEMENT 143 78 05-Dec-11 19-May-12 29-Nov-12 31-Jan-13 02-May-13 216

111 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1320 Signage & Wayfinding Layout & Details, Upper Basement Approval 14 10% 13 12-Apr-12 28-Apr-12 29-Nov-12 17-Apr-13 02-May-13 109

112 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1070 Suspended Ceiling Layout & Details, Upper Basement 7 0% 7 05-Dec-11 12-Dec-11 31-Jan-13 07-Feb-13 20

113 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1120 Stainless Steel Barrier/Detection System & Details, Upper Basement 7 0% 7 05-Jan-12 12-Jan-12 31-Jan-13 07-Feb-13 71

114 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1080 Finishing Schedule & Details, Upper Basement 7 0% 7 13-Dec-11 20-Dec-11 09-Feb-13 16-Feb-13 13

115 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1140 Furniture Layout & Details, Upper Basement 7 0% 7 22-Jan-12 29-Jan-12 09-Feb-13 16-Feb-13 266

116 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1260 Suspended Ceiling Layout & Details, Upper Basement Approval 14 0% 14 13-Dec-11 28-Dec-11 09-Feb-13 24-Feb-13 78

117 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1310 Stainless Steel Barrier/Detection System & Details, Upper Basement Approval14 0% 14 03-May-12 19-May-12 09-Feb-13 24-Feb-13 148

118 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1090 Door Schedule & Details, Upper Basement 7 0% 7 28-Dec-11 04-Jan-12 17-Feb-13 24-Feb-13 13

119 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1100 Glazing Layout & Details, Upper Basement 7 0% 7 28-Dec-11 04-Jan-12 17-Feb-13 24-Feb-13 57

120 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1270 Finishing Schedule & Details, Upper Basement Approval 14 0% 14 29-Dec-11 14-Jan-12 17-Feb-13 04-Mar-13 20

121 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1280 Door Schedule & Details, Upper Basement Approval 14 0% 14 14-Jan-12 29-Jan-12 25-Feb-13 12-Mar-13 13

122 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1290 Glazing Layout & Details, Upper Basement Approval 14 0% 14 22-Jan-12 06-Feb-12 25-Feb-13 12-Mar-13 57

123 NECP-Rebase_06Sep12-4.EN.SDS.4.2UPPER BASEMENT NEENSDS1330 Furniture Layout & Details, Upper Basement Approval 14 0% 14 05-Mar-12 20-Mar-12 25-Feb-13 12-Mar-13 259

124 GROUND LEVELGROUND LEVELGROUND LEVELGROUND LEVEL 35 21 14-Jan-12 22-Feb-12 31-Jan-13 24-Feb-13 71

125 NECP-Rebase_06Sep12-4.EN.SDS.4.3GROUND LEVEL NEENSDS1150 Facade Layout & Details, Ground Level 7 0% 7 14-Jan-12 21-Jan-12 31-Jan-13 07-Feb-13 71

126 NECP-Rebase_06Sep12-4.EN.SDS.4.3GROUND LEVEL NEENSDS1170 Finishing Schedule & Details, Ground Level 7 0% 7 30-Jan-12 06-Feb-12 31-Jan-13 07-Feb-13 27

127 NECP-Rebase_06Sep12-4.EN.SDS.4.3GROUND LEVEL NEENSDS1340 Facade Layout & Details, Ground Level Approval 14 0% 14 22-Jan-12 06-Feb-12 09-Feb-13 24-Feb-13 71

128 NECP-Rebase_06Sep12-4.EN.SDS.4.3GROUND LEVEL NEENSDS1360 Finishing Schedule & Details, Ground Level Approval 14 0% 14 07-Feb-12 22-Feb-12 09-Feb-13 24-Feb-13 27

129 METHOD STATEMENT SUBMITTALS & APPROVALSMETHOD STATEMENT SUBMITTALS & APPROVALSMETHOD STATEMENT SUBMITTALS & APPROVALSMETHOD STATEMENT SUBMITTALS & APPROVALS 230 169 19-Dec-11 11-Sep-12 31-Jan-13 15-Aug-13 108

130 MECHANICAL - METHOD STATEMENT SUBMITTALS & APPROVALSMECHANICAL - METHOD STATEMENT SUBMITTALS & APPROVALSMECHANICAL - METHOD STATEMENT SUBMITTALS & APPROVALSMECHANICAL - METHOD STATEMENT SUBMITTALS & APPROVALS 69 35 24-Jun-12 11-Sep-12 31-Jan-13 12-Mar-13 135

131 NECP-Rebase_06Sep12-4.EN.MSS.2MECHANICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS220 Method Statement for HVAC Equipment Installation 7 0% 7 24-Jun-12 01-Jul-12 31-Jan-13 07-Feb-13 45

132 NECP-Rebase_06Sep12-4.EN.MSS.2MECHANICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS230 Method Statement for Fans Installation 7 0% 7 18-Jul-12 25-Jul-12 09-Feb-13 16-Feb-13 45

133 NECP-Rebase_06Sep12-4.EN.MSS.2MECHANICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS300 Method Statement for HVAC Equipment Installation Approval 14 0% 14 02-Jul-12 17-Jul-12 09-Feb-13 24-Feb-13 52

134 NECP-Rebase_06Sep12-4.EN.MSS.2MECHANICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS240 Method Statement for Pumps Installation 7 0% 7 19-Aug-12 26-Aug-12 17-Feb-13 24-Feb-13 135

135 NECP-Rebase_06Sep12-4.EN.MSS.2MECHANICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS310 Method Statement for Fans Installation Approval 14 0% 14 26-Jul-12 11-Aug-12 17-Feb-13 04-Mar-13 45

136 NECP-Rebase_06Sep12-4.EN.MSS.2MECHANICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS320 Method Statement for Pumps Installation Approval 14 0% 14 27-Aug-12 11-Sep-12 25-Feb-13 12-Mar-13 135

137 ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALS 130 169 19-Dec-11 17-May-12 31-Jan-13 15-Aug-13 58

138 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS360 Method Statement for Lifts & Escalators Installation 7 0% 7 19-Dec-11 26-Dec-11 31-Jan-13 07-Feb-13 18

139 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS370 Method Statement for Switchgears Installation 7 0% 7 27-Dec-11 03-Jan-12 09-Feb-13 16-Feb-13 18

140 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS470 Method Statement for Lifts & Escalators Installation Approval 14 0% 14 26-Feb-12 12-Mar-12 09-Feb-13 24-Feb-13 119

141 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS380 Method Statement for Transformers Installation 7 0% 7 02-Jan-12 09-Jan-12 17-Feb-13 24-Feb-13 18

142 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS390 Method Statement for Generators Installation 7 0% 7 10-Jan-12 17-Jan-12 25-Feb-13 04-Mar-13 18

143 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS400 Method Statement for Parking Guidance System Installation 7 0% 7 18-Jan-12 25-Jan-12 05-Mar-13 12-Mar-13 18

144 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS500 Method Statement for Generators Installation Approval 14 0% 14 18-Feb-12 04-Mar-12 05-Mar-13 20-Mar-13 118

145 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS410 Method Statement for Security System Installation 7 0% 7 26-Jan-12 02-Feb-12 13-Mar-13 20-Mar-13 80

146 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS420 Method Statement for UPS Installation 7 0% 7 04-Feb-12 11-Feb-12 21-Mar-13 28-Mar-13 80

147 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS430 Method Statement for Panel Boards Installation 7 0% 7 12-Feb-12 19-Feb-12 30-Mar-13 06-Apr-13 80

148 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS530 Method Statement for UPS Installation Approval 14 0% 14 24-Apr-12 09-May-12 30-Mar-13 14-Apr-13 164

149 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS540 Method Statement for Panel Boards Installation Approval 14 0% 14 26-Apr-12 12-May-12 07-Apr-13 22-Apr-13 80

150 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS480 Method Statement for Switchgears Installation Approval 14 0% 14 01-Feb-12 16-Feb-12 20-Apr-13 05-May-13 128

151 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS490 Method Statement for Transformers Installation Approval 14 0% 14 01-Feb-12 16-Feb-12 08-May-13 23-May-13 119

152 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS520 Method Statement for Security System Installation Approval 14 0% 14 02-May-12 17-May-12 06-Jul-13 21-Jul-13 40

153 NECP-Rebase_06Sep12-4.EN.MSS.4ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS510 Method Statement for Parking Guidance System Installation Approval 14 0% 14 26-Jan-12 11-Feb-12 31-Jul-13 15-Aug-13 18

154 FINISHES - METHOD STATEMENT SUBMITTALS & APPROVALSFINISHES - METHOD STATEMENT SUBMITTALS & APPROVALSFINISHES - METHOD STATEMENT SUBMITTALS & APPROVALSFINISHES - METHOD STATEMENT SUBMITTALS & APPROVALS 21 21 24-Mar-12 16-Apr-12 12-Mar-13 04-Apr-13 222

155 NECP-Rebase_06Sep12-4.EN.MSS.3FINISHES - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS590 Method Statement for Signage & Wayfinding Installation 7 0% 7 24-Mar-12 31-Mar-12 12-Mar-13 19-Mar-13 222

156 NECP-Rebase_06Sep12-4.EN.MSS.3FINISHES - METHOD STATEMENT SUBMITTALS & APPROVALSNEENMSS640 Method Statement for Signage & Wayfinding Installation Approval 14 0% 14 01-Apr-12 16-Apr-12 20-Mar-13 04-Apr-13 222

157 PROCUREMENTPROCUREMENTPROCUREMENTPROCUREMENT 541 223 13-Sep-11 04-Jun-13 21-Nov-11 31-Jan-13 20-Oct-13 54

158 MATERIAL SUBMITTALS & APPROVALSMATERIAL SUBMITTALS & APPROVALSMATERIAL SUBMITTALS & APPROVALSMATERIAL SUBMITTALS & APPROVALS 117 61 13-Sep-11 26-Jan-12 21-Nov-11 31-Jan-13 11-Apr-13 134

159 CIVIL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALSCIVIL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALSCIVIL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALSCIVIL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALS 21 21 06-Oct-11 30-Oct-11 31-Jan-13 24-Feb-13 103

160 NECP-Rebase_06Sep12-4.PR.MTS.BMCIVIL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALSNEPRMTS380 Heavy Duty Rubber Vehicle Stoppers 7 0% 7 06-Oct-11 13-Oct-11 31-Jan-13 07-Feb-13 103

161 NECP-Rebase_06Sep12-4.PR.MTS.BMCIVIL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALSNEPRMTS430 Heavy Duty Rubber Vehicle Stoppers Approval 14 0% 14 15-Oct-11 30-Oct-11 09-Feb-13 24-Feb-13 103

162 MECHANICAL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALSMECHANICAL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALSMECHANICAL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALSMECHANICAL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALS 72 13 29-Sep-11 21-Dec-11 14-May-12 31-Jan-13 14-Feb-13 32

163 NECP-Rebase_06Sep12-4.PR.MTS.2MECHANICAL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALSNEPRMTS520 Ductile Iron Pipes & Fittings (Extl Firefighting) Approval 14 50% 7 29-Sep-11 15-Oct-11 14-May-12 31-Jan-13 07-Feb-13 23

164 NECP-Rebase_06Sep12-4.PR.MTS.2MECHANICAL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALSNEPRMTS570 FM200 Gas Fire Suppression Approval 14 10% 13 06-Dec-11 21-Dec-11 30-Jul-12 31-Jan-13 14-Feb-13 32

165 FINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALSFINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALSFINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALSFINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALS 26 61 29-Oct-11 27-Nov-11 09-May-12 31-Jan-13 11-Apr-13 87

166 NECP-Rebase_06Sep12-4.PR.MTS.6FINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALSNEPRMTS680 Signages & Wayfinding 5 15% 4 06-Nov-11 10-Nov-11 09-May-12 31-Jan-13 05-Feb-13 109

167 NECP-Rebase_06Sep12-4.PR.MTS.6FINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALSNEPRMTS730 Signages & Wayfinding Approval 14 0% 14 12-Nov-11 27-Nov-11 05-Feb-13 21-Feb-13 109

168 NECP-Rebase_06Sep12-4.PR.MTS.6FINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALSNEPRMTS2760 Assumed ASTAD CR Issuance date: 18Mar13 - Change Specs for Barriers/Bollards/Column Protectors0 0% 0 18-Mar-13 0

169 NECP-Rebase_06Sep12-4.PR.MTS.6FINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALSNEPRMTS660 Stainless Steel Barriers/Bollards (CR awaited from ASTAD) 7 0% 7 29-Oct-11 05-Nov-11 19-Mar-13 26-Mar-13 87

170 NECP-Rebase_06Sep12-4.PR.MTS.6FINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALSNEPRMTS670 Stainless Steel Column Protectors (CR awaited from ASTAD) 7 0% 7 29-Oct-11 05-Nov-11 19-Mar-13 26-Mar-13 87

171 NECP-Rebase_06Sep12-4.PR.MTS.6FINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALSNEPRMTS710 Stainless Steel Barriers/Bollards Approval (CR awaited from ASTAD) 14 0% 14 06-Nov-11 21-Nov-11 27-Mar-13 11-Apr-13 87

172 NECP-Rebase_06Sep12-4.PR.MTS.6FINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALSNEPRMTS720 Stainless Steel Column Protectors Approval (CR awaited from ASTAD) 14 0% 14 06-Nov-11 21-Nov-11 27-Mar-13 11-Apr-13 87

173 MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSMECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSMECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSMECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALS 45 21 06-Dec-11 26-Jan-12 04-Jun-12 31-Jan-13 24-Feb-13 174

174 NECP-Rebase_06Sep12-4.PR.MTS.9MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS810 AHUs Approval (Rejected Vendor: Johnson Control-York; see Act ID NEPRMTS1666 Approve New Vendor: Euroclima)14 10% 13 20-Dec-11 04-Jan-12 29-Jul-12 31-Jan-13 14-Feb-13 30

175 NECP-Rebase_06Sep12-4.PR.MTS.9MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS830 Duct Mounted Extract Fans Approval 14 10% 13 28-Dec-11 12-Jan-12 12-Nov-12 31-Jan-13 14-Feb-13 47

176 NECP-Rebase_06Sep12-4.PR.MTS.9MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS840 Jet Fans Approval 14 10% 13 28-Dec-11 12-Jan-12 12-Nov-12 31-Jan-13 14-Feb-13 62

177 NECP-Rebase_06Sep12-4.PR.MTS.9MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS1840 Sewage Ejector Pumps Approval 14 10% 13 04-Jan-12 19-Jan-12 04-Jun-12 31-Jan-13 14-Feb-13 157

178 NECP-Rebase_06Sep12-4.PR.MTS.9MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS740 Sound Attenuators 5 0% 5 06-Dec-11 11-Dec-11 31-Jan-13 05-Feb-13 41

179 NECP-Rebase_06Sep12-4.PR.MTS.9MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS760 Air Curtain 7 0% 7 20-Dec-11 27-Dec-11 31-Jan-13 07-Feb-13 52

180 NECP-Rebase_06Sep12-4.PR.MTS.9MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS1810 Water Filter Pumps 6 0% 6 04-Jan-12 10-Jan-12 31-Jan-13 06-Feb-13 55

181 NECP-Rebase_06Sep12-4.PR.MTS.9MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS1820 Condensate Pumps 6 0% 6 04-Jan-12 10-Jan-12 31-Jan-13 06-Feb-13 55

182 NECP-Rebase_06Sep12-4.PR.MTS.9MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS800 Sound Attenuators Approval 14 0% 14 12-Dec-11 27-Dec-11 06-Feb-13 21-Feb-13 41

183 NECP-Rebase_06Sep12-4.PR.MTS.9MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS1870 Water Filter Pumps Approval 14 0% 14 11-Jan-12 26-Jan-12 07-Feb-13 23-Feb-13 175

184 NECP-Rebase_06Sep12-4.PR.MTS.9MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS1880 Condensate Pumps Approval 14 0% 14 11-Jan-12 26-Jan-12 07-Feb-13 23-Feb-13 55

185 NECP-Rebase_06Sep12-4.PR.MTS.9MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS820 Air Curtain Approval 14 0% 14 28-Dec-11 12-Jan-12 09-Feb-13 24-Feb-13 52

186 ELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALS 79 39 13-Sep-11 13-Dec-11 21-Nov-11 31-Jan-13 17-Mar-13 1

187 NECP-Rebase_06Sep12-4.PR.MTS.11ELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS880 MV Panels & Accessories 7 40% 4 21-Sep-11 28-Sep-11 23-Nov-11 31-Jan-13 05-Feb-13 22

188 NECP-Rebase_06Sep12-4.PR.MTS.11ELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS970 Telemetry/Scada (BMS) & Accessories 7 40% 4 20-Nov-11 27-Nov-11 03-Jan-12 31-Jan-13 05-Feb-13 11

189 NECP-Rebase_06Sep12-4.PR.MTS.11ELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS990 Parking Guidance System & Accessories 5 40% 3 20-Nov-11 24-Nov-11 05-Dec-11 31-Jan-13 03-Feb-13 0

190 NECP-Rebase_06Sep12-4.PR.MTS.11ELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS930 LV Cables & Accessories 5 0% 25 08-Oct-11 12-Oct-11 02-May-12 31-Jan-13 28-Feb-13 0

191 NECP-Rebase_06Sep12-4.PR.MTS.11ELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS950 Light Fittings & Accessories 7 0% 14 19-Oct-11 26-Oct-11 21-Nov-11 31-Jan-13 16-Feb-13 9

192 NECP-Rebase_06Sep12-4.PR.MTS.11ELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS1150 Parking Guidance System & Accessories Approval 14 0% 14 26-Nov-11 11-Dec-11 04-Feb-13 19-Feb-13 0

193 NECP-Rebase_06Sep12-4.PR.MTS.11ELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS1040 MV Panels & Accessories Approval 14 0% 14 29-Sep-11 15-Oct-11 05-Feb-13 21-Feb-13 22

194 NECP-Rebase_06Sep12-4.PR.MTS.11ELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS1130 Telemetry/Scada (BMS) & Accessories Approval 14 0% 14 28-Nov-11 13-Dec-11 05-Feb-13 21-Feb-13 11

195 NECP-Rebase_06Sep12-4.PR.MTS.11ELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS1110 Light Fittings & Accessories Approval 14 0% 14 27-Oct-11 12-Nov-11 17-Feb-13 04-Mar-13 9

196 NECP-Rebase_06Sep12-4.PR.MTS.11ELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALSNEPRMTS1090 LV Cables & Accessories Approval 14 0% 14 13-Oct-11 29-Oct-11 05-Jul-12 02-Mar-13 17-Mar-13 0

197 IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsIFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsIFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsIFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals 79 32 13-Sep-11 13-Dec-11 23-Nov-11 31-Jan-13 09-Mar-13 0

198 NECP-Rebase_06Sep12-4.PR.MTS.11.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEPRMTS1010 Distribution Boards & Accessories (w/ Substation Issue in UB Slab Area 13) 7 42.86% 4 29-Sep-11 06-Oct-11 23-Nov-11 31-Jan-13 04-Feb-13 0

199 NECP-Rebase_06Sep12-4.PR.MTS.11.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEPRMTS1140 Security System & Accessories Approval 14 10% 13 28-Nov-11 13-Dec-11 22-Nov-12 11-Feb-13 25-Feb-13 0

200 NECP-Rebase_06Sep12-4.PR.MTS.11.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEPRMTS860 HV Switchgear & Accessories 7 0% 18 13-Sep-11 20-Sep-11 24-Nov-11 31-Jan-13 20-Feb-13 0

201 NECP-Rebase_06Sep12-4.PR.MTS.11.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEPRMTS940 Bus Ducts/Bus Bars & Accessories 5 0% 9 13-Oct-11 18-Oct-11 26-Nov-11 31-Jan-13 10-Feb-13 0

202 NECP-Rebase_06Sep12-4.PR.MTS.11.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEPRMTS980 Security System & Accessories 7 0% 9 20-Nov-11 27-Nov-11 03-Dec-11 31-Jan-13 10-Feb-13 0

203 NECP-Rebase_06Sep12-4.PR.MTS.11.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEPRMTS1170 Distribution Boards & Accessories Approval (w/ Substation Issue in UB Slab Area 13)14 0% 14 08-Oct-11 23-Oct-11 05-Feb-13 20-Feb-13 0

204 NECP-Rebase_06Sep12-4.PR.MTS.11.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEPRMTS1100 Bus Ducts/Bus Bars & Accessories Approval 14 0% 14 19-Oct-11 03-Nov-11 03-Dec-12 11-Feb-13 26-Feb-13 0

205 NECP-Rebase_06Sep12-4.PR.MTS.11.1IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & ApprovalsNEPRMTS1020 HV Switchgear & Accessories Approval 14 0% 14 21-Sep-11 06-Oct-11 21-Feb-13 09-Mar-13 0

206 Await Reply from ASTAD re: Terna Letter 112/113 dtd 06Jan13, Assumed ASTAD Approval Date: 06Mar13Await Reply from ASTAD re: Terna Letter 112/113 dtd 06Jan13, Assumed ASTAD Approval Date: 06Mar13Await Reply from ASTAD re: Terna Letter 112/113 dtd 06Jan13, Assumed ASTAD Approval Date: 06Mar13Await Reply from ASTAD re: Terna Letter 112/113 dtd 06Jan13, Assumed ASTAD Approval Date: 06Mar13 21 0 20-Nov-11 13-Dec-11 01-Dec-11 06-Mar-13 06-Mar-13 0

207 NECP-Rebase_06Sep12-4.PR.MTS.11.1.2Await Reply from ASTAD re: Terna Letter 112/113 dtd 06Jan13, Assumed ASTAD Approval Date: 06Mar13NEPRMTS985 Fire Alarm System & Accessories 7 100% 0 20-Nov-11 27-Nov-11 01-Dec-11 13-Sep-12

208 NECP-Rebase_06Sep12-4.PR.MTS.11.1.2Await Reply from ASTAD re: Terna Letter 112/113 dtd 06Jan13, Assumed ASTAD Approval Date: 06Mar13NEPRMTS1145 Fire Alarm System & Accessories Approval 14 100% 0 28-Nov-11 13-Dec-11 14-Sep-12 10-Jan-13

209 NECP-Rebase_06Sep12-4.PR.MTS.11.1.2Await Reply from ASTAD re: Terna Letter 112/113 dtd 06Jan13, Assumed ASTAD Approval Date: 06Mar13NEENSDS1690 Await ASTAD Reply to Terna Letter 112/113, Assumed Approval: 06Mar13 0 0% 0 06-Mar-13 0

210 MATERIAL PROCUREMENTMATERIAL PROCUREMENTMATERIAL PROCUREMENTMATERIAL PROCUREMENT 420 223 01-Feb-12 04-Jun-13 20-Jun-12 31-Jan-13 20-Oct-13 54

211 CIVIL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERCIVIL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERCIVIL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERCIVIL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURER 10 6 19-Mar-12 29-Mar-12 25-Feb-13 03-Mar-13 103

212 NECP-Rebase_06Sep12-4.PR.MT.BMCIVIL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS1300 PO for Heavy Duty Rubber Vehicle Stoppers 10 0% 6 19-Mar-12 29-Mar-12 25-Feb-13 03-Mar-13 103

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Finishing Schedule & Details, Lower Basement Approval

Furniture Layout & Details, Lower Basement Approval

Glazing Layout & Details, Lower Basement

Door Schedule & Details, Lower Basement Approval

Glazing Layout & Details, Lower Basement Approval

Stainless Steel Barrier/Detection System & Details, Lower Basement

Stainless Steel Barrier/Detection System & Details, Lower Basement Approval

Signage & Wayfinding Layout & Details, Upper Basement Approval

Suspended Ceiling Layout & Details, Upper Basement

Stainless Steel Barrier/Detection System & Details, Upper Basement

Finishing Schedule & Details, Upper Basement

Furniture Layout & Details, Upper Basement

Suspended Ceiling Layout & Details, Upper Basement Approval

Stainless Steel Barrier/Detection System & Details, Upper Basement Approval

Door Schedule & Details, Upper Basement

Glazing Layout & Details, Upper Basement

Finishing Schedule & Details, Upper Basement Approval

Door Schedule & Details, Upper Basement Approval

Glazing Layout & Details, Upper Basement Approval

Furniture Layout & Details, Upper Basement Approval

Facade Layout & Details, Ground Level

Finishing Schedule & Details, Ground Level

Facade Layout & Details, Ground Level Approval

Finishing Schedule & Details, Ground Level Approval

Method Statement for HVAC Equipment Installation

Method Statement for Fans Installation

Method Statement for HVAC Equipment Installation Approval

Method Statement for Pumps Installation

Method Statement for Fans Installation Approval

Method Statement for Pumps Installation Approval

Method Statement for Lifts & Escalators Installation

Method Statement for Switchgears Installation

Method Statement for Lifts & Escalators Installation Approval

Method Statement for Transformers Installation

Method Statement for Generators Installation

Method Statement for Parking Guidance System Installation

Method Statement for Generators Installation Approval

Method Statement for Security System Installation

Method Statement for UPS Installation

Method Statement for Panel Boards Installation

Method Statement for UPS Installation Approval

Method Statement for Panel Boards Installation Approval

Method Statement for Switchgears Installation Approval

Method Statement for Transformers Installation Approval

Method Statement for Security System Installation Approval

Method Statement for Parking Guidance System Installation Approval

Method Statement for Signage & Wayfinding Installation

Method Statement for Signage & Wayfinding Installation Approval

Heavy Duty Rubber Vehicle Stoppers

Heavy Duty Rubber Vehicle Stoppers Approval

Ductile Iron Pipes & Fittings (Extl Firefighting) Approval

FM200 Gas Fire Suppression Approval

Signages & Wayfinding

Signages & Wayfinding Approval

Assumed ASTAD CR Issuance date: 18Mar13 - Change Specs for Barriers/Bollards/Column Protectors

Stainless Steel Barriers/Bollards (CR awaited from ASTAD)

Stainless Steel Column Protectors (CR awaited from ASTAD)

Stainless Steel Barriers/Bollards Approval (CR awaited from ASTAD)

Stainless Steel Column Protectors Approval (CR awaited from ASTAD)

AHUs Approval (Rejected Vendor: Johnson Control-York; see Act ID NEPRMTS1666 Approve New Vendor: Euroclima)

Duct Mounted Extract Fans Approval

Jet Fans Approval

Sewage Ejector Pumps Approval

Sound Attenuators

Air Curtain

Water Filter Pumps

Condensate Pumps

Sound Attenuators Approval

Water Filter Pumps Approval

Condensate Pumps Approval

Air Curtain Approval

MV Panels & Accessories

Telemetry/Scada (BMS) & Accessories

Parking Guidance System & Accessories

LV Cables & Accessories

Light Fittings & Accessories

Parking Guidance System & Accessories Approval

MV Panels & Accessories Approval

Telemetry/Scada (BMS) & Accessories Approval

Light Fittings & Accessories Approval

LV Cables & Accessories Approval

Distribution Boards & Accessories (w/ Substation Issue in UB Slab Area 13)

Security System & Accessories Approval

HV Switchgear & Accessories

Bus Ducts/Bus Bars & Accessories

Security System & Accessories

Distribution Boards & Accessories Approval (w/ Substation Issue in UB Slab Area 13)

Bus Ducts/Bus Bars & Accessories Approval

HV Switchgear & Accessories Approval

Fire Alarm System & Accessories Approval

Await ASTAD Reply to Terna Letter 112/113, Assumed Approval: 06Mar13

PO for Heavy Duty Rubber Vehicle Stoppers

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 2 of 19/27-Feb-13 09:03

Page 3: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

213 CIVIL - BULK MATERIALS - MANUFACTURING & DELIVERYCIVIL - BULK MATERIALS - MANUFACTURING & DELIVERYCIVIL - BULK MATERIALS - MANUFACTURING & DELIVERYCIVIL - BULK MATERIALS - MANUFACTURING & DELIVERY 90 90 05-May-12 16-Aug-12 04-Mar-13 16-Jun-13 103

214 NECP-Rebase_06Sep12-4.PR.MT.1CIVIL - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1340 Manufacture & Deliver Heavy Duty Rubber Vehicle Stoppers 90 0% 90 05-May-12 16-Aug-12 04-Mar-13 16-Jun-13 103

215 MECHANICAL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERMECHANICAL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERMECHANICAL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERMECHANICAL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURER 25 133 13-May-12 10-Jun-12 31-Jan-13 04-Jul-13 23

216 NECP-Rebase_06Sep12-4.PR.MT.2MECHANICAL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS1370 PO for Extra Strength Vitrified Clay (ESVC) Pipes & Fittings (Changed to GRP by ASTAD)14 0% 6 26-May-12 10-Jun-12 31-Jan-13 06-Feb-13 37

217 NECP-Rebase_06Sep12-4.PR.MT.2MECHANICAL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS1360 PO for Ductile Iron Pipes & Fittings 14 0% 6 13-May-12 28-May-12 29-Jun-13 04-Jul-13 23

218 MECHANICAL - BULK MATERIALS - MANUFACTURING & DELIVERYMECHANICAL - BULK MATERIALS - MANUFACTURING & DELIVERYMECHANICAL - BULK MATERIALS - MANUFACTURING & DELIVERYMECHANICAL - BULK MATERIALS - MANUFACTURING & DELIVERY 182 223 14-Feb-12 12-Sep-12 20-Jun-12 31-Jan-13 20-Oct-13 23

219 NECP-Rebase_06Sep12-4.PR.MT.3MECHANICAL - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1420 Manufacture & Deliver Black Steel Pipes & Fittings 90 50% 30 14-Feb-12 28-May-12 09-Nov-12 31-Jan-13 06-Mar-13 57

220 NECP-Rebase_06Sep12-4.PR.MT.3MECHANICAL - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1470 Manufacture & Deliver AC Ducts & Accessories 75 50% 38 22-May-12 16-Aug-12 13-Aug-12 31-Jan-13 16-Mar-13 102

221 NECP-Rebase_06Sep12-4.PR.MT.3MECHANICAL - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1435 Manufacture & Deliver Copper Pipes & Fittings 90 50% 45 31-May-12 12-Sep-12 20-Jun-12 31-Jan-13 24-Mar-13 180

222 NECP-Rebase_06Sep12-4.PR.MT.3MECHANICAL - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1450 Manufacture & Deliver GRP Pipes & Fittings 75 20% 60 04-Jun-12 29-Aug-12 16-Jan-13 31-Jan-13 10-Apr-13 186

223 NECP-Rebase_06Sep12-4.PR.MT.3MECHANICAL - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1440 Manufacture & Deliver Extra Strength Vitrified Clay (ESVC) Pipes & Fittings (Changed to GRP by ASTAD)75 0% 75 11-Jun-12 05-Sep-12 07-Feb-13 05-May-13 37

224 NECP-Rebase_06Sep12-4.PR.MT.3MECHANICAL - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1480 Manufacture & Deliver FM200 Gas Fire Suppression 60 0% 60 08-Apr-12 16-Jun-12 14-Feb-13 25-Apr-13 32

225 NECP-Rebase_06Sep12-4.PR.MT.3MECHANICAL - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1430 Manufacture & Deliver Ductile Iron Pipes & Fittings (Extl Fire Line) 90 0% 90 29-May-12 10-Sep-12 06-Jul-13 20-Oct-13 23

226 FINISHES - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERFINISHES - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERFINISHES - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERFINISHES - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURER 90 16 25-Nov-12 09-Mar-13 02-May-13 20-May-13 99

227 NECP-Rebase_06Sep12-4.PR.MT.6FINISHES - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS1590 PO for Signages & Wayfinding 14 0% 6 25-Nov-12 10-Dec-12 02-May-13 09-May-13 109

228 NECP-Rebase_06Sep12-4.PR.MT.6FINISHES - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS1570 PO for Stainless Steel Barriers/Bollards 14 0% 6 05-Feb-13 20-Feb-13 07-May-13 13-May-13 87

229 NECP-Rebase_06Sep12-4.PR.MT.6FINISHES - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS1580 PO for Stainless Steel Column Protectors 14 0% 6 21-Feb-13 09-Mar-13 14-May-13 20-May-13 87

230 FINISHES - BULK MATERIALS - MANUFACTURING & DELIVERYFINISHES - BULK MATERIALS - MANUFACTURING & DELIVERYFINISHES - BULK MATERIALS - MANUFACTURING & DELIVERYFINISHES - BULK MATERIALS - MANUFACTURING & DELIVERY 380 164 19-Mar-12 04-Jun-13 16-Aug-12 06-Feb-13 15-Aug-13 108

231 NECP-Rebase_06Sep12-4.PR.MT.7FINISHES - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1600 Manufacture & Deliver Paint Materials 60 25% 23 19-Mar-12 27-May-12 19-Oct-12 06-Feb-13 04-Mar-13 71

232 NECP-Rebase_06Sep12-4.PR.MT.7FINISHES - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1610 Manufacture & Deliver Tiling Materials 60 25% 34 31-Mar-12 07-Jun-12 16-Aug-12 14-Mar-13 22-Apr-13 57

233 NECP-Rebase_06Sep12-4.PR.MT.7FINISHES - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1620 Manufacture & Deliver Stainless Steel Barriers/Bollards 75 0% 75 21-Feb-13 19-May-13 14-May-13 08-Aug-13 93

234 NECP-Rebase_06Sep12-4.PR.MT.7FINISHES - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1630 Manufacture & Deliver Stainless Steel Column Protectors 75 0% 75 10-Mar-13 04-Jun-13 21-May-13 15-Aug-13 87

235 NECP-Rebase_06Sep12-4.PR.MT.7FINISHES - BULK MATERIALS - MANUFACTURING & DELIVERYNEPRMTS1640 Manufacture & Deliver Signages & Wayfinding 70 0% 70 15-Jan-13 06-Apr-13 26-May-13 15-Aug-13 109

236 MECHANICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERMECHANICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERMECHANICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERMECHANICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURER 0 33 11-Feb-13 21-Mar-13 -33

237 NECP-Rebase_06Sep12-4.PR.MT.9MECHANICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS1662 ASTAD Letter 0374-13 dtd 11Feb13: Rejection of JCI as AHU Vendor 0 0% 0 11-Feb-13 -33

238 NECP-Rebase_06Sep12-4.PR.MT.9MECHANICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS1664 Re-submit AHU New Vendor (Euroclima) 0 0% 15 11-Feb-13 28-Feb-13 -33

239 NECP-Rebase_06Sep12-4.PR.MT.9MECHANICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS1666 Approve AHU New Vendor (Euroclima) 0 0% 14 28-Feb-13 17-Mar-13 -33

240 NECP-Rebase_06Sep12-4.PR.MT.9MECHANICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS1668 PO for AHU New Vendor (Euroclima) 0 0% 4 17-Mar-13 21-Mar-13 -33

241 MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYMECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYMECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYMECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERY 238 162 10-Mar-12 11-Dec-12 09-Nov-12 31-Jan-13 08-Aug-13 63

242 NECP-Rebase_06Sep12-4.PR.MT.10MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS1760 Manufacture & Deliver Sump Pumps (Faisal) 120 50% 60 10-Mar-12 26-Jul-12 09-Nov-12 31-Jan-13 10-Apr-13 85

243 NECP-Rebase_06Sep12-4.PR.MT.10MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS1960 Manufacture & Deliver Sewage Ejector Pumps (Faisal) 120 50% 60 24-Mar-12 09-Aug-12 09-Nov-12 31-Jan-13 10-Apr-13 110

244 NECP-Rebase_06Sep12-4.PR.MT.10MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS1970 Manufacture & Deliver Stormwater Pumps (Faisal) 120 50% 60 07-Apr-12 23-Aug-12 09-Nov-12 31-Jan-13 10-Apr-13 110

245 NECP-Rebase_06Sep12-4.PR.MT.10MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS1980 Manufacture & Deliver Booster Pumps (Faisal) 120 50% 60 07-Apr-12 23-Aug-12 09-Nov-12 31-Jan-13 10-Apr-13 165

246 NECP-Rebase_06Sep12-4.PR.MT.10MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS1950 Manufacture & Deliver Fire Pumps (NAFFCO) 180 10% 162 24-Mar-12 18-Oct-12 18-Jan-13 31-Jan-13 07-Aug-13 63

247 NECP-Rebase_06Sep12-4.PR.MT.10MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS1740 Manufacture & Deliver Duct Mounted Extract Fans (Techview) 60 0% 60 11-Apr-12 19-Jun-12 14-Feb-13 25-Apr-13 47

248 NECP-Rebase_06Sep12-4.PR.MT.10MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS1750 Manufacture & Deliver Jet Fans (Techview) 90 0% 60 19-Apr-12 01-Aug-12 14-Feb-13 25-Apr-13 90

249 NECP-Rebase_06Sep12-4.PR.MT.10MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS1710 Manufacture & Deliver Sound Attenuators (Techview) 60 0% 60 11-Apr-12 19-Jun-12 23-Feb-13 02-May-13 41

250 NECP-Rebase_06Sep12-4.PR.MT.10MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS1990 Manufacture & Deliver Water Filter Pumps (Faisal), Not Long Lead Item 120 0% 30 25-Jul-12 11-Dec-12 24-Feb-13 30-Mar-13 175

251 NECP-Rebase_06Sep12-4.PR.MT.10MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2000 Manufacture & Deliver Condensate Pumps (Techview), Not Long Lead Item 70 0% 30 25-Jul-12 14-Oct-12 24-Feb-13 30-Mar-13 113

252 NECP-Rebase_06Sep12-4.PR.MT.10MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS1730 Manufacture & Deliver Air Curtain (Berner) 120 0% 90 19-Apr-12 05-Sep-12 25-Feb-13 09-Jun-13 52

253 NECP-Rebase_06Sep12-4.PR.MT.10MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS1720 Manufacture & Deliver AHUs (New Vendor: Euroclima) 120 0% 120 19-Apr-12 05-Sep-12 21-Mar-13 08-Aug-13 1

254 ELECTRICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERELECTRICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERELECTRICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERELECTRICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURER 18 25 11-Apr-12 01-May-12 25-Sep-12 09-Mar-13 06-Apr-13 0

255 NECP-Rebase_06Sep12-4.PR.MT.11ELECTRICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS2110 PO for Light Fittings & Accessories (w/ IFC-9 Drawings issue) 6 0% 6 11-Apr-12 17-Apr-12 09-Mar-13 14-Mar-13 0

256 NECP-Rebase_06Sep12-4.PR.MT.11ELECTRICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS2140 PO for Security System & Accessories (CHIP) 7 0% 6 24-Apr-12 01-May-12 25-Sep-12 16-Mar-13 21-Mar-13 0

257 NECP-Rebase_06Sep12-4.PR.MT.11ELECTRICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURERNEPRMTS2130 PO for Telemetry/Scada (BMS) & Accessories (Siemens) 7 0% 6 24-Apr-12 01-May-12 31-Mar-13 06-Apr-13 0

258 ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERY 333 206 01-Feb-12 23-Feb-13 31-Jul-12 31-Jan-13 28-Sep-13 21

259 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2220 Manufacture & Deliver Elevators & Accessories (Schindler) 150 50% 75 26-Feb-12 18-Aug-12 31-Jul-12 31-Jan-13 28-Apr-13 65

260 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2230 Manufacture & Deliver Escalators & Accessories (Schindler) 150 50% 75 26-Feb-12 18-Aug-12 31-Jul-12 31-Jan-13 28-Apr-13 86

261 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2280 Manufacture & Deliver UPS/Battery System & Accessories (Gulf Lights) 180 10% 81 24-Apr-12 19-Nov-12 25-Sep-12 16-May-13 18-Aug-13 56

262 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2180 Manufacture & Deliver Transformer & Accessories (Eng'g Supplies) (w/ Substation Issue by Kahramaa)180 5% 171 01-Feb-12 28-Aug-12 28-Jan-13 31-Jan-13 18-Aug-13 45

263 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2200 Manufacture & Deliver Generators & Accessories (Qatar Site Power) 210 5% 114 18-Feb-12 18-Oct-12 21-Jan-13 31-Jan-13 12-Jun-13 106

264 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2320 Manufacture & Deliver Photo Voltaic System & Accessories (Enviromena) 120 0% 60 08-May-12 24-Sep-12 31-Jan-13 10-Apr-13 80

265 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2210 Manufacture & Deliver Distribution Boards & Accessories (Al Naema) 90 0% 120 26-Apr-12 08-Aug-12 21-Feb-13 10-Jul-13 0

266 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2305 Manufacture & Deliver Fire Alarm System & Accessories (NAFFCO) 90 0% 90 11-Nov-12 23-Feb-13 07-Mar-13 19-Jun-13 30

267 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2170 Manufacture & Deliver HV Switchgear & Accessories (Gulf Lights) (w/ Substation Issue by Kahramaa)180 0% 150 01-Feb-12 28-Aug-12 10-Mar-13 31-Aug-13 0

268 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2270 Manufacture & Deliver Light Fittings & Accessories (w/ IFC-9 Drawings issue)120 0% 120 18-Apr-12 04-Sep-12 16-Mar-13 01-Aug-13 0

269 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2190 Manufacture & Deliver MV Panels & Accessories (Al Naema) 150 0% 120 09-Feb-12 01-Aug-12 19-Mar-13 05-Aug-13 0

270 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2300 Manufacture & Deliver Security System & Accessories (CHIP) 90 0% 90 02-May-12 14-Aug-12 23-Mar-13 04-Jul-13 0

271 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2260 Manufacture & Deliver Bus Ducts/Bus Bars & Accessories (Gulf Lights) 90 0% 90 11-Apr-12 24-Jul-12 24-Mar-13 06-Jul-13 0

272 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2240 Manufacture & Deliver HV Cables & Accessories (Elsewedy) (w/ IFC-9 Drawings issue)120 0% 90 25-Mar-12 11-Aug-12 25-Mar-13 07-Jul-13 0

273 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2250 Manufacture & Deliver LV Cables & Accessories (Elsewedy) (w/ IFC-9 Drawings issue)90 0% 90 04-Apr-12 17-Jul-12 03-Apr-13 16-Jul-13 0

274 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2290 Manufacture & Deliver Telemetry/Scada (BMS) & Accessories (Siemens) 90 0% 150 02-May-12 14-Aug-12 07-Apr-13 28-Sep-13 0

275 NECP-Rebase_06Sep12-4.PR.MT.12ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERYNEPRMTS2310 Manufacture & Deliver Parking Guidance System & Accessories (CHIP) 90 0% 90 30-Apr-12 12-Aug-12 12-Jun-13 24-Sep-13 0

276 DELIVERY MILESTONES - LONG LEAD AND CRITICAL ITEMSDELIVERY MILESTONES - LONG LEAD AND CRITICAL ITEMSDELIVERY MILESTONES - LONG LEAD AND CRITICAL ITEMSDELIVERY MILESTONES - LONG LEAD AND CRITICAL ITEMS 286 156 04-Jun-12 04-May-13 23-Apr-12 30-Mar-13 28-Sep-13 21

277 MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESMECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESMECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESMECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONES 150 112 19-Jun-12 11-Dec-12 30-Mar-13 08-Aug-13 63

278 NECP-Rebase_06Sep12-4.PR.DM.1MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2510 Water Filter Pumps (Faisal) 0 0% 0 11-Dec-12 30-Mar-13 175

279 NECP-Rebase_06Sep12-4.PR.DM.1MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2520 Condensate Pumps (Techview) 0 0% 0 14-Oct-12 30-Mar-13 113

280 NECP-Rebase_06Sep12-4.PR.DM.1MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2460 Sump Pumps (Faisal) 0 0% 0 26-Jul-12 10-Apr-13 85

281 NECP-Rebase_06Sep12-4.PR.DM.1MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2480 Sewage Ejector Pumps (Faisal) 0 0% 0 09-Aug-12 10-Apr-13 110

282 NECP-Rebase_06Sep12-4.PR.DM.1MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2490 Stormwater Pumps (Faisal) 0 0% 0 23-Aug-12 10-Apr-13 110

283 NECP-Rebase_06Sep12-4.PR.DM.1MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2500 Booster Pumps (Faisal) 0 0% 0 23-Aug-12 10-Apr-13 165

284 NECP-Rebase_06Sep12-4.PR.DM.1MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2440 Duct Mounted Extract Fans (Techview) 0 0% 0 19-Jun-12 25-Apr-13 47

285 NECP-Rebase_06Sep12-4.PR.DM.1MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2450 Jet Fans (Techview) 0 0% 0 01-Aug-12 25-Apr-13 90

286 NECP-Rebase_06Sep12-4.PR.DM.1MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2410 Sound Attenuators (Techview) 0 0% 0 19-Jun-12 02-May-13 41

287 NECP-Rebase_06Sep12-4.PR.DM.1MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2430 Air Curtain (Berner) 0 0% 0 05-Sep-12 09-Jun-13 52

288 NECP-Rebase_06Sep12-4.PR.DM.1MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2470 Fire Pumps (NAFFCO) 0 0% 0 18-Oct-12 07-Aug-13 63

289 NECP-Rebase_06Sep12-4.PR.DM.1MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2420 AHUs (New Vendor: Euroclima) 0 0% 0 05-Sep-12 08-Aug-13 1

290 ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONES 249 146 17-Jul-12 04-May-13 10-Apr-13 28-Sep-13 21

291 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2680 Photo Voltaic System & Accessories (Enviromena) 0 0% 0 24-Sep-12 10-Apr-13 80

292 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2580 Elevators & Accessories (Schindler) 0 0% 0 18-Aug-12 28-Apr-13 65

293 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2590 Escalators & Accessories (Schindler) 0 0% 0 18-Aug-12 28-Apr-13 86

294 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2560 Generators & Accessories (Qatar Site Power) 0 0% 0 18-Oct-12 12-Jun-13 106

295 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2665 Fire Alarm System & Accessories (NAFFCO) 0 0% 0 04-May-13 19-Jun-13 30

296 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2660 Security System & Accessories (CHIP) 0 0% 0 14-Aug-12 04-Jul-13 0

297 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2620 Bus Ducts/Bus Bars & Accessories (Gulf Lights) 0 0% 0 24-Jul-12 06-Jul-13 0

298 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2600 HV Cables & Accessories (Elsewedy) 0 0% 0 11-Aug-12 07-Jul-13 0

299 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2570 Distribution Boards & Accessories (Al Naema) 0 0% 0 08-Aug-12 10-Jul-13 0

300 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2610 LV Cables & Accessories (Elsewedy) 0 0% 0 17-Jul-12 16-Jul-13 0

301 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2630 Light Fittings & Accessories 0 0% 0 04-Sep-12 04-Aug-13 0

302 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2550 MV Panels & Accessories (Al Naema) 0 0% 0 01-Aug-12 05-Aug-13 0

303 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2540 Transformer & Accessories (Eng'g Supplies) (w/ Substation Issue by Kahramaa)0 0% 0 28-Aug-12 18-Aug-13 45

304 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2640 UPS/Battery System & Accessories (Gulf Lights) 0 0% 0 19-Nov-12 18-Aug-13 56

305 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2530 HV Switchgear & Accessories (Gulf Lights) (w/ Substation Issue by Kahramaa)0 0% 0 28-Aug-12 31-Aug-13 0

306 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2670 Parking Guidance System & Accessories (CHIP) 0 0% 0 12-Aug-12 24-Sep-13 0

307 NECP-Rebase_06Sep12-4.PR.DM.2ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2650 Telemetry/Scada (BMS) & Accessories (Siemens) 0 0% 0 14-Aug-12 28-Sep-13 0

308 FINISHES - LONG LEAD ITEMS DELIVERY MILESTONESFINISHES - LONG LEAD ITEMS DELIVERY MILESTONESFINISHES - LONG LEAD ITEMS DELIVERY MILESTONESFINISHES - LONG LEAD ITEMS DELIVERY MILESTONES 245 0 04-Jun-12 17-Mar-13 23-Apr-12 01-May-13 01-May-13 14

309 NECP-Rebase_06Sep12-4.PR.DM.3FINISHES - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2720 Timber Louver Screens (NA as per Tender Adjustment Schedule) 0 100% 0 17-Mar-13 23-Apr-12

310 NECP-Rebase_06Sep12-4.PR.DM.3FINISHES - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2690 Aluminum Chaotic Facade (Alumco) 0 0% 0 17-Jul-12 01-May-13 14

311 NECP-Rebase_06Sep12-4.PR.DM.3FINISHES - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2700 Glazing (Curtain Wall, Sliding Doors, Edge Glass, Rooflights) (Alumco) 0 0% 0 12-Jun-12 01-May-13 14

312 NECP-Rebase_06Sep12-4.PR.DM.3FINISHES - LONG LEAD ITEMS DELIVERY MILESTONESNEPRMTS2710 Aluminum/Steel Doors (by S/C), Louver Screens (Alumco) 0 0% 0 04-Jun-12 01-May-13 0

313 MOCK UPSMOCK UPSMOCK UPSMOCK UPS 323 98 08-Dec-11 19-Dec-12 12-Feb-12 31-Jan-13 26-May-13 109

314 MOCK UPS - COMPLETION/APPROVALMOCK UPS - COMPLETION/APPROVALMOCK UPS - COMPLETION/APPROVALMOCK UPS - COMPLETION/APPROVAL 323 98 08-Dec-11 19-Dec-12 12-Feb-12 31-Jan-13 26-May-13 109

315 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS50 Concrete Formwork 0 100% 0 08-Dec-11 12-Feb-12

316 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS80 Tiles, Wall 0 0% 14 22-Mar-12 22-Mar-12 31-Jan-13 16-Feb-13 57

317 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS210 Traffic Floor Paint 0 0% 14 11-Mar-12 11-Mar-12 31-Jan-13 16-Feb-13 85

318 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS260 Fire Stop Barrier 0 0% 14 14-Feb-12 14-Feb-12 31-Jan-13 16-Feb-13 73

319 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS290 Gypsum Ceiling 0 0% 14 11-Mar-12 11-Mar-12 31-Jan-13 16-Feb-13 20

320 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS130 Toilet Tiles 0 0% 14 22-Mar-12 22-Mar-12 17-Feb-13 04-Mar-13 57

321 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS230 Tactile Tiles 0 0% 14 22-Mar-12 22-Mar-12 17-Feb-13 04-Mar-13 85

322 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS310 Plaster Board Paint 0 0% 14 11-Mar-12 11-Mar-12 17-Feb-13 04-Mar-13 20

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Manufacture & Deliver Heavy Duty Rubber Vehicle Stoppers

PO for Extra Strength Vitrified Clay (ESVC) Pipes & Fittings (Changed to GRP by ASTAD)

PO for Ductile Iron Pipes & Fittings

Manufacture & Deliver Black Steel Pipes & Fittings

Manufacture & Deliver AC Ducts & Accessories

Manufacture & Deliver Copper Pipes & Fittings

Manufacture & Deliver GRP Pipes & Fittings

Manufacture & Deliver Extra Strength Vitrified Clay (ESVC) Pipes & Fittings (Changed to GRP by ASTAD)

Manufacture & Deliver FM200 Gas Fire Suppression

Manufacture & Deliver Ductile Iron Pipes & Fittings (Extl Fire Line)

PO for Signages & Wayfinding

PO for Stainless Steel Barriers/Bollards

PO for Stainless Steel Column Protectors

Manufacture & Deliver Paint Materials

Manufacture & Deliver Tiling Materials

Manufacture & Deliver Stainless Steel Barriers/Bollards

Manufacture & Deliver Stainless Steel Column Protectors

Manufacture & Deliver Signages & Wayfinding

ASTAD Letter 0374-13 dtd 11Feb13: Rejection of JCI as AHU Vendor

Re-submit AHU New Vendor (Euroclima)

Approve AHU New Vendor (Euroclima)

PO for AHU New Vendor (Euroclima)

Manufacture & Deliver Sump Pumps (Faisal)

Manufacture & Deliver Sewage Ejector Pumps (Faisal)

Manufacture & Deliver Stormwater Pumps (Faisal)

Manufacture & Deliver Booster Pumps (Faisal)

Manufacture & Deliver Fire Pumps (NAFFCO)

Manufacture & Deliver Duct Mounted Extract Fans (Techview)

Manufacture & Deliver Jet Fans (Techview)

Manufacture & Deliver Sound Attenuators (Techview)

Manufacture & Deliver Water Filter Pumps (Faisal), Not Long Lead Item

Manufacture & Deliver Condensate Pumps (Techview), Not Long Lead Item

Manufacture & Deliver Air Curtain (Berner)

Manufacture & Deliver AHUs (New Vendor: Euroclima)

PO for Light Fittings & Accessories (w/ IFC-9 Drawings issue)

PO for Security System & Accessories (CHIP)

PO for Telemetry/Scada (BMS) & Accessories (Siemens)

Manufacture & Deliver Elevators & Accessories (Schindler)

Manufacture & Deliver Escalators & Accessories (Schindler)

Manufacture & Deliver UPS/Battery System & Accessories (Gulf Lights)

Manufacture & Deliver Transformer & Accessories (Eng'g Supplies) (w/ Substation Issue by Kahramaa)

Manufacture & Deliver Generators & Accessories (Qatar Site Power)

Manufacture & Deliver Photo Voltaic System & Accessories (Enviromena)

Manufacture & Deliver Distribution Boards & Accessories (Al Naema)

Manufacture & Deliver Fire Alarm System & Accessories (NAFFCO)

Manufacture & Deliver HV Switchgear & Accessories (Gulf Lights) (w/ Substation Issue by Kahramaa)

Manufacture & Deliver Light Fittings & Accessories (w/ IFC-9 Drawings issue)

Manufacture & Deliver MV Panels & Accessories (Al Naema)

Manufacture & Deliver Security System & Accessories (CHIP)

Manufacture & Deliver Bus Ducts/Bus Bars & Accessories (Gulf Lights)

Manufacture & Deliver HV Cables & Accessories (Elsewedy) (w/ IFC-9 Drawings issue)

Manufacture & Deliver LV Cables & Accessories (Elsewedy) (w/ IFC-9 Drawings issue)

Manufacture & Deliver Telemetry/Scada (BMS) & Accessories (Siemens)

Manufacture & Deliver Parking Guidance System & Accessories (CHIP)

Water Filter Pumps (Faisal)

Condensate Pumps (Techview)

Sump Pumps (Faisal)

Sewage Ejector Pumps (Faisal)

Stormwater Pumps (Faisal)

Booster Pumps (Faisal)

Duct Mounted Extract Fans (Techview)

Jet Fans (Techview)

Sound Attenuators (Techview)

Air Curtain (Berner)

Fire Pumps (NAFFCO)

AHUs (New Vendor: Euroclima)

Photo Voltaic System & Accessories (Enviromena)

Elevators & Accessories (Schindler)

Escalators & Accessories (Schindler)

Generators & Accessories (Qatar Site Power)

Fire Alarm System & Accessories (NAFFCO)

Security System & Accessories (CHIP)

Bus Ducts/Bus Bars & Accessories (Gulf Lights)

HV Cables & Accessories (Elsewedy)

Distribution Boards & Accessories (Al Naema)

LV Cables & Accessories (Elsewedy)

Light Fittings & Accessories

MV Panels & Accessories (Al Naema)

Transformer & Accessories (Eng'g Supplies) (w/ Substation Issue by Kahramaa)

UPS/Battery System & Accessories (Gulf Lights)

HV Switchgear & Accessories (Gulf Lights) (w/ Substation Issue by Kahramaa)

Parking Guidance System & Accessories (CHIP)

Telemetry/Scada (BMS) & Accessories (Siemens)

Aluminum Chaotic Facade (Alumco)

Glazing (Curtain Wall, Sliding Doors, Edge Glass, Rooflights) (Alumco)

Aluminum/Steel Doors (by S/C), Louver Screens (Alumco)

Tiles, Wall

Traffic Floor Paint

Fire Stop Barrier

Gypsum Ceiling

Toilet Tiles

Tactile Tiles

Plaster Board Paint

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 3 of 19/27-Feb-13 09:03

Page 4: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

323 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS140 Toilet Cubicle Laminate 0 0% 14 31-Mar-12 31-Mar-12 05-Mar-13 20-Mar-13 57

324 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS240 Tactile Surface Indicators 0 0% 14 22-Mar-12 22-Mar-12 05-Mar-13 20-Mar-13 85

325 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS250 Entrance Flooring System 0 0% 14 22-Mar-12 22-Mar-12 05-Mar-13 20-Mar-13 85

326 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS320 Alucore Ceiling 0 0% 14 29-Feb-12 29-Feb-12 05-Mar-13 20-Mar-13 20

327 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS270 Black Granite Counter Top 0 0% 14 22-Mar-12 22-Mar-12 21-Mar-13 06-Apr-13 57

328 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS200 GRC 0 0% 14 31-Mar-12 31-Mar-12 07-Apr-13 22-Apr-13 57

329 NECP-Rebase_06Sep12-4.PR.1.1MOCK UPS - COMPLETION/APPROVALNEPRMTS330 Signage and Wayfinding 0 0% 14 19-Dec-12 19-Dec-12 09-May-13 26-May-13 109

330 SUBCONTRACTINGSUBCONTRACTINGSUBCONTRACTINGSUBCONTRACTING 366 34 30-Oct-11 29-Dec-12 13-Dec-12 31-Jan-13 11-Mar-13 82

331 PRE-QUALIFICATION OF SUBCONTRACTORSPRE-QUALIFICATION OF SUBCONTRACTORSPRE-QUALIFICATION OF SUBCONTRACTORSPRE-QUALIFICATION OF SUBCONTRACTORS 366 34 30-Oct-11 29-Dec-12 13-Dec-12 31-Jan-13 11-Mar-13 82

332 PRE-QUALIFICATION SUBMITTALSPRE-QUALIFICATION SUBMITTALSPRE-QUALIFICATION SUBMITTALSPRE-QUALIFICATION SUBMITTALS 10 10 02-Dec-12 12-Dec-12 12-Feb-13 23-Feb-13 82

333 NECP-Rebase_06Sep12-4.SC.1.PQSPRE-QUALIFICATION SUBMITTALSNESBPQS120 Pre-qualification of Subcontractor - Asphalting 10 0% 10 02-Dec-12 12-Dec-12 12-Feb-13 23-Feb-13 82

334 PRE-QUALIFICATION APPROVALSPRE-QUALIFICATION APPROVALSPRE-QUALIFICATION APPROVALSPRE-QUALIFICATION APPROVALS 366 34 30-Oct-11 29-Dec-12 24-Dec-12 31-Jan-13 11-Mar-13 82

335 NECP-Rebase_06Sep12-4.SC.1.2PRE-QUALIFICATION APPROVALSNESBPQS180 Pre-qualification of Subcontractor - BMS Approval (same as Telemetry by Siemens)14 50% 7 30-Oct-11 14-Nov-11 24-Dec-12 31-Jan-13 07-Feb-13 43

336 NECP-Rebase_06Sep12-4.SC.1.2PRE-QUALIFICATION APPROVALSNESBPQS200 Pre-qualification of Subcontractor - Parking Guidance System Approval (CHIP)14 50% 7 30-Nov-11 15-Dec-11 21-Jan-13 31-Jan-13 07-Feb-13 106

337 NECP-Rebase_06Sep12-4.SC.1.2PRE-QUALIFICATION APPROVALSNESBPQS190 Pre-qualification of Subcontractor - Telemetry/SCADA Approval (Siemens) 14 0% 14 13-Nov-11 28-Nov-11 25-Dec-12 31-Jan-13 16-Feb-13 36

338 NECP-Rebase_06Sep12-4.SC.1.2PRE-QUALIFICATION APPROVALSNESBPQS230 Pre-qualification of Subcontractor - Asphalting Approval 14 0% 14 13-Dec-12 29-Dec-12 24-Feb-13 11-Mar-13 82

339 CHANGE IN MANUFACTURER by ASTAD (Terna Letter 0118 dtd 24Jan13): Re-Submittals & ApprovalsCHANGE IN MANUFACTURER by ASTAD (Terna Letter 0118 dtd 24Jan13): Re-Submittals & ApprovalsCHANGE IN MANUFACTURER by ASTAD (Terna Letter 0118 dtd 24Jan13): Re-Submittals & ApprovalsCHANGE IN MANUFACTURER by ASTAD (Terna Letter 0118 dtd 24Jan13): Re-Submittals & Approvals 24 21 26-Dec-11 22-Jan-12 13-Dec-12 31-Jan-13 24-Feb-13 0

340 NECP-Rebase_06Sep12-4.SC.1.1CHANGE IN MANUFACTURER by ASTAD (Terna Letter 0118 dtd 24Jan13): Re-Submittals & ApprovalsNESBPQS110 Pre-qualification of Subcontractor - Security System (CHIP) 10 100% 0 26-Dec-11 05-Jan-12 13-Dec-12 24-Dec-12

341 NECP-Rebase_06Sep12-4.SC.1.1CHANGE IN MANUFACTURER by ASTAD (Terna Letter 0118 dtd 24Jan13): Re-Submittals & ApprovalsNESBPQS220 Pre-qualification of Subcontractor - Security System Approval (CHIP) 14 50% 7 07-Jan-12 22-Jan-12 25-Dec-12 31-Jan-13 07-Feb-13 14

342 NECP-Rebase_06Sep12-4.SC.1.1CHANGE IN MANUFACTURER by ASTAD (Terna Letter 0118 dtd 24Jan13): Re-Submittals & ApprovalsNESBPQS250 Await Reply to Terna Letter 118, Assumed Approval: 24Feb13 0 0% 0 24-Feb-13 0

343 PRE-CONSTRUCTIONPRE-CONSTRUCTIONPRE-CONSTRUCTIONPRE-CONSTRUCTION 605 119 22-Sep-11 29-Aug-13 22-Sep-11 19-Aug-13 08-Jan-14 10

344 TOWER CRANE ERECTIONTOWER CRANE ERECTIONTOWER CRANE ERECTIONTOWER CRANE ERECTION 255 0 16-Jan-12 09-Nov-12 22-Feb-12 15-Sep-12

345 INTERFACE COORDINATIONINTERFACE COORDINATIONINTERFACE COORDINATIONINTERFACE COORDINATION 605 119 22-Sep-11 29-Aug-13 22-Sep-11 19-Aug-13 08-Jan-14 10

346 EDUCATION CITY PROJECTSEDUCATION CITY PROJECTSEDUCATION CITY PROJECTSEDUCATION CITY PROJECTS 538 116 25-Oct-11 13-Jul-13 25-Oct-11 19-Aug-13 05-Jan-14 13

347 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO10 South Campus People Mover Station, (PMs Rail Works) 0 100% 0 28-Nov-12 28-Nov-12

348 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO40 Temporary Access Roads, Roads Tie-in 0 100% 0 25-Oct-11 25-Oct-11

349 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO120 Oxygen Park, West Facade (MAN) 0 100% 0 29-Sep-12 29-Sep-12

350 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO100 Landscaping Package, Main Irrigation Line Tie-in 0 0% 0 03-Jan-13 19-Aug-13 11

351 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO20 Dukhan Expressway, Roads Tie-in (QD-SBG) 0 0% 0 11-Jun-13 15-Oct-13 82

352 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO70 Primary Roads, Roads Tie-in 0 0% 0 11-Jun-13 15-Oct-13 82

353 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO110 Male Student Housing 0 0% 0 11-Jun-13 15-Oct-13 82

354 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO130 Faculty of Islamic Studies 0 0% 0 11-Jun-13 15-Oct-13 82

355 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO140 South East Car Park 0 0% 0 11-Jun-13 15-Oct-13 82

356 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO60 Central Plant CP7, CHW Pipes Tie-in (Unicorp) 0 0% 0 22-Jun-13 02-Dec-13 37

357 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO80 Primary Infrastructure (Power/Water/Storm/Sewer), Utilities Tie-in 0 0% 0 03-Jan-13 04-Dec-13 30

358 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO30 South Campus Utility Tunnel, Services Tie-in 0 0% 0 22-Jun-13 11-Dec-13 28

359 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO90 Security/IT/Telecom, Infrastructure Tie-in 0 0% 0 24-Jun-13 11-Dec-13 28

360 NECP-Rebase_06Sep12-4.3.ICO.1EDUCATION CITY PROJECTSNECOICO50 Primary Substation EDC4, Electrical Power Tie-in 0 0% 0 13-Jul-13 05-Jan-14 8

361 GOVERNMENT AUTHORITIESGOVERNMENT AUTHORITIESGOVERNMENT AUTHORITIESGOVERNMENT AUTHORITIES 605 111 22-Sep-11 29-Aug-13 22-Sep-11 29-Aug-13 08-Jan-14 10

362 NECP-Rebase_06Sep12-4.3.ICO.2GOVERNMENT AUTHORITIESNECOICO150 Public Works Authority, Transport of Excavated Materials 0 100% 0 25-Sep-11 15-Dec-11

363 NECP-Rebase_06Sep12-4.3.ICO.2GOVERNMENT AUTHORITIESNECOICO180 Municipality, Building Permit 0 100% 0 22-Sep-11 22-Sep-11

364 NECP-Rebase_06Sep12-4.3.ICO.2GOVERNMENT AUTHORITIESNECOICO190 Municipality, Approved Drawings/Specs/Calculations 0 100% 0 14-Nov-11 14-Nov-11

365 NECP-Rebase_06Sep12-4.3.ICO.2GOVERNMENT AUTHORITIESNECOICO170 Civil Defence, Health & Fire Safety 0 0% 0 29-Aug-13 29-Aug-13 0

366 NECP-Rebase_06Sep12-4.3.ICO.2GOVERNMENT AUTHORITIESNECOICO240 Facility License Office, Occupancy Permit (ASTAD/QF) 0 0% 0 29-Aug-13 29-Aug-13 0

367 NECP-Rebase_06Sep12-4.3.ICO.2GOVERNMENT AUTHORITIESNECOICO160 Public Works Authority, Dukhan Expressway Construction 0 0% 0 11-Jun-13 15-Oct-13 82

368 NECP-Rebase_06Sep12-4.3.ICO.2GOVERNMENT AUTHORITIESNECOICO200 Roads Department, Tie-in Approvals 0 0% 0 11-Jun-13 15-Oct-13 82

369 NECP-Rebase_06Sep12-4.3.ICO.2GOVERNMENT AUTHORITIESNECOICO210 Drainage Department, Drainage Tie-in Approvals 0 0% 0 12-Jan-13 12-Dec-13 32

370 NECP-Rebase_06Sep12-4.3.ICO.2GOVERNMENT AUTHORITIESNECOICO220 Qtel, IT/Telecom Tie-in (by Others) 0 0% 0 27-Jun-13 15-Dec-13 30

371 NECP-Rebase_06Sep12-4.3.ICO.2GOVERNMENT AUTHORITIESNECOICO230 Kahramaa, Electrical Power & Water Tie-in (by Others) 0 0% 0 16-Jul-13 08-Jan-14 10

372 CONSTRUCTION/INSTALLATIONCONSTRUCTION/INSTALLATIONCONSTRUCTION/INSTALLATIONCONSTRUCTION/INSTALLATION 607 297 27-Sep-11 03-Sep-13 28-Dec-11 31-Jan-13 15-Jan-14 4

373 PHASE 1 WORKSPHASE 1 WORKSPHASE 1 WORKSPHASE 1 WORKS 605 297 27-Sep-11 02-Sep-13 28-Dec-11 31-Jan-13 15-Jan-14 4

374 M2-Const. Compl. of Demol., Diversion of Exstg Services, Temp. Serv Conn., Excav Phase (1) Axis 1-29M2-Const. Compl. of Demol., Diversion of Exstg Services, Temp. Serv Conn., Excav Phase (1) Axis 1-29M2-Const. Compl. of Demol., Diversion of Exstg Services, Temp. Serv Conn., Excav Phase (1) Axis 1-29M2-Const. Compl. of Demol., Diversion of Exstg Services, Temp. Serv Conn., Excav Phase (1) Axis 1-29 265 73 27-Sep-11 31-Jul-12 28-Dec-11 31-Jan-13 25-Apr-13 14

375 PHASE 1 - DEWATERINGPHASE 1 - DEWATERINGPHASE 1 - DEWATERINGPHASE 1 - DEWATERING 265 73 27-Sep-11 31-Jul-12 28-Dec-11 31-Jan-13 25-Apr-13 14

376 NECP-Rebase_06Sep12-4.CO.1.5.9PHASE 1 - DEWATERINGNECOSDE100 Dewatering Works 265 72.45% 73 27-Sep-11 31-Jul-12 28-Dec-11 31-Jan-13 25-Apr-13 14

377 M3-Const. Compl. of Phase (1) Axis 1-29 RC Substruc. & Superstr. incl. Blockwork & All Reqd ServicesM3-Const. Compl. of Phase (1) Axis 1-29 RC Substruc. & Superstr. incl. Blockwork & All Reqd ServicesM3-Const. Compl. of Phase (1) Axis 1-29 RC Substruc. & Superstr. incl. Blockwork & All Reqd ServicesM3-Const. Compl. of Phase (1) Axis 1-29 RC Substruc. & Superstr. incl. Blockwork & All Reqd Services 218 99 29-Dec-11 08-Sep-12 30-Mar-12 31-Jan-13 26-May-13 6

378 Upper Basement FloorUpper Basement FloorUpper Basement FloorUpper Basement Floor 211 70 29-Dec-11 30-Aug-12 30-Mar-12 31-Jan-13 22-Apr-13 33

379 PHASE 1 - UPPER BASEMENT SLABSPHASE 1 - UPPER BASEMENT SLABSPHASE 1 - UPPER BASEMENT SLABSPHASE 1 - UPPER BASEMENT SLABS 0 70 05-Sep-12 31-Jan-13 22-Apr-13 33

380 Area A12Area A12Area A12Area A12 0 20 05-Sep-12 31-Jan-13 23-Feb-13 42

381 NECP-Rebase_06Sep12-4.CO.1.8.2.8.12Area A12 NECOLBSS2176 RC Suspended Slab, Upper Basement Area A12 0 0% 20 05-Sep-12 31-Jan-13 23-Feb-13 42

382 NECP-Rebase_06Sep12-4.CO.1.8.2.8.12Area A12 NECOLBSS2186 Small power conduits 0 0% 18 12-Sep-12 31-Jan-13 21-Feb-13 42

383 NECP-Rebase_06Sep12-4.CO.1.8.2.8.12Area A12 NECOLBSS2196 Security system conduits 0 0% 18 12-Sep-12 31-Jan-13 21-Feb-13 42

384 NECP-Rebase_06Sep12-4.CO.1.8.2.8.12Area A12 NECOLBSS2206 Earthing conduits 0 0% 18 12-Sep-12 31-Jan-13 21-Feb-13 42

385 NECP-Rebase_06Sep12-4.CO.1.8.2.8.12Area A12 NECOLBSS2216 Lighting conduits 0 0% 18 12-Sep-12 31-Jan-13 21-Feb-13 42

386 NECP-Rebase_06Sep12-4.CO.1.8.2.8.12Area A12 NECOLBSS2226 Fire Alaram conduits 0 0% 18 12-Sep-12 31-Jan-13 21-Feb-13 42

387 NECP-Rebase_06Sep12-4.CO.1.8.2.8.12Area A12 NECOLBSS2236 Telephone conduits 0 0% 18 12-Sep-12 31-Jan-13 21-Feb-13 42

388 Vehicular Ramp - Axis L-M/3-7 (At Raft Foundation 16)Vehicular Ramp - Axis L-M/3-7 (At Raft Foundation 16)Vehicular Ramp - Axis L-M/3-7 (At Raft Foundation 16)Vehicular Ramp - Axis L-M/3-7 (At Raft Foundation 16) 0 21 05-Mar-13 28-Mar-13 0

389 NECP-Rebase_06Sep12-4.CO.1.8.2.8.1Vehicular Ramp - Axis L-M/3-7 (At Raft Foundation 16)NECOLBSS3040 RC Ramp, Axis L-M/3-7 (at Raft Foundation 16) 0 0% 21 05-Mar-13 28-Mar-13 0

390 Vehicular Ramp - Axis A-B/3-7 (At Raft Foundation 17)Vehicular Ramp - Axis A-B/3-7 (At Raft Foundation 17)Vehicular Ramp - Axis A-B/3-7 (At Raft Foundation 17)Vehicular Ramp - Axis A-B/3-7 (At Raft Foundation 17) 0 21 30-Mar-13 22-Apr-13 33

391 NECP-Rebase_06Sep12-4.CO.1.8.2.8.2Vehicular Ramp - Axis A-B/3-7 (At Raft Foundation 17)NECOLBSS3050 RC Ramp, Axis A-B/3-7 (at Raft Foundation 17) 0 0% 21 30-Mar-13 22-Apr-13 33

392 PHASE 1 - POWERFLOAT FINISHESPHASE 1 - POWERFLOAT FINISHESPHASE 1 - POWERFLOAT FINISHESPHASE 1 - POWERFLOAT FINISHES 131 10 29-Dec-11 29-May-12 30-Mar-12 12-Feb-13 23-Feb-13 76

393 NECP-Rebase_06Sep12-4.CO.1.8.2.10PHASE 1 - POWERFLOAT FINISHESNECOBFW1200 Powerfloat Concrete Finishes, Lower Basement & Upper Basement Floors 131 92.37% 10 29-Dec-11 29-May-12 30-Mar-12 12-Feb-13 23-Feb-13 76

394 PHASE 1 - UPPER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNSPHASE 1 - UPPER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNSPHASE 1 - UPPER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNSPHASE 1 - UPPER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNS 6 3 24-Apr-12 30-Apr-12 17-Oct-12 31-Jan-13 03-Feb-13 37

395 Area 12Area 12Area 12Area 12 6 3 24-Apr-12 30-Apr-12 17-Oct-12 31-Jan-13 03-Feb-13 37

396 NECP-Rebase_06Sep12-4.CO.1.8.2.2.12Area 12 NECOUBWC1185 RC Retaining Wall, Upper Basement Area 12 0 95% 0 17-Oct-12 31-Jan-13 31-Jan-13 40

397 NECP-Rebase_06Sep12-4.CO.1.8.2.2.12Area 12 NECOUBWC1190 RC Columns Upper Basement Area 12 6 56.01% 3 24-Apr-12 30-Apr-12 19-Nov-12 31-Jan-13 03-Feb-13 37

398 PHASE 1 - GROUND FLOOR SLABS (incl. Protective Screed)PHASE 1 - GROUND FLOOR SLABS (incl. Protective Screed)PHASE 1 - GROUND FLOOR SLABS (incl. Protective Screed)PHASE 1 - GROUND FLOOR SLABS (incl. Protective Screed) 0 38 07-Dec-12 31-Jan-13 16-Mar-13 42

399 Area A12Area A12Area A12Area A12 0 5 07-Dec-12 31-Jan-13 05-Feb-13 71

400 NECP-Rebase_06Sep12-4.CO.1.8.2.1.12Area A12 NECOUBSS2176 RC Suspended Slab, Ground Floor Area A12 0 50% 5 07-Dec-12 31-Jan-13 05-Feb-13 63

401 NECP-Rebase_06Sep12-4.CO.1.8.2.1.12Area A12 NECOUBSS2186 Small power conduits 0 50% 2 12-Dec-12 31-Jan-13 02-Feb-13 74

402 NECP-Rebase_06Sep12-4.CO.1.8.2.1.12Area A12 NECOUBSS2196 Security system conduits 0 50% 2 12-Dec-12 31-Jan-13 02-Feb-13 74

403 NECP-Rebase_06Sep12-4.CO.1.8.2.1.12Area A12 NECOUBSS2206 Earthing conduits 0 50% 2 12-Dec-12 31-Jan-13 02-Feb-13 74

404 NECP-Rebase_06Sep12-4.CO.1.8.2.1.12Area A12 NECOUBSS2216 Lighting conduits 0 50% 2 12-Dec-12 31-Jan-13 02-Feb-13 74

405 NECP-Rebase_06Sep12-4.CO.1.8.2.1.12Area A12 NECOUBSS2226 Fire Alaram conduits 0 50% 2 12-Dec-12 31-Jan-13 02-Feb-13 74

406 NECP-Rebase_06Sep12-4.CO.1.8.2.1.12Area A12 NECOUBSS2236 Telephone conduits 0 50% 2 12-Dec-12 31-Jan-13 02-Feb-13 74

407 Area A13Area A13Area A13Area A13 0 15 26-Feb-13 16-Mar-13 42

408 NECP-Rebase_06Sep12-4.CO.1.8.2.1.13Area A13 NECOUBSS2246 RC Suspended Slab, Ground Floor Area A13 0 0% 8 26-Feb-13 07-Mar-13 37

409 NECP-Rebase_06Sep12-4.CO.1.8.2.1.13Area A13 NECOUBSS2256 Small power conduits 0 0% 4 02-Mar-13 06-Mar-13 50

410 NECP-Rebase_06Sep12-4.CO.1.8.2.1.13Area A13 NECOUBSS2266 Security system conduits 0 0% 4 02-Mar-13 06-Mar-13 50

411 NECP-Rebase_06Sep12-4.CO.1.8.2.1.13Area A13 NECOUBSS2276 Earthing conduits 0 0% 4 02-Mar-13 06-Mar-13 50

412 NECP-Rebase_06Sep12-4.CO.1.8.2.1.13Area A13 NECOUBSS2286 Lighting conduits 0 0% 4 02-Mar-13 06-Mar-13 50

413 NECP-Rebase_06Sep12-4.CO.1.8.2.1.13Area A13 NECOUBSS2296 Fire Alaram conduits 0 0% 4 02-Mar-13 06-Mar-13 50

414 NECP-Rebase_06Sep12-4.CO.1.8.2.1.13Area A13 NECOUBSS2306 Telephone conduits 0 0% 4 12-Mar-13 16-Mar-13 42

415 PHASE 1 - BACKFILLING (incl. Waterproofing) TO RETAINING WALLS AROUND BUILDINGPHASE 1 - BACKFILLING (incl. Waterproofing) TO RETAINING WALLS AROUND BUILDINGPHASE 1 - BACKFILLING (incl. Waterproofing) TO RETAINING WALLS AROUND BUILDINGPHASE 1 - BACKFILLING (incl. Waterproofing) TO RETAINING WALLS AROUND BUILDING 95 54 13-May-12 30-Aug-12 07-Nov-12 31-Jan-13 03-Apr-13 3

416 NECP-Rebase_06Sep12-4.CO.1.8.2.9PHASE 1 - BACKFILLING (incl. Waterproofing) TO RETAINING WALLS AROUND BUILDINGNECOEX1250 Backfilling Around Building, Area 12 - Area 13 - Area 14 19 12.5% 17 09-Aug-12 30-Aug-12 14-Nov-12 16-Mar-13 03-Apr-13 3

417 NECP-Rebase_06Sep12-4.CO.1.8.2.9PHASE 1 - BACKFILLING (incl. Waterproofing) TO RETAINING WALLS AROUND BUILDINGNECOEX1210 Backfilling Around Building, Area 1 - Area 2 19 11.25% 17 13-May-12 03-Jun-12 07-Nov-12 31-Jan-13 19-Feb-13 3

418 NECP-Rebase_06Sep12-4.CO.1.8.2.9PHASE 1 - BACKFILLING (incl. Waterproofing) TO RETAINING WALLS AROUND BUILDINGNECOEX1220 Backfilling Around Building, Area 3 - Area 4 19 3% 18 04-Jun-12 25-Jun-12 30-Jan-13 19-Feb-13 12-Mar-13 3

419 NECP-Rebase_06Sep12-4.CO.1.8.2.9PHASE 1 - BACKFILLING (incl. Waterproofing) TO RETAINING WALLS AROUND BUILDINGNECOEX1230 Backfilling Around Building, Area 5 - Area 6 - Area 8 - Area 9 19 3% 18 26-Jun-12 17-Jul-12 21-Nov-12 19-Feb-13 12-Mar-13 3

420 NECP-Rebase_06Sep12-4.CO.1.8.2.9PHASE 1 - BACKFILLING (incl. Waterproofing) TO RETAINING WALLS AROUND BUILDINGNECOEX1240 Backfilling Around Building, Area 8 - Area 9 - Area 10 - Area 11 19 0% 19 18-Jul-12 08-Aug-12 12-Mar-13 03-Apr-13 3

421 Blockworks and ServicesBlockworks and ServicesBlockworks and ServicesBlockworks and Services 147 99 21-Mar-12 08-Sep-12 29-Nov-12 31-Jan-13 26-May-13 6

422 PHASE 1 - BLOCKWORK & SERVICESPHASE 1 - BLOCKWORK & SERVICESPHASE 1 - BLOCKWORK & SERVICESPHASE 1 - BLOCKWORK & SERVICES 147 99 21-Mar-12 08-Sep-12 29-Nov-12 31-Jan-13 26-May-13 6

423 LB Area A1 - A2LB Area A1 - A2LB Area A1 - A2LB Area A1 - A2 25 8 09-Apr-12 07-May-12 06-Dec-12 31-Jan-13 09-Feb-13 46

424 NECP-Rebase_06Sep12-4.CO.1.8.3.8.1LB Area A1 - A2 NECOCW50 Blockwork, Lower Basement, Area 1 - Area 2 23 50% 6 09-Apr-12 05-May-12 06-Dec-12 31-Jan-13 06-Feb-13 46

425 NECP-Rebase_06Sep12-4.CO.1.8.3.8.1LB Area A1 - A2 NECOCW52 Installation of Sanitary pipes 16 0% 6 19-Apr-12 07-May-12 03-Feb-13 09-Feb-13 46

426 NECP-Rebase_06Sep12-4.CO.1.8.3.8.1LB Area A1 - A2 NECOCW53 Small power conduits 16 0% 6 19-Apr-12 07-May-12 03-Feb-13 09-Feb-13 46

427 LB Area A5 - A6LB Area A5 - A6LB Area A5 - A6LB Area A5 - A6 25 12 02-Jun-12 30-Jun-12 02-Jan-13 31-Jan-13 14-Feb-13 91

428 NECP-Rebase_06Sep12-4.CO.1.8.3.8.4LB Area A5 - A6 NECOCW70 Blockwork, Lower Basement, Area 5 - Area 6 23 15% 10 02-Jun-12 27-Jun-12 02-Jan-13 31-Jan-13 12-Feb-13 64

429 NECP-Rebase_06Sep12-4.CO.1.8.3.8.4LB Area A5 - A6 NECOCW72 Installation of Sanitary pipes 16 0% 6 12-Jun-12 30-Jun-12 07-Feb-13 14-Feb-13 78

430 NECP-Rebase_06Sep12-4.CO.1.8.3.8.4LB Area A5 - A6 NECOCW73 Small power conduits 16 0% 6 12-Jun-12 30-Jun-12 07-Feb-13 14-Feb-13 91

431 LB Area A3 - A4LB Area A3 - A4LB Area A3 - A4LB Area A3 - A4 25 12 06-May-12 03-Jun-12 27-Dec-12 31-Jan-13 14-Feb-13 91

432 NECP-Rebase_06Sep12-4.CO.1.8.3.8.2LB Area A3 - A4 NECOCW60 Blockwork, Lower Basement, Area 3 - Area 4 23 15% 10 06-May-12 31-May-12 27-Dec-12 31-Jan-13 12-Feb-13 78

433 NECP-Rebase_06Sep12-4.CO.1.8.3.8.2LB Area A3 - A4 NECOCW62 Installation of Sanitary pipes 16 0% 6 16-May-12 03-Jun-12 07-Feb-13 14-Feb-13 78

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Toilet Cubicle Laminate

Tactile Surface Indicators

Entrance Flooring System

Alucore Ceiling

Black Granite Counter Top

GRC

Signage and Wayfinding

Pre-qualification of Subcontractor - Asphalting

Pre-qualification of Subcontractor - BMS Approval (same as Telemetry by Siemens)

Pre-qualification of Subcontractor - Parking Guidance System Approval (CHIP)

Pre-qualification of Subcontractor - Telemetry/SCADA Approval (Siemens)

Pre-qualification of Subcontractor - Asphalting Approval

Pre-qualification of Subcontractor - Security System (CHIP)

Pre-qualification of Subcontractor - Security System Approval (CHIP)

Await Reply to Terna Letter 118, Assumed Approval: 24Feb13

South Campus People Mover Station, (PMs Rail Works)

Landscaping Package, Main Irrigation Line Tie-in

Dukhan Expressway, Roads Tie-in (QD-SBG)

Primary Roads, Roads Tie-in

Male Student Housing

Faculty of Islamic Studies

South East Car Park

Central Plant CP7, CHW Pipes Tie-in (Unicorp)

Primary Infrastructure (Power/Water/Storm/Sewer), Utilities Tie-in

South Campus Utility Tunnel, Services Tie-in

Security/IT/Telecom, Infrastructure Tie-in

Primary Substation EDC4, Electrical Power Tie-in

Civil Defence, Health & Fire Safety

Facility License Office, Occupancy Permit (ASTAD/QF)

Public Works Authority, Dukhan Expressway Construction

Roads Department, Tie-in Approvals

Drainage Department, Drainage Tie-in Approvals

Qtel, IT/Telecom Tie-in (by Others)

Kahramaa, Electrical Power & Water Tie-in (by Others)

Dewatering Works

RC Suspended Slab, Upper Basement Area A12

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alaram conduits

Telephone conduits

RC Ramp, Axis L-M/3-7 (at Raft Foundation 16)

RC Ramp, Axis A-B/3-7 (at Raft Foundation 17)

Powerfloat Concrete Finishes, Lower Basement & Upper Basement Floors

RC Retaining Wall, Upper Basement Area 12

RC Columns Upper Basement Area 12

RC Suspended Slab, Ground Floor Area A12

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alaram conduits

Telephone conduits

RC Suspended Slab, Ground Floor Area A13

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alaram conduits

Telephone conduits

Backfilling Around Building, Area 12 - Area 13 - Area 14

Backfilling Around Building, Area 1 - Area 2

Backfilling Around Building, Area 3 - Area 4

Backfilling Around Building, Area 5 - Area 6 - Area 8 - Area 9

Backfilling Around Building, Area 8 - Area 9 - Area 10 - Area 11

Blockwork, Lower Basement, Area 1 - Area 2

Installation of Sanitary pipes

Small power conduits

Blockwork, Lower Basement, Area 5 - Area 6

Installation of Sanitary pipes

Small power conduits

Blockwork, Lower Basement, Area 3 - Area 4

Installation of Sanitary pipes

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 4 of 19/27-Feb-13 09:03

Page 5: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

434 NECP-Rebase_06Sep12-4.CO.1.8.3.8.2LB Area A3 - A4 NECOCW63 Small power conduits 16 0% 6 16-May-12 03-Jun-12 07-Feb-13 14-Feb-13 91

435 LB Area A7 - A8LB Area A7 - A8LB Area A7 - A8LB Area A7 - A8 24 9 28-Jun-12 25-Jul-12 29-Nov-12 31-Jan-13 11-Feb-13 94

436 NECP-Rebase_06Sep12-4.CO.1.8.3.8.6LB Area A7 - A8 NECOCW80 Blockwork, Lower Basement, Area 7 - Area 8 22 40% 7 28-Jun-12 23-Jul-12 29-Nov-12 31-Jan-13 09-Feb-13 69

437 NECP-Rebase_06Sep12-4.CO.1.8.3.8.6LB Area A7 - A8 NECOCW82 Installation of Sanitary pipes 16 0% 6 08-Jul-12 25-Jul-12 04-Feb-13 11-Feb-13 94

438 NECP-Rebase_06Sep12-4.CO.1.8.3.8.6LB Area A7 - A8 NECOCW83 Small power conduits 16 0% 6 08-Jul-12 25-Jul-12 04-Feb-13 11-Feb-13 94

439 LB Area A9 - A10LB Area A9 - A10LB Area A9 - A10LB Area A9 - A10 24 14 24-Jul-12 20-Aug-12 09-Feb-13 25-Feb-13 82

440 NECP-Rebase_06Sep12-4.CO.1.8.3.8.8LB Area A9 - A10 NECOCW90 Blockwork, Lower Basement, Area 9 - Area 10 22 0% 12 24-Jul-12 18-Aug-12 09-Feb-13 23-Feb-13 69

441 NECP-Rebase_06Sep12-4.CO.1.8.3.8.8LB Area A9 - A10 NECOCW92 Installation of Sanitary pipes 16 0% 6 02-Aug-12 20-Aug-12 18-Feb-13 25-Feb-13 69

442 NECP-Rebase_06Sep12-4.CO.1.8.3.8.8LB Area A9 - A10 NECOCW93 Small power conduits 16 0% 6 02-Aug-12 20-Aug-12 18-Feb-13 25-Feb-13 82

443 LB Area A11 - A12 - A13LB Area A11 - A12 - A13LB Area A11 - A12 - A13LB Area A11 - A12 - A13 0 14 24-Mar-13 09-Apr-13 38

444 NECP-Rebase_06Sep12-4.CO.1.8.3.8.10LB Area A11 - A12 - A13 NECOCW223 Blockwork, Lower Basement, Area 11 - Area 12 - Area 13 0 0% 12 24-Mar-13 07-Apr-13 37

445 NECP-Rebase_06Sep12-4.CO.1.8.3.8.10LB Area A11 - A12 - A13 NECOCW233 Installation of Sanitary pipes 0 0% 6 02-Apr-13 09-Apr-13 37

446 NECP-Rebase_06Sep12-4.CO.1.8.3.8.10LB Area A11 - A12 - A13 NECOCW243 Small power conduits 0 0% 6 02-Apr-13 09-Apr-13 38

447 UB Area A1 - A2UB Area A1 - A2UB Area A1 - A2UB Area A1 - A2 25 99 21-Mar-12 18-Apr-12 06-Dec-12 31-Jan-13 26-May-13 6

448 NECP-Rebase_06Sep12-4.CO.1.8.3.8.3UB Area A1 - A2 NECOCW170 Blockwork, Upper Basement, Area 1 - Area 2 23 20% 10 21-Mar-12 16-Apr-12 06-Dec-12 31-Jan-13 11-Feb-13 37

449 NECP-Rebase_06Sep12-4.CO.1.8.3.8.3UB Area A1 - A2 NECOCW171 Installaton of Rainwater pipes 16 0% 6 01-Apr-12 18-Apr-12 06-Feb-13 13-Feb-13 93

450 NECP-Rebase_06Sep12-4.CO.1.8.3.8.3UB Area A1 - A2 NECOCW172 Installation of Sanitary pipes 16 0% 6 01-Apr-12 18-Apr-12 06-Feb-13 13-Feb-13 93

451 NECP-Rebase_06Sep12-4.CO.1.8.3.8.3UB Area A1 - A2 NECOCW173 Small power conduits 16 0% 6 01-Apr-12 18-Apr-12 06-Feb-13 13-Feb-13 90

452 Siemens PMS Control Room (Manager's Room) - Assumed CR Issuance Date: 31Mar13Siemens PMS Control Room (Manager's Room) - Assumed CR Issuance Date: 31Mar13Siemens PMS Control Room (Manager's Room) - Assumed CR Issuance Date: 31Mar13Siemens PMS Control Room (Manager's Room) - Assumed CR Issuance Date: 31Mar13 0 48 31-Mar-13 26-May-13 0

453 NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1Siemens PMS Control Room (Manager's Room) - Assumed CR Issuance Date: 31Mar13NECOCW303 Await CR for Blockwork Re-configuration (Managers Room), Siemens Control Room0 0% 0 31-Mar-13 0

454 NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1Siemens PMS Control Room (Manager's Room) - Assumed CR Issuance Date: 31Mar13NECOCW313 Submit Shop Dwgs, Blockwork Re-configuration (Managers Room), Siemens Control Room0 0% 7 31-Mar-13 08-Apr-13 0

455 NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1Siemens PMS Control Room (Manager's Room) - Assumed CR Issuance Date: 31Mar13NECOCW323 Approve Shop Dwgs, Blockwork Re-configuration (Managers Room), Siemens Control Room0 0% 14 08-Apr-13 24-Apr-13 0

456 NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1Siemens PMS Control Room (Manager's Room) - Assumed CR Issuance Date: 31Mar13NECOCW333 Blockwork Re-configuration (Managers Room), Siemens Control Room 0 0% 21 24-Apr-13 19-May-13 0

457 NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1Siemens PMS Control Room (Manager's Room) - Assumed CR Issuance Date: 31Mar13NECOCW343 Small power conduits (Managers Room), Siemens Control Room 0 0% 6 19-May-13 26-May-13 0

458 UB Area A3 - A4UB Area A3 - A4UB Area A3 - A4UB Area A3 - A4 25 14 17-Apr-12 15-May-12 11-Feb-13 27-Feb-13 81

459 NECP-Rebase_06Sep12-4.CO.1.8.3.8.5UB Area A3 - A4 NECOCW180 Blockwork, Upper Basement, Area 3 - Area 4 23 0% 12 17-Apr-12 13-May-12 11-Feb-13 25-Feb-13 37

460 NECP-Rebase_06Sep12-4.CO.1.8.3.8.5UB Area A3 - A4 NECOCW181 Installaton of Rainwater pipes 16 0% 6 28-Apr-12 15-May-12 20-Feb-13 27-Feb-13 81

461 NECP-Rebase_06Sep12-4.CO.1.8.3.8.5UB Area A3 - A4 NECOCW182 Installation of Sanitary pipes 16 0% 6 28-Apr-12 15-May-12 20-Feb-13 27-Feb-13 81

462 NECP-Rebase_06Sep12-4.CO.1.8.3.8.5UB Area A3 - A4 NECOCW183 Small power conduits 16 0% 6 28-Apr-12 15-May-12 20-Feb-13 27-Feb-13 73

463 UB Area A5 - A6UB Area A5 - A6UB Area A5 - A6UB Area A5 - A6 25 14 14-May-12 11-Jun-12 25-Feb-13 13-Mar-13 67

464 NECP-Rebase_06Sep12-4.CO.1.8.3.8.7UB Area A5 - A6 NECOCW190 Blockwork, Upper Basement, Area 5 - Area 6 23 0% 12 14-May-12 09-Jun-12 25-Feb-13 11-Mar-13 37

465 NECP-Rebase_06Sep12-4.CO.1.8.3.8.7UB Area A5 - A6 NECOCW191 Installaton of Rainwater pipes 16 0% 6 24-May-12 11-Jun-12 06-Mar-13 13-Mar-13 67

466 NECP-Rebase_06Sep12-4.CO.1.8.3.8.7UB Area A5 - A6 NECOCW192 Installation of Sanitary pipes 16 0% 6 24-May-12 11-Jun-12 06-Mar-13 13-Mar-13 67

467 NECP-Rebase_06Sep12-4.CO.1.8.3.8.7UB Area A5 - A6 NECOCW193 Small power conduits 16 0% 6 24-May-12 11-Jun-12 06-Mar-13 13-Mar-13 67

468 UB Area A8 - A9UB Area A8 - A9UB Area A8 - A9UB Area A8 - A9 24 14 10-Jun-12 07-Jul-12 11-Mar-13 27-Mar-13 55

469 NECP-Rebase_06Sep12-4.CO.1.8.3.8.9UB Area A8 - A9 NECOCW200 Blockwork, Upper Basement, Area 8 - Area 9 22 0% 12 10-Jun-12 04-Jul-12 11-Mar-13 25-Mar-13 37

470 NECP-Rebase_06Sep12-4.CO.1.8.3.8.9UB Area A8 - A9 NECOCW202 Installation of Sanitary pipes 16 0% 6 19-Jun-12 07-Jul-12 20-Mar-13 27-Mar-13 55

471 NECP-Rebase_06Sep12-4.CO.1.8.3.8.9UB Area A8 - A9 NECOCW203 Small power conduits 16 0% 6 19-Jun-12 07-Jul-12 20-Mar-13 27-Mar-13 55

472 UB Area A10 - A11UB Area A10 - A11UB Area A10 - A11UB Area A10 - A11 56 14 05-Jul-12 08-Sep-12 25-Mar-13 10-Apr-13 37

473 NECP-Rebase_06Sep12-4.CO.1.8.3.8.11UB Area A10 - A11 NECOCW210 Blockwork, Upper Basement, Area 10 - Area 11 22 0% 12 05-Jul-12 30-Jul-12 25-Mar-13 08-Apr-13 37

474 NECP-Rebase_06Sep12-4.CO.1.8.3.8.11UB Area A10 - A11 NECOCW212 Installation of Sanitary pipes 16 0% 6 21-Aug-12 08-Sep-12 03-Apr-13 10-Apr-13 37

475 NECP-Rebase_06Sep12-4.CO.1.8.3.8.11UB Area A10 - A11 NECOCW213 Small power conduits 14 0% 6 21-Aug-12 05-Sep-12 03-Apr-13 10-Apr-13 37

476 UB Area A12 - A13UB Area A12 - A13UB Area A12 - A13UB Area A12 - A13 0 14 01-Apr-13 17-Apr-13 37

477 NECP-Rebase_06Sep12-4.CO.1.8.3.8.13UB Area A12 - A13 NECOCW253 Blockwork, Upper Basement, Area 12 - Area 13 0 0% 12 01-Apr-13 15-Apr-13 37

478 NECP-Rebase_06Sep12-4.CO.1.8.3.8.13UB Area A12 - A13 NECOCW263 Installation of Sanitary pipes 0 0% 6 10-Apr-13 17-Apr-13 37

479 NECP-Rebase_06Sep12-4.CO.1.8.3.8.13UB Area A12 - A13 NECOCW273 Small power conduits 0 0% 6 10-Apr-13 17-Apr-13 37

480 M4a-Receipt of Revised IFC Drawgs for Substation in UB Slab Area 12M4a-Receipt of Revised IFC Drawgs for Substation in UB Slab Area 12M4a-Receipt of Revised IFC Drawgs for Substation in UB Slab Area 12M4a-Receipt of Revised IFC Drawgs for Substation in UB Slab Area 12 0 0 25-Nov-12 28-Jan-13

481 NECP-Rebase_06Sep12-4.CO.1.10M4a-Receipt of Revised IFC Drawgs for Substation in UB Slab Area 12NECOLBSS3000 Submit Revised Shop Dwgs, Upper Basement Slab Area 12 0 100% 0 25-Nov-12 09-Dec-12

482 NECP-Rebase_06Sep12-4.CO.1.10M4a-Receipt of Revised IFC Drawgs for Substation in UB Slab Area 12NECOLBSS3010 Approve Revised Shop Dwgs, Upper Basement Slab Area 12 0 100% 0 10-Dec-12 27-Dec-12

483 NECP-Rebase_06Sep12-4.CO.1.10M4a-Receipt of Revised IFC Drawgs for Substation in UB Slab Area 12NECOLBSS3020 Re-Submit Revised Shop Dwgs, Upper Basement Slab Area 12 0 100% 0 28-Dec-12 13-Jan-13

484 NECP-Rebase_06Sep12-4.CO.1.10M4a-Receipt of Revised IFC Drawgs for Substation in UB Slab Area 12NECOLBSS3030 Approve Re-Submitted Revised Shop Dwgs, Upper Basement Slab Area 12 0 100% 0 14-Jan-13 28-Jan-13

485 M4b-Const. Compl. of Phase (1) West Elevation Facade Axis A-M, Bkfl & All Necessary External WorksM4b-Const. Compl. of Phase (1) West Elevation Facade Axis A-M, Bkfl & All Necessary External WorksM4b-Const. Compl. of Phase (1) West Elevation Facade Axis A-M, Bkfl & All Necessary External WorksM4b-Const. Compl. of Phase (1) West Elevation Facade Axis A-M, Bkfl & All Necessary External Works 0 103 31-Jan-13 30-May-13 0

486 West Facade ElevationWest Facade ElevationWest Facade ElevationWest Facade Elevation 0 103 31-Jan-13 30-May-13 0

487 External Staircase Shop Dwgs Submittals & ApprovalsExternal Staircase Shop Dwgs Submittals & ApprovalsExternal Staircase Shop Dwgs Submittals & ApprovalsExternal Staircase Shop Dwgs Submittals & Approvals 0 21 31-Jan-13 24-Feb-13 0

488 NECP-Rebase_06Sep12-4.CO.1.1.1.15External Staircase Shop Dwgs Submittals & ApprovalsNEENSDS1730 External RC Staircase Layout & Details 0 0% 7 31-Jan-13 07-Feb-13 0

489 NECP-Rebase_06Sep12-4.CO.1.1.1.15External Staircase Shop Dwgs Submittals & ApprovalsNEENSDS1740 External RC Staircase Layout & Details Approval 0 0% 14 09-Feb-13 24-Feb-13 0

490 External Staicase - Axis M-H/1External Staicase - Axis M-H/1External Staicase - Axis M-H/1External Staicase - Axis M-H/1 0 45 25-Feb-13 17-Apr-13 0

491 NECP-Rebase_06Sep12-4.CO.1.1.1.1External Staicase - Axis M-H/1NECOLBSS3060 External RC Staircase, Axis M-H/1 0 0% 45 25-Feb-13 17-Apr-13 0

492 External Staicase - Axis A-E/1External Staicase - Axis A-E/1External Staicase - Axis A-E/1External Staicase - Axis A-E/1 0 45 09-Apr-13 30-May-13 0

493 NECP-Rebase_06Sep12-4.CO.1.1.1.14External Staicase - Axis A-E/1NECOLBSS3070 External RC Staircase, Axis A-E/1 0 0% 45 09-Apr-13 30-May-13 0

494 M5a-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 1M5a-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 1M5a-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 1M5a-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 1 0 0 08-Sep-12 29-Oct-12

495 NECP-Rebase_06Sep12-4.CO.1.9M5a-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 1NECOUBSS3000 Submit Revised Shop Dwgs, Ground Floor Slab Area 1 0 100% 0 08-Sep-12 22-Sep-12

496 NECP-Rebase_06Sep12-4.CO.1.9M5a-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 1NECOUBSS3010 Approve Revised Shop Dwgs, Ground Floor Slab Area 1 0 100% 0 23-Sep-12 06-Oct-12

497 NECP-Rebase_06Sep12-4.CO.1.9M5a-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 1NECOUBSS3020 Re-Submit Revised Shop Dwgs, Ground Floor Slab Area 1 0 100% 0 07-Oct-12 14-Oct-12

498 NECP-Rebase_06Sep12-4.CO.1.9M5a-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 1NECOUBSS3030 Approve Re-Submitted Revised Shop Dwgs, Ground Floor Slab Area 1 0 100% 0 15-Oct-12 29-Oct-12

499 M5b-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 2M5b-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 2M5b-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 2M5b-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 2 0 0 13-Oct-12 08-Dec-12

500 NECP-Rebase_06Sep12-4.CO.1.12M5b-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 2NECOUBSS3040 Submit Revised Shop Dwgs, Ground Floor Slab Area 2 0 100% 0 13-Oct-12 28-Oct-12

501 NECP-Rebase_06Sep12-4.CO.1.12M5b-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 2NECOUBSS3050 Approve Revised Shop Dwgs, Ground Floor Slab Area 2 0 100% 0 29-Oct-12 13-Nov-12

502 NECP-Rebase_06Sep12-4.CO.1.12M5b-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 2NECOUBSS3060 Re-Submit Revised Shop Dwgs, Ground Floor Slab Area 2 0 100% 0 14-Nov-12 21-Nov-12

503 NECP-Rebase_06Sep12-4.CO.1.12M5b-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 2NECOUBSS3070 Approve Re-Submitted Revised Shop Dwgs, Ground Floor Slab Area 2 0 100% 0 22-Nov-12 08-Dec-12

504 M5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure FabricationM5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure FabricationM5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure FabricationM5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure Fabrication 127 35 21-Feb-12 17-Jul-12 03-Sep-12 28-Mar-13 07-May-13 9

505 NECP-Rebase_06Sep12-4.CO.1.11M5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure FabricationNEPRMTS1331 Suspend: Manufacture & Deliver Structural Steel (for 90 Days from 03Sep12) 0 100% 0 03-Sep-12 02-Dec-12

506 NECP-Rebase_06Sep12-4.CO.1.11M5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure FabricationNEPRMTS1332 Submit New Shop Drawings, PMS Structural Steel Works 0 100% 0 03-Dec-12 16-Dec-12

507 NECP-Rebase_06Sep12-4.CO.1.11M5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure FabricationNEPRMTS1333 Approve New Shop Drawings, PMS Structural Steel Works 0 100% 0 17-Dec-12 23-Dec-12

508 NECP-Rebase_06Sep12-4.CO.1.11M5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure FabricationNEPRMTS1334 Re-submit New Shop Drawings, PMS Structural Steel Works 0 100% 0 24-Dec-12 30-Dec-12

509 NECP-Rebase_06Sep12-4.CO.1.11M5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure FabricationNEPRMTS1335 Approve Re-submitted New Shop Drawings, PMS Structural Steel Works 0 100% 0 31-Dec-12 06-Jan-13

510 NECP-Rebase_06Sep12-4.CO.1.11M5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure FabricationNEPRMTS1336 Resume: Manufacture & Deliver Structural Steel (Frijns) 0 43.55% 35 07-Jan-13 28-Mar-13 07-May-13 0

511 NECP-Rebase_06Sep12-4.CO.1.11M5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure FabricationNEPRMTS2370 Manufacture & Deliver Aluminum Chaotic Facade (Alumco) 120 0% 30 29-Feb-12 17-Jul-12 28-Mar-13 01-May-13 14

512 NECP-Rebase_06Sep12-4.CO.1.11M5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure FabricationNEPRMTS2380 Manufacture & Deliver Glazing (Curtain Wall, Sliding Doors, Edge Glass, Rooflights) (Alumco)90 0% 30 29-Feb-12 12-Jun-12 28-Mar-13 01-May-13 14

513 NECP-Rebase_06Sep12-4.CO.1.11M5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure FabricationNEPRMTS2390 Manufacture & Deliver Aluminum/Steel Doors (by S/C), Louver Screens (Alumco)90 0% 30 21-Feb-12 04-Jun-12 28-Mar-13 01-May-13 0

514 M5c.2-Suspend Aluminum Painting from Grey to WhiteM5c.2-Suspend Aluminum Painting from Grey to WhiteM5c.2-Suspend Aluminum Painting from Grey to WhiteM5c.2-Suspend Aluminum Painting from Grey to White 0 21 02-Jan-13 03-Mar-13 27-Mar-13 0

515 NECP-Rebase_06Sep12-4.CO.1.13M5c.2-Suspend Aluminum Painting from Grey to WhiteNECOCW283 ASTAD Hold Order: 02Jan13 (Suspend Aluminum Painting of Structures from Grey to White)0 100% 0 02-Jan-13

516 NECP-Rebase_06Sep12-4.CO.1.13M5c.2-Suspend Aluminum Painting from Grey to WhiteNECOCW293 ASTAD Release Order: 03Mar13 (Assumed Decision Date of Aluminum Painting of Structures from Grey to White)0 0% 0 03-Mar-13 0

517 NECP-Rebase_06Sep12-4.CO.1.13M5c.2-Suspend Aluminum Painting from Grey to WhiteNEPRMTS2730 Submit New Color, PMS Structural Steel Works 0 0% 7 04-Mar-13 11-Mar-13 0

518 NECP-Rebase_06Sep12-4.CO.1.13M5c.2-Suspend Aluminum Painting from Grey to WhiteNEPRMTS2740 Approve New Color, PMS Structural Steel Works 0 0% 14 12-Mar-13 27-Mar-13 0

519 M5d-Const. Compl. of People Mover Station (Fit Out, MEP, Facade & All Necessary External Works)M5d-Const. Compl. of People Mover Station (Fit Out, MEP, Facade & All Necessary External Works)M5d-Const. Compl. of People Mover Station (Fit Out, MEP, Facade & All Necessary External Works)M5d-Const. Compl. of People Mover Station (Fit Out, MEP, Facade & All Necessary External Works) 215 131 22-Mar-12 28-Nov-12 23-Dec-12 28-Mar-13 28-Aug-13 0

520 People Mover Station (PMS)People Mover Station (PMS)People Mover Station (PMS)People Mover Station (PMS) 215 131 22-Mar-12 28-Nov-12 23-Dec-12 28-Mar-13 28-Aug-13 0

521 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOCW40 Completion of All Phase 1 Concrete Works - incl. Grd Floor Slabs Area 1 & 2 0 100% 0 22-Mar-12 23-Dec-12

522 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOCW150 Steel Structure (Frijns) 43 44% 24 28-Mar-12 16-May-12 17-Jan-13 28-Mar-13 25-Apr-13 0

523 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOBFW345 Blockworks, Public Services Area 0 0% 14 27-Apr-13 12-May-13 0

524 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOBFW360 Roofing & Insulation 60 0% 45 24-May-12 01-Aug-12 04-May-13 24-Jun-13 39

525 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOBFW350 Walls, Floor and Plaster Finish 14 0% 14 17-May-12 02-Jun-12 13-May-13 28-May-13 0

526 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOMEP250 Hydraulic Pipes, HVAC Works, Plumbing works 33 0% 33 03-Jun-12 10-Jul-12 13-May-13 19-Jun-13 0

527 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOBFW370 Aluminum Louvers, Aluminum Panels, Cladding, Handrails & Metal works (Alumco)40 0% 40 11-Jun-12 26-Jul-12 29-May-13 14-Jul-13 0

528 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOBFW430 Ceiling 45 0% 67 05-Sep-12 27-Oct-12 01-Jun-13 17-Aug-13 0

529 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOBFW380 Glazing (Alumco) 30 0% 30 09-Jul-12 12-Aug-12 15-Jun-13 18-Jul-13 0

530 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOBFW390 Screeds, Ramps 29 0% 29 17-Jul-12 19-Aug-12 23-Jun-13 25-Jul-13 10

531 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOBFW410 Chaotic Pattern Facade - PMS (Alumco) 55 0% 30 13-Aug-12 15-Oct-12 23-Jun-13 27-Jul-13 0

532 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOBFW400 Tiling 50 0% 30 02-Aug-12 29-Sep-12 26-Jun-13 30-Jul-13 10

533 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOCW160 Infrastructure - Roadways Interface with Rail Lines (NA?) 30 0% 30 16-Aug-12 19-Sep-12 26-Jun-13 30-Jul-13 10

534 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOMEP260 Electrical Works 45 0% 30 28-Aug-12 18-Oct-12 26-Jun-13 30-Jul-13 0

535 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOMEP270 Photovoltaic installations 50 0% 15 25-Sep-12 21-Nov-12 14-Jul-13 30-Jul-13 0

536 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOMEP280 Fall Protection - Cable System 12 0% 12 20-Aug-12 02-Sep-12 27-Jul-13 08-Aug-13 12

537 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOBFW420 Joinery 11 0% 11 20-Aug-12 01-Sep-12 27-Jul-13 07-Aug-13 13

538 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOBFW440 Access Walkways 15 0% 15 20-Sep-12 07-Oct-12 31-Jul-13 17-Aug-13 10

539 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOMEP290 EM Equipment (AHUs), Security Installation, Telephone Installation 30 0% 15 20-Oct-12 22-Nov-12 10-Aug-13 26-Aug-13 0

540 NECP-Rebase_06Sep12-4.CO.1.2.1People Mover Station (PMS)NECOBFW450 Painting, Finishing Works 5 0% 5 24-Nov-12 28-Nov-12 24-Aug-13 28-Aug-13 0

541 Architectural Works at Axis A-M/1Architectural Works at Axis A-M/1Architectural Works at Axis A-M/1Architectural Works at Axis A-M/1 0 49 30-Jun-13 25-Aug-13 124

542 NECP-Rebase_06Sep12-4.CO.1.14Architectural Works at Axis A-M/1NECOCW31 Metal Frame & Chaotic Screens, Axis 1 (Alumco) 0 0% 21 30-Jun-13 23-Jul-13 124

543 NECP-Rebase_06Sep12-4.CO.1.14Architectural Works at Axis A-M/1NECOCW32 Steel Railings and Glazed Balustrades, Axis 1 Ground Level (Alumco) 0 0% 14 24-Jul-13 08-Aug-13 124

544 NECP-Rebase_06Sep12-4.CO.1.14Architectural Works at Axis A-M/1NECOCW33 Glazed Curtain Wall Panels, Axis 1 (Alumco) 0 0% 14 10-Aug-13 25-Aug-13 124

545 Roofing & FacadeRoofing & FacadeRoofing & FacadeRoofing & Facade 80 80 12-Sep-12 15-Dec-12 08-May-13 08-Aug-13 78

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Small power conduits

Blockwork, Lower Basement, Area 7 - Area 8

Installation of Sanitary pipes

Small power conduits

Blockwork, Lower Basement, Area 9 - Area 10

Installation of Sanitary pipes

Small power conduits

Blockwork, Lower Basement, Area 11 - Area 12 - Area 13

Installation of Sanitary pipes

Small power conduits

Blockwork, Upper Basement, Area 1 - Area 2

Installaton of Rainwater pipes

Installation of Sanitary pipes

Small power conduits

Await CR for Blockwork Re-configuration (Managers Room), Siemens Control Room

Submit Shop Dwgs, Blockwork Re-configuration (Managers Room), Siemens Control Room

Approve Shop Dwgs, Blockwork Re-configuration (Managers Room), Siemens Control Room

Blockwork Re-configuration (Managers Room), Siemens Control Room

Small power conduits (Managers Room), Siemens Control Room

Blockwork, Upper Basement, Area 3 - Area 4

Installaton of Rainwater pipes

Installation of Sanitary pipes

Small power conduits

Blockwork, Upper Basement, Area 5 - Area 6

Installaton of Rainwater pipes

Installation of Sanitary pipes

Small power conduits

Blockwork, Upper Basement, Area 8 - Area 9

Installation of Sanitary pipes

Small power conduits

Blockwork, Upper Basement, Area 10 - Area 11

Installation of Sanitary pipes

Small power conduits

Blockwork, Upper Basement, Area 12 - Area 13

Installation of Sanitary pipes

Small power conduits

Submit Revised Shop Dwgs, Upper Basement Slab Area 12

Approve Revised Shop Dwgs, Upper Basement Slab Area 12

Re-Submit Revised Shop Dwgs, Upper Basement Slab Area 12

Approve Re-Submitted Revised Shop Dwgs, Upper Basement Slab Area 12

External RC Staircase Layout & Details

External RC Staircase Layout & Details Approval

External RC Staircase, Axis M-H/1

External RC Staircase, Axis A-E/1

Approve Re-Submitted Revised Shop Dwgs, Ground Floor Slab Area 1

Submit Revised Shop Dwgs, Ground Floor Slab Area 2

Approve Revised Shop Dwgs, Ground Floor Slab Area 2

Re-Submit Revised Shop Dwgs, Ground Floor Slab Area 2

Approve Re-Submitted Revised Shop Dwgs, Ground Floor Slab Area 2

Suspend: Manufacture & Deliver Structural Steel (for 90 Days from 03Sep12)

Submit New Shop Drawings, PMS Structural Steel Works

Approve New Shop Drawings, PMS Structural Steel Works

Re-submit New Shop Drawings, PMS Structural Steel Works

Approve Re-submitted New Shop Drawings, PMS Structural Steel Works

Resume: Manufacture & Deliver Structural Steel (Frijns)

Manufacture & Deliver Aluminum Chaotic Facade (Alumco)

Manufacture & Deliver Glazing (Curtain Wall, Sliding Doors, Edge Glass, Rooflights) (Alumco)

Manufacture & Deliver Aluminum/Steel Doors (by S/C), Louver Screens (Alumco)

ASTAD Hold Order: 02Jan13 (Suspend Aluminum Painting of Structures from Grey to White)

ASTAD Release Order: 03Mar13 (Assumed Decision Date of Aluminum Painting of Structures from Grey to White)

Submit New Color, PMS Structural Steel Works

Approve New Color, PMS Structural Steel Works

Completion of All Phase 1 Concrete Works - incl. Grd Floor Slabs Area 1 & 2

Steel Structure (Frijns)

Blockworks, Public Services Area

Roofing & Insulation

Walls, Floor and Plaster Finish

Hydraulic Pipes, HVAC Works, Plumbing works

Aluminum Louvers, Aluminum Panels, Cladding, Handrails & Metal works (Alumco)

Ceiling

Glazing (Alumco)

Screeds, Ramps

Chaotic Pattern Facade - PMS (Alumco)

Tiling

Infrastructure - Roadways Interface with Rail Lines (NA?)

Electrical Works

Photovoltaic installations

Fall Protection - Cable System

Joinery

Access Walkways

EM Equipment (AHUs), Security Installation, Telephone Installation

Painting, Finishing Works

Metal Frame & Chaotic Screens, Axis 1 (Alumco)

Steel Railings and Glazed Balustrades, Axis 1 Ground Level (Alumco)

Glazed Curtain Wall Panels, Axis 1 (Alumco)

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 5 of 19/27-Feb-13 09:03

Page 6: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

546 NECP-Rebase_06Sep12-4.CO.1.P11Roofing & Facade NECOBFW30 Roofing Insulation Works, Area A9-A10 20 0% 20 12-Sep-12 06-Oct-12 08-May-13 30-May-13 78

547 NECP-Rebase_06Sep12-4.CO.1.P11Roofing & Facade NECOBFW60 Roofing Membrane and Ballast Gravel, Area A9-A10 20 0% 20 06-Oct-12 29-Oct-12 01-Jun-13 23-Jun-13 78

548 NECP-Rebase_06Sep12-4.CO.1.P11Roofing & Facade NECOBFW40 Stainless Steel Capping & Flashing, Area A9-A10 20 0% 20 29-Oct-12 21-Nov-12 24-Jun-13 16-Jul-13 78

549 NECP-Rebase_06Sep12-4.CO.1.P11Roofing & Facade NECOBFW50 Stainless Steel Soffit Panels, Area A9-A10 20 0% 20 21-Nov-12 15-Dec-12 17-Jul-13 08-Aug-13 78

550 Steel Frame for Walway Canopies & Intrepretive CentreSteel Frame for Walway Canopies & Intrepretive CentreSteel Frame for Walway Canopies & Intrepretive CentreSteel Frame for Walway Canopies & Intrepretive Centre 70 70 02-Aug-12 23-Oct-12 28-Mar-13 17-Jun-13 79

551 NECP-Rebase_06Sep12-4.CO.1.P1Steel Frame for Walway Canopies & Intrepretive CentreNECOCW100 Steel frame for Walkway Canopies (Frijns) 35 0% 35 02-Aug-12 12-Sep-12 28-Mar-13 07-May-13 78

552 NECP-Rebase_06Sep12-4.CO.1.P1Steel Frame for Walway Canopies & Intrepretive CentreNECOCW110 Steel frame for Interpretive Center (Alumco) 35 0% 35 12-Sep-12 23-Oct-12 08-May-13 17-Jun-13 79

553 Interpretive CentreInterpretive CentreInterpretive CentreInterpretive Centre 108 94 03-Apr-13 06-Aug-13 18-Jun-13 05-Oct-13 88

554 NECP-Rebase_06Sep12-4.CO.1.3Interpretive Centre NECOBFW300 Canopies A, Area A5-A6 14 0% 14 03-Apr-13 18-Apr-13 18-Jun-13 03-Jul-13 79

555 NECP-Rebase_06Sep12-4.CO.1.3Interpretive Centre NECOBFW310 Canopies B, Area A5-A6 14 0% 14 20-Apr-13 05-May-13 04-Jul-13 20-Jul-13 79

556 NECP-Rebase_06Sep12-4.CO.1.3Interpretive Centre NECOBFW320 Canopies A, Area A7-A8 14 0% 14 06-May-13 21-May-13 04-Jul-13 20-Jul-13 79

557 NECP-Rebase_06Sep12-4.CO.1.3Interpretive Centre NECOBFW330 Canopies B, Area A7-A8 14 0% 14 22-May-13 06-Jun-13 21-Jul-13 05-Aug-13 79

558 NECP-Rebase_06Sep12-4.CO.1.3Interpretive Centre NECOBFW260 Screed & Tiles, Area A5-A6, Area A7-A8 18 0% 18 08-Jun-13 27-Jun-13 06-Aug-13 26-Aug-13 79

559 NECP-Rebase_06Sep12-4.CO.1.3Interpretive Centre NECOBFW240 Curtain Wall, Area A5-A6, Area A7-A8 (Alumco) 14 0% 14 29-Jun-13 14-Jul-13 27-Aug-13 11-Sep-13 79

560 NECP-Rebase_06Sep12-4.CO.1.3Interpretive Centre NECOBFW270 Cladding & Insulation, Area A5-A6, Area A7-A8 (Alumco) 20 0% 20 29-Jun-13 21-Jul-13 27-Aug-13 18-Sep-13 79

561 NECP-Rebase_06Sep12-4.CO.1.3Interpretive Centre NECOBFW280 Doors 10 0% 10 22-Jul-13 01-Aug-13 19-Sep-13 30-Sep-13 88

562 NECP-Rebase_06Sep12-4.CO.1.3Interpretive Centre NECOBFW290 Removable Panels 14 0% 14 22-Jul-13 06-Aug-13 19-Sep-13 05-Oct-13 88

563 MEP WorksMEP WorksMEP WorksMEP Works 318 258 16-May-12 21-May-13 29-Dec-12 31-Jan-13 30-Nov-13 40

564 Lower Basement FloorLower Basement FloorLower Basement FloorLower Basement Floor 291 255 17-Jun-12 21-May-13 29-Dec-12 31-Jan-13 26-Nov-13 43

565 PHASE 1 LOWER BASEMENT - BLACK STEEL PIPESPHASE 1 LOWER BASEMENT - BLACK STEEL PIPESPHASE 1 LOWER BASEMENT - BLACK STEEL PIPESPHASE 1 LOWER BASEMENT - BLACK STEEL PIPES 77 70 25-Jun-12 22-Sep-12 02-May-13 23-Jul-13 32

566 NECP-Rebase_06Sep12-4.CO.1.6.1.1PHASE 1 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP1505 Black Steel Pipes, CHW, Area A1 8 0% 7 25-Jun-12 03-Jul-12 02-May-13 11-May-13 32

567 NECP-Rebase_06Sep12-4.CO.1.6.1.1PHASE 1 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP1515 Black Steel Pipes, CHW, Area A2 8 0% 7 04-Jul-12 12-Jul-12 11-May-13 19-May-13 32

568 NECP-Rebase_06Sep12-4.CO.1.6.1.1PHASE 1 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP1525 Black Steel Pipes, CHW, Area A3 8 0% 7 14-Jul-12 22-Jul-12 19-May-13 27-May-13 32

569 NECP-Rebase_06Sep12-4.CO.1.6.1.1PHASE 1 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP1535 Black Steel Pipes, CHW, Area A4 8 0% 7 23-Jul-12 31-Jul-12 27-May-13 04-Jun-13 32

570 NECP-Rebase_06Sep12-4.CO.1.6.1.1PHASE 1 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP1545 Black Steel Pipes, CHW, Area A5 8 0% 7 01-Aug-12 09-Aug-12 04-Jun-13 12-Jun-13 32

571 NECP-Rebase_06Sep12-4.CO.1.6.1.1PHASE 1 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP1555 Black Steel Pipes, CHW, Area A6 8 0% 7 11-Aug-12 19-Aug-12 12-Jun-13 20-Jun-13 32

572 NECP-Rebase_06Sep12-4.CO.1.6.1.1PHASE 1 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP1565 Black Steel Pipes, CHW, Area A7 8 0% 7 20-Aug-12 28-Aug-12 20-Jun-13 29-Jun-13 32

573 NECP-Rebase_06Sep12-4.CO.1.6.1.1PHASE 1 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP1575 Black Steel Pipes, CHW, Area A8 7 0% 7 29-Aug-12 05-Sep-12 29-Jun-13 07-Jul-13 32

574 NECP-Rebase_06Sep12-4.CO.1.6.1.1PHASE 1 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP1585 Black Steel Pipes, CHW, Area A9 7 0% 7 06-Sep-12 13-Sep-12 07-Jul-13 15-Jul-13 32

575 NECP-Rebase_06Sep12-4.CO.1.6.1.1PHASE 1 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP1595 Black Steel Pipes, CHW, Area A10 7 0% 7 15-Sep-12 22-Sep-12 15-Jul-13 23-Jul-13 32

576 PHASE 1 LOWER BASEMENT - SANITARY & FIRE FIGHTING PIPESPHASE 1 LOWER BASEMENT - SANITARY & FIRE FIGHTING PIPESPHASE 1 LOWER BASEMENT - SANITARY & FIRE FIGHTING PIPESPHASE 1 LOWER BASEMENT - SANITARY & FIRE FIGHTING PIPES 143 108 17-Jun-12 29-Nov-12 25-Apr-13 29-Aug-13 35

577 FIRE FIGHTING PIPESFIRE FIGHTING PIPESFIRE FIGHTING PIPESFIRE FIGHTING PIPES 79 60 17-Jun-12 16-Sep-12 25-Apr-13 04-Jul-13 42

578 NECP-Rebase_06Sep12-4.CO.1.6.1.8.1FIRE FIGHTING PIPES NECOMEP1300 Installation of Firefighting Pipes - Area A1 7 0% 6 17-Jun-12 24-Jun-12 25-Apr-13 02-May-13 32

579 NECP-Rebase_06Sep12-4.CO.1.6.1.8.1FIRE FIGHTING PIPES NECOMEP1310 Installation of Firefighting Pipes - Area A2 7 0% 6 25-Jun-12 02-Jul-12 02-May-13 09-May-13 42

580 NECP-Rebase_06Sep12-4.CO.1.6.1.8.1FIRE FIGHTING PIPES NECOMEP1320 Installation of Firefighting Pipes - Area A3 7 0% 6 03-Jul-12 10-Jul-12 09-May-13 16-May-13 42

581 NECP-Rebase_06Sep12-4.CO.1.6.1.8.1FIRE FIGHTING PIPES NECOMEP1330 Installation of Firefighting Pipes -Area A4 7 0% 6 11-Jul-12 18-Jul-12 16-May-13 23-May-13 42

582 NECP-Rebase_06Sep12-4.CO.1.6.1.8.1FIRE FIGHTING PIPES NECOMEP1340 Installation of Firefighting Pipes - Area A5 7 0% 6 19-Jul-12 26-Jul-12 23-May-13 30-May-13 42

583 NECP-Rebase_06Sep12-4.CO.1.6.1.8.1FIRE FIGHTING PIPES NECOMEP1350 Installation of Firefighting Pipes - Area A6 7 0% 6 30-Jul-12 06-Aug-12 30-May-13 06-Jun-13 42

584 NECP-Rebase_06Sep12-4.CO.1.6.1.8.1FIRE FIGHTING PIPES NECOMEP1360 Installation of Firefighting Pipes - Area A7 7 0% 6 09-Aug-12 16-Aug-12 06-Jun-13 13-Jun-13 42

585 NECP-Rebase_06Sep12-4.CO.1.6.1.8.1FIRE FIGHTING PIPES NECOMEP1370 Installation of Firefighting Pipes - Area A8 6 0% 6 20-Aug-12 26-Aug-12 13-Jun-13 20-Jun-13 42

586 NECP-Rebase_06Sep12-4.CO.1.6.1.8.1FIRE FIGHTING PIPES NECOMEP1380 Installation of Firefighting Pipes - Area A9 6 0% 6 30-Aug-12 05-Sep-12 20-Jun-13 27-Jun-13 42

587 NECP-Rebase_06Sep12-4.CO.1.6.1.8.1FIRE FIGHTING PIPES NECOMEP1390 Installation of Firefighting Pipes - Area A10 6 0% 6 10-Sep-12 16-Sep-12 27-Jun-13 04-Jul-13 42

588 SANITARY PIPESSANITARY PIPESSANITARY PIPESSANITARY PIPES 79 60 17-Jun-12 16-Sep-12 25-Apr-13 04-Jul-13 33

589 NECP-Rebase_06Sep12-4.CO.1.6.1.8.2SANITARY PIPES NECOMEP1301 Installation of Sanitary Pipes - Area A1 7 0% 6 17-Jun-12 24-Jun-12 25-Apr-13 02-May-13 32

590 NECP-Rebase_06Sep12-4.CO.1.6.1.8.2SANITARY PIPES NECOMEP1311 Installation of Sanitary Pipes - Area A2 7 0% 6 25-Jun-12 02-Jul-12 02-May-13 09-May-13 33

591 NECP-Rebase_06Sep12-4.CO.1.6.1.8.2SANITARY PIPES NECOMEP1321 Installation of Sanitary Pipes - Area A3 7 0% 6 03-Jul-12 10-Jul-12 09-May-13 16-May-13 33

592 NECP-Rebase_06Sep12-4.CO.1.6.1.8.2SANITARY PIPES NECOMEP1331 Installation of Sanitary Pipes -Area A4 7 0% 6 11-Jul-12 18-Jul-12 16-May-13 23-May-13 33

593 NECP-Rebase_06Sep12-4.CO.1.6.1.8.2SANITARY PIPES NECOMEP1341 Installation of Sanitary Pipes - Area A5 7 0% 6 19-Jul-12 26-Jul-12 23-May-13 30-May-13 33

594 NECP-Rebase_06Sep12-4.CO.1.6.1.8.2SANITARY PIPES NECOMEP1351 Installation of Sanitary Pipes - Area A6 7 0% 6 30-Jul-12 06-Aug-12 30-May-13 06-Jun-13 33

595 NECP-Rebase_06Sep12-4.CO.1.6.1.8.2SANITARY PIPES NECOMEP1361 Installation of Sanitary Pipes - Area A7 7 0% 6 09-Aug-12 16-Aug-12 06-Jun-13 13-Jun-13 33

596 NECP-Rebase_06Sep12-4.CO.1.6.1.8.2SANITARY PIPES NECOMEP1371 Installation of Sanitary Pipes - Area A8 6 0% 6 20-Aug-12 26-Aug-12 13-Jun-13 20-Jun-13 33

597 NECP-Rebase_06Sep12-4.CO.1.6.1.8.2SANITARY PIPES NECOMEP1381 Installation of Sanitary Pipes - Area A9 6 0% 6 30-Aug-12 05-Sep-12 20-Jun-13 27-Jun-13 33

598 NECP-Rebase_06Sep12-4.CO.1.6.1.8.2SANITARY PIPES NECOMEP1391 Installation of Sanitary Pipes - Area A10 6 0% 6 10-Sep-12 16-Sep-12 27-Jun-13 04-Jul-13 33

599 WATER SUPPLYWATER SUPPLYWATER SUPPLYWATER SUPPLY 62 54 19-Sep-12 29-Nov-12 27-Jun-13 29-Aug-13 35

600 NECP-Rebase_06Sep12-4.CO.1.6.1.8.3WATER SUPPLY NECOMEP6030 Installation of Water supply Pipes - Area A1 7 0% 6 19-Sep-12 26-Sep-12 27-Jun-13 04-Jul-13 33

601 NECP-Rebase_06Sep12-4.CO.1.6.1.8.3WATER SUPPLY NECOMEP6040 Installation of Water supply Pipes - Area A2 7 0% 6 27-Sep-12 04-Oct-12 04-Jul-13 11-Jul-13 33

602 NECP-Rebase_06Sep12-4.CO.1.6.1.8.3WATER SUPPLY NECOMEP6050 Installation of Water supply Pipes - Area A3 7 0% 6 06-Oct-12 13-Oct-12 11-Jul-13 18-Jul-13 33

603 NECP-Rebase_06Sep12-4.CO.1.6.1.8.3WATER SUPPLY NECOMEP6060 Installation of Water supply Pipes - Area A4 7 0% 6 14-Oct-12 21-Oct-12 18-Jul-13 25-Jul-13 33

604 NECP-Rebase_06Sep12-4.CO.1.6.1.8.3WATER SUPPLY NECOMEP6070 Installation of Water supply Pipes - Area A5 7 0% 6 22-Oct-12 29-Oct-12 25-Jul-13 01-Aug-13 33

605 NECP-Rebase_06Sep12-4.CO.1.6.1.8.3WATER SUPPLY NECOMEP6080 Installation of Water supply Pipes - Area A6 7 0% 6 30-Oct-12 06-Nov-12 01-Aug-13 08-Aug-13 33

606 NECP-Rebase_06Sep12-4.CO.1.6.1.8.3WATER SUPPLY NECOMEP6090 Installation of Water supply Pipes - Area A7 7 0% 6 07-Nov-12 14-Nov-12 08-Aug-13 15-Aug-13 33

607 NECP-Rebase_06Sep12-4.CO.1.6.1.8.3WATER SUPPLY NECOMEP6000 Installation of Water supply Pipes - Area A8 7 0% 6 15-Nov-12 22-Nov-12 15-Aug-13 22-Aug-13 33

608 NECP-Rebase_06Sep12-4.CO.1.6.1.8.3WATER SUPPLY NECOMEP6010 Installation of Water supply Pipes - Area A9 6 0% 6 24-Nov-12 29-Nov-12 22-Aug-13 29-Aug-13 33

609 NECP-Rebase_06Sep12-4.CO.1.6.1.8.3WATER SUPPLY NECOMEP6020 Installation of Water supply Pipes - Area A10 6 0% 6 24-Nov-12 29-Nov-12 22-Aug-13 29-Aug-13 35

610 PHASE 1 LOWER BASEMENT - DUCTSPHASE 1 LOWER BASEMENT - DUCTSPHASE 1 LOWER BASEMENT - DUCTSPHASE 1 LOWER BASEMENT - DUCTS 125 66 25-Jun-12 17-Nov-12 04-May-13 18-Jul-13 59

611 INSTALLATIONINSTALLATIONINSTALLATIONINSTALLATION 77 60 25-Jun-12 22-Sep-12 04-May-13 11-Jul-13 41

612 NECP-Rebase_06Sep12-4.CO.1.6.1.9.1INSTALLATION NECOMEP1600 AC Ducts Installation works - Area A1 8 0% 6 25-Jun-12 03-Jul-12 04-May-13 09-May-13 41

613 NECP-Rebase_06Sep12-4.CO.1.6.1.9.1INSTALLATION NECOMEP1610 AC Ducts Installation works - Area A2 8 0% 6 04-Jul-12 12-Jul-12 11-May-13 16-May-13 41

614 NECP-Rebase_06Sep12-4.CO.1.6.1.9.1INSTALLATION NECOMEP1620 AC Ducts Installation works- Area A3 8 0% 6 14-Jul-12 22-Jul-12 18-May-13 23-May-13 41

615 NECP-Rebase_06Sep12-4.CO.1.6.1.9.1INSTALLATION NECOMEP1630 AC Ducts Installation works- Area A4 8 0% 6 23-Jul-12 31-Jul-12 25-May-13 30-May-13 41

616 NECP-Rebase_06Sep12-4.CO.1.6.1.9.1INSTALLATION NECOMEP1640 AC Ducts Installation works-Area A5 8 0% 6 01-Aug-12 09-Aug-12 01-Jun-13 06-Jun-13 41

617 NECP-Rebase_06Sep12-4.CO.1.6.1.9.1INSTALLATION NECOMEP1650 AC Ducts Installation works- Area A6 8 0% 6 11-Aug-12 19-Aug-12 08-Jun-13 13-Jun-13 41

618 NECP-Rebase_06Sep12-4.CO.1.6.1.9.1INSTALLATION NECOMEP1660 AC Ducts Installation works- Area A7 8 0% 6 20-Aug-12 28-Aug-12 15-Jun-13 20-Jun-13 41

619 NECP-Rebase_06Sep12-4.CO.1.6.1.9.1INSTALLATION NECOMEP1670 AC Ducts Installation works- Area A8 7 0% 6 29-Aug-12 05-Sep-12 22-Jun-13 27-Jun-13 41

620 NECP-Rebase_06Sep12-4.CO.1.6.1.9.1INSTALLATION NECOMEP1680 AC Ducts Installation works- Area A9 7 0% 6 06-Sep-12 13-Sep-12 29-Jun-13 04-Jul-13 41

621 NECP-Rebase_06Sep12-4.CO.1.6.1.9.1INSTALLATION NECOMEP1690 AC Ducts Installation works- Area A10 7 0% 6 15-Sep-12 22-Sep-12 06-Jul-13 11-Jul-13 41

622 INSULATIONINSULATIONINSULATIONINSULATION 79 60 18-Aug-12 17-Nov-12 11-May-13 18-Jul-13 59

623 NECP-Rebase_06Sep12-4.CO.1.6.1.9.2INSULATION NECOMEP5090 AC Ducts Insulation - Area A1 8 0% 6 18-Aug-12 26-Aug-12 11-May-13 16-May-13 54

624 NECP-Rebase_06Sep12-4.CO.1.6.1.9.2INSULATION NECOMEP5100 AC Ducts Insulation - Area A2 8 0% 6 27-Aug-12 04-Sep-12 18-May-13 23-May-13 54

625 NECP-Rebase_06Sep12-4.CO.1.6.1.9.2INSULATION NECOMEP5110 AC Ducts Insulation- Area A3 8 0% 6 05-Sep-12 13-Sep-12 25-May-13 30-May-13 54

626 NECP-Rebase_06Sep12-4.CO.1.6.1.9.2INSULATION NECOMEP5120 AC Ducts Insulation- Area A4 8 0% 6 15-Sep-12 23-Sep-12 01-Jun-13 06-Jun-13 54

627 NECP-Rebase_06Sep12-4.CO.1.6.1.9.2INSULATION NECOMEP5130 AC Ducts Insulation-Area A5 8 0% 6 24-Sep-12 02-Oct-12 08-Jun-13 13-Jun-13 59

628 NECP-Rebase_06Sep12-4.CO.1.6.1.9.2INSULATION NECOMEP5140 AC Ducts Insulation- Area A6 9 0% 6 03-Oct-12 13-Oct-12 15-Jun-13 20-Jun-13 59

629 NECP-Rebase_06Sep12-4.CO.1.6.1.9.2INSULATION NECOMEP5150 AC Ducts Insulation- Area A7 9 0% 6 14-Oct-12 23-Oct-12 22-Jun-13 27-Jun-13 59

630 NECP-Rebase_06Sep12-4.CO.1.6.1.9.2INSULATION NECOMEP5160 AC Ducts Insulation- Area A8 7 0% 6 24-Oct-12 31-Oct-12 29-Jun-13 04-Jul-13 59

631 NECP-Rebase_06Sep12-4.CO.1.6.1.9.2INSULATION NECOMEP5170 AC Ducts Insulation- Area A9 7 0% 6 01-Nov-12 08-Nov-12 06-Jul-13 11-Jul-13 59

632 NECP-Rebase_06Sep12-4.CO.1.6.1.9.2INSULATION NECOMEP5180 AC Ducts Insulation- Area A10 7 0% 6 10-Nov-12 17-Nov-12 13-Jul-13 18-Jul-13 59

633 PHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMPHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMPHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMPHASE 1 LOWER BASEMENT - SPRINKLER SYSTEM 92 90 11-Aug-12 25-Nov-12 12-Jun-13 25-Sep-13 94

634 NECP-Rebase_06Sep12-4.CO.1.6.1.10PHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP1305 Sprinkler Head & Accessories , Area A1 10 0% 9 11-Aug-12 21-Aug-12 12-Jun-13 23-Jun-13 69

635 NECP-Rebase_06Sep12-4.CO.1.6.1.10PHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP1315 Sprinkler Head & Accessories, Area A2 10 0% 9 22-Aug-12 02-Sep-12 23-Jun-13 03-Jul-13 69

636 NECP-Rebase_06Sep12-4.CO.1.6.1.10PHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP1325 Sprinkler Head & Accessories, Area A3 9 0% 9 03-Sep-12 12-Sep-12 03-Jul-13 14-Jul-13 69

637 NECP-Rebase_06Sep12-4.CO.1.6.1.10PHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP1335 Sprinkler Head & Accessories, Area A4 9 0% 9 13-Sep-12 23-Sep-12 14-Jul-13 24-Jul-13 69

638 NECP-Rebase_06Sep12-4.CO.1.6.1.10PHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP1345 Sprinkler Head & Accessories, Area A5 9 0% 9 24-Sep-12 03-Oct-12 24-Jul-13 04-Aug-13 69

639 NECP-Rebase_06Sep12-4.CO.1.6.1.10PHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP1355 Sprinkler Head & Accessories, Area A6 9 0% 9 04-Oct-12 14-Oct-12 04-Aug-13 14-Aug-13 94

640 NECP-Rebase_06Sep12-4.CO.1.6.1.10PHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP1365 Sprinkler Head & Accessories, Area A7 9 0% 9 15-Oct-12 24-Oct-12 14-Aug-13 25-Aug-13 94

641 NECP-Rebase_06Sep12-4.CO.1.6.1.10PHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP1375 Sprinkler Head & Accessories, Area A8 9 0% 9 25-Oct-12 04-Nov-12 25-Aug-13 04-Sep-13 94

642 NECP-Rebase_06Sep12-4.CO.1.6.1.10PHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP1385 Sprinkler Head & Accessories, Area A9 9 0% 9 05-Nov-12 14-Nov-12 04-Sep-13 15-Sep-13 94

643 NECP-Rebase_06Sep12-4.CO.1.6.1.10PHASE 1 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP1395 Sprinkler Head & Accessories, Area A10 9 0% 9 15-Nov-12 25-Nov-12 15-Sep-13 25-Sep-13 94

644 PHASE 1 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTPHASE 1 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTPHASE 1 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTPHASE 1 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENT 35 35 21-Oct-12 29-Nov-12 08-Aug-13 18-Sep-13 17

645 NECP-Rebase_06Sep12-4.CO.1.6.1.11PHASE 1 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTNECOMEP1800 AC/Refrigeration Equip/Pumps, Supply & Ventilation Fans, Area A1-A4 15 0% 15 21-Oct-12 06-Nov-12 08-Aug-13 26-Aug-13 1

646 NECP-Rebase_06Sep12-4.CO.1.6.1.11PHASE 1 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTNECOMEP1810 AC/Refrigeration Equip/Pumps, Supply & Ventilation Fans, Area A5-A7 10 0% 10 07-Nov-12 18-Nov-12 26-Aug-13 07-Sep-13 17

647 NECP-Rebase_06Sep12-4.CO.1.6.1.11PHASE 1 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTNECOMEP1820 AC/Refrigeration Equip/Pumps, Supply & Ventilation Fans, Area A8-A10 10 0% 10 19-Nov-12 29-Nov-12 07-Sep-13 18-Sep-13 17

648 PHASE 1 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONSPHASE 1 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONSPHASE 1 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONSPHASE 1 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONS 60 46 12-Sep-12 20-Nov-12 23-May-13 16-Jul-13 57

649 NECP-Rebase_06Sep12-4.CO.1.6.1.12PHASE 1 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONSNECOMEP1230 Sump Pumps,Sewage Ejector pumps,Stormwater Pumps Installations, Area A1-A410 0% 10 12-Sep-12 23-Sep-12 23-May-13 04-Jun-13 73

650 NECP-Rebase_06Sep12-4.CO.1.6.1.12PHASE 1 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONSNECOMEP1240 Sump Pumps,Sewage Ejector pumps,Stormwater Pumps Installations, Area A5-A710 0% 10 29-Oct-12 08-Nov-12 13-Jun-13 25-Jun-13 65

651 NECP-Rebase_06Sep12-4.CO.1.6.1.12PHASE 1 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONSNECOMEP1250 Sump Pumps,Sewage Ejector pumps,Stormwater Pumps Installations, Area A8-A1010 0% 10 10-Nov-12 20-Nov-12 04-Jul-13 16-Jul-13 57

652 PHASE 1 LOWER BASEMENT - BMSPHASE 1 LOWER BASEMENT - BMSPHASE 1 LOWER BASEMENT - BMSPHASE 1 LOWER BASEMENT - BMS 103 108 11-Aug-12 08-Dec-12 17-Jul-13 21-Nov-13 0

653 WIRINGWIRINGWIRINGWIRING 54 28 11-Aug-12 11-Oct-12 17-Jul-13 18-Aug-13 0

654 NECP-Rebase_06Sep12-4.CO.1.6.1.13.1WIRING NECOMEP1203 Building Management System Wiring, Area A1-A4 10 0% 10 11-Aug-12 21-Aug-12 17-Jul-13 28-Jul-13 0

655 NECP-Rebase_06Sep12-4.CO.1.6.1.13.1WIRING NECOMEP1213 Building Management System Wiring, Area A5-A7 9 0% 9 08-Sep-12 17-Sep-12 29-Jul-13 07-Aug-13 0

656 NECP-Rebase_06Sep12-4.CO.1.6.1.13.1WIRING NECOMEP1223 Building Management System Wiring, Area A8-A10 9 0% 9 02-Oct-12 11-Oct-12 08-Aug-13 18-Aug-13 0

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Roofing Insulation Works, Area A9-A10

Roofing Membrane and Ballast Gravel, Area A9-A10

Stainless Steel Capping & Flashing, Area A9-A10

Stainless Steel Soffit Panels, Area A9-A10

Steel frame for Walkway Canopies (Frijns)

Steel frame for Interpretive Center (Alumco)

Canopies A, Area A5-A6

Canopies B, Area A5-A6

Canopies A, Area A7-A8

Canopies B, Area A7-A8

Screed & Tiles, Area A5-A6, Area A7-A8

Curtain Wall, Area A5-A6, Area A7-A8 (Alumco)

Cladding & Insulation, Area A5-A6, Area A7-A8 (Alumco)

Doors

Removable Panels

Black Steel Pipes, CHW, Area A1

Black Steel Pipes, CHW, Area A2

Black Steel Pipes, CHW, Area A3

Black Steel Pipes, CHW, Area A4

Black Steel Pipes, CHW, Area A5

Black Steel Pipes, CHW, Area A6

Black Steel Pipes, CHW, Area A7

Black Steel Pipes, CHW, Area A8

Black Steel Pipes, CHW, Area A9

Black Steel Pipes, CHW, Area A10

Installation of Firefighting Pipes - Area A1

Installation of Firefighting Pipes - Area A2

Installation of Firefighting Pipes - Area A3

Installation of Firefighting Pipes -Area A4

Installation of Firefighting Pipes - Area A5

Installation of Firefighting Pipes - Area A6

Installation of Firefighting Pipes - Area A7

Installation of Firefighting Pipes - Area A8

Installation of Firefighting Pipes - Area A9

Installation of Firefighting Pipes - Area A10

Installation of Sanitary Pipes - Area A1

Installation of Sanitary Pipes - Area A2

Installation of Sanitary Pipes - Area A3

Installation of Sanitary Pipes -Area A4

Installation of Sanitary Pipes - Area A5

Installation of Sanitary Pipes - Area A6

Installation of Sanitary Pipes - Area A7

Installation of Sanitary Pipes - Area A8

Installation of Sanitary Pipes - Area A9

Installation of Sanitary Pipes - Area A10

Installation of Water supply Pipes - Area A1

Installation of Water supply Pipes - Area A2

Installation of Water supply Pipes - Area A3

Installation of Water supply Pipes - Area A4

Installation of Water supply Pipes - Area A5

Installation of Water supply Pipes - Area A6

Installation of Water supply Pipes - Area A7

Installation of Water supply Pipes - Area A8

Installation of Water supply Pipes - Area A9

Installation of Water supply Pipes - Area A10

AC Ducts Installation works - Area A1

AC Ducts Installation works - Area A2

AC Ducts Installation works- Area A3

AC Ducts Installation works- Area A4

AC Ducts Installation works-Area A5

AC Ducts Installation works- Area A6

AC Ducts Installation works- Area A7

AC Ducts Installation works- Area A8

AC Ducts Installation works- Area A9

AC Ducts Installation works- Area A10

AC Ducts Insulation - Area A1

AC Ducts Insulation - Area A2

AC Ducts Insulation- Area A3

AC Ducts Insulation- Area A4

AC Ducts Insulation-Area A5

AC Ducts Insulation- Area A6

AC Ducts Insulation- Area A7

AC Ducts Insulation- Area A8

AC Ducts Insulation- Area A9

AC Ducts Insulation- Area A10

Sprinkler Head & Accessories , Area A1

Sprinkler Head & Accessories, Area A2

Sprinkler Head & Accessories, Area A3

Sprinkler Head & Accessories, Area A4

Sprinkler Head & Accessories, Area A5

Sprinkler Head & Accessories, Area A6

Sprinkler Head & Accessories, Area A7

Sprinkler Head & Accessories, Area A8

Sprinkler Head & Accessories, Area A9

Sprinkler Head & Accessories, Area A10

AC/Refrigeration Equip/Pumps, Supply & Ventilation Fans, Area A1-A4

AC/Refrigeration Equip/Pumps, Supply & Ventilation Fans, Area A5-A7

AC/Refrigeration Equip/Pumps, Supply & Ventilation Fans, Area A8-A10

Sump Pumps,Sewage Ejector pumps,Stormwater Pumps Installations, Area A1-A4

Sump Pumps,Sewage Ejector pumps,Stormwater Pumps Installations, Area A5-A7

Sump Pumps,Sewage Ejector pumps,Stormwater Pumps Installations, Area A8-A10

Building Management System Wiring, Area A1-A4

Building Management System Wiring, Area A5-A7

Building Management System Wiring, Area A8-A10

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 6 of 19/27-Feb-13 09:03

Page 7: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

657 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 27 64 07-Nov-12 08-Dec-12 07-Sep-13 21-Nov-13 0

658 NECP-Rebase_06Sep12-4.CO.1.6.1.13.2DEVICE INSTALLATION NECOMEP5200 Building Management System Devices Installation,Area A5-A7 7 0% 7 19-Nov-12 26-Nov-12 07-Sep-13 15-Sep-13 33

659 NECP-Rebase_06Sep12-4.CO.1.6.1.13.2DEVICE INSTALLATION NECOMEP5210 Building Management System Devices Installation,, Area A8-A10 7 0% 7 01-Dec-12 08-Dec-12 18-Sep-13 26-Sep-13 30

660 NECP-Rebase_06Sep12-4.CO.1.6.1.13.2DEVICE INSTALLATION NECOMEP5190 Building Management System Devices Installation, Area A1-A4 7 0% 7 07-Nov-12 14-Nov-12 14-Nov-13 21-Nov-13 0

661 PHASE 1 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONPHASE 1 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONPHASE 1 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONPHASE 1 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATION 24 56 16-Dec-12 12-Jan-13 08-Aug-13 12-Oct-13 33

662 NECP-Rebase_06Sep12-4.CO.1.6.1.14PHASE 1 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONNECOMEP1290 Cold Water & Hot Water Pipe, Booster Pumps & Firefighting Pumps Installation, Area A1-A48 0% 8 16-Dec-12 24-Dec-12 08-Aug-13 17-Aug-13 63

663 NECP-Rebase_06Sep12-4.CO.1.6.1.14PHASE 1 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONNECOMEP1500 Cold Water & Hot Water Pipe, Booster Pumps & Firefighting Pumps Installation, Area A5-A77 0% 7 25-Dec-12 01-Jan-13 18-Aug-13 25-Aug-13 67

664 NECP-Rebase_06Sep12-4.CO.1.6.1.14PHASE 1 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONNECOMEP1510 Cold Water & Hot Water Pipe, Booster Pumps & Firefighting Pumps Installation, Area A8-A107 0% 7 05-Jan-13 12-Jan-13 03-Oct-13 12-Oct-13 33

665 PHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGPHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGPHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGPHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKING 77 105 04-Jul-12 01-Oct-12 29-Dec-12 31-Jan-13 02-Jun-13 72

666 NECP-Rebase_06Sep12-4.CO.1.6.1.15PHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1725 Cable Trays, Cable Ladders, Cable Trunking, Area A3 8 8.99% 5 23-Jul-12 31-Jul-12 29-Dec-12 31-Jan-13 06-Feb-13 153

667 NECP-Rebase_06Sep12-4.CO.1.6.1.15PHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1735 Cable Trays, Cable Ladders, Cable Trunking, Area A4 8 8.99% 5 01-Aug-12 09-Aug-12 22-Jan-13 31-Jan-13 06-Feb-13 138

668 NECP-Rebase_06Sep12-4.CO.1.6.1.15PHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1745 Cable Trays, Cable Ladders, Cable Trunking, Area A5 8 8.99% 5 11-Aug-12 19-Aug-12 07-Jan-13 31-Jan-13 06-Feb-13 171

669 NECP-Rebase_06Sep12-4.CO.1.6.1.15PHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1755 Cable Trays, Cable Ladders, Cable Trunking, Area A6 8 8.99% 5 20-Aug-12 28-Aug-12 20-Jan-13 31-Jan-13 06-Feb-13 171

670 NECP-Rebase_06Sep12-4.CO.1.6.1.15PHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1765 Cable Trays, Cable Ladders, Cable Trunking, Area A7 8 8.99% 5 29-Aug-12 06-Sep-12 17-Jan-13 31-Jan-13 06-Feb-13 148

671 NECP-Rebase_06Sep12-4.CO.1.6.1.15PHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1775 Cable Trays, Cable Ladders, Cable Trunking, Area A8 7 8.99% 5 08-Sep-12 15-Sep-12 20-Jan-13 31-Jan-13 06-Feb-13 140

672 NECP-Rebase_06Sep12-4.CO.1.6.1.15PHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1785 Cable Trays, Cable Ladders, Cable Trunking, Area A9 7 8.99% 5 16-Sep-12 23-Sep-12 19-Jan-13 31-Jan-13 06-Feb-13 151

673 NECP-Rebase_06Sep12-4.CO.1.6.1.15PHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1795 Cable Trays, Cable Ladders, Cable Trunking, Area A10 7 0% 6 24-Sep-12 01-Oct-12 13-Feb-13 20-Feb-13 145

674 NECP-Rebase_06Sep12-4.CO.1.6.1.15PHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1705 Cable Trays, Cable Ladders, Cable Trunking, Area A1 8 0% 6 04-Jul-12 12-Jul-12 19-May-13 26-May-13 54

675 NECP-Rebase_06Sep12-4.CO.1.6.1.15PHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1715 Cable Trays, Cable Ladders, Cable Trunking, Area A2 8 0% 6 14-Jul-12 22-Jul-12 26-May-13 02-Jun-13 54

676 PHASE 1 LOWER BASEMENT - BUS DUCT, BUS BARPHASE 1 LOWER BASEMENT - BUS DUCT, BUS BARPHASE 1 LOWER BASEMENT - BUS DUCT, BUS BARPHASE 1 LOWER BASEMENT - BUS DUCT, BUS BAR 73 60 25-Jul-12 17-Oct-12 06-Aug-13 16-Oct-13 0

677 BUS DUCTBUS DUCTBUS DUCTBUS DUCT 73 60 25-Jul-12 17-Oct-12 06-Aug-13 16-Oct-13 0

678 NECP-Rebase_06Sep12-4.CO.1.6.1.16.1BUS DUCT NECOMEP3790 Bus Duct - Area A1 7 0% 6 25-Jul-12 01-Aug-12 06-Aug-13 12-Aug-13 18

679 NECP-Rebase_06Sep12-4.CO.1.6.1.16.1BUS DUCT NECOMEP3800 Bus Duct - Area A2 7 0% 6 02-Aug-12 09-Aug-12 13-Aug-13 19-Aug-13 18

680 NECP-Rebase_06Sep12-4.CO.1.6.1.16.1BUS DUCT NECOMEP3820 Bus Duct -Area A4 7 0% 6 19-Aug-12 26-Aug-12 27-Aug-13 02-Sep-13 12

681 NECP-Rebase_06Sep12-4.CO.1.6.1.16.1BUS DUCT NECOMEP3840 Bus Duct - Area A6 7 0% 6 04-Sep-12 11-Sep-12 10-Sep-13 16-Sep-13 6

682 NECP-Rebase_06Sep12-4.CO.1.6.1.16.1BUS DUCT NECOMEP3860 Bus Duct - Area A8 7 0% 6 20-Sep-12 27-Sep-12 24-Sep-13 30-Sep-13 0

683 NECP-Rebase_06Sep12-4.CO.1.6.1.16.1BUS DUCT NECOMEP3870 Bus Duct - Area A9 8 0% 6 29-Sep-12 07-Oct-12 01-Oct-13 07-Oct-13 0

684 NECP-Rebase_06Sep12-4.CO.1.6.1.16.1BUS DUCT NECOMEP3880 Bus Duct - Area A10 9 0% 6 08-Oct-12 17-Oct-12 08-Oct-13 16-Oct-13 0

685 BUS BARBUS BARBUS BARBUS BAR 73 60 25-Jul-12 17-Oct-12 06-Aug-13 16-Oct-13 0

686 NECP-Rebase_06Sep12-4.CO.1.6.1.16.2BUS BAR NECOMEP3690 Bus bar - Area A1 7 0% 6 25-Jul-12 01-Aug-12 06-Aug-13 12-Aug-13 0

687 NECP-Rebase_06Sep12-4.CO.1.6.1.16.2BUS BAR NECOMEP3700 Bus bar - Area A2 7 0% 6 02-Aug-12 09-Aug-12 13-Aug-13 19-Aug-13 0

688 NECP-Rebase_06Sep12-4.CO.1.6.1.16.2BUS BAR NECOMEP3710 Bus bar - Area A3 7 0% 6 11-Aug-12 18-Aug-12 20-Aug-13 26-Aug-13 0

689 NECP-Rebase_06Sep12-4.CO.1.6.1.16.2BUS BAR NECOMEP3720 Bus bar - Area A4 7 0% 6 19-Aug-12 26-Aug-12 27-Aug-13 02-Sep-13 0

690 NECP-Rebase_06Sep12-4.CO.1.6.1.16.2BUS BAR NECOMEP3730 Bus bar - Area A5 7 0% 6 27-Aug-12 03-Sep-12 03-Sep-13 09-Sep-13 0

691 NECP-Rebase_06Sep12-4.CO.1.6.1.16.2BUS BAR NECOMEP3740 Bus bar - Area A6 7 0% 6 04-Sep-12 11-Sep-12 10-Sep-13 16-Sep-13 0

692 NECP-Rebase_06Sep12-4.CO.1.6.1.16.2BUS BAR NECOMEP3750 Bus bar - Area A7 7 0% 6 12-Sep-12 19-Sep-12 17-Sep-13 23-Sep-13 0

693 NECP-Rebase_06Sep12-4.CO.1.6.1.16.2BUS BAR NECOMEP3760 Bus bar - Area A8 7 0% 6 20-Sep-12 27-Sep-12 24-Sep-13 30-Sep-13 0

694 NECP-Rebase_06Sep12-4.CO.1.6.1.16.2BUS BAR NECOMEP3770 Bus bar - Area A9 8 0% 6 29-Sep-12 07-Oct-12 01-Oct-13 07-Oct-13 0

695 NECP-Rebase_06Sep12-4.CO.1.6.1.16.2BUS BAR NECOMEP3780 Bus bar - Area A10 9 0% 6 08-Oct-12 17-Oct-12 08-Oct-13 16-Oct-13 0

696 PHASE 1 LOWER BASEMENT - TELEPHONE INSTALLATION CABLE TRAYSPHASE 1 LOWER BASEMENT - TELEPHONE INSTALLATION CABLE TRAYSPHASE 1 LOWER BASEMENT - TELEPHONE INSTALLATION CABLE TRAYSPHASE 1 LOWER BASEMENT - TELEPHONE INSTALLATION CABLE TRAYS 69 60 11-Aug-12 29-Oct-12 17-Jul-13 24-Sep-13 52

697 WIRINGWIRINGWIRINGWIRING 62 53 11-Aug-12 21-Oct-12 17-Jul-13 16-Sep-13 15

698 NECP-Rebase_06Sep12-4.CO.1.6.1.17.1WIRING NECOMEP1893 Telephone wiring works at Cable Trays, Area A1-A4 18 0% 18 11-Aug-12 30-Aug-12 17-Jul-13 06-Aug-13 15

699 NECP-Rebase_06Sep12-4.CO.1.6.1.17.1WIRING NECOMEP1903 Telephone wiring works at Cable Trays, Area A5-A7 18 0% 18 08-Sep-12 27-Sep-12 07-Aug-13 27-Aug-13 15

700 NECP-Rebase_06Sep12-4.CO.1.6.1.17.1WIRING NECOMEP1913 Telephone wiring works at Cable Trays, Area A8-A10 17 0% 17 02-Oct-12 21-Oct-12 28-Aug-13 16-Sep-13 15

701 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 51 42 01-Sep-12 29-Oct-12 07-Aug-13 24-Sep-13 52

702 NECP-Rebase_06Sep12-4.CO.1.6.1.17.2DEVICE INSTALLATION NECOMEP5220 Telephone Devices Installation, Area A1-A4 7 0% 7 01-Sep-12 08-Sep-12 07-Aug-13 14-Aug-13 57

703 NECP-Rebase_06Sep12-4.CO.1.6.1.17.2DEVICE INSTALLATION NECOMEP5230 Telephone Devices Installation, Area A5-A7 7 0% 7 29-Sep-12 06-Oct-12 28-Aug-13 04-Sep-13 54

704 NECP-Rebase_06Sep12-4.CO.1.6.1.17.2DEVICE INSTALLATION NECOMEP5240 Telephone Devices Installation, Area A8-A10 7 0% 7 22-Oct-12 29-Oct-12 17-Sep-13 24-Sep-13 52

705 PHASE 1 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 1)PHASE 1 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 1)PHASE 1 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 1)PHASE 1 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 1) 135 35 24-Oct-12 30-Mar-13 02-Oct-13 13-Nov-13 0

706 NECP-Rebase_06Sep12-4.CO.1.6.1.87PHASE 1 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 1)NECOMEP1103 Substation 1: Switchgear Installation, Area A10 45 0% 21 24-Oct-12 15-Dec-12 02-Oct-13 28-Oct-13 0

707 NECP-Rebase_06Sep12-4.CO.1.6.1.87PHASE 1 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 1)NECOMEP1113 Substation 1: Transformer Installation, Area A10 45 0% 21 16-Dec-12 05-Feb-13 10-Oct-13 05-Nov-13 0

708 NECP-Rebase_06Sep12-4.CO.1.6.1.87PHASE 1 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 1)NECOMEP1123 Substation 1: MV Panels Installation, Area A10 45 0% 21 06-Feb-13 30-Mar-13 21-Oct-13 13-Nov-13 0

709 PHASE 1 LOWER BASEMENT - ELEVATORSPHASE 1 LOWER BASEMENT - ELEVATORSPHASE 1 LOWER BASEMENT - ELEVATORSPHASE 1 LOWER BASEMENT - ELEVATORS 45 45 03-Jan-13 25-Feb-13 29-Apr-13 19-Jun-13 65

710 NECP-Rebase_06Sep12-4.CO.1.6.1.18PHASE 1 LOWER BASEMENT - ELEVATORSNECOMEP2840 Rails, Supports, Area A2 & Area A10 14 0% 14 03-Jan-13 20-Jan-13 29-Apr-13 14-May-13 65

711 NECP-Rebase_06Sep12-4.CO.1.6.1.18PHASE 1 LOWER BASEMENT - ELEVATORSNECOMEP2850 Car, Area A2 & Area A10 10 0% 10 20-Jan-13 31-Jan-13 15-May-13 26-May-13 65

712 NECP-Rebase_06Sep12-4.CO.1.6.1.18PHASE 1 LOWER BASEMENT - ELEVATORSNECOMEP2890 Hoist Machine, Lift Cables, Area A2 & Area A10 7 0% 7 31-Jan-13 09-Feb-13 27-May-13 03-Jun-13 65

713 NECP-Rebase_06Sep12-4.CO.1.6.1.18PHASE 1 LOWER BASEMENT - ELEVATORSNECOMEP2900 Electrical, Controls, Area A2 & Area A10 7 0% 7 09-Feb-13 17-Feb-13 04-Jun-13 11-Jun-13 65

714 NECP-Rebase_06Sep12-4.CO.1.6.1.18PHASE 1 LOWER BASEMENT - ELEVATORSNECOMEP2910 Frames, Doors, Area A2 & Area A10 7 0% 7 17-Feb-13 25-Feb-13 12-Jun-13 19-Jun-13 65

715 PHASE 1 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEMPHASE 1 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEMPHASE 1 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEMPHASE 1 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEM 135 35 24-Oct-12 30-Mar-13 17-Oct-13 26-Nov-13 0

716 NECP-Rebase_06Sep12-4.CO.1.6.1.19PHASE 1 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEMNECOMEP2970 Generator, Area A10 45 0% 21 24-Oct-12 15-Dec-12 17-Oct-13 10-Nov-13 0

717 NECP-Rebase_06Sep12-4.CO.1.6.1.19PHASE 1 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEMNECOMEP2980 UPS, Area A10 45 0% 21 16-Dec-12 05-Feb-13 26-Oct-13 18-Nov-13 0

718 NECP-Rebase_06Sep12-4.CO.1.6.1.19PHASE 1 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEMNECOMEP2990 Battery System, Area A10 45 0% 21 06-Feb-13 30-Mar-13 03-Nov-13 26-Nov-13 0

719 PHASE 1 LOWER BASEMENT - ESCALATORSPHASE 1 LOWER BASEMENT - ESCALATORSPHASE 1 LOWER BASEMENT - ESCALATORSPHASE 1 LOWER BASEMENT - ESCALATORS 30 30 10-Feb-13 16-Mar-13 13-May-13 16-Jun-13 74

720 NECP-Rebase_06Sep12-4.CO.1.6.1.20PHASE 1 LOWER BASEMENT - ESCALATORSNECOMEP3030 Steel Truss, Area A1-Area A2 6 0% 6 10-Feb-13 16-Feb-13 13-May-13 19-May-13 74

721 NECP-Rebase_06Sep12-4.CO.1.6.1.20PHASE 1 LOWER BASEMENT - ESCALATORSNECOMEP3040 Gear Assembly, Area A1-Area A2 7 0% 7 17-Feb-13 24-Feb-13 20-May-13 27-May-13 74

722 NECP-Rebase_06Sep12-4.CO.1.6.1.20PHASE 1 LOWER BASEMENT - ESCALATORSNECOMEP3050 Steps Assembly, Area A1-Area A2 7 0% 7 25-Feb-13 04-Mar-13 28-May-13 04-Jun-13 74

723 NECP-Rebase_06Sep12-4.CO.1.6.1.20PHASE 1 LOWER BASEMENT - ESCALATORSNECOMEP3060 Handrail, Area A1-Area A2 4 0% 4 05-Mar-13 09-Mar-13 05-Jun-13 09-Jun-13 74

724 NECP-Rebase_06Sep12-4.CO.1.6.1.20PHASE 1 LOWER BASEMENT - ESCALATORSNECOMEP3070 Electrical, Controls, Area A1-Area A2 6 0% 6 10-Mar-13 16-Mar-13 10-Jun-13 16-Jun-13 74

725 PHASE 1 LOWER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTSPHASE 1 LOWER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTSPHASE 1 LOWER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTSPHASE 1 LOWER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTS 66 47 18-Jul-12 02-Oct-12 17-Jul-13 09-Sep-13 0

726 WIRINGWIRINGWIRINGWIRING 41 36 18-Jul-12 03-Sep-12 17-Jul-13 27-Aug-13 4

727 NECP-Rebase_06Sep12-4.CO.1.6.1.21.1WIRING NECOMEP3130 Luminaires, Lighting Points, Switch Points, etc.Wiring works, Area A1-A4 13 0% 12 18-Jul-12 01-Aug-12 17-Jul-13 30-Jul-13 0

728 NECP-Rebase_06Sep12-4.CO.1.6.1.21.1WIRING NECOMEP3140 Luminaires, Lighting Points, Switch Points, etc.Wiring works, Area A5-A7 12 0% 12 02-Aug-12 15-Aug-12 31-Jul-13 13-Aug-13 4

729 NECP-Rebase_06Sep12-4.CO.1.6.1.21.1WIRING NECOMEP3150 Luminaires, Lighting Points, Switch Points, etc.Wiring works, Area A8-A10 12 0% 12 21-Aug-12 03-Sep-12 14-Aug-13 27-Aug-13 4

730 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 24 31 05-Sep-12 02-Oct-12 05-Aug-13 09-Sep-13 0

731 NECP-Rebase_06Sep12-4.CO.1.6.1.21.2DEVICE INSTALLATION NECOMEP5250 Luminaires, Lighting Points, Switch Points, etc.Installation, Area A1-A4 7 0% 7 05-Sep-12 12-Sep-12 05-Aug-13 12-Aug-13 0

732 NECP-Rebase_06Sep12-4.CO.1.6.1.21.2DEVICE INSTALLATION NECOMEP5260 Luminaires, Lighting Points, Switch Points, etc.Installation, Area A5-A7 7 0% 7 13-Sep-12 20-Sep-12 25-Aug-13 01-Sep-13 0

733 NECP-Rebase_06Sep12-4.CO.1.6.1.21.2DEVICE INSTALLATION NECOMEP5270 Luminaires, Lighting Points, Switch Points, etc.Installation, Area A8-A10 7 0% 7 25-Sep-12 02-Oct-12 02-Sep-13 09-Sep-13 0

734 PHASE 1 LOWER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATIONPHASE 1 LOWER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATIONPHASE 1 LOWER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATIONPHASE 1 LOWER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATION 52 47 04-Aug-12 02-Oct-12 25-Jul-13 17-Sep-13 0

735 WIRINGWIRINGWIRINGWIRING 38 36 04-Aug-12 16-Sep-12 25-Jul-13 04-Sep-13 0

736 NECP-Rebase_06Sep12-4.CO.1.6.1.22.1WIRING NECOMEP3250 Switchboard, Small power Wiring works, Area A1-A4 13 0% 12 04-Aug-12 18-Aug-12 25-Jul-13 07-Aug-13 0

737 NECP-Rebase_06Sep12-4.CO.1.6.1.22.1WIRING NECOMEP3260 Switchboard, Small power Wiring works, Area A5-A7 13 0% 12 19-Aug-12 02-Sep-12 08-Aug-13 21-Aug-13 0

738 NECP-Rebase_06Sep12-4.CO.1.6.1.22.1WIRING NECOMEP3270 Switchboard, Small power Wiring works, Area A8-A10 12 0% 12 03-Sep-12 16-Sep-12 22-Aug-13 04-Sep-13 0

739 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 39 21 19-Aug-12 02-Oct-12 25-Aug-13 17-Sep-13 0

740 NECP-Rebase_06Sep12-4.CO.1.6.1.22.2DEVICE INSTALLATION NECOMEP5280 Switchboard, Small power Installation, Area A1-A4 7 0% 7 19-Aug-12 26-Aug-12 25-Aug-13 01-Sep-13 0

741 NECP-Rebase_06Sep12-4.CO.1.6.1.22.2DEVICE INSTALLATION NECOMEP5290 Switchboard, Small power Installation, Area A5-A7 7 0% 7 03-Sep-12 10-Sep-12 02-Sep-13 09-Sep-13 0

742 NECP-Rebase_06Sep12-4.CO.1.6.1.22.2DEVICE INSTALLATION NECOMEP5300 Switchboard, Small power Installation, Area A8-A10 7 0% 7 25-Sep-12 02-Oct-12 10-Sep-13 17-Sep-13 0

743 PHASE 1 LOWER BASEMENT - SECURITY SYSTEMPHASE 1 LOWER BASEMENT - SECURITY SYSTEMPHASE 1 LOWER BASEMENT - SECURITY SYSTEMPHASE 1 LOWER BASEMENT - SECURITY SYSTEM 28 65 16-Sep-12 17-Oct-12 07-Sep-13 23-Nov-13 0

744 WIRINGWIRINGWIRINGWIRING 21 21 16-Sep-12 09-Oct-12 07-Sep-13 30-Sep-13 0

745 NECP-Rebase_06Sep12-4.CO.1.6.1.23.1WIRING NECOMEP3370 Security System Wiring, Area A1-A4 7 0% 7 16-Sep-12 23-Sep-12 07-Sep-13 14-Sep-13 0

746 NECP-Rebase_06Sep12-4.CO.1.6.1.23.1WIRING NECOMEP3380 Security System Wiring, Area A5-A7 7 0% 7 24-Sep-12 01-Oct-12 15-Sep-13 22-Sep-13 0

747 NECP-Rebase_06Sep12-4.CO.1.6.1.23.1WIRING NECOMEP3390 Security System Wiring, Area A8-A10 7 0% 7 02-Oct-12 09-Oct-12 23-Sep-13 30-Sep-13 0

748 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 21 44 24-Sep-12 17-Oct-12 01-Oct-13 23-Nov-13 0

749 NECP-Rebase_06Sep12-4.CO.1.6.1.23.2DEVICE INSTALLATION NECOMEP5320 Security System Devices Installation, Area A5-A7 7 0% 7 02-Oct-12 09-Oct-12 01-Oct-13 08-Oct-13 0

750 NECP-Rebase_06Sep12-4.CO.1.6.1.23.2DEVICE INSTALLATION NECOMEP5330 Security System Devices Installation,Area A8-A10 7 0% 7 10-Oct-12 17-Oct-12 09-Oct-13 19-Oct-13 0

751 NECP-Rebase_06Sep12-4.CO.1.6.1.23.2DEVICE INSTALLATION NECOMEP5310 Security System Devices Installation, Area A1-A4 7 0% 7 24-Sep-12 01-Oct-12 16-Nov-13 23-Nov-13 0

752 PHASE 1 LOWER BASEMENT - PARKING GUIDANCE SYSTEMPHASE 1 LOWER BASEMENT - PARKING GUIDANCE SYSTEMPHASE 1 LOWER BASEMENT - PARKING GUIDANCE SYSTEMPHASE 1 LOWER BASEMENT - PARKING GUIDANCE SYSTEM 174 64 16-Sep-12 06-Apr-13 07-Sep-13 21-Nov-13 0

753 WIRINGWIRINGWIRINGWIRING 21 21 16-Sep-12 09-Oct-12 07-Sep-13 30-Sep-13 0

754 NECP-Rebase_06Sep12-4.CO.1.6.1.24.1WIRING NECOMEP3490 Parking Guidance System Wiring works, Area A1-A4 7 0% 7 16-Sep-12 23-Sep-12 07-Sep-13 14-Sep-13 0

755 NECP-Rebase_06Sep12-4.CO.1.6.1.24.1WIRING NECOMEP3500 Parking Guidance System Wiring works, Area A5-A7 7 0% 7 24-Sep-12 01-Oct-12 15-Sep-13 22-Sep-13 0

756 NECP-Rebase_06Sep12-4.CO.1.6.1.24.1WIRING NECOMEP3510 Parking Guidance System Wiring works, Area A8-A10 7 0% 7 02-Oct-12 09-Oct-12 23-Sep-13 30-Sep-13 0

757 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 63 21 23-Jan-13 06-Apr-13 29-Oct-13 21-Nov-13 0

758 NECP-Rebase_06Sep12-4.CO.1.6.1.24.2DEVICE INSTALLATION NECOMEP5340 Parking Guidance System Devices Installation, Area A1-A4 7 0% 7 23-Jan-13 30-Jan-13 29-Oct-13 05-Nov-13 0

759 NECP-Rebase_06Sep12-4.CO.1.6.1.24.2DEVICE INSTALLATION NECOMEP5350 Parking Guidance System Devices Installation, Area A5-A7 7 0% 7 26-Feb-13 05-Mar-13 06-Nov-13 13-Nov-13 0

760 NECP-Rebase_06Sep12-4.CO.1.6.1.24.2DEVICE INSTALLATION NECOMEP5360 Parking Guidance System Devices Installation, Area A8-A10 7 0% 7 30-Mar-13 06-Apr-13 14-Nov-13 21-Nov-13 0

761 PHASE 1 LOWER BASEMENT - TELEMETRY/SCADAPHASE 1 LOWER BASEMENT - TELEMETRY/SCADAPHASE 1 LOWER BASEMENT - TELEMETRY/SCADAPHASE 1 LOWER BASEMENT - TELEMETRY/SCADA 31 31 07-Nov-12 12-Dec-12 26-Aug-13 30-Sep-13 43

762 WIRINGWIRINGWIRINGWIRING 15 15 07-Nov-12 24-Nov-12 26-Aug-13 11-Sep-13 0

763 NECP-Rebase_06Sep12-4.CO.1.6.1.25.1WIRING NECOMEP3610 Telemetry/SCADA, Wiring works - Area A1-A10 15 0% 15 07-Nov-12 24-Nov-12 26-Aug-13 11-Sep-13 0

764 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 16 16 25-Nov-12 12-Dec-12 12-Sep-13 30-Sep-13 43

765 NECP-Rebase_06Sep12-4.CO.1.6.1.25.2DEVICE INSTALLATION NECOMEP5380 Telemetry/SCADA, Device Installation- Area A1-A10 16 0% 16 25-Nov-12 12-Dec-12 12-Sep-13 30-Sep-13 43

766 PHASE 1 LOWER BASEMENT - FIRE ALARM SYSTEMPHASE 1 LOWER BASEMENT - FIRE ALARM SYSTEMPHASE 1 LOWER BASEMENT - FIRE ALARM SYSTEMPHASE 1 LOWER BASEMENT - FIRE ALARM SYSTEM 154 30 24-Nov-12 21-May-13 11-Sep-13 17-Oct-13 30

767 WIRINGWIRINGWIRINGWIRING 15 15 24-Nov-12 10-Dec-12 11-Sep-13 28-Sep-13 0

768 NECP-Rebase_06Sep12-4.CO.1.6.1.26.1WIRING NECOMEP3650 Fire Alarm Wiring, Area A1-A10 15 0% 15 24-Nov-12 10-Dec-12 11-Sep-13 28-Sep-13 0

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Building Management System Devices Installation,Area A5-A7

Building Management System Devices Installation,, Area A8-A10

Building Management System Devices Installation, Area A1-A4

Cold Water & Hot Water Pipe, Booster Pumps & Firefighting Pumps Installation, Area A1-A4

Cold Water & Hot Water Pipe, Booster Pumps & Firefighting Pumps Installation, Area A5-A7

Cold Water & Hot Water Pipe, Booster Pumps & Firefighting Pumps Installation, Area A8-A10

Cable Trays, Cable Ladders, Cable Trunking, Area A3

Cable Trays, Cable Ladders, Cable Trunking, Area A4

Cable Trays, Cable Ladders, Cable Trunking, Area A5

Cable Trays, Cable Ladders, Cable Trunking, Area A6

Cable Trays, Cable Ladders, Cable Trunking, Area A7

Cable Trays, Cable Ladders, Cable Trunking, Area A8

Cable Trays, Cable Ladders, Cable Trunking, Area A9

Cable Trays, Cable Ladders, Cable Trunking, Area A10

Cable Trays, Cable Ladders, Cable Trunking, Area A1

Cable Trays, Cable Ladders, Cable Trunking, Area A2

Bus Duct - Area A1

Bus Duct - Area A2

Bus Duct -Area A4

Bus Duct - Area A6

Bus Duct - Area A8

Bus Duct - Area A9

Bus Duct - Area A10

Bus bar - Area A1

Bus bar - Area A2

Bus bar - Area A3

Bus bar - Area A4

Bus bar - Area A5

Bus bar - Area A6

Bus bar - Area A7

Bus bar - Area A8

Bus bar - Area A9

Bus bar - Area A10

Telephone wiring works at Cable Trays, Area A1-A4

Telephone wiring works at Cable Trays, Area A5-A7

Telephone wiring works at Cable Trays, Area A8-A10

Telephone Devices Installation, Area A1-A4

Telephone Devices Installation, Area A5-A7

Telephone Devices Installation, Area A8-A10

Substation 1: Switchgear Installation, Area A10

Substation 1: Transformer Installation, Area A10

Substation 1: MV Panels Installation, Area A10

Rails, Supports, Area A2 & Area A10

Car, Area A2 & Area A10

Hoist Machine, Lift Cables, Area A2 & Area A10

Electrical, Controls, Area A2 & Area A10

Frames, Doors, Area A2 & Area A10

Generator, Area A10

UPS, Area A10

Battery System, Area A10

Steel Truss, Area A1-Area A2

Gear Assembly, Area A1-Area A2

Steps Assembly, Area A1-Area A2

Handrail, Area A1-Area A2

Electrical, Controls, Area A1-Area A2

Luminaires, Lighting Points, Switch Points, etc.Wiring works, Area A1-A4

Luminaires, Lighting Points, Switch Points, etc.Wiring works, Area A5-A7

Luminaires, Lighting Points, Switch Points, etc.Wiring works, Area A8-A10

Luminaires, Lighting Points, Switch Points, etc.Installation, Area A1-A4

Luminaires, Lighting Points, Switch Points, etc.Installation, Area A5-A7

Luminaires, Lighting Points, Switch Points, etc.Installation, Area A8-A10

Switchboard, Small power Wiring works, Area A1-A4

Switchboard, Small power Wiring works, Area A5-A7

Switchboard, Small power Wiring works, Area A8-A10

Switchboard, Small power Installation, Area A1-A4

Switchboard, Small power Installation, Area A5-A7

Switchboard, Small power Installation, Area A8-A10

Security System Wiring, Area A1-A4

Security System Wiring, Area A5-A7

Security System Wiring, Area A8-A10

Security System Devices Installation, Area A5-A7

Security System Devices Installation,Area A8-A10

Security System Devices Installation, Area A1-A4

Parking Guidance System Wiring works, Area A1-A4

Parking Guidance System Wiring works, Area A5-A7

Parking Guidance System Wiring works, Area A8-A10

Parking Guidance System Devices Installation, Area A1-A4

Parking Guidance System Devices Installation, Area A5-A7

Parking Guidance System Devices Installation, Area A8-A10

Telemetry/SCADA, Wiring works - Area A1-A10

Telemetry/SCADA, Device Installation- Area A1-A10

Fire Alarm Wiring, Area A1-A10

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 7 of 19/27-Feb-13 09:03

Page 8: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

769 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 15 15 05-May-13 21-May-13 29-Sep-13 17-Oct-13 30

770 NECP-Rebase_06Sep12-4.CO.1.6.1.26.2DEVICE INSTALLATION NECOMEP5370 Fire Alarm Device Installation, Area A1-A10 15 0% 15 05-May-13 21-May-13 29-Sep-13 17-Oct-13 30

771 Upper Basement FloorUpper Basement FloorUpper Basement FloorUpper Basement Floor 295 223 16-May-12 24-Apr-13 12-Mar-13 30-Nov-13 40

772 PHASE 1 UPPER BASEMENT - BLACK STEEL PIPESPHASE 1 UPPER BASEMENT - BLACK STEEL PIPESPHASE 1 UPPER BASEMENT - BLACK STEEL PIPESPHASE 1 UPPER BASEMENT - BLACK STEEL PIPES 81 70 29-Sep-12 31-Dec-12 23-Jul-13 15-Oct-13 32

773 NECP-Rebase_06Sep12-4.CO.1.6.2.47PHASE 1 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP1605 Black Steel Pipes, CHW, Area A1 8 0% 7 29-Sep-12 07-Oct-12 23-Jul-13 31-Jul-13 32

774 NECP-Rebase_06Sep12-4.CO.1.6.2.47PHASE 1 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP1615 Black Steel Pipes, CHW, Area A2 8 0% 7 08-Oct-12 16-Oct-12 31-Jul-13 08-Aug-13 32

775 NECP-Rebase_06Sep12-4.CO.1.6.2.47PHASE 1 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP1625 Black Steel Pipes, CHW, Area A3 8 0% 7 17-Oct-12 25-Oct-12 08-Aug-13 17-Aug-13 32

776 NECP-Rebase_06Sep12-4.CO.1.6.2.47PHASE 1 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP1635 Black Steel Pipes, CHW, Area A4 8 0% 7 27-Oct-12 04-Nov-12 17-Aug-13 25-Aug-13 32

777 NECP-Rebase_06Sep12-4.CO.1.6.2.47PHASE 1 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP1645 Black Steel Pipes, CHW, Area A5 8 0% 7 05-Nov-12 13-Nov-12 25-Aug-13 02-Sep-13 32

778 NECP-Rebase_06Sep12-4.CO.1.6.2.47PHASE 1 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP1655 Black Steel Pipes, CHW, Area A6 8 0% 7 14-Nov-12 22-Nov-12 02-Sep-13 10-Sep-13 32

779 NECP-Rebase_06Sep12-4.CO.1.6.2.47PHASE 1 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP1665 Black Steel Pipes, CHW, Area A7 8 0% 7 24-Nov-12 02-Dec-12 10-Sep-13 18-Sep-13 32

780 NECP-Rebase_06Sep12-4.CO.1.6.2.47PHASE 1 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP1675 Black Steel Pipes, CHW, Area A8 7 0% 7 03-Dec-12 10-Dec-12 18-Sep-13 26-Sep-13 32

781 NECP-Rebase_06Sep12-4.CO.1.6.2.47PHASE 1 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP1685 Black Steel Pipes, CHW, Area A9 7 0% 7 13-Dec-12 20-Dec-12 26-Sep-13 05-Oct-13 32

782 NECP-Rebase_06Sep12-4.CO.1.6.2.47PHASE 1 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP1695 Black Steel Pipes, CHW, Area A10 7 0% 7 24-Dec-12 31-Dec-12 05-Oct-13 15-Oct-13 32

783 PHASE 1 UPPER BASEMENT - PIPE INSTALLATION(SANITARY,FIRE FIGHTING & WATER SUPPLY)PHASE 1 UPPER BASEMENT - PIPE INSTALLATION(SANITARY,FIRE FIGHTING & WATER SUPPLY)PHASE 1 UPPER BASEMENT - PIPE INSTALLATION(SANITARY,FIRE FIGHTING & WATER SUPPLY)PHASE 1 UPPER BASEMENT - PIPE INSTALLATION(SANITARY,FIRE FIGHTING & WATER SUPPLY) 87 66 20-Sep-12 30-Dec-12 04-Jul-13 19-Sep-13 48

784 FIRE FIGHTINGFIRE FIGHTINGFIRE FIGHTINGFIRE FIGHTING 87 60 20-Sep-12 30-Dec-12 04-Jul-13 12-Sep-13 54

785 NECP-Rebase_06Sep12-4.CO.1.6.2.45.2FIRE FIGHTING NECOMEP3890 Fire fightinf pipe installation Area A1 7 0% 6 20-Sep-12 27-Sep-12 04-Jul-13 11-Jul-13 42

786 NECP-Rebase_06Sep12-4.CO.1.6.2.45.2FIRE FIGHTING NECOMEP3900 Fire fightinf pipe installation Area A2 7 0% 6 01-Oct-12 08-Oct-12 11-Jul-13 18-Jul-13 48

787 NECP-Rebase_06Sep12-4.CO.1.6.2.45.2FIRE FIGHTING NECOMEP3910 Fire fightinf pipe installation Area A3 7 0% 6 11-Oct-12 18-Oct-12 18-Jul-13 25-Jul-13 50

788 NECP-Rebase_06Sep12-4.CO.1.6.2.45.2FIRE FIGHTING NECOMEP3920 Fire fightinf pipe installation Area A4 7 0% 6 22-Oct-12 29-Oct-12 25-Jul-13 01-Aug-13 52

789 NECP-Rebase_06Sep12-4.CO.1.6.2.45.2FIRE FIGHTING NECOMEP3930 Fire fightinf pipe installation Area A5 7 0% 6 01-Nov-12 08-Nov-12 01-Aug-13 08-Aug-13 54

790 NECP-Rebase_06Sep12-4.CO.1.6.2.45.2FIRE FIGHTING NECOMEP3940 Fire fightinf pipe installation Area A6 7 0% 6 12-Nov-12 19-Nov-12 08-Aug-13 15-Aug-13 54

791 NECP-Rebase_06Sep12-4.CO.1.6.2.45.2FIRE FIGHTING NECOMEP3950 Fire fightinf pipe installation Area A7 7 0% 6 22-Nov-12 29-Nov-12 15-Aug-13 22-Aug-13 54

792 NECP-Rebase_06Sep12-4.CO.1.6.2.45.2FIRE FIGHTING NECOMEP3960 Fire fightinf pipe installation Area A8 6 0% 6 03-Dec-12 09-Dec-12 22-Aug-13 29-Aug-13 54

793 NECP-Rebase_06Sep12-4.CO.1.6.2.45.2FIRE FIGHTING NECOMEP3970 Fire fightinf pipe installation Area A9 6 0% 6 13-Dec-12 19-Dec-12 29-Aug-13 05-Sep-13 54

794 NECP-Rebase_06Sep12-4.CO.1.6.2.45.2FIRE FIGHTING NECOMEP3980 Fire fightinf pipe installation Area A10 6 0% 6 24-Dec-12 30-Dec-12 05-Sep-13 12-Sep-13 54

795 WATER SUPPLYWATER SUPPLYWATER SUPPLYWATER SUPPLY 87 66 20-Sep-12 30-Dec-12 04-Jul-13 19-Sep-13 48

796 NECP-Rebase_06Sep12-4.CO.1.6.2.45.3WATER SUPPLY NECOMEP3990 Water supply pipe installation Area A1 7 0% 6 20-Sep-12 27-Sep-12 04-Jul-13 11-Jul-13 42

797 NECP-Rebase_06Sep12-4.CO.1.6.2.45.3WATER SUPPLY NECOMEP4000 Water supply pipe installation Area A2 7 0% 6 01-Oct-12 08-Oct-12 11-Jul-13 18-Jul-13 48

798 NECP-Rebase_06Sep12-4.CO.1.6.2.45.3WATER SUPPLY NECOMEP4010 Water supply pipe installation Area A3 7 0% 6 11-Oct-12 18-Oct-12 21-Jul-13 28-Jul-13 48

799 NECP-Rebase_06Sep12-4.CO.1.6.2.45.3WATER SUPPLY NECOMEP4020 Water supply pipe installation Area A4 7 0% 6 22-Oct-12 29-Oct-12 30-Jul-13 06-Aug-13 48

800 NECP-Rebase_06Sep12-4.CO.1.6.2.45.3WATER SUPPLY NECOMEP4030 Water supply pipe installation Area A5 7 0% 6 01-Nov-12 08-Nov-12 08-Aug-13 15-Aug-13 48

801 NECP-Rebase_06Sep12-4.CO.1.6.2.45.3WATER SUPPLY NECOMEP4040 Water supply pipe installation Area A6 7 0% 6 12-Nov-12 19-Nov-12 15-Aug-13 22-Aug-13 48

802 NECP-Rebase_06Sep12-4.CO.1.6.2.45.3WATER SUPPLY NECOMEP4050 Water supply pipe installation Area A7 7 0% 6 22-Nov-12 29-Nov-12 22-Aug-13 29-Aug-13 48

803 NECP-Rebase_06Sep12-4.CO.1.6.2.45.3WATER SUPPLY NECOMEP4060 Water supply pipe installation Area A8 6 0% 6 03-Dec-12 09-Dec-12 29-Aug-13 05-Sep-13 48

804 NECP-Rebase_06Sep12-4.CO.1.6.2.45.3WATER SUPPLY NECOMEP4070 Water supply pipe installation Area A9 6 0% 6 13-Dec-12 19-Dec-12 05-Sep-13 12-Sep-13 48

805 NECP-Rebase_06Sep12-4.CO.1.6.2.45.3WATER SUPPLY NECOMEP4080 Water supply pipe installation Area A10 6 0% 6 24-Dec-12 30-Dec-12 12-Sep-13 19-Sep-13 48

806 PHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMPHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMPHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMPHASE 1 UPPER BASEMENT - SPRINKLER SYSTEM 92 70 01-Jan-13 17-Apr-13 02-Sep-13 25-Nov-13 44

807 NECP-Rebase_06Sep12-4.CO.1.6.2.46PHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP1405 Sprinkler Head & Accessories, Area A1 10 0% 7 01-Jan-13 12-Jan-13 02-Sep-13 10-Sep-13 44

808 NECP-Rebase_06Sep12-4.CO.1.6.2.46PHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP1415 Sprinkler Head & Accessories, Area A2 10 0% 7 13-Jan-13 23-Jan-13 10-Sep-13 18-Sep-13 44

809 NECP-Rebase_06Sep12-4.CO.1.6.2.46PHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP1425 Sprinkler Head & Accessories, Area A3 9 0% 7 24-Jan-13 03-Feb-13 18-Sep-13 26-Sep-13 44

810 NECP-Rebase_06Sep12-4.CO.1.6.2.46PHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP1435 Sprinkler Head & Accessories, Area A4 9 0% 7 04-Feb-13 13-Feb-13 26-Sep-13 05-Oct-13 44

811 NECP-Rebase_06Sep12-4.CO.1.6.2.46PHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP1445 Sprinkler Head & Accessories, Area A5 9 0% 7 14-Feb-13 24-Feb-13 05-Oct-13 15-Oct-13 44

812 NECP-Rebase_06Sep12-4.CO.1.6.2.46PHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP1455 Sprinkler Head & Accessories, Area A6 9 0% 7 25-Feb-13 06-Mar-13 15-Oct-13 23-Oct-13 44

813 NECP-Rebase_06Sep12-4.CO.1.6.2.46PHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP1465 Sprinkler Head & Accessories, Area A7 9 0% 7 07-Mar-13 17-Mar-13 23-Oct-13 31-Oct-13 44

814 NECP-Rebase_06Sep12-4.CO.1.6.2.46PHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP1475 Sprinkler Head & Accessories, Area A8 9 0% 7 18-Mar-13 27-Mar-13 31-Oct-13 09-Nov-13 44

815 NECP-Rebase_06Sep12-4.CO.1.6.2.46PHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP1485 Sprinkler Head & Accessories, Area A9 9 0% 7 28-Mar-13 07-Apr-13 09-Nov-13 17-Nov-13 44

816 NECP-Rebase_06Sep12-4.CO.1.6.2.46PHASE 1 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP1495 Sprinkler Head & Accessories, Area A10 9 0% 7 08-Apr-13 17-Apr-13 17-Nov-13 25-Nov-13 44

817 PHASE 1 UPPER BASEMENT - DUCTSPHASE 1 UPPER BASEMENT - DUCTSPHASE 1 UPPER BASEMENT - DUCTSPHASE 1 UPPER BASEMENT - DUCTS 84 66 24-Dec-12 31-Mar-13 13-Jul-13 26-Sep-13 61

818 INSTALLATIONINSTALLATIONINSTALLATIONINSTALLATION 77 60 24-Dec-12 23-Mar-13 13-Jul-13 19-Sep-13 61

819 NECP-Rebase_06Sep12-4.CO.1.6.2.48.1INSTALLATION NECOMEP1700 AC Ducts Installation - Area A1 8 0% 6 24-Dec-12 01-Jan-13 13-Jul-13 18-Jul-13 41

820 NECP-Rebase_06Sep12-4.CO.1.6.2.48.1INSTALLATION NECOMEP1710 AC Ducts Installation - Area A2 8 0% 6 02-Jan-13 10-Jan-13 20-Jul-13 25-Jul-13 42

821 NECP-Rebase_06Sep12-4.CO.1.6.2.48.1INSTALLATION NECOMEP1720 AC Ducts Installation - Area A3 8 0% 6 12-Jan-13 20-Jan-13 27-Jul-13 01-Aug-13 43

822 NECP-Rebase_06Sep12-4.CO.1.6.2.48.1INSTALLATION NECOMEP1730 AC Ducts Installation - Area A4 8 0% 6 21-Jan-13 29-Jan-13 03-Aug-13 08-Aug-13 53

823 NECP-Rebase_06Sep12-4.CO.1.6.2.48.1INSTALLATION NECOMEP1740 AC Ducts Installation - Area A5 8 0% 6 30-Jan-13 07-Feb-13 10-Aug-13 15-Aug-13 56

824 NECP-Rebase_06Sep12-4.CO.1.6.2.48.1INSTALLATION NECOMEP1750 AC Ducts Installation - Area A6 8 0% 6 09-Feb-13 17-Feb-13 17-Aug-13 22-Aug-13 57

825 NECP-Rebase_06Sep12-4.CO.1.6.2.48.1INSTALLATION NECOMEP1760 AC Ducts Installation - Area A7 8 0% 6 18-Feb-13 26-Feb-13 24-Aug-13 29-Aug-13 58

826 NECP-Rebase_06Sep12-4.CO.1.6.2.48.1INSTALLATION NECOMEP1770 AC Ducts Installation - Area A8 7 0% 6 27-Feb-13 06-Mar-13 31-Aug-13 05-Sep-13 59

827 NECP-Rebase_06Sep12-4.CO.1.6.2.48.1INSTALLATION NECOMEP1780 AC Ducts Installation - Area A9 7 0% 6 07-Mar-13 14-Mar-13 07-Sep-13 12-Sep-13 60

828 NECP-Rebase_06Sep12-4.CO.1.6.2.48.1INSTALLATION NECOMEP1790 AC Ducts Installation - Area A10 7 0% 6 16-Mar-13 23-Mar-13 14-Sep-13 19-Sep-13 61

829 INSULATIONINSULATIONINSULATIONINSULATION 76 60 02-Jan-13 31-Mar-13 20-Jul-13 26-Sep-13 61

830 NECP-Rebase_06Sep12-4.CO.1.6.2.48.2INSULATION NECOMEP4090 AC Ducts Insulation works - Area A1 8 0% 6 02-Jan-13 10-Jan-13 20-Jul-13 25-Jul-13 41

831 NECP-Rebase_06Sep12-4.CO.1.6.2.48.2INSULATION NECOMEP4100 AC Ducts Insulation works - Area A2 8 0% 6 12-Jan-13 20-Jan-13 27-Jul-13 01-Aug-13 42

832 NECP-Rebase_06Sep12-4.CO.1.6.2.48.2INSULATION NECOMEP4110 AC Ducts Insulation works - Area A3 9 0% 6 21-Jan-13 30-Jan-13 03-Aug-13 08-Aug-13 43

833 NECP-Rebase_06Sep12-4.CO.1.6.2.48.2INSULATION NECOMEP4120 AC Ducts Insulation works - Area A4 8 0% 6 30-Jan-13 07-Feb-13 10-Aug-13 15-Aug-13 53

834 NECP-Rebase_06Sep12-4.CO.1.6.2.48.2INSULATION NECOMEP4130 AC Ducts Insulation works - Area A5 8 0% 6 09-Feb-13 17-Feb-13 17-Aug-13 22-Aug-13 56

835 NECP-Rebase_06Sep12-4.CO.1.6.2.48.2INSULATION NECOMEP4140 AC Ducts Insulation works- Area A6 8 0% 6 18-Feb-13 26-Feb-13 24-Aug-13 29-Aug-13 57

836 NECP-Rebase_06Sep12-4.CO.1.6.2.48.2INSULATION NECOMEP4150 AC Ducts Insulation works - Area A7 8 0% 6 27-Feb-13 07-Mar-13 31-Aug-13 05-Sep-13 58

837 NECP-Rebase_06Sep12-4.CO.1.6.2.48.2INSULATION NECOMEP4160 AC Ducts Insulation works - Area A8 7 0% 6 07-Mar-13 14-Mar-13 07-Sep-13 12-Sep-13 59

838 NECP-Rebase_06Sep12-4.CO.1.6.2.48.2INSULATION NECOMEP4170 AC Ducts Insulation works - Area A9 8 0% 6 16-Mar-13 24-Mar-13 14-Sep-13 19-Sep-13 60

839 NECP-Rebase_06Sep12-4.CO.1.6.2.48.2INSULATION NECOMEP4180 AC Ducts Insulation works - Area A10 7 0% 6 24-Mar-13 31-Mar-13 21-Sep-13 26-Sep-13 61

840 PHASE 1 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTPHASE 1 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTPHASE 1 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTPHASE 1 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENT 48 35 09-Feb-13 04-Apr-13 18-Sep-13 31-Oct-13 49

841 NECP-Rebase_06Sep12-4.CO.1.6.2.50PHASE 1 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTNECOMEP1830 AC/Refrigeration Equip, Supply & Ventilation Fans, Area A1-A4 15 0% 15 09-Feb-13 25-Feb-13 18-Sep-13 06-Oct-13 17

842 NECP-Rebase_06Sep12-4.CO.1.6.2.50PHASE 1 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTNECOMEP1840 AC/Refrigeration Equip, Supply & Ventilation Fans, Area A5-A7 10 0% 10 09-Mar-13 19-Mar-13 06-Oct-13 20-Oct-13 26

843 NECP-Rebase_06Sep12-4.CO.1.6.2.50PHASE 1 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTNECOMEP1850 AC/Refrigeration Equip, Supply & Ventilation Fans, Area A8-A10 10 0% 10 25-Mar-13 04-Apr-13 20-Oct-13 31-Oct-13 49

844 PHASE 1 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONSPHASE 1 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONSPHASE 1 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONSPHASE 1 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONS 30 30 24-Dec-12 27-Jan-13 16-Jul-13 20-Aug-13 57

845 NECP-Rebase_06Sep12-4.CO.1.6.2.51PHASE 1 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONSNECOMEP1260 Sanitary Installation, Rainwater Installations, Area A1-A4 10 0% 10 24-Dec-12 03-Jan-13 16-Jul-13 28-Jul-13 57

846 NECP-Rebase_06Sep12-4.CO.1.6.2.51PHASE 1 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONSNECOMEP1270 Sanitary Installation, Rainwater Installations, Area A5-A7 10 0% 10 05-Jan-13 15-Jan-13 28-Jul-13 08-Aug-13 57

847 NECP-Rebase_06Sep12-4.CO.1.6.2.51PHASE 1 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONSNECOMEP1280 Sanitary Installation, Rainwater Installations, Area A8-A10 10 0% 10 16-Jan-13 27-Jan-13 08-Aug-13 20-Aug-13 57

848 PHASE 1 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONPHASE 1 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONPHASE 1 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONPHASE 1 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATION 23 36 13-Jan-13 07-Feb-13 18-Aug-13 28-Sep-13 72

849 NECP-Rebase_06Sep12-4.CO.1.6.2.52PHASE 1 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONNECOMEP1520 Cold Water, Hot Water & Firefighting Installation, Area A1-A4 8 0% 7 13-Jan-13 21-Jan-13 18-Aug-13 25-Aug-13 63

850 NECP-Rebase_06Sep12-4.CO.1.6.2.52PHASE 1 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONNECOMEP1530 Cold Water, Hot Water & Firefighting Installation, Area A5-A7 8 0% 7 22-Jan-13 30-Jan-13 29-Aug-13 07-Sep-13 83

851 NECP-Rebase_06Sep12-4.CO.1.6.2.52PHASE 1 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONNECOMEP1540 Cold Water, Hot Water & Firefighting Installation, Area A8-A10 7 0% 7 31-Jan-13 07-Feb-13 19-Sep-13 28-Sep-13 72

852 PHASE 1 UPPER BASEMENT - BMSPHASE 1 UPPER BASEMENT - BMSPHASE 1 UPPER BASEMENT - BMSPHASE 1 UPPER BASEMENT - BMS 136 68 08-Nov-12 15-Apr-13 19-Aug-13 09-Nov-13 49

853 WIRINGWIRINGWIRINGWIRING 55 27 08-Nov-12 10-Jan-13 19-Aug-13 18-Sep-13 22

854 NECP-Rebase_06Sep12-4.CO.1.6.2.53.1WIRING NECOMEP1233 Building Management System Wiring, Area A1-A4 9 0% 9 08-Nov-12 18-Nov-12 19-Aug-13 28-Aug-13 11

855 NECP-Rebase_06Sep12-4.CO.1.6.2.53.1WIRING NECOMEP1243 Building Management System Wiring, Area A5-A7 9 0% 9 06-Dec-12 16-Dec-12 29-Aug-13 08-Sep-13 11

856 NECP-Rebase_06Sep12-4.CO.1.6.2.53.1WIRING NECOMEP1253 Building Management System Wiring, Area A8-A10 9 0% 9 01-Jan-13 10-Jan-13 09-Sep-13 18-Sep-13 22

857 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 42 27 26-Feb-13 15-Apr-13 06-Oct-13 09-Nov-13 49

858 NECP-Rebase_06Sep12-4.CO.1.6.2.53.2DEVICE INSTALLATION NECOMEP5400 Building Management System Devices Installation, Area A1-A4 7 0% 7 26-Feb-13 05-Mar-13 06-Oct-13 16-Oct-13 29

859 NECP-Rebase_06Sep12-4.CO.1.6.2.53.2DEVICE INSTALLATION NECOMEP5410 Building Management System Devices Installation, Area A5-A7 7 0% 7 20-Mar-13 27-Mar-13 20-Oct-13 28-Oct-13 26

860 NECP-Rebase_06Sep12-4.CO.1.6.2.53.2DEVICE INSTALLATION NECOMEP5420 Building Management System Devices Installation, Area A8-A10 7 0% 7 08-Apr-13 15-Apr-13 31-Oct-13 09-Nov-13 49

861 PHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGPHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGPHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGPHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKING 78 60 02-Oct-12 31-Dec-12 02-May-13 11-Jul-13 67

862 NECP-Rebase_06Sep12-4.CO.1.6.2.54PHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1805 Cable Trays, Cable Ladders, Cable Trunking, Area A1 8 0% 6 02-Oct-12 10-Oct-12 02-May-13 09-May-13 67

863 NECP-Rebase_06Sep12-4.CO.1.6.2.54PHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1815 Cable Trays, Cable Ladders, Cable Trunking, Area A2 8 0% 6 11-Oct-12 20-Oct-12 09-May-13 16-May-13 67

864 NECP-Rebase_06Sep12-4.CO.1.6.2.54PHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1825 Cable Trays, Cable Ladders, Cable Trunking, Area A3 8 0% 6 21-Oct-12 29-Oct-12 16-May-13 23-May-13 67

865 NECP-Rebase_06Sep12-4.CO.1.6.2.54PHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1835 Cable Trays, Cable Ladders, Cable Trunking, Area A4 8 0% 6 30-Oct-12 07-Nov-12 23-May-13 30-May-13 67

866 NECP-Rebase_06Sep12-4.CO.1.6.2.54PHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1845 Cable Trays, Cable Ladders, Cable Trunking, Area A5 8 0% 6 08-Nov-12 17-Nov-12 30-May-13 06-Jun-13 67

867 NECP-Rebase_06Sep12-4.CO.1.6.2.54PHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1855 Cable Trays, Cable Ladders, Cable Trunking, Area A6 8 0% 6 18-Nov-12 26-Nov-12 06-Jun-13 13-Jun-13 67

868 NECP-Rebase_06Sep12-4.CO.1.6.2.54PHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1865 Cable Trays, Cable Ladders, Cable Trunking, Area A7 8 0% 6 27-Nov-12 05-Dec-12 13-Jun-13 20-Jun-13 67

869 NECP-Rebase_06Sep12-4.CO.1.6.2.54PHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1875 Cable Trays, Cable Ladders, Cable Trunking, Area A8 7 0% 6 06-Dec-12 13-Dec-12 20-Jun-13 27-Jun-13 67

870 NECP-Rebase_06Sep12-4.CO.1.6.2.54PHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1885 Cable Trays, Cable Ladders, Cable Trunking, Area A9 7 0% 6 15-Dec-12 22-Dec-12 27-Jun-13 04-Jul-13 67

871 NECP-Rebase_06Sep12-4.CO.1.6.2.54PHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP1895 Cable Trays, Cable Ladders, Cable Trunking, Area A10 7 0% 6 24-Dec-12 31-Dec-12 04-Jul-13 11-Jul-13 67

872 PHASE 1 UPPER BASEMENT - BUS BARPHASE 1 UPPER BASEMENT - BUS BARPHASE 1 UPPER BASEMENT - BUS BARPHASE 1 UPPER BASEMENT - BUS BAR 77 60 11-Oct-12 08-Jan-13 09-May-13 18-Jul-13 67

873 BUS BAR LIGHTINGBUS BAR LIGHTINGBUS BAR LIGHTINGBUS BAR LIGHTING 77 60 11-Oct-12 08-Jan-13 09-May-13 18-Jul-13 67

874 NECP-Rebase_06Sep12-4.CO.1.6.2.55.1BUS BAR LIGHTING NECOMEP1900 Bus Bar Area A1 7 0% 6 11-Oct-12 18-Oct-12 09-May-13 16-May-13 67

875 NECP-Rebase_06Sep12-4.CO.1.6.2.55.1BUS BAR LIGHTING NECOMEP1910 Bus Bar Area A2 7 0% 6 21-Oct-12 28-Oct-12 16-May-13 23-May-13 67

876 NECP-Rebase_06Sep12-4.CO.1.6.2.55.1BUS BAR LIGHTING NECOMEP1920 Bus Bar Area A3 7 0% 6 30-Oct-12 06-Nov-12 23-May-13 30-May-13 67

877 NECP-Rebase_06Sep12-4.CO.1.6.2.55.1BUS BAR LIGHTING NECOMEP1930 Bus Bar Area A4 7 0% 6 08-Nov-12 15-Nov-12 30-May-13 06-Jun-13 67

878 NECP-Rebase_06Sep12-4.CO.1.6.2.55.1BUS BAR LIGHTING NECOMEP1940 Bus Bar Area A5 7 0% 6 18-Nov-12 25-Nov-12 06-Jun-13 13-Jun-13 67

879 NECP-Rebase_06Sep12-4.CO.1.6.2.55.1BUS BAR LIGHTING NECOMEP1950 Bus Bar Area A6 7 0% 6 27-Nov-12 04-Dec-12 13-Jun-13 20-Jun-13 67

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Fire Alarm Device Installation, Area A1-A10

Black Steel Pipes, CHW, Area A1

Black Steel Pipes, CHW, Area A2

Black Steel Pipes, CHW, Area A3

Black Steel Pipes, CHW, Area A4

Black Steel Pipes, CHW, Area A5

Black Steel Pipes, CHW, Area A6

Black Steel Pipes, CHW, Area A7

Black Steel Pipes, CHW, Area A8

Black Steel Pipes, CHW, Area A9

Black Steel Pipes, CHW, Area A10

Fire fightinf pipe installation Area A1

Fire fightinf pipe installation Area A2

Fire fightinf pipe installation Area A3

Fire fightinf pipe installation Area A4

Fire fightinf pipe installation Area A5

Fire fightinf pipe installation Area A6

Fire fightinf pipe installation Area A7

Fire fightinf pipe installation Area A8

Fire fightinf pipe installation Area A9

Fire fightinf pipe installation Area A10

Water supply pipe installation Area A1

Water supply pipe installation Area A2

Water supply pipe installation Area A3

Water supply pipe installation Area A4

Water supply pipe installation Area A5

Water supply pipe installation Area A6

Water supply pipe installation Area A7

Water supply pipe installation Area A8

Water supply pipe installation Area A9

Water supply pipe installation Area A10

Sprinkler Head & Accessories, Area A1

Sprinkler Head & Accessories, Area A2

Sprinkler Head & Accessories, Area A3

Sprinkler Head & Accessories, Area A4

Sprinkler Head & Accessories, Area A5

Sprinkler Head & Accessories, Area A6

Sprinkler Head & Accessories, Area A7

Sprinkler Head & Accessories, Area A8

Sprinkler Head & Accessories, Area A9

Sprinkler Head & Accessories, Area A10

AC Ducts Installation - Area A1

AC Ducts Installation - Area A2

AC Ducts Installation - Area A3

AC Ducts Installation - Area A4

AC Ducts Installation - Area A5

AC Ducts Installation - Area A6

AC Ducts Installation - Area A7

AC Ducts Installation - Area A8

AC Ducts Installation - Area A9

AC Ducts Installation - Area A10

AC Ducts Insulation works - Area A1

AC Ducts Insulation works - Area A2

AC Ducts Insulation works - Area A3

AC Ducts Insulation works - Area A4

AC Ducts Insulation works - Area A5

AC Ducts Insulation works- Area A6

AC Ducts Insulation works - Area A7

AC Ducts Insulation works - Area A8

AC Ducts Insulation works - Area A9

AC Ducts Insulation works - Area A10

AC/Refrigeration Equip, Supply & Ventilation Fans, Area A1-A4

AC/Refrigeration Equip, Supply & Ventilation Fans, Area A5-A7

AC/Refrigeration Equip, Supply & Ventilation Fans, Area A8-A10

Sanitary Installation, Rainwater Installations, Area A1-A4

Sanitary Installation, Rainwater Installations, Area A5-A7

Sanitary Installation, Rainwater Installations, Area A8-A10

Cold Water, Hot Water & Firefighting Installation, Area A1-A4

Cold Water, Hot Water & Firefighting Installation, Area A5-A7

Cold Water, Hot Water & Firefighting Installation, Area A8-A10

Building Management System Wiring, Area A1-A4

Building Management System Wiring, Area A5-A7

Building Management System Wiring, Area A8-A10

Building Management System Devices Installation, Area A1-A4

Building Management System Devices Installation, Area A5-A7

Building Management System Devices Installation, Area A8-A10

Cable Trays, Cable Ladders, Cable Trunking, Area A1

Cable Trays, Cable Ladders, Cable Trunking, Area A2

Cable Trays, Cable Ladders, Cable Trunking, Area A3

Cable Trays, Cable Ladders, Cable Trunking, Area A4

Cable Trays, Cable Ladders, Cable Trunking, Area A5

Cable Trays, Cable Ladders, Cable Trunking, Area A6

Cable Trays, Cable Ladders, Cable Trunking, Area A7

Cable Trays, Cable Ladders, Cable Trunking, Area A8

Cable Trays, Cable Ladders, Cable Trunking, Area A9

Cable Trays, Cable Ladders, Cable Trunking, Area A10

Bus Bar Area A1

Bus Bar Area A2

Bus Bar Area A3

Bus Bar Area A4

Bus Bar Area A5

Bus Bar Area A6

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 8 of 19/27-Feb-13 09:03

Page 9: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

880 NECP-Rebase_06Sep12-4.CO.1.6.2.55.1BUS BAR LIGHTING NECOMEP1960 Bus Bar Area A7 7 0% 6 06-Dec-12 13-Dec-12 20-Jun-13 27-Jun-13 67

881 NECP-Rebase_06Sep12-4.CO.1.6.2.55.1BUS BAR LIGHTING NECOMEP1970 Bus Bar Area A8 7 0% 6 15-Dec-12 22-Dec-12 27-Jun-13 04-Jul-13 67

882 NECP-Rebase_06Sep12-4.CO.1.6.2.55.1BUS BAR LIGHTING NECOMEP1980 Bus Bar Area A9 7 0% 6 23-Dec-12 30-Dec-12 04-Jul-13 11-Jul-13 67

883 NECP-Rebase_06Sep12-4.CO.1.6.2.55.1BUS BAR LIGHTING NECOMEP1990 Bus Bar Area A10 7 0% 6 01-Jan-13 08-Jan-13 11-Jul-13 18-Jul-13 67

884 PHASE 1 UPPER BASEMENT - TELEPHONE INSTALLATION CABLE TRAYSPHASE 1 UPPER BASEMENT - TELEPHONE INSTALLATION CABLE TRAYSPHASE 1 UPPER BASEMENT - TELEPHONE INSTALLATION CABLE TRAYSPHASE 1 UPPER BASEMENT - TELEPHONE INSTALLATION CABLE TRAYS 136 34 08-Nov-12 15-Apr-13 08-Sep-13 19-Oct-13 66

885 WIRINGWIRINGWIRINGWIRING 63 27 08-Nov-12 20-Jan-13 08-Sep-13 08-Oct-13 33

886 NECP-Rebase_06Sep12-4.CO.1.6.2.56.1WIRING NECOMEP4300 Telephone Conduites wiring - Area A5-A7 18 0% 18 06-Dec-12 26-Dec-12 08-Sep-13 28-Sep-13 42

887 NECP-Rebase_06Sep12-4.CO.1.6.2.56.1WIRING NECOMEP4310 Telephone Conduites wiring - Area A8-A10 17 0% 17 01-Jan-13 20-Jan-13 09-Sep-13 28-Sep-13 11

888 NECP-Rebase_06Sep12-4.CO.1.6.2.56.1WIRING NECOMEP4290 Telephone Conduites wiring - Area A1-A4 19 0% 19 08-Nov-12 29-Nov-12 17-Sep-13 08-Oct-13 15

889 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 37 16 04-Mar-13 15-Apr-13 29-Sep-13 19-Oct-13 66

890 NECP-Rebase_06Sep12-4.CO.1.6.2.56.2DEVICE INSTALLATION NECOMEP1933 Telephone Devices Installation - Area A5-A7 7 0% 7 07-Mar-13 14-Mar-13 29-Sep-13 06-Oct-13 42

891 NECP-Rebase_06Sep12-4.CO.1.6.2.56.2DEVICE INSTALLATION NECOMEP1943 Telephone Devices Installation - Area A8-A10 7 0% 7 08-Apr-13 15-Apr-13 29-Sep-13 06-Oct-13 75

892 NECP-Rebase_06Sep12-4.CO.1.6.2.56.2DEVICE INSTALLATION NECOMEP1923 Telephone Devices Installation - Area A1-A4 7 0% 7 04-Mar-13 11-Mar-13 09-Oct-13 19-Oct-13 15

893 PHASE 1 UPPER BASEMENT - ELEVATORSPHASE 1 UPPER BASEMENT - ELEVATORSPHASE 1 UPPER BASEMENT - ELEVATORSPHASE 1 UPPER BASEMENT - ELEVATORS 24 24 20-Jan-13 17-Feb-13 15-May-13 11-Jun-13 78

894 NECP-Rebase_06Sep12-4.CO.1.6.2.57PHASE 1 UPPER BASEMENT - ELEVATORSNECOMEP2920 Rails, Supports, Area A1 7 0% 7 20-Jan-13 28-Jan-13 15-May-13 22-May-13 78

895 NECP-Rebase_06Sep12-4.CO.1.6.2.57PHASE 1 UPPER BASEMENT - ELEVATORSNECOMEP2930 Car, Area A1 5 0% 5 28-Jan-13 03-Feb-13 23-May-13 28-May-13 78

896 NECP-Rebase_06Sep12-4.CO.1.6.2.57PHASE 1 UPPER BASEMENT - ELEVATORSNECOMEP2940 Hoist Machine, Lift Cables, Area A1 4 0% 4 03-Feb-13 07-Feb-13 29-May-13 02-Jun-13 78

897 NECP-Rebase_06Sep12-4.CO.1.6.2.57PHASE 1 UPPER BASEMENT - ELEVATORSNECOMEP2950 Electrical, Controls, Area A1 4 0% 4 07-Feb-13 12-Feb-13 03-Jun-13 06-Jun-13 78

898 NECP-Rebase_06Sep12-4.CO.1.6.2.57PHASE 1 UPPER BASEMENT - ELEVATORSNECOMEP2960 Frames, Doors, Area A1 4 0% 4 12-Feb-13 17-Feb-13 08-Jun-13 11-Jun-13 78

899 PHASE 1 UPPER BASEMENT - ESCALATORSPHASE 1 UPPER BASEMENT - ESCALATORSPHASE 1 UPPER BASEMENT - ESCALATORSPHASE 1 UPPER BASEMENT - ESCALATORS 30 30 17-Mar-13 20-Apr-13 17-Jun-13 21-Jul-13 74

900 NECP-Rebase_06Sep12-4.CO.1.6.2.59PHASE 1 UPPER BASEMENT - ESCALATORSNECOMEP3080 Steel Truss, Area A1-Area A2 6 0% 6 17-Mar-13 23-Mar-13 17-Jun-13 23-Jun-13 74

901 NECP-Rebase_06Sep12-4.CO.1.6.2.59PHASE 1 UPPER BASEMENT - ESCALATORSNECOMEP3090 Gear Assembly, Area A1-Area A2 7 0% 7 24-Mar-13 31-Mar-13 24-Jun-13 01-Jul-13 74

902 NECP-Rebase_06Sep12-4.CO.1.6.2.59PHASE 1 UPPER BASEMENT - ESCALATORSNECOMEP3100 Steps Assembly, Area A1-Area A2 7 0% 7 01-Apr-13 08-Apr-13 02-Jul-13 09-Jul-13 74

903 NECP-Rebase_06Sep12-4.CO.1.6.2.59PHASE 1 UPPER BASEMENT - ESCALATORSNECOMEP3110 Handrail, Area A1-Area A2 4 0% 4 09-Apr-13 13-Apr-13 10-Jul-13 14-Jul-13 74

904 NECP-Rebase_06Sep12-4.CO.1.6.2.59PHASE 1 UPPER BASEMENT - ESCALATORSNECOMEP3120 Electrical, Controls, Area A1-Area A2 6 0% 6 14-Apr-13 20-Apr-13 15-Jul-13 21-Jul-13 74

905 PHASE 1 UPPER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTSPHASE 1 UPPER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTSPHASE 1 UPPER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTSPHASE 1 UPPER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTS 287 141 16-May-12 15-Apr-13 12-Mar-13 24-Aug-13 46

906 WIRINGWIRINGWIRINGWIRING 77 38 16-May-12 13-Aug-12 12-Mar-13 25-Apr-13 90

907 NECP-Rebase_06Sep12-4.CO.1.6.2.60.1WIRING NECOMEP3160 Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A1-A4 13 0% 13 16-May-12 30-May-12 12-Mar-13 27-Mar-13 90

908 NECP-Rebase_06Sep12-4.CO.1.6.2.60.1WIRING NECOMEP3170 Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A5-A7 13 0% 13 05-Jul-12 19-Jul-12 27-Mar-13 11-Apr-13 90

909 NECP-Rebase_06Sep12-4.CO.1.6.2.60.1WIRING NECOMEP3180 Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A8-A10 12 0% 12 31-Jul-12 13-Aug-12 11-Apr-13 25-Apr-13 90

910 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 61 61 04-Feb-13 15-Apr-13 15-Jun-13 24-Aug-13 46

911 NECP-Rebase_06Sep12-4.CO.1.6.2.60.2DEVICE INSTALLATION NECOMEP4320 Luminaires, Lighting Points, Switch Points, etc., Area A1-A4 7 0% 7 04-Feb-13 11-Feb-13 15-Jun-13 22-Jun-13 86

912 NECP-Rebase_06Sep12-4.CO.1.6.2.60.2DEVICE INSTALLATION NECOMEP4330 Luminaires, Lighting Points, Switch Points, etc., Area A5-A7 7 0% 7 07-Mar-13 14-Mar-13 16-Jul-13 23-Jul-13 66

913 NECP-Rebase_06Sep12-4.CO.1.6.2.60.2DEVICE INSTALLATION NECOMEP4340 Luminaires, Lighting Points, Switch Points, etc., Area A8-A10 7 0% 7 08-Apr-13 15-Apr-13 17-Aug-13 24-Aug-13 46

914 PHASE 1 UPPER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATIONPHASE 1 UPPER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATIONPHASE 1 UPPER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATIONPHASE 1 UPPER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATION 188 43 17-Sep-12 23-Apr-13 05-Sep-13 27-Oct-13 0

915 WIRINGWIRINGWIRINGWIRING 39 36 17-Sep-12 31-Oct-12 05-Sep-13 19-Oct-13 0

916 NECP-Rebase_06Sep12-4.CO.1.6.2.61.1WIRING NECOMEP3280 Wiring for Switchboard, Small power Area A1-A4 13 0% 12 17-Sep-12 01-Oct-12 05-Sep-13 18-Sep-13 0

917 NECP-Rebase_06Sep12-4.CO.1.6.2.61.1WIRING NECOMEP3290 Wiring for Switchboard, Small power Area A5-A7 13 0% 12 02-Oct-12 16-Oct-12 19-Sep-13 02-Oct-13 0

918 NECP-Rebase_06Sep12-4.CO.1.6.2.61.1WIRING NECOMEP3300 Wiring for Switchboard, Small power Area A8-A10 13 0% 12 17-Oct-12 31-Oct-12 03-Oct-13 19-Oct-13 0

919 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 61 31 12-Feb-13 23-Apr-13 19-Sep-13 27-Oct-13 0

920 NECP-Rebase_06Sep12-4.CO.1.6.2.61.2DEVICE INSTALLATION NECOMEP4350 Switchboard, Small power Devices Installation, Area A1-A4 7 0% 7 12-Feb-13 19-Feb-13 19-Sep-13 26-Sep-13 10

921 NECP-Rebase_06Sep12-4.CO.1.6.2.61.2DEVICE INSTALLATION NECOMEP4360 Switchboard, Small power Devices Installation, Area A5-A7 7 0% 7 16-Mar-13 23-Mar-13 03-Oct-13 10-Oct-13 5

922 NECP-Rebase_06Sep12-4.CO.1.6.2.61.2DEVICE INSTALLATION NECOMEP4370 Switchboard, Small power Devices Installation, Area A8-A10 7 0% 7 16-Apr-13 23-Apr-13 20-Oct-13 27-Oct-13 0

923 PHASE 1 UPPER BASEMENT - SECURITY SYSTEMPHASE 1 UPPER BASEMENT - SECURITY SYSTEMPHASE 1 UPPER BASEMENT - SECURITY SYSTEMPHASE 1 UPPER BASEMENT - SECURITY SYSTEM 136 45 08-Nov-12 15-Apr-13 07-Oct-13 30-Nov-13 12

924 WIRINGWIRINGWIRINGWIRING 53 38 08-Nov-12 08-Jan-13 07-Oct-13 21-Nov-13 12

925 NECP-Rebase_06Sep12-4.CO.1.6.2.62.1WIRING NECOMEP3400 Security System wiring works , Area A1-A4 7 0% 7 08-Nov-12 15-Nov-12 07-Oct-13 16-Oct-13 4

926 NECP-Rebase_06Sep12-4.CO.1.6.2.62.1WIRING NECOMEP3410 Security System wiring works , Area A5-A7 7 0% 7 06-Dec-12 13-Dec-12 06-Nov-13 13-Nov-13 4

927 NECP-Rebase_06Sep12-4.CO.1.6.2.62.1WIRING NECOMEP3420 Security System wiring works , A8-A10 7 0% 7 01-Jan-13 08-Jan-13 14-Nov-13 21-Nov-13 12

928 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 61 21 04-Feb-13 15-Apr-13 06-Nov-13 30-Nov-13 12

929 NECP-Rebase_06Sep12-4.CO.1.6.2.62.2DEVICE INSTALLATION NECOMEP4380 Security System Devices Installation , Area A1-A4 7 0% 7 04-Feb-13 11-Feb-13 06-Nov-13 13-Nov-13 11

930 NECP-Rebase_06Sep12-4.CO.1.6.2.62.2DEVICE INSTALLATION NECOMEP4390 Security System Devices Installation , Area A5-A7 7 0% 7 07-Mar-13 14-Mar-13 14-Nov-13 21-Nov-13 4

931 NECP-Rebase_06Sep12-4.CO.1.6.2.62.2DEVICE INSTALLATION NECOMEP4400 Security System Devices Installation , A8-A10 7 0% 7 08-Apr-13 15-Apr-13 23-Nov-13 30-Nov-13 12

932 PHASE 1 UPPER BASEMENT - PARKING GUIDANCE SYSTEMPHASE 1 UPPER BASEMENT - PARKING GUIDANCE SYSTEMPHASE 1 UPPER BASEMENT - PARKING GUIDANCE SYSTEMPHASE 1 UPPER BASEMENT - PARKING GUIDANCE SYSTEM 136 28 08-Nov-12 15-Apr-13 01-Oct-13 04-Nov-13 33

933 WIRINGWIRINGWIRINGWIRING 53 21 08-Nov-12 08-Jan-13 01-Oct-13 27-Oct-13 0

934 NECP-Rebase_06Sep12-4.CO.1.6.2.63.1WIRING NECOMEP3520 Parking Guidance System wiring, Area A1-A4 7 0% 7 08-Nov-12 15-Nov-12 01-Oct-13 08-Oct-13 0

935 NECP-Rebase_06Sep12-4.CO.1.6.2.63.1WIRING NECOMEP3530 Parking Guidance System wiring, Area A5-A7 7 0% 7 10-Dec-12 17-Dec-12 09-Oct-13 19-Oct-13 0

936 NECP-Rebase_06Sep12-4.CO.1.6.2.63.1WIRING NECOMEP3540 Parking Guidance System wiring, Area A8-A10 7 0% 7 01-Jan-13 08-Jan-13 20-Oct-13 27-Oct-13 0

937 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 61 21 04-Feb-13 15-Apr-13 09-Oct-13 04-Nov-13 33

938 NECP-Rebase_06Sep12-4.CO.1.6.2.63.2DEVICE INSTALLATION NECOMEP4410 Parking Guidance System Devices Installation , Area A1-A4 7 0% 7 04-Feb-13 11-Feb-13 09-Oct-13 19-Oct-13 33

939 NECP-Rebase_06Sep12-4.CO.1.6.2.63.2DEVICE INSTALLATION NECOMEP4420 Parking Guidance System Devices Installation , Area A5-A7 7 0% 7 07-Mar-13 14-Mar-13 20-Oct-13 27-Oct-13 26

940 NECP-Rebase_06Sep12-4.CO.1.6.2.63.2DEVICE INSTALLATION NECOMEP4430 Parking Guidance System Devices Installation , Area A8-A10 7 0% 7 08-Apr-13 15-Apr-13 28-Oct-13 04-Nov-13 33

941 PHASE 1 UPPER BASEMENT - TELEMETRY/SCADAPHASE 1 UPPER BASEMENT - TELEMETRY/SCADAPHASE 1 UPPER BASEMENT - TELEMETRY/SCADAPHASE 1 UPPER BASEMENT - TELEMETRY/SCADA 98 30 01-Jan-13 24-Apr-13 12-Sep-13 19-Oct-13 47

942 WIRINGWIRINGWIRINGWIRING 15 15 01-Jan-13 17-Jan-13 12-Sep-13 29-Sep-13 14

943 NECP-Rebase_06Sep12-4.CO.1.6.2.64.1WIRING NECOMEP3620 Telemetry/SCADA Wiring, Area A1-A10 15 0% 15 01-Jan-13 17-Jan-13 12-Sep-13 29-Sep-13 14

944 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 15 15 08-Apr-13 24-Apr-13 30-Sep-13 19-Oct-13 47

945 NECP-Rebase_06Sep12-4.CO.1.6.2.64.2DEVICE INSTALLATION NECOMEP5430 Telemetry/SCADA Device Installation, Area A1-A10 15 0% 15 08-Apr-13 24-Apr-13 30-Sep-13 19-Oct-13 47

946 PHASE 1 UPPER BASEMENT - FIRE ALARM SYSTEMPHASE 1 UPPER BASEMENT - FIRE ALARM SYSTEMPHASE 1 UPPER BASEMENT - FIRE ALARM SYSTEMPHASE 1 UPPER BASEMENT - FIRE ALARM SYSTEM 98 30 01-Jan-13 24-Apr-13 29-Sep-13 04-Nov-13 33

947 WIRINGWIRINGWIRINGWIRING 15 15 01-Jan-13 17-Jan-13 29-Sep-13 17-Oct-13 0

948 NECP-Rebase_06Sep12-4.CO.1.6.2.65.1WIRING NECOMEP3660 Fire Alarm Wiring works, Area A1-A10 15 0% 15 01-Jan-13 17-Jan-13 29-Sep-13 17-Oct-13 0

949 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 15 15 08-Apr-13 24-Apr-13 19-Oct-13 04-Nov-13 33

950 NECP-Rebase_06Sep12-4.CO.1.6.2.65.2DEVICE INSTALLATION NECOMEP5440 Fire Alarm Device Installation, Area A1-A10 15 0% 15 08-Apr-13 24-Apr-13 19-Oct-13 04-Nov-13 33

951 Internal FinishesInternal FinishesInternal FinishesInternal Finishes 413 297 08-May-12 02-Sep-13 12-Dec-12 31-Jan-13 15-Jan-14 4

952 Lower Basement FloorLower Basement FloorLower Basement FloorLower Basement Floor 399 297 08-May-12 17-Aug-13 12-Dec-12 31-Jan-13 15-Jan-14 4

953 PHASE 1 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSPHASE 1 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSPHASE 1 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSPHASE 1 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDS 106 58 08-May-12 08-Sep-12 10-Feb-13 17-Apr-13 46

954 NECP-Rebase_06Sep12-4.CO.1.7.1.2PHASE 1 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1600 Plasterworks, Gypsum Boards, Plasterboards, Area A1 10 0% 10 08-May-12 19-May-12 10-Feb-13 20-Feb-13 46

955 NECP-Rebase_06Sep12-4.CO.1.7.1.2PHASE 1 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1610 Plasterworks, Gypsum Boards, Plasterboards, Area A2 10 0% 10 20-May-12 30-May-12 21-Feb-13 04-Mar-13 46

956 NECP-Rebase_06Sep12-4.CO.1.7.1.2PHASE 1 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1620 Plasterworks, Gypsum Boards, Plasterboards, Area A5 10 0% 10 28-Jun-12 09-Jul-12 05-Mar-13 16-Mar-13 46

957 NECP-Rebase_06Sep12-4.CO.1.7.1.2PHASE 1 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1630 Plasterworks, Gypsum Boards, Plasterboards, Area A6 10 0% 10 10-Jul-12 21-Jul-12 17-Mar-13 27-Mar-13 46

958 NECP-Rebase_06Sep12-4.CO.1.7.1.2PHASE 1 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1640 Plasterworks, Gypsum Boards, Plasterboards, Area A9 9 0% 9 19-Aug-12 28-Aug-12 28-Mar-13 07-Apr-13 46

959 NECP-Rebase_06Sep12-4.CO.1.7.1.2PHASE 1 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1650 Plasterworks, Gypsum Boards, Plasterboards, Area A10 9 0% 9 29-Aug-12 08-Sep-12 08-Apr-13 17-Apr-13 46

960 PHASE 1 LOWER BASEMENT - PAINTING CEILINGPHASE 1 LOWER BASEMENT - PAINTING CEILINGPHASE 1 LOWER BASEMENT - PAINTING CEILINGPHASE 1 LOWER BASEMENT - PAINTING CEILING 352 282 28-May-12 13-Jul-13 12-Dec-12 31-Jan-13 29-Dec-13 19

961 PRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATS 90 40 28-May-12 09-Sep-12 12-Dec-12 31-Jan-13 18-Mar-13 108

962 NECP-Rebase_06Sep12-4.CO.1.7.1.8.1PRIMER & FIRST COATSNECOBFW1260 Painting Ceiling, Area A7 9 15% 5 30-Jul-12 08-Aug-12 26-Dec-12 31-Jan-13 06-Feb-13 137

963 NECP-Rebase_06Sep12-4.CO.1.7.1.8.1PRIMER & FIRST COATSNECOBFW1220 Painting Ceiling, Area A3 9 12.01% 5 18-Jun-12 27-Jun-12 15-Dec-12 31-Jan-13 06-Feb-13 113

964 NECP-Rebase_06Sep12-4.CO.1.7.1.8.1PRIMER & FIRST COATSNECOBFW1230 Painting Ceiling, Area A4 9 12.01% 5 28-Jun-12 08-Jul-12 15-Dec-12 31-Jan-13 06-Feb-13 119

965 NECP-Rebase_06Sep12-4.CO.1.7.1.8.1PRIMER & FIRST COATSNECOBFW1240 Painting Ceiling, Area A5 9 12.01% 5 09-Jul-12 18-Jul-12 12-Dec-12 31-Jan-13 06-Feb-13 125

966 NECP-Rebase_06Sep12-4.CO.1.7.1.8.1PRIMER & FIRST COATSNECOBFW1250 Painting Ceiling, Area A6 9 12.01% 5 19-Jul-12 29-Jul-12 21-Dec-12 31-Jan-13 06-Feb-13 131

967 NECP-Rebase_06Sep12-4.CO.1.7.1.8.1PRIMER & FIRST COATSNECOBFW1270 Painting Ceiling, Area A8 9 12.01% 5 09-Aug-12 19-Aug-12 15-Jan-13 31-Jan-13 06-Feb-13 143

968 NECP-Rebase_06Sep12-4.CO.1.7.1.8.1PRIMER & FIRST COATSNECOBFW1280 Painting Ceiling, Area A9 9 12.01% 5 20-Aug-12 29-Aug-12 21-Dec-12 31-Jan-13 06-Feb-13 84

969 NECP-Rebase_06Sep12-4.CO.1.7.1.8.1PRIMER & FIRST COATSNECOBFW1290 Painting Ceiling, Area A10 9 0% 6 30-Aug-12 09-Sep-12 06-Feb-13 13-Feb-13 84

970 NECP-Rebase_06Sep12-4.CO.1.7.1.8.1PRIMER & FIRST COATSNECOBFW1190 Painting Ceiling, Area A1 9 0% 6 28-May-12 06-Jun-12 05-Mar-13 11-Mar-13 71

971 NECP-Rebase_06Sep12-4.CO.1.7.1.8.1PRIMER & FIRST COATSNECOBFW1210 Painting Ceiling, Area A2 9 0% 6 07-Jun-12 17-Jun-12 12-Mar-13 18-Mar-13 72

972 FINAL COATFINAL COATFINAL COATFINAL COAT 31 30 06-Jun-13 13-Jul-13 24-Nov-13 29-Dec-13 19

973 NECP-Rebase_06Sep12-4.CO.1.7.1.8.2FINAL COAT NECOBFW1191 Painting Ceiling, Area A1 3 0% 3 06-Jun-13 10-Jun-13 24-Nov-13 26-Nov-13 0

974 NECP-Rebase_06Sep12-4.CO.1.7.1.8.2FINAL COAT NECOBFW1211 Painting Ceiling, Area A2 3 0% 3 10-Jun-13 13-Jun-13 27-Nov-13 30-Nov-13 0

975 NECP-Rebase_06Sep12-4.CO.1.7.1.8.2FINAL COAT NECOBFW1221 Painting Ceiling, Area A3 3 0% 3 13-Jun-13 17-Jun-13 01-Dec-13 03-Dec-13 0

976 NECP-Rebase_06Sep12-4.CO.1.7.1.8.2FINAL COAT NECOBFW1231 Painting Ceiling, Area A4 3 0% 3 17-Jun-13 20-Jun-13 04-Dec-13 07-Dec-13 0

977 NECP-Rebase_06Sep12-4.CO.1.7.1.8.2FINAL COAT NECOBFW1241 Painting Ceiling, Area A5 3 0% 3 20-Jun-13 24-Jun-13 08-Dec-13 10-Dec-13 0

978 NECP-Rebase_06Sep12-4.CO.1.7.1.8.2FINAL COAT NECOBFW1251 Painting Ceiling, Area A6 3 0% 3 24-Jun-13 27-Jun-13 11-Dec-13 14-Dec-13 19

979 NECP-Rebase_06Sep12-4.CO.1.7.1.8.2FINAL COAT NECOBFW1261 Painting Ceiling, Area A7 3 0% 3 27-Jun-13 01-Jul-13 15-Dec-13 17-Dec-13 19

980 NECP-Rebase_06Sep12-4.CO.1.7.1.8.2FINAL COAT NECOBFW1271 Painting Ceiling, Area A8 4 0% 3 01-Jul-13 06-Jul-13 19-Dec-13 22-Dec-13 19

981 NECP-Rebase_06Sep12-4.CO.1.7.1.8.2FINAL COAT NECOBFW1281 Painting Ceiling, Area A9 3 0% 3 06-Jul-13 09-Jul-13 23-Dec-13 25-Dec-13 19

982 NECP-Rebase_06Sep12-4.CO.1.7.1.8.2FINAL COAT NECOBFW1291 Painting Ceiling, Area A10 3 0% 3 09-Jul-13 13-Jul-13 26-Dec-13 29-Dec-13 19

983 PHASE 1 LOWER BASEMENT - PAINTING WALLSPHASE 1 LOWER BASEMENT - PAINTING WALLSPHASE 1 LOWER BASEMENT - PAINTING WALLSPHASE 1 LOWER BASEMENT - PAINTING WALLS 369 297 12-Jun-12 17-Aug-13 15-Dec-12 31-Jan-13 15-Jan-14 0

984 PRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATS 90 56 12-Jun-12 24-Sep-12 15-Dec-12 31-Jan-13 06-Apr-13 146

985 NECP-Rebase_06Sep12-4.CO.1.7.1.1.1PRIMER & FIRST COATSNECOBFW2400 Painting Walls & Columns, Area A7 9 8.01% 8 14-Aug-12 23-Aug-12 26-Dec-12 31-Jan-13 10-Feb-13 168

986 NECP-Rebase_06Sep12-4.CO.1.7.1.1.1PRIMER & FIRST COATSNECOBFW2360 Painting Walls & Columns, Area A3 9 5% 9 03-Jul-12 12-Jul-12 15-Dec-12 31-Jan-13 10-Feb-13 163

987 NECP-Rebase_06Sep12-4.CO.1.7.1.1.1PRIMER & FIRST COATSNECOBFW2370 Painting Walls & Columns, Area A4 9 5% 9 14-Jul-12 23-Jul-12 15-Dec-12 31-Jan-13 10-Feb-13 150

988 NECP-Rebase_06Sep12-4.CO.1.7.1.1.1PRIMER & FIRST COATSNECOBFW2380 Painting Walls & Columns, Area A5 9 5% 9 24-Jul-12 02-Aug-12 12-Jan-13 31-Jan-13 10-Feb-13 175

989 NECP-Rebase_06Sep12-4.CO.1.7.1.1.1PRIMER & FIRST COATSNECOBFW2390 Painting Walls & Columns, Area A6 9 5% 9 04-Aug-12 13-Aug-12 21-Dec-12 31-Jan-13 10-Feb-13 181

990 NECP-Rebase_06Sep12-4.CO.1.7.1.1.1PRIMER & FIRST COATSNECOBFW2410 Painting Walls & Columns, Area A8 9 5% 9 25-Aug-12 03-Sep-12 15-Dec-12 31-Jan-13 10-Feb-13 193

991 NECP-Rebase_06Sep12-4.CO.1.7.1.1.1PRIMER & FIRST COATSNECOBFW2420 Painting Walls & Columns, Area A9 9 5% 9 04-Sep-12 13-Sep-12 21-Dec-12 31-Jan-13 10-Feb-13 107

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Bus Bar Area A7

Bus Bar Area A8

Bus Bar Area A9

Bus Bar Area A10

Telephone Conduites wiring - Area A5-A7

Telephone Conduites wiring - Area A8-A10

Telephone Conduites wiring - Area A1-A4

Telephone Devices Installation - Area A5-A7

Telephone Devices Installation - Area A8-A10

Telephone Devices Installation - Area A1-A4

Rails, Supports, Area A1

Car, Area A1

Hoist Machine, Lift Cables, Area A1

Electrical, Controls, Area A1

Frames, Doors, Area A1

Steel Truss, Area A1-Area A2

Gear Assembly, Area A1-Area A2

Steps Assembly, Area A1-Area A2

Handrail, Area A1-Area A2

Electrical, Controls, Area A1-Area A2

Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A1-A4

Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A5-A7

Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A8-A10

Luminaires, Lighting Points, Switch Points, etc., Area A1-A4

Luminaires, Lighting Points, Switch Points, etc., Area A5-A7

Luminaires, Lighting Points, Switch Points, etc., Area A8-A10

Wiring for Switchboard, Small power Area A1-A4

Wiring for Switchboard, Small power Area A5-A7

Wiring for Switchboard, Small power Area A8-A10

Switchboard, Small power Devices Installation, Area A1-A4

Switchboard, Small power Devices Installation, Area A5-A7

Switchboard, Small power Devices Installation, Area A8-A10

Security System wiring works , Area A1-A4

Security System wiring works , Area A5-A7

Security System wiring works , A8-A10

Security System Devices Installation , Area A1-A4

Security System Devices Installation , Area A5-A7

Security System Devices Installation , A8-A10

Parking Guidance System wiring, Area A1-A4

Parking Guidance System wiring, Area A5-A7

Parking Guidance System wiring, Area A8-A10

Parking Guidance System Devices Installation , Area A1-A4

Parking Guidance System Devices Installation , Area A5-A7

Parking Guidance System Devices Installation , Area A8-A10

Telemetry/SCADA Wiring, Area A1-A10

Telemetry/SCADA Device Installation, Area A1-A10

Fire Alarm Wiring works, Area A1-A10

Fire Alarm Device Installation, Area A1-A10

Plasterworks, Gypsum Boards, Plasterboards, Area A1

Plasterworks, Gypsum Boards, Plasterboards, Area A2

Plasterworks, Gypsum Boards, Plasterboards, Area A5

Plasterworks, Gypsum Boards, Plasterboards, Area A6

Plasterworks, Gypsum Boards, Plasterboards, Area A9

Plasterworks, Gypsum Boards, Plasterboards, Area A10

Painting Ceiling, Area A7

Painting Ceiling, Area A3

Painting Ceiling, Area A4

Painting Ceiling, Area A5

Painting Ceiling, Area A6

Painting Ceiling, Area A8

Painting Ceiling, Area A9

Painting Ceiling, Area A10

Painting Ceiling, Area A1

Painting Ceiling, Area A2

Painting Ceiling, Area A1

Painting Ceiling, Area A2

Painting Ceiling, Area A3

Painting Ceiling, Area A4

Painting Ceiling, Area A5

Painting Ceiling, Area A6

Painting Ceiling, Area A7

Painting Ceiling, Area A8

Painting Ceiling, Area A9

Painting Ceiling, Area A10

Painting Walls & Columns, Area A7

Painting Walls & Columns, Area A3

Painting Walls & Columns, Area A4

Painting Walls & Columns, Area A5

Painting Walls & Columns, Area A6

Painting Walls & Columns, Area A8

Painting Walls & Columns, Area A9

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 9 of 19/27-Feb-13 09:03

Page 10: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

992 NECP-Rebase_06Sep12-4.CO.1.7.1.1.1PRIMER & FIRST COATSNECOBFW2430 Painting Walls & Columns, Area A10 9 0% 9 15-Sep-12 24-Sep-12 13-Feb-13 24-Feb-13 105

993 NECP-Rebase_06Sep12-4.CO.1.7.1.1.1PRIMER & FIRST COATSNECOBFW2340 Painting Walls & Columns, Area A1 9 0% 9 12-Jun-12 21-Jun-12 17-Mar-13 26-Mar-13 110

994 NECP-Rebase_06Sep12-4.CO.1.7.1.1.1PRIMER & FIRST COATSNECOBFW2350 Painting Walls & Columns, Area A2 9 0% 9 23-Jun-12 02-Jul-12 27-Mar-13 06-Apr-13 110

995 FINAL COATFINAL COATFINAL COATFINAL COAT 30 30 13-Jul-13 17-Aug-13 11-Dec-13 15-Jan-14 0

996 NECP-Rebase_06Sep12-4.CO.1.7.1.1.2FINAL COAT NECOBFW2341 Painting Walls & Columns, Area A1 3 0% 3 13-Jul-13 16-Jul-13 11-Dec-13 14-Dec-13 0

997 NECP-Rebase_06Sep12-4.CO.1.7.1.1.2FINAL COAT NECOBFW2351 Painting Walls & Columns, Area A2 3 0% 3 16-Jul-13 20-Jul-13 15-Dec-13 17-Dec-13 0

998 NECP-Rebase_06Sep12-4.CO.1.7.1.1.2FINAL COAT NECOBFW2361 Painting Walls & Columns, Area A3 3 0% 3 20-Jul-13 23-Jul-13 19-Dec-13 22-Dec-13 0

999 NECP-Rebase_06Sep12-4.CO.1.7.1.1.2FINAL COAT NECOBFW2371 Painting Walls & Columns, Area A4 3 0% 3 23-Jul-13 27-Jul-13 23-Dec-13 25-Dec-13 0

1000 NECP-Rebase_06Sep12-4.CO.1.7.1.1.2FINAL COAT NECOBFW2381 Painting Walls & Columns, Area A5 3 0% 3 27-Jul-13 30-Jul-13 26-Dec-13 29-Dec-13 0

1001 NECP-Rebase_06Sep12-4.CO.1.7.1.1.2FINAL COAT NECOBFW2391 Painting Walls & Columns, Area A6 3 0% 3 30-Jul-13 03-Aug-13 30-Dec-13 01-Jan-14 0

1002 NECP-Rebase_06Sep12-4.CO.1.7.1.1.2FINAL COAT NECOBFW2401 Painting Walls & Columns, Area A7 3 0% 3 03-Aug-13 06-Aug-13 02-Jan-14 05-Jan-14 0

1003 NECP-Rebase_06Sep12-4.CO.1.7.1.1.2FINAL COAT NECOBFW2411 Painting Walls & Columns, Area A8 3 0% 3 06-Aug-13 10-Aug-13 06-Jan-14 08-Jan-14 0

1004 NECP-Rebase_06Sep12-4.CO.1.7.1.1.2FINAL COAT NECOBFW2421 Painting Walls & Columns, Area A9 3 0% 3 10-Aug-13 13-Aug-13 09-Jan-14 12-Jan-14 0

1005 NECP-Rebase_06Sep12-4.CO.1.7.1.1.2FINAL COAT NECOBFW2431 Painting Walls & Columns, Area A10 3 0% 3 13-Aug-13 17-Aug-13 13-Jan-14 15-Jan-14 0

1006 PHASE 1 LOWER BASEMENT - PAINTING FLOORSPHASE 1 LOWER BASEMENT - PAINTING FLOORSPHASE 1 LOWER BASEMENT - PAINTING FLOORSPHASE 1 LOWER BASEMENT - PAINTING FLOORS 97 40 01-Dec-12 23-Mar-13 29-Aug-13 17-Oct-13 35

1007 NECP-Rebase_06Sep12-4.CO.1.7.1.10PHASE 1 LOWER BASEMENT - PAINTING FLOORSNECOBFW2740 Painting Floors, Area A1 10 0% 4 01-Dec-12 11-Dec-12 29-Aug-13 03-Sep-13 35

1008 NECP-Rebase_06Sep12-4.CO.1.7.1.10PHASE 1 LOWER BASEMENT - PAINTING FLOORSNECOBFW2750 Painting Floors, Area A2 10 0% 4 12-Dec-12 23-Dec-12 03-Sep-13 08-Sep-13 35

1009 NECP-Rebase_06Sep12-4.CO.1.7.1.10PHASE 1 LOWER BASEMENT - PAINTING FLOORSNECOBFW2760 Painting Floors, Area A3 10 0% 4 24-Dec-12 03-Jan-13 08-Sep-13 12-Sep-13 35

1010 NECP-Rebase_06Sep12-4.CO.1.7.1.10PHASE 1 LOWER BASEMENT - PAINTING FLOORSNECOBFW2770 Painting Floors, Area A4 10 0% 4 05-Jan-13 15-Jan-13 12-Sep-13 17-Sep-13 35

1011 NECP-Rebase_06Sep12-4.CO.1.7.1.10PHASE 1 LOWER BASEMENT - PAINTING FLOORSNECOBFW2780 Painting Floors, Area A5 10 0% 4 16-Jan-13 27-Jan-13 17-Sep-13 22-Sep-13 35

1012 NECP-Rebase_06Sep12-4.CO.1.7.1.10PHASE 1 LOWER BASEMENT - PAINTING FLOORSNECOBFW2790 Painting Floors, Area A6 10 0% 4 28-Jan-13 07-Feb-13 22-Sep-13 26-Sep-13 35

1013 NECP-Rebase_06Sep12-4.CO.1.7.1.10PHASE 1 LOWER BASEMENT - PAINTING FLOORSNECOBFW2800 Painting Floors, Area A7 10 0% 4 09-Feb-13 19-Feb-13 26-Sep-13 01-Oct-13 35

1014 NECP-Rebase_06Sep12-4.CO.1.7.1.10PHASE 1 LOWER BASEMENT - PAINTING FLOORSNECOBFW2810 Painting Floors, Area A8 9 0% 4 20-Feb-13 02-Mar-13 01-Oct-13 06-Oct-13 35

1015 NECP-Rebase_06Sep12-4.CO.1.7.1.10PHASE 1 LOWER BASEMENT - PAINTING FLOORSNECOBFW2820 Painting Floors, Area A9 9 0% 4 03-Mar-13 12-Mar-13 06-Oct-13 10-Oct-13 35

1016 NECP-Rebase_06Sep12-4.CO.1.7.1.10PHASE 1 LOWER BASEMENT - PAINTING FLOORSNECOBFW2830 Painting Floors, Area A10 9 0% 4 13-Mar-13 23-Mar-13 10-Oct-13 17-Oct-13 35

1017 PHASE 1 LOWER BASEMENT - TILINGPHASE 1 LOWER BASEMENT - TILINGPHASE 1 LOWER BASEMENT - TILINGPHASE 1 LOWER BASEMENT - TILING 73 24 09-Jun-12 01-Sep-12 23-Apr-13 20-May-13 57

1018 NECP-Rebase_06Sep12-4.CO.1.7.1.9PHASE 1 LOWER BASEMENT - TILINGNECOBFW1800 Tiling, Area A1 6 0% 4 09-Jun-12 14-Jun-12 23-Apr-13 27-Apr-13 57

1019 NECP-Rebase_06Sep12-4.CO.1.7.1.9PHASE 1 LOWER BASEMENT - TILINGNECOBFW1810 Tiling, Area A2 6 0% 4 16-Jun-12 21-Jun-12 28-Apr-13 01-May-13 57

1020 NECP-Rebase_06Sep12-4.CO.1.7.1.9PHASE 1 LOWER BASEMENT - TILINGNECOBFW1820 Tiling, Area A5 6 0% 4 28-Jun-12 04-Jul-12 02-May-13 06-May-13 57

1021 NECP-Rebase_06Sep12-4.CO.1.7.1.9PHASE 1 LOWER BASEMENT - TILINGNECOBFW1830 Tiling, Area A6 6 0% 4 05-Jul-12 11-Jul-12 07-May-13 11-May-13 57

1022 NECP-Rebase_06Sep12-4.CO.1.7.1.9PHASE 1 LOWER BASEMENT - TILINGNECOBFW1840 Tiling, Area A9 6 0% 4 19-Aug-12 25-Aug-12 12-May-13 15-May-13 57

1023 NECP-Rebase_06Sep12-4.CO.1.7.1.9PHASE 1 LOWER BASEMENT - TILINGNECOBFW1850 Tiling, Area A10 6 0% 4 26-Aug-12 01-Sep-12 16-May-13 20-May-13 57

1024 PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSPHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSPHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSPHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORS 92 50 12-Dec-12 28-Mar-13 03-Sep-13 03-Nov-13 35

1025 NECP-Rebase_06Sep12-4.CO.1.7.1.14PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3140 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A1 6 0% 5 12-Dec-12 18-Dec-12 03-Sep-13 09-Sep-13 35

1026 NECP-Rebase_06Sep12-4.CO.1.7.1.14PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3150 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A2 6 0% 5 24-Dec-12 30-Dec-12 09-Sep-13 15-Sep-13 35

1027 NECP-Rebase_06Sep12-4.CO.1.7.1.14PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3160 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A3 6 0% 5 05-Jan-13 10-Jan-13 15-Sep-13 21-Sep-13 35

1028 NECP-Rebase_06Sep12-4.CO.1.7.1.14PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3170 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A4 6 0% 5 16-Jan-13 22-Jan-13 21-Sep-13 26-Sep-13 35

1029 NECP-Rebase_06Sep12-4.CO.1.7.1.14PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3180 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A5 6 0% 5 28-Jan-13 03-Feb-13 26-Sep-13 02-Oct-13 35

1030 NECP-Rebase_06Sep12-4.CO.1.7.1.14PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3190 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A6 5 0% 5 09-Feb-13 13-Feb-13 02-Oct-13 08-Oct-13 35

1031 NECP-Rebase_06Sep12-4.CO.1.7.1.14PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3200 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A7 5 0% 5 20-Feb-13 25-Feb-13 08-Oct-13 16-Oct-13 35

1032 NECP-Rebase_06Sep12-4.CO.1.7.1.14PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3210 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A8 5 0% 5 03-Mar-13 07-Mar-13 16-Oct-13 22-Oct-13 35

1033 NECP-Rebase_06Sep12-4.CO.1.7.1.14PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3220 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A9 5 0% 5 13-Mar-13 18-Mar-13 22-Oct-13 28-Oct-13 35

1034 NECP-Rebase_06Sep12-4.CO.1.7.1.14PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3230 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A10 5 0% 5 24-Mar-13 28-Mar-13 28-Oct-13 03-Nov-13 35

1035 PHASE 1 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENSPHASE 1 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENSPHASE 1 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENSPHASE 1 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENS 18 38 18-Mar-13 07-Apr-13 08-Sep-13 24-Oct-13 57

1036 NECP-Rebase_06Sep12-4.CO.1.7.1.16PHASE 1 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENSNECOBFW3620 Timber Doors and Louver Screens, Area A1-A2 6 0% 6 18-Mar-13 24-Mar-13 08-Sep-13 15-Sep-13 53

1037 NECP-Rebase_06Sep12-4.CO.1.7.1.16PHASE 1 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENSNECOBFW3630 Timber Doors and Louver Screens, Area A7-A8 6 0% 6 25-Mar-13 31-Mar-13 06-Oct-13 15-Oct-13 59

1038 NECP-Rebase_06Sep12-4.CO.1.7.1.16PHASE 1 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENSNECOBFW3640 Timber Doors and Louver Screens, Area A9-A10 6 0% 6 01-Apr-13 07-Apr-13 17-Oct-13 24-Oct-13 57

1039 PHASE 1 LOWER BASEMENT - STEEL DOORS AND LOUVERSPHASE 1 LOWER BASEMENT - STEEL DOORS AND LOUVERSPHASE 1 LOWER BASEMENT - STEEL DOORS AND LOUVERSPHASE 1 LOWER BASEMENT - STEEL DOORS AND LOUVERS 19 29 27-Mar-13 17-Apr-13 22-Sep-13 28-Oct-13 39

1040 NECP-Rebase_06Sep12-4.CO.1.7.1.35PHASE 1 LOWER BASEMENT - STEEL DOORS AND LOUVERSNECOBFW3730 Steel Doors and Louvers, Area A1-A5 10 0% 10 27-Mar-13 07-Apr-13 22-Sep-13 03-Oct-13 49

1041 NECP-Rebase_06Sep12-4.CO.1.7.1.35PHASE 1 LOWER BASEMENT - STEEL DOORS AND LOUVERSNECOBFW3740 Steel Doors and Louvers, Area A6-A10 9 0% 9 08-Apr-13 17-Apr-13 17-Oct-13 28-Oct-13 39

1042 PHASE 1 LOWER BASEMENT - HANDRAILSPHASE 1 LOWER BASEMENT - HANDRAILSPHASE 1 LOWER BASEMENT - HANDRAILSPHASE 1 LOWER BASEMENT - HANDRAILS 27 21 30-Mar-13 29-Apr-13 26-Oct-13 19-Nov-13 45

1043 NECP-Rebase_06Sep12-4.CO.1.7.1.15PHASE 1 LOWER BASEMENT - HANDRAILSNECOBFW3500 Handrails, Area A1-A2 9 0% 7 30-Mar-13 08-Apr-13 26-Oct-13 03-Nov-13 35

1044 NECP-Rebase_06Sep12-4.CO.1.7.1.15PHASE 1 LOWER BASEMENT - HANDRAILSNECOBFW3510 Handrails, Area A5-A6 9 0% 7 09-Apr-13 18-Apr-13 03-Nov-13 11-Nov-13 45

1045 NECP-Rebase_06Sep12-4.CO.1.7.1.15PHASE 1 LOWER BASEMENT - HANDRAILSNECOBFW3520 Handrails, Area A9-A10 9 0% 7 20-Apr-13 29-Apr-13 11-Nov-13 19-Nov-13 45

1046 PHASE 1 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSPHASE 1 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSPHASE 1 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSPHASE 1 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORS 22 22 05-Jun-13 30-Jun-13 17-Oct-13 12-Nov-13 35

1047 NECP-Rebase_06Sep12-4.CO.1.7.1.36PHASE 1 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSNECOBFW3810 Skirtings, Walkway Grilles, Bollards, Column Protectors, A1-A4 8 0% 8 05-Jun-13 13-Jun-13 17-Oct-13 27-Oct-13 35

1048 NECP-Rebase_06Sep12-4.CO.1.7.1.36PHASE 1 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSNECOBFW3820 Skirtings, Walkway Grilles, Bollards, Column Protectors, A5-A7 7 0% 7 15-Jun-13 22-Jun-13 27-Oct-13 04-Nov-13 35

1049 NECP-Rebase_06Sep12-4.CO.1.7.1.36PHASE 1 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSNECOBFW3830 Skirtings, Walkway Grilles, Bollards, Column Protectors, A8-A10 7 0% 7 23-Jun-13 30-Jun-13 04-Nov-13 12-Nov-13 35

1050 Upper Basement FloorUpper Basement FloorUpper Basement FloorUpper Basement Floor 313 277 02-Sep-12 02-Sep-13 13-Feb-13 05-Jan-14 13

1051 PHASE 1 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSPHASE 1 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSPHASE 1 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSPHASE 1 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDS 59 59 09-Sep-12 15-Nov-12 18-Apr-13 25-Jun-13 63

1052 NECP-Rebase_06Sep12-4.CO.1.7.2.12PHASE 1 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1660 Plasterworks, Gypsum Boards, Plasterboards, Area A1 10 0% 10 09-Sep-12 19-Sep-12 18-Apr-13 29-Apr-13 46

1053 NECP-Rebase_06Sep12-4.CO.1.7.2.12PHASE 1 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1670 Plasterworks, Gypsum Boards, Plasterboards, Area A2 10 0% 10 20-Sep-12 01-Oct-12 30-Apr-13 11-May-13 46

1054 NECP-Rebase_06Sep12-4.CO.1.7.2.12PHASE 1 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1680 Plasterworks, Gypsum Boards, Plasterboards, Area A3 10 0% 10 02-Oct-12 13-Oct-12 12-May-13 22-May-13 46

1055 NECP-Rebase_06Sep12-4.CO.1.7.2.12PHASE 1 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1690 Plasterworks, Gypsum Boards, Plasterboards, Area A4 10 0% 10 14-Oct-12 24-Oct-12 23-May-13 03-Jun-13 46

1056 NECP-Rebase_06Sep12-4.CO.1.7.2.12PHASE 1 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1700 Plasterworks, Gypsum Boards, Plasterboards, Area A7 10 0% 10 25-Oct-12 05-Nov-12 04-Jun-13 15-Jun-13 63

1057 NECP-Rebase_06Sep12-4.CO.1.7.2.12PHASE 1 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1710 Plasterworks, Gypsum Boards, Plasterboards, Area A8 9 0% 9 06-Nov-12 15-Nov-12 16-Jun-13 25-Jun-13 63

1058 PHASE 1 UPPER BASEMENT - PAINTING CEILINGPHASE 1 UPPER BASEMENT - PAINTING CEILINGPHASE 1 UPPER BASEMENT - PAINTING CEILINGPHASE 1 UPPER BASEMENT - PAINTING CEILING 306 274 10-Sep-12 02-Sep-13 13-Feb-13 01-Jan-14 16

1059 PRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATS 90 60 10-Sep-12 23-Dec-12 13-Feb-13 24-Apr-13 87

1060 NECP-Rebase_06Sep12-4.CO.1.7.2.11.1PRIMER & FIRST COATSNECOBFW1300 Painting Ceiling, Area A1 9 0% 6 10-Sep-12 19-Sep-12 13-Feb-13 20-Feb-13 84

1061 NECP-Rebase_06Sep12-4.CO.1.7.2.11.1PRIMER & FIRST COATSNECOBFW1310 Painting Ceiling, Area A2 9 0% 6 20-Sep-12 30-Sep-12 20-Feb-13 27-Feb-13 84

1062 NECP-Rebase_06Sep12-4.CO.1.7.2.11.1PRIMER & FIRST COATSNECOBFW1320 Painting Ceiling, Area A3 9 0% 6 01-Oct-12 10-Oct-12 27-Feb-13 06-Mar-13 84

1063 NECP-Rebase_06Sep12-4.CO.1.7.2.11.1PRIMER & FIRST COATSNECOBFW1330 Painting Ceiling, Area A4 9 0% 6 11-Oct-12 21-Oct-12 06-Mar-13 13-Mar-13 84

1064 NECP-Rebase_06Sep12-4.CO.1.7.2.11.1PRIMER & FIRST COATSNECOBFW1340 Painting Ceiling, Area A5 9 0% 6 22-Oct-12 31-Oct-12 13-Mar-13 20-Mar-13 84

1065 NECP-Rebase_06Sep12-4.CO.1.7.2.11.1PRIMER & FIRST COATSNECOBFW1350 Painting Ceiling, Area A6 9 0% 6 01-Nov-12 11-Nov-12 20-Mar-13 27-Mar-13 87

1066 NECP-Rebase_06Sep12-4.CO.1.7.2.11.1PRIMER & FIRST COATSNECOBFW1360 Painting Ceiling, Area A7 9 0% 6 12-Nov-12 21-Nov-12 27-Mar-13 03-Apr-13 87

1067 NECP-Rebase_06Sep12-4.CO.1.7.2.11.1PRIMER & FIRST COATSNECOBFW1370 Painting Ceiling, Area A8 9 0% 6 22-Nov-12 02-Dec-12 03-Apr-13 10-Apr-13 87

1068 NECP-Rebase_06Sep12-4.CO.1.7.2.11.1PRIMER & FIRST COATSNECOBFW1380 Painting Ceiling, Area A9 9 0% 6 03-Dec-12 12-Dec-12 10-Apr-13 17-Apr-13 87

1069 NECP-Rebase_06Sep12-4.CO.1.7.2.11.1PRIMER & FIRST COATSNECOBFW1390 Painting Ceiling, Area A10 9 0% 6 13-Dec-12 23-Dec-12 17-Apr-13 24-Apr-13 87

1070 FINAL COATFINAL COATFINAL COATFINAL COAT 30 30 29-Jul-13 02-Sep-13 27-Nov-13 01-Jan-14 16

1071 NECP-Rebase_06Sep12-4.CO.1.7.2.11.2FINAL COAT NECOBFW1301 Painting Ceiling, Area A1 3 0% 3 29-Jul-13 01-Aug-13 27-Nov-13 30-Nov-13 13

1072 NECP-Rebase_06Sep12-4.CO.1.7.2.11.2FINAL COAT NECOBFW1311 Painting Ceiling, Area A2 3 0% 3 01-Aug-13 05-Aug-13 01-Dec-13 03-Dec-13 16

1073 NECP-Rebase_06Sep12-4.CO.1.7.2.11.2FINAL COAT NECOBFW1321 Painting Ceiling, Area A3 3 0% 3 05-Aug-13 08-Aug-13 04-Dec-13 07-Dec-13 16

1074 NECP-Rebase_06Sep12-4.CO.1.7.2.11.2FINAL COAT NECOBFW1331 Painting Ceiling, Area A4 3 0% 3 08-Aug-13 12-Aug-13 08-Dec-13 10-Dec-13 16

1075 NECP-Rebase_06Sep12-4.CO.1.7.2.11.2FINAL COAT NECOBFW1341 Painting Ceiling, Area A5 3 0% 3 12-Aug-13 15-Aug-13 11-Dec-13 14-Dec-13 16

1076 NECP-Rebase_06Sep12-4.CO.1.7.2.11.2FINAL COAT NECOBFW1351 Painting Ceiling, Area A6 3 0% 3 15-Aug-13 19-Aug-13 15-Dec-13 17-Dec-13 16

1077 NECP-Rebase_06Sep12-4.CO.1.7.2.11.2FINAL COAT NECOBFW1361 Painting Ceiling, Area A7 3 0% 3 19-Aug-13 22-Aug-13 19-Dec-13 22-Dec-13 16

1078 NECP-Rebase_06Sep12-4.CO.1.7.2.11.2FINAL COAT NECOBFW1371 Painting Ceiling, Area A8 3 0% 3 22-Aug-13 26-Aug-13 23-Dec-13 25-Dec-13 16

1079 NECP-Rebase_06Sep12-4.CO.1.7.2.11.2FINAL COAT NECOBFW1381 Painting Ceiling, Area A9 3 0% 3 26-Aug-13 29-Aug-13 26-Dec-13 29-Dec-13 16

1080 NECP-Rebase_06Sep12-4.CO.1.7.2.11.2FINAL COAT NECOBFW1391 Painting Ceiling, Area A10 3 0% 3 29-Aug-13 02-Sep-13 30-Dec-13 01-Jan-14 16

1081 PHASE 1 UPPER BASEMENT - PAINTING WALLSPHASE 1 UPPER BASEMENT - PAINTING WALLSPHASE 1 UPPER BASEMENT - PAINTING WALLSPHASE 1 UPPER BASEMENT - PAINTING WALLS 216 212 24-Dec-12 02-Sep-13 30-Apr-13 05-Jan-14 13

1082 PRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATS 90 93 24-Dec-12 07-Apr-13 30-Apr-13 15-Aug-13 46

1083 NECP-Rebase_06Sep12-4.CO.1.7.2.17.1PRIMER & FIRST COATSNECOBFW2440 Painting Walls & Columns, Area A1 9 0% 9 24-Dec-12 02-Jan-13 30-Apr-13 09-May-13 49

1084 NECP-Rebase_06Sep12-4.CO.1.7.2.17.1PRIMER & FIRST COATSNECOBFW2450 Painting Walls & Columns, Area A2 9 0% 9 03-Jan-13 13-Jan-13 12-May-13 21-May-13 48

1085 NECP-Rebase_06Sep12-4.CO.1.7.2.17.1PRIMER & FIRST COATSNECOBFW2460 Painting Walls & Columns, Area A3 9 0% 9 14-Jan-13 23-Jan-13 23-May-13 02-Jun-13 47

1086 NECP-Rebase_06Sep12-4.CO.1.7.2.17.1PRIMER & FIRST COATSNECOBFW2470 Painting Walls & Columns, Area A4 9 0% 9 24-Jan-13 03-Feb-13 04-Jun-13 13-Jun-13 46

1087 NECP-Rebase_06Sep12-4.CO.1.7.2.17.1PRIMER & FIRST COATSNECOBFW2480 Painting Walls & Columns, Area A5 9 0% 9 04-Feb-13 13-Feb-13 15-Jun-13 24-Jun-13 46

1088 NECP-Rebase_06Sep12-4.CO.1.7.2.17.1PRIMER & FIRST COATSNECOBFW2490 Painting Walls & Columns, Area A6 9 0% 9 14-Feb-13 24-Feb-13 25-Jun-13 04-Jul-13 46

1089 NECP-Rebase_06Sep12-4.CO.1.7.2.17.1PRIMER & FIRST COATSNECOBFW2500 Painting Walls & Columns, Area A7 9 0% 9 25-Feb-13 06-Mar-13 06-Jul-13 15-Jul-13 46

1090 NECP-Rebase_06Sep12-4.CO.1.7.2.17.1PRIMER & FIRST COATSNECOBFW2510 Painting Walls & Columns, Area A8 9 0% 9 07-Mar-13 17-Mar-13 16-Jul-13 25-Jul-13 46

1091 NECP-Rebase_06Sep12-4.CO.1.7.2.17.1PRIMER & FIRST COATSNECOBFW2520 Painting Walls & Columns, Area A9 9 0% 9 18-Mar-13 27-Mar-13 27-Jul-13 05-Aug-13 46

1092 NECP-Rebase_06Sep12-4.CO.1.7.2.17.1PRIMER & FIRST COATSNECOBFW2530 Painting Walls & Columns, Area A10 9 0% 9 28-Mar-13 07-Apr-13 06-Aug-13 15-Aug-13 46

1093 FINAL COATFINAL COATFINAL COATFINAL COAT 30 30 29-Jul-13 02-Sep-13 01-Dec-13 05-Jan-14 13

1094 NECP-Rebase_06Sep12-4.CO.1.7.2.17.2FINAL COAT NECOBFW2441 Painting Walls & Columns, Area A1 3 0% 3 29-Jul-13 01-Aug-13 01-Dec-13 03-Dec-13 13

1095 NECP-Rebase_06Sep12-4.CO.1.7.2.17.2FINAL COAT NECOBFW2451 Painting Walls & Columns, Area A2 3 0% 3 01-Aug-13 05-Aug-13 04-Dec-13 07-Dec-13 13

1096 NECP-Rebase_06Sep12-4.CO.1.7.2.17.2FINAL COAT NECOBFW2461 Painting Walls & Columns, Area A3 3 0% 3 05-Aug-13 08-Aug-13 08-Dec-13 10-Dec-13 13

1097 NECP-Rebase_06Sep12-4.CO.1.7.2.17.2FINAL COAT NECOBFW2471 Painting Walls & Columns, Area A4 3 0% 3 08-Aug-13 12-Aug-13 11-Dec-13 14-Dec-13 13

1098 NECP-Rebase_06Sep12-4.CO.1.7.2.17.2FINAL COAT NECOBFW2481 Painting Walls & Columns, Area A5 3 0% 3 12-Aug-13 15-Aug-13 15-Dec-13 17-Dec-13 13

1099 NECP-Rebase_06Sep12-4.CO.1.7.2.17.2FINAL COAT NECOBFW2491 Painting Walls & Columns, Area A6 3 0% 3 15-Aug-13 19-Aug-13 19-Dec-13 22-Dec-13 13

1100 NECP-Rebase_06Sep12-4.CO.1.7.2.17.2FINAL COAT NECOBFW2501 Painting Walls & Columns, Area A7 3 0% 3 19-Aug-13 22-Aug-13 23-Dec-13 25-Dec-13 13

1101 NECP-Rebase_06Sep12-4.CO.1.7.2.17.2FINAL COAT NECOBFW2511 Painting Walls & Columns, Area A8 3 0% 3 22-Aug-13 26-Aug-13 26-Dec-13 29-Dec-13 13

1102 NECP-Rebase_06Sep12-4.CO.1.7.2.17.2FINAL COAT NECOBFW2521 Painting Walls & Columns, Area A9 3 0% 3 26-Aug-13 29-Aug-13 30-Dec-13 01-Jan-14 13

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Painting Walls & Columns, Area A10

Painting Walls & Columns, Area A1

Painting Walls & Columns, Area A2

Painting Walls & Columns, Area A1

Painting Walls & Columns, Area A2

Painting Walls & Columns, Area A3

Painting Walls & Columns, Area A4

Painting Walls & Columns, Area A5

Painting Walls & Columns, Area A6

Painting Walls & Columns, Area A7

Painting Walls & Columns, Area A8

Painting Walls & Columns, Area A9

Painting Walls & Columns, Area A10

Painting Floors, Area A1

Painting Floors, Area A2

Painting Floors, Area A3

Painting Floors, Area A4

Painting Floors, Area A5

Painting Floors, Area A6

Painting Floors, Area A7

Painting Floors, Area A8

Painting Floors, Area A9

Painting Floors, Area A10

Tiling, Area A1

Tiling, Area A2

Tiling, Area A5

Tiling, Area A6

Tiling, Area A9

Tiling, Area A10

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A1

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A2

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A3

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A4

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A5

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A6

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A7

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A8

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A9

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A10

Timber Doors and Louver Screens, Area A1-A2

Timber Doors and Louver Screens, Area A7-A8

Timber Doors and Louver Screens, Area A9-A10

Steel Doors and Louvers, Area A1-A5

Steel Doors and Louvers, Area A6-A10

Handrails, Area A1-A2

Handrails, Area A5-A6

Handrails, Area A9-A10

Skirtings, Walkway Grilles, Bollards, Column Protectors, A1-A4

Skirtings, Walkway Grilles, Bollards, Column Protectors, A5-A7

Skirtings, Walkway Grilles, Bollards, Column Protectors, A8-A10

Plasterworks, Gypsum Boards, Plasterboards, Area A1

Plasterworks, Gypsum Boards, Plasterboards, Area A2

Plasterworks, Gypsum Boards, Plasterboards, Area A3

Plasterworks, Gypsum Boards, Plasterboards, Area A4

Plasterworks, Gypsum Boards, Plasterboards, Area A7

Plasterworks, Gypsum Boards, Plasterboards, Area A8

Painting Ceiling, Area A1

Painting Ceiling, Area A2

Painting Ceiling, Area A3

Painting Ceiling, Area A4

Painting Ceiling, Area A5

Painting Ceiling, Area A6

Painting Ceiling, Area A7

Painting Ceiling, Area A8

Painting Ceiling, Area A9

Painting Ceiling, Area A10

Painting Ceiling, Area A1

Painting Ceiling, Area A2

Painting Ceiling, Area A3

Painting Ceiling, Area A4

Painting Ceiling, Area A5

Painting Ceiling, Area A6

Painting Ceiling, Area A7

Painting Ceiling, Area A8

Painting Ceiling, Area A9

Painting Ceiling, Area A10

Painting Walls & Columns, Area A1

Painting Walls & Columns, Area A2

Painting Walls & Columns, Area A3

Painting Walls & Columns, Area A4

Painting Walls & Columns, Area A5

Painting Walls & Columns, Area A6

Painting Walls & Columns, Area A7

Painting Walls & Columns, Area A8

Painting Walls & Columns, Area A9

Painting Walls & Columns, Area A10

Painting Walls & Columns, Area A1

Painting Walls & Columns, Area A2

Painting Walls & Columns, Area A3

Painting Walls & Columns, Area A4

Painting Walls & Columns, Area A5

Painting Walls & Columns, Area A6

Painting Walls & Columns, Area A7

Painting Walls & Columns, Area A8

Painting Walls & Columns, Area A9

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 10 of 19/27-Feb-13 09:03

Page 11: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

1103 NECP-Rebase_06Sep12-4.CO.1.7.2.17.2FINAL COAT NECOBFW2531 Painting Walls & Columns, Area A10 3 0% 3 29-Aug-13 02-Sep-13 02-Jan-14 05-Jan-14 13

1104 PHASE 1 UPPER BASEMENT - PAINTING FLOORSPHASE 1 UPPER BASEMENT - PAINTING FLOORSPHASE 1 UPPER BASEMENT - PAINTING FLOORSPHASE 1 UPPER BASEMENT - PAINTING FLOORS 90 40 08-Apr-13 21-Jul-13 08-Oct-13 26-Nov-13 46

1105 NECP-Rebase_06Sep12-4.CO.1.7.2.18PHASE 1 UPPER BASEMENT - PAINTING FLOORSNECOBFW2840 Painting Floors, Area A1 9 0% 4 08-Apr-13 17-Apr-13 08-Oct-13 15-Oct-13 32

1106 NECP-Rebase_06Sep12-4.CO.1.7.2.18PHASE 1 UPPER BASEMENT - PAINTING FLOORSNECOBFW2850 Painting Floors, Area A2 9 0% 4 18-Apr-13 28-Apr-13 15-Oct-13 20-Oct-13 42

1107 NECP-Rebase_06Sep12-4.CO.1.7.2.18PHASE 1 UPPER BASEMENT - PAINTING FLOORSNECOBFW2860 Painting Floors, Area A3 9 0% 4 29-Apr-13 08-May-13 20-Oct-13 24-Oct-13 42

1108 NECP-Rebase_06Sep12-4.CO.1.7.2.18PHASE 1 UPPER BASEMENT - PAINTING FLOORSNECOBFW2870 Painting Floors, Area A4 9 0% 4 09-May-13 19-May-13 24-Oct-13 29-Oct-13 43

1109 NECP-Rebase_06Sep12-4.CO.1.7.2.18PHASE 1 UPPER BASEMENT - PAINTING FLOORSNECOBFW2880 Painting Floors, Area A5 9 0% 4 20-May-13 29-May-13 29-Oct-13 03-Nov-13 43

1110 NECP-Rebase_06Sep12-4.CO.1.7.2.18PHASE 1 UPPER BASEMENT - PAINTING FLOORSNECOBFW2890 Painting Floors, Area A6 9 0% 4 30-May-13 09-Jun-13 03-Nov-13 07-Nov-13 43

1111 NECP-Rebase_06Sep12-4.CO.1.7.2.18PHASE 1 UPPER BASEMENT - PAINTING FLOORSNECOBFW2900 Painting Floors, Area A7 9 0% 4 10-Jun-13 19-Jun-13 07-Nov-13 12-Nov-13 43

1112 NECP-Rebase_06Sep12-4.CO.1.7.2.18PHASE 1 UPPER BASEMENT - PAINTING FLOORSNECOBFW2910 Painting Floors, Area A8 9 0% 4 20-Jun-13 30-Jun-13 12-Nov-13 17-Nov-13 45

1113 NECP-Rebase_06Sep12-4.CO.1.7.2.18PHASE 1 UPPER BASEMENT - PAINTING FLOORSNECOBFW2920 Painting Floors, Area A9 9 0% 4 01-Jul-13 10-Jul-13 17-Nov-13 21-Nov-13 45

1114 NECP-Rebase_06Sep12-4.CO.1.7.2.18PHASE 1 UPPER BASEMENT - PAINTING FLOORSNECOBFW2930 Painting Floors, Area A10 9 0% 4 11-Jul-13 21-Jul-13 21-Nov-13 26-Nov-13 46

1115 PHASE 1 UPPER BASEMENT - TILINGPHASE 1 UPPER BASEMENT - TILINGPHASE 1 UPPER BASEMENT - TILINGPHASE 1 UPPER BASEMENT - TILING 69 40 02-Sep-12 20-Nov-12 21-May-13 06-Jul-13 102

1116 NECP-Rebase_06Sep12-4.CO.1.7.2.13PHASE 1 UPPER BASEMENT - TILINGNECOBFW1860 Tiling, Area A1 7 0% 4 02-Sep-12 09-Sep-12 21-May-13 25-May-13 57

1117 NECP-Rebase_06Sep12-4.CO.1.7.2.13PHASE 1 UPPER BASEMENT - TILINGNECOBFW1870 Tiling, Area A2 7 0% 4 10-Sep-12 17-Sep-12 26-May-13 29-May-13 57

1118 NECP-Rebase_06Sep12-4.CO.1.7.2.13PHASE 1 UPPER BASEMENT - TILINGNECOBFW1880 Tiling, Area A3 7 0% 4 18-Sep-12 25-Sep-12 30-May-13 03-Jun-13 57

1119 NECP-Rebase_06Sep12-4.CO.1.7.2.13PHASE 1 UPPER BASEMENT - TILINGNECOBFW1890 Tiling, Area A4 7 0% 4 26-Sep-12 03-Oct-12 04-Jun-13 08-Jun-13 57

1120 NECP-Rebase_06Sep12-4.CO.1.7.2.13PHASE 1 UPPER BASEMENT - TILINGNECOBFW1900 Tiling, Area A5 7 0% 4 04-Oct-12 11-Oct-12 09-Jun-13 12-Jun-13 57

1121 NECP-Rebase_06Sep12-4.CO.1.7.2.13PHASE 1 UPPER BASEMENT - TILINGNECOBFW1910 Tiling, Area A6 7 0% 4 13-Oct-12 20-Oct-12 13-Jun-13 17-Jun-13 102

1122 NECP-Rebase_06Sep12-4.CO.1.7.2.13PHASE 1 UPPER BASEMENT - TILINGNECOBFW1920 Tiling, Area A7 7 0% 4 21-Oct-12 28-Oct-12 18-Jun-13 22-Jun-13 102

1123 NECP-Rebase_06Sep12-4.CO.1.7.2.13PHASE 1 UPPER BASEMENT - TILINGNECOBFW1930 Tiling, Area A8 7 0% 4 29-Oct-12 05-Nov-12 23-Jun-13 26-Jun-13 102

1124 NECP-Rebase_06Sep12-4.CO.1.7.2.13PHASE 1 UPPER BASEMENT - TILINGNECOBFW1940 Tiling, Area A9 7 0% 4 06-Nov-12 13-Nov-12 27-Jun-13 01-Jul-13 102

1125 NECP-Rebase_06Sep12-4.CO.1.7.2.13PHASE 1 UPPER BASEMENT - TILINGNECOBFW1950 Tiling, Area A10 6 0% 4 14-Nov-12 20-Nov-12 02-Jul-13 06-Jul-13 102

1126 PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSPHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSPHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSPHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORS 55 50 18-Apr-13 20-Jun-13 15-Oct-13 12-Dec-13 32

1127 NECP-Rebase_06Sep12-4.CO.1.7.2.19PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3240 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A1 6 0% 5 18-Apr-13 24-Apr-13 15-Oct-13 21-Oct-13 32

1128 NECP-Rebase_06Sep12-4.CO.1.7.2.19PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3250 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A2 6 0% 5 25-Apr-13 01-May-13 21-Oct-13 27-Oct-13 32

1129 NECP-Rebase_06Sep12-4.CO.1.7.2.19PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3260 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A3 6 0% 5 02-May-13 08-May-13 27-Oct-13 02-Nov-13 32

1130 NECP-Rebase_06Sep12-4.CO.1.7.2.19PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3270 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A4 6 0% 5 09-May-13 15-May-13 02-Nov-13 07-Nov-13 32

1131 NECP-Rebase_06Sep12-4.CO.1.7.2.19PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3280 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A5 6 0% 5 16-May-13 22-May-13 07-Nov-13 13-Nov-13 32

1132 NECP-Rebase_06Sep12-4.CO.1.7.2.19PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3290 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A6 5 0% 5 23-May-13 28-May-13 13-Nov-13 19-Nov-13 32

1133 NECP-Rebase_06Sep12-4.CO.1.7.2.19PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3300 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A7 5 0% 5 29-May-13 03-Jun-13 19-Nov-13 25-Nov-13 32

1134 NECP-Rebase_06Sep12-4.CO.1.7.2.19PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3310 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A8 5 0% 5 04-Jun-13 09-Jun-13 25-Nov-13 01-Dec-13 32

1135 NECP-Rebase_06Sep12-4.CO.1.7.2.19PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3320 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A9 5 0% 5 10-Jun-13 15-Jun-13 01-Dec-13 07-Dec-13 32

1136 NECP-Rebase_06Sep12-4.CO.1.7.2.19PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3330 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A10 5 0% 5 16-Jun-13 20-Jun-13 07-Dec-13 12-Dec-13 32

1137 PHASE 1 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENSPHASE 1 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENSPHASE 1 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENSPHASE 1 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENS 59 25 20-May-13 27-Jul-13 29-Oct-13 27-Nov-13 45

1138 NECP-Rebase_06Sep12-4.CO.1.7.2.21PHASE 1 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENSNECOBFW3650 Timber Doors and Louver Screens, Area A3-A4 6 0% 6 20-May-13 26-May-13 29-Oct-13 05-Nov-13 53

1139 NECP-Rebase_06Sep12-4.CO.1.7.2.21PHASE 1 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENSNECOBFW3660 Timber Doors and Louver Screens, Area A7-A8 6 0% 6 01-Jul-13 07-Jul-13 12-Nov-13 19-Nov-13 47

1140 NECP-Rebase_06Sep12-4.CO.1.7.2.21PHASE 1 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENSNECOBFW3670 Timber Doors and Louver Screens, Area A9-A10 5 0% 5 22-Jul-13 27-Jul-13 21-Nov-13 27-Nov-13 45

1141 PHASE 1 UPPER BASEMENT - STEEL DOORS AND LOUVERSPHASE 1 UPPER BASEMENT - STEEL DOORS AND LOUVERSPHASE 1 UPPER BASEMENT - STEEL DOORS AND LOUVERSPHASE 1 UPPER BASEMENT - STEEL DOORS AND LOUVERS 45 12 30-May-13 21-Jul-13 28-Oct-13 11-Nov-13 39

1142 NECP-Rebase_06Sep12-4.CO.1.7.2.37PHASE 1 UPPER BASEMENT - STEEL DOORS AND LOUVERSNECOBFW3750 Steel Doors and Louvers, Area A1-A5 9 0% 6 30-May-13 09-Jun-13 28-Oct-13 04-Nov-13 39

1143 NECP-Rebase_06Sep12-4.CO.1.7.2.37PHASE 1 UPPER BASEMENT - STEEL DOORS AND LOUVERSNECOBFW3760 Steel Doors and Louvers, Area A6-A10 6 0% 6 15-Jul-13 21-Jul-13 04-Nov-13 11-Nov-13 39

1144 PHASE 1 UPPER BASEMENT - HANDRAILSPHASE 1 UPPER BASEMENT - HANDRAILSPHASE 1 UPPER BASEMENT - HANDRAILSPHASE 1 UPPER BASEMENT - HANDRAILS 52 29 02-May-13 01-Jul-13 03-Nov-13 07-Dec-13 37

1145 NECP-Rebase_06Sep12-4.CO.1.7.2.20PHASE 1 UPPER BASEMENT - HANDRAILSNECOBFW3530 Handrails, Area A1-A2 9 0% 7 02-May-13 12-May-13 03-Nov-13 11-Nov-13 35

1146 NECP-Rebase_06Sep12-4.CO.1.7.2.20PHASE 1 UPPER BASEMENT - HANDRAILSNECOBFW3540 Handrails, Area A5-A6 9 0% 7 29-May-13 08-Jun-13 19-Nov-13 27-Nov-13 38

1147 NECP-Rebase_06Sep12-4.CO.1.7.2.20PHASE 1 UPPER BASEMENT - HANDRAILSNECOBFW3550 Handrails, Area A9-A10 9 0% 7 22-Jun-13 01-Jul-13 28-Nov-13 07-Dec-13 37

1148 PHASE 1 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSPHASE 1 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSPHASE 1 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSPHASE 1 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORS 23 23 01-Jul-13 27-Jul-13 12-Nov-13 09-Dec-13 35

1149 NECP-Rebase_06Sep12-4.CO.1.7.2.38PHASE 1 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSNECOBFW3840 Skirtings, Walkway Grilles, Bollards, Column Protectors, A1-A4 8 0% 8 01-Jul-13 09-Jul-13 12-Nov-13 21-Nov-13 35

1150 NECP-Rebase_06Sep12-4.CO.1.7.2.38PHASE 1 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSNECOBFW3850 Skirtings, Walkway Grilles, Bollards, Column Protectors, A5-A7 8 0% 8 10-Jul-13 18-Jul-13 21-Nov-13 01-Dec-13 35

1151 NECP-Rebase_06Sep12-4.CO.1.7.2.38PHASE 1 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSNECOBFW3860 Skirtings, Walkway Grilles, Bollards, Column Protectors, A8-A10 7 0% 7 20-Jul-13 27-Jul-13 01-Dec-13 09-Dec-13 35

1152 PHASE 1 - FINISHING WORKSPHASE 1 - FINISHING WORKSPHASE 1 - FINISHING WORKSPHASE 1 - FINISHING WORKS 224 105 17-Nov-12 04-Aug-13 26-Jun-13 28-Oct-13 59

1153 NECP-Rebase_06Sep12-4.CO.1.7.2.8PHASE 1 - FINISHING WORKSNECOBFW1040 Glazing System - Internal Glazed Screen, Area A1, A9-A10 Lower Bsmt; A1-A2/A5-A6/A7-A8 Grd Flr26 0% 26 17-Nov-12 16-Dec-12 26-Jun-13 25-Jul-13 107

1154 NECP-Rebase_06Sep12-4.CO.1.7.2.8PHASE 1 - FINISHING WORKSNECOBFW1120 Softwood Framing, Joinery Panels, WC Partitions, Area A1-A2 Lower Bsmt; Area A1-A2/A9-A10 Upper Bsmt20 0% 20 24-Mar-13 15-Apr-13 13-Jul-13 04-Aug-13 97

1155 NECP-Rebase_06Sep12-4.CO.1.7.2.8PHASE 1 - FINISHING WORKSNECOBFW1130 Sandstone Cladding, Area A1-A2 Grd Flr (PMS) 11 0% 11 24-Mar-13 04-Apr-13 22-Aug-13 03-Sep-13 57

1156 NECP-Rebase_06Sep12-4.CO.1.7.2.8PHASE 1 - FINISHING WORKSNECOBFW1080 Steel Cladding and Panels (PMS) 14 0% 14 18-Mar-13 02-Apr-13 23-Sep-13 08-Oct-13 57

1157 NECP-Rebase_06Sep12-4.CO.1.7.2.8PHASE 1 - FINISHING WORKSNECOBFW1180 Ticket Office Counters & Windows, Area A1 Upper Bsmt (PMS) 9 0% 9 30-Jun-13 09-Jul-13 09-Oct-13 21-Oct-13 57

1158 NECP-Rebase_06Sep12-4.CO.1.7.2.8PHASE 1 - FINISHING WORKSNECOBFW1140 Backlit Feature Wall, Area A1-A2 Grd Flr (PMS) 6 0% 6 10-Jul-13 16-Jul-13 15-Oct-13 21-Oct-13 57

1159 NECP-Rebase_06Sep12-4.CO.1.7.2.8PHASE 1 - FINISHING WORKSNECOBFW1150 Road Markings, Area A1-A10 Lower Bsmt, A1-A10 Upper Bsmt 15 0% 12 10-Jul-13 27-Jul-13 15-Oct-13 28-Oct-13 57

1160 NECP-Rebase_06Sep12-4.CO.1.7.2.8PHASE 1 - FINISHING WORKSNECOBFW1160 Bench, Area A1-A2, Area A5-A6, Area A7-A8 Grd Flr 5 0% 5 16-Jul-13 21-Jul-13 15-Oct-13 20-Oct-13 59

1161 NECP-Rebase_06Sep12-4.CO.1.7.2.8PHASE 1 - FINISHING WORKSNECOBFW1170 Signages and Wayfinding, Area A1-A10 Lower Bsmt; Area A1-A10 Upper Bsmt12 0% 12 22-Jul-13 04-Aug-13 15-Oct-13 28-Oct-13 59

1162 Furniture, Fittings & EquipmentFurniture, Fittings & EquipmentFurniture, Fittings & EquipmentFurniture, Fittings & Equipment 91 111 16-Apr-13 30-Jul-13 20-Aug-13 31-Dec-13 12

1163 NECP-Rebase_06Sep12-4.CO.1.4Furniture, Fittings & EquipmentNECOBFFE1010 Sanitary Fixtures & Fittings, Accessories (Concourse Pantry) 20 0% 20 16-Apr-13 08-May-13 20-Aug-13 12-Sep-13 83

1164 NECP-Rebase_06Sep12-4.CO.1.4Furniture, Fittings & EquipmentNECOBFFE1030 Kitchen Equipment (Concourse Pantry) 5 0% 5 16-Apr-13 21-Apr-13 22-Aug-13 27-Aug-13 112

1165 NECP-Rebase_06Sep12-4.CO.1.4Furniture, Fittings & EquipmentNECOBFFE1040 Furniture (Concourse Pantry) 5 0% 5 16-Apr-13 21-Apr-13 28-Aug-13 02-Sep-13 112

1166 NECP-Rebase_06Sep12-4.CO.1.4Furniture, Fittings & EquipmentNECOBFFE1000 Benches (Concourse Pantry) 8 0% 8 22-Jul-13 30-Jul-13 19-Sep-13 28-Sep-13 88

1167 NECP-Rebase_06Sep12-4.CO.1.4Furniture, Fittings & EquipmentNECOBFFE1020 Security Control Equipment (Concourse Pantry) 14 0% 14 16-Apr-13 01-May-13 15-Dec-13 31-Dec-13 0

1168 PHASE 2 WORKSPHASE 2 WORKSPHASE 2 WORKSPHASE 2 WORKS 480 296 22-Feb-12 03-Sep-13 03-Jan-12 31-Jan-13 14-Jan-14 5

1169 M6-Const. Compl. of Remaining Works Phase 1 & 2 Fit Out, MEP, Facade, Ext'l Works, Test, CommissionM6-Const. Compl. of Remaining Works Phase 1 & 2 Fit Out, MEP, Facade, Ext'l Works, Test, CommissionM6-Const. Compl. of Remaining Works Phase 1 & 2 Fit Out, MEP, Facade, Ext'l Works, Test, CommissionM6-Const. Compl. of Remaining Works Phase 1 & 2 Fit Out, MEP, Facade, Ext'l Works, Test, Commission 296 150 22-Feb-12 02-Feb-13 03-Jan-12 31-Jan-13 24-Jul-13 151

1170 Lower Basement FloorLower Basement FloorLower Basement FloorLower Basement Floor 296 150 22-Feb-12 02-Feb-13 03-Jan-12 31-Jan-13 24-Jul-13 75

1171 PHASE 2 - DEWATERINGPHASE 2 - DEWATERINGPHASE 2 - DEWATERINGPHASE 2 - DEWATERING 296 33 22-Feb-12 02-Feb-13 03-Jan-12 17-Jun-13 24-Jul-13 75

1172 NECP-Rebase_06Sep12-4.CO.2.1.2.13PHASE 2 - DEWATERINGNECOSPE25 Dewatering Works 296 89% 33 22-Feb-12 02-Feb-13 03-Jan-12 17-Jun-13 24-Jul-13 75

1173 PHASE 2 - EXCAVATIONPHASE 2 - EXCAVATIONPHASE 2 - EXCAVATIONPHASE 2 - EXCAVATION 10 0 22-Feb-12 04-Mar-12 12-Jan-12 31-Jan-13 31-Jan-13 23

1174 Area 19Area 19Area 19Area 19 5 0 22-Feb-12 27-Feb-12 12-Jan-12 31-Jan-13 31-Jan-13 23

1175 NECP-Rebase_06Sep12-4.CO.2.1.2.6.1Area 19 NECOEX2000 Excavation Area 34 5 95% 0 22-Feb-12 27-Feb-12 12-Jan-12 31-Jan-13 31-Jan-13 23

1176 Area 22Area 22Area 22Area 22 5 0 28-Feb-12 04-Mar-12 17-Jan-12 31-Jan-13 31-Jan-13 23

1177 NECP-Rebase_06Sep12-4.CO.2.1.2.6.3Area 22 NECOEX2020 Excavation Area 31 5 95% 0 28-Feb-12 04-Mar-12 17-Jan-12 31-Jan-13 31-Jan-13 23

1178 PHASE 2 - LOWER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNSPHASE 2 - LOWER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNSPHASE 2 - LOWER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNSPHASE 2 - LOWER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNS 0 6 17-Nov-12 31-Jan-13 06-Feb-13 34

1179 Area 22/(Area 31)Area 22/(Area 31)Area 22/(Area 31)Area 22/(Area 31) 0 6 31-Dec-12 31-Jan-13 06-Feb-13 25

1180 NECP-Rebase_06Sep12-4.CO.2.1.2.11.3Area 22/(Area 31) NECOLBWC2035 RC Retaining Wall Lower Basement, Area 32 0 30% 6 31-Dec-12 31-Jan-13 06-Feb-13 25

1181 Area 20/(Area 35)Area 20/(Area 35)Area 20/(Area 35)Area 20/(Area 35) 0 5 21-Dec-12 31-Jan-13 05-Feb-13 35

1182 NECP-Rebase_06Sep12-4.CO.2.1.2.11.15Area 20/(Area 35) NECOLBWC2245 RC Retaining Wall, Lower Basement, Area 36 0 40% 5 21-Dec-12 31-Jan-13 05-Feb-13 35

1183 Area 42/(Area 42)Area 42/(Area 42)Area 42/(Area 42)Area 42/(Area 42) 0 5 17-Nov-12 31-Jan-13 05-Feb-13 19

1184 NECP-Rebase_06Sep12-4.CO.2.1.2.11.24Area 42/(Area 42) NECOLBWC2460 RC Retaining Wall, Lower Basement, Area 45 and 46 0 40% 5 17-Nov-12 31-Jan-13 05-Feb-13 19

1185 Area 41/(Area 41)Area 41/(Area 41)Area 41/(Area 41)Area 41/(Area 41) 0 6 15-Dec-12 31-Jan-13 06-Feb-13 7

1186 NECP-Rebase_06Sep12-4.CO.2.1.2.11.23Area 41/(Area 41) NECOLBWC2440 RC Retaining Wall, Lower Basement, Area 44 0 30% 6 15-Dec-12 31-Jan-13 06-Feb-13 7

1187 Area 40/(Area 40)Area 40/(Area 40)Area 40/(Area 40)Area 40/(Area 40) 0 2 05-Dec-12 31-Jan-13 02-Feb-13 22

1188 NECP-Rebase_06Sep12-4.CO.2.1.2.11.22Area 40/(Area 40) NECOLBWC2420 RC Retaining Wall, Lower Basement, Area 42 and 43 0 75% 2 05-Dec-12 31-Jan-13 02-Feb-13 22

1189 Upper Basement FloorUpper Basement FloorUpper Basement FloorUpper Basement Floor 249 136 13-Mar-12 29-Dec-12 03-Sep-12 31-Jan-13 08-Jul-13 165

1190 PHASE 2 - UPPER BASEMENT SLABSPHASE 2 - UPPER BASEMENT SLABSPHASE 2 - UPPER BASEMENT SLABSPHASE 2 - UPPER BASEMENT SLABS 64 92 17-Jul-12 30-Sep-12 26-Nov-12 31-Jan-13 18-May-13 137

1191 Area B1 (A24/A26)Area B1 (A24/A26)Area B1 (A24/A26)Area B1 (A24/A26) 14 38 17-Jul-12 02-Aug-12 10-Dec-12 31-Jan-13 16-Mar-13 2

1192 NECP-Rebase_06Sep12-4.CO.2.1.3.10.2Area B1 (A24/A26) NECOLBSS2000 RC Suspended Slab, Upper Basement, Area 22 14 0% 38 17-Jul-12 02-Aug-12 10-Dec-12 31-Jan-13 16-Mar-13 0

1193 NECP-Rebase_06Sep12-4.CO.2.1.3.10.2Area B1 (A24/A26) NECOLBSS2001 Small power conduits 4 0% 4 25-Jul-12 30-Jul-12 10-Mar-13 14-Mar-13 4

1194 NECP-Rebase_06Sep12-4.CO.2.1.3.10.2Area B1 (A24/A26) NECOLBSS2002 Security system conduits 4 0% 4 25-Jul-12 30-Jul-12 10-Mar-13 14-Mar-13 4

1195 NECP-Rebase_06Sep12-4.CO.2.1.3.10.2Area B1 (A24/A26) NECOLBSS2003 Earthing conduits 4 0% 4 25-Jul-12 30-Jul-12 10-Mar-13 14-Mar-13 4

1196 NECP-Rebase_06Sep12-4.CO.2.1.3.10.2Area B1 (A24/A26) NECOLBSS2004 Lighting conduits 4 0% 4 25-Jul-12 30-Jul-12 10-Mar-13 14-Mar-13 4

1197 NECP-Rebase_06Sep12-4.CO.2.1.3.10.2Area B1 (A24/A26) NECOLBSS2005 Fire Alaram conduits 4 0% 4 25-Jul-12 30-Jul-12 10-Mar-13 14-Mar-13 4

1198 NECP-Rebase_06Sep12-4.CO.2.1.3.10.2Area B1 (A24/A26) NECOLBSS2006 Telephone conduits 4 0% 4 25-Jul-12 30-Jul-12 10-Mar-13 14-Mar-13 4

1199 Area B2 (A25/A26)Area B2 (A25/A26)Area B2 (A25/A26)Area B2 (A25/A26) 14 29 13-Sep-12 30-Sep-12 26-Nov-12 31-Jan-13 05-Mar-13 16

1200 NECP-Rebase_06Sep12-4.CO.2.1.3.10.5Area B2 (A25/A26) NECOLBSS2050 RC Suspended Slab, Upper Basement, Area 23 14 0% 29 13-Sep-12 30-Sep-12 26-Nov-12 31-Jan-13 05-Mar-13 -9

1201 NECP-Rebase_06Sep12-4.CO.2.1.3.10.5Area B2 (A25/A26) NECOLBSS2051 Small power conduits 4 0% 4 22-Sep-12 26-Sep-12 27-Feb-13 04-Mar-13 18

1202 NECP-Rebase_06Sep12-4.CO.2.1.3.10.5Area B2 (A25/A26) NECOLBSS2052 Security system conduits 4 0% 4 22-Sep-12 26-Sep-12 27-Feb-13 04-Mar-13 18

1203 NECP-Rebase_06Sep12-4.CO.2.1.3.10.5Area B2 (A25/A26) NECOLBSS2053 Earthing conduits 4 0% 4 22-Sep-12 26-Sep-12 27-Feb-13 04-Mar-13 18

1204 NECP-Rebase_06Sep12-4.CO.2.1.3.10.5Area B2 (A25/A26) NECOLBSS2054 Lighting conduits 4 0% 4 22-Sep-12 26-Sep-12 27-Feb-13 04-Mar-13 18

1205 NECP-Rebase_06Sep12-4.CO.2.1.3.10.5Area B2 (A25/A26) NECOLBSS2055 Fire Alaram conduits 4 0% 4 22-Sep-12 26-Sep-12 27-Feb-13 04-Mar-13 18

1206 NECP-Rebase_06Sep12-4.CO.2.1.3.10.5Area B2 (A25/A26) NECOLBSS2056 Telephone conduits 4 0% 4 22-Sep-12 26-Sep-12 27-Feb-13 04-Mar-13 18

1207 Area 24Area 24Area 24Area 24 0 22 10-Dec-12 31-Jan-13 25-Feb-13 21

1208 NECP-Rebase_06Sep12-4.CO.2.1.3.10.11Area 24 NECOLBSS2316 RC Suspended Slab, Upper Basement, Area 24 0 0% 22 10-Dec-12 31-Jan-13 25-Feb-13 2

1209 NECP-Rebase_06Sep12-4.CO.2.1.3.10.11Area 24 NECOLBSS2326 Small power conduits 0 0% 4 19-Feb-13 24-Feb-13 23

1210 NECP-Rebase_06Sep12-4.CO.2.1.3.10.11Area 24 NECOLBSS2336 Security system conduits 0 0% 4 19-Feb-13 24-Feb-13 23

1211 NECP-Rebase_06Sep12-4.CO.2.1.3.10.11Area 24 NECOLBSS2346 Earthing conduits 0 0% 4 19-Feb-13 24-Feb-13 23

1212 NECP-Rebase_06Sep12-4.CO.2.1.3.10.11Area 24 NECOLBSS2356 Lighting conduits 0 0% 4 19-Feb-13 24-Feb-13 23

1213 NECP-Rebase_06Sep12-4.CO.2.1.3.10.11Area 24 NECOLBSS2366 Fire Alarm conduits 0 0% 4 19-Feb-13 24-Feb-13 23

1214 NECP-Rebase_06Sep12-4.CO.2.1.3.10.11Area 24 NECOLBSS2376 Telephone conduits 0 0% 4 19-Feb-13 24-Feb-13 23

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Painting Walls & Columns, Area A10

Painting Floors, Area A1

Painting Floors, Area A2

Painting Floors, Area A3

Painting Floors, Area A4

Painting Floors, Area A5

Painting Floors, Area A6

Painting Floors, Area A7

Painting Floors, Area A8

Painting Floors, Area A9

Painting Floors, Area A10

Tiling, Area A1

Tiling, Area A2

Tiling, Area A3

Tiling, Area A4

Tiling, Area A5

Tiling, Area A6

Tiling, Area A7

Tiling, Area A8

Tiling, Area A9

Tiling, Area A10

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A1

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A2

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A3

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A4

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A5

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A6

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A7

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A8

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A9

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A10

Timber Doors and Louver Screens, Area A3-A4

Timber Doors and Louver Screens, Area A7-A8

Timber Doors and Louver Screens, Area A9-A10

Steel Doors and Louvers, Area A1-A5

Steel Doors and Louvers, Area A6-A10

Handrails, Area A1-A2

Handrails, Area A5-A6

Handrails, Area A9-A10

Skirtings, Walkway Grilles, Bollards, Column Protectors, A1-A4

Skirtings, Walkway Grilles, Bollards, Column Protectors, A5-A7

Skirtings, Walkway Grilles, Bollards, Column Protectors, A8-A10

Glazing System - Internal Glazed Screen, Area A1, A9-A10 Lower Bsmt; A1-A2/A5-A6/A7-A8 Grd Flr

Softwood Framing, Joinery Panels, WC Partitions, Area A1-A2 Lower Bsmt; Area A1-A2/A9-A10 Upper Bsmt

Sandstone Cladding, Area A1-A2 Grd Flr (PMS)

Steel Cladding and Panels (PMS)

Ticket Office Counters & Windows, Area A1 Upper Bsmt (PMS)

Backlit Feature Wall, Area A1-A2 Grd Flr (PMS)

Road Markings, Area A1-A10 Lower Bsmt, A1-A10 Upper Bsmt

Bench, Area A1-A2, Area A5-A6, Area A7-A8 Grd Flr

Signages and Wayfinding, Area A1-A10 Lower Bsmt; Area A1-A10 Upper Bsmt

Sanitary Fixtures & Fittings, Accessories (Concourse Pantry)

Kitchen Equipment (Concourse Pantry)

Furniture (Concourse Pantry)

Benches (Concourse Pantry)

Security Control Equipment (Concourse Pantry)

Dewatering Works

Excavation Area 34

Excavation Area 31

RC Retaining Wall Lower Basement, Area 32

RC Retaining Wall, Lower Basement, Area 36

RC Retaining Wall, Lower Basement, Area 45 and 46

RC Retaining Wall, Lower Basement, Area 44

RC Retaining Wall, Lower Basement, Area 42 and 43

RC Suspended Slab, Upper Basement, Area 22

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alaram conduits

Telephone conduits

RC Suspended Slab, Upper Basement, Area 23

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alaram conduits

Telephone conduits

RC Suspended Slab, Upper Basement, Area 24

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alarm conduits

Telephone conduits

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 11 of 19/27-Feb-13 09:03

Page 12: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

1215 Area 25Area 25Area 25Area 25 0 15 26-Nov-12 31-Jan-13 17-Feb-13 26

1216 NECP-Rebase_06Sep12-4.CO.2.1.3.10.12Area 25 NECOLBSS2386 RC Suspended Slab, Upper Basement, Area 25 0 0% 15 26-Nov-12 31-Jan-13 17-Feb-13 19

1217 NECP-Rebase_06Sep12-4.CO.2.1.3.10.12Area 25 NECOLBSS2396 Small power conduits 0 0% 4 11-Feb-13 16-Feb-13 28

1218 NECP-Rebase_06Sep12-4.CO.2.1.3.10.12Area 25 NECOLBSS2406 Security system conduits 0 0% 4 11-Feb-13 16-Feb-13 28

1219 NECP-Rebase_06Sep12-4.CO.2.1.3.10.12Area 25 NECOLBSS2416 Earthing conduits 0 0% 4 11-Feb-13 16-Feb-13 28

1220 NECP-Rebase_06Sep12-4.CO.2.1.3.10.12Area 25 NECOLBSS2426 Lighting conduits 0 0% 4 11-Feb-13 16-Feb-13 28

1221 NECP-Rebase_06Sep12-4.CO.2.1.3.10.12Area 25 NECOLBSS2436 Fire Alarm conduits 0 0% 4 11-Feb-13 16-Feb-13 28

1222 NECP-Rebase_06Sep12-4.CO.2.1.3.10.12Area 25 NECOLBSS2446 Telephone conduits 0 0% 4 11-Feb-13 16-Feb-13 28

1223 Area 26Area 26Area 26Area 26 0 8 19-Feb-13 28-Feb-13 20

1224 NECP-Rebase_06Sep12-4.CO.2.1.3.10.13Area 26 NECOLBSS2456 RC Suspended Slab, Upper Basement, Area 26 0 0% 8 19-Feb-13 28-Feb-13 7

1225 NECP-Rebase_06Sep12-4.CO.2.1.3.10.13Area 26 NECOLBSS2466 Small power conduits 0 0% 4 21-Feb-13 26-Feb-13 22

1226 NECP-Rebase_06Sep12-4.CO.2.1.3.10.13Area 26 NECOLBSS2476 Security system conduits 0 0% 4 21-Feb-13 26-Feb-13 22

1227 NECP-Rebase_06Sep12-4.CO.2.1.3.10.13Area 26 NECOLBSS2486 Earthing conduits 0 0% 4 21-Feb-13 26-Feb-13 22

1228 NECP-Rebase_06Sep12-4.CO.2.1.3.10.13Area 26 NECOLBSS2496 Lighting conduits 0 0% 4 21-Feb-13 26-Feb-13 22

1229 NECP-Rebase_06Sep12-4.CO.2.1.3.10.13Area 26 NECOLBSS2506 Fire Alarm conduits 0 0% 4 21-Feb-13 26-Feb-13 22

1230 NECP-Rebase_06Sep12-4.CO.2.1.3.10.13Area 26 NECOLBSS2516 Telephone conduits 0 0% 4 21-Feb-13 26-Feb-13 22

1231 Vehicular Ramp - Axis L-M/36-41 (At Raft Foundation 25)Vehicular Ramp - Axis L-M/36-41 (At Raft Foundation 25)Vehicular Ramp - Axis L-M/36-41 (At Raft Foundation 25)Vehicular Ramp - Axis L-M/36-41 (At Raft Foundation 25) 0 21 31-Mar-13 23-Apr-13 137

1232 NECP-Rebase_06Sep12-4.CO.2.1.3.10.14Vehicular Ramp - Axis L-M/36-41 (At Raft Foundation 25)NECOLBSS3080 RC Ramp, Axis L-M/36-41 (at Raft Foundation 25) 0 0% 21 31-Mar-13 23-Apr-13 137

1233 Vehicular Ramp - Axis A-B/36-41 (At Raft Foundation 26)Vehicular Ramp - Axis A-B/36-41 (At Raft Foundation 26)Vehicular Ramp - Axis A-B/36-41 (At Raft Foundation 26)Vehicular Ramp - Axis A-B/36-41 (At Raft Foundation 26) 0 21 24-Apr-13 18-May-13 137

1234 NECP-Rebase_06Sep12-4.CO.2.1.3.10.15Vehicular Ramp - Axis A-B/36-41 (At Raft Foundation 26)NECOLBSS3090 RC Ramp, Axis A-B/36-41 (at Raft Foundation 26) 0 0% 21 24-Apr-13 18-May-13 137

1235 PHASE 2 - POWERFLOAT FINISHESPHASE 2 - POWERFLOAT FINISHESPHASE 2 - POWERFLOAT FINISHESPHASE 2 - POWERFLOAT FINISHES 214 38 13-Mar-12 18-Nov-12 03-Sep-12 31-Jan-13 16-Mar-13 175

1236 NECP-Rebase_06Sep12-4.CO.2.1.3.22PHASE 2 - POWERFLOAT FINISHESNECOBFW2200 Powerfloat Concrete Finishes, Lower Basement & Upper Basement Floors 214 62% 38 13-Mar-12 18-Nov-12 03-Sep-12 31-Jan-13 16-Mar-13 175

1237 PHASE 2 - UPPER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNSPHASE 2 - UPPER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNSPHASE 2 - UPPER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNSPHASE 2 - UPPER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNS 85 45 02-Aug-12 10-Nov-12 17-Nov-12 31-Jan-13 24-Mar-13 0

1238 Area 25Area 25Area 25Area 25 5 4 26-Aug-12 01-Sep-12 03-Dec-12 31-Jan-13 04-Feb-13 27

1239 NECP-Rebase_06Sep12-4.CO.2.1.3.9.5Area 25 NECOUBWC2080 RC Columns Upper Basement, Area 20 5 25% 4 26-Aug-12 01-Sep-12 03-Dec-12 31-Jan-13 04-Feb-13 27

1240 Area 26Area 26Area 26Area 26 5 4 04-Nov-12 10-Nov-12 03-Dec-12 31-Jan-13 04-Feb-13 37

1241 NECP-Rebase_06Sep12-4.CO.2.1.3.9.17Area 26 NECOUBWC2270 RC Columns Upper Basement, Area 21 5 25% 4 04-Nov-12 10-Nov-12 03-Dec-12 31-Jan-13 04-Feb-13 37

1242 Area 24Area 24Area 24Area 24 5 5 20-Aug-12 26-Aug-12 19-Mar-13 24-Mar-13 0

1243 NECP-Rebase_06Sep12-4.CO.2.1.3.9.4Area 24 NECOUBWC2060 RC Columns Upper Basement, Area 22 5 0% 5 20-Aug-12 26-Aug-12 19-Mar-13 24-Mar-13 0

1244 Area 23Area 23Area 23Area 23 8 12 29-Oct-12 07-Nov-12 06-Mar-13 19-Mar-13 0

1245 NECP-Rebase_06Sep12-4.CO.2.1.3.9.16Area 23 NECOUBWC2250 RC Retaining Wall, Upper Basement, Area 23 8 0% 8 29-Oct-12 07-Nov-12 06-Mar-13 14-Mar-13 -9

1246 NECP-Rebase_06Sep12-4.CO.2.1.3.9.16Area 23 NECOUBWC2260 RC Columns Upper Basement, Area 23 5 0% 5 29-Oct-12 04-Nov-12 14-Mar-13 19-Mar-13 0

1247 Area 19Area 19Area 19Area 19 8 13 02-Aug-12 12-Aug-12 05-Dec-12 28-Feb-13 14-Mar-13 -6

1248 NECP-Rebase_06Sep12-4.CO.2.1.3.9.1Area 19 NECOUBWC2000 RC Retaining Wall, Upper Basement, Area 24 8 75% 2 02-Aug-12 12-Aug-12 05-Dec-12 13-Mar-13 14-Mar-13 -9

1249 NECP-Rebase_06Sep12-4.CO.2.1.3.9.1Area 19 NECOUBWC2010 RC Columns Upper Basement, Area 24 5 0% 5 02-Aug-12 08-Aug-12 28-Feb-13 05-Mar-13 2

1250 Area 20Area 20Area 20Area 20 5 41 23-Oct-12 29-Oct-12 17-Nov-12 31-Jan-13 19-Mar-13 0

1251 NECP-Rebase_06Sep12-4.CO.2.1.3.9.15Area 20 NECOUBWC2235 RC Retaining Wall, Upper Basement, Area 25 0 40% 5 17-Nov-12 31-Jan-13 05-Feb-13 36

1252 NECP-Rebase_06Sep12-4.CO.2.1.3.9.15Area 20 NECOUBWC2240 RC Columns Upper Basement, Area 25 5 0% 5 23-Oct-12 29-Oct-12 14-Mar-13 19-Mar-13 0

1253 Area 21Area 21Area 21Area 21 8 30 08-Aug-12 18-Aug-12 15-Dec-12 31-Jan-13 06-Mar-13 8

1254 NECP-Rebase_06Sep12-4.CO.2.1.3.9.2Area 21 NECOUBWC2020 RC Retaining Wall, Upper Basement, Area 26 8 30% 6 08-Aug-12 18-Aug-12 15-Dec-12 31-Jan-13 06-Feb-13 32

1255 NECP-Rebase_06Sep12-4.CO.2.1.3.9.2Area 21 NECOUBWC2030 RC Columns Upper Basement, Area 26 5 0% 5 08-Aug-12 14-Aug-12 28-Feb-13 06-Mar-13 7

1256 PHASE 2 - GROUND FLOOR SLABS (incl. Protective Screed)PHASE 2 - GROUND FLOOR SLABS (incl. Protective Screed)PHASE 2 - GROUND FLOOR SLABS (incl. Protective Screed)PHASE 2 - GROUND FLOOR SLABS (incl. Protective Screed) 108 63 11-Aug-12 15-Dec-12 29-Dec-12 31-Jan-13 14-Apr-13 18

1257 Area B10Area B10Area B10Area B10 14 39 28-Nov-12 15-Dec-12 07-Jan-13 31-Jan-13 17-Mar-13 42

1258 NECP-Rebase_06Sep12-4.CO.2.1.3.8.10Area B10 NECOUBSS2090 RC Suspended Slab, Ground Floor, Area 17 14 0% 39 28-Nov-12 15-Dec-12 07-Jan-13 31-Jan-13 17-Mar-13 14

1259 NECP-Rebase_06Sep12-4.CO.2.1.3.8.10Area B10 NECOUBSS2091 Small power conduits 4 0% 4 06-Dec-12 11-Dec-12 11-Mar-13 16-Mar-13 44

1260 NECP-Rebase_06Sep12-4.CO.2.1.3.8.10Area B10 NECOUBSS2092 Security system conduits 4 0% 4 06-Dec-12 11-Dec-12 11-Mar-13 16-Mar-13 44

1261 NECP-Rebase_06Sep12-4.CO.2.1.3.8.10Area B10 NECOUBSS2093 Earthing conduits 4 0% 4 06-Dec-12 11-Dec-12 11-Mar-13 16-Mar-13 44

1262 NECP-Rebase_06Sep12-4.CO.2.1.3.8.10Area B10 NECOUBSS2094 Lighting conduits 4 0% 4 06-Dec-12 11-Dec-12 11-Mar-13 16-Mar-13 44

1263 NECP-Rebase_06Sep12-4.CO.2.1.3.8.10Area B10 NECOUBSS2095 Fire Alarm conduits 4 0% 4 06-Dec-12 11-Dec-12 11-Mar-13 16-Mar-13 44

1264 NECP-Rebase_06Sep12-4.CO.2.1.3.8.10Area B10 NECOUBSS2096 Telephone conduits 4 0% 4 06-Dec-12 11-Dec-12 11-Mar-13 16-Mar-13 44

1265 Area 17Area 17Area 17Area 17 0 6 28-Feb-13 06-Mar-13 16

1266 NECP-Rebase_06Sep12-4.CO.2.1.3.8.11Area 17 NECOUBSS2596 RC Suspended Slab, Ground Floor, Area 18 0 0% 6 28-Feb-13 06-Mar-13 16

1267 NECP-Rebase_06Sep12-4.CO.2.1.3.8.11Area 17 NECOUBSS2606 Small power conduits 0 0% 2 03-Mar-13 04-Mar-13 16

1268 NECP-Rebase_06Sep12-4.CO.2.1.3.8.11Area 17 NECOUBSS2616 Security system conduits 0 0% 2 03-Mar-13 04-Mar-13 16

1269 NECP-Rebase_06Sep12-4.CO.2.1.3.8.11Area 17 NECOUBSS2626 Earthing conduits 0 0% 2 03-Mar-13 04-Mar-13 16

1270 NECP-Rebase_06Sep12-4.CO.2.1.3.8.11Area 17 NECOUBSS2636 Lighting conduits 0 0% 2 03-Mar-13 04-Mar-13 16

1271 NECP-Rebase_06Sep12-4.CO.2.1.3.8.11Area 17 NECOUBSS2646 Fire Alarm conduits 0 0% 2 03-Mar-13 04-Mar-13 16

1272 NECP-Rebase_06Sep12-4.CO.2.1.3.8.11Area 17 NECOUBSS2656 Telephone conduits 0 0% 2 03-Mar-13 04-Mar-13 16

1273 Area B7Area B7Area B7Area B7 14 35 15-Sep-12 01-Oct-12 29-Dec-12 31-Jan-13 12-Mar-13 1

1274 NECP-Rebase_06Sep12-4.CO.2.1.3.8.4Area B7 NECOUBSS2030 RC Suspended Slab, Ground Floor, Area 19 14 0% 35 15-Sep-12 01-Oct-12 29-Dec-12 31-Jan-13 12-Mar-13 0

1275 NECP-Rebase_06Sep12-4.CO.2.1.3.8.4Area B7 NECOUBSS2031 Small power conduits 4 0% 4 23-Sep-12 27-Sep-12 06-Mar-13 11-Mar-13 3

1276 NECP-Rebase_06Sep12-4.CO.2.1.3.8.4Area B7 NECOUBSS2032 Security system conduits 4 0% 4 23-Sep-12 27-Sep-12 06-Mar-13 11-Mar-13 3

1277 NECP-Rebase_06Sep12-4.CO.2.1.3.8.4Area B7 NECOUBSS2033 Earthing conduits 4 0% 4 24-Sep-12 29-Sep-12 06-Mar-13 11-Mar-13 3

1278 NECP-Rebase_06Sep12-4.CO.2.1.3.8.4Area B7 NECOUBSS2034 Lighting conduits 4 0% 4 24-Sep-12 29-Sep-12 06-Mar-13 11-Mar-13 3

1279 NECP-Rebase_06Sep12-4.CO.2.1.3.8.4Area B7 NECOUBSS2035 Fire Alaram conduits 4 0% 4 24-Sep-12 29-Sep-12 06-Mar-13 11-Mar-13 3

1280 NECP-Rebase_06Sep12-4.CO.2.1.3.8.4Area B7 NECOUBSS2036 Telephone conduits 4 0% 4 24-Sep-12 29-Sep-12 06-Mar-13 11-Mar-13 3

1281 Area B8Area B8Area B8Area B8 14 8 12-Nov-12 28-Nov-12 05-Jan-13 19-Mar-13 27-Mar-13 0

1282 NECP-Rebase_06Sep12-4.CO.2.1.3.8.9Area B8 NECOUBSS2080 RC Suspended Slab, Ground Floor, Area 20 14 20% 8 12-Nov-12 28-Nov-12 05-Jan-13 19-Mar-13 27-Mar-13 0

1283 NECP-Rebase_06Sep12-4.CO.2.1.3.8.9Area B8 NECOUBSS2081 Small power conduits 4 0% 4 20-Nov-12 25-Nov-12 21-Mar-13 26-Mar-13 0

1284 NECP-Rebase_06Sep12-4.CO.2.1.3.8.9Area B8 NECOUBSS2082 Security system conduits 4 0% 4 20-Nov-12 25-Nov-12 21-Mar-13 26-Mar-13 0

1285 NECP-Rebase_06Sep12-4.CO.2.1.3.8.9Area B8 NECOUBSS2083 Earthing conduits 4 0% 4 20-Nov-12 25-Nov-12 21-Mar-13 26-Mar-13 0

1286 NECP-Rebase_06Sep12-4.CO.2.1.3.8.9Area B8 NECOUBSS2084 Lighting conduits 4 0% 4 20-Nov-12 25-Nov-12 21-Mar-13 26-Mar-13 0

1287 NECP-Rebase_06Sep12-4.CO.2.1.3.8.9Area B8 NECOUBSS2085 Fire Alaram conduits 4 0% 4 20-Nov-12 25-Nov-12 21-Mar-13 26-Mar-13 0

1288 NECP-Rebase_06Sep12-4.CO.2.1.3.8.9Area B8 NECOUBSS2086 Telephone conduits 4 0% 4 20-Nov-12 25-Nov-12 21-Mar-13 26-Mar-13 0

1289 Area B5Area B5Area B5Area B5 14 6 03-Sep-12 19-Sep-12 30-Dec-12 06-Mar-13 12-Mar-13 9

1290 NECP-Rebase_06Sep12-4.CO.2.1.3.8.3Area B5 NECOUBSS2020 RC Suspended Slab, Ground Floor, Area 21 14 25% 6 03-Sep-12 19-Sep-12 30-Dec-12 06-Mar-13 12-Mar-13 9

1291 NECP-Rebase_06Sep12-4.CO.2.1.3.8.3Area B5 NECOUBSS2021 Small power conduits 4 0% 4 11-Sep-12 16-Sep-12 06-Mar-13 11-Mar-13 9

1292 NECP-Rebase_06Sep12-4.CO.2.1.3.8.3Area B5 NECOUBSS2022 Security system conduits 4 0% 4 11-Sep-12 16-Sep-12 06-Mar-13 11-Mar-13 9

1293 NECP-Rebase_06Sep12-4.CO.2.1.3.8.3Area B5 NECOUBSS2023 Earthing conduits 4 0% 4 12-Sep-12 17-Sep-12 06-Mar-13 11-Mar-13 9

1294 NECP-Rebase_06Sep12-4.CO.2.1.3.8.3Area B5 NECOUBSS2024 Lighting conduits 4 0% 4 12-Sep-12 17-Sep-12 06-Mar-13 11-Mar-13 9

1295 NECP-Rebase_06Sep12-4.CO.2.1.3.8.3Area B5 NECOUBSS2025 Fire Alaram conduits 4 0% 4 12-Sep-12 17-Sep-12 06-Mar-13 11-Mar-13 9

1296 NECP-Rebase_06Sep12-4.CO.2.1.3.8.3Area B5 NECOUBSS2026 Telephone conduits 4 0% 4 12-Sep-12 17-Sep-12 06-Mar-13 11-Mar-13 9

1297 Area B6Area B6Area B6Area B6 14 6 31-Oct-12 17-Nov-12 04-Jan-13 20-Mar-13 27-Mar-13 0

1298 NECP-Rebase_06Sep12-4.CO.2.1.3.8.8Area B6 NECOUBSS2070 RC Suspended Slab, Ground Floor, Area 22 14 20% 6 31-Oct-12 17-Nov-12 04-Jan-13 20-Mar-13 27-Mar-13 0

1299 NECP-Rebase_06Sep12-4.CO.2.1.3.8.8Area B6 NECOUBSS2071 Small power conduits 4 0% 4 08-Nov-12 13-Nov-12 21-Mar-13 26-Mar-13 0

1300 NECP-Rebase_06Sep12-4.CO.2.1.3.8.8Area B6 NECOUBSS2072 Security system conduits 4 0% 4 08-Nov-12 13-Nov-12 21-Mar-13 26-Mar-13 0

1301 NECP-Rebase_06Sep12-4.CO.2.1.3.8.8Area B6 NECOUBSS2073 Earthing conduits 4 0% 4 08-Nov-12 13-Nov-12 21-Mar-13 26-Mar-13 0

1302 NECP-Rebase_06Sep12-4.CO.2.1.3.8.8Area B6 NECOUBSS2074 Lighting conduits 4 0% 4 08-Nov-12 13-Nov-12 21-Mar-13 26-Mar-13 0

1303 NECP-Rebase_06Sep12-4.CO.2.1.3.8.8Area B6 NECOUBSS2075 Fire Alaram conduits 4 0% 4 08-Nov-12 13-Nov-12 21-Mar-13 26-Mar-13 0

1304 NECP-Rebase_06Sep12-4.CO.2.1.3.8.8Area B6 NECOUBSS2076 Telephone conduits 4 0% 4 08-Nov-12 13-Nov-12 21-Mar-13 26-Mar-13 0

1305 Area B3Area B3Area B3Area B3 14 10 22-Aug-12 08-Sep-12 09-Mar-13 19-Mar-13 0

1306 NECP-Rebase_06Sep12-4.CO.2.1.3.8.2Area B3 NECOUBSS2010 RC Suspended Slab, Ground Floor, Area 24B 14 0% 10 22-Aug-12 08-Sep-12 09-Mar-13 19-Mar-13 0

1307 NECP-Rebase_06Sep12-4.CO.2.1.3.8.2Area B3 NECOUBSS2011 Small power conduits 5 0% 4 30-Aug-12 05-Sep-12 14-Mar-13 18-Mar-13 0

1308 NECP-Rebase_06Sep12-4.CO.2.1.3.8.2Area B3 NECOUBSS2012 Security system conduits 5 0% 4 30-Aug-12 05-Sep-12 14-Mar-13 18-Mar-13 0

1309 NECP-Rebase_06Sep12-4.CO.2.1.3.8.2Area B3 NECOUBSS2013 Earthing conduits 5 0% 4 30-Aug-12 05-Sep-12 14-Mar-13 18-Mar-13 0

1310 NECP-Rebase_06Sep12-4.CO.2.1.3.8.2Area B3 NECOUBSS2014 Lighting conduits 5 0% 4 30-Aug-12 05-Sep-12 14-Mar-13 18-Mar-13 0

1311 NECP-Rebase_06Sep12-4.CO.2.1.3.8.2Area B3 NECOUBSS2015 Fire Alaram conduits 5 0% 4 30-Aug-12 05-Sep-12 14-Mar-13 18-Mar-13 0

1312 NECP-Rebase_06Sep12-4.CO.2.1.3.8.2Area B3 NECOUBSS2016 Telephone conduits 5 0% 4 30-Aug-12 05-Sep-12 14-Mar-13 18-Mar-13 0

1313 Area B4Area B4Area B4Area B4 14 14 20-Oct-12 05-Nov-12 30-Mar-13 14-Apr-13 4

1314 NECP-Rebase_06Sep12-4.CO.2.1.3.8.7Area B4 NECOUBSS2060 RC Suspended Slab, Ground Floor, Area 23 14 0% 14 20-Oct-12 05-Nov-12 30-Mar-13 14-Apr-13 4

1315 NECP-Rebase_06Sep12-4.CO.2.1.3.8.7Area B4 NECOUBSS2061 Small power conduits 4 0% 4 28-Oct-12 01-Nov-12 06-Apr-13 10-Apr-13 4

1316 NECP-Rebase_06Sep12-4.CO.2.1.3.8.7Area B4 NECOUBSS2062 Security system conduits 4 0% 4 28-Oct-12 01-Nov-12 06-Apr-13 10-Apr-13 4

1317 NECP-Rebase_06Sep12-4.CO.2.1.3.8.7Area B4 NECOUBSS2063 Earthing conduits 4 0% 4 28-Oct-12 01-Nov-12 06-Apr-13 10-Apr-13 4

1318 NECP-Rebase_06Sep12-4.CO.2.1.3.8.7Area B4 NECOUBSS2064 Lighting conduits 4 0% 4 28-Oct-12 01-Nov-12 06-Apr-13 10-Apr-13 4

1319 NECP-Rebase_06Sep12-4.CO.2.1.3.8.7Area B4 NECOUBSS2065 Fire Alaram conduits 4 0% 4 28-Oct-12 01-Nov-12 06-Apr-13 10-Apr-13 4

1320 NECP-Rebase_06Sep12-4.CO.2.1.3.8.7Area B4 NECOUBSS2066 Telephone conduits 4 0% 4 28-Oct-12 01-Nov-12 06-Apr-13 10-Apr-13 4

1321 Area B1Area B1Area B1Area B1 14 7 11-Aug-12 27-Aug-12 17-Mar-13 24-Mar-13 0

1322 NECP-Rebase_06Sep12-4.CO.2.1.3.8.1Area B1 NECOUBSS2000 RC Suspended Slab, Ground Floor, Area 25 14 0% 7 11-Aug-12 27-Aug-12 17-Mar-13 24-Mar-13 0

1323 NECP-Rebase_06Sep12-4.CO.2.1.3.8.1Area B1 NECOUBSS2001 Small power conduits 4 0% 4 19-Aug-12 23-Aug-12 19-Mar-13 23-Mar-13 0

1324 NECP-Rebase_06Sep12-4.CO.2.1.3.8.1Area B1 NECOUBSS2002 Security system conduits 4 0% 4 19-Aug-12 23-Aug-12 19-Mar-13 23-Mar-13 0

1325 NECP-Rebase_06Sep12-4.CO.2.1.3.8.1Area B1 NECOUBSS2003 Earthing conduits 4 0% 4 19-Aug-12 23-Aug-12 19-Mar-13 23-Mar-13 0

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

RC Suspended Slab, Upper Basement, Area 25

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alarm conduits

Telephone conduits

RC Suspended Slab, Upper Basement, Area 26

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alarm conduits

Telephone conduits

RC Ramp, Axis L-M/36-41 (at Raft Foundation 25)

RC Ramp, Axis A-B/36-41 (at Raft Foundation 26)

Powerfloat Concrete Finishes, Lower Basement & Upper Basement Floors

RC Columns Upper Basement, Area 20

RC Columns Upper Basement, Area 21

RC Columns Upper Basement, Area 22

RC Retaining Wall, Upper Basement, Area 23

RC Columns Upper Basement, Area 23

RC Retaining Wall, Upper Basement, Area 24

RC Columns Upper Basement, Area 24

RC Retaining Wall, Upper Basement, Area 25

RC Columns Upper Basement, Area 25

RC Retaining Wall, Upper Basement, Area 26

RC Columns Upper Basement, Area 26

RC Suspended Slab, Ground Floor, Area 17

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alarm conduits

Telephone conduits

RC Suspended Slab, Ground Floor, Area 18

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alarm conduits

Telephone conduits

RC Suspended Slab, Ground Floor, Area 19

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alaram conduits

Telephone conduits

RC Suspended Slab, Ground Floor, Area 20

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alaram conduits

Telephone conduits

RC Suspended Slab, Ground Floor, Area 21

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alaram conduits

Telephone conduits

RC Suspended Slab, Ground Floor, Area 22

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alaram conduits

Telephone conduits

RC Suspended Slab, Ground Floor, Area 24B

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alaram conduits

Telephone conduits

RC Suspended Slab, Ground Floor, Area 23

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alaram conduits

Telephone conduits

RC Suspended Slab, Ground Floor, Area 25

Small power conduits

Security system conduits

Earthing conduits

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 12 of 19/27-Feb-13 09:03

Page 13: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

1326 NECP-Rebase_06Sep12-4.CO.2.1.3.8.1Area B1 NECOUBSS2004 Lighting conduits 4 0% 4 19-Aug-12 23-Aug-12 19-Mar-13 23-Mar-13 0

1327 NECP-Rebase_06Sep12-4.CO.2.1.3.8.1Area B1 NECOUBSS2005 Fire Alaram conduits 4 0% 4 19-Aug-12 23-Aug-12 19-Mar-13 23-Mar-13 0

1328 NECP-Rebase_06Sep12-4.CO.2.1.3.8.1Area B1 NECOUBSS2006 Telephone conduits 4 0% 4 19-Aug-12 23-Aug-12 19-Mar-13 23-Mar-13 0

1329 Area B2Area B2Area B2Area B2 14 7 08-Oct-12 24-Oct-12 20-Mar-13 27-Mar-13 0

1330 NECP-Rebase_06Sep12-4.CO.2.1.3.8.6Area B2 NECOUBSS2050 RC Suspended Slab, Ground Floor, Area 24A 14 0% 7 08-Oct-12 24-Oct-12 20-Mar-13 27-Mar-13 0

1331 NECP-Rebase_06Sep12-4.CO.2.1.3.8.6Area B2 NECOUBSS2051 Small power conduits 4 0% 4 16-Oct-12 21-Oct-12 23-Mar-13 26-Mar-13 0

1332 NECP-Rebase_06Sep12-4.CO.2.1.3.8.6Area B2 NECOUBSS2052 Security system conduits 4 0% 4 16-Oct-12 21-Oct-12 23-Mar-13 26-Mar-13 0

1333 NECP-Rebase_06Sep12-4.CO.2.1.3.8.6Area B2 NECOUBSS2053 Earthing conduits 4 0% 4 16-Oct-12 21-Oct-12 23-Mar-13 26-Mar-13 0

1334 NECP-Rebase_06Sep12-4.CO.2.1.3.8.6Area B2 NECOUBSS2054 Lighting conduits 4 0% 4 16-Oct-12 21-Oct-12 23-Mar-13 26-Mar-13 0

1335 NECP-Rebase_06Sep12-4.CO.2.1.3.8.6Area B2 NECOUBSS2055 Fire Alaram conduits 4 0% 4 16-Oct-12 21-Oct-12 23-Mar-13 26-Mar-13 0

1336 NECP-Rebase_06Sep12-4.CO.2.1.3.8.6Area B2 NECOUBSS2056 Telephone conduits 4 0% 4 16-Oct-12 21-Oct-12 23-Mar-13 26-Mar-13 0

1337 Area 26Area 26Area 26Area 26 0 10 19-Mar-13 30-Mar-13 0

1338 NECP-Rebase_06Sep12-4.CO.2.1.3.8.13Area 26 NECOUBSS2456 RC Suspended Slab, Ground Floor, Area 26 0 0% 10 19-Mar-13 30-Mar-13 0

1339 NECP-Rebase_06Sep12-4.CO.2.1.3.8.13Area 26 NECOUBSS2466 Small power conduits 0 0% 4 25-Mar-13 28-Mar-13 0

1340 NECP-Rebase_06Sep12-4.CO.2.1.3.8.13Area 26 NECOUBSS2476 Security system conduits 0 0% 4 25-Mar-13 28-Mar-13 0

1341 NECP-Rebase_06Sep12-4.CO.2.1.3.8.13Area 26 NECOUBSS2486 Earthing conduits 0 0% 4 25-Mar-13 28-Mar-13 0

1342 NECP-Rebase_06Sep12-4.CO.2.1.3.8.13Area 26 NECOUBSS2496 Lighting conduits 0 0% 4 25-Mar-13 28-Mar-13 0

1343 NECP-Rebase_06Sep12-4.CO.2.1.3.8.13Area 26 NECOUBSS2506 Fire Alarm conduits 0 0% 4 25-Mar-13 28-Mar-13 0

1344 NECP-Rebase_06Sep12-4.CO.2.1.3.8.13Area 26 NECOUBSS2516 Telephone conduits 0 0% 4 25-Mar-13 28-Mar-13 0

1345 PHASE 2 - BACKFILLING TO RETAINING WALLS AROUND BUILDINGPHASE 2 - BACKFILLING TO RETAINING WALLS AROUND BUILDINGPHASE 2 - BACKFILLING TO RETAINING WALLS AROUND BUILDINGPHASE 2 - BACKFILLING TO RETAINING WALLS AROUND BUILDING 100 90 03-Sep-12 29-Dec-12 06-Nov-12 26-Mar-13 08-Jul-13 165

1346 NECP-Rebase_06Sep12-4.CO.2.1.3.14PHASE 2 - BACKFILLING TO RETAINING WALLS AROUND BUILDINGNECOEX2310 Backfilling Around Building, Area 25 - Area 26 20 12.5% 18 03-Sep-12 26-Sep-12 06-Nov-12 18-Jun-13 08-Jul-13 75

1347 NECP-Rebase_06Sep12-4.CO.2.1.3.14PHASE 2 - BACKFILLING TO RETAINING WALLS AROUND BUILDINGNECOEX2350 Backfilling Around Building, Area 16 - Area 17 20 0% 20 05-Dec-12 29-Dec-12 26-Mar-13 17-Apr-13 145

1348 NECP-Rebase_06Sep12-4.CO.2.1.3.14PHASE 2 - BACKFILLING TO RETAINING WALLS AROUND BUILDINGNECOEX2340 Backfilling Around Building, Area 19 - Area 20 20 0% 20 12-Nov-12 05-Dec-12 18-Apr-13 11-May-13 175

1349 NECP-Rebase_06Sep12-4.CO.2.1.3.14PHASE 2 - BACKFILLING TO RETAINING WALLS AROUND BUILDINGNECOEX2330 Backfilling Around Building, Area 21 - Area 22 20 0% 20 20-Oct-12 12-Nov-12 12-May-13 03-Jun-13 175

1350 NECP-Rebase_06Sep12-4.CO.2.1.3.14PHASE 2 - BACKFILLING TO RETAINING WALLS AROUND BUILDINGNECOEX2320 Backfilling Around Building, Area 23 - Area 24 20 0% 20 26-Sep-12 20-Oct-12 04-Jun-13 26-Jun-13 175

1351 Blockworks and ServicesBlockworks and ServicesBlockworks and ServicesBlockworks and Services 123 100 15-Aug-12 06-Jan-13 12-Jan-13 31-Jan-13 27-May-13 123

1352 PHASE 2 - BLOCKWORK & SERVICESPHASE 2 - BLOCKWORK & SERVICESPHASE 2 - BLOCKWORK & SERVICESPHASE 2 - BLOCKWORK & SERVICES 123 100 15-Aug-12 06-Jan-13 12-Jan-13 31-Jan-13 27-May-13 123

1353 LB Area B1 - B2LB Area B1 - B2LB Area B1 - B2LB Area B1 - B2 38 14 15-Aug-12 27-Sep-12 16-Apr-13 01-May-13 139

1354 NECP-Rebase_06Sep12-4.CO.2.1.4.7.1LB Area B1 - B2 NECOBW1020 Blockwork, Lower Basement, Area 24 - Area 25 - Area 26 25 0% 12 15-Aug-12 13-Sep-12 16-Apr-13 29-Apr-13 0

1355 NECP-Rebase_06Sep12-4.CO.2.1.4.7.1LB Area B1 - B2 NECOBW1022 Installation of Sanitary pipes 17 0% 6 09-Sep-12 27-Sep-12 25-Apr-13 01-May-13 139

1356 NECP-Rebase_06Sep12-4.CO.2.1.4.7.1LB Area B1 - B2 NECOBW1023 Small power conduits 17 0% 6 06-Sep-12 25-Sep-12 25-Apr-13 01-May-13 139

1357 NECP-Rebase_06Sep12-4.CO.2.1.4.7.1LB Area B1 - B2 NECOBW1021 Installation of Rainwater Pipes 17 0% 6 27-Aug-12 16-Sep-12 25-Apr-13 01-May-13 139

1358 LB Area B5 - B6LB Area B5 - B6LB Area B5 - B6LB Area B5 - B6 30 14 13-Sep-12 17-Oct-12 30-Apr-13 15-May-13 133

1359 NECP-Rebase_06Sep12-4.CO.2.1.4.7.2LB Area B5 - B6 NECOBW1030 Blockwork, Lower Basement, Area 18 - Area 19 25 0% 12 13-Sep-12 13-Oct-12 30-Apr-13 13-May-13 1

1360 NECP-Rebase_06Sep12-4.CO.2.1.4.7.2LB Area B5 - B6 NECOBW1032 Installation of Sanitary pipes 16 0% 6 29-Sep-12 16-Oct-12 09-May-13 15-May-13 133

1361 NECP-Rebase_06Sep12-4.CO.2.1.4.7.2LB Area B5 - B6 NECOBW1033 Small power conduits 16 0% 6 30-Sep-12 17-Oct-12 09-May-13 15-May-13 133

1362 NECP-Rebase_06Sep12-4.CO.2.1.4.7.2LB Area B5 - B6 NECOBW1072 Installation of Rainwater Pipes 16 0% 6 26-Sep-12 15-Oct-12 09-May-13 15-May-13 1

1363 LB Area B7 - B8LB Area B7 - B8LB Area B7 - B8LB Area B7 - B8 31 13 13-Oct-12 17-Nov-12 12-Jan-13 31-Jan-13 14-Feb-13 62

1364 NECP-Rebase_06Sep12-4.CO.2.1.4.7.4LB Area B7 - B8 NECOBW1040 Blockwork, Lower Basement, Area 16 - Area17 25 10% 11 13-Oct-12 11-Nov-12 12-Jan-13 31-Jan-13 12-Feb-13 56

1365 NECP-Rebase_06Sep12-4.CO.2.1.4.7.4LB Area B7 - B8 NECOBW1042 Installation of Sanitary pipes 16 0% 6 27-Oct-12 13-Nov-12 07-Feb-13 14-Feb-13 62

1366 NECP-Rebase_06Sep12-4.CO.2.1.4.7.4LB Area B7 - B8 NECOBW1043 Small power conduits 16 0% 6 30-Oct-12 17-Nov-12 07-Feb-13 14-Feb-13 62

1367 LB Area B9 - B10LB Area B9 - B10LB Area B9 - B10LB Area B9 - B10 27 14 11-Nov-12 12-Dec-12 03-Apr-13 18-Apr-13 14

1368 NECP-Rebase_06Sep12-4.CO.2.1.4.7.6LB Area B9 - B10 NECOBW1050 Blockwork, Lower Basement, Area 14 - Area15 25 0% 12 11-Nov-12 10-Dec-12 03-Apr-13 16-Apr-13 14

1369 NECP-Rebase_06Sep12-4.CO.2.1.4.7.6LB Area B9 - B10 NECOBW1052 Installation of Sanitary pipes 16 0% 6 24-Nov-12 12-Dec-12 13-Apr-13 18-Apr-13 14

1370 NECP-Rebase_06Sep12-4.CO.2.1.4.7.6LB Area B9 - B10 NECOBW1053 Small power conduits 16 0% 6 24-Nov-12 12-Dec-12 13-Apr-13 18-Apr-13 14

1371 UB Area B1 - B2UB Area B1 - B2UB Area B1 - B2UB Area B1 - B2 27 14 09-Sep-12 10-Oct-12 24-Apr-13 09-May-13 2

1372 NECP-Rebase_06Sep12-4.CO.2.1.4.7.3UB Area B1 - B2 NECOBW1060 Blockwork, Upper Basement, Area 25 - Area 26 25 0% 12 09-Sep-12 08-Oct-12 24-Apr-13 07-May-13 2

1373 NECP-Rebase_06Sep12-4.CO.2.1.4.7.3UB Area B1 - B2 NECOBW1062 Installation of Sanitary pipes 16 0% 6 22-Sep-12 10-Oct-12 04-May-13 09-May-13 2

1374 NECP-Rebase_06Sep12-4.CO.2.1.4.7.3UB Area B1 - B2 NECOBW1063 Small power conduits 16 0% 6 22-Sep-12 10-Oct-12 04-May-13 09-May-13 2

1375 NECP-Rebase_06Sep12-4.CO.2.1.4.7.3UB Area B1 - B2 NECOBW1061 Installation of Rainwater Pipes 16 0% 6 22-Sep-12 10-Oct-12 04-May-13 09-May-13 2

1376 UB Area B5 - B6UB Area B5 - B6UB Area B5 - B6UB Area B5 - B6 27 15 08-Oct-12 08-Nov-12 11-May-13 27-May-13 1

1377 NECP-Rebase_06Sep12-4.CO.2.1.4.7.5UB Area B5 - B6 NECOBW1070 Blockworks, Upper Basement, Area 21 - Area 22 25 0% 12 08-Oct-12 06-Nov-12 11-May-13 23-May-13 2

1378 NECP-Rebase_06Sep12-4.CO.2.1.4.7.5UB Area B5 - B6 NECOBW1065 Installation of Sanitary pipes 17 0% 6 20-Oct-12 08-Nov-12 21-May-13 27-May-13 1

1379 NECP-Rebase_06Sep12-4.CO.2.1.4.7.5UB Area B5 - B6 NECOBW1066 Small power conduits 17 0% 6 20-Oct-12 08-Nov-12 21-May-13 27-May-13 1

1380 NECP-Rebase_06Sep12-4.CO.2.1.4.7.5UB Area B5 - B6 NECOBW1064 Installation of Rainwater Pipes 17 0% 6 20-Oct-12 08-Nov-12 21-May-13 27-May-13 1

1381 UB Area B7 - B8UB Area B7 - B8UB Area B7 - B8UB Area B7 - B8 30 13 06-Nov-12 10-Dec-12 19-Jan-13 31-Jan-13 16-Feb-13 98

1382 NECP-Rebase_06Sep12-4.CO.2.1.4.7.7UB Area B7 - B8 NECOBW1080 Blockworks, Upper Basement, Area B19 - Area 20 25 5% 11 06-Nov-12 05-Dec-12 19-Jan-13 31-Jan-13 13-Feb-13 98

1383 NECP-Rebase_06Sep12-4.CO.2.1.4.7.7UB Area B7 - B8 NECOBW1082 Installation of Sanitary pipes 16 0% 6 19-Nov-12 08-Dec-12 09-Feb-13 16-Feb-13 98

1384 NECP-Rebase_06Sep12-4.CO.2.1.4.7.7UB Area B7 - B8 NECOBW1083 Small power conduits 16 0% 6 22-Nov-12 10-Dec-12 09-Feb-13 16-Feb-13 98

1385 UB Area B9 - B10UB Area B9 - B10UB Area B9 - B10UB Area B9 - B10 27 14 05-Dec-12 06-Jan-13 11-Apr-13 27-Apr-13 97

1386 NECP-Rebase_06Sep12-4.CO.2.1.4.7.8UB Area B9 - B10 NECOBW1090 Blockwork, Upper Basement, Area 16 - Area 17 25 0% 12 05-Dec-12 03-Jan-13 11-Apr-13 24-Apr-13 68

1387 NECP-Rebase_06Sep12-4.CO.2.1.4.7.8UB Area B9 - B10 NECOBW1092 Installation of Sanitary pipes 16 0% 6 18-Dec-12 06-Jan-13 21-Apr-13 27-Apr-13 97

1388 NECP-Rebase_06Sep12-4.CO.2.1.4.7.8UB Area B9 - B10 NECOBW1093 Small power conduits 16 0% 6 18-Dec-12 06-Jan-13 21-Apr-13 27-Apr-13 97

1389 Steel Frame for Walkway CanopiesSteel Frame for Walkway CanopiesSteel Frame for Walkway CanopiesSteel Frame for Walkway Canopies 35 35 16-Jan-13 26-Feb-13 08-May-13 17-Jun-13 79

1390 NECP-Rebase_06Sep12-4.CO.2.P2Steel Frame for Walkway CanopiesNECOCW120 Steel frame for Walkway Canopies (Frijns) 35 0% 35 16-Jan-13 26-Feb-13 08-May-13 17-Jun-13 79

1391 Gate HouseGate HouseGate HouseGate House 78 183 24-Mar-13 22-Jun-13 20-May-13 22-Dec-13 0

1392 NECP-Rebase_06Sep12-4.CO.2.2Gate House NECOCW130 Concrete Base, Gate House 15 0% 15 24-Mar-13 09-Apr-13 20-May-13 05-Jun-13 107

1393 NECP-Rebase_06Sep12-4.CO.2.2Gate House NECOCW140 Walls, Screeds, Gate House 10 0% 10 10-Apr-13 21-Apr-13 06-Jun-13 17-Jun-13 107

1394 NECP-Rebase_06Sep12-4.CO.2.2Gate House NECOMEP230 MEP Works, Gate House 15 0% 15 22-Apr-13 08-May-13 18-Jun-13 04-Jul-13 107

1395 NECP-Rebase_06Sep12-4.CO.2.2Gate House NECOBFW220 GRC Cladding/Tiles/Ceiling/Windows/Doors, Gate House 30 0% 30 30-Apr-13 03-Jun-13 26-Jun-13 30-Jul-13 107

1396 NECP-Rebase_06Sep12-4.CO.2.2Gate House NECOMEP240 System Control Equipment, Gate House 25 0% 25 25-May-13 22-Jun-13 23-Nov-13 22-Dec-13 0

1397 MEP WorksMEP WorksMEP WorksMEP Works 292 218 14-Aug-12 21-Jul-13 25-Apr-13 07-Jan-14 5

1398 Lower Basement FloorLower Basement FloorLower Basement FloorLower Basement Floor 286 218 14-Aug-12 13-Jul-13 25-Apr-13 07-Jan-14 5

1399 PHASE 2 LOWER BASEMENT - BLACK STEEL PIPESPHASE 2 LOWER BASEMENT - BLACK STEEL PIPESPHASE 2 LOWER BASEMENT - BLACK STEEL PIPESPHASE 2 LOWER BASEMENT - BLACK STEEL PIPES 75 70 12-Sep-12 09-Dec-12 25-Apr-13 15-Jul-13 56

1400 NECP-Rebase_06Sep12-4.CO.2.5.1.29PHASE 2 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP2400 Black Steel Pipes, CHW, Area B1 8 0% 7 12-Sep-12 22-Sep-12 25-Apr-13 02-May-13 42

1401 NECP-Rebase_06Sep12-4.CO.2.5.1.29PHASE 2 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP2410 Black Steel Pipes, CHW, Area B2 8 0% 7 22-Sep-12 01-Oct-12 04-May-13 11-May-13 42

1402 NECP-Rebase_06Sep12-4.CO.2.5.1.29PHASE 2 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP2420 Black Steel Pipes, CHW, Area B3 8 0% 7 01-Oct-12 10-Oct-12 12-May-13 19-May-13 42

1403 NECP-Rebase_06Sep12-4.CO.2.5.1.29PHASE 2 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP2430 Black Steel Pipes, CHW, Area B4 8 0% 7 10-Oct-12 20-Oct-12 20-May-13 27-May-13 56

1404 NECP-Rebase_06Sep12-4.CO.2.5.1.29PHASE 2 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP2440 Black Steel Pipes, CHW, Area B5 8 0% 7 20-Oct-12 29-Oct-12 28-May-13 04-Jun-13 56

1405 NECP-Rebase_06Sep12-4.CO.2.5.1.29PHASE 2 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP2450 Black Steel Pipes, CHW, Area B6 7 0% 7 29-Oct-12 06-Nov-12 05-Jun-13 12-Jun-13 56

1406 NECP-Rebase_06Sep12-4.CO.2.5.1.29PHASE 2 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP2460 Black Steel Pipes, CHW, Area B7 7 0% 7 06-Nov-12 14-Nov-12 13-Jun-13 20-Jun-13 56

1407 NECP-Rebase_06Sep12-4.CO.2.5.1.29PHASE 2 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP2470 Black Steel Pipes, CHW, Area B8 7 0% 7 14-Nov-12 22-Nov-12 22-Jun-13 29-Jun-13 56

1408 NECP-Rebase_06Sep12-4.CO.2.5.1.29PHASE 2 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP2480 Black Steel Pipes, CHW, Area B9 7 0% 7 22-Nov-12 01-Dec-12 30-Jun-13 07-Jul-13 56

1409 NECP-Rebase_06Sep12-4.CO.2.5.1.29PHASE 2 LOWER BASEMENT - BLACK STEEL PIPESNECOMEP2490 Black Steel Pipes, CHW, Area B10 7 0% 7 01-Dec-12 09-Dec-12 08-Jul-13 15-Jul-13 56

1410 PHASE 2 LOWER BASEMENT - PIPE INSTALLATION (SANITARY, FIRE FIGHTING & WATER SUPPLY)PHASE 2 LOWER BASEMENT - PIPE INSTALLATION (SANITARY, FIRE FIGHTING & WATER SUPPLY)PHASE 2 LOWER BASEMENT - PIPE INSTALLATION (SANITARY, FIRE FIGHTING & WATER SUPPLY)PHASE 2 LOWER BASEMENT - PIPE INSTALLATION (SANITARY, FIRE FIGHTING & WATER SUPPLY) 110 60 12-Sep-12 19-Jan-13 25-Apr-13 03-Jul-13 89

1411 FIRE FIGHTINGFIRE FIGHTINGFIRE FIGHTINGFIRE FIGHTING 110 60 12-Sep-12 19-Jan-13 25-Apr-13 03-Jul-13 66

1412 NECP-Rebase_06Sep12-4.CO.2.5.1.28.2FIRE FIGHTING NECOMEP4440 Fire fighting pipe installation - Area B1 7 0% 6 12-Sep-12 20-Sep-12 25-Apr-13 01-May-13 42

1413 NECP-Rebase_06Sep12-4.CO.2.5.1.28.2FIRE FIGHTING NECOMEP4450 Fire fighting pipe installation - Area B2 7 0% 6 10-Nov-12 18-Nov-12 02-May-13 08-May-13 58

1414 NECP-Rebase_06Sep12-4.CO.2.5.1.28.2FIRE FIGHTING NECOMEP4460 Fire fighting pipe installation - Area B3 7 0% 6 18-Nov-12 26-Nov-12 09-May-13 15-May-13 59

1415 NECP-Rebase_06Sep12-4.CO.2.5.1.28.2FIRE FIGHTING NECOMEP4470 Fire fighting pipe installation - Area B4 8 0% 6 26-Nov-12 05-Dec-12 16-May-13 22-May-13 60

1416 NECP-Rebase_06Sep12-4.CO.2.5.1.28.2FIRE FIGHTING NECOMEP4480 Fire fighting pipe installation - Area B5 7 0% 6 05-Dec-12 13-Dec-12 23-May-13 29-May-13 61

1417 NECP-Rebase_06Sep12-4.CO.2.5.1.28.2FIRE FIGHTING NECOMEP4490 Fire fighting pipe installation - Area B6 7 0% 6 13-Dec-12 22-Dec-12 30-May-13 05-Jun-13 62

1418 NECP-Rebase_06Sep12-4.CO.2.5.1.28.2FIRE FIGHTING NECOMEP4500 Fire fighting pipe installation - Area B7 6 0% 6 22-Dec-12 29-Dec-12 06-Jun-13 12-Jun-13 63

1419 NECP-Rebase_06Sep12-4.CO.2.5.1.28.2FIRE FIGHTING NECOMEP4510 Fire fighting pipe installation - Area B8 6 0% 6 29-Dec-12 05-Jan-13 13-Jun-13 19-Jun-13 64

1420 NECP-Rebase_06Sep12-4.CO.2.5.1.28.2FIRE FIGHTING NECOMEP4520 Fire fighting pipe installation - Area B9 6 0% 6 05-Jan-13 12-Jan-13 20-Jun-13 26-Jun-13 65

1421 NECP-Rebase_06Sep12-4.CO.2.5.1.28.2FIRE FIGHTING NECOMEP4530 Fire fighting pipe installation - Area B10 6 0% 6 12-Jan-13 19-Jan-13 27-Jun-13 03-Jul-13 66

1422 SANITARYSANITARYSANITARYSANITARY 110 60 12-Sep-12 19-Jan-13 25-Apr-13 03-Jul-13 81

1423 NECP-Rebase_06Sep12-4.CO.2.5.1.28.1SANITARY NECOMEP2300 Sanitary pipe installation - Area B1 7 0% 6 12-Sep-12 20-Sep-12 25-Apr-13 01-May-13 81

1424 NECP-Rebase_06Sep12-4.CO.2.5.1.28.1SANITARY NECOMEP2310 Sanitary pipe installation - Area B2 7 0% 6 10-Nov-12 18-Nov-12 02-May-13 08-May-13 81

1425 NECP-Rebase_06Sep12-4.CO.2.5.1.28.1SANITARY NECOMEP2320 Sanitary pipe installation - Area B3 7 0% 6 18-Nov-12 26-Nov-12 09-May-13 15-May-13 81

1426 NECP-Rebase_06Sep12-4.CO.2.5.1.28.1SANITARY NECOMEP2330 Sanitary pipe installation - Area B4 7 0% 6 26-Nov-12 04-Dec-12 16-May-13 22-May-13 81

1427 NECP-Rebase_06Sep12-4.CO.2.5.1.28.1SANITARY NECOMEP2340 Sanitary pipe installation - Area B5 7 0% 6 04-Dec-12 12-Dec-12 23-May-13 29-May-13 81

1428 NECP-Rebase_06Sep12-4.CO.2.5.1.28.1SANITARY NECOMEP2350 Sanitary pipe installation - Area B6 7 0% 6 12-Dec-12 20-Dec-12 30-May-13 05-Jun-13 81

1429 NECP-Rebase_06Sep12-4.CO.2.5.1.28.1SANITARY NECOMEP2360 Sanitary pipe installation - Area B7 6 0% 6 20-Dec-12 27-Dec-12 06-Jun-13 12-Jun-13 81

1430 NECP-Rebase_06Sep12-4.CO.2.5.1.28.1SANITARY NECOMEP2370 Sanitary pipe installation - Area B8 6 0% 6 29-Dec-12 05-Jan-13 13-Jun-13 19-Jun-13 81

1431 NECP-Rebase_06Sep12-4.CO.2.5.1.28.1SANITARY NECOMEP2380 Sanitary pipe installation - Area B9 6 0% 6 05-Jan-13 12-Jan-13 20-Jun-13 26-Jun-13 81

1432 NECP-Rebase_06Sep12-4.CO.2.5.1.28.1SANITARY NECOMEP2390 Sanitary pipe installation - Area B10 6 0% 6 12-Jan-13 19-Jan-13 27-Jun-13 03-Jul-13 81

1433 WATER SUPPLYWATER SUPPLYWATER SUPPLYWATER SUPPLY 110 60 12-Sep-12 19-Jan-13 25-Apr-13 03-Jul-13 89

1434 NECP-Rebase_06Sep12-4.CO.2.5.1.28.3WATER SUPPLY NECOMEP4540 Water supply pipe installation - Area B1 7 0% 6 12-Sep-12 20-Sep-12 25-Apr-13 01-May-13 42

1435 NECP-Rebase_06Sep12-4.CO.2.5.1.28.3WATER SUPPLY NECOMEP4550 Water supply pipe installation - Area B2 7 0% 6 10-Nov-12 18-Nov-12 02-May-13 08-May-13 89

1436 NECP-Rebase_06Sep12-4.CO.2.5.1.28.3WATER SUPPLY NECOMEP4560 Water supply pipe installation - Area B3 7 0% 6 18-Nov-12 26-Nov-12 09-May-13 15-May-13 89

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Lighting conduits

Fire Alaram conduits

Telephone conduits

RC Suspended Slab, Ground Floor, Area 24A

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alaram conduits

Telephone conduits

RC Suspended Slab, Ground Floor, Area 26

Small power conduits

Security system conduits

Earthing conduits

Lighting conduits

Fire Alarm conduits

Telephone conduits

Backfilling Around Building, Area 25 - Area 26

Backfilling Around Building, Area 16 - Area 17

Backfilling Around Building, Area 19 - Area 20

Backfilling Around Building, Area 21 - Area 22

Backfilling Around Building, Area 23 - Area 24

Blockwork, Lower Basement, Area 24 - Area 25 - Area 26

Installation of Sanitary pipes

Small power conduits

Installation of Rainwater Pipes

Blockwork, Lower Basement, Area 18 - Area 19

Installation of Sanitary pipes

Small power conduits

Installation of Rainwater Pipes

Blockwork, Lower Basement, Area 16 - Area17

Installation of Sanitary pipes

Small power conduits

Blockwork, Lower Basement, Area 14 - Area15

Installation of Sanitary pipes

Small power conduits

Blockwork, Upper Basement, Area 25 - Area 26

Installation of Sanitary pipes

Small power conduits

Installation of Rainwater Pipes

Blockworks, Upper Basement, Area 21 - Area 22

Installation of Sanitary pipes

Small power conduits

Installation of Rainwater Pipes

Blockworks, Upper Basement, Area B19 - Area 20

Installation of Sanitary pipes

Small power conduits

Blockwork, Upper Basement, Area 16 - Area 17

Installation of Sanitary pipes

Small power conduits

Steel frame for Walkway Canopies (Frijns)

Concrete Base, Gate House

Walls, Screeds, Gate House

MEP Works, Gate House

GRC Cladding/Tiles/Ceiling/Windows/Doors, Gate House

System Control Equipment, Gate House

Black Steel Pipes, CHW, Area B1

Black Steel Pipes, CHW, Area B2

Black Steel Pipes, CHW, Area B3

Black Steel Pipes, CHW, Area B4

Black Steel Pipes, CHW, Area B5

Black Steel Pipes, CHW, Area B6

Black Steel Pipes, CHW, Area B7

Black Steel Pipes, CHW, Area B8

Black Steel Pipes, CHW, Area B9

Black Steel Pipes, CHW, Area B10

Fire fighting pipe installation - Area B1

Fire fighting pipe installation - Area B2

Fire fighting pipe installation - Area B3

Fire fighting pipe installation - Area B4

Fire fighting pipe installation - Area B5

Fire fighting pipe installation - Area B6

Fire fighting pipe installation - Area B7

Fire fighting pipe installation - Area B8

Fire fighting pipe installation - Area B9

Fire fighting pipe installation - Area B10

Sanitary pipe installation - Area B1

Sanitary pipe installation - Area B2

Sanitary pipe installation - Area B3

Sanitary pipe installation - Area B4

Sanitary pipe installation - Area B5

Sanitary pipe installation - Area B6

Sanitary pipe installation - Area B7

Sanitary pipe installation - Area B8

Sanitary pipe installation - Area B9

Sanitary pipe installation - Area B10

Water supply pipe installation - Area B1

Water supply pipe installation - Area B2

Water supply pipe installation - Area B3

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 13 of 19/27-Feb-13 09:03

Page 14: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

1437 NECP-Rebase_06Sep12-4.CO.2.5.1.28.3WATER SUPPLY NECOMEP4570 Water supply pipe installation - Area B4 8 0% 6 26-Nov-12 05-Dec-12 16-May-13 22-May-13 89

1438 NECP-Rebase_06Sep12-4.CO.2.5.1.28.3WATER SUPPLY NECOMEP4580 Water supply pipe installation - Area B5 7 0% 6 05-Dec-12 13-Dec-12 23-May-13 29-May-13 89

1439 NECP-Rebase_06Sep12-4.CO.2.5.1.28.3WATER SUPPLY NECOMEP4590 Water supply pipe installation - Area B6 7 0% 6 13-Dec-12 22-Dec-12 30-May-13 05-Jun-13 89

1440 NECP-Rebase_06Sep12-4.CO.2.5.1.28.3WATER SUPPLY NECOMEP4600 Water supply pipe installation - Area B7 6 0% 6 22-Dec-12 29-Dec-12 06-Jun-13 12-Jun-13 89

1441 NECP-Rebase_06Sep12-4.CO.2.5.1.28.3WATER SUPPLY NECOMEP4610 Water supply pipe installation - Area B8 6 0% 6 29-Dec-12 05-Jan-13 13-Jun-13 19-Jun-13 89

1442 NECP-Rebase_06Sep12-4.CO.2.5.1.28.3WATER SUPPLY NECOMEP4620 Water supply pipe installation - Area B9 6 0% 6 05-Jan-13 12-Jan-13 20-Jun-13 26-Jun-13 89

1443 NECP-Rebase_06Sep12-4.CO.2.5.1.28.3WATER SUPPLY NECOMEP4630 Water supply pipe installation - Area B10 6 0% 6 12-Jan-13 19-Jan-13 27-Jun-13 03-Jul-13 89

1444 PHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMPHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMPHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMPHASE 2 LOWER BASEMENT - SPRINKLER SYSTEM 100 70 10-Oct-12 04-Feb-13 20-May-13 08-Aug-13 42

1445 NECP-Rebase_06Sep12-4.CO.2.5.1.30PHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP2305 Sprinkler Head & Accessories, Area B1 8 0% 7 10-Oct-12 20-Oct-12 20-May-13 27-May-13 42

1446 NECP-Rebase_06Sep12-4.CO.2.5.1.30PHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP2315 Sprinkler Head & Accessories, Area B2 8 0% 7 18-Nov-12 27-Nov-12 28-May-13 04-Jun-13 42

1447 NECP-Rebase_06Sep12-4.CO.2.5.1.30PHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP2325 Sprinkler Head & Accessories, Area B3 8 0% 7 27-Nov-12 06-Dec-12 05-Jun-13 12-Jun-13 42

1448 NECP-Rebase_06Sep12-4.CO.2.5.1.30PHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP2335 Sprinkler Head & Accessories, Area B4 8 0% 7 06-Dec-12 16-Dec-12 13-Jun-13 20-Jun-13 42

1449 NECP-Rebase_06Sep12-4.CO.2.5.1.30PHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP2345 Sprinkler Head & Accessories, Area B5 8 0% 7 16-Dec-12 25-Dec-12 22-Jun-13 29-Jun-13 42

1450 NECP-Rebase_06Sep12-4.CO.2.5.1.30PHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP2355 Sprinkler Head & Accessories, Area B6 7 0% 7 25-Dec-12 02-Jan-13 30-Jun-13 07-Jul-13 42

1451 NECP-Rebase_06Sep12-4.CO.2.5.1.30PHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP2365 Sprinkler Head & Accessories, Area B7 7 0% 7 02-Jan-13 10-Jan-13 08-Jul-13 15-Jul-13 42

1452 NECP-Rebase_06Sep12-4.CO.2.5.1.30PHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP2375 Sprinkler Head & Accessories, Area B8 7 0% 7 10-Jan-13 19-Jan-13 16-Jul-13 23-Jul-13 42

1453 NECP-Rebase_06Sep12-4.CO.2.5.1.30PHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP2385 Sprinkler Head & Accessories, Area B9 7 0% 7 19-Jan-13 27-Jan-13 24-Jul-13 31-Jul-13 42

1454 NECP-Rebase_06Sep12-4.CO.2.5.1.30PHASE 2 LOWER BASEMENT - SPRINKLER SYSTEMNECOMEP2395 Sprinkler Head & Accessories, Area B10 7 0% 7 27-Jan-13 04-Feb-13 01-Aug-13 08-Aug-13 42

1455 PHASE 2 LOWER BASEMENT - DUCTSPHASE 2 LOWER BASEMENT - DUCTSPHASE 2 LOWER BASEMENT - DUCTSPHASE 2 LOWER BASEMENT - DUCTS 180 149 12-Sep-12 09-Apr-13 25-Apr-13 17-Oct-13 52

1456 INSTALLATIONINSTALLATIONINSTALLATIONINSTALLATION 117 70 12-Sep-12 27-Jan-13 25-Apr-13 15-Jul-13 54

1457 NECP-Rebase_06Sep12-4.CO.2.5.1.31.1INSTALLATION NECOMEP2405 AC Ducts Installation - Area B1 8 0% 7 12-Sep-12 22-Sep-12 25-Apr-13 02-May-13 54

1458 NECP-Rebase_06Sep12-4.CO.2.5.1.31.1INSTALLATION NECOMEP2415 AC Ducts Installation - Area B2 8 0% 7 10-Nov-12 19-Nov-12 04-May-13 11-May-13 54

1459 NECP-Rebase_06Sep12-4.CO.2.5.1.31.1INSTALLATION NECOMEP2425 AC Ducts Installation - Area B3 8 0% 7 19-Nov-12 28-Nov-12 12-May-13 19-May-13 54

1460 NECP-Rebase_06Sep12-4.CO.2.5.1.31.1INSTALLATION NECOMEP2435 AC Ducts Installation - Area B4 8 0% 7 28-Nov-12 08-Dec-12 20-May-13 27-May-13 54

1461 NECP-Rebase_06Sep12-4.CO.2.5.1.31.1INSTALLATION NECOMEP2445 AC Ducts Installation - Area B5 8 0% 7 08-Dec-12 17-Dec-12 28-May-13 04-Jun-13 54

1462 NECP-Rebase_06Sep12-4.CO.2.5.1.31.1INSTALLATION NECOMEP2455 AC Ducts Installation - Area B6 7 0% 7 17-Dec-12 25-Dec-12 05-Jun-13 12-Jun-13 54

1463 NECP-Rebase_06Sep12-4.CO.2.5.1.31.1INSTALLATION NECOMEP2465 AC Ducts Installation - Area B7 7 0% 7 25-Dec-12 02-Jan-13 13-Jun-13 20-Jun-13 54

1464 NECP-Rebase_06Sep12-4.CO.2.5.1.31.1INSTALLATION NECOMEP2475 AC Ducts Installation - Area B8 7 0% 7 02-Jan-13 10-Jan-13 22-Jun-13 29-Jun-13 54

1465 NECP-Rebase_06Sep12-4.CO.2.5.1.31.1INSTALLATION NECOMEP2485 AC Ducts Installation - Area B9 7 0% 7 10-Jan-13 19-Jan-13 30-Jun-13 07-Jul-13 54

1466 NECP-Rebase_06Sep12-4.CO.2.5.1.31.1INSTALLATION NECOMEP2495 AC Ducts Installation - Area B10 7 0% 7 19-Jan-13 27-Jan-13 08-Jul-13 15-Jul-13 54

1467 INSULATIONINSULATIONINSULATIONINSULATION 76 70 12-Jan-13 09-Apr-13 27-Jul-13 17-Oct-13 52

1468 NECP-Rebase_06Sep12-4.CO.2.5.1.31.2INSULATION NECOMEP4640 AC Ducts Insulation works - Area B1 8 0% 7 12-Jan-13 20-Jan-13 27-Jul-13 03-Aug-13 41

1469 NECP-Rebase_06Sep12-4.CO.2.5.1.31.2INSULATION NECOMEP4650 AC Ducts Insulation works - Area B2 8 0% 7 21-Jan-13 29-Jan-13 04-Aug-13 11-Aug-13 41

1470 NECP-Rebase_06Sep12-4.CO.2.5.1.31.2INSULATION NECOMEP4660 AC Ducts Insulation works - Area B3 8 0% 7 31-Jan-13 09-Feb-13 12-Aug-13 19-Aug-13 41

1471 NECP-Rebase_06Sep12-4.CO.2.5.1.31.2INSULATION NECOMEP4670 AC Ducts Insulation works - Area B4 8 0% 7 10-Feb-13 18-Feb-13 20-Aug-13 27-Aug-13 50

1472 NECP-Rebase_06Sep12-4.CO.2.5.1.31.2INSULATION NECOMEP4680 AC Ducts Insulation works - Area B5 8 0% 7 19-Feb-13 27-Feb-13 28-Aug-13 04-Sep-13 52

1473 NECP-Rebase_06Sep12-4.CO.2.5.1.31.2INSULATION NECOMEP4690 AC Ducts Insulation works - Area B6 7 0% 7 28-Feb-13 07-Mar-13 05-Sep-13 12-Sep-13 52

1474 NECP-Rebase_06Sep12-4.CO.2.5.1.31.2INSULATION NECOMEP4700 AC Ducts Insulation works - Area B7 7 0% 7 09-Mar-13 16-Mar-13 14-Sep-13 21-Sep-13 52

1475 NECP-Rebase_06Sep12-4.CO.2.5.1.31.2INSULATION NECOMEP4710 AC Ducts Insulation works - Area B8 7 0% 7 17-Mar-13 24-Mar-13 22-Sep-13 29-Sep-13 52

1476 NECP-Rebase_06Sep12-4.CO.2.5.1.31.2INSULATION NECOMEP4720 AC Ducts Insulation works - Area B9 7 0% 7 25-Mar-13 01-Apr-13 30-Sep-13 07-Oct-13 52

1477 NECP-Rebase_06Sep12-4.CO.2.5.1.31.2INSULATION NECOMEP4730 AC Ducts Insulation works - Area B10 7 0% 7 02-Apr-13 09-Apr-13 08-Oct-13 17-Oct-13 52

1478 PHASE 2 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTPHASE 2 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTPHASE 2 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTPHASE 2 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENT 35 35 06-Apr-13 15-May-13 06-Oct-13 18-Nov-13 41

1479 NECP-Rebase_06Sep12-4.CO.2.5.1.32PHASE 2 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTNECOMEP2600 AC/Refrigeration Equip, Supply & Ventilation Fans, Area B1-B4 15 0% 15 06-Apr-13 22-Apr-13 06-Oct-13 26-Oct-13 17

1480 NECP-Rebase_06Sep12-4.CO.2.5.1.32PHASE 2 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTNECOMEP2610 AC/Refrigeration Equip, Supply & Ventilation Fans, Area B5-B7 10 0% 10 23-Apr-13 04-May-13 26-Oct-13 06-Nov-13 41

1481 NECP-Rebase_06Sep12-4.CO.2.5.1.32PHASE 2 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTNECOMEP2620 AC/Refrigeration Equip, Supply & Ventilation Fans, Area B8-B10 10 0% 10 05-May-13 15-May-13 06-Nov-13 18-Nov-13 41

1482 PHASE 2 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONSPHASE 2 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONSPHASE 2 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONSPHASE 2 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONS 30 30 28-Jan-13 03-Mar-13 20-Aug-13 24-Sep-13 75

1483 NECP-Rebase_06Sep12-4.CO.2.5.1.33PHASE 2 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONSNECOMEP2630 Sanitary Installation, Rainwater Installations, Area B1-B4 10 0% 10 28-Jan-13 07-Feb-13 20-Aug-13 01-Sep-13 57

1484 NECP-Rebase_06Sep12-4.CO.2.5.1.33PHASE 2 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONSNECOMEP2640 Sanitary Installation, Rainwater Installations, Area B5-B7 10 0% 10 09-Feb-13 19-Feb-13 01-Sep-13 12-Sep-13 75

1485 NECP-Rebase_06Sep12-4.CO.2.5.1.33PHASE 2 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONSNECOMEP2650 Sanitary Installation, Rainwater Installations, Area B8-B10 10 0% 10 20-Feb-13 03-Mar-13 12-Sep-13 24-Sep-13 75

1486 PHASE 2 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONPHASE 2 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONPHASE 2 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONPHASE 2 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATION 22 22 09-Feb-13 05-Mar-13 26-Aug-13 19-Sep-13 89

1487 NECP-Rebase_06Sep12-4.CO.2.5.1.34PHASE 2 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONNECOMEP2660 Cold Water, Hot Water & Firefighting Installation, Area B1-B4 8 0% 7 09-Feb-13 17-Feb-13 26-Aug-13 02-Sep-13 78

1488 NECP-Rebase_06Sep12-4.CO.2.5.1.34PHASE 2 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONNECOMEP2670 Cold Water, Hot Water & Firefighting Installation, Area B5-B7 7 0% 7 18-Feb-13 25-Feb-13 03-Sep-13 10-Sep-13 90

1489 NECP-Rebase_06Sep12-4.CO.2.5.1.34PHASE 2 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONNECOMEP2680 Cold Water, Hot Water & Firefighting Installation, Area B8-B10 7 0% 7 26-Feb-13 05-Mar-13 12-Sep-13 19-Sep-13 89

1490 PHASE 2 LOWER BASEMENT - BMSPHASE 2 LOWER BASEMENT - BMSPHASE 2 LOWER BASEMENT - BMSPHASE 2 LOWER BASEMENT - BMS 91 40 07-Feb-13 23-May-13 19-Sep-13 06-Nov-13 50

1491 WIRINGWIRINGWIRINGWIRING 51 28 07-Feb-13 07-Apr-13 19-Sep-13 23-Oct-13 22

1492 NECP-Rebase_06Sep12-4.CO.2.5.1.35.1WIRING NECOMEP2143 Building Management System Wiring works, Area B1-B4 10 0% 10 07-Feb-13 18-Feb-13 19-Sep-13 30-Sep-13 22

1493 NECP-Rebase_06Sep12-4.CO.2.5.1.35.1WIRING NECOMEP2153 Building Management System Wiring works, Area B5-B7 9 0% 9 04-Mar-13 13-Mar-13 01-Oct-13 10-Oct-13 22

1494 NECP-Rebase_06Sep12-4.CO.2.5.1.35.1WIRING NECOMEP2163 Building Management System Wiring works Area B8-B10 9 0% 9 28-Mar-13 07-Apr-13 12-Oct-13 23-Oct-13 22

1495 DEVICES INSTALLATIONDEVICES INSTALLATIONDEVICES INSTALLATIONDEVICES INSTALLATION 27 21 23-Apr-13 23-May-13 12-Oct-13 06-Nov-13 50

1496 NECP-Rebase_06Sep12-4.CO.2.5.1.35.2DEVICES INSTALLATIONNECOMEP5450 Building Management System Device Installation, Area B1-B4 7 0% 7 23-Apr-13 30-Apr-13 12-Oct-13 21-Oct-13 24

1497 NECP-Rebase_06Sep12-4.CO.2.5.1.35.2DEVICES INSTALLATIONNECOMEP5460 Building Management System Device Installation, Area B5-B7 7 0% 7 05-May-13 12-May-13 22-Oct-13 29-Oct-13 24

1498 NECP-Rebase_06Sep12-4.CO.2.5.1.35.2DEVICES INSTALLATIONNECOMEP5470 Building Management System Device Installation, Area B8-B10 7 0% 7 16-May-13 23-May-13 30-Oct-13 06-Nov-13 50

1499 PHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGPHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGPHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGPHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKING 74 50 01-Jan-13 27-Mar-13 06-Jun-13 04-Aug-13 81

1500 NECP-Rebase_06Sep12-4.CO.2.5.1.36PHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP2905 Cable Trays, Cable Ladders, Cable Trunking, Area B1 8 0% 5 01-Jan-13 09-Jan-13 06-Jun-13 12-Jun-13 79

1501 NECP-Rebase_06Sep12-4.CO.2.5.1.36PHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP2915 Cable Trays, Cable Ladders, Cable Trunking, Area B2 8 0% 5 10-Jan-13 19-Jan-13 12-Jun-13 18-Jun-13 79

1502 NECP-Rebase_06Sep12-4.CO.2.5.1.36PHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP2925 Cable Trays, Cable Ladders, Cable Trunking, Area B3 8 0% 5 20-Jan-13 28-Jan-13 18-Jun-13 24-Jun-13 79

1503 NECP-Rebase_06Sep12-4.CO.2.5.1.36PHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP2935 Cable Trays, Cable Ladders, Cable Trunking, Area B4 8 0% 5 29-Jan-13 06-Feb-13 24-Jun-13 30-Jun-13 79

1504 NECP-Rebase_06Sep12-4.CO.2.5.1.36PHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP2945 Cable Trays, Cable Ladders, Cable Trunking, Area B5 7 0% 5 07-Feb-13 14-Feb-13 30-Jun-13 06-Jul-13 79

1505 NECP-Rebase_06Sep12-4.CO.2.5.1.36PHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP2955 Cable Trays, Cable Ladders, Cable Trunking, Area B6 7 0% 5 16-Feb-13 23-Feb-13 06-Jul-13 11-Jul-13 81

1506 NECP-Rebase_06Sep12-4.CO.2.5.1.36PHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP2965 Cable Trays, Cable Ladders, Cable Trunking, Area B7 7 0% 5 24-Feb-13 03-Mar-13 11-Jul-13 17-Jul-13 81

1507 NECP-Rebase_06Sep12-4.CO.2.5.1.36PHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP2975 Cable Trays, Cable Ladders, Cable Trunking, Area B8 7 0% 5 04-Mar-13 11-Mar-13 17-Jul-13 23-Jul-13 81

1508 NECP-Rebase_06Sep12-4.CO.2.5.1.36PHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP2985 Cable Trays, Cable Ladders, Cable Trunking, Area B9 7 0% 5 12-Mar-13 19-Mar-13 23-Jul-13 29-Jul-13 81

1509 NECP-Rebase_06Sep12-4.CO.2.5.1.36PHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP2995 Cable Trays, Cable Ladders, Cable Trunking, Area B10 7 0% 5 20-Mar-13 27-Mar-13 29-Jul-13 04-Aug-13 81

1510 PHASE 2 LOWER BASEMENT - BUS DUCT, BUS BARPHASE 2 LOWER BASEMENT - BUS DUCT, BUS BARPHASE 2 LOWER BASEMENT - BUS DUCT, BUS BARPHASE 2 LOWER BASEMENT - BUS DUCT, BUS BAR 77 60 10-Jan-13 09-Apr-13 18-Jul-13 26-Sep-13 78

1511 BUS DUCTBUS DUCTBUS DUCTBUS DUCT 73 60 10-Jan-13 04-Apr-13 18-Jul-13 26-Sep-13 78

1512 NECP-Rebase_06Sep12-4.CO.2.5.1.37.1BUS DUCT NECOMEP2220 Bus Duct - Area B1 7 0% 6 10-Jan-13 17-Jan-13 18-Jul-13 25-Jul-13 67

1513 NECP-Rebase_06Sep12-4.CO.2.5.1.37.1BUS DUCT NECOMEP2230 Bus Duct - Area B2 7 0% 6 20-Jan-13 27-Jan-13 25-Jul-13 01-Aug-13 67

1514 NECP-Rebase_06Sep12-4.CO.2.5.1.37.1BUS DUCT NECOMEP2240 Bus Duct - Area B3 7 0% 6 29-Jan-13 05-Feb-13 01-Aug-13 08-Aug-13 67

1515 NECP-Rebase_06Sep12-4.CO.2.5.1.37.1BUS DUCT NECOMEP2250 Bus Duct - Area B4 7 0% 6 07-Feb-13 14-Feb-13 08-Aug-13 15-Aug-13 67

1516 NECP-Rebase_06Sep12-4.CO.2.5.1.37.1BUS DUCT NECOMEP2260 Bus Duct - Area B5 7 0% 6 16-Feb-13 23-Feb-13 15-Aug-13 22-Aug-13 67

1517 NECP-Rebase_06Sep12-4.CO.2.5.1.37.1BUS DUCT NECOMEP2270 Bus Duct - Area B6 7 0% 6 24-Feb-13 03-Mar-13 22-Aug-13 29-Aug-13 78

1518 NECP-Rebase_06Sep12-4.CO.2.5.1.37.1BUS DUCT NECOMEP2280 Bus Duct - Area B7 7 0% 6 04-Mar-13 11-Mar-13 29-Aug-13 05-Sep-13 78

1519 NECP-Rebase_06Sep12-4.CO.2.5.1.37.1BUS DUCT NECOMEP2290 Bus Duct - Area B8 7 0% 6 12-Mar-13 19-Mar-13 05-Sep-13 12-Sep-13 78

1520 NECP-Rebase_06Sep12-4.CO.2.5.1.37.1BUS DUCT NECOMEP2720 Bus Duct - Area B9 7 0% 6 20-Mar-13 27-Mar-13 12-Sep-13 19-Sep-13 78

1521 NECP-Rebase_06Sep12-4.CO.2.5.1.37.1BUS DUCT NECOMEP2730 Bus Duct - Area B10 7 0% 6 28-Mar-13 04-Apr-13 19-Sep-13 26-Sep-13 78

1522 BUS BARBUS BARBUS BARBUS BAR 70 53 19-Jan-13 09-Apr-13 25-Jul-13 25-Sep-13 78

1523 NECP-Rebase_06Sep12-4.CO.2.5.1.37.2BUS BAR NECOMEP4740 Bus Bar - Area B1 7 0% 5 19-Jan-13 26-Jan-13 25-Jul-13 31-Jul-13 81

1524 NECP-Rebase_06Sep12-4.CO.2.5.1.37.2BUS BAR NECOMEP4750 Bus Bar - Area B2 7 0% 5 27-Jan-13 03-Feb-13 31-Jul-13 06-Aug-13 81

1525 NECP-Rebase_06Sep12-4.CO.2.5.1.37.2BUS BAR NECOMEP4760 Bus Bar - Area B3 7 0% 5 04-Feb-13 11-Feb-13 06-Aug-13 12-Aug-13 81

1526 NECP-Rebase_06Sep12-4.CO.2.5.1.37.2BUS BAR NECOMEP4770 Bus Bar - Area B4 7 0% 5 12-Feb-13 19-Feb-13 12-Aug-13 18-Aug-13 81

1527 NECP-Rebase_06Sep12-4.CO.2.5.1.37.2BUS BAR NECOMEP4780 Bus Bar - Area B5 7 0% 5 20-Feb-13 27-Feb-13 18-Aug-13 24-Aug-13 81

1528 NECP-Rebase_06Sep12-4.CO.2.5.1.37.2BUS BAR NECOMEP4790 Bus Bar - Area B6 7 0% 5 28-Feb-13 07-Mar-13 24-Aug-13 29-Aug-13 81

1529 NECP-Rebase_06Sep12-4.CO.2.5.1.37.2BUS BAR NECOMEP4800 Bus Bar - Area B7 7 0% 5 09-Mar-13 16-Mar-13 29-Aug-13 04-Sep-13 81

1530 NECP-Rebase_06Sep12-4.CO.2.5.1.37.2BUS BAR NECOMEP4810 Bus Bar - Area B8 7 0% 5 17-Mar-13 24-Mar-13 05-Sep-13 11-Sep-13 80

1531 NECP-Rebase_06Sep12-4.CO.2.5.1.37.2BUS BAR NECOMEP4820 Bus Bar - Area B9 7 0% 5 25-Mar-13 01-Apr-13 12-Sep-13 18-Sep-13 79

1532 NECP-Rebase_06Sep12-4.CO.2.5.1.37.2BUS BAR NECOMEP4830 Bus Bar - Area B10 7 0% 5 02-Apr-13 09-Apr-13 19-Sep-13 25-Sep-13 78

1533 PHASE 2 LOWER BASEMENT - TELEPHONE CABLE TRAYS INSTALLATIONPHASE 2 LOWER BASEMENT - TELEPHONE CABLE TRAYS INSTALLATIONPHASE 2 LOWER BASEMENT - TELEPHONE CABLE TRAYS INSTALLATIONPHASE 2 LOWER BASEMENT - TELEPHONE CABLE TRAYS INSTALLATION 87 54 21-Jan-13 01-May-13 12-Oct-13 15-Dec-13 10

1534 WIRINGWIRINGWIRINGWIRING 40 40 21-Jan-13 07-Mar-13 12-Oct-13 28-Nov-13 11

1535 NECP-Rebase_06Sep12-4.CO.2.5.1.38.1WIRING NECOMEP2013 Telephone Wiring works - Area B1-B4 14 0% 14 21-Jan-13 05-Feb-13 12-Oct-13 29-Oct-13 0

1536 NECP-Rebase_06Sep12-4.CO.2.5.1.38.1WIRING NECOMEP2023 Telephone Wiring works - Area B5-B7 13 0% 13 06-Feb-13 20-Feb-13 30-Oct-13 13-Nov-13 11

1537 NECP-Rebase_06Sep12-4.CO.2.5.1.38.1WIRING NECOMEP2033 Telephone Wiring works - Area B8-B10 13 0% 13 21-Feb-13 07-Mar-13 14-Nov-13 28-Nov-13 11

1538 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 60 40 21-Feb-13 01-May-13 30-Oct-13 15-Dec-13 10

1539 NECP-Rebase_06Sep12-4.CO.2.5.1.38.2DEVICE INSTALLATION NECOMEP4940 Telephone Device Installation - Area B1-B4 14 0% 14 16-Apr-13 01-May-13 30-Oct-13 14-Nov-13 6

1540 NECP-Rebase_06Sep12-4.CO.2.5.1.38.2DEVICE INSTALLATION NECOMEP4950 Telephone Device Installation - Area B5-B7 13 0% 13 21-Feb-13 07-Mar-13 16-Nov-13 30-Nov-13 10

1541 NECP-Rebase_06Sep12-4.CO.2.5.1.38.2DEVICE INSTALLATION NECOMEP4960 Telephone Device Installation - Area B8-B10 13 0% 13 09-Mar-13 23-Mar-13 01-Dec-13 15-Dec-13 10

1542 PHASE 2 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 2)PHASE 2 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 2)PHASE 2 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 2)PHASE 2 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 2) 90 44 31-Mar-13 13-Jul-13 14-Nov-13 05-Jan-14 0

1543 NECP-Rebase_06Sep12-4.CO.2.5.1.89PHASE 2 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 2)NECOMEP2113 Substation 2: Transformer Installation, Area B1 30 0% 30 31-Mar-13 04-May-13 14-Nov-13 19-Dec-13 0

1544 NECP-Rebase_06Sep12-4.CO.2.5.1.89PHASE 2 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 2)NECOMEP2123 Substation 2: MV Panels Installation, Area B1 30 0% 30 05-May-13 08-Jun-13 23-Nov-13 28-Dec-13 0

1545 NECP-Rebase_06Sep12-4.CO.2.5.1.89PHASE 2 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 2)NECOMEP2133 Substation 2: Switchgear Installation, Area B2 30 0% 30 09-Jun-13 13-Jul-13 01-Dec-13 05-Jan-14 0

1546 PHASE 2 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEMPHASE 2 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEMPHASE 2 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEMPHASE 2 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEM 90 35 31-Mar-13 13-Jul-13 27-Nov-13 07-Jan-14 5

1547 NECP-Rebase_06Sep12-4.CO.2.5.1.39PHASE 2 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEMNECOMEP3000 Generator, Area B1 30 0% 21 31-Mar-13 04-May-13 27-Nov-13 22-Dec-13 5

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Water supply pipe installation - Area B4

Water supply pipe installation - Area B5

Water supply pipe installation - Area B6

Water supply pipe installation - Area B7

Water supply pipe installation - Area B8

Water supply pipe installation - Area B9

Water supply pipe installation - Area B10

Sprinkler Head & Accessories, Area B1

Sprinkler Head & Accessories, Area B2

Sprinkler Head & Accessories, Area B3

Sprinkler Head & Accessories, Area B4

Sprinkler Head & Accessories, Area B5

Sprinkler Head & Accessories, Area B6

Sprinkler Head & Accessories, Area B7

Sprinkler Head & Accessories, Area B8

Sprinkler Head & Accessories, Area B9

Sprinkler Head & Accessories, Area B10

AC Ducts Installation - Area B1

AC Ducts Installation - Area B2

AC Ducts Installation - Area B3

AC Ducts Installation - Area B4

AC Ducts Installation - Area B5

AC Ducts Installation - Area B6

AC Ducts Installation - Area B7

AC Ducts Installation - Area B8

AC Ducts Installation - Area B9

AC Ducts Installation - Area B10

AC Ducts Insulation works - Area B1

AC Ducts Insulation works - Area B2

AC Ducts Insulation works - Area B3

AC Ducts Insulation works - Area B4

AC Ducts Insulation works - Area B5

AC Ducts Insulation works - Area B6

AC Ducts Insulation works - Area B7

AC Ducts Insulation works - Area B8

AC Ducts Insulation works - Area B9

AC Ducts Insulation works - Area B10

AC/Refrigeration Equip, Supply & Ventilation Fans, Area B1-B4

AC/Refrigeration Equip, Supply & Ventilation Fans, Area B5-B7

AC/Refrigeration Equip, Supply & Ventilation Fans, Area B8-B10

Sanitary Installation, Rainwater Installations, Area B1-B4

Sanitary Installation, Rainwater Installations, Area B5-B7

Sanitary Installation, Rainwater Installations, Area B8-B10

Cold Water, Hot Water & Firefighting Installation, Area B1-B4

Cold Water, Hot Water & Firefighting Installation, Area B5-B7

Cold Water, Hot Water & Firefighting Installation, Area B8-B10

Building Management System Wiring works, Area B1-B4

Building Management System Wiring works, Area B5-B7

Building Management System Wiring works Area B8-B10

Building Management System Device Installation, Area B1-B4

Building Management System Device Installation, Area B5-B7

Building Management System Device Installation, Area B8-B10

Cable Trays, Cable Ladders, Cable Trunking, Area B1

Cable Trays, Cable Ladders, Cable Trunking, Area B2

Cable Trays, Cable Ladders, Cable Trunking, Area B3

Cable Trays, Cable Ladders, Cable Trunking, Area B4

Cable Trays, Cable Ladders, Cable Trunking, Area B5

Cable Trays, Cable Ladders, Cable Trunking, Area B6

Cable Trays, Cable Ladders, Cable Trunking, Area B7

Cable Trays, Cable Ladders, Cable Trunking, Area B8

Cable Trays, Cable Ladders, Cable Trunking, Area B9

Cable Trays, Cable Ladders, Cable Trunking, Area B10

Bus Duct - Area B1

Bus Duct - Area B2

Bus Duct - Area B3

Bus Duct - Area B4

Bus Duct - Area B5

Bus Duct - Area B6

Bus Duct - Area B7

Bus Duct - Area B8

Bus Duct - Area B9

Bus Duct - Area B10

Bus Bar - Area B1

Bus Bar - Area B2

Bus Bar - Area B3

Bus Bar - Area B4

Bus Bar - Area B5

Bus Bar - Area B6

Bus Bar - Area B7

Bus Bar - Area B8

Bus Bar - Area B9

Bus Bar - Area B10

Telephone Wiring works - Area B1-B4

Telephone Wiring works - Area B5-B7

Telephone Wiring works - Area B8-B10

Telephone Device Installation - Area B1-B4

Telephone Device Installation - Area B5-B7

Telephone Device Installation - Area B8-B10

Substation 2: Transformer Installation, Area B1

Substation 2: MV Panels Installation, Area B1

Substation 2: Switchgear Installation, Area B2

Generator, Area B1

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 14 of 19/27-Feb-13 09:03

Page 15: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

1548 NECP-Rebase_06Sep12-4.CO.2.5.1.39PHASE 2 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEMNECOMEP3010 UPS, Area B1 30 0% 21 05-May-13 08-Jun-13 05-Dec-13 30-Dec-13 5

1549 NECP-Rebase_06Sep12-4.CO.2.5.1.39PHASE 2 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEMNECOMEP3020 Battery System, Area A10 30 0% 21 09-Jun-13 13-Jul-13 14-Dec-13 07-Jan-14 5

1550 PHASE 2 LOWER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTSPHASE 2 LOWER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTSPHASE 2 LOWER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTSPHASE 2 LOWER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTS 149 105 14-Aug-12 04-Feb-13 25-Apr-13 26-Aug-13 73

1551 WIRINGWIRINGWIRINGWIRING 38 38 14-Aug-12 26-Sep-12 25-Apr-13 09-Jun-13 90

1552 NECP-Rebase_06Sep12-4.CO.2.5.1.40.1WIRING NECOMEP3190 Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B1-B4 13 0% 13 14-Aug-12 28-Aug-12 25-Apr-13 11-May-13 90

1553 NECP-Rebase_06Sep12-4.CO.2.5.1.40.1WIRING NECOMEP3200 Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B5-B7 13 0% 13 29-Aug-12 12-Sep-12 11-May-13 26-May-13 90

1554 NECP-Rebase_06Sep12-4.CO.2.5.1.40.1WIRING NECOMEP3210 Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B8-B10 12 0% 12 13-Sep-12 26-Sep-12 26-May-13 09-Jun-13 90

1555 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 37 38 23-Dec-12 04-Feb-13 14-Jul-13 26-Aug-13 73

1556 NECP-Rebase_06Sep12-4.CO.2.5.1.40.2DEVICE INSTALLATION NECOMEP4970 Luminaires, Lighting Points, Switch Points, etc Devices installation., Area B1-B413 0% 13 23-Dec-12 07-Jan-13 14-Jul-13 28-Jul-13 48

1557 NECP-Rebase_06Sep12-4.CO.2.5.1.40.2DEVICE INSTALLATION NECOMEP4980 Luminaires, Lighting Points, Switch Points, etc Devices installation, Area B5-B713 0% 13 07-Jan-13 22-Jan-13 29-Jul-13 12-Aug-13 73

1558 NECP-Rebase_06Sep12-4.CO.2.5.1.40.2DEVICE INSTALLATION NECOMEP4990 Luminaires, Lighting Points, Switch Points, etc Devices installation, Area B8-B1012 0% 12 21-Jan-13 04-Feb-13 13-Aug-13 26-Aug-13 73

1559 PHASE 2 LOWER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATIONPHASE 2 LOWER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATIONPHASE 2 LOWER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATIONPHASE 2 LOWER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATION 81 49 01-Nov-12 04-Feb-13 03-Oct-13 01-Dec-13 0

1560 WIRINGWIRINGWIRINGWIRING 37 37 01-Nov-12 13-Dec-12 03-Oct-13 17-Nov-13 0

1561 NECP-Rebase_06Sep12-4.CO.2.5.1.41.1WIRING NECOMEP3310 Switchboard, Small power wiring works, Area B1-B4 13 0% 13 01-Nov-12 15-Nov-12 03-Oct-13 20-Oct-13 0

1562 NECP-Rebase_06Sep12-4.CO.2.5.1.41.1WIRING NECOMEP3320 Switchboard, Small power wiring works, Area B5-B7 12 0% 12 17-Nov-12 29-Nov-12 21-Oct-13 03-Nov-13 0

1563 NECP-Rebase_06Sep12-4.CO.2.5.1.41.1WIRING NECOMEP3330 Switchboard, Small power wiring works, Area B8-B10 12 0% 12 01-Dec-12 13-Dec-12 04-Nov-13 17-Nov-13 0

1564 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 37 36 23-Dec-12 04-Feb-13 21-Oct-13 01-Dec-13 0

1565 NECP-Rebase_06Sep12-4.CO.2.5.1.41.2DEVICE INSTALLATION NECOMEP5000 Switchboard, Small power Devices installation, Area B1-B4 13 0% 13 23-Dec-12 07-Jan-13 21-Oct-13 04-Nov-13 0

1566 NECP-Rebase_06Sep12-4.CO.2.5.1.41.2DEVICE INSTALLATION NECOMEP5010 Switchboard, Small power Devices installation, Area B5-B7 12 0% 12 07-Jan-13 21-Jan-13 04-Nov-13 17-Nov-13 0

1567 NECP-Rebase_06Sep12-4.CO.2.5.1.41.2DEVICE INSTALLATION NECOMEP5020 Switchboard, Small power Devices installation, Area B8-B10 12 0% 12 21-Jan-13 04-Feb-13 18-Nov-13 01-Dec-13 0

1568 PHASE 2 LOWER BASEMENT - SECURITY SYSTEMPHASE 2 LOWER BASEMENT - SECURITY SYSTEMPHASE 2 LOWER BASEMENT - SECURITY SYSTEMPHASE 2 LOWER BASEMENT - SECURITY SYSTEM 26 26 09-Jan-13 07-Feb-13 17-Oct-13 16-Nov-13 9

1569 WIRINGWIRINGWIRINGWIRING 20 20 09-Jan-13 31-Jan-13 17-Oct-13 09-Nov-13 9

1570 NECP-Rebase_06Sep12-4.CO.2.5.1.42.1WIRING NECOMEP3430 Security System wiring works, Area B1-B4 7 0% 7 09-Jan-13 16-Jan-13 17-Oct-13 24-Oct-13 7

1571 NECP-Rebase_06Sep12-4.CO.2.5.1.42.1WIRING NECOMEP3440 Security System wiring works, Area B5-B7 7 0% 7 17-Jan-13 24-Jan-13 26-Oct-13 02-Nov-13 9

1572 NECP-Rebase_06Sep12-4.CO.2.5.1.42.1WIRING NECOMEP3450 Security System wiring works, Area B8-B10 6 0% 6 26-Jan-13 31-Jan-13 03-Nov-13 09-Nov-13 9

1573 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 19 19 17-Jan-13 07-Feb-13 26-Oct-13 16-Nov-13 9

1574 NECP-Rebase_06Sep12-4.CO.2.5.1.42.2DEVICE INSTALLATION NECOMEP5030 Security System Device installation , Area B1-B4 7 0% 7 17-Jan-13 24-Jan-13 26-Oct-13 02-Nov-13 7

1575 NECP-Rebase_06Sep12-4.CO.2.5.1.42.2DEVICE INSTALLATION NECOMEP5040 Security System Device installation , Area B5-B7 7 0% 7 26-Jan-13 02-Feb-13 03-Nov-13 10-Nov-13 14

1576 NECP-Rebase_06Sep12-4.CO.2.5.1.42.2DEVICE INSTALLATION NECOMEP5050 Security System Device installation , Area B8-B10 6 0% 6 02-Feb-13 07-Feb-13 10-Nov-13 16-Nov-13 9

1577 PHASE 2 LOWER BASEMENT - PARKING GUIDANCE SYSTEMPHASE 2 LOWER BASEMENT - PARKING GUIDANCE SYSTEMPHASE 2 LOWER BASEMENT - PARKING GUIDANCE SYSTEMPHASE 2 LOWER BASEMENT - PARKING GUIDANCE SYSTEM 132 28 09-Jan-13 12-Jun-13 28-Oct-13 28-Nov-13 32

1578 WIRINGWIRINGWIRINGWIRING 21 21 09-Jan-13 02-Feb-13 28-Oct-13 20-Nov-13 0

1579 NECP-Rebase_06Sep12-4.CO.2.5.1.43.1WIRING NECOMEP3550 Parking Guidance System wiring works, Area B1-B4 7 0% 7 09-Jan-13 16-Jan-13 28-Oct-13 04-Nov-13 0

1580 NECP-Rebase_06Sep12-4.CO.2.5.1.43.1WIRING NECOMEP3560 Parking Guidance System wiring works, Area B5-B7 7 0% 7 17-Jan-13 24-Jan-13 05-Nov-13 12-Nov-13 0

1581 NECP-Rebase_06Sep12-4.CO.2.5.1.43.1WIRING NECOMEP3570 Parking Guidance System wiring works, Area B8-B10 7 0% 7 26-Jan-13 02-Feb-13 13-Nov-13 20-Nov-13 0

1582 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 47 21 18-Apr-13 12-Jun-13 05-Nov-13 28-Nov-13 32

1583 NECP-Rebase_06Sep12-4.CO.2.5.1.43.2DEVICE INSTALLATION NECOMEP5060 Parking Guidance System Device installation, Area B1-B4 7 0% 7 18-Apr-13 27-Apr-13 05-Nov-13 12-Nov-13 18

1584 NECP-Rebase_06Sep12-4.CO.2.5.1.43.2DEVICE INSTALLATION NECOMEP5070 Parking Guidance System Device installation, Area B5-B7 7 0% 7 13-May-13 21-May-13 13-Nov-13 20-Nov-13 33

1585 NECP-Rebase_06Sep12-4.CO.2.5.1.43.2DEVICE INSTALLATION NECOMEP5080 Parking Guidance System Device installation, Area B8-B10 7 0% 7 04-Jun-13 12-Jun-13 21-Nov-13 28-Nov-13 32

1586 PHASE 2 LOWER BASEMENT - TELEMETRY/SCADAPHASE 2 LOWER BASEMENT - TELEMETRY/SCADAPHASE 2 LOWER BASEMENT - TELEMETRY/SCADAPHASE 2 LOWER BASEMENT - TELEMETRY/SCADA 30 30 19-Jan-13 21-Feb-13 30-Sep-13 05-Nov-13 14

1587 WIRINGWIRINGWIRINGWIRING 15 15 19-Jan-13 04-Feb-13 30-Sep-13 19-Oct-13 14

1588 NECP-Rebase_06Sep12-4.CO.2.5.1.44.1WIRING NECOMEP3630 Telemetry/SCADA Wiring works, Area B1-B10 15 0% 15 19-Jan-13 04-Feb-13 30-Sep-13 19-Oct-13 14

1589 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 15 15 05-Feb-13 21-Feb-13 20-Oct-13 05-Nov-13 14

1590 NECP-Rebase_06Sep12-4.CO.2.5.1.44.2DEVICE INSTALLATION NECOMEP5490 Telemetry/SCADA Device Installation, Area B1-B10 15 0% 15 05-Feb-13 21-Feb-13 20-Oct-13 05-Nov-13 14

1591 PHASE 2 LOWER BASEMENT - FIRE ALARM SYSTEMPHASE 2 LOWER BASEMENT - FIRE ALARM SYSTEMPHASE 2 LOWER BASEMENT - FIRE ALARM SYSTEMPHASE 2 LOWER BASEMENT - FIRE ALARM SYSTEM 30 30 19-Jan-13 21-Feb-13 19-Oct-13 21-Nov-13 0

1592 WIRINGWIRINGWIRINGWIRING 15 15 19-Jan-13 04-Feb-13 19-Oct-13 04-Nov-13 0

1593 NECP-Rebase_06Sep12-4.CO.2.5.1.49.1WIRING NECOMEP3670 Fire Alarm Wiring works, Area B1-B10 15 0% 15 19-Jan-13 04-Feb-13 19-Oct-13 04-Nov-13 0

1594 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 15 15 05-Feb-13 21-Feb-13 05-Nov-13 21-Nov-13 0

1595 NECP-Rebase_06Sep12-4.CO.2.5.1.49.2DEVICE INSTALLATION NECOMEP5480 Fire Alarm Devices Installation, Area B1-B10 15 0% 15 05-Feb-13 21-Feb-13 05-Nov-13 21-Nov-13 0

1596 Upper Basement FloorUpper Basement FloorUpper Basement FloorUpper Basement Floor 168 173 06-Jan-13 21-Jul-13 09-Jun-13 31-Dec-13 7

1597 PHASE 2 UPPER BASEMENT - BLACK STEEL PIPESPHASE 2 UPPER BASEMENT - BLACK STEEL PIPESPHASE 2 UPPER BASEMENT - BLACK STEEL PIPESPHASE 2 UPPER BASEMENT - BLACK STEEL PIPES 75 70 09-Mar-13 04-Jun-13 19-Sep-13 11-Dec-13 17

1598 NECP-Rebase_06Sep12-4.CO.2.5.2.68PHASE 2 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP2605 Black Steel Pipes, CHW, Area B1 8 0% 7 09-Mar-13 18-Mar-13 19-Sep-13 26-Sep-13 0

1599 NECP-Rebase_06Sep12-4.CO.2.5.2.68PHASE 2 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP2615 Black Steel Pipes, CHW, Area B2 8 0% 7 18-Mar-13 27-Mar-13 28-Sep-13 05-Oct-13 13

1600 NECP-Rebase_06Sep12-4.CO.2.5.2.68PHASE 2 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP2625 Black Steel Pipes, CHW, Area B3 8 0% 7 27-Mar-13 06-Apr-13 06-Oct-13 15-Oct-13 13

1601 NECP-Rebase_06Sep12-4.CO.2.5.2.68PHASE 2 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP2635 Black Steel Pipes, CHW, Area B4 8 0% 7 06-Apr-13 15-Apr-13 16-Oct-13 23-Oct-13 13

1602 NECP-Rebase_06Sep12-4.CO.2.5.2.68PHASE 2 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP2645 Black Steel Pipes, CHW, Area B5 8 0% 7 15-Apr-13 24-Apr-13 24-Oct-13 31-Oct-13 13

1603 NECP-Rebase_06Sep12-4.CO.2.5.2.68PHASE 2 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP2655 Black Steel Pipes, CHW, Area B6 7 0% 7 24-Apr-13 02-May-13 02-Nov-13 09-Nov-13 13

1604 NECP-Rebase_06Sep12-4.CO.2.5.2.68PHASE 2 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP2665 Black Steel Pipes, CHW, Area B7 7 0% 7 02-May-13 11-May-13 10-Nov-13 17-Nov-13 17

1605 NECP-Rebase_06Sep12-4.CO.2.5.2.68PHASE 2 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP2675 Black Steel Pipes, CHW, Area B8 7 0% 7 11-May-13 19-May-13 18-Nov-13 25-Nov-13 17

1606 NECP-Rebase_06Sep12-4.CO.2.5.2.68PHASE 2 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP2685 Black Steel Pipes, CHW, Area B9 7 0% 7 19-May-13 27-May-13 26-Nov-13 03-Dec-13 17

1607 NECP-Rebase_06Sep12-4.CO.2.5.2.68PHASE 2 UPPER BASEMENT - BLACK STEEL PIPESNECOMEP2695 Black Steel Pipes, CHW, Area B10 7 0% 7 27-May-13 04-Jun-13 04-Dec-13 11-Dec-13 17

1608 PHASE 2 UPPER BASEMENT - PIPE INSTALLATION (FIRE FIGHTING, SANITARY & WATER SUPPLY)PHASE 2 UPPER BASEMENT - PIPE INSTALLATION (FIRE FIGHTING, SANITARY & WATER SUPPLY)PHASE 2 UPPER BASEMENT - PIPE INSTALLATION (FIRE FIGHTING, SANITARY & WATER SUPPLY)PHASE 2 UPPER BASEMENT - PIPE INSTALLATION (FIRE FIGHTING, SANITARY & WATER SUPPLY) 65 60 27-Jan-13 13-Apr-13 15-Aug-13 26-Oct-13 12

1609 FIRE FIGHTINGFIRE FIGHTINGFIRE FIGHTINGFIRE FIGHTING 65 60 27-Jan-13 13-Apr-13 15-Aug-13 26-Oct-13 12

1610 NECP-Rebase_06Sep12-4.CO.2.5.2.66.1FIRE FIGHTING NECOMEP2500 Fire Fighting Pipe Installation, Area B1 7 0% 6 27-Jan-13 04-Feb-13 15-Aug-13 21-Aug-13 0

1611 NECP-Rebase_06Sep12-4.CO.2.5.2.66.1FIRE FIGHTING NECOMEP2510 Fire Fighting Pipe Installation, Area B2 7 0% 6 04-Feb-13 12-Feb-13 22-Aug-13 28-Aug-13 0

1612 NECP-Rebase_06Sep12-4.CO.2.5.2.66.1FIRE FIGHTING NECOMEP2520 Fire Fighting Pipe Installation, Area B3 7 0% 6 12-Feb-13 20-Feb-13 29-Aug-13 04-Sep-13 0

1613 NECP-Rebase_06Sep12-4.CO.2.5.2.66.1FIRE FIGHTING NECOMEP2530 Fire Fighting Pipe Installation, Area B4 7 0% 6 20-Feb-13 28-Feb-13 05-Sep-13 11-Sep-13 0

1614 NECP-Rebase_06Sep12-4.CO.2.5.2.66.1FIRE FIGHTING NECOMEP2540 Fire Fighting Pipe Installation, Area B5 7 0% 6 28-Feb-13 09-Mar-13 12-Sep-13 18-Sep-13 0

1615 NECP-Rebase_06Sep12-4.CO.2.5.2.66.1FIRE FIGHTING NECOMEP2550 Fire Fighting Pipe Installation, Area B6 6 0% 6 09-Mar-13 16-Mar-13 19-Sep-13 25-Sep-13 12

1616 NECP-Rebase_06Sep12-4.CO.2.5.2.66.1FIRE FIGHTING NECOMEP2560 Fire Fighting Pipe Installation, Area B7 6 0% 6 16-Mar-13 23-Mar-13 26-Sep-13 02-Oct-13 12

1617 NECP-Rebase_06Sep12-4.CO.2.5.2.66.1FIRE FIGHTING NECOMEP2570 Fire Fighting Pipe Installation, Area B8 6 0% 6 23-Mar-13 30-Mar-13 03-Oct-13 09-Oct-13 12

1618 NECP-Rebase_06Sep12-4.CO.2.5.2.66.1FIRE FIGHTING NECOMEP2580 Fire Fighting Pipe Installation, Area B9 6 0% 6 30-Mar-13 06-Apr-13 10-Oct-13 19-Oct-13 12

1619 NECP-Rebase_06Sep12-4.CO.2.5.2.66.1FIRE FIGHTING NECOMEP2590 Fire Fighting Pipe Installation, Area B10 6 0% 6 06-Apr-13 13-Apr-13 20-Oct-13 26-Oct-13 12

1620 WATER SUPPLYWATER SUPPLYWATER SUPPLYWATER SUPPLY 65 60 27-Jan-13 13-Apr-13 15-Aug-13 26-Oct-13 12

1621 NECP-Rebase_06Sep12-4.CO.2.5.2.66.3WATER SUPPLY NECOMEP5600 Water supply Pipe Installation, Area B1 7 0% 6 27-Jan-13 04-Feb-13 15-Aug-13 21-Aug-13 12

1622 NECP-Rebase_06Sep12-4.CO.2.5.2.66.3WATER SUPPLY NECOMEP5610 Water supply Pipe Installation, Area B2 7 0% 6 04-Feb-13 12-Feb-13 22-Aug-13 28-Aug-13 12

1623 NECP-Rebase_06Sep12-4.CO.2.5.2.66.3WATER SUPPLY NECOMEP5620 Water supply Pipe Installation, Area B3 7 0% 6 12-Feb-13 20-Feb-13 29-Aug-13 04-Sep-13 12

1624 NECP-Rebase_06Sep12-4.CO.2.5.2.66.3WATER SUPPLY NECOMEP5630 Water supply Pipe Installation, Area B4 7 0% 6 20-Feb-13 28-Feb-13 05-Sep-13 11-Sep-13 12

1625 NECP-Rebase_06Sep12-4.CO.2.5.2.66.3WATER SUPPLY NECOMEP5640 Water supply Pipe Installation, Area B5 7 0% 6 28-Feb-13 09-Mar-13 12-Sep-13 18-Sep-13 12

1626 NECP-Rebase_06Sep12-4.CO.2.5.2.66.3WATER SUPPLY NECOMEP5650 Water supply Pipe Installation, Area B6 6 0% 6 09-Mar-13 16-Mar-13 19-Sep-13 25-Sep-13 12

1627 NECP-Rebase_06Sep12-4.CO.2.5.2.66.3WATER SUPPLY NECOMEP5660 Water supply Pipe Installation, Area B7 6 0% 6 16-Mar-13 23-Mar-13 26-Sep-13 02-Oct-13 12

1628 NECP-Rebase_06Sep12-4.CO.2.5.2.66.3WATER SUPPLY NECOMEP5670 Water supply Pipe Installation, Area B8 6 0% 6 23-Mar-13 30-Mar-13 03-Oct-13 09-Oct-13 12

1629 NECP-Rebase_06Sep12-4.CO.2.5.2.66.3WATER SUPPLY NECOMEP5680 Water supply Pipe Installation, Area B9 6 0% 6 30-Mar-13 06-Apr-13 10-Oct-13 19-Oct-13 12

1630 NECP-Rebase_06Sep12-4.CO.2.5.2.66.3WATER SUPPLY NECOMEP5690 Water supply Pipe Installation, Area B10 6 0% 6 06-Apr-13 13-Apr-13 20-Oct-13 26-Oct-13 12

1631 PHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMPHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMPHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMPHASE 2 UPPER BASEMENT - SPRINKLER SYSTEM 75 70 24-Apr-13 21-Jul-13 28-Sep-13 21-Dec-13 0

1632 NECP-Rebase_06Sep12-4.CO.2.5.2.67PHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP2505 Sprinkler Header & Accessories , Area B1 8 0% 7 24-Apr-13 04-May-13 28-Sep-13 05-Oct-13 0

1633 NECP-Rebase_06Sep12-4.CO.2.5.2.67PHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP2515 Sprinkler Header & Accessories , Area B2 8 0% 7 04-May-13 13-May-13 06-Oct-13 15-Oct-13 0

1634 NECP-Rebase_06Sep12-4.CO.2.5.2.67PHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP2525 Sprinkler Header & Accessories , Area B3 8 0% 7 13-May-13 22-May-13 16-Oct-13 23-Oct-13 0

1635 NECP-Rebase_06Sep12-4.CO.2.5.2.67PHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP2535 Sprinkler Header & Accessories , Area B4 8 0% 7 22-May-13 01-Jun-13 24-Oct-13 31-Oct-13 0

1636 NECP-Rebase_06Sep12-4.CO.2.5.2.67PHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP2545 Sprinkler Header & Accessories , Area B5 8 0% 7 01-Jun-13 10-Jun-13 02-Nov-13 09-Nov-13 0

1637 NECP-Rebase_06Sep12-4.CO.2.5.2.67PHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP2555 Sprinkler Header & Accessories , Area B6 7 0% 7 10-Jun-13 18-Jun-13 10-Nov-13 17-Nov-13 0

1638 NECP-Rebase_06Sep12-4.CO.2.5.2.67PHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP2565 Sprinkler Header & Accessories , Area B7 7 0% 7 18-Jun-13 26-Jun-13 18-Nov-13 25-Nov-13 0

1639 NECP-Rebase_06Sep12-4.CO.2.5.2.67PHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP2575 Sprinkler Header & Accessories , Area B8 7 0% 7 26-Jun-13 04-Jul-13 26-Nov-13 03-Dec-13 0

1640 NECP-Rebase_06Sep12-4.CO.2.5.2.67PHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP2585 Sprinkler Header & Accessories , Area B9 7 0% 7 04-Jul-13 13-Jul-13 04-Dec-13 11-Dec-13 0

1641 NECP-Rebase_06Sep12-4.CO.2.5.2.67PHASE 2 UPPER BASEMENT - SPRINKLER SYSTEMNECOMEP2595 Sprinkler Header & Accessories , Area B10 7 0% 7 13-Jul-13 21-Jul-13 12-Dec-13 21-Dec-13 0

1642 PHASE 2 UPPER BASEMENT - DUCTSPHASE 2 UPPER BASEMENT - DUCTSPHASE 2 UPPER BASEMENT - DUCTSPHASE 2 UPPER BASEMENT - DUCTS 82 77 27-Jan-13 02-May-13 16-Jul-13 15-Oct-13 54

1643 INSTALLATIONINSTALLATIONINSTALLATIONINSTALLATION 75 70 27-Jan-13 24-Apr-13 16-Jul-13 05-Oct-13 54

1644 NECP-Rebase_06Sep12-4.CO.2.5.2.69.1INSTALLATION NECOMEP2705 AC Ducts Installation, Area B1 8 0% 7 27-Jan-13 05-Feb-13 16-Jul-13 23-Jul-13 54

1645 NECP-Rebase_06Sep12-4.CO.2.5.2.69.1INSTALLATION NECOMEP2715 AC Ducts Installation, Area B2 8 0% 7 05-Feb-13 14-Feb-13 24-Jul-13 31-Jul-13 54

1646 NECP-Rebase_06Sep12-4.CO.2.5.2.69.1INSTALLATION NECOMEP2725 AC Ducts Installation, Area B3 8 0% 7 14-Feb-13 24-Feb-13 01-Aug-13 08-Aug-13 54

1647 NECP-Rebase_06Sep12-4.CO.2.5.2.69.1INSTALLATION NECOMEP2735 AC Ducts Installation, Area B4 8 0% 7 24-Feb-13 05-Mar-13 10-Aug-13 17-Aug-13 54

1648 NECP-Rebase_06Sep12-4.CO.2.5.2.69.1INSTALLATION NECOMEP2745 AC Ducts Installation, Area B5 8 0% 7 05-Mar-13 14-Mar-13 18-Aug-13 25-Aug-13 54

1649 NECP-Rebase_06Sep12-4.CO.2.5.2.69.1INSTALLATION NECOMEP2755 AC Ducts Installation, Area B6 7 0% 7 14-Mar-13 23-Mar-13 26-Aug-13 02-Sep-13 54

1650 NECP-Rebase_06Sep12-4.CO.2.5.2.69.1INSTALLATION NECOMEP2765 AC Ducts Installation, Area B7 7 0% 7 23-Mar-13 31-Mar-13 03-Sep-13 10-Sep-13 54

1651 NECP-Rebase_06Sep12-4.CO.2.5.2.69.1INSTALLATION NECOMEP2775 AC Ducts Installation, Area B8 7 0% 7 31-Mar-13 08-Apr-13 11-Sep-13 18-Sep-13 54

1652 NECP-Rebase_06Sep12-4.CO.2.5.2.69.1INSTALLATION NECOMEP2785 AC Ducts Installation, Area B9 7 0% 7 08-Apr-13 16-Apr-13 19-Sep-13 26-Sep-13 54

1653 NECP-Rebase_06Sep12-4.CO.2.5.2.69.1INSTALLATION NECOMEP2795 AC Ducts Installation, Area B10 7 0% 7 16-Apr-13 24-Apr-13 28-Sep-13 05-Oct-13 54

1654 INSULATIONINSULATIONINSULATIONINSULATION 74 70 05-Feb-13 02-May-13 24-Jul-13 15-Oct-13 54

1655 NECP-Rebase_06Sep12-4.CO.2.5.2.69.2INSULATION NECOMEP5700 AC Ducts work Insulation, Area B1 8 0% 7 05-Feb-13 14-Feb-13 24-Jul-13 31-Jul-13 77

1656 NECP-Rebase_06Sep12-4.CO.2.5.2.69.2INSULATION NECOMEP5710 AC Ducts work Insulation, Area B2 8 0% 7 14-Feb-13 24-Feb-13 01-Aug-13 08-Aug-13 74

1657 NECP-Rebase_06Sep12-4.CO.2.5.2.69.2INSULATION NECOMEP5720 AC Ducts work Insulation, Area B3 8 0% 7 24-Feb-13 05-Mar-13 10-Aug-13 17-Aug-13 71

1658 NECP-Rebase_06Sep12-4.CO.2.5.2.69.2INSULATION NECOMEP5730 AC Ducts work Insulation, Area B4 8 0% 7 05-Mar-13 14-Mar-13 18-Aug-13 25-Aug-13 67

1659 NECP-Rebase_06Sep12-4.CO.2.5.2.69.2INSULATION NECOMEP5740 AC Ducts work Insulation, Area B5 8 0% 7 14-Mar-13 24-Mar-13 26-Aug-13 02-Sep-13 65

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

UPS, Area B1

Battery System, Area A10

Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B1-B4

Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B5-B7

Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B8-B10

Luminaires, Lighting Points, Switch Points, etc Devices installation., Area B1-B4

Luminaires, Lighting Points, Switch Points, etc Devices installation, Area B5-B7

Luminaires, Lighting Points, Switch Points, etc Devices installation, Area B8-B10

Switchboard, Small power wiring works, Area B1-B4

Switchboard, Small power wiring works, Area B5-B7

Switchboard, Small power wiring works, Area B8-B10

Switchboard, Small power Devices installation, Area B1-B4

Switchboard, Small power Devices installation, Area B5-B7

Switchboard, Small power Devices installation, Area B8-B10

Security System wiring works, Area B1-B4

Security System wiring works, Area B5-B7

Security System wiring works, Area B8-B10

Security System Device installation , Area B1-B4

Security System Device installation , Area B5-B7

Security System Device installation , Area B8-B10

Parking Guidance System wiring works, Area B1-B4

Parking Guidance System wiring works, Area B5-B7

Parking Guidance System wiring works, Area B8-B10

Parking Guidance System Device installation, Area B1-B4

Parking Guidance System Device installation, Area B5-B7

Parking Guidance System Device installation, Area B8-B10

Telemetry/SCADA Wiring works, Area B1-B10

Telemetry/SCADA Device Installation, Area B1-B10

Fire Alarm Wiring works, Area B1-B10

Fire Alarm Devices Installation, Area B1-B10

Black Steel Pipes, CHW, Area B1

Black Steel Pipes, CHW, Area B2

Black Steel Pipes, CHW, Area B3

Black Steel Pipes, CHW, Area B4

Black Steel Pipes, CHW, Area B5

Black Steel Pipes, CHW, Area B6

Black Steel Pipes, CHW, Area B7

Black Steel Pipes, CHW, Area B8

Black Steel Pipes, CHW, Area B9

Black Steel Pipes, CHW, Area B10

Fire Fighting Pipe Installation, Area B1

Fire Fighting Pipe Installation, Area B2

Fire Fighting Pipe Installation, Area B3

Fire Fighting Pipe Installation, Area B4

Fire Fighting Pipe Installation, Area B5

Fire Fighting Pipe Installation, Area B6

Fire Fighting Pipe Installation, Area B7

Fire Fighting Pipe Installation, Area B8

Fire Fighting Pipe Installation, Area B9

Fire Fighting Pipe Installation, Area B10

Water supply Pipe Installation, Area B1

Water supply Pipe Installation, Area B2

Water supply Pipe Installation, Area B3

Water supply Pipe Installation, Area B4

Water supply Pipe Installation, Area B5

Water supply Pipe Installation, Area B6

Water supply Pipe Installation, Area B7

Water supply Pipe Installation, Area B8

Water supply Pipe Installation, Area B9

Water supply Pipe Installation, Area B10

Sprinkler Header & Accessories , Area B1

Sprinkler Header & Accessories , Area B2

Sprinkler Header & Accessories , Area B3

Sprinkler Header & Accessories , Area B4

Sprinkler Header & Accessories , Area B5

Sprinkler Header & Accessories , Area B6

Sprinkler Header & Accessories , Area B7

Sprinkler Header & Accessories , Area B8

Sprinkler Header & Accessories , Area B9

Sprinkler Header & Accessories , Area B10

AC Ducts Installation, Area B1

AC Ducts Installation, Area B2

AC Ducts Installation, Area B3

AC Ducts Installation, Area B4

AC Ducts Installation, Area B5

AC Ducts Installation, Area B6

AC Ducts Installation, Area B7

AC Ducts Installation, Area B8

AC Ducts Installation, Area B9

AC Ducts Installation, Area B10

AC Ducts work Insulation, Area B1

AC Ducts work Insulation, Area B2

AC Ducts work Insulation, Area B3

AC Ducts work Insulation, Area B4

AC Ducts work Insulation, Area B5

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 15 of 19/27-Feb-13 09:03

Page 16: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

1660 NECP-Rebase_06Sep12-4.CO.2.5.2.69.2INSULATION NECOMEP5750 AC Ducts work Insulation, Area B6 7 0% 7 23-Mar-13 31-Mar-13 03-Sep-13 10-Sep-13 62

1661 NECP-Rebase_06Sep12-4.CO.2.5.2.69.2INSULATION NECOMEP5760 AC Ducts work Insulation, Area B7 7 0% 7 31-Mar-13 08-Apr-13 11-Sep-13 18-Sep-13 63

1662 NECP-Rebase_06Sep12-4.CO.2.5.2.69.2INSULATION NECOMEP5770 AC Ducts work Insulation, Area B8 7 0% 7 08-Apr-13 16-Apr-13 19-Sep-13 26-Sep-13 68

1663 NECP-Rebase_06Sep12-4.CO.2.5.2.69.2INSULATION NECOMEP5780 AC Ducts work Insulation, Area B9 7 0% 7 16-Apr-13 24-Apr-13 28-Sep-13 05-Oct-13 61

1664 NECP-Rebase_06Sep12-4.CO.2.5.2.69.2INSULATION NECOMEP5790 AC Ducts work Insulation, Area B10 7 0% 7 24-Apr-13 02-May-13 06-Oct-13 15-Oct-13 54

1665 PHASE 2 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTPHASE 2 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTPHASE 2 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTPHASE 2 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENT 32 32 16-May-13 22-Jun-13 26-Oct-13 02-Dec-13 21

1666 NECP-Rebase_06Sep12-4.CO.2.5.2.71PHASE 2 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTNECOMEP2805 AC/Refrigeration Equip, Supply & Ventilation Fans, Area B1-B4 15 0% 15 16-May-13 02-Jun-13 26-Oct-13 12-Nov-13 17

1667 NECP-Rebase_06Sep12-4.CO.2.5.2.71PHASE 2 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTNECOMEP2815 AC/Refrigeration Equip, Supply & Ventilation Fans, Area B5-B7 10 0% 10 03-Jun-13 13-Jun-13 12-Nov-13 24-Nov-13 19

1668 NECP-Rebase_06Sep12-4.CO.2.5.2.71PHASE 2 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENTNECOMEP2825 AC/Refrigeration Equip, Supply & Ventilation Fans, Area B8-B10 7 0% 7 15-Jun-13 22-Jun-13 24-Nov-13 02-Dec-13 21

1669 PHASE 2 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONSPHASE 2 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONSPHASE 2 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONSPHASE 2 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONS 40 30 04-Mar-13 18-Apr-13 01-Sep-13 06-Oct-13 65

1670 NECP-Rebase_06Sep12-4.CO.2.5.2.72PHASE 2 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONSNECOMEP2860 Sanitary Installation, Rainwater Installations, Area B1-B4 10 0% 10 04-Mar-13 14-Mar-13 01-Sep-13 12-Sep-13 65

1671 NECP-Rebase_06Sep12-4.CO.2.5.2.72PHASE 2 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONSNECOMEP2870 Sanitary Installation, Rainwater Installations, Area B5-B7 10 0% 10 16-Mar-13 26-Mar-13 12-Sep-13 24-Sep-13 65

1672 NECP-Rebase_06Sep12-4.CO.2.5.2.72PHASE 2 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONSNECOMEP2880 Sanitary Installation, Rainwater Installations, Area B8-B10 10 0% 10 08-Apr-13 18-Apr-13 24-Sep-13 06-Oct-13 65

1673 PHASE 2 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONPHASE 2 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONPHASE 2 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONPHASE 2 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATION 39 43 06-Mar-13 21-Apr-13 12-Sep-13 03-Nov-13 50

1674 NECP-Rebase_06Sep12-4.CO.2.5.2.73PHASE 2 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONNECOMEP2690 Cold Water, Hot Water & Firefighting Installation, Area B1-B4 8 0% 8 06-Mar-13 14-Mar-13 12-Sep-13 21-Sep-13 70

1675 NECP-Rebase_06Sep12-4.CO.2.5.2.73PHASE 2 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONNECOMEP2700 Cold Water, Hot Water & Firefighting Installation, Area B5-B7 8 0% 8 23-Mar-13 01-Apr-13 03-Oct-13 12-Oct-13 60

1676 NECP-Rebase_06Sep12-4.CO.2.5.2.73PHASE 2 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATIONNECOMEP2710 Cold Water, Hot Water & Firefighting Installation, Area B8-B10 7 0% 7 13-Apr-13 21-Apr-13 27-Oct-13 03-Nov-13 50

1677 PHASE 2 UPPER BASEMENT - BMSPHASE 2 UPPER BASEMENT - BMSPHASE 2 UPPER BASEMENT - BMSPHASE 2 UPPER BASEMENT - BMS 36 40 23-May-13 04-Jul-13 24-Oct-13 10-Dec-13 21

1678 WIRINGWIRINGWIRINGWIRING 27 27 23-May-13 24-Jun-13 24-Oct-13 24-Nov-13 25

1679 NECP-Rebase_06Sep12-4.CO.2.5.2.74.1WIRING NECOMEP2173 Building Management System Wiring, Area B1-B4 9 0% 9 23-May-13 03-Jun-13 24-Oct-13 03-Nov-13 22

1680 NECP-Rebase_06Sep12-4.CO.2.5.2.74.1WIRING NECOMEP2183 Building Management System Wiring, Area B5-B7 9 0% 9 03-Jun-13 13-Jun-13 04-Nov-13 13-Nov-13 25

1681 NECP-Rebase_06Sep12-4.CO.2.5.2.74.1WIRING NECOMEP2193 Building Management System Wiring, Area B8-B10 9 0% 9 13-Jun-13 24-Jun-13 14-Nov-13 24-Nov-13 25

1682 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 27 26 03-Jun-13 04-Jul-13 10-Nov-13 10-Dec-13 21

1683 NECP-Rebase_06Sep12-4.CO.2.5.2.74.2DEVICE INSTALLATION NECOMEP5800 Building Management Device Installation, Area B1-B4 9 0% 9 03-Jun-13 13-Jun-13 10-Nov-13 20-Nov-13 17

1684 NECP-Rebase_06Sep12-4.CO.2.5.2.74.2DEVICE INSTALLATION NECOMEP5810 Building Management Device Installation, Area B5-B7 9 0% 9 15-Jun-13 24-Jun-13 21-Nov-13 02-Dec-13 19

1685 NECP-Rebase_06Sep12-4.CO.2.5.2.74.2DEVICE INSTALLATION NECOMEP5820 Building Management Device Installation, Area B8-B10 9 0% 9 24-Jun-13 04-Jul-13 30-Nov-13 10-Dec-13 21

1686 PHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGPHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGPHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGPHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKING 69 50 28-Mar-13 16-Jun-13 06-Jul-13 02-Sep-13 79

1687 NECP-Rebase_06Sep12-4.CO.2.5.2.75PHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP3005 Cable Trays, Cable Ladders, Cable Trunking, Area B1 8 0% 5 28-Mar-13 06-Apr-13 06-Jul-13 11-Jul-13 79

1688 NECP-Rebase_06Sep12-4.CO.2.5.2.75PHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP3015 Cable Trays, Cable Ladders, Cable Trunking, Area B2 8 0% 5 07-Apr-13 15-Apr-13 11-Jul-13 17-Jul-13 79

1689 NECP-Rebase_06Sep12-4.CO.2.5.2.75PHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP3025 Cable Trays, Cable Ladders, Cable Trunking, Area B3 8 0% 5 16-Apr-13 24-Apr-13 17-Jul-13 23-Jul-13 79

1690 NECP-Rebase_06Sep12-4.CO.2.5.2.75PHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP3035 Cable Trays, Cable Ladders, Cable Trunking, Area B4 8 0% 5 25-Apr-13 04-May-13 23-Jul-13 29-Jul-13 79

1691 NECP-Rebase_06Sep12-4.CO.2.5.2.75PHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP3045 Cable Trays, Cable Ladders, Cable Trunking, Area B5 8 0% 5 05-May-13 13-May-13 29-Jul-13 04-Aug-13 79

1692 NECP-Rebase_06Sep12-4.CO.2.5.2.75PHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP3055 Cable Trays, Cable Ladders, Cable Trunking, Area B6 8 0% 5 14-May-13 22-May-13 04-Aug-13 10-Aug-13 79

1693 NECP-Rebase_06Sep12-4.CO.2.5.2.75PHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP3065 Cable Trays, Cable Ladders, Cable Trunking, Area B7 7 0% 5 23-May-13 30-May-13 10-Aug-13 15-Aug-13 79

1694 NECP-Rebase_06Sep12-4.CO.2.5.2.75PHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP3075 Cable Trays, Cable Ladders, Cable Trunking, Area B8 7 0% 5 01-Jun-13 08-Jun-13 15-Aug-13 21-Aug-13 79

1695 NECP-Rebase_06Sep12-4.CO.2.5.2.75PHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP3085 Cable Trays, Cable Ladders, Cable Trunking, Area B9 7 0% 5 09-Jun-13 16-Jun-13 21-Aug-13 27-Aug-13 79

1696 NECP-Rebase_06Sep12-4.CO.2.5.2.75PHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKINGNECOMEP3095 Cable Trays, Cable Ladders, Cable Trunking, Area B10 7 0% 5 01-Apr-13 09-Apr-13 27-Aug-13 02-Sep-13 79

1697 PHASE 2 UPPER BASEMENT - BUS BARPHASE 2 UPPER BASEMENT - BUS BARPHASE 2 UPPER BASEMENT - BUS BARPHASE 2 UPPER BASEMENT - BUS BAR 73 50 07-Apr-13 30-Jun-13 22-Aug-13 22-Oct-13 67

1698 BUS BAR - LIGHTINGBUS BAR - LIGHTINGBUS BAR - LIGHTINGBUS BAR - LIGHTING 73 50 07-Apr-13 30-Jun-13 22-Aug-13 22-Oct-13 67

1699 NECP-Rebase_06Sep12-4.CO.2.5.2.76.1BUS BAR - LIGHTING NECOMEP2740 Bus Bar, Area B1 7 0% 5 07-Apr-13 14-Apr-13 22-Aug-13 28-Aug-13 67

1700 NECP-Rebase_06Sep12-4.CO.2.5.2.76.1BUS BAR - LIGHTING NECOMEP2750 Bus Bar, Area B2 7 0% 5 16-Apr-13 23-Apr-13 28-Aug-13 03-Sep-13 67

1701 NECP-Rebase_06Sep12-4.CO.2.5.2.76.1BUS BAR - LIGHTING NECOMEP2760 Bus Bar, Area B3 7 0% 5 25-Apr-13 02-May-13 03-Sep-13 09-Sep-13 67

1702 NECP-Rebase_06Sep12-4.CO.2.5.2.76.1BUS BAR - LIGHTING NECOMEP2770 Bus Bar, Area B4 7 0% 5 05-May-13 12-May-13 09-Sep-13 15-Sep-13 67

1703 NECP-Rebase_06Sep12-4.CO.2.5.2.76.1BUS BAR - LIGHTING NECOMEP2780 Bus Bar, Area B5 7 0% 5 14-May-13 21-May-13 15-Sep-13 21-Sep-13 67

1704 NECP-Rebase_06Sep12-4.CO.2.5.2.76.1BUS BAR - LIGHTING NECOMEP2790 Bus Bar, Area B6 7 0% 5 23-May-13 30-May-13 21-Sep-13 26-Sep-13 67

1705 NECP-Rebase_06Sep12-4.CO.2.5.2.76.1BUS BAR - LIGHTING NECOMEP2800 Bus Bar, Area B7 7 0% 5 01-Jun-13 08-Jun-13 26-Sep-13 02-Oct-13 67

1706 NECP-Rebase_06Sep12-4.CO.2.5.2.76.1BUS BAR - LIGHTING NECOMEP2810 Bus Bar, Area B8 6 0% 5 09-Jun-13 15-Jun-13 02-Oct-13 08-Oct-13 67

1707 NECP-Rebase_06Sep12-4.CO.2.5.2.76.1BUS BAR - LIGHTING NECOMEP2820 Bus Bar, Area B9 6 0% 5 17-Jun-13 23-Jun-13 08-Oct-13 16-Oct-13 67

1708 NECP-Rebase_06Sep12-4.CO.2.5.2.76.1BUS BAR - LIGHTING NECOMEP2830 Bus Bar, Area B10 6 0% 5 24-Jun-13 30-Jun-13 16-Oct-13 22-Oct-13 67

1709 PHASE 2 UPPER BASEMENT - TELEPHONE CABLE TRAYS INSTALLATIONPHASE 2 UPPER BASEMENT - TELEPHONE CABLE TRAYS INSTALLATIONPHASE 2 UPPER BASEMENT - TELEPHONE CABLE TRAYS INSTALLATIONPHASE 2 UPPER BASEMENT - TELEPHONE CABLE TRAYS INSTALLATION 53 53 09-Mar-13 08-May-13 30-Oct-13 31-Dec-13 0

1710 WIRINGWIRINGWIRINGWIRING 40 40 09-Mar-13 23-Apr-13 30-Oct-13 15-Dec-13 0

1711 NECP-Rebase_06Sep12-4.CO.2.5.2.77.1WIRING NECOMEP2043 Telephone Wiring at Cable Trays, Area B1-B4 14 0% 14 09-Mar-13 24-Mar-13 30-Oct-13 14-Nov-13 0

1712 NECP-Rebase_06Sep12-4.CO.2.5.2.77.1WIRING NECOMEP2053 Telephone Wiring at Cable Trays, Area B5-B7 13 0% 13 25-Mar-13 08-Apr-13 16-Nov-13 30-Nov-13 0

1713 NECP-Rebase_06Sep12-4.CO.2.5.2.77.1WIRING NECOMEP2063 Telephone Wiring at Cable Trays, Area B8-B10 13 0% 13 09-Apr-13 23-Apr-13 01-Dec-13 15-Dec-13 0

1714 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 39 39 25-Mar-13 08-May-13 16-Nov-13 31-Dec-13 0

1715 NECP-Rebase_06Sep12-4.CO.2.5.2.77.2DEVICE INSTALLATION NECOMEP5830 Telephone Devices Installation, Area B1-B4 14 0% 14 25-Mar-13 09-Apr-13 16-Nov-13 01-Dec-13 0

1716 NECP-Rebase_06Sep12-4.CO.2.5.2.77.2DEVICE INSTALLATION NECOMEP5840 Telephone Devices Installation, Area B5-B7 13 0% 13 09-Apr-13 23-Apr-13 01-Dec-13 15-Dec-13 0

1717 NECP-Rebase_06Sep12-4.CO.2.5.2.77.2DEVICE INSTALLATION NECOMEP5850 Telephone Devices Installation, Area B8-B10 13 0% 13 24-Apr-13 08-May-13 16-Dec-13 31-Dec-13 0

1718 PHASE 2 UPPER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTSPHASE 2 UPPER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTSPHASE 2 UPPER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTSPHASE 2 UPPER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTS 89 117 06-Jan-13 20-Apr-13 09-Jun-13 26-Oct-13 23

1719 WIRINGWIRINGWIRINGWIRING 38 38 06-Jan-13 19-Feb-13 09-Jun-13 23-Jul-13 90

1720 NECP-Rebase_06Sep12-4.CO.2.5.2.81.1WIRING NECOMEP3220 Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B1-B4 13 0% 13 06-Jan-13 21-Jan-13 09-Jun-13 24-Jun-13 90

1721 NECP-Rebase_06Sep12-4.CO.2.5.2.81.1WIRING NECOMEP3230 Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B5-B7 13 0% 13 21-Jan-13 05-Feb-13 24-Jun-13 09-Jul-13 90

1722 NECP-Rebase_06Sep12-4.CO.2.5.2.81.1WIRING NECOMEP3240 Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B8-B10 12 0% 12 05-Feb-13 19-Feb-13 09-Jul-13 23-Jul-13 90

1723 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 51 48 19-Feb-13 20-Apr-13 29-Aug-13 26-Oct-13 23

1724 NECP-Rebase_06Sep12-4.CO.2.5.2.81.2DEVICE INSTALLATION NECOMEP5860 Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B1-B413 0% 13 19-Feb-13 06-Mar-13 29-Aug-13 12-Sep-13 42

1725 NECP-Rebase_06Sep12-4.CO.2.5.2.81.2DEVICE INSTALLATION NECOMEP5870 Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B5-B714 0% 14 14-Mar-13 31-Mar-13 12-Sep-13 28-Sep-13 41

1726 NECP-Rebase_06Sep12-4.CO.2.5.2.81.2DEVICE INSTALLATION NECOMEP5880 Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B8-B1012 0% 12 06-Apr-13 20-Apr-13 10-Oct-13 26-Oct-13 23

1727 PHASE 2 UPPER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATIONPHASE 2 UPPER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATIONPHASE 2 UPPER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATIONPHASE 2 UPPER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATION 101 48 07-Jan-13 05-May-13 21-Oct-13 15-Dec-13 0

1728 WIRINGWIRINGWIRINGWIRING 37 36 07-Jan-13 18-Feb-13 21-Oct-13 01-Dec-13 0

1729 NECP-Rebase_06Sep12-4.CO.2.5.2.82.1WIRING NECOMEP3340 Switchboard, Small power Wiring Works, Area B1-B4 13 0% 12 07-Jan-13 21-Jan-13 21-Oct-13 03-Nov-13 0

1730 NECP-Rebase_06Sep12-4.CO.2.5.2.82.1WIRING NECOMEP3350 Switchboard, Small power Wiring Works, Area B5-B7 12 0% 12 22-Jan-13 04-Feb-13 04-Nov-13 17-Nov-13 0

1731 NECP-Rebase_06Sep12-4.CO.2.5.2.82.1WIRING NECOMEP3360 Switchboard, Small power Wiring Works, Area B8-B10 12 0% 12 05-Feb-13 18-Feb-13 18-Nov-13 01-Dec-13 0

1732 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 51 36 06-Mar-13 05-May-13 04-Nov-13 15-Dec-13 0

1733 NECP-Rebase_06Sep12-4.CO.2.5.2.82.2DEVICE INSTALLATION NECOMEP5890 Switchboard, Small power Device Installation, Area B1-B4 14 0% 12 06-Mar-13 23-Mar-13 04-Nov-13 17-Nov-13 0

1734 NECP-Rebase_06Sep12-4.CO.2.5.2.82.2DEVICE INSTALLATION NECOMEP5900 Switchboard, Small power Device Installation, Area B5-B7 12 0% 12 31-Mar-13 14-Apr-13 18-Nov-13 01-Dec-13 0

1735 NECP-Rebase_06Sep12-4.CO.2.5.2.82.2DEVICE INSTALLATION NECOMEP5910 Switchboard, Small power Device Installation, Area B8-B10 13 0% 12 20-Apr-13 05-May-13 02-Dec-13 15-Dec-13 0

1736 PHASE 2 UPPER BASEMENT - SECURITY SYSTEMPHASE 2 UPPER BASEMENT - SECURITY SYSTEMPHASE 2 UPPER BASEMENT - SECURITY SYSTEMPHASE 2 UPPER BASEMENT - SECURITY SYSTEM 44 28 05-May-13 24-Jun-13 10-Nov-13 11-Dec-13 19

1737 WIRINGWIRINGWIRINGWIRING 37 21 05-May-13 16-Jun-13 10-Nov-13 03-Dec-13 19

1738 NECP-Rebase_06Sep12-4.CO.2.5.2.83.1WIRING NECOMEP3460 Security System Wiring, Area B1-B4 7 0% 7 05-May-13 12-May-13 10-Nov-13 17-Nov-13 19

1739 NECP-Rebase_06Sep12-4.CO.2.5.2.83.1WIRING NECOMEP3470 Security System Wiring, Area B5-B7 7 0% 7 01-Jun-13 08-Jun-13 18-Nov-13 25-Nov-13 19

1740 NECP-Rebase_06Sep12-4.CO.2.5.2.83.1WIRING NECOMEP3480 Security System Wiring, Area B8-B10 7 0% 7 09-Jun-13 16-Jun-13 26-Nov-13 03-Dec-13 19

1741 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 37 21 13-May-13 24-Jun-13 18-Nov-13 11-Dec-13 19

1742 NECP-Rebase_06Sep12-4.CO.2.5.2.83.2DEVICE INSTALLATION NECOMEP5920 Security System Devices Installation, Area B1-B4 7 0% 7 13-May-13 20-May-13 18-Nov-13 25-Nov-13 23

1743 NECP-Rebase_06Sep12-4.CO.2.5.2.83.2DEVICE INSTALLATION NECOMEP5930 Security System Devices Installation, Area B5-B7 7 0% 7 09-Jun-13 16-Jun-13 26-Nov-13 03-Dec-13 23

1744 NECP-Rebase_06Sep12-4.CO.2.5.2.83.2DEVICE INSTALLATION NECOMEP5940 Security System Devices Installation, Area B8-B10 7 0% 7 17-Jun-13 24-Jun-13 04-Dec-13 11-Dec-13 19

1745 PHASE 2 UPPER BASEMENT - PARKING GUIDANCE SYSTEMPHASE 2 UPPER BASEMENT - PARKING GUIDANCE SYSTEMPHASE 2 UPPER BASEMENT - PARKING GUIDANCE SYSTEMPHASE 2 UPPER BASEMENT - PARKING GUIDANCE SYSTEM 42 26 05-May-13 22-Jun-13 21-Nov-13 22-Dec-13 12

1746 WIRINGWIRINGWIRINGWIRING 36 20 05-May-13 15-Jun-13 21-Nov-13 14-Dec-13 0

1747 NECP-Rebase_06Sep12-4.CO.2.5.2.84.1WIRING NECOMEP3580 Parking Guidance System Wiring works, Area B1-B4 7 0% 7 05-May-13 12-May-13 21-Nov-13 28-Nov-13 0

1748 NECP-Rebase_06Sep12-4.CO.2.5.2.84.1WIRING NECOMEP3590 Parking Guidance System Wiring works, Area B5-B7 7 0% 7 01-Jun-13 08-Jun-13 30-Nov-13 07-Dec-13 0

1749 NECP-Rebase_06Sep12-4.CO.2.5.2.84.1WIRING NECOMEP3600 Parking Guidance System Wiring works, Area B8-B10 6 0% 6 09-Jun-13 15-Jun-13 08-Dec-13 14-Dec-13 0

1750 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 35 19 13-May-13 22-Jun-13 30-Nov-13 22-Dec-13 12

1751 NECP-Rebase_06Sep12-4.CO.2.5.2.84.2DEVICE INSTALLATION NECOMEP5950 Parking Guidance System Device Installation, Area B1-B4 7 0% 7 13-May-13 20-May-13 30-Nov-13 07-Dec-13 24

1752 NECP-Rebase_06Sep12-4.CO.2.5.2.84.2DEVICE INSTALLATION NECOMEP5960 Parking Guidance System Device Installation, Area B5-B7 7 0% 7 09-Jun-13 16-Jun-13 08-Dec-13 15-Dec-13 17

1753 NECP-Rebase_06Sep12-4.CO.2.5.2.84.2DEVICE INSTALLATION NECOMEP5970 Parking Guidance System Device Installation, Area B8-B10 6 0% 6 16-Jun-13 22-Jun-13 15-Dec-13 22-Dec-13 0

1754 PHASE 2 UPPER BASEMENT - TELEMETRY/SCADAPHASE 2 UPPER BASEMENT - TELEMETRY/SCADAPHASE 2 UPPER BASEMENT - TELEMETRY/SCADAPHASE 2 UPPER BASEMENT - TELEMETRY/SCADA 17 14 28-Mar-13 17-Apr-13 20-Oct-13 04-Nov-13 33

1755 WIRINGWIRINGWIRINGWIRING 10 7 28-Mar-13 09-Apr-13 20-Oct-13 27-Oct-13 33

1756 NECP-Rebase_06Sep12-4.CO.2.5.2.85.1WIRING NECOMEP3640 Telemetry/SCADA wiring works, Area B1-B10 10 0% 7 28-Mar-13 09-Apr-13 20-Oct-13 27-Oct-13 33

1757 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 7 7 09-Apr-13 17-Apr-13 28-Oct-13 04-Nov-13 33

1758 NECP-Rebase_06Sep12-4.CO.2.5.2.85.2DEVICE INSTALLATION NECOMEP5980 Telemetry/SCADA Device Installation, Area B1-B10 7 0% 7 09-Apr-13 17-Apr-13 28-Oct-13 04-Nov-13 33

1759 PHASE 2 UPPER BASEMENT - FIRE ALARM SYSTEMPHASE 2 UPPER BASEMENT - FIRE ALARM SYSTEMPHASE 2 UPPER BASEMENT - FIRE ALARM SYSTEMPHASE 2 UPPER BASEMENT - FIRE ALARM SYSTEM 30 30 05-Feb-13 11-Mar-13 05-Nov-13 09-Dec-13 0

1760 WIRINGWIRINGWIRINGWIRING 15 15 05-Feb-13 21-Feb-13 05-Nov-13 21-Nov-13 0

1761 NECP-Rebase_06Sep12-4.CO.2.5.2.86.1WIRING NECOMEP3680 Fire Alarm Wiring works, Area B1-B10 15 0% 15 05-Feb-13 21-Feb-13 05-Nov-13 21-Nov-13 0

1762 DEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATIONDEVICE INSTALLATION 15 15 23-Feb-13 11-Mar-13 23-Nov-13 09-Dec-13 0

1763 NECP-Rebase_06Sep12-4.CO.2.5.2.86.2DEVICE INSTALLATION NECOMEP5990 Fire Alarm Device Installation, Area B1-B10 15 0% 15 23-Feb-13 11-Mar-13 23-Nov-13 09-Dec-13 0

1764 Internal FinishesInternal FinishesInternal FinishesInternal Finishes 313 230 04-Sep-12 03-Sep-13 18-Apr-13 14-Jan-14 5

1765 Lower Basement FloorLower Basement FloorLower Basement FloorLower Basement Floor 296 228 04-Sep-12 15-Aug-13 18-Apr-13 12-Jan-14 7

1766 PHASE 2 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSPHASE 2 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSPHASE 2 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSPHASE 2 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDS 66 48 13-Sep-12 29-Nov-12 30-Apr-13 24-Jun-13 0

1767 NECP-Rebase_06Sep12-4.CO.2.6.1.28PHASE 2 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1720 Plasterworks, Gypsum Boards, Plasterboards, Area B3 8 0% 8 13-Sep-12 23-Sep-12 30-Apr-13 08-May-13 0

1768 NECP-Rebase_06Sep12-4.CO.2.6.1.28PHASE 2 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1730 Plasterworks, Gypsum Boards, Plasterboards, Area B4 8 0% 8 23-Sep-12 02-Oct-12 09-May-13 18-May-13 0

1769 NECP-Rebase_06Sep12-4.CO.2.6.1.28PHASE 2 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1740 Plasterworks, Gypsum Boards, Plasterboards, Area B5 8 0% 8 13-Oct-12 22-Oct-12 19-May-13 27-May-13 0

1770 NECP-Rebase_06Sep12-4.CO.2.6.1.28PHASE 2 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1750 Plasterworks, Gypsum Boards, Plasterboards, Area B6 8 0% 8 22-Oct-12 31-Oct-12 28-May-13 05-Jun-13 0

1771 NECP-Rebase_06Sep12-4.CO.2.6.1.28PHASE 2 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1760 Plasterworks, Gypsum Boards, Plasterboards, Area B7 8 0% 8 11-Nov-12 20-Nov-12 06-Jun-13 15-Jun-13 0

1772 NECP-Rebase_06Sep12-4.CO.2.6.1.28PHASE 2 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1770 Plasterworks, Gypsum Boards, Plasterboards, Area B8 8 0% 8 20-Nov-12 29-Nov-12 16-Jun-13 24-Jun-13 0

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

AC Ducts work Insulation, Area B6

AC Ducts work Insulation, Area B7

AC Ducts work Insulation, Area B8

AC Ducts work Insulation, Area B9

AC Ducts work Insulation, Area B10

AC/Refrigeration Equip, Supply & Ventilation Fans, Area B1-B4

AC/Refrigeration Equip, Supply & Ventilation Fans, Area B5-B7

AC/Refrigeration Equip, Supply & Ventilation Fans, Area B8-B10

Sanitary Installation, Rainwater Installations, Area B1-B4

Sanitary Installation, Rainwater Installations, Area B5-B7

Sanitary Installation, Rainwater Installations, Area B8-B10

Cold Water, Hot Water & Firefighting Installation, Area B1-B4

Cold Water, Hot Water & Firefighting Installation, Area B5-B7

Cold Water, Hot Water & Firefighting Installation, Area B8-B10

Building Management System Wiring, Area B1-B4

Building Management System Wiring, Area B5-B7

Building Management System Wiring, Area B8-B10

Building Management Device Installation, Area B1-B4

Building Management Device Installation, Area B5-B7

Building Management Device Installation, Area B8-B10

Cable Trays, Cable Ladders, Cable Trunking, Area B1

Cable Trays, Cable Ladders, Cable Trunking, Area B2

Cable Trays, Cable Ladders, Cable Trunking, Area B3

Cable Trays, Cable Ladders, Cable Trunking, Area B4

Cable Trays, Cable Ladders, Cable Trunking, Area B5

Cable Trays, Cable Ladders, Cable Trunking, Area B6

Cable Trays, Cable Ladders, Cable Trunking, Area B7

Cable Trays, Cable Ladders, Cable Trunking, Area B8

Cable Trays, Cable Ladders, Cable Trunking, Area B9

Cable Trays, Cable Ladders, Cable Trunking, Area B10

Bus Bar, Area B1

Bus Bar, Area B2

Bus Bar, Area B3

Bus Bar, Area B4

Bus Bar, Area B5

Bus Bar, Area B6

Bus Bar, Area B7

Bus Bar, Area B8

Bus Bar, Area B9

Bus Bar, Area B10

Telephone Wiring at Cable Trays, Area B1-B4

Telephone Wiring at Cable Trays, Area B5-B7

Telephone Wiring at Cable Trays, Area B8-B10

Telephone Devices Installation, Area B1-B4

Telephone Devices Installation, Area B5-B7

Telephone Devices Installation, Area B8-B10

Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B1-B4

Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B5-B7

Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B8-B10

Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B1-B4

Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B5-B7

Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B8-B10

Switchboard, Small power Wiring Works, Area B1-B4

Switchboard, Small power Wiring Works, Area B5-B7

Switchboard, Small power Wiring Works, Area B8-B10

Switchboard, Small power Device Installation, Area B1-B4

Switchboard, Small power Device Installation, Area B5-B7

Switchboard, Small power Device Installation, Area B8-B10

Security System Wiring, Area B1-B4

Security System Wiring, Area B5-B7

Security System Wiring, Area B8-B10

Security System Devices Installation, Area B1-B4

Security System Devices Installation, Area B5-B7

Security System Devices Installation, Area B8-B10

Parking Guidance System Wiring works, Area B1-B4

Parking Guidance System Wiring works, Area B5-B7

Parking Guidance System Wiring works, Area B8-B10

Parking Guidance System Device Installation, Area B1-B4

Parking Guidance System Device Installation, Area B5-B7

Parking Guidance System Device Installation, Area B8-B10

Telemetry/SCADA wiring works, Area B1-B10

Telemetry/SCADA Device Installation, Area B1-B10

Fire Alarm Wiring works, Area B1-B10

Fire Alarm Device Installation, Area B1-B10

Plasterworks, Gypsum Boards, Plasterboards, Area B3

Plasterworks, Gypsum Boards, Plasterboards, Area B4

Plasterworks, Gypsum Boards, Plasterboards, Area B5

Plasterworks, Gypsum Boards, Plasterboards, Area B6

Plasterworks, Gypsum Boards, Plasterboards, Area B7

Plasterworks, Gypsum Boards, Plasterboards, Area B8

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 16 of 19/27-Feb-13 09:03

Page 17: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

1773 PHASE 2 LOWER BASEMENT - PAINTING CEILINGPHASE 2 LOWER BASEMENT - PAINTING CEILINGPHASE 2 LOWER BASEMENT - PAINTING CEILINGPHASE 2 LOWER BASEMENT - PAINTING CEILING 296 228 04-Sep-12 15-Aug-13 18-Apr-13 12-Jan-14 7

1774 PRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATS 111 60 04-Sep-12 12-Jan-13 18-Apr-13 26-Jun-13 63

1775 NECP-Rebase_06Sep12-4.CO.2.6.1.19.1PRIMER & FIRST COATSNECOBFW1400 Painting Ceiling, Area B1 7 0% 6 04-Sep-12 12-Sep-12 18-Apr-13 24-Apr-13 42

1776 NECP-Rebase_06Sep12-4.CO.2.6.1.19.1PRIMER & FIRST COATSNECOBFW1410 Painting Ceiling, Area B2 7 0% 6 01-Nov-12 10-Nov-12 25-Apr-13 01-May-13 55

1777 NECP-Rebase_06Sep12-4.CO.2.6.1.19.1PRIMER & FIRST COATSNECOBFW1420 Painting Ceiling, Area B3 7 0% 6 10-Nov-12 18-Nov-12 02-May-13 08-May-13 56

1778 NECP-Rebase_06Sep12-4.CO.2.6.1.19.1PRIMER & FIRST COATSNECOBFW1430 Painting Ceiling, Area B4 7 0% 6 18-Nov-12 26-Nov-12 09-May-13 15-May-13 57

1779 NECP-Rebase_06Sep12-4.CO.2.6.1.19.1PRIMER & FIRST COATSNECOBFW1440 Painting Ceiling, Area B5 7 0% 6 26-Nov-12 04-Dec-12 16-May-13 22-May-13 58

1780 NECP-Rebase_06Sep12-4.CO.2.6.1.19.1PRIMER & FIRST COATSNECOBFW1450 Painting Ceiling, Area B6 7 0% 6 04-Dec-12 12-Dec-12 23-May-13 29-May-13 59

1781 NECP-Rebase_06Sep12-4.CO.2.6.1.19.1PRIMER & FIRST COATSNECOBFW1460 Painting Ceiling, Area B7 7 0% 6 12-Dec-12 20-Dec-12 30-May-13 05-Jun-13 60

1782 NECP-Rebase_06Sep12-4.CO.2.6.1.19.1PRIMER & FIRST COATSNECOBFW1470 Painting Ceiling, Area B8 7 0% 6 20-Dec-12 29-Dec-12 06-Jun-13 12-Jun-13 61

1783 NECP-Rebase_06Sep12-4.CO.2.6.1.19.1PRIMER & FIRST COATSNECOBFW1480 Painting Ceiling, Area B9 6 0% 6 29-Dec-12 05-Jan-13 13-Jun-13 19-Jun-13 62

1784 NECP-Rebase_06Sep12-4.CO.2.6.1.19.1PRIMER & FIRST COATSNECOBFW1490 Painting Ceiling, Area B10 6 0% 6 05-Jan-13 12-Jan-13 20-Jun-13 26-Jun-13 63

1785 FINAL COATFINAL COATFINAL COATFINAL COAT 68 30 28-May-13 15-Aug-13 08-Dec-13 12-Jan-14 7

1786 NECP-Rebase_06Sep12-4.CO.2.6.1.19.2FINAL COAT NECOBFW1401 Painting Ceiling, Area B1 7 0% 3 28-May-13 05-Jun-13 08-Dec-13 10-Dec-13 7

1787 NECP-Rebase_06Sep12-4.CO.2.6.1.19.2FINAL COAT NECOBFW1411 Painting Ceiling, Area B2 7 0% 3 05-Jun-13 13-Jun-13 11-Dec-13 14-Dec-13 7

1788 NECP-Rebase_06Sep12-4.CO.2.6.1.19.2FINAL COAT NECOBFW1421 Painting Ceiling, Area B3 7 0% 3 13-Jun-13 22-Jun-13 15-Dec-13 17-Dec-13 7

1789 NECP-Rebase_06Sep12-4.CO.2.6.1.19.2FINAL COAT NECOBFW1431 Painting Ceiling, Area B4 7 0% 3 22-Jun-13 30-Jun-13 19-Dec-13 22-Dec-13 7

1790 NECP-Rebase_06Sep12-4.CO.2.6.1.19.2FINAL COAT NECOBFW1441 Painting Ceiling, Area B5 7 0% 3 30-Jun-13 08-Jul-13 23-Dec-13 25-Dec-13 7

1791 NECP-Rebase_06Sep12-4.CO.2.6.1.19.2FINAL COAT NECOBFW1451 Painting Ceiling, Area B6 7 0% 3 08-Jul-13 16-Jul-13 26-Dec-13 29-Dec-13 7

1792 NECP-Rebase_06Sep12-4.CO.2.6.1.19.2FINAL COAT NECOBFW1461 Painting Ceiling, Area B7 7 0% 3 16-Jul-13 24-Jul-13 30-Dec-13 01-Jan-14 7

1793 NECP-Rebase_06Sep12-4.CO.2.6.1.19.2FINAL COAT NECOBFW1471 Painting Ceiling, Area B8 7 0% 3 24-Jul-13 01-Aug-13 02-Jan-14 05-Jan-14 7

1794 NECP-Rebase_06Sep12-4.CO.2.6.1.19.2FINAL COAT NECOBFW1481 Painting Ceiling, Area B9 6 0% 3 01-Aug-13 08-Aug-13 06-Jan-14 08-Jan-14 7

1795 NECP-Rebase_06Sep12-4.CO.2.6.1.19.2FINAL COAT NECOBFW1491 Painting Ceiling, Area B10 6 0% 3 08-Aug-13 15-Aug-13 09-Jan-14 12-Jan-14 7

1796 PHASE 2 LOWER BASEMENT - PAINTING WALLSPHASE 2 LOWER BASEMENT - PAINTING WALLSPHASE 2 LOWER BASEMENT - PAINTING WALLSPHASE 2 LOWER BASEMENT - PAINTING WALLS 213 167 29-Nov-12 05-Aug-13 25-Jun-13 08-Jan-14 10

1797 PRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATS 45 40 29-Nov-12 21-Jan-13 25-Jun-13 10-Aug-13 0

1798 NECP-Rebase_06Sep12-4.CO.2.6.1.30.1PRIMER & FIRST COATSNECOBFW2540 Painting Walls & Columns, Area B1 5 0% 4 29-Nov-12 05-Dec-12 25-Jun-13 29-Jun-13 0

1799 NECP-Rebase_06Sep12-4.CO.2.6.1.30.1PRIMER & FIRST COATSNECOBFW2550 Painting Walls & Columns, Area B2 5 0% 4 05-Dec-12 11-Dec-12 30-Jun-13 03-Jul-13 0

1800 NECP-Rebase_06Sep12-4.CO.2.6.1.30.1PRIMER & FIRST COATSNECOBFW2560 Painting Walls & Columns, Area B3 5 0% 4 11-Dec-12 17-Dec-12 04-Jul-13 08-Jul-13 0

1801 NECP-Rebase_06Sep12-4.CO.2.6.1.30.1PRIMER & FIRST COATSNECOBFW2570 Painting Walls & Columns, Area B4 5 0% 4 17-Dec-12 23-Dec-12 09-Jul-13 13-Jul-13 0

1802 NECP-Rebase_06Sep12-4.CO.2.6.1.30.1PRIMER & FIRST COATSNECOBFW2580 Painting Walls & Columns, Area B5 5 0% 4 23-Dec-12 29-Dec-12 14-Jul-13 17-Jul-13 0

1803 NECP-Rebase_06Sep12-4.CO.2.6.1.30.1PRIMER & FIRST COATSNECOBFW2590 Painting Walls & Columns, Area B6 4 0% 4 29-Dec-12 02-Jan-13 18-Jul-13 22-Jul-13 0

1804 NECP-Rebase_06Sep12-4.CO.2.6.1.30.1PRIMER & FIRST COATSNECOBFW2600 Painting Walls & Columns, Area B7 4 0% 4 02-Jan-13 07-Jan-13 23-Jul-13 27-Jul-13 0

1805 NECP-Rebase_06Sep12-4.CO.2.6.1.30.1PRIMER & FIRST COATSNECOBFW2610 Painting Walls & Columns, Area B8 4 0% 4 07-Jan-13 12-Jan-13 28-Jul-13 31-Jul-13 0

1806 NECP-Rebase_06Sep12-4.CO.2.6.1.30.1PRIMER & FIRST COATSNECOBFW2620 Painting Walls & Columns, Area B9 4 0% 4 12-Jan-13 16-Jan-13 01-Aug-13 05-Aug-13 0

1807 NECP-Rebase_06Sep12-4.CO.2.6.1.30.1PRIMER & FIRST COATSNECOBFW2630 Painting Walls & Columns, Area B10 4 0% 4 16-Jan-13 21-Jan-13 06-Aug-13 10-Aug-13 0

1808 FINAL COATFINAL COATFINAL COATFINAL COAT 46 40 12-Jun-13 05-Aug-13 23-Nov-13 08-Jan-14 10

1809 NECP-Rebase_06Sep12-4.CO.2.6.1.30.2FINAL COAT NECOBFW2541 Painting Walls & Columns, Area B1 5 0% 4 12-Jun-13 18-Jun-13 23-Nov-13 26-Nov-13 10

1810 NECP-Rebase_06Sep12-4.CO.2.6.1.30.2FINAL COAT NECOBFW2551 Painting Walls & Columns, Area B2 5 0% 4 18-Jun-13 24-Jun-13 27-Nov-13 01-Dec-13 10

1811 NECP-Rebase_06Sep12-4.CO.2.6.1.30.2FINAL COAT NECOBFW2561 Painting Walls & Columns, Area B3 5 0% 4 24-Jun-13 30-Jun-13 02-Dec-13 05-Dec-13 10

1812 NECP-Rebase_06Sep12-4.CO.2.6.1.30.2FINAL COAT NECOBFW2571 Painting Walls & Columns, Area B4 6 0% 4 30-Jun-13 07-Jul-13 07-Dec-13 10-Dec-13 10

1813 NECP-Rebase_06Sep12-4.CO.2.6.1.30.2FINAL COAT NECOBFW2581 Painting Walls & Columns, Area B5 5 0% 4 07-Jul-13 13-Jul-13 11-Dec-13 15-Dec-13 10

1814 NECP-Rebase_06Sep12-4.CO.2.6.1.30.2FINAL COAT NECOBFW2591 Painting Walls & Columns, Area B6 4 0% 4 13-Jul-13 17-Jul-13 16-Dec-13 21-Dec-13 10

1815 NECP-Rebase_06Sep12-4.CO.2.6.1.30.2FINAL COAT NECOBFW2601 Painting Walls & Columns, Area B7 4 0% 4 17-Jul-13 22-Jul-13 22-Dec-13 25-Dec-13 10

1816 NECP-Rebase_06Sep12-4.CO.2.6.1.30.2FINAL COAT NECOBFW2611 Painting Walls & Columns, Area B8 4 0% 4 22-Jul-13 27-Jul-13 26-Dec-13 30-Dec-13 10

1817 NECP-Rebase_06Sep12-4.CO.2.6.1.30.2FINAL COAT NECOBFW2621 Painting Walls & Columns, Area B9 4 0% 4 27-Jul-13 31-Jul-13 31-Dec-13 04-Jan-14 10

1818 NECP-Rebase_06Sep12-4.CO.2.6.1.30.2FINAL COAT NECOBFW2631 Painting Walls & Columns, Area B10 4 0% 4 31-Jul-13 05-Aug-13 05-Jan-14 08-Jan-14 10

1819 PHASE 2 LOWER BASEMENT - PAINTING FLOORSPHASE 2 LOWER BASEMENT - PAINTING FLOORSPHASE 2 LOWER BASEMENT - PAINTING FLOORSPHASE 2 LOWER BASEMENT - PAINTING FLOORS 52 53 19-Feb-13 21-Apr-13 20-Aug-13 22-Oct-13 52

1820 NECP-Rebase_06Sep12-4.CO.2.6.1.31PHASE 2 LOWER BASEMENT - PAINTING FLOORSNECOBFW2940 Painting Floors, Area B1 6 0% 4 19-Feb-13 26-Feb-13 20-Aug-13 24-Aug-13 41

1821 NECP-Rebase_06Sep12-4.CO.2.6.1.31PHASE 2 LOWER BASEMENT - PAINTING FLOORSNECOBFW2950 Painting Floors, Area B2 6 0% 4 26-Feb-13 05-Mar-13 25-Aug-13 28-Aug-13 41

1822 NECP-Rebase_06Sep12-4.CO.2.6.1.31PHASE 2 LOWER BASEMENT - PAINTING FLOORSNECOBFW2960 Painting Floors, Area B3 5 0% 4 05-Mar-13 11-Mar-13 29-Aug-13 02-Sep-13 41

1823 NECP-Rebase_06Sep12-4.CO.2.6.1.31PHASE 2 LOWER BASEMENT - PAINTING FLOORSNECOBFW2970 Painting Floors, Area B4 5 0% 4 11-Mar-13 17-Mar-13 03-Sep-13 07-Sep-13 41

1824 NECP-Rebase_06Sep12-4.CO.2.6.1.31PHASE 2 LOWER BASEMENT - PAINTING FLOORSNECOBFW2980 Painting Floors, Area B5 5 0% 4 17-Mar-13 23-Mar-13 08-Sep-13 11-Sep-13 41

1825 NECP-Rebase_06Sep12-4.CO.2.6.1.31PHASE 2 LOWER BASEMENT - PAINTING FLOORSNECOBFW2990 Painting Floors, Area B6 5 0% 4 23-Mar-13 28-Mar-13 12-Sep-13 16-Sep-13 61

1826 NECP-Rebase_06Sep12-4.CO.2.6.1.31PHASE 2 LOWER BASEMENT - PAINTING FLOORSNECOBFW3000 Painting Floors, Area B7 5 0% 4 28-Mar-13 03-Apr-13 22-Sep-13 25-Sep-13 58

1827 NECP-Rebase_06Sep12-4.CO.2.6.1.31PHASE 2 LOWER BASEMENT - PAINTING FLOORSNECOBFW3010 Painting Floors, Area B8 5 0% 4 03-Apr-13 09-Apr-13 26-Sep-13 30-Sep-13 59

1828 NECP-Rebase_06Sep12-4.CO.2.6.1.31PHASE 2 LOWER BASEMENT - PAINTING FLOORSNECOBFW3020 Painting Floors, Area B9 5 0% 4 09-Apr-13 15-Apr-13 01-Oct-13 05-Oct-13 60

1829 NECP-Rebase_06Sep12-4.CO.2.6.1.31PHASE 2 LOWER BASEMENT - PAINTING FLOORSNECOBFW3030 Painting Floors, Area B10 5 0% 4 15-Apr-13 21-Apr-13 19-Oct-13 22-Oct-13 52

1830 PHASE 2 LOWER BASEMENT - TILINGPHASE 2 LOWER BASEMENT - TILINGPHASE 2 LOWER BASEMENT - TILINGPHASE 2 LOWER BASEMENT - TILING 60 40 21-Nov-12 29-Jan-13 13-Jun-13 29-Jul-13 97

1831 NECP-Rebase_06Sep12-4.CO.2.6.1.29PHASE 2 LOWER BASEMENT - TILINGNECOBFW1960 Tiling, Area B1 6 0% 4 21-Nov-12 27-Nov-12 13-Jun-13 17-Jun-13 57

1832 NECP-Rebase_06Sep12-4.CO.2.6.1.29PHASE 2 LOWER BASEMENT - TILINGNECOBFW1970 Tiling, Area B2 6 0% 4 28-Nov-12 04-Dec-12 18-Jun-13 22-Jun-13 57

1833 NECP-Rebase_06Sep12-4.CO.2.6.1.29PHASE 2 LOWER BASEMENT - TILINGNECOBFW1980 Tiling, Area B3 6 0% 4 05-Dec-12 11-Dec-12 23-Jun-13 26-Jun-13 57

1834 NECP-Rebase_06Sep12-4.CO.2.6.1.29PHASE 2 LOWER BASEMENT - TILINGNECOBFW1990 Tiling, Area B4 6 0% 4 12-Dec-12 18-Dec-12 27-Jun-13 01-Jul-13 57

1835 NECP-Rebase_06Sep12-4.CO.2.6.1.29PHASE 2 LOWER BASEMENT - TILINGNECOBFW2190 Tiling, Area B5 6 0% 4 19-Dec-12 25-Dec-12 02-Jul-13 06-Jul-13 57

1836 NECP-Rebase_06Sep12-4.CO.2.6.1.29PHASE 2 LOWER BASEMENT - TILINGNECOBFW2210 Tiling, Area B6 6 0% 4 26-Dec-12 01-Jan-13 07-Jul-13 10-Jul-13 97

1837 NECP-Rebase_06Sep12-4.CO.2.6.1.29PHASE 2 LOWER BASEMENT - TILINGNECOBFW2220 Tiling, Area B7 6 0% 4 02-Jan-13 08-Jan-13 11-Jul-13 15-Jul-13 97

1838 NECP-Rebase_06Sep12-4.CO.2.6.1.29PHASE 2 LOWER BASEMENT - TILINGNECOBFW2230 Tiling, Area B8 6 0% 4 09-Jan-13 15-Jan-13 16-Jul-13 20-Jul-13 97

1839 NECP-Rebase_06Sep12-4.CO.2.6.1.29PHASE 2 LOWER BASEMENT - TILINGNECOBFW2240 Tiling, Area B9 6 0% 4 16-Jan-13 22-Jan-13 21-Jul-13 24-Jul-13 97

1840 NECP-Rebase_06Sep12-4.CO.2.6.1.29PHASE 2 LOWER BASEMENT - TILINGNECOBFW2250 Tiling, Area B10 6 0% 4 23-Jan-13 29-Jan-13 25-Jul-13 29-Jul-13 97

1841 PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSPHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSPHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSPHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORS 68 54 17-Mar-13 04-Jun-13 25-Aug-13 28-Oct-13 52

1842 NECP-Rebase_06Sep12-4.CO.2.6.1.32PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3340 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B1 7 0% 5 17-Mar-13 25-Mar-13 25-Aug-13 29-Aug-13 56

1843 NECP-Rebase_06Sep12-4.CO.2.6.1.32PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3350 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B2 7 0% 5 25-Mar-13 02-Apr-13 31-Aug-13 04-Sep-13 56

1844 NECP-Rebase_06Sep12-4.CO.2.6.1.32PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3360 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B3 7 0% 5 02-Apr-13 10-Apr-13 05-Sep-13 10-Sep-13 56

1845 NECP-Rebase_06Sep12-4.CO.2.6.1.32PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3370 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B4 7 0% 5 10-Apr-13 18-Apr-13 11-Sep-13 16-Sep-13 56

1846 NECP-Rebase_06Sep12-4.CO.2.6.1.32PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3380 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B5 7 0% 5 18-Apr-13 27-Apr-13 17-Sep-13 22-Sep-13 56

1847 NECP-Rebase_06Sep12-4.CO.2.6.1.32PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3390 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B6 7 0% 5 27-Apr-13 05-May-13 23-Sep-13 28-Sep-13 56

1848 NECP-Rebase_06Sep12-4.CO.2.6.1.32PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3400 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B7 7 0% 5 05-May-13 13-May-13 29-Sep-13 03-Oct-13 56

1849 NECP-Rebase_06Sep12-4.CO.2.6.1.32PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3410 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B8 7 0% 5 13-May-13 21-May-13 05-Oct-13 09-Oct-13 56

1850 NECP-Rebase_06Sep12-4.CO.2.6.1.32PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3420 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B9 6 0% 5 21-May-13 28-May-13 10-Oct-13 17-Oct-13 56

1851 NECP-Rebase_06Sep12-4.CO.2.6.1.32PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3430 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B10 6 0% 5 28-May-13 04-Jun-13 23-Oct-13 28-Oct-13 52

1852 PHASE 2 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENSPHASE 2 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENSPHASE 2 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENSPHASE 2 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENS 18 18 21-Apr-13 12-May-13 29-Aug-13 18-Sep-13 59

1853 NECP-Rebase_06Sep12-4.CO.2.6.1.34PHASE 2 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENSNECOBFW3680 Timber Doors and Louver Screens, Area B1-B2 6 0% 6 21-Apr-13 28-Apr-13 29-Aug-13 04-Sep-13 59

1854 NECP-Rebase_06Sep12-4.CO.2.6.1.34PHASE 2 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENSNECOBFW3690 Timber Doors and Louver Screens, Area B7-B8 6 0% 6 28-Apr-13 05-May-13 05-Sep-13 11-Sep-13 59

1855 NECP-Rebase_06Sep12-4.CO.2.6.1.34PHASE 2 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENSNECOBFW3700 Timber Doors and Louver Screens, Area B9-B10 6 0% 6 05-May-13 12-May-13 12-Sep-13 18-Sep-13 59

1856 PHASE 2 LOWER BASEMENT - STEEL DOORS AND LOUVERSPHASE 2 LOWER BASEMENT - STEEL DOORS AND LOUVERSPHASE 2 LOWER BASEMENT - STEEL DOORS AND LOUVERSPHASE 2 LOWER BASEMENT - STEEL DOORS AND LOUVERS 18 12 22-Jul-13 11-Aug-13 11-Nov-13 25-Nov-13 39

1857 NECP-Rebase_06Sep12-4.CO.2.6.1.39PHASE 2 LOWER BASEMENT - STEEL DOORS AND LOUVERSNECOBFW3770 Steel Doors and Louvers, Area B1-B5 9 0% 6 22-Jul-13 31-Jul-13 11-Nov-13 18-Nov-13 39

1858 NECP-Rebase_06Sep12-4.CO.2.6.1.39PHASE 2 LOWER BASEMENT - STEEL DOORS AND LOUVERSNECOBFW3780 Steel Doors and Louvers, Area B6-B10 9 0% 6 01-Aug-13 11-Aug-13 18-Nov-13 25-Nov-13 39

1859 PHASE 2 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSPHASE 2 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSPHASE 2 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSPHASE 2 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORS 22 22 21-Apr-13 16-May-13 26-Sep-13 23-Oct-13 68

1860 NECP-Rebase_06Sep12-4.CO.2.6.1.40PHASE 2 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSNECOBFW3870 Skirtings, Walkway Grilles, Bollards, Column Protectors, B1-B4 8 0% 8 21-Apr-13 30-Apr-13 26-Sep-13 05-Oct-13 66

1861 NECP-Rebase_06Sep12-4.CO.2.6.1.40PHASE 2 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSNECOBFW3880 Skirtings, Walkway Grilles, Bollards, Column Protectors, B5-B7 7 0% 7 30-Apr-13 08-May-13 06-Oct-13 15-Oct-13 68

1862 NECP-Rebase_06Sep12-4.CO.2.6.1.40PHASE 2 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSNECOBFW3890 Skirtings, Walkway Grilles, Bollards, Column Protectors, B8-B10 7 0% 7 08-May-13 16-May-13 16-Oct-13 23-Oct-13 68

1863 PHASE 2 LOWER BASEMENT - HANDRAILSPHASE 2 LOWER BASEMENT - HANDRAILSPHASE 2 LOWER BASEMENT - HANDRAILSPHASE 2 LOWER BASEMENT - HANDRAILS 27 18 02-Jul-13 01-Aug-13 11-Nov-13 02-Dec-13 35

1864 NECP-Rebase_06Sep12-4.CO.2.6.1.33PHASE 2 LOWER BASEMENT - HANDRAILSNECOBFW3560 Handrails, Area B1-B2 9 0% 6 02-Jul-13 11-Jul-13 11-Nov-13 18-Nov-13 35

1865 NECP-Rebase_06Sep12-4.CO.2.6.1.33PHASE 2 LOWER BASEMENT - HANDRAILSNECOBFW3570 Handrails, Area B5-B6 9 0% 6 13-Jul-13 22-Jul-13 18-Nov-13 25-Nov-13 35

1866 NECP-Rebase_06Sep12-4.CO.2.6.1.33PHASE 2 LOWER BASEMENT - HANDRAILSNECOBFW3580 Handrails, Area B9-B10 9 0% 6 23-Jul-13 01-Aug-13 25-Nov-13 02-Dec-13 35

1867 Upper Basement FloorUpper Basement FloorUpper Basement FloorUpper Basement Floor 239 223 29-Nov-12 03-Sep-13 27-Apr-13 14-Jan-14 5

1868 PHASE 2 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSPHASE 2 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSPHASE 2 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSPHASE 2 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDS 23 15 29-Nov-12 26-Dec-12 25-Jun-13 11-Jul-13 14

1869 NECP-Rebase_06Sep12-4.CO.2.6.2.21PHASE 2 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1780 Plasterworks, Gypsum Boards, Plasterboards, Area B7 8 0% 8 29-Nov-12 09-Dec-12 25-Jun-13 03-Jul-13 14

1870 NECP-Rebase_06Sep12-4.CO.2.6.2.21PHASE 2 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDSNECOBFW1790 Plasterworks, Gypsum Boards, Plasterboards, Area B8 7 0% 7 18-Dec-12 26-Dec-12 04-Jul-13 11-Jul-13 14

1871 PHASE 2 UPPER BASEMENT - PAINTING CEILINGPHASE 2 UPPER BASEMENT - PAINTING CEILINGPHASE 2 UPPER BASEMENT - PAINTING CEILINGPHASE 2 UPPER BASEMENT - PAINTING CEILING 199 223 12-Jan-13 01-Sep-13 27-Apr-13 14-Jan-14 0

1872 PRIMER & FIRST COATPRIMER & FIRST COATPRIMER & FIRST COATPRIMER & FIRST COAT 68 60 12-Jan-13 01-Apr-13 27-Apr-13 04-Jul-13 97

1873 NECP-Rebase_06Sep12-4.CO.2.6.2.20.1PRIMER & FIRST COAT NECOBFW1500 Painting Ceiling, Area B1 7 0% 6 12-Jan-13 20-Jan-13 27-Apr-13 02-May-13 85

1874 NECP-Rebase_06Sep12-4.CO.2.6.2.20.1PRIMER & FIRST COAT NECOBFW1510 Painting Ceiling, Area B2 7 0% 6 20-Jan-13 28-Jan-13 04-May-13 09-May-13 85

1875 NECP-Rebase_06Sep12-4.CO.2.6.2.20.1PRIMER & FIRST COAT NECOBFW1520 Painting Ceiling, Area B3 7 0% 6 28-Jan-13 05-Feb-13 11-May-13 16-May-13 85

1876 NECP-Rebase_06Sep12-4.CO.2.6.2.20.1PRIMER & FIRST COAT NECOBFW1530 Painting Ceiling, Area B4 7 0% 6 05-Feb-13 13-Feb-13 18-May-13 23-May-13 85

1877 NECP-Rebase_06Sep12-4.CO.2.6.2.20.1PRIMER & FIRST COAT NECOBFW1540 Painting Ceiling, Area B5 7 0% 6 13-Feb-13 21-Feb-13 25-May-13 30-May-13 85

1878 NECP-Rebase_06Sep12-4.CO.2.6.2.20.1PRIMER & FIRST COAT NECOBFW1550 Painting Ceiling, Area B6 7 0% 6 21-Feb-13 02-Mar-13 01-Jun-13 06-Jun-13 97

1879 NECP-Rebase_06Sep12-4.CO.2.6.2.20.1PRIMER & FIRST COAT NECOBFW1560 Painting Ceiling, Area B7 7 0% 6 02-Mar-13 10-Mar-13 08-Jun-13 13-Jun-13 97

1880 NECP-Rebase_06Sep12-4.CO.2.6.2.20.1PRIMER & FIRST COAT NECOBFW1570 Painting Ceiling, Area B8 7 0% 6 10-Mar-13 18-Mar-13 15-Jun-13 20-Jun-13 97

1881 NECP-Rebase_06Sep12-4.CO.2.6.2.20.1PRIMER & FIRST COAT NECOBFW1580 Painting Ceiling, Area B9 6 0% 6 18-Mar-13 25-Mar-13 22-Jun-13 27-Jun-13 97

1882 NECP-Rebase_06Sep12-4.CO.2.6.2.20.1PRIMER & FIRST COAT NECOBFW1590 Painting Ceiling, Area B10 6 0% 6 25-Mar-13 01-Apr-13 29-Jun-13 04-Jul-13 97

1883 FINAL COATFINAL COATFINAL COATFINAL COAT 68 30 13-Jun-13 01-Sep-13 10-Dec-13 14-Jan-14 0

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Painting Ceiling, Area B1

Painting Ceiling, Area B2

Painting Ceiling, Area B3

Painting Ceiling, Area B4

Painting Ceiling, Area B5

Painting Ceiling, Area B6

Painting Ceiling, Area B7

Painting Ceiling, Area B8

Painting Ceiling, Area B9

Painting Ceiling, Area B10

Painting Ceiling, Area B1

Painting Ceiling, Area B2

Painting Ceiling, Area B3

Painting Ceiling, Area B4

Painting Ceiling, Area B5

Painting Ceiling, Area B6

Painting Ceiling, Area B7

Painting Ceiling, Area B8

Painting Ceiling, Area B9

Painting Ceiling, Area B10

Painting Walls & Columns, Area B1

Painting Walls & Columns, Area B2

Painting Walls & Columns, Area B3

Painting Walls & Columns, Area B4

Painting Walls & Columns, Area B5

Painting Walls & Columns, Area B6

Painting Walls & Columns, Area B7

Painting Walls & Columns, Area B8

Painting Walls & Columns, Area B9

Painting Walls & Columns, Area B10

Painting Walls & Columns, Area B1

Painting Walls & Columns, Area B2

Painting Walls & Columns, Area B3

Painting Walls & Columns, Area B4

Painting Walls & Columns, Area B5

Painting Walls & Columns, Area B6

Painting Walls & Columns, Area B7

Painting Walls & Columns, Area B8

Painting Walls & Columns, Area B9

Painting Walls & Columns, Area B10

Painting Floors, Area B1

Painting Floors, Area B2

Painting Floors, Area B3

Painting Floors, Area B4

Painting Floors, Area B5

Painting Floors, Area B6

Painting Floors, Area B7

Painting Floors, Area B8

Painting Floors, Area B9

Painting Floors, Area B10

Tiling, Area B1

Tiling, Area B2

Tiling, Area B3

Tiling, Area B4

Tiling, Area B5

Tiling, Area B6

Tiling, Area B7

Tiling, Area B8

Tiling, Area B9

Tiling, Area B10

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B1

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B2

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B3

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B4

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B5

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B6

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B7

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B8

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B9

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B10

Timber Doors and Louver Screens, Area B1-B2

Timber Doors and Louver Screens, Area B7-B8

Timber Doors and Louver Screens, Area B9-B10

Steel Doors and Louvers, Area B1-B5

Steel Doors and Louvers, Area B6-B10

Skirtings, Walkway Grilles, Bollards, Column Protectors, B1-B4

Skirtings, Walkway Grilles, Bollards, Column Protectors, B5-B7

Skirtings, Walkway Grilles, Bollards, Column Protectors, B8-B10

Handrails, Area B1-B2

Handrails, Area B5-B6

Handrails, Area B9-B10

Plasterworks, Gypsum Boards, Plasterboards, Area B7

Plasterworks, Gypsum Boards, Plasterboards, Area B8

Painting Ceiling, Area B1

Painting Ceiling, Area B2

Painting Ceiling, Area B3

Painting Ceiling, Area B4

Painting Ceiling, Area B5

Painting Ceiling, Area B6

Painting Ceiling, Area B7

Painting Ceiling, Area B8

Painting Ceiling, Area B9

Painting Ceiling, Area B10

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 17 of 19/27-Feb-13 09:03

Page 18: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

1884 NECP-Rebase_06Sep12-4.CO.2.6.2.20.2FINAL COAT NECOBFW1501 Painting Ceiling, Area B1 7 0% 3 13-Jun-13 22-Jun-13 10-Dec-13 12-Dec-13 0

1885 NECP-Rebase_06Sep12-4.CO.2.6.2.20.2FINAL COAT NECOBFW1511 Painting Ceiling, Area B2 7 0% 3 22-Jun-13 30-Jun-13 14-Dec-13 16-Dec-13 0

1886 NECP-Rebase_06Sep12-4.CO.2.6.2.20.2FINAL COAT NECOBFW1521 Painting Ceiling, Area B3 7 0% 3 30-Jun-13 08-Jul-13 17-Dec-13 21-Dec-13 0

1887 NECP-Rebase_06Sep12-4.CO.2.6.2.20.2FINAL COAT NECOBFW1531 Painting Ceiling, Area B4 7 0% 3 08-Jul-13 16-Jul-13 22-Dec-13 24-Dec-13 0

1888 NECP-Rebase_06Sep12-4.CO.2.6.2.20.2FINAL COAT NECOBFW1541 Painting Ceiling, Area B5 7 0% 3 16-Jul-13 24-Jul-13 25-Dec-13 28-Dec-13 0

1889 NECP-Rebase_06Sep12-4.CO.2.6.2.20.2FINAL COAT NECOBFW1551 Painting Ceiling, Area B6 7 0% 3 24-Jul-13 01-Aug-13 29-Dec-13 31-Dec-13 0

1890 NECP-Rebase_06Sep12-4.CO.2.6.2.20.2FINAL COAT NECOBFW1561 Painting Ceiling, Area B7 7 0% 3 01-Aug-13 10-Aug-13 01-Jan-14 04-Jan-14 0

1891 NECP-Rebase_06Sep12-4.CO.2.6.2.20.2FINAL COAT NECOBFW1571 Painting Ceiling, Area B8 7 0% 3 10-Aug-13 18-Aug-13 05-Jan-14 07-Jan-14 0

1892 NECP-Rebase_06Sep12-4.CO.2.6.2.20.2FINAL COAT NECOBFW1581 Painting Ceiling, Area B9 6 0% 3 18-Aug-13 25-Aug-13 08-Jan-14 11-Jan-14 0

1893 NECP-Rebase_06Sep12-4.CO.2.6.2.20.2FINAL COAT NECOBFW1591 Painting Ceiling, Area B10 6 0% 3 25-Aug-13 01-Sep-13 12-Jan-14 14-Jan-14 0

1894 PHASE 2 UPPER BASEMENT - PAINTING WALLSPHASE 2 UPPER BASEMENT - PAINTING WALLSPHASE 2 UPPER BASEMENT - PAINTING WALLSPHASE 2 UPPER BASEMENT - PAINTING WALLS 177 123 21-Jan-13 15-Aug-13 11-Aug-13 04-Jan-14 14

1895 PRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATSPRIMER & FIRST COATS 64 52 21-Jan-13 06-Apr-13 11-Aug-13 09-Oct-13 18

1896 NECP-Rebase_06Sep12-4.CO.2.6.2.23.1PRIMER & FIRST COATSNECOBFW2640 Painting Walls & Columns, Area B1 5 0% 4 21-Jan-13 27-Jan-13 11-Aug-13 14-Aug-13 0

1897 NECP-Rebase_06Sep12-4.CO.2.6.2.23.1PRIMER & FIRST COATSNECOBFW2650 Painting Walls & Columns, Area B2 5 0% 4 28-Jan-13 03-Feb-13 15-Aug-13 19-Aug-13 2

1898 NECP-Rebase_06Sep12-4.CO.2.6.2.23.1PRIMER & FIRST COATSNECOBFW2660 Painting Walls & Columns, Area B3 5 0% 4 05-Feb-13 11-Feb-13 20-Aug-13 24-Aug-13 4

1899 NECP-Rebase_06Sep12-4.CO.2.6.2.23.1PRIMER & FIRST COATSNECOBFW2670 Painting Walls & Columns, Area B4 5 0% 4 13-Feb-13 19-Feb-13 25-Aug-13 28-Aug-13 6

1900 NECP-Rebase_06Sep12-4.CO.2.6.2.23.1PRIMER & FIRST COATSNECOBFW2680 Painting Walls & Columns, Area B5 5 0% 4 21-Feb-13 27-Feb-13 29-Aug-13 02-Sep-13 8

1901 NECP-Rebase_06Sep12-4.CO.2.6.2.23.1PRIMER & FIRST COATSNECOBFW2690 Painting Walls & Columns, Area B6 4 0% 4 02-Mar-13 06-Mar-13 03-Sep-13 07-Sep-13 22

1902 NECP-Rebase_06Sep12-4.CO.2.6.2.23.1PRIMER & FIRST COATSNECOBFW2700 Painting Walls & Columns, Area B7 4 0% 4 10-Mar-13 14-Mar-13 08-Sep-13 11-Sep-13 24

1903 NECP-Rebase_06Sep12-4.CO.2.6.2.23.1PRIMER & FIRST COATSNECOBFW2710 Painting Walls & Columns, Area B8 4 0% 4 18-Mar-13 23-Mar-13 26-Sep-13 30-Sep-13 14

1904 NECP-Rebase_06Sep12-4.CO.2.6.2.23.1PRIMER & FIRST COATSNECOBFW2720 Painting Walls & Columns, Area B9 4 0% 4 25-Mar-13 30-Mar-13 01-Oct-13 05-Oct-13 16

1905 NECP-Rebase_06Sep12-4.CO.2.6.2.23.1PRIMER & FIRST COATSNECOBFW2730 Painting Walls & Columns, Area B10 4 0% 4 01-Apr-13 06-Apr-13 06-Oct-13 09-Oct-13 18

1906 FINAL COATFINAL COATFINAL COATFINAL COAT 45 40 24-Jun-13 15-Aug-13 18-Nov-13 04-Jan-14 14

1907 NECP-Rebase_06Sep12-4.CO.2.6.2.23.2FINAL COAT NECOBFW2641 Painting Walls & Columns, Area B1 5 0% 4 24-Jun-13 30-Jun-13 18-Nov-13 21-Nov-13 14

1908 NECP-Rebase_06Sep12-4.CO.2.6.2.23.2FINAL COAT NECOBFW2651 Painting Walls & Columns, Area B2 5 0% 4 30-Jun-13 06-Jul-13 23-Nov-13 26-Nov-13 14

1909 NECP-Rebase_06Sep12-4.CO.2.6.2.23.2FINAL COAT NECOBFW2661 Painting Walls & Columns, Area B3 5 0% 4 06-Jul-13 11-Jul-13 27-Nov-13 01-Dec-13 14

1910 NECP-Rebase_06Sep12-4.CO.2.6.2.23.2FINAL COAT NECOBFW2671 Painting Walls & Columns, Area B4 5 0% 4 11-Jul-13 17-Jul-13 02-Dec-13 05-Dec-13 14

1911 NECP-Rebase_06Sep12-4.CO.2.6.2.23.2FINAL COAT NECOBFW2681 Painting Walls & Columns, Area B5 5 0% 4 17-Jul-13 23-Jul-13 07-Dec-13 10-Dec-13 14

1912 NECP-Rebase_06Sep12-4.CO.2.6.2.23.2FINAL COAT NECOBFW2691 Painting Walls & Columns, Area B6 4 0% 4 23-Jul-13 28-Jul-13 11-Dec-13 15-Dec-13 14

1913 NECP-Rebase_06Sep12-4.CO.2.6.2.23.2FINAL COAT NECOBFW2701 Painting Walls & Columns, Area B7 4 0% 4 28-Jul-13 01-Aug-13 16-Dec-13 21-Dec-13 14

1914 NECP-Rebase_06Sep12-4.CO.2.6.2.23.2FINAL COAT NECOBFW2711 Painting Walls & Columns, Area B8 4 0% 4 01-Aug-13 06-Aug-13 22-Dec-13 25-Dec-13 14

1915 NECP-Rebase_06Sep12-4.CO.2.6.2.23.2FINAL COAT NECOBFW2721 Painting Walls & Columns, Area B9 4 0% 4 06-Aug-13 11-Aug-13 26-Dec-13 30-Dec-13 14

1916 NECP-Rebase_06Sep12-4.CO.2.6.2.23.2FINAL COAT NECOBFW2731 Painting Walls & Columns, Area B10 4 0% 4 11-Aug-13 15-Aug-13 31-Dec-13 04-Jan-14 14

1917 PHASE 2 UPPER BASEMENT - PAINTING FLOORSPHASE 2 UPPER BASEMENT - PAINTING FLOORSPHASE 2 UPPER BASEMENT - PAINTING FLOORSPHASE 2 UPPER BASEMENT - PAINTING FLOORS 54 71 21-Apr-13 22-Jun-13 23-Sep-13 16-Dec-13 21

1918 NECP-Rebase_06Sep12-4.CO.2.6.2.24PHASE 2 UPPER BASEMENT - PAINTING FLOORSNECOBFW3040 Painting Floors, Area B1 6 0% 4 21-Apr-13 28-Apr-13 23-Sep-13 26-Sep-13 32

1919 NECP-Rebase_06Sep12-4.CO.2.6.2.24PHASE 2 UPPER BASEMENT - PAINTING FLOORSNECOBFW3050 Painting Floors, Area B2 6 0% 4 21-Apr-13 28-Apr-13 01-Oct-13 05-Oct-13 29

1920 NECP-Rebase_06Sep12-4.CO.2.6.2.24PHASE 2 UPPER BASEMENT - PAINTING FLOORSNECOBFW3060 Painting Floors, Area B3 6 0% 4 28-Apr-13 05-May-13 16-Oct-13 20-Oct-13 22

1921 NECP-Rebase_06Sep12-4.CO.2.6.2.24PHASE 2 UPPER BASEMENT - PAINTING FLOORSNECOBFW3070 Painting Floors, Area B4 5 0% 4 05-May-13 11-May-13 24-Oct-13 28-Oct-13 19

1922 NECP-Rebase_06Sep12-4.CO.2.6.2.24PHASE 2 UPPER BASEMENT - PAINTING FLOORSNECOBFW3080 Painting Floors, Area B5 5 0% 4 14-May-13 19-May-13 02-Nov-13 05-Nov-13 16

1923 NECP-Rebase_06Sep12-4.CO.2.6.2.24PHASE 2 UPPER BASEMENT - PAINTING FLOORSNECOBFW3090 Painting Floors, Area B6 5 0% 4 23-May-13 28-May-13 10-Nov-13 13-Nov-13 13

1924 NECP-Rebase_06Sep12-4.CO.2.6.2.24PHASE 2 UPPER BASEMENT - PAINTING FLOORSNECOBFW3100 Painting Floors, Area B7 5 0% 4 01-Jun-13 05-Jun-13 18-Nov-13 21-Nov-13 30

1925 NECP-Rebase_06Sep12-4.CO.2.6.2.24PHASE 2 UPPER BASEMENT - PAINTING FLOORSNECOBFW3110 Painting Floors, Area B8 5 0% 4 09-Jun-13 13-Jun-13 26-Nov-13 30-Nov-13 27

1926 NECP-Rebase_06Sep12-4.CO.2.6.2.24PHASE 2 UPPER BASEMENT - PAINTING FLOORSNECOBFW3120 Painting Floors, Area B9 5 0% 4 17-Jun-13 22-Jun-13 04-Dec-13 08-Dec-13 24

1927 NECP-Rebase_06Sep12-4.CO.2.6.2.24PHASE 2 UPPER BASEMENT - PAINTING FLOORSNECOBFW3130 Painting Floors, Area B10 5 0% 4 17-Jun-13 22-Jun-13 12-Dec-13 16-Dec-13 21

1928 PHASE 2 UPPER BASEMENT - TILINGPHASE 2 UPPER BASEMENT - TILINGPHASE 2 UPPER BASEMENT - TILINGPHASE 2 UPPER BASEMENT - TILING 45 40 30-Jan-13 23-Mar-13 07-Jul-13 21-Aug-13 57

1929 NECP-Rebase_06Sep12-4.CO.2.6.2.22PHASE 2 UPPER BASEMENT - TILINGNECOBFW2260 Tiling, Area B1 6 0% 5 30-Jan-13 05-Feb-13 07-Jul-13 11-Jul-13 57

1930 NECP-Rebase_06Sep12-4.CO.2.6.2.22PHASE 2 UPPER BASEMENT - TILINGNECOBFW2270 Tiling, Area B2 6 0% 5 06-Feb-13 12-Feb-13 13-Jul-13 17-Jul-13 57

1931 NECP-Rebase_06Sep12-4.CO.2.6.2.22PHASE 2 UPPER BASEMENT - TILINGNECOBFW2280 Tiling, Area B3 6 0% 5 13-Feb-13 19-Feb-13 18-Jul-13 23-Jul-13 57

1932 NECP-Rebase_06Sep12-4.CO.2.6.2.22PHASE 2 UPPER BASEMENT - TILINGNECOBFW2290 Tiling, Area B4 6 0% 5 20-Feb-13 26-Feb-13 24-Jul-13 29-Jul-13 57

1933 NECP-Rebase_06Sep12-4.CO.2.6.2.22PHASE 2 UPPER BASEMENT - TILINGNECOBFW2300 Tiling, Area B5 6 0% 5 27-Feb-13 05-Mar-13 30-Jul-13 04-Aug-13 57

1934 NECP-Rebase_06Sep12-4.CO.2.6.2.22PHASE 2 UPPER BASEMENT - TILINGNECOBFW2310 Tiling, Area B6 5 0% 5 06-Mar-13 11-Mar-13 05-Aug-13 10-Aug-13 57

1935 NECP-Rebase_06Sep12-4.CO.2.6.2.22PHASE 2 UPPER BASEMENT - TILINGNECOBFW2320 Tiling, Area B7 5 0% 5 12-Mar-13 17-Mar-13 11-Aug-13 15-Aug-13 57

1936 NECP-Rebase_06Sep12-4.CO.2.6.2.22PHASE 2 UPPER BASEMENT - TILINGNECOBFW2330 Tiling, Area B8 5 0% 5 18-Mar-13 23-Mar-13 17-Aug-13 21-Aug-13 57

1937 PHASE 2 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSPHASE 2 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSPHASE 2 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSPHASE 2 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORS 40 40 04-Jun-13 21-Jul-13 06-Nov-13 23-Dec-13 24

1938 NECP-Rebase_06Sep12-4.CO.2.6.2.25PHASE 2 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3440 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B5 7 0% 5 04-Jun-13 12-Jun-13 06-Nov-13 11-Nov-13 34

1939 NECP-Rebase_06Sep12-4.CO.2.6.2.25PHASE 2 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3450 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B6 7 0% 5 12-Jun-13 20-Jun-13 14-Nov-13 19-Nov-13 32

1940 NECP-Rebase_06Sep12-4.CO.2.6.2.25PHASE 2 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3460 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B7 7 0% 5 20-Jun-13 29-Jun-13 23-Nov-13 27-Nov-13 30

1941 NECP-Rebase_06Sep12-4.CO.2.6.2.25PHASE 2 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3470 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B8 7 0% 5 29-Jun-13 07-Jul-13 01-Dec-13 05-Dec-13 28

1942 NECP-Rebase_06Sep12-4.CO.2.6.2.25PHASE 2 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3480 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B9 6 0% 5 07-Jul-13 14-Jul-13 09-Dec-13 14-Dec-13 26

1943 NECP-Rebase_06Sep12-4.CO.2.6.2.25PHASE 2 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORSNECOBFW3490 Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B10 6 0% 5 14-Jul-13 21-Jul-13 17-Dec-13 23-Dec-13 24

1944 PHASE 2 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENSPHASE 2 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENSPHASE 2 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENSPHASE 2 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENS 27 12 29-May-13 29-Jun-13 14-Nov-13 27-Nov-13 13

1945 NECP-Rebase_06Sep12-4.CO.2.6.2.27PHASE 2 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENSNECOBFW3710 Timber Doors and Louver Screens, Area B5-B6 6 0% 6 29-May-13 04-Jun-13 14-Nov-13 20-Nov-13 13

1946 NECP-Rebase_06Sep12-4.CO.2.6.2.27PHASE 2 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENSNECOBFW3720 Timber Doors and Louver Screens, Area B9-B10 6 0% 6 23-Jun-13 29-Jun-13 21-Nov-13 27-Nov-13 13

1947 PHASE 2 UPPER BASEMENT - STEEL DOORS AND LOUVERSPHASE 2 UPPER BASEMENT - STEEL DOORS AND LOUVERSPHASE 2 UPPER BASEMENT - STEEL DOORS AND LOUVERSPHASE 2 UPPER BASEMENT - STEEL DOORS AND LOUVERS 17 30 12-Aug-13 31-Aug-13 18-Nov-13 24-Dec-13 21

1948 NECP-Rebase_06Sep12-4.CO.2.6.2.41PHASE 2 UPPER BASEMENT - STEEL DOORS AND LOUVERSNECOBFW3790 Steel Doors and Louvers, Area B1-B5 9 0% 6 12-Aug-13 21-Aug-13 18-Nov-13 25-Nov-13 39

1949 NECP-Rebase_06Sep12-4.CO.2.6.2.41PHASE 2 UPPER BASEMENT - STEEL DOORS AND LOUVERSNECOBFW3800 Steel Doors and Louvers, Area B6-B10 8 0% 6 22-Aug-13 31-Aug-13 17-Dec-13 24-Dec-13 21

1950 PHASE 2 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSPHASE 2 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSPHASE 2 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSPHASE 2 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORS 23 23 16-May-13 12-Jun-13 06-Oct-13 03-Nov-13 66

1951 NECP-Rebase_06Sep12-4.CO.2.6.2.42PHASE 2 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSNECOBFW3900 Skirtings, Walkway Grilles, Bollards, Column Protectors, B1-B4 8 0% 8 16-May-13 26-May-13 06-Oct-13 16-Oct-13 66

1952 NECP-Rebase_06Sep12-4.CO.2.6.2.42PHASE 2 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSNECOBFW3910 Skirtings, Walkway Grilles, Bollards, Column Protectors, B5-B7 8 0% 8 26-May-13 04-Jun-13 17-Oct-13 26-Oct-13 66

1953 NECP-Rebase_06Sep12-4.CO.2.6.2.42PHASE 2 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORSNECOBFW3920 Skirtings, Walkway Grilles, Bollards, Column Protectors, B8-B10 7 0% 7 04-Jun-13 12-Jun-13 27-Oct-13 03-Nov-13 66

1954 PHASE 2 UPPER BASEMENT - HANDRAILSPHASE 2 UPPER BASEMENT - HANDRAILSPHASE 2 UPPER BASEMENT - HANDRAILSPHASE 2 UPPER BASEMENT - HANDRAILS 27 18 03-Aug-13 02-Sep-13 18-Nov-13 09-Dec-13 35

1955 NECP-Rebase_06Sep12-4.CO.2.6.2.26PHASE 2 UPPER BASEMENT - HANDRAILSNECOBFW3590 Handrails, Area B1-B2 9 0% 6 03-Aug-13 12-Aug-13 18-Nov-13 25-Nov-13 35

1956 NECP-Rebase_06Sep12-4.CO.2.6.2.26PHASE 2 UPPER BASEMENT - HANDRAILSNECOBFW3600 Handrails, Area B5-B6 9 0% 6 13-Aug-13 22-Aug-13 25-Nov-13 02-Dec-13 35

1957 NECP-Rebase_06Sep12-4.CO.2.6.2.26PHASE 2 UPPER BASEMENT - HANDRAILSNECOBFW3610 Handrails, Area B9-B10 9 0% 6 24-Aug-13 02-Sep-13 02-Dec-13 09-Dec-13 35

1958 PHASE 2 - FINISHING WORKSPHASE 2 - FINISHING WORKSPHASE 2 - FINISHING WORKSPHASE 2 - FINISHING WORKS 121 85 16-Apr-13 03-Sep-13 05-Aug-13 13-Nov-13 57

1959 NECP-Rebase_06Sep12-4.CO.2.6.2.6PHASE 2 - FINISHING WORKSNECOBFW2100 Softwood Framing, Joinery Panels, WC Partitions 20 0% 20 16-Apr-13 08-May-13 05-Aug-13 27-Aug-13 97

1960 NECP-Rebase_06Sep12-4.CO.2.6.2.6PHASE 2 - FINISHING WORKSNECOBFW2130 Road Markings, Area B1-B10 Lower Bsmt; Area B1-B10 Upper Bsmt 15 0% 12 18-Aug-13 03-Sep-13 29-Oct-13 11-Nov-13 57

1961 NECP-Rebase_06Sep12-4.CO.2.6.2.6PHASE 2 - FINISHING WORKSNECOBFW2150 Signages and Wayfinding,Area B1-B10 Lower Bsmt; Area B1-B10 Upper Bsmt12 0% 12 05-Aug-13 18-Aug-13 31-Oct-13 13-Nov-13 57

1962 Furniture, Fittings & EquipmentFurniture, Fittings & EquipmentFurniture, Fittings & EquipmentFurniture, Fittings & Equipment 93 128 22-Apr-13 07-Aug-13 10-Aug-13 08-Jan-14 10

1963 NECP-Rebase_06Sep12-4.CO.2.3Furniture, Fittings & EquipmentNECOBFFE2050 Vehicular Traffic Barrier (Gate House), Grd Floor 7 0% 7 20-May-13 27-May-13 10-Aug-13 17-Aug-13 107

1964 NECP-Rebase_06Sep12-4.CO.2.3Furniture, Fittings & EquipmentNECOBFFE2040 Furniture (Gate House), Grd Floor 5 0% 5 09-May-13 14-May-13 03-Sep-13 08-Sep-13 112

1965 NECP-Rebase_06Sep12-4.CO.2.3Furniture, Fittings & EquipmentNECOBFFE2010 Sanitary Fixtures & Fittings, Accessories (Gate House), Grd Floor 20 0% 20 09-May-13 01-Jun-13 12-Sep-13 06-Oct-13 83

1966 NECP-Rebase_06Sep12-4.CO.2.3Furniture, Fittings & EquipmentNECOBFFE2060 Vehicular Sliding Gates/Chaotic Pattern, Upper Bsmt (Alumco) 14 0% 14 28-May-13 12-Jun-13 19-Sep-13 05-Oct-13 79

1967 NECP-Rebase_06Sep12-4.CO.2.3Furniture, Fittings & EquipmentNECOBFFE2000 Benches (Gate House), Grd Floor 7 0% 7 31-Jul-13 07-Aug-13 29-Sep-13 06-Oct-13 88

1968 NECP-Rebase_06Sep12-4.CO.2.3Furniture, Fittings & EquipmentNECOBFFE2030 Kitchen Equipment (Gate House), Grd Floor 5 0% 5 22-Apr-13 27-Apr-13 06-Oct-13 12-Oct-13 83

1969 NECP-Rebase_06Sep12-4.CO.2.3Furniture, Fittings & EquipmentNECOBFFE2020 Security Control Equipment (Gate House), Grd Floor 14 0% 14 13-Jun-13 29-Jun-13 24-Dec-13 08-Jan-14 0

1970 EXTERNAL WORKSEXTERNAL WORKSEXTERNAL WORKSEXTERNAL WORKS 271 188 20-Sep-12 03-Aug-13 22-May-13 30-Dec-13 18

1971 Phase 1 Exterior Fire SystemPhase 1 Exterior Fire SystemPhase 1 Exterior Fire SystemPhase 1 Exterior Fire System 16 16 13-Apr-13 01-May-13 27-Oct-13 13-Nov-13 18

1972 NECP-Rebase_06Sep12-4.CO.5.27Phase 1 Exterior Fire SystemNECOMEP1060 Exterior Fire Pipe & Accessories, Axis 28-1 (Phase 1) 16 0% 16 13-Apr-13 01-May-13 27-Oct-13 13-Nov-13 18

1973 Phase 2 Exterior Fire SystemPhase 2 Exterior Fire SystemPhase 2 Exterior Fire SystemPhase 2 Exterior Fire System 16 16 01-May-13 20-May-13 14-Nov-13 02-Dec-13 18

1974 NECP-Rebase_06Sep12-4.CO.5.58Phase 2 Exterior Fire SystemNECOMEP2000 Exterior Fire Pipe & Accessories, Axis 53-28 (Phase 2) 16 0% 16 01-May-13 20-May-13 14-Nov-13 02-Dec-13 18

1975 Infrastructure UtilitlesInfrastructure UtilitlesInfrastructure UtilitlesInfrastructure Utilitles 90 77 20-Sep-12 03-Jan-13 22-May-13 19-Aug-13 11

1976 NECP-Rebase_06Sep12-4.CO.5.1Infrastructure Utilitles NECOEXT1000 Trench Excavation 25 0% 25 20-Sep-12 20-Oct-12 22-May-13 19-Jun-13 11

1977 NECP-Rebase_06Sep12-4.CO.5.1Infrastructure Utilitles NECOEXT1110 Rainwater, Sanitary, Drainage, Firefighting, etc., Axis 28-1 (Phase 1) 35 0% 35 20-Oct-12 29-Nov-12 05-Jun-13 15-Jul-13 11

1978 NECP-Rebase_06Sep12-4.CO.5.1Infrastructure Utilitles NECOEXT1120 Rainwater, Sanitary, Drainage, Firefighting, etc., Axis 53-28 (Phase 2) 30 0% 30 29-Nov-12 03-Jan-13 16-Jul-13 19-Aug-13 11

1979 Concrete WorksConcrete WorksConcrete WorksConcrete Works 75 62 03-Mar-13 29-May-13 19-Sep-13 02-Dec-13 41

1980 NECP-Rebase_06Sep12-4.CO.5.2Concrete Works NECOEXT1240 Concrete Slab 3, Approach Road from Huwar St. 18 0% 18 26-Mar-13 16-Apr-13 19-Sep-13 09-Oct-13 48

1981 NECP-Rebase_06Sep12-4.CO.5.2Concrete Works NECOEXT1170 Retaining Wall, Type 3 (6.0m ht x 1.25 thk x 30.7m length) 25 0% 18 03-Mar-13 01-Apr-13 29-Sep-13 21-Oct-13 18

1982 NECP-Rebase_06Sep12-4.CO.5.2Concrete Works NECOEXT1250 Concrete Slab 2, Approach Road from Huwar St. 18 0% 18 16-Apr-13 07-May-13 10-Oct-13 02-Nov-13 49

1983 NECP-Rebase_06Sep12-4.CO.5.2Concrete Works NECOEXT1180 Retaining Wall, Type 2 (5.0m ht x 0.90m thk x 30m length) 25 0% 18 01-Apr-13 30-Apr-13 22-Oct-13 11-Nov-13 18

1984 NECP-Rebase_06Sep12-4.CO.5.2Concrete Works NECOEXT1260 Concrete Slab 1, Approach Road from Huwar St. 18 0% 18 07-May-13 28-May-13 03-Nov-13 23-Nov-13 49

1985 NECP-Rebase_06Sep12-4.CO.5.2Concrete Works NECOEXT1190 Retaining Wall, Type 1 (3.3m ht x 0.60m thk x 40m length) 25 0% 18 30-Apr-13 29-May-13 12-Nov-13 02-Dec-13 18

1986 RoadworksRoadworksRoadworksRoadworks 167 140 03-Jan-13 17-Jul-13 16-Jul-13 29-Dec-13 19

1987 NECP-Rebase_06Sep12-4.CO.5.3Roadworks NECOEXT1130 Grade Fillings, Axis 28-1 (Phase 1) 25 0% 21 03-Jan-13 02-Feb-13 16-Jul-13 08-Aug-13 48

1988 NECP-Rebase_06Sep12-4.CO.5.3Roadworks NECOEXT1140 Grade Fillings, Axis 53-28 (Phase 2) 25 0% 21 02-Feb-13 03-Mar-13 10-Aug-13 02-Sep-13 48

1989 NECP-Rebase_06Sep12-4.CO.5.3Roadworks NECOEXT1150 Sub-base, Axis 28-1 (Phase 1) 20 0% 7 07-Feb-13 03-Mar-13 10-Aug-13 17-Aug-13 54

1990 NECP-Rebase_06Sep12-4.CO.5.3Roadworks NECOEXT1160 Sub-base, Axis 53-28 (Phase 2) 20 0% 14 03-Mar-13 26-Mar-13 03-Sep-13 18-Sep-13 48

1991 NECP-Rebase_06Sep12-4.CO.5.3Roadworks NECOEXT1200 Kerbs, Edgings, Axis 28-1 (Phase 1) 34 0% 30 04-Mar-13 13-Apr-13 03-Sep-13 07-Oct-13 57

1992 NECP-Rebase_06Sep12-4.CO.5.3Roadworks NECOEXT1270 Asphalt Works, Axis 28-1 (Phase 1) 33 0% 7 26-Mar-13 04-May-13 19-Sep-13 26-Sep-13 78

1993 NECP-Rebase_06Sep12-4.CO.5.3Roadworks NECOEXT1280 Asphalt Works, Axis 53-28 (Phase 2) 33 0% 14 04-May-13 11-Jun-13 28-Sep-13 15-Oct-13 78

1994 NECP-Rebase_06Sep12-4.CO.5.3Roadworks NECOEXT1210 Kerbs, Edgings, Axis 53-28 (Phase 2) 30 0% 30 13-Apr-13 18-May-13 08-Oct-13 13-Nov-13 57

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Painting Ceiling, Area B1

Painting Ceiling, Area B2

Painting Ceiling, Area B3

Painting Ceiling, Area B4

Painting Ceiling, Area B5

Painting Ceiling, Area B6

Painting Ceiling, Area B7

Painting Ceiling, Area B8

Painting Ceiling, Area B9

Painting Ceiling, Area B10

Painting Walls & Columns, Area B1

Painting Walls & Columns, Area B2

Painting Walls & Columns, Area B3

Painting Walls & Columns, Area B4

Painting Walls & Columns, Area B5

Painting Walls & Columns, Area B6

Painting Walls & Columns, Area B7

Painting Walls & Columns, Area B8

Painting Walls & Columns, Area B9

Painting Walls & Columns, Area B10

Painting Walls & Columns, Area B1

Painting Walls & Columns, Area B2

Painting Walls & Columns, Area B3

Painting Walls & Columns, Area B4

Painting Walls & Columns, Area B5

Painting Walls & Columns, Area B6

Painting Walls & Columns, Area B7

Painting Walls & Columns, Area B8

Painting Walls & Columns, Area B9

Painting Walls & Columns, Area B10

Painting Floors, Area B1

Painting Floors, Area B2

Painting Floors, Area B3

Painting Floors, Area B4

Painting Floors, Area B5

Painting Floors, Area B6

Painting Floors, Area B7

Painting Floors, Area B8

Painting Floors, Area B9

Painting Floors, Area B10

Tiling, Area B1

Tiling, Area B2

Tiling, Area B3

Tiling, Area B4

Tiling, Area B5

Tiling, Area B6

Tiling, Area B7

Tiling, Area B8

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B5

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B6

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B7

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B8

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B9

Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B10

Timber Doors and Louver Screens, Area B5-B6

Timber Doors and Louver Screens, Area B9-B10

Steel Doors and Louvers, Area B1-B5

Steel Doors and Louvers, Area B6-B10

Skirtings, Walkway Grilles, Bollards, Column Protectors, B1-B4

Skirtings, Walkway Grilles, Bollards, Column Protectors, B5-B7

Skirtings, Walkway Grilles, Bollards, Column Protectors, B8-B10

Handrails, Area B1-B2

Handrails, Area B5-B6

Handrails, Area B9-B10

Softwood Framing, Joinery Panels, WC Partitions

Road Markings, Area B1-B10 Lower Bsmt; Area B1-B10 Upper Bsmt

Signages and Wayfinding,Area B1-B10 Lower Bsmt; Area B1-B10 Upper Bsmt

Vehicular Traffic Barrier (Gate House), Grd Floor

Furniture (Gate House), Grd Floor

Sanitary Fixtures & Fittings, Accessories (Gate House), Grd Floor

Vehicular Sliding Gates/Chaotic Pattern, Upper Bsmt (Alumco)

Benches (Gate House), Grd Floor

Kitchen Equipment (Gate House), Grd Floor

Security Control Equipment (Gate House), Grd Floor

Exterior Fire Pipe & Accessories, Axis 28-1 (Phase 1)

Exterior Fire Pipe & Accessories, Axis 53-28 (Phase 2)

Trench Excavation

Rainwater, Sanitary, Drainage, Firefighting, etc., Axis 28-1 (Phase 1)

Rainwater, Sanitary, Drainage, Firefighting, etc., Axis 53-28 (Phase 2)

Concrete Slab 3, Approach Road from Huwar St.

Retaining Wall, Type 3 (6.0m ht x 1.25 thk x 30.7m length)

Concrete Slab 2, Approach Road from Huwar St.

Retaining Wall, Type 2 (5.0m ht x 0.90m thk x 30m length)

Concrete Slab 1, Approach Road from Huwar St.

Retaining Wall, Type 1 (3.3m ht x 0.60m thk x 40m length)

Grade Fillings, Axis 28-1 (Phase 1)

Grade Fillings, Axis 53-28 (Phase 2)

Sub-base, Axis 28-1 (Phase 1)

Sub-base, Axis 53-28 (Phase 2)

Kerbs, Edgings, Axis 28-1 (Phase 1)

Asphalt Works, Axis 28-1 (Phase 1)

Asphalt Works, Axis 53-28 (Phase 2)

Kerbs, Edgings, Axis 53-28 (Phase 2)

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 18 of 19/27-Feb-13 09:03

Page 19: Forecast Schedule Upd 31Jan13!3!27Feb13 Filtered

# WBS WBS Name Activity ID Activity Name BL Project Duration

Activity %Complete

Remaining Duration

BL ProjectStart

BL ProjectFinish

Actual Start ActualFinish

Early Start Early Finish TotalFloat

1995 NECP-Rebase_06Sep12-4.CO.5.3Roadworks NECOEXT1220 Traffic Signs, Steel Parapets, Wheel Stoppers, Speed Humps, Axis 6-1 (Phase 1)22 0% 20 29-May-13 24-Jun-13 03-Dec-13 26-Dec-13 18

1996 NECP-Rebase_06Sep12-4.CO.5.3Roadworks NECOEXT1230 Traffic Signs, Steel Parapets, Wheel Stoppers, Speed Humps, Axis 53-28 (Phase 2)20 0% 20 24-Jun-13 17-Jul-13 05-Dec-13 29-Dec-13 18

1997 Street LightingsStreet LightingsStreet LightingsStreet Lightings 106 85 01-Apr-13 03-Aug-13 19-Sep-13 30-Dec-13 18

1998 NECP-Rebase_06Sep12-4.CO.5.4Street Lightings NECOEXT1290 Cable Trench, Ducts, Cables, and interface infrastructure with PMS, Axis 28-1425 0% 25 01-Apr-13 30-Apr-13 19-Sep-13 20-Oct-13 48

1999 NECP-Rebase_06Sep12-4.CO.5.4Street Lightings NECOEXT1300 Cable Trench, Ducts, Cables, and interface infrastructure with PMS, Axis 14-120 0% 20 30-Apr-13 23-May-13 07-Oct-13 31-Oct-13 48

2000 NECP-Rebase_06Sep12-4.CO.5.4Street Lightings NECOEXT1310 Cable Trench, Ducts, Cables, Axis 53-40 25 0% 25 23-May-13 22-Jun-13 15-Oct-13 12-Nov-13 48

2001 NECP-Rebase_06Sep12-4.CO.5.4Street Lightings NECOEXT1320 Cable Trench, Ducts, Cables, Axis 40-28 20 0% 20 22-Jun-13 15-Jul-13 02-Nov-13 24-Nov-13 48

2002 NECP-Rebase_06Sep12-4.CO.5.4Street Lightings NECOEXT1090 Street Lighting Poles 14 0% 14 17-Jul-13 03-Aug-13 14-Dec-13 30-Dec-13 18

2003 CHANGE REQUEST 1 (ROADWORKS) & CHANGE REQUEST 4 (INFRASTRUCTURES)CHANGE REQUEST 1 (ROADWORKS) & CHANGE REQUEST 4 (INFRASTRUCTURES)CHANGE REQUEST 1 (ROADWORKS) & CHANGE REQUEST 4 (INFRASTRUCTURES)CHANGE REQUEST 1 (ROADWORKS) & CHANGE REQUEST 4 (INFRASTRUCTURES) 0 89 28-Jun-12 09-Feb-13 22-May-13 7

2004 GeneralGeneralGeneralGeneral 0 89 28-Jun-12 09-Feb-13 22-May-13 7

2005 NECP-Rebase_06Sep12-4.2.1General NEVN2RW1000 Milestone CR1-1: Issue Change Request No. 1 0 100% 0 28-Jun-12

2006 NECP-Rebase_06Sep12-4.2.1General NEVN2RW1005 Milestone CR4-1: Issue Change Request No. 4 0 0% 0 09-Feb-13 0

2007 NECP-Rebase_06Sep12-4.2.1General NEVN2RW1010 Milestone CR1-2: Complete Concrete Works at Axis A1-A3/A1-C1 0 0% 0 07-Mar-13 40

2008 NECP-Rebase_06Sep12-4.2.1General NEVN2RW1020 Milestone CR1-3: Complete Roadworks to Student Male Housing 0 0% 0 22-May-13 7

2009 SubmittalsSubmittalsSubmittalsSubmittals 0 35 09-Feb-13 20-Mar-13 7

2010 NECP-Rebase_06Sep12-4.2.2Submittals NEVN2RW2000 Submit Shop Drawings 0 0% 7 09-Feb-13 16-Feb-13 7

2011 NECP-Rebase_06Sep12-4.2.2Submittals NEVN2RW2010 Approve Shop Drawings 0 0% 14 17-Feb-13 04-Mar-13 7

2012 NECP-Rebase_06Sep12-4.2.2Submittals NEVN2RW2020 Submit Materials 0 0% 7 17-Feb-13 24-Feb-13 14

2013 NECP-Rebase_06Sep12-4.2.2Submittals NEVN2RW2030 Approve Materials 0 0% 14 05-Mar-13 20-Mar-13 7

2014 NECP-Rebase_06Sep12-4.2.2Submittals NEVN2RW2040 Complete Submittals and Approvals 0 0% 0 20-Mar-13 7

2015 Concrete Works at Axis A1-A3/A1-C1Concrete Works at Axis A1-A3/A1-C1Concrete Works at Axis A1-A3/A1-C1Concrete Works at Axis A1-A3/A1-C1 0 38 02-Jul-12 01-Apr-13 14-May-13 3

2016 NECP-Rebase_06Sep12-4.2.5Concrete Works at Axis A1-A3/A1-C1NEVN2RW5000 Start Area 17 Raft Foundation Works 0 100% 0 02-Jul-12

2017 NECP-Rebase_06Sep12-4.2.5Concrete Works at Axis A1-A3/A1-C1NEVN2RW5005 Complete Area 17 Raft Foundation Works 0 100% 0 29-Jul-12

2018 NECP-Rebase_06Sep12-4.2.5Concrete Works at Axis A1-A3/A1-C1NEVN2RW5010 Backfill Around Area 12/13 Ground Slab Retaining Wall/External RC Staircases0 0% 38 01-Apr-13 14-May-13 3

2019 Infrastructure WorksInfrastructure WorksInfrastructure WorksInfrastructure Works 0 83 16-Feb-13 22-May-13 7

2020 Storm Water PipesStorm Water PipesStorm Water PipesStorm Water Pipes 0 83 16-Feb-13 22-May-13 7

2021 ESVC PIPES 200 & 150 MM DIA.ESVC PIPES 200 & 150 MM DIA.ESVC PIPES 200 & 150 MM DIA.ESVC PIPES 200 & 150 MM DIA. 0 36 11-Apr-13 22-May-13 7

2022 NECP-Rebase_06Sep12-4.2.6.1.3ESVC PIPES 200 & 150 MM DIA.NEVN2RW8000 Excavate Trench, Stormwater Pipes, 150/200mm dia x 158 lm 0 0% 7 11-Apr-13 18-Apr-13 7

2023 NECP-Rebase_06Sep12-4.2.6.1.3ESVC PIPES 200 & 150 MM DIA.NEVN2RW8010 Install Stormwater ESVC Pipes, 150/200mm dia x 275 lm 0 0% 14 20-Apr-13 05-May-13 7

2024 NECP-Rebase_06Sep12-4.2.6.1.3ESVC PIPES 200 & 150 MM DIA.NEVN2RW8020 Install PCC Manholes 200mm dia, 6 nos.; Kerb Inlet Chambers 150mm dia, 12 nos0 0% 18 28-Apr-13 18-May-13 7

2025 NECP-Rebase_06Sep12-4.2.6.1.3ESVC PIPES 200 & 150 MM DIA.NEVN2RW8030 Backfill Trench, Stormwater Pipes, 150/200mm dia x 158 lm 0 0% 14 07-May-13 22-May-13 7

2026 ESVC PIPES 1200 MM DIA. (Micro-Tunneling)ESVC PIPES 1200 MM DIA. (Micro-Tunneling)ESVC PIPES 1200 MM DIA. (Micro-Tunneling)ESVC PIPES 1200 MM DIA. (Micro-Tunneling) 0 40 16-Feb-13 02-Apr-13 8

2027 NECP-Rebase_06Sep12-4.2.6.1.1ESVC PIPES 1200 MM DIA. (Micro-Tunneling)NEVN2RW6000 Excavate Trench for Thrust Block, 1200mm 0 0% 7 16-Feb-13 23-Feb-13 7

2028 NECP-Rebase_06Sep12-4.2.6.1.1ESVC PIPES 1200 MM DIA. (Micro-Tunneling)NEVN2RW6010 Construct RC Thrust Block, 1200mm dia 0 0% 9 24-Feb-13 05-Mar-13 8

2029 NECP-Rebase_06Sep12-4.2.6.1.1ESVC PIPES 1200 MM DIA. (Micro-Tunneling)NEVN2RW6020 Pipe Jacking/Install RC Sleeves + MH, GRP Pipes, 1200mm dia x 147 lm 0 0% 21 06-Mar-13 30-Mar-13 8

2030 NECP-Rebase_06Sep12-4.2.6.1.1ESVC PIPES 1200 MM DIA. (Micro-Tunneling)NEVN2RW6030 Backfill Trench, 1200mm dia x 8 lm 0 0% 6 27-Mar-13 02-Apr-13 8

2031 ESVC PIPES 1000 MM DIA. (Micro-Tunneling)ESVC PIPES 1000 MM DIA. (Micro-Tunneling)ESVC PIPES 1000 MM DIA. (Micro-Tunneling)ESVC PIPES 1000 MM DIA. (Micro-Tunneling) 0 40 24-Feb-13 10-Apr-13 7

2032 NECP-Rebase_06Sep12-4.2.6.1.2ESVC PIPES 1000 MM DIA. (Micro-Tunneling)NEVN2RW7000 Excavate Trench for Thrust Block, 1000mm 0 0% 7 24-Feb-13 03-Mar-13 7

2033 NECP-Rebase_06Sep12-4.2.6.1.2ESVC PIPES 1000 MM DIA. (Micro-Tunneling)NEVN2RW7010 Construct RC Thrust Block, 1000mm dia 0 0% 9 04-Mar-13 13-Mar-13 7

2034 NECP-Rebase_06Sep12-4.2.6.1.2ESVC PIPES 1000 MM DIA. (Micro-Tunneling)NEVN2RW7020 Pipe Jacking/Install RC Sleeves + MH, GRP Pipes, 1000mm dia x 63 lm 0 0% 21 14-Mar-13 07-Apr-13 7

2035 NECP-Rebase_06Sep12-4.2.6.1.2ESVC PIPES 1000 MM DIA. (Micro-Tunneling)NEVN2RW7030 Backfill Trench, 1000mm dia x 6 lm 0 0% 6 04-Apr-13 10-Apr-13 7

2036 Street LightingStreet LightingStreet LightingStreet Lighting 0 23 13-Apr-13 08-May-13 19

2037 NECP-Rebase_06Sep12-4.2.6.2Street Lighting NEVN2RW8500 Excavate Trench, Lighting Cables, 100 lm 0 0% 3 13-Apr-13 15-Apr-13 19

2038 NECP-Rebase_06Sep12-4.2.6.2Street Lighting NEVN2RW8510 Lay DB Lighting Cables, 100 lm 0 0% 7 16-Apr-13 23-Apr-13 19

2039 NECP-Rebase_06Sep12-4.2.6.2Street Lighting NEVN2RW8520 Backfill Trench, Lighting Cables, 100 lm 0 0% 6 24-Apr-13 30-Apr-13 19

2040 NECP-Rebase_06Sep12-4.2.6.2Street Lighting NEVN2RW8530 Install Lighting Footings, 10 m High, 4 nos. 0 0% 7 01-May-13 08-May-13 19

2041 Roadworks - Student Male HousingRoadworks - Student Male HousingRoadworks - Student Male HousingRoadworks - Student Male Housing 0 36 06-Apr-13 16-May-13 12

2042 FootwaysFootwaysFootwaysFootways 0 18 27-Apr-13 16-May-13 12

2043 NECP-Rebase_06Sep12-4.2.7.2Footways NEVN2RW9050 Install PCC Kerbs and Edgings (200 lm) 0 0% 6 27-Apr-13 02-May-13 12

2044 NECP-Rebase_06Sep12-4.2.7.2Footways NEVN2RW9060 Spread Concrete Mortar Base (152 m2) 0 0% 6 04-May-13 09-May-13 12

2045 NECP-Rebase_06Sep12-4.2.7.2Footways NEVN2RW9070 Install PCC Paving Bricks (200 lm) 0 0% 6 11-May-13 16-May-13 12

2046 RoadsRoadsRoadsRoads 0 36 06-Apr-13 16-May-13 11

2047 NECP-Rebase_06Sep12-4.2.7.1Roads NEVN2RW9000 Earthworks Filling and Sloping of Edges (1,200 m2) 0 0% 6 06-Apr-13 11-Apr-13 11

2048 NECP-Rebase_06Sep12-4.2.7.1Roads NEVN2RW9010 Lay Sub-base and Road Base Course (240 m3) 0 0% 12 13-Apr-13 25-Apr-13 11

2049 NECP-Rebase_06Sep12-4.2.7.1Roads NEVN2RW9020 Install Road Kerbs and Edgings 0 0% 12 20-Apr-13 02-May-13 11

2050 NECP-Rebase_06Sep12-4.2.7.1Roads NEVN2RW9030 Lay Asphalt Wearing Course (800 m2) 0 0% 12 27-Apr-13 09-May-13 11

2051 NECP-Rebase_06Sep12-4.2.7.1Roads NEVN2RW9040 Install Speed Humps, Traffic Signs, and Road Markings 0 0% 6 11-May-13 16-May-13 11

2052 TIE-IN WORKSTIE-IN WORKSTIE-IN WORKSTIE-IN WORKS 204 29 03-Jan-13 28-Aug-13 05-Dec-13 08-Jan-14 8

2053 UTILITY TIE-INSUTILITY TIE-INSUTILITY TIE-INSUTILITY TIE-INS 204 29 03-Jan-13 28-Aug-13 05-Dec-13 08-Jan-14 8

2054 NECP-Rebase_06Sep12-4.1.1UTILITY TIE-INS NECOTIW1010 Storm Water Drainage Tie-in 7 0% 7 21-Aug-13 28-Aug-13 05-Dec-13 12-Dec-13 30

2055 NECP-Rebase_06Sep12-4.1.1UTILITY TIE-INS NECOTIW1040 Domestic Water Piping Tie -in 3 0% 3 26-Aug-13 28-Aug-13 05-Dec-13 08-Dec-13 34

2056 NECP-Rebase_06Sep12-4.1.1UTILITY TIE-INS NECOTIW1070 Waste Water Drainage Tie-in 7 0% 7 03-Jan-13 12-Jan-13 05-Dec-13 12-Dec-13 30

2057 NECP-Rebase_06Sep12-4.1.1UTILITY TIE-INS NECOTIW1020 Chilled Water Piping Tie-in 3 0% 3 26-Aug-13 28-Aug-13 12-Dec-13 15-Dec-13 28

2058 NECP-Rebase_06Sep12-4.1.1UTILITY TIE-INS NECOTIW1050 IT/ Telecom Tie-in 3 0% 3 25-Jun-13 27-Jun-13 12-Dec-13 15-Dec-13 28

2059 NECP-Rebase_06Sep12-4.1.1UTILITY TIE-INS NECOTIW1060 Security System Tie-in 3 0% 3 26-Aug-13 28-Aug-13 12-Dec-13 15-Dec-13 28

2060 NECP-Rebase_06Sep12-4.1.1UTILITY TIE-INS NECOTIW1030 Fire Water/Irrigation Piping Tie-in 3 0% 3 26-Aug-13 28-Aug-13 02-Jan-14 05-Jan-14 11

2061 NECP-Rebase_06Sep12-4.1.1UTILITY TIE-INS NECOTIW1000 Primary Power Tie-in 3 0% 3 14-Jul-13 16-Jul-13 06-Jan-14 08-Jan-14 8

2062 TESTING & COMMISSIONINGTESTING & COMMISSIONINGTESTING & COMMISSIONINGTESTING & COMMISSIONING 87 59 20-May-13 28-Aug-13 10-Nov-13 18-Jan-14 0

2063 TESTING & COMMISSIONINGTESTING & COMMISSIONINGTESTING & COMMISSIONINGTESTING & COMMISSIONING 87 59 20-May-13 28-Aug-13 10-Nov-13 18-Jan-14 0

2064 PRE-COMMISSIONINGPRE-COMMISSIONINGPRE-COMMISSIONINGPRE-COMMISSIONING 87 55 20-May-13 28-Aug-13 10-Nov-13 13-Jan-14 0

2065 NECP-Rebase_06Sep12-4.TC.PRC.1PRE-COMMISSIONING NETCPC1010 Pipeline Flushing, Cleaning, De-watering 60 0% 45 20-May-13 29-Jul-13 10-Nov-13 01-Jan-14 0

2066 NECP-Rebase_06Sep12-4.TC.PRC.1PRE-COMMISSIONING NETCPC1020 Pipeline Pressure/Vacuum and Leak Tests, Drying Out, Inert and Chemical Cleansing60 0% 45 28-May-13 06-Aug-13 18-Nov-13 09-Jan-14 0

2067 NECP-Rebase_06Sep12-4.TC.PRC.1PRE-COMMISSIONING NETCPC1030 Systematic Conformity Tests, Mechl and Electrical Equipment 40 0% 40 30-Jun-13 14-Aug-13 23-Nov-13 08-Jan-14 0

2068 NECP-Rebase_06Sep12-4.TC.PRC.1PRE-COMMISSIONING NETCPC1040 Static, De-energized Tests, Mechl and Electrical Equipment 40 0% 40 14-Jul-13 28-Aug-13 27-Nov-13 13-Jan-14 0

2069 SYSTEM COMMISSIONINGSYSTEM COMMISSIONINGSYSTEM COMMISSIONINGSYSTEM COMMISSIONING 30 30 25-Jul-13 28-Aug-13 14-Dec-13 18-Jan-14 0

2070 NECP-Rebase_06Sep12-4.TC.PRC.2SYSTEM COMMISSIONINGNEPCSC1010 Overall System Commissioning 30 0% 30 25-Jul-13 28-Aug-13 14-Dec-13 18-Jan-14 0

2071 HANDOVERHANDOVERHANDOVERHANDOVER 126 124 11-Apr-13 04-Sep-13 26-Aug-13 20-Jan-14 0

2072 AS-BUILT DRAWINGSAS-BUILT DRAWINGSAS-BUILT DRAWINGSAS-BUILT DRAWINGS 120 120 11-Apr-13 28-Aug-13 26-Aug-13 16-Jan-14 1

2073 NECP-Rebase_06Sep12-4.OA.1AS-BUILT DRAWINGS NEOA20 Submit As-Built Drawings 120 0% 120 11-Apr-13 28-Aug-13 26-Aug-13 16-Jan-14 1

2074 O&M MANUALSO&M MANUALSO&M MANUALSO&M MANUALS 90 90 16-May-13 28-Aug-13 30-Sep-13 16-Jan-14 1

2075 NECP-Rebase_06Sep12-4.OA.4O&M MANUALS NEOA30 Submit O&M Manuals 90 0% 90 16-May-13 28-Aug-13 30-Sep-13 16-Jan-14 1

2076 TRAININGTRAININGTRAININGTRAINING 66 86 12-Jun-13 28-Aug-13 05-Oct-13 16-Jan-14 1

2077 NECP-Rebase_06Sep12-4.OA.3TRAINING NEOA35 Submit Training Schedule 0 0% 0 12-Jun-13 05-Oct-13 1

2078 NECP-Rebase_06Sep12-4.OA.3TRAINING NEOA40 Prepare Training Materials 6 0% 6 30-Jul-13 05-Aug-13 16-Dec-13 24-Dec-13 1

2079 NECP-Rebase_06Sep12-4.OA.3TRAINING NEOA50 Conduct On-Site Training 20 0% 20 06-Aug-13 28-Aug-13 24-Dec-13 16-Jan-14 1

2080 CLOSE OUT REPORTCLOSE OUT REPORTCLOSE OUT REPORTCLOSE OUT REPORT 60 60 27-Jun-13 04-Sep-13 11-Nov-13 20-Jan-14 0

2081 NECP-Rebase_06Sep12-4.OA.2CLOSE OUT REPORT NEOA60 Submit Project Closing Out Report 60 0% 60 27-Jun-13 04-Sep-13 11-Nov-13 20-Jan-14 0

2082 DEMOBILIZATIONDEMOBILIZATIONDEMOBILIZATIONDEMOBILIZATION 26 26 06-Aug-13 04-Sep-13 22-Dec-13 20-Jan-14 0

2083 DEMOBILIZATIONDEMOBILIZATIONDEMOBILIZATIONDEMOBILIZATION 26 26 06-Aug-13 04-Sep-13 22-Dec-13 20-Jan-14 0

2084 NECP-Rebase_06Sep12-4.DEM.1DEMOBILIZATION NEGEDM10 Cleaning Works, Demobilization 26 0% 26 06-Aug-13 04-Sep-13 22-Dec-13 20-Jan-14 0

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2013 2014

Traffic Signs, Steel Parapets, Wheel Stoppers, Sp

Traffic Signs, Steel Parapets, Wheel Stoppers, S

Cable Trench, Ducts, Cables, and interface infrastructure with PMS, Axis 28-14

Cable Trench, Ducts, Cables, and interface infrastructure with PMS, Axis 14-1

Cable Trench, Ducts, Cables, Axis 53-40

Cable Trench, Ducts, Cables, Axis 40-28

Street Lighting Poles

Milestone CR4-1: Issue Change Request No. 4

Milestone CR1-2: Complete Concrete Works at Axis A1-A3/A1-C1

Milestone CR1-3: Complete Roadworks to Student Male Housing

Submit Shop Drawings

Approve Shop Drawings

Submit Materials

Approve Materials

Complete Submittals and Approvals

Backfill Around Area 12/13 Ground Slab Retaining Wall/External RC Staircases

Excavate Trench, Stormwater Pipes, 150/200mm dia x 158 lm

Install Stormwater ESVC Pipes, 150/200mm dia x 275 lm

Install PCC Manholes 200mm dia, 6 nos.; Kerb Inlet Chambers 150mm dia, 12 nos

Backfill Trench, Stormwater Pipes, 150/200mm dia x 158 lm

Excavate Trench for Thrust Block, 1200mm

Construct RC Thrust Block, 1200mm dia

Pipe Jacking/Install RC Sleeves + MH, GRP Pipes, 1200mm dia x 147 lm

Backfill Trench, 1200mm dia x 8 lm

Excavate Trench for Thrust Block, 1000mm

Construct RC Thrust Block, 1000mm dia

Pipe Jacking/Install RC Sleeves + MH, GRP Pipes, 1000mm dia x 63 lm

Backfill Trench, 1000mm dia x 6 lm

Excavate Trench, Lighting Cables, 100 lm

Lay DB Lighting Cables, 100 lm

Backfill Trench, Lighting Cables, 100 lm

Install Lighting Footings, 10 m High, 4 nos.

Install PCC Kerbs and Edgings (200 lm)

Spread Concrete Mortar Base (152 m2)

Install PCC Paving Bricks (200 lm)

Earthworks Filling and Sloping of Edges (1,200 m2)

Lay Sub-base and Road Base Course (240 m3)

Install Road Kerbs and Edgings

Lay Asphalt Wearing Course (800 m2)

Install Speed Humps, Traffic Signs, and Road Markings

Storm Water Drainage Tie-in

Domestic Water Piping Tie -in

Waste Water Drainage Tie-in

Chilled Water Piping Tie-in

IT/ Telecom Tie-in

Security System Tie-in

Fire Water/Irrigation Piping Tie-in

Primary Power Tie-in

Pipeline Flushing, Cleaning, De-watering

Pipeline Pressure/Vacuum and Leak Te

Systematic Conformity Tests, Mechl and

Static, De-energized Tests, Mechl a

Overall System Commissioning

Submit As-Built Drawings

Submit O&M Manuals

Submit Training Schedule

Prepare Training Materials

Conduct On-Site Training

Submit Project Closing Out Report

Cleaning Works, Demobilization

Construction of North East Underground Carpark Contract No. XC10101100 Execution Programme Level 3 Page 19 of 19/27-Feb-13 09:03