4
Focus Improvement Eliminate Losses and impress powerful changes to make global Electrical Brand Focus Improvement policy Practice concepts of zero losses in every sphere of activity. relentless pursuit to achieve cost reduction targets in all resources Relentless pursuit to improve over all plant equipment effectiveness. Extensive use of PM analysis as a tool for eliminating losses. Focus of easy handling of operators Target Achieve and sustain zero loses with respect to minor stops, measurement and adjustments, defects and unavoidable downtimes. It also aims to achieve 30% manufacturing cost reduction. Sub - Committee HOM – Samantha Alwis TPM Coordinator – Prasanga Sanjeewa Pillar Leader – Pramod Wattegedara Production Engineer (Switch & Socket)– Anupa de Silva Design & Development – Chaminda Dilruksha Maintenance – Lal Pushpakumara QA Engineer – Isuru Karunarathne Operators –

Transcript of Focus improvement Activity Plan

Page 1: Focus improvement Activity Plan

Focus ImprovementEliminate Losses and impress powerful changes to make global Electrical

Brand

Focus Improvement policy

• Practice concepts of zero losses in every sphere of activity. • relentless pursuit to achieve cost reduction targets in all resources • Relentless pursuit to improve over all plant equipment effectiveness. • Extensive use of PM analysis as a tool for eliminating losses. • Focus of easy handling of operators

Target

Achieve and sustain zero loses with respect to minor stops, measurement and adjustments, defects and unavoidable downtimes. It also aims to achieve 30% manufacturing cost reduction.

Sub - Committee

HOM – Samantha Alwis TPM Coordinator – Prasanga Sanjeewa Pillar Leader – Pramod Wattegedara Production Engineer (Switch & Socket)– Anupa de Silva Design & Development – Chaminda Dilruksha Maintenance – Lal Pushpakumara QA Engineer – Isuru Karunarathne Operators –

Page 2: Focus improvement Activity Plan

Three Focus Improvement Teams

1. Material improvement Team Team Leader – Mr. Prasanga Sanjeewa Quality Member – Mr. Ruwan / Sampath Operators – Samantha Operator - Operator

2. Tools improvement Team Team Leader – Mr. Thilina Quality Member – Viranga Tool room Technician – Wasantha Operator -

3. Engineering improvement Team Team Leader – Lal Pushpakumara Automation Member – Chaminda Dilruksha Engineering Technician – Thilina / Samitha/ Kosala Operators-

Time Line

Page 3: Focus improvement Activity Plan

Activity/ Step Detailed Outline Time DurationSelect Improvement Topic Select & Register

Topic Form Project Idea Plan Activities

1 Month

Understand Situation Identify Bottle necks in process

Measure failures, defect & other losses

Use baselines (Bench mark) to set targets

1 Month

Expose & Eliminate Abnormalities

Thoroughly Study & Expose Abnormalities

Restore deterioration correct major flows

Establish basic equipment condition

1.5 Month

Analyze causes Stratify and analyze causes

Apply analytical techniques (WWA's)

Employ specific technology, fabricate prototypes &conduct experiments

1.5 Month

Implement Improvements Plan Improvementso Make improvement

Proposal with drawings

o Budget Reporto Check for possible

adverse effect & Disadvantages

Provide instruction on improved equipment, operating methods

3 Months

Check Results Evaluate results with time as improvement project proceeds

Check whether targets have been achieved

If not, begin again from Step3

1 month

Consolidate gains Draw up control standards to sustain results

Formulate work standards and manuals

Feed information back to maintenance prevention program

1 month

Page 4: Focus improvement Activity Plan

Training & Development Introduction Bottle necks Identification Record failures, defect & other losses Identification & Classification of 16 big losses OEE WORKSHOP SMED OVERALL EQUIPMENT EFFECTIVENESS: THEORY AND APPLICATION OEE VS 6 BIG Losses