FOR QUARRYING OF MULTI COLOUR...
Transcript of FOR QUARRYING OF MULTI COLOUR...
�� ��� � �������� � ��� � ��
FOR QUARRYING OF MULTI COLOUR GRANITE
(Extent – 2.44.0Ha)-B2 Project
��
S.F.Nos: 411/4B (Part)
Village: Kannanallur
Taluk: Radhapuram
District: Tirunelveli
State: Tamilnadu
�������� ��
����� ����� ���� !�"��� #"$�%� &''�''"��� &(�)! ��* +��#&&,-
.!�� �"��� !/ 0�"����1(
2)�����
�������� �3
Tvl. K.A.S.Rock Exports,
Door No.41, 4th Street,
Suyarajjyapuram,
Sellur,
Madurai District – 625 002
�������� �� �������� �� ���������� �� ���� ���� �� � �������
S. No Documents/Information required for Initial Scrutiny Yes/No Page No
1. Processing fee in the form of DD as per GO Yes 13
2. Duly filled and signed by both RQP/Consultant & Proponent
in Mining of Minor Minerals Checklist
Yes 1-(f)
3. Duly filled and signed by both RQP/Consultant & Proponent
in Form- 1
Yes 15
4. Duly Prepared and Signed by both RQP / Consultant &
Proponent Pre Feasibility report
Yes 141
5. Approved Mining Plan duly attested with seal by Assistant /
Deputy Director / Commissioner of Geology and Mining
Yes 107
6. Precise area communication letter from District Collector /
Principal Secretary to Government
Yes 109
7. Certificate from the VAO /Tashildhar stating details of
habitation located within 500m radius from the boundary of
the proposed site along with FMB sketch
No 171
8. Acknowledgement copy of the application submitted to
NBWL if applicable
Not applicable -
9. Letter from the AD/DD mines about the details (Name of the
Owner, S.F.No, Extent & distance from the boundary of this
quarry) of other quarries
(Proposed/Existing/Abandoned quarries) within a radius of
500m from the boundary of the proposed quarry site
(Applicable for Rough stone/Granite)
Not applicable -
10. Affidavit from the applicant regarding all the general
conditions stipulated in the EIA notification 2006
Yes 201
11. Affidavit from the applicant stating the habitation, details of
other quarry permanent structures within 500m, child labour
etc
Yes 201
12. Documents of village records, FMB, Combined Sketch,
Patta, Chitta, Adangal, consent letter, etc., and also 1km & 10
km radius map, surface plan duly attested by the
AD/DD/Commissioner of Geology and Mining and signed
by concerned authorities
Yes 111-
123,131,1
35
Verified By
To consider the proposal for the grant of Environmental Clearance for Multi Colour Granite for
over an extent of 2.44.0Ha in S.F.Nos: 411/4B(Part) at Kannanallur Village of Radhapuram
Taluk, Tirunelveli District by Tvl. K.A.S.Rock Exports, The salient features of the proposal are as follows:
S.No: Details of the proposal Data furnished Page No:
1.
Name of the owner/Firm Tvl. K.A.S.Rock Exports,
Door No.41, 4th Street,
Suyarajjyapuram,
Sellur,
Madurai District – 625 002
Mobile No: 95859 92747
19,55,125,167
2.
Type of quarrying
(Savudu/Rough stone/
Sand/Granite)
It is a Multi Colour Granite quarry Project in
Kannanallur Village.
17,55,125,167
3. S.F.No of the quarry site with
area break up
S.F.Nos. 411/4B(Part) at Kannanallur Village of
Radhapuram Taluk, Tirunelveli District
17,55,125,167
4. Village in which situated Kannanallur Village 17,55,125,167
5. Taluk in which situated Radhapuram Taluk 17,55,125,167
6. District in which situated Tirunelveli District 17,55,125,167
7. Extent of quarry (in ha) 2.44.0Ha 17,55,125,167
8. Period of quarrying proposed Mining license applied for period of twenty years only.
Mining plan period for the first five years
55,81,125
9. Production (Quantity in m3) The proposed quantity (20%) is about 7500m
3 of Multi
Colour Granite for a period of five years.
17,91,93,99,171
10. Latitude and Longitude of all
corners of the quarry site
08°23’09’’N to 08°23’03’’N
77°40’56’’ E to 77°40’50’’ E
17,81,171
11. Topo sheet No 58 -H/11 17,81,171
12.
Precise area communication
approved by the District
Collector with date
Letter No: 17513/MME.2/2013-1 Dated: 01.02.2016 125
13.
Mining plan approved by the
Assistant Director of the District
with date
Letter. No: 10143/MM2/2014 Dated: 25.02.2016 55
14.
Water Requirement:
1. Drinking & Domestic
purpose (in KLD)
2. Dust suppression & Green
Belt (in KLD)
Purpose Quantity KLD Source
Drinking 0.3KLD Water vendors
Domestic purpose 0.3KLD From Existing bore hole on
nearby quarry
Dust suppression
and Afforestation
0.4KLD From Existing bore hole on
nearby quarry
33,83,173
15. Depth of quarrying The applicant proposed up to a depth of 6m (1m top
soil + 5m Multi Colour Granite) for a period of five
years
97
16.
Project cost (including EMP
cost)
The total project cost including EMP cost (A+B+C) is
about Rs. 52,55,000/- (Rupees fifty two lakhs fifty
five thousand only)
115,219
17. EMP cost The total EMP cost is about Rs. 2,55,000/-(Rupees two
lakhs fifty five thousand only)
115,219
Checklist for Mining of Minor Mineral 2.44.0Ha mine lease area
S.No Details of the proposal Data furnished Page No
1. Name of the owner/Firm Tvl. K.A.S.Rock Exports, 19,55,125
,167
2.
Correspondence Address with Pin
Code
Door No.41, 4th Street,
Suyarajjyapuram,
Sellur,
Madurai District – 625 002.
3. Email Address [email protected] 19,79,179
4. Mobile Number 95859 92747 19,79,179
5. Type of quarrying
(Earth/ Rough stone/Sand/Granite)
It is a Multi Colour Granite quarry Project in Kannanallur
Village.
17,55,125
,167
6. S.F. No of the Quarry site S.F.Nos. 411/4B(Part) at Kannanallur Village of
Radhapuram Taluk, Tirunelveli District
17,55,125
,167
7.
Village in which situated, Town
Panchayat/ Panchayat Union in
which the village is situated
Village Panchayat : Kannanallur
Panchayat Union : Radhapuram
17,55,125
,167
8. Taluk in which situated Radhapuram Taluk 17,55,125
,167
9. District in which situated Tirunelveli District 17,55,125
,167
10. Extent of quarry (in Ha) 2.44.0Ha 17,55,125
,167
11. New or existing quarry It is New proposal Multi Colour Granite Quarry Project in
Kannanallur Village.
17,55,125
,171
12.
If in case of existing Rough Stone/
Blue Metal/ Granite Quarry, the
length, width and depth to which
quarrying has already been done
(below the ground level/ above the
ground level)
It is New proposal Multi Colour Granite Quarry Project in
Kannanallur Village.
17,55,125
,171
13.
If quarrying had been done below
the ground level/above the Ground
level, the height of quarrying
It is New proposal Multi Colour Granite Quarry Project in
Kannanallur Village.
17,55,125
,171
14.
Name of the owner who had earlier
undertaken the quarrying & a copy
of mining lease issued with date
It is New proposal Multi Colour Granite Quarry Project in
Kannanallur Village.
17,55,125
,171
15.
Proof of land ownership.
If owned patta copy.
If not own patta land agreement/
lease copy entered with the owner
(to be enclosed)
It is a patta Land registered in the name of the company
Vide Patta No.2984 and the company has got surface rights
over the area applied for quarry lease.
131
16. Period of quarrying Mining license applied for period of twenty years only.
Mining plan period for the first five years
55,81,125
17.
Production (quantity in m3) The proposed quantity (20%) is about 7500m
3 (or) 1325
Lorry Loads of Multi Colour Granite for a period of five
years.
The quarry operation is proposed up to depth for 16m (1m
top soil + 15m Multi Colour Granite) at present scenario
considering for the entire lease period The applicant
proposed up to a depth of 6m (1m top soil + 5m Multi
Colour Granite) for a period of five years
Description
ROM (m3)
Reserve
s 20%
(m3)
Granite
waste
80% (m3)
Top soil
in m3
Geological
reserves 367395 73479 293916 24493
Mineable
Reserves 241810 48362 193448 19613
five years
reserves 37500 7500 30000 8064
17,91,93,
99,171
18.
Method of Mining The quarrying operation will be carried out by Open cast
semi mechanized mining method with 5.0m vertical bench
with a bench width of 5.0m is being proposed.
23,95,171
19.
Top soil/ Overburden in case of
Rough Stone/ Blue Metal
There is a thickness of top soil is about 1m brownish soil,
the generation of top soil is about 8064m3
during the five
years.
77,85,171
20.
Quantity of rejects in m3 in case of
Granite Mining.
Total waste is 193448m3 of Granite waste @ 80% for
entire life period.
Total waste is 30000m3 of Granite waste @ 80% for a
period of five years; There is no quantity of rejects.
95,99,171
21.
Length, Width, Depth & Proposed
Quarry in meters. Dimension of the year wise:
L (m) W(m) D (m)
128 63 6
Ultimate pit dimensions Length (m) Width (m) Depth (m)
169 149 (Max) 16
101
22.
Land use pattern for a radius of 1Km
around the quarry site such as
Agriculture, Habitation etc.,
Description Percentage %
Trees - 15%
Roads - 10%
Agricultural land - 45%
Habitation - 05%
Tank/Power line - 15%
Barren Land - 10%
149
23.
Details of other quarries for a radius
of 1Km, around the quarry site.
The village Topo sketch map showing the quarry proposed
site.
There is one quarry located within the radius of 500m.
149,253
24. Aerial distance from periphery of the
site to the nearest habitation
The Nearest habitation Thangayam is 1.0km on North
eastern side.
49,113,21
1
25.
Aerial distance to the interstate
borders, in case of Rough Stone/
Blue Metal/ Granite quarry to be
obtained from IRS, Anna University.
There is no interstate boundary within the radius of 15km. 49,175,20
9
26.
In case of Rough Stone/ Blue Metal/
Granite quarry no objection
certificate from the concerned
district Forest Officer/ Wild Life
Sanctuaries/ National Parks/ HACA/
Western Ghats region if the quarry
site is within 15 Kms of these areas.
There are no wild life sanctuaries, National parks, HACA,
Western Ghats region within the radius of 15km.
49,175,20
9
27.
Aerial distance to the nearest eco-
sensitive areas, CRZ, Forests,
Monuments etc., within 15Kms of
these areas.
There is no CRZ, Monuments, forest and sensitive areas
within the radius of 15km.
49,175,20
9
28. Latitude and Longitude of all corners
of the quarry site. 08°23’09’’N to 08°23’03’’N
77°40’56’’ E to 77°40’50’’ E
17,81,171
29. Topo Sheet No 58 -H/11 17,81,171
30.
Copy of explosives license and a
consent letter/ agreement of
competent recognized person who
has agreed to handle explosive for
the blasting, in case of Rough Stone/
Blue Metal/ Granite quarry.
A copy of consent letter and license copy enclosed.
259,261
31.
Brief details of APC measures
proposed to be proposed to be
implemented.
The granite stones are quarried as undamaged dimensional
stones without involving deep hole drilling and heavy
blasting, fragmentation and generation of lumps, fines or
dust is negligible. Water will be sprinkled for the
suppression air borne dust from mine approach roads waste
dumps on regular intervals using water tankers.
119
32.
Mine Closure Plan to be furnished in
Mining plan.
In the Multi Colour Granite quarry operations the
maximum depth about 16m (1m top soil + 15m Multi
Colour Granite) for the entire lease period this is based on
the market potential at present scenario.
After completion of quarry operation the quarried out land
will be land will be fenced and maintained with barbed
wire to prevent inherent entry of the Public and cattle.
Garland drains will be constructed around the quarry to
prevent the surface run off rain water.
119
33. Mining plan prepared by (Xerox
copy of certificate to be attached)
M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A.,
RQP/MAS/183/2004/A
59,123,14
1
34.
Precise area communication
approved by the District Collector
The Precise area communication letter was issued by the
Additional Chief Secretary, Industries (MME.2)
Department Government of Tamilnadu, Chennai vide
Letter No: 17513/MME.2/2013-1 Dated: 01.02.2016
125
35.
Mining plan approved by the
Deputy/ Assistant Director of the
District.
The Mining Plan was Approved by the Commissioner of
Geology and Mining, Chennai vide Letter. No:
10143/MM2/2014 Dated: 25.02.2016
55
36.
Water requirement :
a) Drinking & domestic
purposes in KLD.
b) Dust suppression (in KLD)
c) Green belt (in KLD)
Drinking Water –0.3 KLD
& Domestic purpose
Dust Suppression – 0.3 KLD
Green belt -0.4 KLD
Total – 1.0 KLD
33,83,173
37.
Source of water
Purpose Sources
Drinking &
Domestic
Purpose
Packaged drinking water will be brought
from the approved water vendors
Dust suppression From Existing Borehole on nearby quarry
Green belt
development
From Existing Borehole on nearby quarry
33,83,173
38. Ground water table The Ground water is about 50mt depth from ground level. 29,113,17
1
39.
Project Cost (excluding EMP Cost) The Project cost: A. Fixed Asset cost = Rs. 7,00,000/-
B. Operational cost = Rs. 43,00,000/-
C. EMP cost = Rs. 2,55,000/-
Total cost = Rs. 52,55,000/-
The total project cost including EMP cost (A+B+C) is
about Rs. 52,55,000/- (Rupees fifty two lakhs fifty five
thousand only)
115,219
40. EMP Cost The total EMP cost is about Rs. 2,55,000/-(Rupees two
lakhs fifty five thousand only)
115,219
41. Disclosure RQP
M.Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A.,
RQP/MAS/183/2004/A
59,123,14
1
42.
Soft copy of the Form–1,
Pre –feasibility report and Mining
plan in CD.
There is enclosed Soft copy for form –1, Pre – feasibility
report and mining plan in CD.
263
43.
Key map showing the approach
roads to the site to be attested by the
Deputy/ Assistant Director of
Geology and Mining of the
concerned District.
The Route map showing with approach roads to the site is
enclosed Plate No: IC
147
44.
Village map with S.F. Nos& salient
features such as vegetation,
habitations etc., for a radius of 500m
around the quarry site.
Village map with S.F.No and Salient features such as
vegetation, habitation etc., for 500mt radius is enclosed as
Plate no. VIII & Annexure - III
149
45.
If lakes, Ponds, river, nallah, odai
etc. are situated near the quarry site
permission from the concerned PWD
authorities for mining
There is no Rivers/Stream, Lakes, and Reservoir within the
500m distance to the lease applied area.
One Tank is situated within the radius of 500mt
Thottavilai river is situated 4km away from the North
eastern side of the area.
Nambi Dam is situated 6km away from the South eastern
side of the area.
49,149,17
5,209
46.
Section map for mining to be
attested by the Deputy/ Assistant
Director of Geology and Mining of
the concerned District.
The Geological Plan and section in 1:1000 & 1:500 scale is
enclosed: IV
155
47.
Photograph of the proposed Mining
site with S.F.No and attested by at
least VAO.
The Photo of the quarry site is enclosed. 207
48. Form –I To be signed by applicant I am hereby signed 53
49. Pre- Feasibility Report to be signed
by applicant.
Pre-feasibility report has been signed by the applicant
223
50.
First and last page and the page at
which quantity of mining has been
worked out to be signed by the
Deputy/Assistant Director of
Geology and Mining of the
concerned District.
First page and last page and the quantity proposed in the
plan have been signed by the Commissioner of Geology
and Mining.
59,97
51.
Affidavit from the applicant that
child labor is not being employed in
the mining activity.
It is been ensured that the labor will not be employed less
than 18 years, No child labor will engaged or entertained
for any kind of quarrying operations. All the labor engaged
for quarrying operations will be insured during the quarry
lease period.
251,253
52.
Affidavit from the applicant
regarding planting of trees around
the quarry site in fulfillment of the
Green belt commitment furnished.
Affidavit from the applicant regarding the proposal for
planting trees around the quarry and fulfillment of
greenbelt commitment is enclosed
251,253
53.
Details (POD) Regarding
communicating the proposal to the
members of the committee.
1. Signature of the applicant
For Tvl. K.A.S.Rock Exports
1.A.Alavuthin
2.P.Sivansakthi
(Partners)
2. Signature of the Recognized qualified person
M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A.,
RQP/MAS/183/2004/A
INDEX FILE
From:
Tvl. K.A.S.Rock Exports,
Door No.41, 4th
Street,
Suyarajjyapuram,
Sellur,
Madurai District – 625 002
Mobile No: 95859 92747
To:
THE CHAIRMAN,
STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY,
PANAGAL BUILDING, SAIDAPET,
CHENNAI
Sir,
Sub: Submission of Approved Mining Plan (Letter No: 10143/MM2/2014 Dated:
25.02.2016) Form–1 and Pre-feasibility report and Mining plan for obtaining
Environmental Clearance for our Kannanallur Multi Colour Granite Quarry Lease
applied area- Reg.,
****************
I am here by submitting the processing fee in the form of demand draft for rupees one
lakh, along with Form-I and Pre-feasibility report and mining plan to your good office for
obtaining clearance from SEIAA, Chennai, for our Kannanallur Multi Colour Granite quarry
Lease applied area for over an extent of 2.44.0Ha in S.F.Nos. 411/4B (Part) at Kannanallur
Village of Radhapuram Taluk, Tirunelveli District, Tamilnadu.
I have submitted all the relevant documents to your good office to the best of our
knowledge. If any clarifications are required, we are ready to submit the same to your office at
your convenient time. Also we are ready to present the project in front of the committee.
Hence we request your good office to kindly process our application and allow us to
present our project at the earliest.
Thanking you.
Yours sincerely
For Tvl. K.A.S.Rock Exports
1. A.Alavuthin
2. P.Sivansakthi
(Partners)
Place: Tirunelveli
Dated: 26.02.2016
KANNANALLUR MULTI COLOUR GRANITE QUARRY LEASEAPPLIED AREA
(2.44.0Ha)
The proponent Tvl. K.A.S.Rock Exports has applied for Environmental clearance for the proposed
quarry Multi Colour Granite for over an extent of 2.44.0Ha in S.F.Nos: 411/4B (Part) at Kannanallur
Village of Radhapuram Taluk, Tirunelveli District.
Salient features of the proposal are as follows:
S.
No
Details of the proposal :
Data furnished Page No
1. Name of the Owner +
Firm
: Tvl. K.A.S.Rock Exports,
Door No.41, 4th Street,
Suyarajjyapuram,
Sellur,
Madurai District – 625 002
Mobile No: 95859 92747
19,55,12
5,167
2. Location of the quarry-
S.F.No.
: S.F.Nos. 411/4B (Part) at Kannanallur Village of
Radhapuram Taluk, Tirunelveli District
17,55,12
5,167
3. Purpose of Application : It is a Multi Colour Granite quarry Project in Kannanallur
Village.
17,55,12
5,167
4. Extent of quarry in Ha- : 2.44.0Ha 17,55,12
5,167
5. Land use planning
a) Mining
b) Storage of Topsoil
over burden
c) Infrastructure Road
d) Utilized Area
Total
:
Description
Present
Area
(Ha.)
Area to be
Required at
the present
Mining plan
period(Ha)
Net area
considered
for
calculation
(Ha)
Area under
quarry Nil 0.80.6 1.90.5
Waste dump Nil 0.58.0 Backfilling
Infrastructure Nil 0.01.0 0.01.0
Roads Nil 0.01.0 0.02.0
Green Belt Nil 0.17.0 0.47.0
Unutilized 2.44.0 0.86.4 0.03.5
Grand Total 2.44.0 2.44.0 2.44.0
23,121,2
13
6. Production (quantity in
m3)
: The proposed quantity (20%) is about 7500m3 (or) 1325
Lorry Loads of Multi Colour Granite for a period of five
years.
The quarry operation is proposed up to depth for 16m (1m
top soil + 15m Multi Colour Granite) at present scenario
considering for the entire lease period The applicant
proposed up to a depth of 6m (1m top soil and 5m Multi
Colour) for a period of five years
Description
ROM
(m3)
Reserv
es 20%
(m3)
Granite
waste
80%
(m3)
Top
soil in
m3
Geological
reserves 367395 73479 293916 24493
Mineable
Reserves 241810 48362 193448 19613
five years
reserves 37500 7500 30000 8064
17,91,93
,99,171
7. Top soil & overburden
(quantity in m3)
: There is a thickness of top soil is about 1m brownish soil,
the generation of top soil is about 8064m3
during the five
years.
77,85,17
1
8. Method of Mining : The quarrying operation will be carried out by Open cast
semi mechanized mining method with 5.0m vertical bench
with a bench width of 5.0m is being proposed.
23,95,17
1
9. Life of Mine as per
approved mining plan
: Mining license applied for period of twenty years only.
Mining plan period for the first five years
55,81,12
5
10. Height / width of the
bench
: Height 5.0m & Width 5.0m
23,95,17
1
11. Source of water /
quantity required
Quantity
(in litres) Source
33,83,17
3
a. Drinking & Domestic
Purpose
0.3 KLD Packaged drinking water will be brought from approved
water vender
b. Dust Suppression 0.3KLD From Existing bore hole on nearby quarry
C. Afforestation 0.4 KLD From Existing bore hole on nearby quarry
12. Waste water
Sewage water
Mode of disposal
:
:
There is no waste water. 37,43,21
5 The septic tank is constructed on permanent structure with
in the quarry lease area.
To local Panchyat Authority
13. APC Measures : 1.Mist Spray using water tankers,
2. Enclosed covered system. (Tarpaulin) for transportation.
39,
14. Ariel distance of nearest
habitation
: S.
No Name of the Village
Approximate
Distance & Direction
from lease hold area
Approximate
population
1. Thangayam 1.0km –NE 150
2. Anaikulam 2.0km-NW 400
3. Kannanallur 5.0km-NW 500
4. Moolaikadu 2.0km-S 200
5. Muthunadarkudieruppu 3.0km-SE 150
6. Kizhavaneri 5.0km-SW 250
7. Kallikulam 4.0km-SW 1000
49,113,2
11
15. Ariel distance from
Reserve forest, Sensitive
areas, Forest, Bird
sanctuaries, Wild life
sanctuaries, National
parks, Monuments
etc., within 15km
: Reserved forest -Nil
Bird Sanctuaries – Nil
Wild life sanctuaries - Nil
National Park – Nil
Monuments – Nil
49,175,2
09
16. Land owner ship
document
Own patta land
Lease
Govt. Poromboke
:
:
:
It is a patta Land registered in the name of the company
Vide Patta No.2984 and the company has got surface
rights over the area applied for quarry lease.
131
17. Land use classification : It is New proposal Multi Colour Granite Quarry Project in
Kannanallur Village.
17,55,12
5,171
18. Mining plan prepared by
:
M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A.,
RQP/MAS/183/2004/A
59,123,1
41
19. Approved by : The Mining Plan was Approved by the Commissioner of
Geology and Mining, Chennai vide Letter. No:
10143/MM2/2014 Dated: 25.02.2016
55
20 Precise area statement
Approved by
: The Precise area communication letter was issued by the
Additional Chief Secretary, Industries (MME.2)
Department Government of Tamilnadu, Chennai vide
Letter No: 17513/MME.2/2013-1 Dated: 01.02.2016
125
21. Nearby quarries : There is one quarry located within the radius of 500m 149
22. Nearby lake / river/ odai /
channel etc.
: There is no Rivers/Stream, Lakes, and Reservoir within
the 500m distance to the lease applied area.
49,175,2
09
One Tank is situated within the radius of 500mt
Thottavilai river is situated 4km away from the North
eastern side of the area.
Nambi Dam is situated 6km away from the South eastern
side of the area.
23. Latitude / Longitude : 08°23’09’’N to 08°23’03’’N
77°40’56’’ E to 77°40’50’’ E
17,81,17
1
24. GI Sheet No. : 58 -H/11 17,81,17
1
25. Project Cost(Project cost
+EMP cost)
: The Project cost:
A. Fixed Asset cost = Rs. 7,00,000/-
B. Operational cost = Rs. 43,00,000/-
C. EMP cost = Rs. 2,55,000/-
Total cost = Rs. 52,55,000/-
The total project cost including EMP cost (A+B+C) is
about Rs. 52,55,000/- (Rupees fifty two lakhs fifty five
thousand only)
115,219
26. EMP Cost (Capital and
recurring)
: The total EMP cost is about Rs. 2,55,000/-(Rupees two
lakhs fifty five thousand only)
115,219
27. Water table : The Ground water is about 50mt depth from ground level. 29,113,1
71
28. Interstate boundary : There is no interstate boundary within the radius of 15km. 49,175,2
09
29. western Ghats : There is no western Ghats within the radius of 15km. 49,175,2
09