Forbes - Beeler Residence Hall Update · 1/13/2020 · Forbes/Beeler Residence. Banded Bond....
Transcript of Forbes - Beeler Residence Hall Update · 1/13/2020 · Forbes/Beeler Residence. Banded Bond....
1
F o r b e s - B e e l e r R e s i d e n c e H a l lU p d a t e
J a n u a r y 2 0 2 0
2
Doherty Apartments Site
3
2012 Institutional Master Plan
Excerpt from 2012 Institutional Master Plan:
4
Forbes/Beeler Residence
East Campus Garage
Existing ForestParking
(20 spaces)Proposed Building
Forbes Ave
Pull-off
Compactor & Generator
ZONING BOUNDARYPROPERTY BOUNDARY
Rendered Site Plan
5
Forbes/Beeler ResidenceZoning & Grading
50’
15’ Excerpt from 2012 Institutional Master Plan:
6
Forbes/Beeler ResidenceSite Section
Excerpt from 2012 Institutional Master Plan:
7
Forbes/Beeler ResidenceView from Forbes
8
Forbes/Beeler ResidenceView into the Plaza
9
Forbes/Beeler ResidenceView of Entry
10
Forbes/Beeler ResidenceNorth Façade
11
Forbes/Beeler Residence
South Elevation
Exterior Elevation Development
12
Forbes/Beeler ResidenceExterior Elevation Development
Banded BondRecessed every3rd course
Banded BondProjected every 3rd course
Running BondDarker coloredbrick
Running Bond
Soldier Course
Precast Concrete
Soldier Course
13
Forbes/Beeler ResidenceExterior Materials Precedents : Brick
14
Forbes/Beeler ResidenceExterior Materials Precedents: Precast Concrete
15
Forbes/Beeler ResidenceExterior Materials Precedents: Metal Roof
16
Forbes/Beeler ResidenceMarket Space
17
Forbes/Beeler ResidenceLandscape Plan
18
Forbes/Beeler ResidenceSite Plantings Streetscape
19
Forbes/Beeler ResidenceSite Plantings Angled Walk
20
Forbes/Beeler ResidenceSite Plantings Meadow
21
Forbes/Beeler ResidenceSite Plantings Screening
22
Forbes/Beeler ResidenceSite Lighting
23
Permitting- Design Review Complete- Planning Commission Feb 2020- Foundations and Excavation Early Spring 2020- Superstructure and Enclosure Filing late Spring 2020
Construction- Site Mobilization Mar 2020- Demolition of Doherty Apts Apr – Jun 2020- Excavation Apr – Sep 2020- Foundations Jun – Sep 2020- Steel Erection Sep 2020 – Feb 2021- Enclosure Jan 2021 – Sep 2021- Interior Work Mar 2021 – Apr 2022- Final Site Work Jan 2022 – Jun 2022- Occupancy Jul 2022
Schedule