FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work...

27
41O16NW2002 2.17961 SILK 010 DAii-Y WORK REPORTS FOR S'WAYZE RIVER PROJECT PHASE V" UK TOWNSHIP piSrRlCT of C E MINING Di VIS l OKI Ti M M l N S f O N TAR i C NJQV. 23 A. C.R.CAMPSALL R . co - HO L .o E: p, s

Transcript of FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work...

Page 1: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

41O16NW2002 2.17961 SILK 010

DAii-Y WORK REPORTS

FOR

S'WAYZE RIVER PROJECT PHASE V"

UK TOWNSHIP

piSrRlCT of CE MINING Di VIS l OKI

Ti M M l N S f O N TAR i C NJQV. 23

A. C.R.CAMPSALL

R .

co - HO L .o E: p, s

Page 2: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

41O16NW20022.17961 SILK 01OC

TAB UK OF CONTENTS

MAPS

.REGIONAL LOCATION MAP

N.T. s. MAP (FOLEYET/RIDOUT)CLAIMS TITLE PAGE G-1Q.13

CLAIM MAP SHOWING CLAIM LOCATIONS

REFERENCE MAP TO STRIPPING b T RENCHING AREAS, AND ANOMALOUS CONTACTS

DAILY WORK REPORTS :

STRIPPING k TRENCHING DAILY LOGS, INCLUDING DAILY WORK REPORT SHEETS

LOCATION OF STRIPPING S TRENCHING SKETCHES

SKETCH-ES OF TRENCHING fe SAMPLING

DESCRIPTION OF SAMPLES

ASSAY CERTIFICATESAS AVAILABLE AT TIME OF REPORT

/t~-

Page 3: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

x- .^ ir— .( l '

J^ V

afijutuK-^' j A

*t^ ?*B?^K^- , ^^^*^^ .--v5S^S^Si^gv^ ;l—o^.xSr? x^r •1^^L^fia^;T^^ \ ̂ r\5ss Regional Location Mao

SILK TOWNSHIP. ONTARIOPorcupine Mining Division District of SudburyScale: 1:1 725 000

l inch - 27.2 miles

Page 4: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

it -Jf-- \\-... . : v - i j. ^ -- - ~ N v S J

IVANHOE T W p .

L-f? \L-Wf

HORWOOD

,/' FOLEYET 42 B/SE

7 -,-^X-^v/ i-.-X^X'Y /'^ ^5^/^^2/J] C.

rr2..i--K^

A Ci. e— S

COLD MIN'E V^jU - - ^-———- /^ —

\...^J^-...-SLl.^

M.T.S. Maps: F OLEYET 42 B/SE

SWAYZE RIVER PROPERTYSILK TOWNSHIP, ONTARIOPorcupine Mining Division District of SudburyScale: 1: 100 000

l inch - 1.53 miles

.") ^Cilutama* f l ~~ i' ^ '•'"

Page 5: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

t E ET1000 2 0OO 4COO 6000 BOOO

O 200 METRES

1000 (1 K MI

2000 (2 KM)

LEGENDNOTES

T) THiS TWP. IS SUBJECT TO FOREST ACTIVITIES IN ^ 1990. FURTHER INFORMATION AVAILABLE ON FILE.

THE INFORMATION THAT APPEARS ON THIS MAP HAS BEEN COMPILED FROM VARIOUS SOURCES, AND., ACCURACY IS NOT GUARANTEED. THOSE WISHING TO STAKE WIN ING CLAIMS SHOULD COM- SULT WITH THE MINING RECORDER, MINISTRY OF NORTHERN DEVELOP MENT AND MINES, FOR AD- DITIONAL INFORMATION ON THE STATUS OF THE LAN r1S SHOWN HFRFClN

TOWNSHIP

SILKM.N.R. ADMINISTRATIVE DISTRICT

CHAPLEAUMINING DIVISION ,

PORCUPINE.TITLES./ REGISTRY DIVISION

Si.D,3URY' lij-f. ".••j ;' _ J. "J ___ ' '' ' ' ' ''- - :,"" . ;'fo" " 'l-''.:; .'" '.'N"'-.''''

-'Ministr^pf ;''[Ministryof r:/. -' " ' : " Natural" :' -Northern Development

. Resburce.s and ,Mines: : -f. - '' ' - ' :"'; "'-'-- 1'

CONTIGUOUS STAK&D AND RECORDED IN 1992

JUN 2 S 199?

Page 6: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

R

TO

WN

SH

IP

Page 7: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

"REFERENCE MAP/TO STRIPPING ^TRENCHING AREAS,- ANOMQLOUS ^CO^TACTS_®•^:_®_.___._...

l ( j cm* iCOrn) 1 : JO OOO

Page 8: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

DAILY WORK "REPORT

TOWNSHIP : CLAIM N 2.

i L.K PROTECT AREA : AS Mcre-D

DATE

W7

Auq. II

AU^, 12

AU.fi, 13

AUS, i4-

AUC,, 15

AUQ. 16

A"4. l'7

L OAUC^. ID

AUG. 19

— 1TOTAL ^ HOURS J

•^^^™^^^^^™*-*^^^^^^

HOURS WORKED

!O

10

1C10

99

a6

99e8 ,99aPo101C

NAME OF CO -HOLDER or HELPER

C. R. CAAAP^ALU.

C.R. CAMPS ALL.A. HA05EM

C. R. CAMpSALLA, HAGENJ

C. R. CAM PS A u-A . HAG EN

C, R. CAHPSVm-LA. HA^EN

C^R, CAMPS ALLA. HAGEM

C', R. CAM PS ALLA, HAGEK1

Ci R. CA/APS^LLA , HA^e-N

C. R. C AM PS ALLA, KAGtW

WORK PERFORMED SEE ATTACHED SKETCHES

ae W A7A/ -o c M P W .TWSu^^/fS,

C'OAJr^crs (j) AMD PARTOf-' (g)

- C OMPLETE TXAVfgZES /A/AREA Qf) AM ft (3J /AAJD(^Oi-i-^C'7' SAMfi-f-S FOfZG e o LOG t S r 's A S5 c ss/n /FA/ r

T^Vf^^f A/'^i-OW?CONTACTS /AJ A/? /r A (A)^/5C/*^ Z.- SOO i)^1 fudoL+GHTO i.- 1 600*1/1 A A/i? COLLECTSAMPI~E.S FOR ^'foi-o&v&r

- CHECK A WQfct^LouS CO.VTACT?

co^cfs&^sr *"0- STRIP 'TREK1C-H (T) AMP

START PuUQC?eRiMG,

- COMPLETE PLuG'QERtiosTHE A&OVE ,

— &LAST AMD MUCK -OUTTRENCH 0^

- pLU^aER AMD P, LASTSAME, 'TO PtcPEM AMOXA/iDEKJ THIS TRENCH

- Muck -OUT AMP SAMPLETfttMCH © ;

- AU D MAP THIS /^R^A

nn i, . j-^oo TOTAL AMOUNT ^ - , ^ cc EQUAL 20 DAYS X ^0- CALCULATED FOR !^3OOC;-

"RjEfORT PREPAY' W.

WAGES PAID

NOTES :-

Page 9: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

DAILY WORK REPORT

TOWNS mp : ^Til-K CLAIM NO j 8*7 II 3

DATE

i*mAUQ.20

AUG,, 21

AU4.22

Aua-23

AUG.. 24

—— 1TOTAL ^ HOURS A

\ . A

HOURS WORKED

lil!

8

B9 9

6 B

14 14

i bo

NOTES :

NAME OF CO-HOLDER or HELPER

C.R.CAMPSALL A. WAGEM

C. R, CAM PS ALL

C, R. CAMPSALL A. HAGE-Ni

C. R. CA/^PSALL A. HAS E. w

C. R. CAMPSALL A. HA^EM

PROTECT AREA : -j- ^\ /^C

WORK PERFORMED SEE ATTACHED SKETCHES

— START" SrRiPviNi^TREKiCH ^̂ }

— COMPLETE STR-'PPi^^ TRENCH (2) TO QuARra VE^KI AtJ?? 'REP ROOK

~ STRIP AMD PLUGG'cR TREMCM (3)

- BLAST AMD A\UCW-OUT TR-EMCH (3)

— START irXTRACTIMq EdUlPMEMT AMP TOOuS

- COMPLETE CLEAR! (O Q xXBCv^t TR.EMCH,

- SAMPi-r- AMD MAP AP-EA X

— DEMORiUee THE CAMP AKJD TRAX/EU BACK TO TOWN).

n /- vy i r~sn6Cj TOTAL AMOUNT i trO'Ttr OCi EQUAL tt, S DAYS X IS®- CALCULATED FOR ! ? l875i t±)

TtjEfORf PREPAY 1 N.

WAGES PAID

-

Page 10: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

DAILY WORK "REPORT PA 3 eTOWNSHIP : ^ I L\^ . CLAIM INS i B9n3

DATE

19Q7NOV , 1^

NCV, 2

Now. 3)

NOW , 4

NOV. 5

NO^ (S

NCV, 7

NOV/, 8

TOTAL ^ HOURS J

HOURS WORKED

Mi t

8

89 Q

eB

99

8 888

7 7

^ssss^sss^ssx

1 36

NAMB OF CO -HOLDER or HELPER

C. R, CAMPSALL A. HAOFM

C. R, CAKiPSALL A. MA^F-Ni

C. R-. CAMPS/M-U A, HAaLM

C.R.C'AMrSAi-L, A , H AC 6 M

C. R. CAMPSALL A, H AGE.N

C. ft. CAMPSALL A. HAC^EKI

C- R. CAM PS ALL A. HAGGM

C. R. CAMPSAU. A- HAQ^Ni

PROJECT AREA : AS NJOrEO•"E.ELOW

WORK PERFORMED SEE ATTACHED SKETCHES

- TRAx/FL TO Ci-AlMS.AMD SET-UP CAMP.

- START TRAVERSES ovEieANiO/^At-OuS CONTACTSm AMD (g) /AND couuEorgAYMPUSS Fo* CJCOuOeilST'S AS-SpSSA^rNJT,

- TRAVELS CONTACTS (3)) AMD (f)

- COMfL&TC TKAVEi2^fcS OWR ANOMALOUS OOMTACB

(g) AMD ®, AsiD ^utecrSAMPi-ES fbft eeOLOG'ST,

- T^AMSPoST pLu(SceR x s-reeLAKiO EQUlPM^KiT TO TRENJCH (i)

- ST A RT P L u 3 C, t R t Ni ^ TRtwcH @ TO FOLLOW A QUARTZ VfciN AKJD Ml WPRAU2AT10M iM THF- TP-EKJCH fsJOTFO tM THE J99-4 REPORT ,

( 3) - STE&i-S GET J-AMMcD.y

- DR*L.L OUT JAMMEP STEELAKlO COMTiMUETO PLU^CJfR

TREKJCH @

- BLAST AIO.D MUCK-OUT, SAMPLE AMD MAP TREKJCH (2)

- TP-AKiSPOftr EQUlPM&NJT TO T^EMCH (g) AMDSTART pLUQ^F-^iKJ^,

~ COMPLETE pLuaGGRlKjqTRENCH (g1) BLAST AMP STA RT M ciCKili G, -O UT,

1*7 \.y i .—^cv TOTAL AMOUNT ^-.i*-,-v-^ oo EQUAL I/ DAYS X ^0.- CALCULATED FOR !^25bO ~

RjEfORf PREPAR'M.

WAGES PA 10

NOTES :

Page 11: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

DAILY WORK 'REPORT 2. - 2TOWNS HUP : ^ 1 t- K CLAIM N2. H 09 M 3

DATE

19^7MOV, 9

TOTAL ^ HOURS ^

•' -ffiiTi-ii r -n™*^^^^*

HOURS WORKED

1C

10

201

NAME OF CO-HOLDER or HELPER

C. R . CAMPSALL A. HA(Sje.M

PR03-ECT AREA : A^ tOOTED BEuOw1

\VORK P^RFORMBD ^ SEE ATTACHED SKETCHES

- FlMi^H A^HClciNK^-OUr-rREMCH @ SAXMPLE AMP MAP,

- ExT(iACT i^ou i PM^MT ,-DEMOftiLiaf CAMP AMP

TCA^&L l^AC^TO TOvOd

f^ - i - -' v^ ,-t.

n s. y , ^/NftO TOTAL AMOUNT ± .or\xs oO EQUAL2, DAYS X 150 f- CALCULATED FOR ! 4 30O;~

RpfORf PREPAY.

WAGES PAID

NOTES :-

Page 12: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

LOCATIONS of STRIPPING qnd TRENCHING

PAR" OF BLOCK CLAIM * M89M3

TREKJCHES0-(2)-(3) z

SCALE:

Page 13: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

S (ri pping and Trenching 'Daily log

Project Area: Date: Work Performed:

BLOCK CLAIM

TOTRE.MCM (I)

Location of Stripping and Trenching

—— sketch attached / also shown on KEY MAP

oK.elch of Trenching and Sampling^

—— sketch attached,

Jr:^5^Q P^-ion of Sam pies:

J^JTpkJl0. , Type of Sample KockType Hincraliigtion , Assay "ResultsC ~

97- (9 CHIP

CHIP

CHIP

QUARTZ.

AI-TEP.EO

MIMOR

MlWOR

CERTIFICATE ATTACHED,)

ASSAYAT

"T\ME t? THtS

(l

Page 14: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

SKETCH of STRIPPING .TRENCH IN'CLAIM: Il89ii3 TRENCH SCALE: i - 2OO

P o

LIN e PICKET 1-1-25 s

TFVEKICH j.3m PSLEP

25.0 t'n

JO O

LINE PICKET 14-50 S

SCALE : l :2OO

Page 15: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

Stripping and Trenching Daily Log

Date -. Work Performed:

BLOCK CLAIM * I189M3

TO

TRENCH (2-

Location of Stripping and Trenching

—— sketch attaeheo^ also shown on KEY MAPL.-.-.

oK.elch of Trenching and Sampling

—— sketch attached,

^escription of Sana

Sample No Type of Sample~ - ~ —"* l ——-——- - i I —— — i——

97- CHIP

CHIP

CHIP

VEIN

QUARTZ VEIKJ

ALTERED

Hincnaliz.qii'on , Assay Results(CERTIFICATE ATTACHED,)

SULPHIDES

SULPHIPES

M i MOR SULPHIDES

KJ or AVA t u A a u: Ar

Page 16: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

SKETCH cf STRIPPING, TRENCHING

CLAIM: H89H3 TRENCH (g)

OEEf

•41.0of i. - eoo w

SCALE: j:!OO

Page 17: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

S tr i pp'ng and Trench in g 'Daily Log

Date : Work Performed'.

'BLOCK C1189113

TO

TRENCH

Location of Strj P ping and Trenching-

—— sketch attached also shown on KEY MAP

o Ketch of Trenching and Sampling^

—— sketch attached,

l ]e^cf\ ption of Sample^:

Sample No

97-©

Fypc of Sample KockType

CHIP

CHIP

QUARI2 C FLOAT)

QUARTZ. ( FLOAT)

Hineroliigjion , Assay "ResultsATTACHED J

NOT AS

Page 18: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

S (ri pp'ng and Trench in 9 'Daily log

project Area : Date -. Work Performed:

BLOCX CLAIM tt 1199113

TRENCH

J-•c' CQ^'IC)n Qf ^tripping and Trenching

—— sketch attached also shown on KEY MAP

o*Ketch of Trenching and Sampling^

—— sketch atta eh ed,

J'escri ption of Sam pies:

.?9.TRk.!^ , Type of Sample flockType Hinetnlizgii'on , Assay "Results(CERTIFICATE ATTACHEOJ

CHIP

CHiP

CHIP

QUARTZ

BASALT

ALTERED

M i

MlkiOR SULPHIDES

2 H JL

MOT AVAiLAfcuB AT TIME CF

H

Page 19: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

SKETCH cf STRIPPING, TRENCHINGCLAIM: ||89H3 TRENCHES (3) AND

iqq '7SAMPLES

52m WEST of {.-GOO W AT

TRENCH

00

SCALE: u too

Page 20: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

Ontario Ministry otNorthern Developmentand Mines

Declaration of Assessment Work Performed on Mining LandMining Act, Subsection 65(2) and 66(3), R.S.O. 1990

Transaction Number (oltice use)

Assessment Files Research Imaging

Personal information collected on this form is obtained under the authority c Mining Act, the information is a public record. This information will be used to Questions about this collection should be directed to the Chief Mining 933 Ramsey Lake Road, Sudbury, Ontario, P3E 685. 41O16NW20022.17961 SILK 900

Instructions: - For work performed on Crown Lands before recording a claim, use form 0240. - Please type or print in ink.

1. Recorded holder(s) (Attach a list if necessary)Name

AOOUF HAGEMAddress

SCHUMACHER, OMT, RON \ GONameCLAR.EMCE Q.CAMPSAULAddress

l PlNiE STREET

SCHUMACHBR, OMT, PCN i(3o

Client NumberI4-OSO8

Telephone Number, .(70S) - 2G7- 2644

Fax Number

Client Number r~ r\ t^ "~*

f "7^5) — 2^4 -5^1- 32.Fax Number

2. Type of work performed: Check ( s ) and report on only ONE of the following groups for this declaration.

r^f Geotechnical: prospecting, surveys, i — i L^—l assays and work under section 18 (regs) l — l

Work Type TRAVE^SE ANOMALOUS COM' AMD COUUeCT SAMPLES Fi^U (SEOUOGIST AS RETAILED OH MAPS , 'DAILY W0p.fc SPORTS ,

Dates Work 117 1*117 T 14Performed P rom t i II i |A^7 ^

Day | Month | Year Day

Physical: drilling, stripping, rn Renabi i itatjon trenching and associated assays L-1 HenaDllltatlon

FACTS

PROVIDED

-7 1*H7M i m~7

Month 1 YearGlobal Positioning System Data (if available) Township/Area

SILK TOWNSHIPM or G-Plan Number

O - 121 3

Office Use

Commodity

Total S Value of *fo . Work Claimed If ( 7 (^ t}

;NTS Reference

l )Mining Division /X-,

Resident Geologist ^T~ d" District ///k^j^^-o

Please remember to: - obtain a work permit from the Ministry of Natural Resources as required;- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for assigning work;- include two copies of your technical report.

2-3. Person or companies who prepared the technical report (Attach a list if necessary)Name

ADOLF HAGIENTelephone Number

54. RRST AVE V

4. Certification by Recorded Holder or Agent

(Print Name), do hereby certify that l have per icRQWRWBWedge 'of ifjjf

forth in this Declaration of Assessment Work having caused the work to be performed or witnessed the same during or after its completion and, to the best of my knowledge, the annexed report is true.

Signature of Recorded Holder

Agent's Address*54 FI (ter AVE^^ *

or Agent /̂ ^L/^

,f ScHUMACHEli, OJOT

O^v.

POK.^0Telephone NumberOos)- 267- 2.G"*(4

DateK)0\/, 23X l^^~7

Fax Number

Page 21: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

the mining land where work was performed, at the time work was performed. A map showing must accompany this form.

ntiguous link

Mining Claim Number. Or if work was done on other eligible mining land, show in this column the location number indicated on the claim map.

eg

eg

eg

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

TB 7827

1234567

1234568

II89H2II89H3118911-1-

Number of Claim Units. For other mining land, list hectares.

16 ha

12

2

292.

Column Totals

Value of work performed on this claim or other mining land.

S26, 825

0

S 8, 892

^2:72

^1,400*2.88

*I,96O

Value of work applied to this claim.

N/A

S24,000

$ 4 ,000

*272H4OO*188

* 1,960

Value of woi, assigned to otr,-. mining claims.

324,000

0

0

000

0

Bank. Value of work to be distributed at a future date.

$2,825

0

S4.892

000

0APOLF HAC2E-N1 , do hereby certify that the above work credits are eligible under

(Print Full Name)

subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application to

the claim where the work was done.Signature of Recorded Holder or Agent Authorized in Writing

6. Instructions for cutting back credits that are not approved.

Some of the credits claimed in this declaration may be cut back. Please check ( ^ ) in the boxes below to show how

you wish to priockize the deletion of credits:

ST 1. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated.

D 2. Credits are to be cut back starting with the claims listed last, working backwards; or

D 3. Credits are to be cut back equally over all claims listed in this declaration; or

D 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):

Note: If you have not indicated how your credits are to be deleted, credits will be cut back from the Bank first, followed by option number 2 if necessary.

For Office tee Only J? f* y^^—^——Received Stfcmp "" .-, ~. : ;''' ~~

26 199?

Deemed Approved Date

Date Approved -

Date Notification Sent

Total Value of Credit Approved

Approved for Recording by Mining Recorder (Signature)

Page 22: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

J Ontario Ministry ofNorthern Developmentand Mines

Declaration of Assessment Work Performed on Mining LandMining Act, Subsection 65(2) and 66(3), R.S.O. 1990

Transaction Number (ellice use)

Assessment Files ResearchTfnaging

Personal information collected on this form is obtained under the authority of subsections 65(2) and 66(3) of the Mining Act. Under section 8 of the Mining Act, the information is a public record. This information will be used to review the assessment work and correspond with the mining land holder. Questions about this collection should be directed to the Chief Mining Recorder, Ministry of Northern Development and Mines, 6th Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E 6B5.

Instructions: - For work performed on Crown Lands before recording a claim, use form 0240. - Please type or print in ink.

1. Recorded holder(s) (Attach a list if necessary)Name

ADOUF HAGEMAddress5^4 FIRST Awf - f APT. IN

SCHUKACHEft , OUT, PON I3O

Name CUAREJslCE R , CAMPSALLAddress

l PINE STREET

SCHKMACHEfc, OMT POW |(3O

Client Number

Telephone Number

Kosoanosj~^7-2^44

Fax Number

Client Number tr-rt/OO

TeIePh0neNUmberC705)-aG4-5432

Fax Number

2. Type of work performed: Check ( ^ ) and report on only ONE of the following groups for this declaration.

D Geotechnical: prospecting, surveys, rnf Physical: drilling, stripping, assays and work under section 18 (regs) ^-l trenching and associated assays

WorkType STRIPPING AMD TRENCH IKi(3 AS RETAILED ON PROVIDED MAPS. SKETCHES AMD PAI LV V/OSK UOGS AMD REPORTS ,

Dates Work IS S IW7 24 8 W7 Performed From 3 i U i |*W7 To 9 1 II 11*7

Day 1 Month | Year Day | Monlh YearGlobal Positioning System Data (if available) Township/Area

M or G-Plan Number

[ 1 Rehabilitation

Office Use

Commodity

Total S Value of -fi Work Claimed M

NTS Reference

Mining Division

J'

7tU^®^^Resident Geologist ^^- U ^DiStrlCt ///J^v^

Please remember to: - obtain a work permit from the Ministry of Natural Resources as required;- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for assigning work;- include two copies of your technical report. ~. . .,,, ^ ^•'" "

3. Person or companies who prepared the technical report (Attach a list if necessary)Name

AOCUF HAGEM

AddreS S4 B52ST AV/Ey SCHUMACttER.OUT POM I^O

Name - ^ -^^ V

Address ^*V^ ̂ ^" \\

am8 \ *^ 0 *^ /D- 1 w^\.Address \ ^*v bfi^'^'*' ^.x**^**^

Telephone Number ^ ^

Fax Number

Telephone Number

Fax Number

Telephone Number

Fax Number - "T'-~--";.rrr"r,r;-^ ~.v.;-— .-----— -,- - : . : ; ,-''. ^': ''."" ;: -'''- 'i j- "' 't'" ''"' f'ipH v-!\!

i -, :: i^.A:-'"--.^ ; ^ \V it* i l i t ;

\-^**^ ^OV SB MQ7 ^"^ '4. Certification by Recorded Holder or Agent W 1 *w nr'' v-'

l A'DOl- HAGtNJ , do hereby certify that1 ~ (Print Nama)

//••y;//^ /irr1 have persoi^i^npwledge of ttl^i^^p 'set

i " lforth in this Declaration of Assessment Work having caused the work to be performed~or"w"itnessed thFsame during or after its completion and, to the best of my knowledge, the annexed report is true.

Signature ot Recorded

Agent's Address

Holder or A9entX^^7{y ^^^fs&f ' ̂ ^^

v,\JEy SCHUMACHER. ,OMT fOM |^OTelephone Number(-70sJ-2G.-7-2G.44

Date fsiOs/i 23 l***?•^ x

Fax Number

Page 23: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

5. Work to be recorded and distributed. Worn oan only be assigned to ciaims tnat are coni.guuob (.aujo.innyy 1 the mining land where work was performed, at the time work was performed. A map showing the contiguous link must accompany this form.

Mining Claim Number. Or ifwork was done on other eligible mining land, show in this column the location number indicated on the claim map.

eg

eg

eg

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

TB 7827

1234567

1234568

ii89U21187111*/I67H4

Number of Claim Units. For other mining land, list hectares.

16 ha

12

2

a92

Column Totals

Value of work performed on this claim or other mining land.

326, 825

0

S 8, 892

O* 7,4 25

O

*74^5

Value of workapplied to this claim.

N/A

S24,000

S 4,000

s 528*2 ( 2.0O

45ICL

43,240

Value of work assigned to other mining claims.

S24,000

0

0

0* l ,04G

0

* !,O40

Bank. Value of work to be distributed at a future date.

S2.825

0

S4,892

0^ 4, 1 85

0

1

*4,!8Sl, . do hereby certify that the above work credits are eligible under

(Print Full Name)

subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application to

the claim where the work was done.yOxx

Signature of Recorded Holder or Agent Authorized in Wriiing

————————————————————76. Instructions for cutting back credits that are not approved.

MOV, T7

Some of the credits claimed in this declaration may be cut back. Please check ( ^ ) in the boxes below to show how

you wish to prioritize the deletion of credits:

(?J 1. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated.

Q 2. Credits are to be cut back starting with the claims listed last, working backwards; or

D 3. Credits are to be cut back equally over all claims listed in this declaration; or

D 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):

Note: If you have, not indicatedJiow your credits are to be deleted, credits will be cut back from the Bank first, fol lowed! by option numher\2 ijijiji^

For Officeffgp Only_______'Received Stai ip'-v MOV 26 199?

PORCUPINE to 1 , "

Deemed Approved Date

Date Approved

Date Notification Sent

Total Value of Credit Approved

Approved for Recording by Mining Recorder (Signature)

Page 24: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

lLai lu and Mines for Assessment Credit

Personal information collected on this form is obtained under the authority of subsection 6(1) of the Assessmenl Work Regulation 6/96. Under section 8 of Ihe Mining Act, the information is a public record. This information will be used to review the assessment work and correspond with the mining land holder. Questions about this collection should be directed to the Chief Mining Recorder, Ministry of Northern Development and Mines, 6th Floor. 933 Ramsey Lake Road, Sudbury, Ontario, P3E 6B5.

Work Type

MAWUAL STCtPPiKlS AMD TP-EKtCHlMS, Pi-UGC/EB-lM^,BLASTING AMD MUCKIW^,

SAMPUMq AMD FieuD MAPPlMQ^SURVEY AWO^ALOUS CONTACTS ,

MAPPIMQ, SKETCHES AMD REPORT PRePARATION

Units of WorkDepending on the type of work, list the number of hours/days worked, metres of drilling, kilo metres of grid line, number of samples, elc.

37-8 UOuC. DAYS

2.5- 8 M^Uft DAVS

12. - 8 Wouft pAVS

2-8 Woue. D/vfS\ssociated Costs (e.g. supplies, mobilization and demobilization).

ExPLOSiv^S AMD FUSES, "B-uwE , e-to,

GAS AMD OIL Fe-R puuG3E#HEATINS, COOKIN^ AMD UAMP F^EL^ FUASG ( MQ etc .

Transportation Costs

CouvEYAwce To AMD FROM CLAIMS, ( 2 - fceruRw TRIPS,)

Food and Lodging Costs

fitoCB*,*S TOR CO-HOUP^S ( 23 , MAN DAy ^^

MOBiM2iWQ AND DEMO&iUZiM^ CAMP f 2 -MANjWWs)

Cost Per Unit of work

150.^150,^0

ISO, 00

)SO, ee

3I3 ( 00

44 ooG2, 00

I96^c

,2.80

i as, c oy^^VVj&WalueXof Assessment Work

— ^̂ t i\-^ V

Total Cost

S.S'SO,^^75,^2

! ( 8oo ( e^

300,- ( 9C1S)

313,5244, 0 0̂/~ o ooO X . — ( 4C? 0-")

396, 0-0

2^5,^ISO, ̂ 2 (^4,-)

^9,385.^

Calculations of Filing Discounts:

Work filed within two years of performanc\^©6^i^d^^rorj'^b of the above Total Value of Assessment Work. :. If work is filed after two years and up to fiOeyeaie-srfter performance, it can only be claimed at 50 07o of the Total

Value of Assessment Work. If this situationv3pplies to your claims, use the calculation below:

TOTAL VALUE OF ASSESSMENT WORK x 0.50 = Total S value of worked claimed.

Jote:Work older than 5 years is not eligible for credit. A recorded holder may be required to verify expenditures claimed in this statement of,-costsrwLth]n,45- clays of a equest for verification and/or correction/clarification. If verification and/or ——— '--'-'-^f!^^ ;c ™f m^^-tK^- :~

Minister may reject all or part of the assessment work submitted.

Certification verifying costs:26 1997

, do hereby certify, that the amounts accurate(please print lull name)

easonably be determined and the costs were incurred while conducting assessment work on the lands indica'tecTdn

he accompanying Declaration of Work form as

o make this certification.

(recorded holder, agent, or slate company position wilh signing authority)am authorized

Signature Date

Page 25: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

Ministry ofNorthern Developmentand Mines

Ministere du Developpement du Nord et des Mines Ontario

April 9, 1998

ADOLF HAGEN54 FIRST AVENUE APT #1P.O. BOX 692SCHUMACHER, OntarioPON-1GO

Geoscience Assessment Office 933 Ramsey Lake Road 6th Floor Sudbury, Ontario P3E 6B5

Telephone: (888)415-9846 Fax: (705) 670-5881

Dear Sir or Madam:

Subject: Transaction Number(s):

Submission Number: 2 .17961

W9760.00722 W9760.00723

StatusApproval After Notice Approval After Notice

We have reviewed your Assessment Work submission with the above noted Transaction Number(s). The attached summary page(s) indicate the results of the review. WE RECOMMEND YOU READ THIS SUMMARY FOR THE DETAILS PERTAINING TO YOUR ASSESSMENT WORK.

If the status for a transaction is a 45 Day Notice, the summary will outline the reasons for the notice, and any steps you can take to remedy deficiencies. The 90-day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, will no longer be in effect for assessment work which has received a 45 Day Notice.

Please note any revisions must be submitted in DUPLICATE to the Geoscience Assessment Office, by the response date on the summary.

If you have any questions regarding this correspondence, please contact Lucille Jerome by e-mail at [email protected] or by telephone at (705) 670-5858.

Yours sincerely,

ORIGINAL SIGNED BYBlair KiteSupervisor, Geoscience Assessment OfficeMining Lands Section

Correspondence ID: 12109

Copy for: Assessment Library

Page 26: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

Work Report Assessment Results

Submission Number: 2.17961

Date Correspondence Sent: April 09,

Transaction First Claim Number Number

W9760.00722 1189112

1998

Township(s) 1 Area(s)

SILK

AssessorLucille Jerome

Status

Approval After Notice

Approval Date

April 07, 1998

Section:

9 Prospecting PROSP

The 45 days outlined in the Notice dated February 20, 1998 have passed.

Assessment work credit has been approved as outlined on the attached Distribution of Assessment Work Credit sheet.

Transaction Number

W9760.00723

Section:

10 Physical PMAN

First Claim Number

1189113Township(s) l Area(s)

SILKStatus

Approval After Notice

Approval Date

April 07, 1998

Correspondence to:Resident Geologist South Porcupine, ON

Assessment Files Library Sudbury, ON

Recorded Holder(s) and/or Agent(s):ADOLF HAGEN SCHUMACHER, Ontario

CLARENCE ROSS CAMPSALL SCHUMACHER, Ontario

REINO JARVI SCHUMACHER, Ontario

Page: 1Correspondence ID: 12109

Page 27: FOR S'WAYZE RIVER PROJECT PHASE V · 2017-01-17 · 41o16nw2002 2.17961 silk 010 daii-y work reports for s'wayze river project phase v" uk township pisrrlct of c e mining di vis l

Distribution of Assessment Work Credit

The following credit distribution reflects the value of assessment work performed on the mining land(s).

Date: April 09, 1998

Submission Number: 2 .17961

Transaction Number: W9760.00722

Claim Number Value Of Work Performed

118911211891131189114

100.00290.00

100.00

Total: 0 490.00

Transaction Number: W9760.00723

Claim Number Value Of Work Performed

1189113 7,237.00

Total: $ 7 ,237.00

Page: l