FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha)-B2 Project S.F.Nos: 411/4B (Part) Village: Kannanallur Taluk: Radhapuram District: Tirunelveli State: Tamilnadu Tvl. K.A.S.Rock Exports, Door No.41, 4 th Street, Suyarajjyapuram, Sellur, Madurai District – 625 002

Transcript of FOR QUARRYING OF MULTI COLOUR...

Page 1: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

�� ��� � �������� � ��� � ��

FOR QUARRYING OF MULTI COLOUR GRANITE

(Extent – 2.44.0Ha)-B2 Project

��

S.F.Nos: 411/4B (Part)

Village: Kannanallur

Taluk: Radhapuram

District: Tirunelveli

State: Tamilnadu

�������� ��

����� ����� ���� !�"��� #"$�%� &''�''"��� &(�)! ��* +��#&&,-

.!�� �"��� !/ 0�"����1(

2)�����

�������� �3

Tvl. K.A.S.Rock Exports,

Door No.41, 4th Street,

Suyarajjyapuram,

Sellur,

Madurai District – 625 002

Page 2: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

�������� �� �������� �� ���������� �� ���� ���� �� � �������

S. No Documents/Information required for Initial Scrutiny Yes/No Page No

1. Processing fee in the form of DD as per GO Yes 13

2. Duly filled and signed by both RQP/Consultant & Proponent

in Mining of Minor Minerals Checklist

Yes 1-(f)

3. Duly filled and signed by both RQP/Consultant & Proponent

in Form- 1

Yes 15

4. Duly Prepared and Signed by both RQP / Consultant &

Proponent Pre Feasibility report

Yes 141

5. Approved Mining Plan duly attested with seal by Assistant /

Deputy Director / Commissioner of Geology and Mining

Yes 107

6. Precise area communication letter from District Collector /

Principal Secretary to Government

Yes 109

7. Certificate from the VAO /Tashildhar stating details of

habitation located within 500m radius from the boundary of

the proposed site along with FMB sketch

No 171

8. Acknowledgement copy of the application submitted to

NBWL if applicable

Not applicable -

9. Letter from the AD/DD mines about the details (Name of the

Owner, S.F.No, Extent & distance from the boundary of this

quarry) of other quarries

(Proposed/Existing/Abandoned quarries) within a radius of

500m from the boundary of the proposed quarry site

(Applicable for Rough stone/Granite)

Not applicable -

10. Affidavit from the applicant regarding all the general

conditions stipulated in the EIA notification 2006

Yes 201

11. Affidavit from the applicant stating the habitation, details of

other quarry permanent structures within 500m, child labour

etc

Yes 201

12. Documents of village records, FMB, Combined Sketch,

Patta, Chitta, Adangal, consent letter, etc., and also 1km & 10

km radius map, surface plan duly attested by the

AD/DD/Commissioner of Geology and Mining and signed

by concerned authorities

Yes 111-

123,131,1

35

Verified By

Page 3: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

To consider the proposal for the grant of Environmental Clearance for Multi Colour Granite for

over an extent of 2.44.0Ha in S.F.Nos: 411/4B(Part) at Kannanallur Village of Radhapuram

Taluk, Tirunelveli District by Tvl. K.A.S.Rock Exports, The salient features of the proposal are as follows:

S.No: Details of the proposal Data furnished Page No:

1.

Name of the owner/Firm Tvl. K.A.S.Rock Exports,

Door No.41, 4th Street,

Suyarajjyapuram,

Sellur,

Madurai District – 625 002

Mobile No: 95859 92747

19,55,125,167

2.

Type of quarrying

(Savudu/Rough stone/

Sand/Granite)

It is a Multi Colour Granite quarry Project in

Kannanallur Village.

17,55,125,167

3. S.F.No of the quarry site with

area break up

S.F.Nos. 411/4B(Part) at Kannanallur Village of

Radhapuram Taluk, Tirunelveli District

17,55,125,167

4. Village in which situated Kannanallur Village 17,55,125,167

5. Taluk in which situated Radhapuram Taluk 17,55,125,167

6. District in which situated Tirunelveli District 17,55,125,167

7. Extent of quarry (in ha) 2.44.0Ha 17,55,125,167

8. Period of quarrying proposed Mining license applied for period of twenty years only.

Mining plan period for the first five years

55,81,125

9. Production (Quantity in m3) The proposed quantity (20%) is about 7500m

3 of Multi

Colour Granite for a period of five years.

17,91,93,99,171

10. Latitude and Longitude of all

corners of the quarry site

08°23’09’’N to 08°23’03’’N

77°40’56’’ E to 77°40’50’’ E

17,81,171

11. Topo sheet No 58 -H/11 17,81,171

12.

Precise area communication

approved by the District

Collector with date

Letter No: 17513/MME.2/2013-1 Dated: 01.02.2016 125

13.

Mining plan approved by the

Assistant Director of the District

with date

Letter. No: 10143/MM2/2014 Dated: 25.02.2016 55

14.

Water Requirement:

1. Drinking & Domestic

purpose (in KLD)

2. Dust suppression & Green

Belt (in KLD)

Purpose Quantity KLD Source

Drinking 0.3KLD Water vendors

Domestic purpose 0.3KLD From Existing bore hole on

nearby quarry

Dust suppression

and Afforestation

0.4KLD From Existing bore hole on

nearby quarry

33,83,173

15. Depth of quarrying The applicant proposed up to a depth of 6m (1m top

soil + 5m Multi Colour Granite) for a period of five

years

97

16.

Project cost (including EMP

cost)

The total project cost including EMP cost (A+B+C) is

about Rs. 52,55,000/- (Rupees fifty two lakhs fifty

five thousand only)

115,219

17. EMP cost The total EMP cost is about Rs. 2,55,000/-(Rupees two

lakhs fifty five thousand only)

115,219

Page 4: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

Checklist for Mining of Minor Mineral 2.44.0Ha mine lease area

S.No Details of the proposal Data furnished Page No

1. Name of the owner/Firm Tvl. K.A.S.Rock Exports, 19,55,125

,167

2.

Correspondence Address with Pin

Code

Door No.41, 4th Street,

Suyarajjyapuram,

Sellur,

Madurai District – 625 002.

3. Email Address [email protected] 19,79,179

4. Mobile Number 95859 92747 19,79,179

5. Type of quarrying

(Earth/ Rough stone/Sand/Granite)

It is a Multi Colour Granite quarry Project in Kannanallur

Village.

17,55,125

,167

6. S.F. No of the Quarry site S.F.Nos. 411/4B(Part) at Kannanallur Village of

Radhapuram Taluk, Tirunelveli District

17,55,125

,167

7.

Village in which situated, Town

Panchayat/ Panchayat Union in

which the village is situated

Village Panchayat : Kannanallur

Panchayat Union : Radhapuram

17,55,125

,167

8. Taluk in which situated Radhapuram Taluk 17,55,125

,167

9. District in which situated Tirunelveli District 17,55,125

,167

10. Extent of quarry (in Ha) 2.44.0Ha 17,55,125

,167

11. New or existing quarry It is New proposal Multi Colour Granite Quarry Project in

Kannanallur Village.

17,55,125

,171

12.

If in case of existing Rough Stone/

Blue Metal/ Granite Quarry, the

length, width and depth to which

quarrying has already been done

(below the ground level/ above the

ground level)

It is New proposal Multi Colour Granite Quarry Project in

Kannanallur Village.

17,55,125

,171

13.

If quarrying had been done below

the ground level/above the Ground

level, the height of quarrying

It is New proposal Multi Colour Granite Quarry Project in

Kannanallur Village.

17,55,125

,171

14.

Name of the owner who had earlier

undertaken the quarrying & a copy

of mining lease issued with date

It is New proposal Multi Colour Granite Quarry Project in

Kannanallur Village.

17,55,125

,171

15.

Proof of land ownership.

If owned patta copy.

If not own patta land agreement/

lease copy entered with the owner

(to be enclosed)

It is a patta Land registered in the name of the company

Vide Patta No.2984 and the company has got surface rights

over the area applied for quarry lease.

131

16. Period of quarrying Mining license applied for period of twenty years only.

Mining plan period for the first five years

55,81,125

Page 5: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

17.

Production (quantity in m3) The proposed quantity (20%) is about 7500m

3 (or) 1325

Lorry Loads of Multi Colour Granite for a period of five

years.

The quarry operation is proposed up to depth for 16m (1m

top soil + 15m Multi Colour Granite) at present scenario

considering for the entire lease period The applicant

proposed up to a depth of 6m (1m top soil + 5m Multi

Colour Granite) for a period of five years

Description

ROM (m3)

Reserve

s 20%

(m3)

Granite

waste

80% (m3)

Top soil

in m3

Geological

reserves 367395 73479 293916 24493

Mineable

Reserves 241810 48362 193448 19613

five years

reserves 37500 7500 30000 8064

17,91,93,

99,171

18.

Method of Mining The quarrying operation will be carried out by Open cast

semi mechanized mining method with 5.0m vertical bench

with a bench width of 5.0m is being proposed.

23,95,171

19.

Top soil/ Overburden in case of

Rough Stone/ Blue Metal

There is a thickness of top soil is about 1m brownish soil,

the generation of top soil is about 8064m3

during the five

years.

77,85,171

20.

Quantity of rejects in m3 in case of

Granite Mining.

Total waste is 193448m3 of Granite waste @ 80% for

entire life period.

Total waste is 30000m3 of Granite waste @ 80% for a

period of five years; There is no quantity of rejects.

95,99,171

21.

Length, Width, Depth & Proposed

Quarry in meters. Dimension of the year wise:

L (m) W(m) D (m)

128 63 6

Ultimate pit dimensions Length (m) Width (m) Depth (m)

169 149 (Max) 16

101

22.

Land use pattern for a radius of 1Km

around the quarry site such as

Agriculture, Habitation etc.,

Description Percentage %

Trees - 15%

Roads - 10%

Agricultural land - 45%

Habitation - 05%

Tank/Power line - 15%

Barren Land - 10%

149

23.

Details of other quarries for a radius

of 1Km, around the quarry site.

The village Topo sketch map showing the quarry proposed

site.

There is one quarry located within the radius of 500m.

149,253

24. Aerial distance from periphery of the

site to the nearest habitation

The Nearest habitation Thangayam is 1.0km on North

eastern side.

49,113,21

1

25.

Aerial distance to the interstate

borders, in case of Rough Stone/

Blue Metal/ Granite quarry to be

obtained from IRS, Anna University.

There is no interstate boundary within the radius of 15km. 49,175,20

9

Page 6: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

26.

In case of Rough Stone/ Blue Metal/

Granite quarry no objection

certificate from the concerned

district Forest Officer/ Wild Life

Sanctuaries/ National Parks/ HACA/

Western Ghats region if the quarry

site is within 15 Kms of these areas.

There are no wild life sanctuaries, National parks, HACA,

Western Ghats region within the radius of 15km.

49,175,20

9

27.

Aerial distance to the nearest eco-

sensitive areas, CRZ, Forests,

Monuments etc., within 15Kms of

these areas.

There is no CRZ, Monuments, forest and sensitive areas

within the radius of 15km.

49,175,20

9

28. Latitude and Longitude of all corners

of the quarry site. 08°23’09’’N to 08°23’03’’N

77°40’56’’ E to 77°40’50’’ E

17,81,171

29. Topo Sheet No 58 -H/11 17,81,171

30.

Copy of explosives license and a

consent letter/ agreement of

competent recognized person who

has agreed to handle explosive for

the blasting, in case of Rough Stone/

Blue Metal/ Granite quarry.

A copy of consent letter and license copy enclosed.

259,261

31.

Brief details of APC measures

proposed to be proposed to be

implemented.

The granite stones are quarried as undamaged dimensional

stones without involving deep hole drilling and heavy

blasting, fragmentation and generation of lumps, fines or

dust is negligible. Water will be sprinkled for the

suppression air borne dust from mine approach roads waste

dumps on regular intervals using water tankers.

119

32.

Mine Closure Plan to be furnished in

Mining plan.

In the Multi Colour Granite quarry operations the

maximum depth about 16m (1m top soil + 15m Multi

Colour Granite) for the entire lease period this is based on

the market potential at present scenario.

After completion of quarry operation the quarried out land

will be land will be fenced and maintained with barbed

wire to prevent inherent entry of the Public and cattle.

Garland drains will be constructed around the quarry to

prevent the surface run off rain water.

119

33. Mining plan prepared by (Xerox

copy of certificate to be attached)

M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A.,

RQP/MAS/183/2004/A

59,123,14

1

34.

Precise area communication

approved by the District Collector

The Precise area communication letter was issued by the

Additional Chief Secretary, Industries (MME.2)

Department Government of Tamilnadu, Chennai vide

Letter No: 17513/MME.2/2013-1 Dated: 01.02.2016

125

35.

Mining plan approved by the

Deputy/ Assistant Director of the

District.

The Mining Plan was Approved by the Commissioner of

Geology and Mining, Chennai vide Letter. No:

10143/MM2/2014 Dated: 25.02.2016

55

36.

Water requirement :

a) Drinking & domestic

purposes in KLD.

b) Dust suppression (in KLD)

c) Green belt (in KLD)

Drinking Water –0.3 KLD

& Domestic purpose

Dust Suppression – 0.3 KLD

Green belt -0.4 KLD

Total – 1.0 KLD

33,83,173

Page 7: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

37.

Source of water

Purpose Sources

Drinking &

Domestic

Purpose

Packaged drinking water will be brought

from the approved water vendors

Dust suppression From Existing Borehole on nearby quarry

Green belt

development

From Existing Borehole on nearby quarry

33,83,173

38. Ground water table The Ground water is about 50mt depth from ground level. 29,113,17

1

39.

Project Cost (excluding EMP Cost) The Project cost: A. Fixed Asset cost = Rs. 7,00,000/-

B. Operational cost = Rs. 43,00,000/-

C. EMP cost = Rs. 2,55,000/-

Total cost = Rs. 52,55,000/-

The total project cost including EMP cost (A+B+C) is

about Rs. 52,55,000/- (Rupees fifty two lakhs fifty five

thousand only)

115,219

40. EMP Cost The total EMP cost is about Rs. 2,55,000/-(Rupees two

lakhs fifty five thousand only)

115,219

41. Disclosure RQP

M.Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A.,

RQP/MAS/183/2004/A

59,123,14

1

42.

Soft copy of the Form–1,

Pre –feasibility report and Mining

plan in CD.

There is enclosed Soft copy for form –1, Pre – feasibility

report and mining plan in CD.

263

43.

Key map showing the approach

roads to the site to be attested by the

Deputy/ Assistant Director of

Geology and Mining of the

concerned District.

The Route map showing with approach roads to the site is

enclosed Plate No: IC

147

44.

Village map with S.F. Nos& salient

features such as vegetation,

habitations etc., for a radius of 500m

around the quarry site.

Village map with S.F.No and Salient features such as

vegetation, habitation etc., for 500mt radius is enclosed as

Plate no. VIII & Annexure - III

149

45.

If lakes, Ponds, river, nallah, odai

etc. are situated near the quarry site

permission from the concerned PWD

authorities for mining

There is no Rivers/Stream, Lakes, and Reservoir within the

500m distance to the lease applied area.

One Tank is situated within the radius of 500mt

Thottavilai river is situated 4km away from the North

eastern side of the area.

Nambi Dam is situated 6km away from the South eastern

side of the area.

49,149,17

5,209

46.

Section map for mining to be

attested by the Deputy/ Assistant

Director of Geology and Mining of

the concerned District.

The Geological Plan and section in 1:1000 & 1:500 scale is

enclosed: IV

155

47.

Photograph of the proposed Mining

site with S.F.No and attested by at

least VAO.

The Photo of the quarry site is enclosed. 207

48. Form –I To be signed by applicant I am hereby signed 53

49. Pre- Feasibility Report to be signed

by applicant.

Pre-feasibility report has been signed by the applicant

223

Page 8: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

50.

First and last page and the page at

which quantity of mining has been

worked out to be signed by the

Deputy/Assistant Director of

Geology and Mining of the

concerned District.

First page and last page and the quantity proposed in the

plan have been signed by the Commissioner of Geology

and Mining.

59,97

51.

Affidavit from the applicant that

child labor is not being employed in

the mining activity.

It is been ensured that the labor will not be employed less

than 18 years, No child labor will engaged or entertained

for any kind of quarrying operations. All the labor engaged

for quarrying operations will be insured during the quarry

lease period.

251,253

52.

Affidavit from the applicant

regarding planting of trees around

the quarry site in fulfillment of the

Green belt commitment furnished.

Affidavit from the applicant regarding the proposal for

planting trees around the quarry and fulfillment of

greenbelt commitment is enclosed

251,253

53.

Details (POD) Regarding

communicating the proposal to the

members of the committee.

1. Signature of the applicant

For Tvl. K.A.S.Rock Exports

1.A.Alavuthin

2.P.Sivansakthi

(Partners)

2. Signature of the Recognized qualified person

M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A.,

RQP/MAS/183/2004/A

Page 9: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

INDEX FILE

Page 10: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

From:

Tvl. K.A.S.Rock Exports,

Door No.41, 4th

Street,

Suyarajjyapuram,

Sellur,

Madurai District – 625 002

Mobile No: 95859 92747

To:

THE CHAIRMAN,

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY,

PANAGAL BUILDING, SAIDAPET,

CHENNAI

Sir,

Sub: Submission of Approved Mining Plan (Letter No: 10143/MM2/2014 Dated:

25.02.2016) Form–1 and Pre-feasibility report and Mining plan for obtaining

Environmental Clearance for our Kannanallur Multi Colour Granite Quarry Lease

applied area- Reg.,

****************

I am here by submitting the processing fee in the form of demand draft for rupees one

lakh, along with Form-I and Pre-feasibility report and mining plan to your good office for

obtaining clearance from SEIAA, Chennai, for our Kannanallur Multi Colour Granite quarry

Lease applied area for over an extent of 2.44.0Ha in S.F.Nos. 411/4B (Part) at Kannanallur

Village of Radhapuram Taluk, Tirunelveli District, Tamilnadu.

I have submitted all the relevant documents to your good office to the best of our

knowledge. If any clarifications are required, we are ready to submit the same to your office at

your convenient time. Also we are ready to present the project in front of the committee.

Hence we request your good office to kindly process our application and allow us to

present our project at the earliest.

Thanking you.

Yours sincerely

For Tvl. K.A.S.Rock Exports

1. A.Alavuthin

2. P.Sivansakthi

(Partners)

Place: Tirunelveli

Dated: 26.02.2016

Page 11: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

KANNANALLUR MULTI COLOUR GRANITE QUARRY LEASEAPPLIED AREA

(2.44.0Ha)

The proponent Tvl. K.A.S.Rock Exports has applied for Environmental clearance for the proposed

quarry Multi Colour Granite for over an extent of 2.44.0Ha in S.F.Nos: 411/4B (Part) at Kannanallur

Village of Radhapuram Taluk, Tirunelveli District.

Salient features of the proposal are as follows:

S.

No

Details of the proposal :

Data furnished Page No

1. Name of the Owner +

Firm

: Tvl. K.A.S.Rock Exports,

Door No.41, 4th Street,

Suyarajjyapuram,

Sellur,

Madurai District – 625 002

Mobile No: 95859 92747

19,55,12

5,167

2. Location of the quarry-

S.F.No.

: S.F.Nos. 411/4B (Part) at Kannanallur Village of

Radhapuram Taluk, Tirunelveli District

17,55,12

5,167

3. Purpose of Application : It is a Multi Colour Granite quarry Project in Kannanallur

Village.

17,55,12

5,167

4. Extent of quarry in Ha- : 2.44.0Ha 17,55,12

5,167

5. Land use planning

a) Mining

b) Storage of Topsoil

over burden

c) Infrastructure Road

d) Utilized Area

Total

:

Description

Present

Area

(Ha.)

Area to be

Required at

the present

Mining plan

period(Ha)

Net area

considered

for

calculation

(Ha)

Area under

quarry Nil 0.80.6 1.90.5

Waste dump Nil 0.58.0 Backfilling

Infrastructure Nil 0.01.0 0.01.0

Roads Nil 0.01.0 0.02.0

Green Belt Nil 0.17.0 0.47.0

Unutilized 2.44.0 0.86.4 0.03.5

Grand Total 2.44.0 2.44.0 2.44.0

23,121,2

13

6. Production (quantity in

m3)

: The proposed quantity (20%) is about 7500m3 (or) 1325

Lorry Loads of Multi Colour Granite for a period of five

years.

The quarry operation is proposed up to depth for 16m (1m

top soil + 15m Multi Colour Granite) at present scenario

considering for the entire lease period The applicant

proposed up to a depth of 6m (1m top soil and 5m Multi

Colour) for a period of five years

Description

ROM

(m3)

Reserv

es 20%

(m3)

Granite

waste

80%

(m3)

Top

soil in

m3

Geological

reserves 367395 73479 293916 24493

Mineable

Reserves 241810 48362 193448 19613

five years

reserves 37500 7500 30000 8064

17,91,93

,99,171

7. Top soil & overburden

(quantity in m3)

: There is a thickness of top soil is about 1m brownish soil,

the generation of top soil is about 8064m3

during the five

years.

77,85,17

1

Page 12: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

8. Method of Mining : The quarrying operation will be carried out by Open cast

semi mechanized mining method with 5.0m vertical bench

with a bench width of 5.0m is being proposed.

23,95,17

1

9. Life of Mine as per

approved mining plan

: Mining license applied for period of twenty years only.

Mining plan period for the first five years

55,81,12

5

10. Height / width of the

bench

: Height 5.0m & Width 5.0m

23,95,17

1

11. Source of water /

quantity required

Quantity

(in litres) Source

33,83,17

3

a. Drinking & Domestic

Purpose

0.3 KLD Packaged drinking water will be brought from approved

water vender

b. Dust Suppression 0.3KLD From Existing bore hole on nearby quarry

C. Afforestation 0.4 KLD From Existing bore hole on nearby quarry

12. Waste water

Sewage water

Mode of disposal

:

:

There is no waste water. 37,43,21

5 The septic tank is constructed on permanent structure with

in the quarry lease area.

To local Panchyat Authority

13. APC Measures : 1.Mist Spray using water tankers,

2. Enclosed covered system. (Tarpaulin) for transportation.

39,

14. Ariel distance of nearest

habitation

: S.

No Name of the Village

Approximate

Distance & Direction

from lease hold area

Approximate

population

1. Thangayam 1.0km –NE 150

2. Anaikulam 2.0km-NW 400

3. Kannanallur 5.0km-NW 500

4. Moolaikadu 2.0km-S 200

5. Muthunadarkudieruppu 3.0km-SE 150

6. Kizhavaneri 5.0km-SW 250

7. Kallikulam 4.0km-SW 1000

49,113,2

11

15. Ariel distance from

Reserve forest, Sensitive

areas, Forest, Bird

sanctuaries, Wild life

sanctuaries, National

parks, Monuments

etc., within 15km

: Reserved forest -Nil

Bird Sanctuaries – Nil

Wild life sanctuaries - Nil

National Park – Nil

Monuments – Nil

49,175,2

09

16. Land owner ship

document

Own patta land

Lease

Govt. Poromboke

:

:

:

It is a patta Land registered in the name of the company

Vide Patta No.2984 and the company has got surface

rights over the area applied for quarry lease.

131

17. Land use classification : It is New proposal Multi Colour Granite Quarry Project in

Kannanallur Village.

17,55,12

5,171

18. Mining plan prepared by

:

M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A.,

RQP/MAS/183/2004/A

59,123,1

41

19. Approved by : The Mining Plan was Approved by the Commissioner of

Geology and Mining, Chennai vide Letter. No:

10143/MM2/2014 Dated: 25.02.2016

55

20 Precise area statement

Approved by

: The Precise area communication letter was issued by the

Additional Chief Secretary, Industries (MME.2)

Department Government of Tamilnadu, Chennai vide

Letter No: 17513/MME.2/2013-1 Dated: 01.02.2016

125

21. Nearby quarries : There is one quarry located within the radius of 500m 149

22. Nearby lake / river/ odai /

channel etc.

: There is no Rivers/Stream, Lakes, and Reservoir within

the 500m distance to the lease applied area.

49,175,2

09

Page 13: FOR QUARRYING OF MULTI COLOUR GRANITEenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · FOR QUARRYING OF MULTI COLOUR GRANITE (Extent – 2.44.0Ha) ... No Documents/Information

One Tank is situated within the radius of 500mt

Thottavilai river is situated 4km away from the North

eastern side of the area.

Nambi Dam is situated 6km away from the South eastern

side of the area.

23. Latitude / Longitude : 08°23’09’’N to 08°23’03’’N

77°40’56’’ E to 77°40’50’’ E

17,81,17

1

24. GI Sheet No. : 58 -H/11 17,81,17

1

25. Project Cost(Project cost

+EMP cost)

: The Project cost:

A. Fixed Asset cost = Rs. 7,00,000/-

B. Operational cost = Rs. 43,00,000/-

C. EMP cost = Rs. 2,55,000/-

Total cost = Rs. 52,55,000/-

The total project cost including EMP cost (A+B+C) is

about Rs. 52,55,000/- (Rupees fifty two lakhs fifty five

thousand only)

115,219

26. EMP Cost (Capital and

recurring)

: The total EMP cost is about Rs. 2,55,000/-(Rupees two

lakhs fifty five thousand only)

115,219

27. Water table : The Ground water is about 50mt depth from ground level. 29,113,1

71

28. Interstate boundary : There is no interstate boundary within the radius of 15km. 49,175,2

09

29. western Ghats : There is no western Ghats within the radius of 15km. 49,175,2