PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM
DISTRICT LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY (DEIAA),
KRISHNAGIRI DISTRICT, TAMILNADU
FOR QUARRYING OF AGASIPALLI
BLACK GRANITE (DOLERITE)QUARRY (TO SUBMISSION OF FORM -1, APPROVED MINING PLAN & PRE-FEASIBILITY REPORT)
(PROJECT CATEGORY-“B2” / PATTA LAND)
(LEASE PERIOD – 20 YEARS)
LOCATION OF THE QUARRY LEASE APPLIED AREA
Extent : 1.26.5Ha
S.F.No : 757
Village : Agasipalli
Taluk : Krishnagiri
District : Krishnagiri
State : Tamilnadu
APPLICANT
D. Loganathan,
S/o. Duraisamy,
Door No. 3B, 3rd Cross,
Power House Colony,
Krishnagiri Taluk and District,
Tamil Nadu – 635 001.
PREPARED BY
Dr. M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., Ph.D.,
RQP/MAS/183/2004/A
INDEX FILE
S.No DESCRIPTION PAGE
NOS
1 To Obtain Environment Clearance 3
2 Environment Clearance Format 5-9
3 Declaration Letter 11
4 Challan 13
5 Form-1 15-55
6 Approved Mining Plan along with
Approval Letter 57- 169
7 Pre-Feasibility Report 171-239
8 VAO signed for Quarry site 223
9 Baselines Studies 241-267
10 Affidavit Document 269-271
11 Details of Quarries 273
12 Habitation details from VAO 275
13 Copy of Explosive License 277-279
14 Consolidated Above Document In
PDF Format (DVD)
281
To consider the proposal for the grant of Environmental Clearance for Black granite (Dolerite)
quarrying in at 1.26.5Ha in S.F.No: 757 of Agasipalli Village in Krishnagiri Taluk , Krishnagiri
District by Thiru. D. Loganathan
The salient features of the proposal are as follows:
S.No: Details of the proposal : Data furnished Page No:
1.
Name of the owner/Firm
:
D. Loganathan,
S/o. Duraisamy,
Door No. 3B, 3rd Cross,
Power House Colony,
Krishnagiri Taluk and District,
Tamil Nadu – 635 001.
Mobile No: +91 94432 28596, 93442 23717.
19,83,183
2.
Type of quarrying
(Savudu/Rough stone/
Sand/Granite)
:
It is a Black granite (Dolerite) quarry Project in
Agasipalli Village.
57,85,137,
183
3. S.F.No of the quarry site with
area break up :
S.F.No: 757 17,63,85,
183
4. Village in which situated : Agasipalli Village 17,85,183
5. Taluk in which situated : Krishnagiri Taluk 17,85,183
6. District in which situated : Krishnagiri District 17,85,183
7. Extent of quarry (in ha) 1.26.5Ha 17,85,183
8. Period of quarrying proposed
: Mining license applied for period of twenty years only.
Mining plan period for the first five years.
57,79,137,
173
9.
Production (Quantity in m3)
:
The proposed quantity of reserves (30%) is about
3030m3 of Black Granite for during this period of five
years.
17,105,175
10. Latitude and Longitude of all
corners of the quarry site :
12°28'45.13"N to 12°28'48.60"N
78°13'58.49"E to 78°14'07.46"E
17,87,
155,175
11. Topo sheet No : 57–L/03 17,155,175
12.
Precise area communication
approved by the District
Collector with date
: The Precise area Communication has been granted as
per Govt. letter No.9969/MME2/2018-1 dated
06.09.2018.
137
13.
Mining plan approved by the
Assistant Director of the District
with date
:
The Mining Plan was Approved by the Commissioner
of Geology and Mining, Chennai vide Letter. No:
3274/MM5/2018 Dated: 05.10.2018.
57
14.
Water Requirement:
1. Drinking & Domestic
purpose (in KLD)
2. Dust suppression &
Green Belt (in KLD)
;
Purpose Quantity
KLD
Source
Drinking 1.5KLD Water vendors
Domestic purpose 1.5KLD From Existing bore hole
nearby quarry area
Dust suppression and
Afforestation
1.0KLD From Existing bore hole
nearby quarry area
33,213
15. Depth of quarrying
: The applicant proposed Black Granite up to a depth of
8m during this period.
105
16.
Project cost (including EMP
cost) :
The total project cost including EMP cost (A+B+C) is
about Rs. 2,10,43,250/- (Rupees two crore ten lakh
forty three thousand and two hundred fifty only)
127,235
17.
EMP cost
:
The total EMP cost including CSR cost is about Rs.
6,93,250/- (Rupees six lakhs ninety three thousand two
hundred fifty rupees only)
127,235
Checklist for Mining of Minor Mineral 0 - 4.99 Ha for B2 Category mines & Cluster of
Mines within 25 Ha fallen within 500m radius
S. No Details of the proposal : Data furnished Page No
1. Name of the owner/Firm : D. Loganathan, 19,83,183
2.
Correspondence Address with Pin
Code :
S/o. Duraisamy,
Door No. 3B, 3rd Cross,
Power House Colony,
Krishnagiri Taluk and District,
Tamil Nadu – 635 001
3. Email Address : [email protected] 19,183
4. Telephone Number : +91 94432 28596, 93442 23717 19,183
5. Type of quarrying
(Earth/ Rough stone/Sand/Granite) :
It is a Black granite (Dolerite) quarry Project in Agasipalli
Village
57,85,137,
183
6. S.F. No of the Quarry site : S.F.No: 757 17,85,183
7.
Village in which situated, Town
Panchayat/ Panchayat Union in
which the village is situated
:
Village Panchayat : Agasipalli
Panchayat Union : Krishnagiri
17,85,183
8. Taluk in which situated : Krishnagiri Taluk 17,85,183
9. District in which situated : Krishnagiri District 17,85,183
10. Extent of quarry (in Ha) : 1.26.5Ha 17,85,183
11.
New or existing quarry
:
It is New proposal Black granite Quarry Project in
Agasipalli Village
57,79,137,
183
12.
If in case of existing Rough Stone/
Blue Metal/ Granite Quarry, the
length, width and depth to which
quarrying has already been done
(below the ground level/ above the
ground level)
:
It is New proposal Black granite Quarry Project in
Agasipalli Village
57,79,137,
183
13.
If quarrying had been done below
the ground level/above the Ground
level, the height of quarrying
: It is New proposal Black granite Quarry Project in
Agasipalli Village
57,79,137,
183
14.
Name of the owner who had earlier
undertaken the quarrying & a copy
of mining lease issued with date
:
It is New proposal Black granite Quarry Project in
Agasipalli Village
57,79,137,
183
15.
Proof of land ownership.
If owned patta copy.
If not own patta land agreement/
lease copy entered with the owner
(to be enclosed)
:
It is a patta Land, registered in the name of applicant Vide
Patta No. 3093 (Refer Annexure No.IV)
87,143
16. Period of quarrying
: Mining license applied for period of twenty years only.
Mining plan period for the first five years.
57,79,137,
173
17.
Production (quantity in m3):
The proposed quantity of reserves (30%) is about 3030m3 (or) 505Lorry Loads of Black granite for
during this period of five years. The quarry operation is proposed up to depth for 21mts (1m topsoil
+ 2m weathered + 18m black granite) at present scenario considering for the entire lease period. The
applicant proposed up to a depth of 8.0m during this period.
Description
ROM
(m3)
Recoverable
Reserves
30% (m3)
Granite
waste
70%
(m3)
Weathered
Rock (m3)
Side
burden
(m3)
Top
soil in
m3
Total
waste
(GW+W+
SB) in m3
Geological
resources 183996 55199 128797 23584 28260 11792 180641
Mineable
Reserves 32798 9839 22959 9912 - 5763 32871
Five years of
mining plan 10100 3030 7070 5640 - 3447 12710
17,99,101,
105, 175
18.
Method of Mining
:
The quarrying operation will be carried out by Open cast
mechanized mining method with 5.0m vertical bench with
a bench width of 5.0m is being proposed.
23,103,109,
175
19. Top soil/ Overburden in case of
Rough Stone/ Blue Metal :
The thickness of topsoil is about 1.0m. There will be
generation of topsoil is about 3447m3 for the present period.
105,115,
175, 215
20.
Quantity of rejects in m3 in case of
Granite Mining.
:
Total waste is 32871m3 (22959m
3 of Granite waste (70%)
+ 9912m3 of W) for entire life period.
Total waste is 12710m3 (7070m
3 of Granite waste (70%)
+ 5640m3 of W) for during this period; There is no
quantity of rejects.
37,109,115,
185
21.
Length, Width, Depth & Proposed
Quarry in meters.
:
Dimension of the year wise:
L (m) Max W(m) Max D (m) Max
177 39 8.0
Ultimate pit dimensions
Dimensions in meters (Maximum)
Length Width Depth
238 10 21
105,109,
209
22.
Land use pattern for a radius of 1Km
around the quarry site such as
Agriculture, Habitation etc.,
:
Description Percentage %
Trees – 10%
Road – 10%
Agricultural land – 10%
Hillock – 60%
Habitation – 05%
Barren Land – 05%
155
23.
Details of other quarries for a radius
of 1Km, around the quarry site. :
The village Topo sketch map showing the quarry
proposed site.
There is no quarry located within the radius of 500m.
155,273
24. Aerial distance from periphery of the
site to the nearest habitation :
The Nearest habitation is Agasipalli in 1km on Northern
side.
51,123,227
25.
Aerial distance to the interstate
borders, in case of Rough Stone/
Blue Metal/ Granite quarry to be
obtained from IRS, Anna University.
:
There is no interstate boundary within the radius of 10km. 179,225
26.
In case of Rough Stone/ Blue Metal/
Granite quarry no objection
certificate from the concerned
district Forest Officer/ Wild Life
Sanctuaries/ National Parks/ HACA/
Western Ghats region if the quarry
site is within 10Km of these areas.
:
There are no wild life sanctuaries, National parks, HACA,
within the radius of 10km.
179,225
27.
Aerial distance to the nearest eco-
sensitive areas, CRZ, Forests,
Monuments etc., within 10Kms of
these areas.
:
There is no CRZ, forest, Monuments and sensitive areas
within the radius of 10km.
179,225
28. Latitude and Longitude of all corners
of the quarry site. :
12°28'45.13"N to 12°28'48.60"N
78°13'58.49"E to 78°14'07.46"E
17,87,
155,175
29. Topo Sheet No : 57–L/03 17,155,175
30.
Copy of explosives license and a
consent letter/ agreement of
competent recognized person who
has agreed to handle explosive for
the blasting, in case of Rough Stone/
Blue Metal/ Granite quarry.
:
A copy of consent letter and license copy enclosed.
277
31.
Brief details of APC measures
proposed to be proposed to be
implemented. :
The granite stones are quarried as undamaged dimensional
stones without involving deep hole drilling and heavy
blasting, fragmentation and generation of lumps, fines or
dust is negligible. Water will be sprinkled for the
suppression air borne dust from mine approach roads
waste dumps on regular intervals using water tankers.
41
32.
Mine Closure Plan to be furnished in
Mining plan.
:
In the Black granite quarry operations the maximum depth
about 21mts (1.0m Topsoil + 2m weathered rock + 18m
Black granite) for the entire lease period this is based on
the market potential at present scenario.
After completion of quarry operation the quarried out land
will be land will be fenced and maintained with barbed
wire to prevent inherent entry of the Public and cattle.
Garland drains will be constructed around the quarry to
prevent the surface run off rain water.
133
33. Mining plan prepared by (Xerox
copy of certificate to be attached) :
Dr. M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., Ph.D.,
RQP/MAS/183/2004/A
63, 85,153
34. Precise area communication
approved by the District Collector :
The Precise area Communication has been granted as per
Govt. letter No. 9969/MME2/2018-1 dated 06.09.2018.
137
35.
Mining plan approved by the
Deputy/ Assistant Director of the
District.
:
The Mining Plan was Approved by the Commissioner of
Geology and Mining, Chennai vide Letter. No:
3274/MM5/2018 Dated: 05.10.2018.
57
36.
Water requirement :
a) Drinking & domestic
purposes in KLD.
b) Dust suppression (in KLD)
c) Green belt (in KLD)
:
Drinking Water - 1.5 KLD
& Domestic purpose
Dust Suppression - 1.5 KLD
Green belt - 1.0 KLD
Total - 4.0 KLD
33,213
37.
Source of water
:
Purpose Sources
Drinking &
Domestic Purpose
Packaged drinking water is available
from the nearby approved water vendors
Dust suppression From Existing Borehole on nearby
quarry
Green belt
development
From Existing Borehole on nearby
quarry
33,213
38. Ground water table : The Ground water is about 57mt depth from ground level. 29,91,175
39.
Project Cost (excluding EMP Cost)
:
The Project cost:
A. Fixed Asset cost = Rs. 13,00,000/-
B. Operational cost = Rs. 1,90, 50,000/-
C. EMP cost = Rs. 6, 93,2500/-
Total cost = Rs. 2,10, 43,250/-
The total project cost including EMP cost (A+B+C) is
about Rs. 2,10,43,250/- (Rupees two crore ten lakh forty
three thousand and two hundred fifty only)
127,235
40.
EMP Cost
:
The total EMP cost including CSR cost is about Rs.
6,93,250/- (Rupees six lakhs ninety three thousand two
hundred fifty rupees only)
127,235
41. Disclosure RQP
: Dr. M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., Ph.D.,
RQP/MAS/183/2004/A
63, 85,153
42.
Soft copy of the Form–1,
Pre –feasibility report and Mining
plan in CD. :
There is enclosed Soft copy for form –1, Pre – feasibility
report and mining plan in CD.
281
43.
Key map showing the approach
roads to the site to be attested by the
Deputy/ Assistant Director of
Geology and Mining of the
concerned District.
:
The Route map showing with approach roads to the site is
enclosed Plate No: IC.
155
44.
Village map with S.F. Nos& salient
features such as vegetation,
habitations etc., for a radius of 500m
around the quarry site.
:
Village map with S.F.No and Salient features such as
vegetation, habitation etc., for 500mt radius is enclosed as
Plate no. VIII & Annexure – III
155, 141
45.
If lakes, Ponds, river, nallah, odai
etc. are situated near the quarry site
permission from the concerned PWD
authorities for mining
There is no Rivers/Stream, Lakes, and Reservoir within
the 500m distance to the lease applied area.
Odai is passing about 900m away from the North Eastern
side of the area.
51,225
Tank is situated about 1.0km away from the eastern side
of the area.
Avathanapatti Lake and Barur Lake is situated about
1.8km & 2.7km away from the Western & southwestern
side of the area.
Thenpennai River is flow about 3.7km away from the
Southwestern side of the area.
Krishnagiri Dam is located about 4.9km away from the
western side of the area.
46.
Section map for mining to be
attested by the Deputy/ Assistant
Director of Geology and Mining of
the concerned District.
:
The Geological Plan and section in 1:1000 & 1:500 scale
is enclosed: IV.
161
47.
Photograph of the proposed Mining
site with S.F.No and attested by at
least VAO.
:
The Photo of the quarry site is enclosed 223
48. Form –I To be signed by applicant : I am hereby signed 55
49. Pre- Feasibility Report to be signed
by applicant. :
Pre-feasibility report has been signed by the applicant
239
50.
First and last page and the page at
which quantity of mining has been
worked out to be signed by the
Deputy/Assistant Director of
Geology and Mining of the
concerned District.
:
First page and last page and the quantity proposed in the
plan have been signed by the Commissioner of Geology
and Mining.
79
51.
Affidavit from the applicant that
child labor is not being employed in
the mining activity. :
It is been ensured that the labor will not be employed less
than 18 years, No child labor will engaged or entertained
for any kind of quarrying operations. All the labor
engaged for quarrying operations will be insured during
the quarry lease period
269-271
52.
Affidavit from the applicant
regarding planting of trees around
the quarry site in fulfillment of the
Green belt commitment furnished.
:
Affidavit from the applicant regarding the proposal for
planting trees around the quarry and fulfillment of
greenbelt commitment is enclosed
269-271
53. Details (POD) Regarding
communicating the proposal to the
members of the committee.
:
1. Signature of the applicant
(D. Loganathan)
Proprietor
2. Signature of the Recognized Qualified Person
Dr. M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., Ph.D.,
RQP/MAS/183/2004/A
AGASIPALLI BLACK GRANITE (DOLERITE) QUARRY LEASE APPLIED
AREA (1.26.5Ha)
The proponent Mr. D. Loganathan has applied for Environmental clearance for the proposed quarry
Black granite (Dolerite) for over an extent of 1.26.5Ha in S.F.No: 757 of Agasipalli Village in
Krishnagiri Taluk, Krishnagiri District.
Salient features of the proposal are as follows:
S.
No
Details of the proposal :
Data furnished Page No
1. Name of the Owner +
Firm
: D. Loganathan, S/o. Duraisamy,
Door No. 3B, 3rd Cross,
Power House Colony, Krishnagiri Taluk and District,
Tamil Nadu – 635 001.
Mobile No: +91 94432 28596, 93442 23717
19,83,183
2. Location of the quarry-
S.F.No.
: S.F.No:757 of Agasipalli Village in Krishnagiri Taluk,
Krishnagiri District.
17,81,181
3. Purpose of Application : It is a Black granite (Dolerite) quarry Project in
Agasipalli Village.
57,85,137,
183
4. Extent of quarry in Ha : 1.26.5Ha 17,63,85,
183
5. Land use planning
a) Mining
b) Storage of Topsoil
over burden
c) Infrastructure Road
d) Utilized Area
Total
:
Description
Area to be
Required
during the
present
Mining Plan
period(Ha)
Area at the
end of life of
quarry
(Ha)
Area under Quarrying 0.37.8 0.62.0
Waste dump 0.21.3 Backfilling
Infrastructure 0.01.0 0.01.0
Roads 0.02.0 0.02.0
Green Belt 0.20.0 0.50.0
Stocking Blocks 0.44.4 0.11.5
Grand Total 1.26.5 1.26.5
23,133,167
,217
6. Production (quantity in m3):
The proposed quantity of reserves (30%) is about 3030m3 (or) 505 Lorry Loads of Black granite
for during this period of five years. The quarry operation is proposed up to depth for 21mts (1m
Topsoil + 2m weathered rock + 18m Black granite) at present scenario considering for the entire
lease period. The applicant proposed up to a depth of 8m during this period.
Description
ROM
(m3)
Recoverable
Reserves
30% (m3)
Granite
waste
70%
(m3)
Weathered
Rock (m3)
Side
burden
(m3)
Top
soil in
m3
Total
waste
(GW+W+
SB) in m3
Geological
resources 183996 55199 128797 23584 28260 11792 180641
Mineable
Reserves 32798 9839 22959 9912 - 5763 32871
Five years of
mining plan 10100 3030 7070 5640 - 3447 12710
17,99,101,
105, 175
7. Top soil & overburden
(quantity in m3)
: The thickness of topsoil is about 1m. There will be
generation of topsoil is about 3447m3 for the present
period.
105,115,
175, 215
8. Method of Mining : The quarrying operation will be carried out by Open cast
mechanized mining method with 5.0m vertical bench
with a bench width of 5.0m is being proposed.
23,103,109
, 175
9. Life of Mine as per
approved mining plan
: Mining license applied for period of twenty years only.
Mining plan period for the first five years.
57,79,137,
173
10. Height / width of the
bench
: Height 5.0m & Width 5.0m 23,103,109
, 175
11. Source of water /
quantity required :
Quantity
required
(in litres)
Source
33,213
a. Drinking &
Domestic Purpose
0.2 KLD Packaged drinking water is available from the approved
water vender
b. Dust Suppression 0.4KLD From Existing bore hole on nearby quarry
C. Afforestation 0.4 KLD From Existing bore hole on nearby quarry
12. Waste water
Sewage water
Mode of disposal
:
:
There is no waste water. 39,231
The septic tank is constructed on permanent structure
with in the quarry lease area.
To local Panchyat Authority
13. APC Measures : 1.Mist Spray using water tankers,
2. Enclosed covered system. (Tarpaulin) for
transportation.
41,
14. Ariel distance of nearest
habitation
:
S.
No Name of the Village
Approximate
Distance & Direction
from lease hold
area
Approximate
population
1. Agasipalli 1km - N 13,000
2. Sundekuppam 3km – SW 8,700
3. Periyamuthu 4km – SW 8,500
4. Krishnagiri Urban 4km – NW 30,200
51,123,227
15. Ariel distance from
Reserve forest,
Sensitive areas, Forest,
Bird sanctuaries, Wild
life sanctuaries,
National parks,
Monuments etc., within
10km
: Reserved Forest – Nil
Bird Sanctuaries – Nil
Wild life sanctuaries – Nil
National Park – Nil
Monuments – Nil
51,225
16. Land owner ship
document
Own patta land
Lease
Govt. Poramboke
:
:
:
It is a patta land register in the name of applicant Vide
Patta No. 3093 (Refer Annexure IV).
87,143
17. Land use classification : The area is situated in an elevated in the valley portion in
between two small hillocks terrain.
89, 175
18. Mining plan prepared
by
: Dr. M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., Ph.D.,
RQP/MAS/183/2004/A
63, 85,153
19. Precise area statement
Approved by
: The Precise area Communication has been granted as per
Govt. letter No. 9969/MME2/2018-1 dated 06.09.2018.
137
20. Approved by : The Mining Plan was Approved by the Commissioner of
Geology and Mining, Chennai vide Letter. No:
3274/MM5/2018 Dated: 05.10.2018.
57
21. Nearby quarries : There is no quarry located within the radius of 500m. 129,155,
225, 273
22. Nearby lake / river/ odai
/ channel etc.
: There is no Rivers/Stream, Lakes, and Reservoir within
the 500m distance to the lease applied area.
Odai is passing about 900m away from the North Eastern
side of the area.
Tank is situated about 1.0km away from the eastern side
of the area. Avathanapatti Lake and Barur Lake is situated about
1.8km & 2.7km away from the Western & southwestern
side of the area. Thenpennai River is flow about 3.7km away from the
Southwestern side of the area.
Krishnagiri Dam is located about 4.9km away from the
western side of the area.
51,225
23. Latitude / Longitude : 12°28'45.13"N to 12°28'48.60"N
78°13'58.49"E to 78°14'07.46"E
17,87,
155,175
24. GI Sheet No. : 57–L/03 17,155,175
25. Project Cost(Project
cost +EMP cost)
: The Project cost:
A. Fixed Asset cost = Rs. 13,00,000/-
B. Operational cost = Rs. 1,90, 50,000/-
C. EMP cost = Rs. 6, 93,2500/-
Total cost = Rs. 2,10, 43,250/-
The total project cost including EMP cost (A+B+C) is
about Rs. 2,10,43,250/- (Rupees two crore ten lakh forty
three thousand and two hundred fifty only)
127,235
26. EMP Cost (Capital and
recurring)
: The total EMP cost including CSR cost is about Rs.
6,93,250/- (Rupees six lakhs ninety three thousand two
hundred fifty rupees only)
127,235
27. Water table : The Ground water is about 57mt depth from ground
level.
29,91,175
28. Interstate boundary : There is no interstate boundary within the radius of
10km.
179,225
29. Western Ghats : There is no Western Ghats within the radius of 10km. 179,225
From:
D. Loganathan,
S/o. Duraisamy,
Door No. 3B, 3rd Cross,
Power House Colony,
Krishnagiri Taluk and District,
Tamil Nadu – 635 001.
Mobile No: +91 94432 28596, 93442 23717
To:
The Chairman,
District Environment Impact
Assessment Authority (DEIAA),
O/o. The Revenue Divisional Officer, Bangalore Road,
Krishnagiri District - 635 001
Sir,
Sub: Submission of Approved Mining Plan (Letter. No: 3274/MM5/2018 Dated:
05.10.2018) Form–1 and Pre-feasibility report and approved Mining Plan for obtaining
Environment Clearance for our Agasipalli Black Granite Quarry Lease applied area-
Reg.,
****************
I am here by submitting the processing fee in the form of demand draft for rupees one
lakh, along with Form-1 and Pre-feasibility report and approved Mining Plan to your good office
for obtaining clearance from DEIAA, Krishnagiri District for our Agasipalli Black Granite
quarry Lease applied area for over an extent of 1.26.5Ha in S.F.No. 757 at Agasipalli Village,
Krishnagiri Taluk and Krishnagiri District, Tamilnadu.
I have submitted all the relevant documents to your good office to the best of our
knowledge. If any clarifications are required, we are ready to submit the same to your office at
your convenient time. Also we are ready to present the project in front of the committee.
Hence we request your good office to kindly process our application and allow us to
present our project at the earliest.
Thanking you.
Yours sincerely
(D. Loganathan)
Proprietor
Place: Krishnagiri
Dated: 25.10.2018