For the construction of the ground floor slabs and basement structures, and in accordance with BS:8102 (2009) the groundwater is considered ‘Variable’ and ‘High’ respectively.
Excavations will take place to create the piles as well as the basements, generating volumes of Made Ground, Alluvium, Taplow Gravel Formation and London Clay Formation. Consideration should be given to the re-use of arisings from foundation trenches/ piles / basements / drainage runs etc. Where contamination has been encountered, it may be possible to re-use excavation arisings subject to risk assessment; however, certainty of use and volume should be confirmed in accordance with the requirements of CL:AIRE guidance and acceptability testing as per Manual of Contract Documents for Highway Works, Volume 1, Specification for Highway Works, Series 600.
JL - B1JL - New B1
Key
Anchor
Anchor Existing
MEP
Service Yard
M&S B1
121110090807060504030201
03S02S
M&
S De
liver
y
M&
S De
liver
y
M&
S De
liver
y
13141516171819202122
01S
05S04S
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y
BX
- Del
iver
y BX -
Deliv
ery
BX -
Deliv
ery
BX -
Deliv
ery
BX -
Deliv
ery
BX -
Deliv
ery
MEP
MEPMEP
MEP
MEP
CALLISONRTKL
25 Farringdon Street, 10th FloorLondon EC4A 4AB
T:+44(0)20 7306 0404
PROJECT
2016 CALLISONRTKL UK Ltd
CLIENT
KEY PLAN
TITLE
STATUS
PROJECT NUMBER
GENERAL NOTES
c
DATE DRAWN:
DRAWN BY:
CHECKED BY:
SCALE @ A1:
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
SHEET IDENTIFICATION
REVISION
NC
WC
JL
EB
FN
EC
HA
NB
EN
SD
SB
HC
PROJECT ORIGINATOR ZONE LEVEL TYPE ROLE DESCRIPTION
P0
1 : 1000
11/1
1/20
16 1
7:01
:52
1
Masterplan - L
LEASING PLAN -BASEMENT LEVEL
50.14026
08069-CRL-SW-B10-DR-A-11000
11/11/16
NG
AB
Brent Cross London
0 10m 20m 40m 100m
Scale 1:1000
Scheme L - Revision F
REV NO. DATE DESCRIPTIONA 02/03/16 General UpdateB 26/04/16 General UpdateC 10/06/16 General UpdateD 18/08/16 General UpdateE 17/10/16 General Update1 11/11/16 General Update
Resi
Resi
Resi
382 sqm
382 sqm
580 sqm
44.8
46.2
HA TCH GEN ER ATEB OUNDARY
A
A
1to3
The Exchange
1 to 3Exchange
The
4to5
200
3113
54.3m
HEN
DO
N W
AY
14
48
65
75
El Sub Sta
1
26
21
43
28
DRIVE
El Sub Sta
38
13
PRINCE
53
RENTERS
2
AV
EN
UE
CHARLES
Shelter
UE
ELD
GARDENS
CHARLES DRIVE
BRENT CROSS
R
PRINCE
79
HE
ND
ON
WA
Y
BR
EN
T CR
OS
S FLY
OV
ER
15
13
54
53
95
10
29
18
30
42
17
140
152
1312
20
128
26
41
El Sub Sta
LA
YF
IEL
D C
LO
SE
12a
BUS
STAND
STAND
BUSSTOP
BUSSTOP
BUS STOP
BUS STOP
BUS STOP
BUS STOP
STOP
BUS STOP
STAND
STAND
STAND
STAND
RTSSTOP
BUSSTOP
STAND
STAND
STAND
STAND
STAND
STAND
STAND
STAND
BUSSTOP
STAND
BUSSTOP
STAND
STANDBUSSTOPBUSSTOP
BUSSTOPBUSSTOP
TAXI
2.750
10.500
12.000
3.000
BUS
STAND
STAND
BUSSTOP
BUSSTOP
BUS STOP
BUS STOP
BUS STOP
BUS STOP
STOP
BUS STOP
STAND
STAND
STAND
STAND
RTSSTOP
BUSSTOP
STAND
STAND
STAND
STAND
STAND
STAND
STAND
STAND
BUSSTOP
STAND
BUSSTOP
STAND
STANDBUSSTOPBUSSTOP
BUSSTOPBUSSTOP
MSU 0 01
SU 0 02
SU 0 03
SU 0 04
MSU 0 02
SU 0 05
SU 0 06
SU 0 07
SU 0 08
SU 0 08A
Fenwick LG
SU 0 26
SU 0 27
SU 0 28
SU 0 29
SU 0 29 ASU 0 30
SU 0 31
SU 0 32
SU 0 37 A
MSU 0 04
MSU 0 05
SU 0 42 A
SU 0 35
SU 0 36
SU 0 37
SU 0 38
SU 0 38 A
SU 0 39
SU 0 40
SU 0 41
CF-LG-2
MSU 0 06
SU 0 42
SU 0 43
SU 0 44
SU 0 45
SU 0 46
SU 0 47
N15 LG E3 E4 E5 E6
RSU 0 01
F1 F2 F3 RSU 0 02
RSU 0 02 A
RSU 0 03
RSU 0 04
RSU 0 05
CF-LG-1
RSU 0 01 A
JL - LG
D1 D2 D3
D4/5/6/7 STORE 1 D8/9/10 D11/12 D13
D14 D15 D16 D17A/B D18/19
Hotel A-B Lobby
FC 0 08
FC 0 07
FC 0 06
FC 0 03
Key
Anchor
Anchor Existing
Circulation
Customer Facilities
Existing Retail
F&B Kiosk
F&B Kiosk allocated seating
Hotel
MEP
MSU
SU
SU Reconfigured Area
42365
42365
47000
41100
41900
43000
42500
42050
41250
41850
FCS 0 07
FCS 0 08
FCS 0 06
FCS 0 03
D1-New D2-New D3-New
FC 0 04
FCS 0 04
FCS 0 05
FC 0 05
RSU 0 02 B
SU 0 09 M&S LG
M&S CBC
FC 0 02
FCS 0 02
CF-LG-3
SU 0 28 A
SU 0 10
SU 0 11
SU 0 12
SU 0 13
SU 0 13A
SU 0 14
SU 0 15
SU 0 16
SU 0 17
SU 0 18
SU 0 19
SU 0 20
SU 0 21
SU 0 22
SU 0 23
SU 0 24
MSU 0 03
MEP
MEP
MEP
MEP
MEP
MEP
MEP
MEP
MEP
MEP
MEPMEP
MEP
MEP
MEP MEP
MEP
MEP
MEP
MEP
MEP
MEP
MEP
CALLISONRTKL
25 Farringdon Street, 10th FloorLondon EC4A 4AB
T:+44(0)20 7306 0404
PROJECT
2016 CALLISONRTKL UK Ltd
CLIENT
KEY PLAN
TITLE
STATUS
PROJECT NUMBER
GENERAL NOTES
c
DATE DRAWN:
DRAWN BY:
CHECKED BY:
SCALE @ A1:
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
SHEET IDENTIFICATION
REVISION
NC
WC
JL
EB
FN
EC
HA
NB
EN
SD
SB
HC
PROJECT ORIGINATOR ZONE LEVEL TYPE ROLE DESCRIPTION
P0
1 : 1000
11/1
1/20
16 1
7:02
:16
1
Masterplan - L
LEASING PLAN - LOWERGROUND LEVEL
50.14026
08069-CRL-SW-LG0-DR-A-11001
11/11/16
NG
AB
Brent Cross London
0 10m 20m 40m 100m
Scale 1:1000
REV NO. DATE DESCRIPTIONA 02/03/16 General UpdateB 26/04/16 General UpdateC 10/06/16 General UpdateD 18/08/16 General UpdateE 17/10/16 General Update1 11/11/16 General Update
Scheme L - Revision F
TAXI TAXI TAXI
BUSSTOP
BUSSTOP
RTSSTOP
BUSSTOP
BUSSTOP
BUSSTOPBUSSTOP
BUSSTOPBUSSTOP
Resi
Resi
Resi
382 sqm
382 sqm
580 sqm
44.8
46.2
HA TCH GEN ER ATEB OUNDARY
A
A
1to3
The Exchange
1 to 3
Exchange
The
4to5
200
3113
54.3m
HEN
DO
N W
AY
14
48
65
75
El Sub Sta
1
26
21
43
28
DRIVE
El Sub Sta
38
PRINCE
53
RENTERS
2
AV
EN
UE
CHARLES
Shelter
GARDENS
CHARLES DRIVE
BRENT CROSS
R
PRINCE
79
HE
ND
ON
WA
Y
BR
EN
T CR
OS
S FLY
OV
ER
54
53
95
29
30
42
17
140
152
1312
20
128
26
41
El Sub Sta
LA
YF
IEL
D C
LO
SE
12a
JL - UG
Fenwick UG
MSU 1 01
SU 1 02
SU 1 04
MSU 1 02
SU 1 05
Hotel B L01
Hotel A L01
SU 1 05 A
SU 1 06
SU 1 07
SU 1 08
RS 1 01
RS 1 03
SU 1 19SU 1 20
SU 1 21
SU 1 21 A
SU 1 22
SU 1 22 A
SU 1 23SU 1 23 A
MSU 1 06
MSU 1 07
SU 1 24
SU 1 25
SU 1 26
SU 1 27
SU 1 28
SU 1 29
SU 1 30
CF-UG-2
MSU 1 08
SU 1 31
RS 1 06
SU 1 33
SU 1 34
SU 1 35
SU 1 36
RSU 1 06
RSU 1 05
CF-UG-1
RSU 1 04
RSU 1 03
RSU 1 02 A
RSU 1 02
RSU 1 01
CF-UG-3 Existing
FC 1 02
FCS 1 02
Room
N13 UGE
A1
A5 V6a
V7 U
GE-
1
V7a
UG
E-2
V8 A9 A10 A11/12
A13a
A13b
A14
A15
RSU 1 06 C3/C4 C5 C6 C6a
N5
N4
N3
N2
N1
N6b
N6a
N7
N8
N9
N10
B1
B2a
B2b
B3
B4a
B4
B5/B6 STORE 2 UGE B8
C8/9 C10
B9
B10a
B11
B12
B13/14
B15
B16
N11
N12
WAITROSE UG
FC 1 03
FCS 1 03
RSS 1 03
Living Bridge
48565
47465
Sub Station
Key
Anchor
Anchor Existing
Circulation
Customer Facilities
Existing Retail
F&B Existing
F&B Kiosk
F&B Kiosk allocated seating
F&B Restaurant
F&B Restaurant allocated seating
Hotel
MEP
MSU
Parking Existing
SU
SU Reconfigured Area
Sub Station
47465
1
2
3
4
5
6
1
2
3
4
5
6
12
13
14
15
1110
9 87
1617
1819
10
11
12
13
98
7
1415
16
18
19
17
20
STAIR
STAIR
STAIR
BOH
BOH
STAIR
SU 1 23 B
RSS 1 01
M&S UG
RS 1 02
RSS 1 02
SU 1 20 A
SU 1 11
SU 1 12SU 1 12 A
SU 1 12 B
SU 1 13
MSU 1 03
SU 1 14
SU 1 15
SU 1 16
Room
MSU 1 04
SU 1 18
SU 1 18 A
MSU 1 05
SU 1 11SU 1 11
RS 1 04
M&S UG
MEP
MEP
MEP
MEP
MEP
MEP
MEP
MEP
MEP
MEP
MEP
MEP
MEP
MEP MEP
MEP MEP
MEP
MEP
CALLISONRTKL
25 Farringdon Street, 10th FloorLondon EC4A 4AB
T:+44(0)20 7306 0404
PROJECT
2016 CALLISONRTKL UK Ltd
CLIENT
KEY PLAN
TITLE
STATUS
PROJECT NUMBER
GENERAL NOTES
c
DATE DRAWN:
DRAWN BY:
CHECKED BY:
SCALE @ A1:
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
SHEET IDENTIFICATION
REVISION
NC
WC
JL
EB
FN
EC
HA
NB
EN
SD
SB
HC
PROJECT ORIGINATOR ZONE LEVEL TYPE ROLE DESCRIPTION
P0
1 : 1000
11/1
1/20
16 1
7:08
:48
1
Masterplan - L
LEASING PLAN - UPPERGROUND LEVEL
50.14026
08069-CRL-SW-UG0-DR-A-11002
11/11/16
NG
AB
Brent Cross London
0 10m 20m 40m 100m
Scale 1:1000
REV NO. DATE DESCRIPTIONA 02/03/16 General UpdateB 26/04/16 General UpdateC 10/06/16 General UpdateD 18/08/16 General UpdateE 17/10/16 General Update1 11/11/16 General Update
Scheme L - Revision F
DDDDDDDDDDDDDDDDDDDDD
D
DD
DDDDDDDDDDDDDDDDDDDDDDD
DD
D
D
D
D
D
D
DDDDDDDDDDDDDDDDD
D
D
D
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD
DDDDDD
DDDDDDDDDDDD
DDDDDD
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
DDDDDD
DDDDDD
Z.1227
Z.111
3/3D
B1954
Z.1113/3D
Z.1113/4D
CON.133 MOGZ.1113/4
D 1477
!
225225
300 225
225
1372 375 225225
300
225
675
225
10901000
1016225
1016 H
ENDON BRANCH SEWER150
975
300975
225 150300
300 225
225
1016 225
600225 225
1016 H
ENDON BRANCH SEWER
225
750
750 HENDON BRANCH CONNECTION SEWER
TO BE ABANDONED 225
750 225 762225
750 HENDON BRANCH CONNECTION SEWER
TO BE ABANDONED
750
225
750
900
450
225
300
450
1372
825
450
975
600
225
225
975
300
225
1372
225
V!
V
<<
< <
VV
<<
<<
<<
<<
<<
<< <
!
9
(
(
"
"
"
"
"
1 1
1
1
1
1
1
1
1
U
K
UU
.
1
%
%
%% %
%%
%
%
%
%
%%
%
%
%
%
%
%
%
%%
%
%%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
%
%%
%
%
% %
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%%
%
% %
%
% %
%
%
%
% %
%
IL33.22m
IL33.84m
IL34.39m
B
B
B
4908
4911
4002
4903
4079
4907
4802
4078
49054904
4906
4902
4805
5002
5914
5901
5918
5902
5801
5903
5003
5004
5006
5907
3002
3004
3005
3001
3901
3906
4901
4910
3903
9901
9903
9801
0901
1502
45021503
36052601 3607 3604
36063603
36023601
3608
4702
4705
1702 4701
470327022701
2703
3801 4801
48043802
5804
58083803
1402
0501
95021501
0502
15050503 1506
0601
0602 16020603
1601
0604
16030605
9706
97011701
0701
07020801
0802
0403 040404029408
04059410
9404 0401
140195019411B
5805
5806
24014404
440124024405
34011504
2501
450135043501
350235061507 3507
35033505
!
=
!
=
!
!
=
= =
!
!
=
!
!
!
=
=
=!
=
!
=!
= ==
=!
= =
==
!
==
!!
=!=
= =!
=! =!
=!
!
!
=
!
=
=
!
!
!
=
===! === !
== !
==! != =
! ===
!
!
=
!
=!
!
!
!
=
= !
!
=
!
=
=
=
=
==
!=!=
=!==
==
=!!
Brent Cross Shopping Centre
Car Park
CR
School
NORTH CIRCULAR ROAD
Bus Station
Mapledown
A 406 (Flyover)
Whychcote Point
River Brent
16
1314
Dyson Court
Anderson Court
Rawlinson Court 42.2m
41.1m
43.0m
42.1m42.9m
El
Hotel
FB
LB
Sta
Cottage
Sub
Garden Court
TILLING ROAD
SPALDING ROAD
STADIUM ROAD
PRINCE CHARLES DRIVE
Weir
TEMPELHOF AVENUE
CLAREMONT ROADSTADIUM ROAD EAST
TCB
1 to 6 1 to 44
7 to 12
Posts
Gantry
Shelter
Gas Govn
Unde
rpas
s
El Sub Sta
Clarefield Park
WHITEFIELD AVENUE
ETHERIDGE ROAD
El Sub Sta
Sta
El
LB
Shelter
El Sub Sta
STADIUM ROAD EAST
Car Park
1 to 6
7 to 12
Shelter
Car Park
1 to 6
Car Park
Car Park
7 to 12
El Sub Sta
Brent Farm
Boro Cons
t & Ward
Bdy
WHITEFIELD AVENUE
Car Park
Car Park
STADIUM ROAD
ElSta
Sub
Sub
Scale:Width: 500m
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of anykind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified before any works are undertaken. Crown copyright Reserved
Based on the Ordnance Survey Map with thesanction of the Controller of H.M StationaryOffice License Number 10019345
ALS/ALS Standard/2013_2468829
0 20 40 60 8010Meters
mabdul
TQ2387NW
21/05/2013523250,187750
Printed By:Print Date:Map Centre:Grid Reference:
Comments:1:1791
ALS/ALS Standard/2013_2468829
NB: Level quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates no Survey information is available.
REFERENCE COVER LEVEL INVERT LEVEL REFERENCE COVER LEVEL INVERT LEVEL
3907 44.14 3906 43.89
4904 46.13 4905 41.44 40.41
1702 41.09 35.11 2701 40.99 38.75
4701 40.44 2702 40.97 38.29
4703 39.98 38.12 2703 41.17 38.07
4801 40.04 38.3 3801 40.51 35.63
3802 41.18 39.14 4804 39.77 38.65
3803 41.25 38.2 4805 40.1 35.45
4802 40.93 39.81 4901 43.71 41.74
4911 40.77 4903 44.29
4902 42.54 40.36 4908 44.55 40.32
4910 43.12 4906 42.98 39.94
3901 45.93 41.74 4907 47.63 46.21
3903 41.73 0604 41.54 39.7
0702 42.53 34.77 0802 42.65 39.39
0605 41.27 37.25 0801 42.4 34.7
0901 46.62 42.37 0701 42.05 34.38
3502 41.95 40.91 3506 41.84 39.69
3507 41.86 39.31 1507 41.76 32.84
3503 41.94 40.53 3505 41.83 39.41
1505 41.78 39.97 1502 41.765 33.235
4502 42.01 39.96 1506 42.51
1503 0.01 0601 42.32 40.56
3605 41.33 39.18 2601
3607 1602 41.04
3604 41.04 3606 40.89
3603 41.11 40.06 3602 40.94 39.78
3601 40.99 39.91 3608
1601 42.11 33.62 1603 40.14 38.21
4702 40.75 4705 40.71 39.43
1701 41.39 34.26 0501 43.14 35.13
0603 42.05 40.81 0503 42.62 40.99
0502 43 41.04 0602 42.12 40.66
1504 42.61 40.89 2501 42.22 40.22
4501 43.12 3504 42.09 40.21
1501 42.86 34.88 3501 42.06 38.84
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability ofany kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified before any works are undertaken. Crown copyright Reserved