FOLSOM JOINT FEDERAL PROJECT FORECAST OPERATIONS STUDY Photo courtesy of USACE-SPK Brett Whitin – California Nevada River Forecast Center Randi Field – U.S. Bureau of Reclamation

Transcript of FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting...

Page 1: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

FOLSOM JOINT FEDERAL PROJECTFORECAST OPERATIONS STUDY

Photo courtesy of USACE-SPK

Brett Whitin – California Nevada River Forecast CenterRandi Field – U.S. Bureau of Reclamation

Page 2: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

FOLSOM LAKE

Storage Capacity: 976,000 acre feet(1.204x109 m3)

Watershed: 1,861 square miles (4,820 km2)

Multi-Objective Reservoir

High Refill Potential

Upstream of Urban Area - Sacramento

Page 3: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

AMERICAN RIVER HYDROLOGIC MODEL

Page 4: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

AMERICAN RIVER HYDROLOGIC MODEL

Page 5: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

Hindcast:- Ensemble forecast performed for historical time period

using current forecasting methodology (1985-2010)- Meteorological Ensemble Forecast Preprocessor (MEFP)

using GEFSv10 precip and temp- Run the forcings through our hydrologic models

Value of Hindcasts:Provide a large and consistent sample for verification

Bottom Line: demonstrate forecast quality/reliability

Hindcasting

Page 6: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

He

ENSEMBLE RIVER FORECASTS

Timeline

Mod

el R

un T

ime

Observed Weather

Streamflow

Model States

Short Term Weather Models(GEFS)

Days 1-15

Page 7: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

Hourly ensemble inflow forecasts to Folsom

- 61 traces per day• Daily forecasts for 1985-2010

HINDCAST FINAL PRODUCTS

Page 8: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

HINDCAST VERIFICATION OF RESULTS

Page 9: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

FOLSOM 3-DAY AVERAGE FLOW

(MEAN ENSEMBLE FORECAST VS. OBSERVED)

Page 10: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

FOLSOM 3-DAY 25% EXCEEDENCE FLOW

(MEAN ENSEMBLE FORECAST VS. OBSERVED)

Page 11: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

FOLSOM 1986 3-DAY INFLOW VOLUME

Feb

12th

Feb

13th

Feb

14th

Feb

15th

Feb

16th

Feb

17th

Page 12: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

FOLSOM FEB18-20 (3-DAY) VOLUME FORECAST PROGRESSION

Page 13: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

FLOOD MANAGEMENT PARADIGM SHIFT

• Old – Upstream Storage Credit– Conservative from a flood protection perspective– Precipitation measurements already “on the ground” – Leverage existing flood reserve space

Page 14: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

FLOOD MANAGEMENT PARADIGM SHIFT• New

– Harness forecasting technology– Increase flood preparation “Advanced-release” – Increase water supply use efficiency

Page 15: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

MANAGEMENT GOALS

1. Use advanced release to improve flood risk2. Reduce Safety of Dams and high release risks3. Increase water supply use efficiency

Page 16: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

FORECAST INFORMED DESIGN STRUCTURE

1. Advance Release “Blue Sky Action”2. Evacuate storage prior to a storm event3. Communication Opportunities4. Forecast Dynamics

Page 17: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

FORECAST INFORMED DECISION MAKING PROCESS

Ensemble

Model Runs

Page 18: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

FORECAST INFORMED DECISION MAKING PROCESS

392

417

442

467

492

517

542

567

592

617

642325

350

375

400

425

450

475

500

525

550

575

0 10020030040050060070080090010001100120013001400150016001700 Floo

d Co

ntro

l Res

erva

tion

(FCR

) (10

00 a

c-ft

)

Top

of C

onse

rvat

ion

(TO

C) S

tora

ge (1

000

ac-

ft)

Forecasted Inflow Volume (1,000 ac-ft)

Variable Top of Conservation

24-hr

48-hr

72-hr

120-hr

TOC

25% Exceedance Probability

Cumulative Volume for Day 1, 2, 3, and 5

Test if Cumulative Volume > 300,000 acre feet

Yes

No

Increase Release based on Confidence and Risk

Maintain current Release

Page 19: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

FORECAST INFORMED DECISION MAKING

Page 20: FORECAST OPERATIONS STUDY · FLOOD MANAGEMENT PARADIGM SHIFT • New – Harness forecasting technology – Increase flood preparation “Advanced -release ... FORECAST INFORMED DECISION

NEW WATER CONTROL MANUAL SIGNED(JUNE 12TH 2019)